Loading...
HomeMy WebLinkAboutFacilities Bond Project Monthly Update 2022-06-30SCHOOL_NAME,PROJ_ID,PROJ_NAME,PROJ_TYPE,BOARD_DISTRICT,BOARD_MEMBER,LOCAL_DISTRICT,COST_CENTER,SITE_ID,PROJ_ADDRESS,PROJ_CITY,PROJ_ZIP,PROJ_DESCRIP,BUDGET_000S,START_YYYYQQ,COMPLETION_YYYYQQ,PROJ_PROGRESS_STAGE,DATA_DATE_YYYYMMDD 4th St. ES,10372340,4th St. ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1397301,13482,420 Amalia Ave.,Los Angeles,90022,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",91,2022-Q2,2022-Q3,Construction,20220630 Loreto ES,10372345,Loreto ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1495901,13301,3408 Arroyo Seco Ave.,Los Angeles,90065,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",92,2022-Q3,2022-Q4,Planning,20220630 Brentwood Science Magnet ES,10372351,Brentwood Science Magnet - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1250701,13394,740 Gretna Green Way,Los Angeles,90049,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",91,2022-Q3,2022-Q4,Planning,20220630 Broadous ES,10372360,Broadous ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1382901,13768,12561 Filmore St.,Pacoima,91331,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",94,2022-Q3,2022-Q4,Planning,20220630 Rio Vista ES,10372364,Rio Vista ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1628801,13441,4243 Satsuma Ave.,North Hollywood,91602,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",91,2022-Q3,2023-Q1,Planning,20220630 Sendak ES,10372365,Sendak ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1357401,13919,11414 W. Tiara St.,North Hollywood,91601,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",80,2022-Q3,2022-Q4,Planning,20220630 112th St. ES,10372319,112th St. ES - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"Install new electronic, wall-mounted marquee on south wall of auditorium building. 8'x5' color LED display.",63,2022-Q4,2022-Q4,Design,20220630 Perez Special Education Center,10372614,Perez Special Education Center - Secure Entry System,Security System,2,Monica Garcia,East,1195301,13489,4540 Michigan Ave.,Los Angeles,90022,Install new secure entry system at the Main Office.,39,2022-Q3,2022-Q3,Planning,20220630 Los Feliz STEMM Magnet ES,10370331,Los Feliz STEMM Magnet ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1498601,13344,1740 N. New Hampshire Ave.,Los Angeles,90027,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",59,2019-Q3,2020-Q2,Closeout,20220630 Evergreen ES,10370925,Evergreen ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1369901,13569,2730 Ganahl St.,Los Angeles,90033,"Demolish and remove 2 portable buildings, remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",317,2020-Q1,2021-Q2,Closeout,20220630 Carver MS,10004109,Carver MS - Facelift,Facelift,5,Jackie Goldberg,Central,1809401,13409,4410 McKinley Ave.,Los Angeles,90011,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",187,2012-Q1,2016-Q3,Closeout,20220630 Webster MS,10004107,Webster MS - Facelift,Facelift,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",157,2012-Q1,2016-Q3,Closeout,20220630 Belvedere ES,10369063,Belvedere ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1239701,13373,3724 E. 1st St.,Los Angeles,90063,"Removal of 3 portable buildings. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprints.",230,2018-Q1,2019-Q2,Closeout,20220630 Wonderland ES,10367510,Wonderland ES - Classroom Replacement,Addition,4,Nick Melvoin,West,1784901,13485,8510 Wonderland Ave.,Los Angeles,90046,"This project will replace 2 kindergarten classrooms located in a DOH portable that does not comply with State standards for school buildings and are approximately half the size of the District's standard for kindergarten classrooms. Included in the project are the design and construction of 2 kindergarten classrooms and support spaces; construction of a retaining wall, grading of the hill area, and drainage as required; expansion of the parking area and construction of a new fence and gate; infrastructure to support the new facilities; removal of the DOH portable once the classroom replacement project is complete and upgrades to landscape, hardscape, and playground areas where portables are removed; and site work, path of travel, and other required ADA improvements. In addition, the project may include the placement of interim housing as needed.","10,683",2020-Q4,2022-Q4,Construction,20220630 Gardena HS,10367684,Gardena HS - 2016-18 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a charter school renovation for New Millennium Secondary School. This growth project included 1 charter office, 1 special education room, and 5 instructional spaces for charter students in grades 9-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",73,2016-Q2,2016-Q3,Closeout,20220630 Fishburn ES,10105893,Fishburn ES - Compliance with State & Federal Access Requirements,Fire Alarm System,5,Jackie Goldberg,East,1384901,13532,5701 Fishburn Ave.,Maywood,90270,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),406,2015-Q4,2016-Q2,Closeout,20220630 Holmes MS,10368277,Holmes MS - Portable Wheelchair Lift & Metal Ramp,Access Compliance,3,Scott Schmerelson,Northwest,1818201,13835,9351 Paso Robles Ave.,Northridge,91325,Provide and install portable wheelchair lift for Auditorium; Provide and install metal ramp to outdoor stage.,63,2017-Q1,2017-Q2,Closeout,20220630 Chase EEC,10367305,Chase EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northwest,1946001,16744,8635 N. Colbath Ave.,Panorama City,91402,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",105,2016-Q3,2016-Q3,Closeout,20220630 Enadia Way Technology Charter,10366728,Enadia Way ES - Shade for Main Playground Play Structure,Lunch/Shade Shelter,3,Scott Schmerelson,Northwest,1361001,13656,22944 Enadia Way,West Hills,91307,This project will provide a shade shelter over the existing play structure in the main playground plus associated accessibility improvements.,148,2015-Q4,2016-Q1,Closeout,20220630 East LA Occupational Center,10367176,East LA Occupational Center - HVAC & Roofing,HVAC,2,Monica Garcia,East,1908001,13893,2100 Marengo St.,Los Angeles,90033,"This project upgrades the heating, ventilation, and air conditioning (HVAC) systems on 4 buildings which are over 30 years old and beyond economical repair. The scope of work also includes upgrading the roofing on all 4 buildings with a Polyvinyl Chloride (PVC) material, installing new metal flashing, replacing damaged wood, and painting to match existing areas affected in the roof demolition.","1,649",2017-Q2,2018-Q1,Closeout,20220630 Downtown Magnets HS: Downtown Business,10108862,Downtown Magnets HS: Downtown Business - Repair Water Intrusion,Plumbing/Irrigation/Drainage,2,Monica Garcia,Central,1873801,13269,1081 W. Temple St.,Los Angeles,90012,"This school was built in 1961. Rainwater intruded below the parking surface into classroom B13, the library and a storage room. Water intrusion also damaged the overhead steel truss that supports the edge of the school entrance walkway that is at the same elevation as the parking lot. The project corrected the surface drainage system to direct storm runoff away from the property, repaired previously water-damaged facilities components, and incorporated signage in order to restrict heavy vehicles from using the parking structure. The water-damaged steel truss was examined and repaired as appropriate.",351,2014-Q2,2014-Q3,Closeout,20220630 Evans Community Adult School,10368925,Evans Community Adult School - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1909201,13288,717 N. Figueroa St.,Los Angeles,90012,"This project includes the installation of new network equipment, wireless access points, the digital convergence of the legacy public address system over the data network, and new phone systems. The data network infrastructure will be upgraded to support multimedia technologies including voice, video and data.","1,073",2018-Q4,2019-Q2,Closeout,20220630 Hamilton HS,10368659,Hamilton HS - Auditorium Upgrades & Signage,Access Compliance,1,"Dr. George J. McKenna, III",West,1868601,13570,2955 Robertson Blvd.,Los Angeles,90034,Provide and install new handrails at Auditorium. Remove and replace existing concrete slab at south auditorium. Provide and install ADA signage at various locations.,17,2017-Q2,2017-Q2,Closeout,20220630 Hillside ES,10368105,Hillside ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1453401,13293,120 E. Ave. 35,Los Angeles,90031,"Remove 2 bungalows including abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprints.",239,2016-Q4,2018-Q1,Closeout,20220630 Mar Vista ES,10368727,Mar Vista ES - Security Upgrades,Security System,4,Nick Melvoin,West,1519201,13603,3330 Granville Ave.,Los Angeles,90066,Provide and install new Aiphone secure entry system at the main entrance.,22,2017-Q3,2018-Q2,Closeout,20220630 San Gabriel ES,10364067,San Gabriel ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1646601,13651,8628 San Gabriel Ave.,South Gate,90280,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",947,2015-Q1,2016-Q1,Closeout,20220630 Gardena HS,10370488,Gardena HS - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"This project is to provide approximately 238,000 square feet of new roofing at 32 buildings, including new gutters and downspouts, and painting of affected areas.","4,381",2022-Q4,2023-Q3,Planning,20220630 Northridge MS,10369964,Northridge MS - Fencing,Fencing,3,Scott Schmerelson,Northwest,1828301,13740,17960 Chase St.,Northridge,91325,Install new fence at front of school,15,2019-Q1,2019-Q2,Closeout,20220630 Logan Academy of Global Ecology,10370171,Logan Academy of Global Ecology - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1490401,13266,1711 W. Montana St.,Los Angeles,90026,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q4,2027-Q2,Planning,20220630 State ES,10364128,State ES - HVAC,HVAC,5,Jackie Goldberg,East,1691801,13639,3211 Santa Ana St.,South Gate,90280,"The project will remove and replace the existing 80-ton Trane chiller, Ajax boiler, air handlers, and direct digital controls which provide heating and cooling to 23 classrooms. This equipment is more than 30 years old, in poor condition, and in constant need of servicing.","4,883",2016-Q1,2018-Q1,Closeout,20220630 Playa Del Rey ES,10152891,Playa Del Rey ES - Upgrade Fire Alarm System & Comply with Associated State Requirements,Fire Alarm System,4,Nick Melvoin,West,1611001,13559,12221 Juniette St.,Culver City,90230,Upgrade Fire Alarm System & Comply with Associated State Requirements,356,2014-Q3,2015-Q2,Closeout,20220630 Cienega ES,10104966,Cienega ES - Upgrade Fire Alarm System,Fire Alarm System,1,"Dr. George J. McKenna, III",West,1306801,13429,2611 S. Orange Dr.,Los Angeles,90016,Upgrade Fire Alarm System,897,2011-Q1,2016-Q3,Closeout,20220630 Gardena HS,10369748,Gardena HS - 2018-20 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"This project was initially approved in BOE Report No. 429-17/18 for the 2018-19 Prop 39 co-locations as a charter school renovation for New Millennium Secondary School. This project included 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades 9-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 8 spaces allocated to the charter and a scope of work that is not yet defined.",12,2018-Q2,2018-Q3,Closeout,20220630 Pacific ES,10371883,Pacific ES - 2021-22 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1464201,13936,2660 E. 57th St.,Huntington Park,90255,"This project is a charter school renovation for KIPP Pueblo Unido for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades K-2;5-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",553,2021-Q2,2021-Q4,Closeout,20220630 Kittridge ES,10370316,Kittridge ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1476001,13696,13619 Kittridge St.,Van Nuys,91401,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",60,2019-Q4,2020-Q1,Closeout,20220630 Parthenia Academy of Arts & Technology,10372229,Parthenia ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1602701,13702,16825 Napa St.,North Hills,91343,Install new secure entry system at the Main Office,37,2022-Q1,2022-Q3,Construction,20220630 Marina EEC,10371827,Marina EEC - Purchase Lunch Tables,Furniture/Fixtures/Equipment,4,Nick Melvoin,West,1953301,16283,4908 Westlawn Ave.,Los Angeles,90066,Purchase (3) exterior lunch tables,6,2021-Q3,2021-Q3,Closeout,20220630 Holmes ES,10372498,Holmes ES - 2022-23 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1456201,13315,5108 Holmes Ave.,Los Angeles,90058,"This project is a charter school renovation for KIPP Pueblo Unido for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 10 instructional spaces for charter student seats in grades TK-2 and 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",666,2022-Q3,2022-Q3,Planning,20220630 Kenter Canyon Charter ES,10371073,Kenter Canyon Charter ES - Water Bottle Filling Station,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1469901,13626,645 N. Kenter Ave.,Los Angeles,90049,Remove existing drinking water fountain at the restroom bungalow on the north playground and replace with one set of tandem bottle fillers and one set of high/low drinking fountains.,11,2020-Q2,2020-Q2,Closeout,20220630 Valley Oaks Center for Enriched Studies,10372213,Valley Oaks Center for Enriched Studies - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1789501,13842,9171 Telfair Ave.,Sun Valley,91352,Provide upgrades to the campus by replacing the electronic message board at the front of the school,164,2022-Q2,2022-Q4,Construction,20220630 Broad ES,10371695,Broad ES - Install Water Bottle Filling Station,Plumbing/Irrigation/Drainage,7,Tanya Ortiz Franklin,South,1252701,13774,24815 Broad Ave.,Wilmington,90744,Install one water bottle filling station outside on the north side of bungalow AA-1865.,4,2021-Q2,2021-Q4,Closeout,20220630 Millikan Charter MS,10371601,Millikan MS - Provide New Dance Studio,Reconfiguration,3,Scott Schmerelson,Northeast,1823801,13728,5041 Sunnyslope Ave.,Sherman Oaks,91423,"Reconfigure old shop class into dance studio. Remove all unnecessary raceways, patch and paint, and install new hardwood floor.",91,2021-Q1,2022-Q1,Closeout,20220630 Huntington Park HS,10366800,Huntington Park HS - Comprehensive Modernization,Comprehensive Modernization,5,Jackie Goldberg,East,1870001,13597,6020 Miles Ave.,Huntington Park,90255,"This project includes the construction of new buildings and site improvements with 22 general and specialty classrooms, instructional support spaces, gymnasium, outdoor pool, tennis and basketball courts, softball field and batting cages, additional parking, and a stand-alone restroom building. Existing school facilities will be upgraded including new HVAC system, fire alarm system, and security improvements to provide a secure entryway in administration/classroom building #1; new HVAC system and a culinary arts classroom in shop building #2; and new HVAC system in science/classroom building #30 and shop building #1. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of the gymnasium, annex building, home economics building, central plant, and 15 relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","150,116",2020-Q4,2026-Q2,Construction,20220630 Riordan PC,10372339,Riordan PC - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1538501,13858,5531 Monte Vista St.,Los Angeles,90042,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing the deteriorated flooring; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",101,2022-Q3,2022-Q4,Planning,20220630 Monte Vista ES,10364055,Monte Vista ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1538401,13270,5423 Monte Vista St.,Los Angeles,90042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",383,2013-Q4,2014-Q2,Closeout,20220630 Perez Special Education Center,10364060,Perez Special Education Center - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1195301,13489,4540 Michigan Ave.,Los Angeles,90022,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",448,2014-Q1,2014-Q2,Closeout,20220630 52nd St. ES,10363862,52nd St. ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1380801,13307,816 W. 51st St.,Los Angeles,90037,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",566,2015-Q2,2015-Q3,Closeout,20220630 West Hollywood ES,10365134,West Hollywood ES - Security Upgrades,Security System,4,Nick Melvoin,West,1764901,13364,670 N. Hammond St.,West Hollywood,90069,Upgrade physical security of the campus by purchasing and installing an electronic camera door entry system for the main entrance.,23,2013-Q4,2014-Q2,Closeout,20220630 66th St. ES,10363864,66th St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1682201,13339,6600 S. San Pedro St.,Los Angeles,90003,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",404,2015-Q1,2015-Q2,Closeout,20220630 99th St. ES,10363870,99th St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1553401,13508,9900 S. Wadsworth Ave.,Los Angeles,90002,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",504,2015-Q1,2015-Q2,Closeout,20220630 Polytechnic HS,10366165,Polytechnic HS - Compliance with State & Federal Access Requirements,Access Compliance,6,Kelly Gonez,Northeast,1863601,13734,12431 Roscoe Blvd.,Sun Valley,91352,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Installation of Electrical Outlets and Removal of Divider,5,2014-Q2,2014-Q2,Closeout,20220630 Heliotrope ES,10368815,Heliotrope ES - 2017-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,"This project is a charter school renovation for Clemente Charter School for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office and 4 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",56,2017-Q2,2017-Q3,Closeout,20220630 Los Angeles Academy MS,10368826,Los Angeles Academy MS - 2017-18 Prop 39 (Summit Preparatory Charter School),Charter Prop 39,7,Tanya Ortiz Franklin,Central,1820001,13890,644 E. 56th St.,Los Angeles,90011,"This project is a charter school renovation for Summit Preparatory Charter School for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades 4-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",188,2017-Q2,2017-Q3,Closeout,20220630 Muir MS,10368834,Muir MS - 2017-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1825501,13436,5929 S. Vermont Ave.,Los Angeles,90044,"This project is a charter school renovation for California Collegiate Charter School for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades 6-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",166,2017-Q2,2017-Q3,Closeout,20220630 Stevenson College & Career Preparatory,10368844,Stevenson MS - 2017-18 Prop 39,Charter Prop 39,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"This project is a charter school renovation for Animo Ellen Ochoa Charter MS for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office and 17 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",188,2017-Q2,2017-Q3,Closeout,20220630 24th St. ES,10367763,24th St. ES - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",Central,1730101,13335,2055 W. 24th St.,Los Angeles,90018,Purchase and install an Aiphone secure entrance system.,11,2016-Q3,2016-Q4,Closeout,20220630 Sunland ES,10367767,Sunland ES - Accessibility Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1697301,13451,8350 Hillrose St.,Sunland,91040,"Provide and install new door hardware on 6 doors. Provide and install concrete sloped walkway at exterior door for room 17. Provide and install ramp, carpeting and handrails for change of level in library. Provide and install 4 ADA compliant lunch tables. Provide and install 1 portable wheelchair lift with built platform. Extend computer lab (data connections only) to include 24 new work stations.",169,2016-Q2,2016-Q3,Closeout,20220630 75th St. ES,10367772,75th St. ES - ADA Lunch Tables,Access Compliance,7,Tanya Ortiz Franklin,South,1663001,13470,142 W. 75th St.,Los Angeles,90003,Provide and install 4 accessible lunch tables.,3,2016-Q2,2016-Q3,Closeout,20220630 Bryson ES,10366346,Bryson ES - Laptops,Communications/Technology Upgrade,5,Jackie Goldberg,East,1258901,13558,4470 Missouri Ave.,South Gate,90280,Increase school's access to technology by providing laptop computers,36,2014-Q3,2014-Q3,Closeout,20220630 Osceola ES,10367801,Osceola ES - Technology & Security Upgrades,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1589401,13751,14940 Osceola St.,Sylmar,91342,Purchase 30 Chromebooks and charging cart; update classroom security features including door hardware and installation of metal skins on doors.,14,2016-Q3,2016-Q4,Closeout,20220630 Stoner ES,10367147,Stoner ES - Electrical Upgrades to Computer Lab,Communications/Technology Upgrade,4,Nick Melvoin,West,1695201,13772,11735 Braddock Dr.,Culver City,90230,"Provide upgrades to room 32 computer lab by providing new additional electrical outlets, internet wiring and drops.",44,2016-Q3,2016-Q3,Closeout,20220630 Superior Charter ES,10367150,Superior ES - 41 Computers for Lab,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1700701,13810,9756 Oso Ave.,Chatsworth,91311,Increase school's access to technology by providing 41 new desktop computers for the computer lab.,65,2015-Q4,2015-Q4,Closeout,20220630 West Vernon ES,10367158,West Vernon ES - Electronic Camera Door Entry System,Security System,5,Jackie Goldberg,Central,1765401,13330,4312 S. Grand Ave.,Los Angeles,90037,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,13,2016-Q1,2016-Q3,Closeout,20220630 Aragon ES,10367106,Aragon ES - Electronic Camera Door Entry System,Security System,2,Monica Garcia,Central,1217801,13372,1118 Aragon Ave.,Los Angeles,90065,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,13,2016-Q2,2016-Q4,Closeout,20220630 Brainard ES,10367109,Brainard ES - 7 Computers,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1248601,13834,11407 Brainard Ave.,Lake View Terrace,91342,Increase school's access to technology by providing seven new desktop computers for various classrooms.,7,2015-Q3,2015-Q4,Closeout,20220630 Capistrano ES,10367113,Capistrano ES - 30 Computers & Projector,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1280201,13759,8118 Capistrano Ave.,West Hills,91304,Increase school's access to technology by providing thirty new desktop computers and projector for a computer lab.,49,2015-Q4,2016-Q1,Closeout,20220630 Hooper PC,10367128,Hooper PC - Electronic Camera Door Entry System,Security System,5,Jackie Goldberg,Central,1457601,13849,1280 E. 52nd St.,Los Angeles,90011,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,16,2016-Q1,2016-Q2,Closeout,20220630 Jones PC,10367129,Jones PC - Electronic Camera Door Entry System,Security System,1,"Dr. George J. McKenna, III",Central,1511201,13914,1017 W. 47th St.,Los Angeles,90037,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,25,2015-Q4,2016-Q2,Closeout,20220630 Willenberg Special Education Center,10367019,Willenberg Sp Ed-Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1195701,13545,308 Weymouth Ave.,San Pedro,90732,remove and Replace 5 kinder toilets with primary toilets in 3 restrooms.,11,2015-Q2,2015-Q3,Closeout,20220630 Lillian ES,10367830,Lillian ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1487701,13468,5909 Lillian St.,Los Angeles,90001,"Remove 2 DSA portable buildings (24' x 60'), relocate contents of the portable buildings, provide temporary fencing, disconnect all utilities and data systems and reconnect to the remaining buildings on site, and patch/seal asphalt paving over the former building footprints as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",81,2016-Q4,2018-Q1,Closeout,20220630 Sutter MS,10369433,Sutter MS - Roofing,Roofing,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,"The project will replace approximately 174,430 square feet of deteriorated roofing campus-wide with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes replacing damaged wood, installing new gutters and downspouts, and painting to match existing areas affected in the roof demolition. As part of this roofing project, selected heating, ventilation, and air conditioning (HVAC) units and equipment on 5 buildings will be replaced while the remaining roof-mounted HVAC units and ductwork will be protected in place.","3,098",2022-Q4,2023-Q3,Planning,20220630 Normont ES,10105860,Normont ES - Compliance with State & Federal Access Requirements,Fire Alarm System,7,Tanya Ortiz Franklin,South,1564401,13652,1001 W. 253rd St.,Harbor City,90710,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),483,2015-Q2,2015-Q4,Closeout,20220630 Escalante EEC,10004997,Escalante EEC - Nature Explore Classroom,Campus Improvement,5,Jackie Goldberg,East,1945801,193566,7221 S. Atlantic Ave.,Cudahy,90201,Design and construct new nature explore classroom.,992,2017-Q1,2017-Q4,Closeout,20220630 Arroyo Seco Museum Science Magnet,10368190,Arroyo Seco Museum Science Magnet - New Sanitary Buildings,Campus Improvement,2,Monica Garcia,Central,1432201,13900,4805 Sycamore Terrace,Los Angeles,90042,"The project will purchase and install 2 sanitary buildings including the site preparation and utility connections. The scope of work includes the construction of a ramp, elevator and other related accessibility work to comply with the Americans with Disabilities Act (ADA).","3,637",2019-Q4,2020-Q3,Closeout,20220630 Irving STEAM Magnet MS,10366901,Irving MS - 2015-16 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"This project is a charter school renovation for Celerity Octavia Charter School for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 19 classrooms for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",2,2015-Q4,2015-Q4,Closeout,20220630 Bradley Global Awareness Magnet ES,10369734,Bradley Global Awareness Magnet ES - 2018-20 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1712301,13516,3875 Dublin Ave.,Los Angeles,90008,"This project was initially approved in BOE Report No. 429-17/18 for the 2018-19 Prop 39 co-locations as a charter school renovation for Libertas College Preparatory Charter School. This project included 1 charter office, 1 special education room, and 13 instructional spaces for charter student seats in grades 4-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 15 spaces allocated to the charter and a scope of work that is not yet defined.",43,2018-Q2,2018-Q3,Closeout,20220630 Towne ES,10102212,Towne ES - Exterior Painting & Refinish,Painting,7,Tanya Ortiz Franklin,South,1720501,13755,18924 Towne Ave.,Carson,90746,Exterior Painting & Refinish,261,2012-Q2,2014-Q1,Closeout,20220630 Narbonne HS,10105159,Narbonne HS - Certification of Portables,Access Compliance,7,Tanya Ortiz Franklin,South,1877901,13407,24300 S. Western Ave.,Harbor City,90710,Certification of Portables,959,2014-Q2,2015-Q1,Closeout,20220630 Chase ES,10365688,Chase ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northwest,1301401,13620,14041 Chase St.,Panorama City,91402,Replace deteriorated playground matting systems to ensure the health and safety of students.,78,2014-Q3,2014-Q3,Closeout,20220630 Compton ES,10365693,Compton ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1320501,13498,1515 E. 104th St.,Los Angeles,90002,Replace deteriorated playground matting systems to ensure the health and safety of students.,66,2013-Q4,2014-Q1,Closeout,20220630 Harmony ES,10365706,Harmony ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1468101,13535,899 E. 42nd Pl.,Los Angeles,90011,Replace deteriorated playground matting systems to ensure the health and safety of students.,24,2014-Q4,2014-Q4,Closeout,20220630 Hobart ES,10365708,Hobart ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1454801,13331,980 S. Hobart Blvd.,Los Angeles,90006,Replace deteriorated playground matting systems to ensure the health and safety of students.,36,2014-Q3,2014-Q3,Closeout,20220630 Lassen ES,10365714,Lassen ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northwest,1479001,13803,15017 Superior St.,North Hills,91343,Replace deteriorated playground matting systems to ensure the health and safety of students.,87,2014-Q3,2014-Q3,Closeout,20220630 Cohasset ES,10363908,Cohasset ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1313701,13542,15810 Saticoy St.,Lake Balboa,91406,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",413,2014-Q2,2014-Q3,Closeout,20220630 El Sereno MS,10363922,El Sereno MS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1811801,13412,2839 N. Eastern Ave.,Los Angeles,90032,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,196",2014-Q3,2015-Q1,Closeout,20220630 Huntington Park HS,10369758,Huntington Park HS - 2018-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1870001,13597,6020 Miles Ave.,Huntington Park,90255,"This project was approved in Board of Education Report No. 429-17/18 as a 2018-19 Prop. 39 charter co-location. The charter operator, Prepa Tec Los Angeles HS, did not occupy Huntington Park HS during the 2018-19 academic year. As a result, the scope of work changed from a co-location to vacating the site which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District-operated program.",36,2018-Q2,2018-Q3,Closeout,20220630 Westchester Enriched Sciences Magnets,10368854,Westchester Enriched Sciences Magnets - 2017-18 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Charter HS for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 4 instructional spaces for charter student seats in grade 9. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",106,2017-Q2,2017-Q3,Closeout,20220630 Irving STEAM Magnet MS,10366240,Irving MS - 2014-15 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"This project is a charter school renovation for Celerity Octavia Charter School for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 20 classrooms for 487.79 charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",136,2014-Q2,2014-Q3,Closeout,20220630 Cienega ES,10369414,Cienega ES - Technology Upgrade,Communications/Technology Upgrade,1,"Dr. George J. McKenna, III",West,1306801,13429,2611 S. Orange Dr.,Los Angeles,90016,Purchase 9 laptops.,10,2017-Q4,2017-Q4,Closeout,20220630 Lankershim ES,10370035,Lankershim ES - Fencing,Fencing,6,Kelly Gonez,Northeast,1478101,13358,5250 Bakman Ave.,North Hollywood,91601,Install 2 emergency gates in the playground fence.,27,2019-Q1,2019-Q3,Closeout,20220630 Lorena ES,10367697,Lorena ES - 2016-20 Prop 39,Charter Prop 39,2,Monica Garcia,East,1494501,13351,1015 S. Lorena St.,Los Angeles,90023,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-location for Extera Public School - Lorena. This project included 1 charter office, 1 special education room, and 12 instructional spaces for charter students in grades K-4. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no change"" project with 1 charter office, 1 special education room, and 12 instructional spaces for charter students in grades K-5. The project was amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with 1 charter office, 1 special education room, and 12 instructional spaces for charter students in grades K-5. The project was again amended for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 14 spaces allocated to the charter and a scope of work that is not yet defined.",51,2016-Q2,2016-Q3,Closeout,20220630 YES Academy at Hyde Park ES,10103465,YES Academy at Hyde Park ES - Campus Beautification & Improvement,Campus Improvement,1,"Dr. George J. McKenna, III",West,1465801,13465,3140 Hyde Park Blvd.,Los Angeles,90043,Campus Beautification & Improvement,48,2014-Q3,2015-Q2,Closeout,20220630 6th Ave. ES,10369504,6th Ave. ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1678101,13425,3109 Sixth Ave.,Los Angeles,90018,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",191,2019-Q3,2020-Q3,Closeout,20220630 Fairfax HS,10370509,Fairfax HS - Flooring,Flooring,4,Nick Melvoin,West,1862101,13473,7850 Melrose Ave.,Los Angeles,90046,"This project is to replace approximately 254,000 square feet of deteriorated flooring.","1,973",2023-Q2,2025-Q3,Planning,20220630 Lincoln HS,10101365,"Lincoln HS - Facilities Upgrades - Outdoor Spaces, Visual Identity, Compliance with State & Federal Access Requirements",Small Learning Community/Academy,2,Monica Garcia,East,1872901,13280,3501 N. Broadway,Los Angeles,90031,"Facilities Upgrades - Outdoor Spaces, Visual Identity, Compliance with State & Federal Access Requirements","1,565",2016-Q2,2017-Q3,Closeout,20220630 Haddon ES,10370677,Haddon ES - Roofing,Roofing,6,Kelly Gonez,Northeast,1432901,13527,10115 Haddon Ave.,Pacoima,91331,"This project is to provide approximately 57,000 square feet of new roofing at 10 buildings, including the installation of new gutters and downspouts and painting of affected areas.","1,233",2021-Q3,2022-Q3,Construction,20220630 Toluca Lake EEC,10367363,Toluca Lake EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1956801,16690,4915 Strohm Ave.,North Hollywood,91601,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",43,2016-Q2,2016-Q3,Closeout,20220630 Noble EEC,10367346,Noble EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1954001,16668,8315 Noble Ave.,North Hills,91343,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",83,2016-Q3,2016-Q3,Closeout,20220630 Valley View ES,10368948,Valley View ES - Secure Entry System (Aiphone),Security System,3,Scott Schmerelson,West,1739701,13428,6921 Woodrow Wilson Dr.,Los Angeles,90068,Provide and install new secure entry system (Aiphone) at the Northwest pedestrian gate.,40,2017-Q4,2018-Q1,Closeout,20220630 Henry MS,10367620,Henry MS - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1817401,13658,17340 San Jose St.,Granada Hills,91344,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",42,2016-Q3,2016-Q4,Closeout,20220630 Windsor Hills Math/Science/Aerospace Magnet ES,10149930,Windsor Hills Math/Science/Aerospace Magnet ES - Upgrade Fire Alarm System & Comply with Associated State Requirements,Fire Alarm System,1,"Dr. George J. McKenna, III",West,1782201,13757,5215 Overdale Dr.,Los Angeles,90043,Upgrade Fire Alarm System & Comply with Associated State Requirements,531,2014-Q2,2015-Q1,Closeout,20220630 Loreto ES,10364114,Loreto ES - HVAC,HVAC,2,Monica Garcia,East,1495901,13301,3408 Arroyo Seco Ave.,Los Angeles,90065,"The project will replace the existing steam boilers and associated equipment, fan coil units, and rooftop package units servicing 3 classroom buildings. The existing equipment is more than 25 years old, inefficient, and requires frequent service.","1,445",2016-Q1,2016-Q4,Closeout,20220630 Adams MS,10004091,Adams MS - Facelift,Facelift,5,Jackie Goldberg,Central,1800901,13366,151 W. 30th St.,Los Angeles,90007,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",206,2011-Q3,2016-Q3,Closeout,20220630 Franklin ES,10004602,Franklin ES - Facelift,Facelift,2,Monica Garcia,Central,1398601,13446,1910 N. Commonwealth Ave.,Los Angeles,90027,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",95,2013-Q2,2016-Q3,Closeout,20220630 Hamasaki Medical & Science Magnet ES,10004612,Hamasaki ES - Facelift,Facelift,2,Monica Garcia,East,1627401,13577,4865 E. 1st St.,Los Angeles,90022,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",86,2012-Q2,2016-Q3,Closeout,20220630 Heliotrope ES,10004631,Heliotrope ES - Facelift,Facelift,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",133,2013-Q1,2016-Q3,Closeout,20220630 Glenwood ES,10004584,Glenwood ES - Facelift,Facelift,6,Kelly Gonez,Northeast,1419201,13590,8001 Ledge Ave.,Sun Valley,91352,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",106,2013-Q2,2016-Q3,Closeout,20220630 Maywood ES,10366067,Maywood ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1238101,13950,5200 Cudahy Ave.,Maywood,90270,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",367,2015-Q1,2015-Q2,Closeout,20220630 Murchison ES,10370310,Murchison ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1543801,13522,1501 Murchison St.,Los Angeles,90033,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",52,2019-Q1,2020-Q1,Closeout,20220630 University Charter HS,10107361,University Charter HS - Track & Field Improvement,Gym/Athletic Facilities Renovation,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,Track & Field Improvement,"6,640",2014-Q3,2015-Q2,Closeout,20220630 Franklin HS,10371660,Franklin HS - Install Video Surveillance System,Security System,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,Install video surveillance (CCTV) system with three cameras throughout campus.,44,2020-Q4,2022-Q1,Closeout,20220630 Berendo MS,10371795,Berendo MS - Roofing,Roofing,5,Jackie Goldberg,Central,1805701,13274,1157 S. Berendo St.,Los Angeles,90006,"This project is to provide approximately 76,345 square feet of new roofing sitewide, including the installation of new gutters and downspouts, skylights, gravity vents, and painting of affected areas.","1,687",2023-Q1,2023-Q3,Planning,20220630 Aldama ES,10371802,Aldama ES - Seismic Retrofits & HVAC at Main Building,Seismic Modernization,2,Monica Garcia,Central,1202701,13401,632 N. Ave. 50,Los Angeles,90042,"This project is to provide seismic retrofits and HVAC systems at the Main Building with a total area of approximately 31,500 square feet. The scope of work includes ADA upgrades as required.","17,524",2024-Q1,2025-Q4,Design,20220630 Millikan Charter MS,10372484,Armstrong MS - 2022-23 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northeast,1823801,13728,5041 Sunnyslope Ave.,Sherman Oaks,91423,"This project is a charter school renovation for High Tech Los Angeles MS for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",429,2022-Q3,2022-Q3,Planning,20220630 "Sun Valley Magnet: Biomedical Sciences, Engineering & Leadership",10366937,Sun Valley Magnet - New Science Labs,Reconfiguration,6,Kelly Gonez,Northeast,1839603,13546,7330 Bakman Ave.,Sun Valley,91352,"This project converts 2 existing home economic classrooms and an adjacent storeroom into 1 chemistry lab, 1 flexible science workroom, and 1 biology lab for the Sun Valley Magnet: Biomedical Sciences, Engineering & Leadership. The new labs will be designed, constructed, and furnished to meet District standards for new high school chemistry and biology laboratories as well as to ensure compliance with the Americans with Disabilities Act (ADA) including associated path of travel improvements.","4,067",2017-Q2,2019-Q1,Closeout,20220630 Griffith-Joyner ES,10372152,Griffith-Joyner ES - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1584901,13497,1963 E. 103rd St.,Los Angeles,90002,Install electronic free-standing marquee near main entrance. Approx. 100 feet of conduit required. Single-sided color LED display.,62,2022-Q2,2022-Q3,Construction,20220630 Cleveland Charter HS,10366805,Cleveland Charter HS - Comprehensive Modernization,Comprehensive Modernization,3,Scott Schmerelson,Northwest,1859001,13753,8140 Vanalden Ave.,Reseda,91335,"This project includes the construction of new buildings and site improvements with 51 general and specialty classrooms, instructional support spaces, food services and lunch shelter, performing arts center, and maintenance and operations area. Existing school facilities will be upgraded including the modernization and reconfiguration of classroom buildings #4 & #5 to convert science classrooms into standard classrooms; and the seismic retrofit of the physical education building with replacement of the gym bleachers, repair and replace deteriorated roofing. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of the multipurpose/food service building, lunch shelter and student store building, maintenance/storage/receiving building, drafting/specialty classroom building, dean's office, three H series classroom buildings, and 48 classrooms in relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","172,852",2018-Q4,2022-Q4,Construction,20220630 95th St. EEC,10371709,95th St. EEC - Install CCTV System,Security System,1,"Dr. George J. McKenna, III",West,1953801,16684,1027 W. 96th St.,Los Angeles,90044,Install 4 cameras around administration building.,59,2021-Q1,2021-Q4,Closeout,20220630 Grand View ES,10372444,Grand View ES - Secure Entry System,Security System,4,Nick Melvoin,West,1424701,13716,3951 Grand View Blvd.,Los Angeles,90066,Install new secure entry system at the Main Office.,42,2022-Q2,2022-Q4,Construction,20220630 Garfield HS,10370832,Garfield HS - New Baseball Field,Gym/Athletic Facilities Renovation,2,Monica Garcia,East,1867901,13512,5101 E. 6th St.,Los Angeles,90022,"This project will expand the school's existing softball playfield area to include both a baseball and a softball field with corresponding backstops and dugouts. To provide sufficient space, the existing softball field will be relocated to the opposite end of the playfield and a portion of the existing visitor bleachers will be demolished. The scope of work also includes high barrier and perimeter fencing, site infrastructure and accessibility upgrades if necessary.","5,824",2021-Q3,2022-Q4,Construction,20220630 Loyola Village Fine & Performing Arts Magnet ES,10372447,Loyola Village Fine & Performing Arts Magnet ES - Secure Entry System,Security System,4,Nick Melvoin,West,1501401,13602,8821 Villanova Ave.,Los Angeles,90045,Install new secure entry system at the Main Office.,40,2022-Q2,2022-Q4,Construction,20220630 32nd St./USC Performing Arts Magnet ES,10371458,32nd St./USC Performing Arts Magnet ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",Central,1713701,13299,822 W. 32nd St.,Los Angeles,90007,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",470,2020-Q4,2021-Q2,Closeout,20220630 Chatsworth Charter HS,10371128,Chatsworth Charter HS - New Scoreboard,Gym/Athletic Facilities Renovation,3,Scott Schmerelson,Northwest,1858301,13870,10027 Lurline Ave.,Chatsworth,91311,Provide and install new scoreboard on existing support poles.,54,2020-Q4,2021-Q2,Closeout,20220630 Stoner ES,10371146,Stoner ES - Privacy Fencing,Fencing,4,Nick Melvoin,West,1695201,13772,11735 Braddock Dr.,Culver City,90230,Install perimeter privacy fencing.,102,2020-Q1,2020-Q2,Closeout,20220630 49th St. ES,10372400,49th St. ES - Install Security Monitor System,Security System,7,Tanya Ortiz Franklin,Central,1393201,13348,750 E. 49th St.,Los Angeles,90011,Install new CCTV system with (3) cameras,53,2022-Q3,2022-Q4,Planning,20220630 Wooden Continuation HS,10370785,Wooden Continuation HS - Greenhouse and Food Storage Upgrades,Electrical/Lighting,3,Scott Schmerelson,Northwest,1859101,16721,18741 Elkwood St.,Reseda,91335,Provide power to greenhouse/food storage building,18,2019-Q4,2019-Q4,Closeout,20220630 San Miguel ES,10372592,San Miguel ES - Provide Exterior Tables,Furniture/Fixtures/Equipment,5,Jackie Goldberg,East,1687501,14741,9801 San Miguel Ave.,South Gate,90280,Provide (4) exterior kindergarten lunch tables.,8,2022-Q3,2022-Q4,Planning,20220630 Bernstein HS,10371705,Bernstein HS - Synthetic Turf Field,Paving/Greening/Playground Equipment,5,Jackie Goldberg,West,1869601,13953,1309 N. Wilton Pl.,Hollywood,90028,"This project is to replace approximately 87,573 square feet of synthetic turf on the soccer field which will include re-grading and additional irrigation as required. The scope of work also includes re-grading planter areas surrounding the field and installing new drainage, new pavers, and new landscaping to prevent damage that results from run-off.","6,383",2023-Q2,2024-Q3,Design,20220630 West Valley Occupational Center,10367173,West Valley Occupational Center - Paving,Paving/Greening/Playground Equipment,4,Nick Melvoin,Northwest,1901001,13659,6200 Winnetka Ave.,Woodland Hills,91367,"Replace asphalt paving in parking areas as well as meet accessibility requirements of the Americans with Disabilities Act (ADA) with upgrades to restrooms, drinking fountain, parking, and path of travel improvements.","8,696",2018-Q1,2019-Q3,Closeout,20220630 Harding ES,10370100,Harding ES - Exterior Painting,Painting,6,Kelly Gonez,Northeast,1443101,13819,13060 Harding St.,Sylmar,91342,"Prepare, paint, and refinish the exterior of all buildings and their appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site, at Harding Elementary School.",299,2020-Q3,2021-Q1,Closeout,20220630 Verdugo Hills HS,10370446,Verdugo Hills HS - New Science Lab,Addition,6,Kelly Gonez,Northeast,1891401,13642,10625 Plainview Ave.,Tujunga,91042,"This science laboratory building project authorizes preconstruction activities such as planning, due diligence, design through Division of the State Architect (DSA) approval, as well as site, infrastructure, and environmental analysis. The school offers a variety of high caliber science programs which operate in facilities that are outdated, undersized and inadequate, particularly for hands-on chemistry experiments. Included in the project design is a new facility with approximately 5,000 square feet consisting of two chemistry laboratories designed to meet current standards for high school chemistry, one workroom, boys' and girls' restroom, staff restroom, janitor's closet, and mechanical and electrical rooms; site infrastructure to support the new facilities; specialized furniture and equipment to support chemistry and other physical science programs; and site work, path of travel, and other required ADA improvements. In addition, limited construction activities may include the possible demolition of an existing unoccupied and outdated building (to enable the eventual construction of the new proposed chemistry laboratory building) during preconstruction.","11,407",2023-Q3,2025-Q1,Design,20220630 Birmingham Community Charter HS,10363885,Birmingham Community Charter HS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1855701,13667,17000 Haynes St.,Lake Balboa,91406,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,860",2014-Q3,2015-Q1,Closeout,20220630 Bryson ES,10369602,Bryson ES - Technology Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1258901,13558,4470 Missouri Ave.,South Gate,90280,Purchase 80 Chromebooks and 2 charging carts,27,2018-Q1,2018-Q2,Closeout,20220630 Rowan ES,10365742,Rowan ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1642501,13381,600 S. Rowan Ave.,Los Angeles,90023,Replace deteriorated playground matting systems to ensure the health and safety of students.,23,2014-Q2,2014-Q2,Closeout,20220630 Van Nuys ES,10364131,Van Nuys ES - HVAC,HVAC,3,Scott Schmerelson,Northeast,1743801,13403,6464 Sylmar Ave.,Van Nuys,91401,"The project will replace deteriorated and aged air handlers, fan coils, chillers, pumps, and exhaust fans that serve classrooms, administrative and support areas, with rooftop units. The equipment is more than 30 years old, inefficient and requires frequent service. Maintenance & Operations received more than 57 related service calls within the past 12 months prior to approval of this project.","6,998",2017-Q1,2019-Q1,Closeout,20220630 Bravo Medical Magnet HS,10366333,Bravo Medical Magnet HS - New Hot Water Storage Tank & Boiler,Plumbing/Irrigation/Drainage,2,Monica Garcia,East,1875401,13336,1200 N. Cornwell St.,Los Angeles,90033,"The campus consists of one 5-story building which houses all operational equipment, including the hot water storage tank located on the fifth floor above the library, administrative offices, and numerous classrooms. The tank is approximately 20 years old and in poor condition with extensive visible corrosion. Previously the tank ruptured, flooding the building and causing extensive water damage. The water in the tank is required to be stored at approximately 140 degrees Fahrenheit which poses a potential safety hazard if the tank were to rupture while the school is occupied. The project will provide Bravo Medical Magnet HS with a new hot water storage tank and boiler in a more appropriate location.",451,2016-Q3,2016-Q4,Closeout,20220630 King ES,10366903,King ES - 2015-20 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1653401,13423,3989 S. Hobart Blvd.,Los Angeles,90062,"This project was initially approved in BOE Report No. 423-14/15 for 2015-16 Prop. 39 co-locations as a charter school renovation for New Heights Charter School. This project included 1 charter office and 18 instructional spaces for charter students in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a ""no growth"" project with 1 charter office and 17 instructional spaces for charter students in grades K-8. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with 1 charter office and 17 instructional spaces for charter students in grades K-8. The project was amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with 1 charter office and 17 instructional spaces for charter students in grades K-8. The project was again amended for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 1 charter office and 21 instructional spaces for charter students in grades K-8 and a scope of work that is not yet defined.",37,2015-Q2,2015-Q3,Closeout,20220630 Gledhill ES,10367220,Gledhill ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northwest,1413001,13746,16030 Gledhill St.,North Hills,91343,"Remove 3 DSA portable buildings including abatement of hazardous materials, disconnection of all utilities and data feeds, and repair/replacement of asphalt over the former building footprints.",230,2015-Q4,2017-Q4,Closeout,20220630 Ascot ES,10369813,Ascot ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1221901,13276,1447 E. 45th St.,Los Angeles,90011,Purchase 165 Chromebooks and 5 charging carts; provide security upgrades as needed.,56,2018-Q2,2018-Q3,Closeout,20220630 Vinedale College Preparatory Academy,10370275,Vinedale ES - Accessibility Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1754801,13430,10150 La Tuna Canyon Rd.,Sun Valley,91352,"Purchase and install 2 Hi-Lo changing tables, privacy screens and electrical outlets.",8,2018-Q4,2018-Q4,Closeout,20220630 South Gate HS,10101542,South Gate HS - Facilities Upgrades (Phase 2),Small Learning Community/Academy,5,Jackie Goldberg,East,1887101,13262,3351 Firestone Blvd.,South Gate,90280,Facilities Upgrades (Phase 2),"1,568",2013-Q2,2014-Q1,Closeout,20220630 Sylvan Park ES,10365751,Sylvan Park ES - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northeast,1702701,13477,6238 Noble Ave.,Van Nuys,91411,Replace deteriorated playground matting systems to ensure the health and safety of students.,21,2015-Q1,2015-Q1,Closeout,20220630 Van Gogh Charter ES,10365756,Van Gogh ES - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1742201,13862,17160 Van Gogh St.,Granada Hills,91344,Replace deteriorated playground matting systems to ensure the health and safety of students.,224,2014-Q2,2014-Q3,Closeout,20220630 Walgrove ES,10365761,Walgrove ES - Replace Playground Matting,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1760301,13729,1630 Walgrove Ave.,Los Angeles,90066,Replace deteriorated playground matting systems to ensure the health and safety of students.,72,2014-Q3,2014-Q3,Closeout,20220630 Hamasaki Medical & Science Magnet ES,10366898,Hamasaki ES - 2015-16 Prop 39,Charter Prop 39,2,Monica Garcia,East,1627401,13577,4865 E. 1st St.,Los Angeles,90022,"KIPP Iluminar Academy is vacating this site. This project was approved in Board of Education Report No. 423-14/15 . The scope of work includes relocation of classrooms, remedial construction, and reconnecting of all low voltage systems to the District operated program.",35,2015-Q2,2015-Q3,Closeout,20220630 Monroe HS,10366914,Monroe HS - 2015-16 Prop 39,Charter Prop 39,6,Kelly Gonez,Northwest,1876801,13704,9229 Haskell Ave.,North Hills,91343,"Valley Charter MS is vacating this site. This project was approved in Board of Education Report No. 423-14/15 . The scope of work includes relocation of classrooms, remedial construction, and reconnecting of all low voltage systems to the District operated program.",19,2015-Q2,2015-Q2,Closeout,20220630 Castlebay Charter ES,10003968,Castlebay ES - Multipurpose Room Renovation,Campus Improvement,3,Scott Schmerelson,Northwest,1288101,13892,19010 Castlebay Lane,Porter Ranch,91326,Expand multipurpose room construct addition to multipurpose room,"5,504",2014-Q1,2015-Q1,Closeout,20220630 Angelou Community HS,10366642,Angelou CHS - Fiberglass Shade Umbrellas on Lunch Tables,Furniture/Fixtures/Equipment,7,Tanya Ortiz Franklin,Central,1856301,13866,300 E. 53rd St.,Los Angeles,90011,Upgrade the campus by providing fiberglass shade umbrellas over the lunch tables in the quad area,25,2015-Q1,2015-Q2,Closeout,20220630 Bandini ES,10368321,Bandini ES - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1228801,13458,425 N. Bandini St.,San Pedro,90731,Provide and install electronic marquee.,21,2017-Q3,2017-Q4,Closeout,20220630 Griffith STEAM Magnet MS,10368897,Griffith MS-Lunch Tables,Access Compliance,2,Monica Garcia,East,1816801,13646,4765 E. 4th St.,Los Angeles,90022,"Purchase 2 accessible lunch tables. Remodel storage room into changing room which includes; electrical outlets, exhaust fan, widen doorways, provide privacy curtains, provide instant water heater, remove cabinets and finish walls, door and cabinet hardware and r/r mastic floor.",69,2017-Q2,2017-Q3,Closeout,20220630 West Vernon ES,10365763,West Vernon ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1765401,13330,4312 S. Grand Ave.,Los Angeles,90037,Replace deteriorated playground matting systems to ensure the health and safety of students.,73,2014-Q2,2014-Q2,Closeout,20220630 Andasol ES,10367270,Andasol ES - Replace Roofing,Roofing,3,Scott Schmerelson,Northwest,1211701,13839,10126 Encino Ave.,Northridge,91325,"Project is to replace 24,500 square feet of deteriorated roofing with new PVC roofing and metal flashing installation at 14 buildings and arcades, replace damaged wood in kind, and paint to match existing areas affected in the roof demolition. The scope of the work also includes 31,500 square feet of roof recoating for 5 buildings. The existing roof-mounted HVAC units and ductwork will be protected in place.",456,2016-Q2,2016-Q3,Closeout,20220630 Vista MS,10368850,Vista MS - 2017-18 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1811701,13896,15040 Roscoe Blvd.,Panorama City,91402,"This project was approved in Board of Education Report No. 530-16/17 as a 2017-18 Proposition 39 charter co-location. The charter operator, Girls Athletic Leadership School did not occupy Vista MS during the 2017-18 academic year. As a result, the scope of work changed from a co-location to vacating the site which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",23,2017-Q2,2017-Q3,Closeout,20220630 Fremont HS,10369942,Fremont HS - Replace Synthetic Turf Football Field,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1865001,13475,7676 S. San Pedro St.,Los Angeles,90003,"This project is to replace approximately 78,000 square feet of deteriorated synthetic turf at the football field. The scope of work includes cleaning the existing field drainage system and providing irrigation repairs.","1,608",2019-Q1,2019-Q3,Closeout,20220630 Sterry ES,10370805,Sterry ES - Exterior Painting,Painting,4,Nick Melvoin,West,1693201,13431,1730 Corinth Ave.,Los Angeles,90025,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",282,2020-Q1,2020-Q3,Closeout,20220630 Wilton ES,10370813,Wilton ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1780801,13433,745 S. Wilton Pl.,Los Angeles,90005,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",543,2021-Q1,2021-Q4,Closeout,20220630 Ann ES,10370304,Ann ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1213701,13286,126 E. Bloom St.,Los Angeles,90012,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",55,2019-Q3,2020-Q1,Closeout,20220630 Raymond ES,10366920,Raymond ES - 2015-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1621901,13469,7511 Raymond Ave.,Los Angeles,90044,"This project was initially approved in BOE Report No. 423-14/15 for 2015-16 Prop. 39 co-locations as a charter school renovation for Community Preparatory Academy. This reconfiguration project included 1 charter office and 9 instructional spaces for charter students in grades 6-12, and reduced the number of spaces previously allocated to Community Preparatory Academy during the 2014-15 school year The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a ""no growth"" project with 1 charter office, 1 special education room, and 8 instructional spaces for charter students in grades 6-12. The project was again amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with an unspecified scope of work and a revised expiration date for the charter school of 6/30/18. The charter operator, Community Preparatory Academy did not continue to occupy Raymond ES during the 2017-18 academic year. As a result, the scope of work was defined as a vacancy which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",173,2015-Q2,2015-Q3,Closeout,20220630 Solis Learning Academy,10368842,Solis Learning Academy - 2017-18 Prop 39,Charter Prop 39,2,Monica Garcia,East,1775201,14564,319 N. Humphreys Ave.,Los Angeles,90022,"This project is a charter school renovation for USC College Prep Orange Campus Charter School for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grade 9. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",88,2017-Q2,2017-Q3,Closeout,20220630 Langdon ES,10370376,Langdon ES - Lunch Shelter Lighting,Electrical/Lighting,6,Kelly Gonez,Northwest,1477501,13413,8817 Langdon Ave.,North Hills,91343,Install lighting sensors throughout the lunch shelter to improve safety.,15,2019-Q1,2019-Q2,Closeout,20220630 Frost MS,10369510,Frost MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1813701,13777,12314 Bradford Pl.,Granada Hills,91344,"Replace deteriorated interior walk-in cooler and exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",472,2020-Q2,2021-Q3,Closeout,20220630 Hart ES,10366731,Hart ES - Lunch Shelters,Lunch/Shade Shelter,3,Scott Schmerelson,Northwest,1444501,13749,21040 Hart St.,Canoga Park,91303,"This project replaces the undersized and aging wooden lunch shelter with 2 new 30' x 64' steel lunch shelters to provide seating for approximately half of the school population of 900 students. The project also provides a connection to the storm drain system on the campus which currently does not serve the existing lunch shelter, provides new paving, installs new flood lights on the new lunch shelters, purchases and installs new lunch tables and benches, and installs a new double convection oven in the kitchen. Also included are upgrades to meet the accessibility requirements of the Americans with Disabilities Act (ADA) with restrooms, drinking fountain, and path of travel improvements.","1,038",2016-Q4,2017-Q3,Closeout,20220630 Corona ES,10370140,Corona ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1321901,13453,3825 Bell Ave.,Bell,90201,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2024-Q4,2025-Q2,Planning,20220630 Liberty ES,10370170,Liberty ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1486301,13599,2728 Liberty Blvd.,South Gate,90280,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q2,2026-Q3,Planning,20220630 Kester ES,10369254,Kester ES - Fencing,Fencing,3,Scott Schmerelson,Northeast,1472601,13683,5353 Kester Ave.,Van Nuys,91411,Fabricate 4' wrought iron fence using perforated metal as a security screen and install on top of the existing kindergarten wall. Fabricate and install a wrought iron pedestrian gate with double lock set.,24,2021-Q3,2022-Q3,Construction,20220630 Canoga Park HS,10365984,Canoga Park HS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1857101,13415,6850 Topanga Canyon Blvd.,Canoga Park,91303,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",801,2014-Q2,2014-Q3,Closeout,20220630 Drew MS,10370239,Drew MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1811201,13871,8511 Compton Ave.,Los Angeles,90001,"Replace deteriorated interior walk-in cooler and interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, interior walk-in freezer/cooler combination unit, and refrigeration equipment.",182,2026-Q3,2026-Q4,Planning,20220630 Rosewood Urban Planning & Design Magnet ES,10364125,Rosewood ES - Emergency Lighting System,Electrical/Lighting,4,Nick Melvoin,West,1638401,13579,503 N. Croft Ave.,Los Angeles,90048,The emergency power inverters located in the auditorium and girls' restroom storage are not functioning and need to be completely replaced to restore the functionality of this life safety system during a site power failure. The system provides power for emergency lighting and exit signs to illuminate the path of egress from the building. It is not in compliance with the California Health Code and poses a health and safety risk in the event of an emergency evacuation.,71,2014-Q1,2014-Q2,Closeout,20220630 Kentwood ES,10370525,Kentwood ES - Multimedia Technology,Communications/Technology Upgrade,4,Nick Melvoin,West,1471201,13589,8401 Emerson Ave.,Los Angeles,90045,Purchase multimedia technology and install ceiling-mounted projectors,27,2019-Q3,2019-Q3,Closeout,20220630 Panorama City ES,10366715,Panorama City ES - Install Entry Alarm,Security System,6,Kelly Gonez,Northwest,1560401,13874,8600 Kester Ave.,Panorama City,91402,Upgrade physical security of the school by installing an entry alarm system at the double entry doors,4,2015-Q2,2015-Q2,Closeout,20220630 Marianna ES,10370309,Marianna ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1513701,13479,4215 E. Gleason St.,Los Angeles,90063,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new chairs. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",59,2019-Q3,2020-Q1,Closeout,20220630 Multnomah ES,10368882,Multnomah ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1542501,13631,2101 N. Indiana Ave.,Los Angeles,90032,Removal of 2 Portable Buildings. Abatement of hazardous materials; disconnection of low and high volt utilities and repair/replace asphalt at footprint of buildings.,161,2017-Q4,2018-Q3,Closeout,20220630 Mulholland MS,10368675,Mulholland MS - Roofing,Roofing,3,Scott Schmerelson,Northwest,1825901,15184,17120 Vanowen St.,Lake Balboa,91406,"The project will replace approximately 254,000 square feet of deteriorated roofing campus-wide with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes replacing damaged wood, installing new gutters and downspouts, and painting to match existing areas affected in the roof demolition. The existing roof-mounted heating, ventilation, and air conditioning (HVAC) units and ductwork will be protected in place.","4,171",2023-Q1,2023-Q3,Planning,20220630 Stevenson College & Career Preparatory,10370618,Stevenson College & Career Preparatory - 2019-20 Prop 39 (KIPP Academy of Innovation),Charter Prop 39,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"KIPP Academy of Innovation is vacating this site. This project was approved in Board of Education Report No. 343-18/19. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",15,2019-Q2,2019-Q3,Closeout,20220630 Banning HS,10366444,Banning HS - Dance Floor Repair,Flooring,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,This project is to replace the floor covering in the dance classroom and the foyer of the gymnasium. The project will include asbestos abatement of existing 9X9 asbestos-containing floor tiles.,28,2014-Q4,2015-Q1,Closeout,20220630 Ramona ES,10368838,Ramona ES - 2017-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1617801,13353,1133 N. Mariposa Ave.,Los Angeles,90029,"This project is a charter school renovation for Citizens of the World - Silver Lake for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office and 7 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",42,2017-Q2,2017-Q3,Closeout,20220630 Plasencia ES,10372257,Plasencia ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1324701,13287,1321 Cortez St.,Los Angeles,90026,"Removal of one Portable Building. Abatement of hazardous materials, Disconnection oh High/Low volt utilities and repair/replace asphalt.",205,2022-Q3,2023-Q1,Planning,20220630 Mount Gleason MS,10372504,Mount Gleason MS - 2022-23 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1824001,13744,10965 Mt. Gleason Ave.,Sunland,91040,"This project is a charter school renovation for North Valley Military Institute for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 4 special education rooms, and 6 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",613,2022-Q3,2022-Q3,Planning,20220630 El Camino Real Charter HS,10371359,El Camino Real Charter HS - New Pipelines Sitewide,HVAC,3,Scott Schmerelson,Northwest,1861701,13776,5440 Valley Circle Blvd.,Woodland Hills,91367,The existing pipelines are deteriorated and have repeatedly failed. This project is to provide new hot and chilled water pipelines serving the entire campus.,"8,939",2023-Q3,2024-Q1,Design,20220630 49th St. ES,10372112,49th St. ES - Major Modernization,Major Modernization,7,Tanya Ortiz Franklin,Central,1393201,13348,750 E. 49th St.,Los Angeles,90011,"Site Due Diligence, Planning and Feasibility Activities.","1,295",-Q,-Q,Planning,20220630 Eagle Rock ES,10371368,Eagle Rock ES - Secure Entry System,Security System,5,Jackie Goldberg,Central,1350701,13499,2057 Fair Park Ave.,Los Angeles,90041,Install new secure entry system at door to main office,43,2020-Q3,2020-Q4,Closeout,20220630 Grand View ES,10370426,Grand View ES - Parking Gates,Fencing,4,Nick Melvoin,West,1424701,13716,3951 Grand View Blvd.,Los Angeles,90066,Install new parking lot gates,15,2020-Q1,2020-Q1,Closeout,20220630 Sherman Oaks Charter ES,10371851,Sherman Oaks ES - Purchase Library Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northeast,1669901,13517,14755 Greenleaf St.,Sherman Oaks,91403,"Purchase full library furniture package, including: standard tables, cluster tables, chairs, cushioned benches, soft seats, and librarian desk and storage",45,2021-Q2,2021-Q4,Closeout,20220630 Selma ES,10004611,Selma ES - Facelift,Facelift,5,Jackie Goldberg,West,1658901,13360,6611 Selma Ave.,Los Angeles,90028,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",109,2013-Q1,2016-Q3,Closeout,20220630 Albion EEC,10005014,Albion EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,East,1950001,16685,348 S. Ave. 18,Los Angeles,90031,"Upgrade fencing, entry control system, exterior gates, and playground equipment",41,2014-Q2,2015-Q4,Closeout,20220630 Mikes EEC,10005075,Mikes EEC - Safety Upgrades and Improvements,Campus Improvement,1,"Dr. George J. McKenna, III",South,1959101,16682,7720 S. Vermont Ave.,Los Angeles,90044,"Upgrade entry control system, exterior gates, and playground equipment",14,2014-Q3,2015-Q3,Closeout,20220630 Graham EEC,10005035,Graham EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1951801,16291,8332 S. Elm St.,Los Angeles,90001,"Upgrade entry control system, exterior gates, playground equipment, and electrical system",66,2014-Q3,2015-Q3,Closeout,20220630 Balboa Gifted/High Ability Magnet ES,10229921,Balboa Gifted/High Ability Magnet ES - Non Air-Conditioned Classroom & Equipment,HVAC,3,Scott Schmerelson,Northwest,1226901,13840,17020 Labrador St.,Northridge,91325,Non Air-Conditioned Classroom & Equipment,21,2013-Q4,2014-Q1,Closeout,20220630 Clover ES,10304278,Clover ES - Computer Devices,Communications/Technology Upgrade,1,"Dr. George J. McKenna, III",West,1312301,13688,11020 Clover Ave.,Los Angeles,90034,Computer Devices,27,2013-Q4,2014-Q4,Closeout,20220630 Monte Vista EEC,10005053,Monte Vista EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,Central,1959001,15741,5509 Ash St.,Los Angeles,90042,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",127,2014-Q1,2015-Q1,Closeout,20220630 Riordan PC,10366090,Riordan PC - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1538501,13858,5531 Monte Vista St.,Los Angeles,90042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",193,2015-Q2,2015-Q3,Closeout,20220630 Barrett ES,10100272,Barrett ES - Repairs for Compliance with State & Federal Access Requirements,Fire Alarm System,1,"Dr. George J. McKenna, III",South,1556201,13449,419 W. 98th St.,Los Angeles,90003,Repairs to Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),388,2014-Q4,2015-Q2,Closeout,20220630 Ramona Opportunity HS,10364063,Ramona Opportunity HS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1880701,13422,231 S. Alma Ave.,Los Angeles,90063,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",347,2013-Q4,2014-Q2,Closeout,20220630 Sierra Park ES,10365210,Sierra Park ES - Compliance with State & Federal Access Requirements,Access Compliance,2,Monica Garcia,East,1675301,13391,3170 Budau Ave.,Los Angeles,90032,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Installation of Grab Bars,2,2013-Q4,2014-Q1,Closeout,20220630 Gratts Learning Academy for Young Scholars,10367190,Gratts Learning Academy for Young Scholars - Portable Removal,Portable Removal,2,Monica Garcia,Central,1238501,13829,309 Lucas Ave.,Los Angeles,90017,Remove 3 portable buildings.,71,2015-Q2,2017-Q4,Closeout,20220630 San Pedro HS,10364194,San Pedro HS - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1885001,13377,1001 W. 15th St.,San Pedro,90731,Demolish/Remove Portable Building(s),961,2013-Q3,2015-Q2,Closeout,20220630 Dodson MS,10103870,Dodson MS - Provide Sanitary Building,Portable Upgrade,7,Tanya Ortiz Franklin,South,1811001,13846,28014 Montereina Dr.,Rancho Palos Verdes,90275,Provide Sanitary Building,"2,181",2014-Q3,2015-Q4,Closeout,20220630 107th St. ES,10369712,107th St. ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1585701,13857,147 E. 107th St.,Los Angeles,90003,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 5 doors, 30 door hardware, 11 thresholds, accessible paths of travel, 34 signs, 7 restrooms, 10 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 2 metal ramps, 13 pieces of accessible furniture, 1 assembly seat, 2 railings, 1 parking area, 1 casework/counter, and 1 nurse's exam room modification.","2,632",2020-Q1,2022-Q3,Construction,20220630 Stevenson College & Career Preparatory,10368713,Stevenson MS - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"Upgrade restroom by removing 1 toilet partition, lowering 1 lavatory to ADA compliant height, and providing and installing accessible partition with related accessories, electrical outlet, looking device for partition, and electric changing table.",24,2017-Q2,2017-Q3,Closeout,20220630 Marvin ES,10367473,Marvin ES - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1517801,13573,2411 Marvin Ave.,Los Angeles,90016,"Provide campus security upgrades including new chain link fence and gates, new camera buzzer system, and new wrought iron fence and gates.",55,2016-Q1,2016-Q3,Closeout,20220630 Bandini ES,10368379,Bandini ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1228801,13458,425 N. Bandini St.,San Pedro,90731,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",155,2024-Q1,2024-Q3,Planning,20220630 Century Park ES,10369478,Century Park ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1294501,13675,10935 S. Spinning Ave.,Inglewood,90303,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2025-Q3,2025-Q4,Planning,20220630 Hollywood HS,10368945,Hollywood HS - Security Upgrades,Security System,4,Nick Melvoin,West,1869301,13356,1521 N. Highland Ave.,Los Angeles,90028,Install 18-camera closed-circuit television (CCTV) system for video surveillance.,183,2017-Q3,2019-Q2,Closeout,20220630 153rd St. ES,10367054,153rd St. ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1582201,13812,1605 W. 153rd St.,Gardena,90247,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 65 doors/hardware, 41 accessible paths of travel, 65 signs, 15 restrooms, 13 drinking fountains/sinks, 13 casework/counters, 1 assistive listening device/intercom/phone, 5 concrete ramps, 7 metal ramps, 3 pieces of accessible furniture, 1 assembly seat, 1 railing, 1 parking area, and 1 stage lift.","4,286",2016-Q4,2022-Q1,Closeout,20220630 Humphreys ES,10372392,Humphreys ES - Purchase Lunch Tables And Benches,Furniture/Fixtures/Equipment,2,Monica Garcia,East,1461601,13437,500 S. Humphreys Ave.,Los Angeles,90022,Purchase (31) exterior lunch tables and (29) exterior benches,65,2022-Q3,2022-Q4,Planning,20220630 Superior Charter ES,10370106,Superior ES - Exterior Painting,Painting,3,Scott Schmerelson,Northwest,1700701,13810,9756 Oso Ave.,Chatsworth,91311,"Prepare, paint, and refinish the exterior of all buildings and there appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site, at Superior Elementary School.",221,2019-Q2,2019-Q3,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10369710,Sun Valley Magnet - HVAC,HVAC,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"This project provides a new heating, ventilation, and air conditioning (HVAC) system in Building C. The existing HVAC system is undersized and does not provide adequate ventilation. Portable air conditioning units have been provided as an interim solution until the permanent system is installed.","4,126",2020-Q4,2022-Q1,Closeout,20220630 Highland Park Continuation HS,10372404,Highland Park Continuation HS - HVAC,HVAC,2,Monica Garcia,Central,1864501,16421,928 N. Ave. 53,Los Angeles,90042,"This project is to provide new heating, ventilation, and air conditioning (HVAC) systems campus-wide.","1,322",2023-Q3,2024-Q1,Planning,20220630 Ararat Charter School,10372605,Ararat Charter School - Secure Entry System,Security System,3,Scott Schmerelson,Northeast,1775701,13864,6555 Sylmar Ave.,Van Nuys,91401,This project is to provide a secure entry system at the main entrance.,33,2022-Q3,2022-Q3,Planning,20220630 Westport Heights ES,10369185,Westport Heights ES - Roofing,Roofing,4,Nick Melvoin,West,1771201,13592,6011 W. 79th St.,Los Angeles,90045,"The project will replace approximately 56,000 square feet of deteriorated roofing campus-wide with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes replacing damaged wood, installing new gutters and downspouts, and painting to match existing areas affected in the roof demolition. The existing roof-mounted heating, ventilation, and air conditioning (HVAC) units and ductwork will be protected in place.","1,009",2018-Q2,2019-Q1,Closeout,20220630 Valerio ES,10365755,Valerio ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1738401,15143,15035 Valerio St.,Van Nuys,91405,Replace deteriorated playground matting systems to ensure the health and safety of students.,152,2014-Q3,2014-Q3,Closeout,20220630 El Dorado ES,10365699,El Dorado ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1354101,13792,12749 El Dorado Ave.,Sylmar,91342,Replace deteriorated playground matting systems to ensure the health and safety of students.,130,2014-Q3,2014-Q3,Closeout,20220630 Bradley Global Awareness Magnet ES,10371308,Bradley Global Awareness Magnet ES - 2020-22 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1712301,13516,3875 Dublin Ave.,Los Angeles,90008,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for Libertas College Preparatory Charter School. This project included 1 charter office, 1 special education room, and 14 instructional spaces for charter student seats in grades 4-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 14 instructional spaces for charter student seats in grades 4-8 and an undefined scope of work. However, the charter school opted to vacate the site and will not continue occupancy in the 2021-22 school year. As a result, this project is amended to include the scope of work required to restore the LAUSD campus to its former condition. The required reconfiguration may include the relocation of classrooms, cleaning, retrieving furniture and equipment, and reconnecting all low voltage systems to the District operated program.",101,2021-Q3,2021-Q3,Closeout,20220630 Florence ES,10372017,Florence ES - Install Secure Entry System,Security System,7,Tanya Ortiz Franklin,East,1389001,13397,7211 Bell Ave.,Los Angeles,90001,Install new secure entry system at door to main office with two video receivers in main office and one in principal's office.,30,2021-Q4,2022-Q1,Closeout,20220630 Webster MS,10371342,Webster MS - 2020-21 Prop 39 (Citizens of the World - Mar Vista),Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project is a charter school renovation for Citizens of the World - Mar Vista for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 9 instructional spaces for charter student seats in grades 1-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",19,2020-Q3,2020-Q3,Closeout,20220630 Cleveland EEC,10372461,Cleveland EEC - Purchase Classroom Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1858801,16481,19031 W. Strathern St.,Reseda,91335,"Purchase classroom furniture: tables, chairs, and storage (18 items).",8,2022-Q3,2022-Q4,Planning,20220630 San Gabriel ES,10371235,San Gabriel ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1646601,13651,8628 San Gabriel Ave.,South Gate,90280,Install new secure entry system at door to main office with three video receivers in main office.,25,2020-Q2,2020-Q3,Closeout,20220630 Victory ES,10372366,Victory ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1752101,13442,6315 Radford Ave.,North Hollywood,91606,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",93,2022-Q3,2022-Q4,Planning,20220630 Barton Hill ES,10372373,Barton Hill ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1231501,13340,423 N. Pacific Ave.,San Pedro,90731,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor and ceiling tiles; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",93,2022-Q3,2023-Q1,Planning,20220630 Trinity ES,10372518,Trinity ES - 2022-23 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,"This project is a charter school renovation for Gabriella Charter School #2 for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 3 special education rooms, and 22 instructional spaces for charter student seats in grades TK-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",268,2022-Q3,2022-Q3,Planning,20220630 Venice HS,10370944,Venice HS - Technology Upgrade,Communications/Technology Upgrade,4,Nick Melvoin,West,1890701,13513,13000 Venice Blvd.,Los Angeles,90066,Purchase 74 Chromebooks and 2 storage carts.,24,2019-Q4,2020-Q1,Closeout,20220630 Heliotrope ES,10371257,Heliotrope ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,"Demolish/remove 1 portable building and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",130,2022-Q3,2022-Q4,Planning,20220630 Harte Preparatory MS,10372162,Harte Preparatory MS - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1817001,13612,9301 S. Hoover St.,Los Angeles,90044,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",865,2022-Q3,2023-Q1,Planning,20220630 Figueroa ES,10371900,Figueroa ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",South,1382201,13502,510 W. 111th St.,Los Angeles,90044,"Demolish and remove 2 portable buildings, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Construct parking lot where bungalows are being removed.",809,2021-Q3,2022-Q3,Construction,20220630 Alexandria EEC,10371808,Alexandria EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,2,Monica Garcia,Central,1950101,16686,4304 Rosewood Ave.,Los Angeles,90004,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 8,046 ft2. ADA upgrades for this project include (a) resurfacing the parking area - approximately 1,402 ft2 - to provide an ADA compliant path of travel and (b) providing an ADA compliant restroom. Additionally, we will replace deteriorated HVAC units and make necessary upgrades to the fire alarm system, as required by current code.","2,433",2023-Q2,2024-Q2,Design,20220630 Bonita ES,10367752,Bonita ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1247301,13796,21929 Bonita St.,Carson,90745,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 60 doors/hardware, 12 accessible paths of travel, 29 signs, 5 restrooms, 19 drinking fountains/sinks, 1 metal ramp, 2 pieces of accessible furniture, 1 assembly seat, 3 railings, 1 parking area, 1 playground component, 1 nurse's exam room modification, 14 casework/counters, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","4,755",2017-Q2,2021-Q3,Closeout,20220630 Yorkdale ES,10370055,Yorkdale ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1795901,13385,5657 Meridian St.,Los Angeles,90042,"Demolish 1 bungalow building, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",214,2019-Q1,2019-Q4,Closeout,20220630 Franklin HS,10100955,Franklin HS - Upgrade Fire Alarm System,Fire Alarm System,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,Upgrade Fire Alarm System,"2,118",2009-Q2,2015-Q1,Closeout,20220630 Danube ES,10366637,Danube ES - 48 Laptops,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1333501,13845,11220 Danube Ave.,Granada Hills,91344,Increase school's access to technology by providing 48 laptop computers,55,2014-Q4,2015-Q1,Closeout,20220630 El Oro Way Charter for Enriched Studies,10366639,El Oro Way ES - 48 Laptops,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1354501,13802,12230 El Oro Way,Granada Hills,91344,Increase school's access to technology by providing 48 laptop computers,74,2014-Q4,2015-Q1,Closeout,20220630 Mid-City's Prescott School of Enriched Sciences,10364053,Mid-City's Prescott School of Enriched Sciences - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1350001,13911,3150 W. Adams Blvd.,Los Angeles,90018,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",378,2013-Q4,2014-Q2,Closeout,20220630 Woodland Hills Academy,10366866,Woodland Hills Academy - Address Antiquated Roofing,Roofing,4,Nick Melvoin,Northwest,1834401,13806,20800 Burbank Blvd.,Woodland Hills,91367,"This project is to replace 24,500 Square Feet of roofing on the Physical Education Building. The roofing is more than 25 years old. This building was left off of recent project that replaced the roofing on the rest of the buildings at the site. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",270,2015-Q4,2016-Q1,Closeout,20220630 Los Angeles Academy MS,10367590,Los Angeles Academy MS - Renovate Classroom for Changing Room,Access Compliance,7,Tanya Ortiz Franklin,Central,1820001,13890,644 E. 56th St.,Los Angeles,90011,Modify classroom for changing area; Provide and install exhaust fan and electrical outlet.,10,2016-Q2,2016-Q3,Closeout,20220630 Bakewell PC,10367596,Bakewell PC - Renovate Computer Lab,Communications/Technology Upgrade,1,"Dr. George J. McKenna, III",South,1402001,13850,8261 S. Baring Cross St.,Los Angeles,90044,"Renovate computer lab: electrical upgrades, including power and data, in support of new technology to be provided by Educational Technology Grant program. Update classroom security features, including door hardware and installation of metal skins on doors.",14,2016-Q2,2016-Q2,Closeout,20220630 97th St. EEC,10100491,97th St. EEC - Paint Building Exterior,Painting,1,"Dr. George J. McKenna, III",South,1953901,16743,430 W. Colden Ave.,Los Angeles,90003,Paint Building Exterior,34,2013-Q4,2015-Q1,Closeout,20220630 Hawaiian ES,10366761,Hawaiian ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1446601,13648,540 Hawaiian Ave.,Wilmington,90744,"Renovate and upgrade school's existing parent & family center by providing interior paint, flooring and lighting repairs, and security upgrades including new doors and panic hardware as well as security on windows. Remove deteriorated built-in cabinets and patch up walls. Provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",97,2015-Q1,2015-Q4,Closeout,20220630 Calahan ES,10003965,Calahan ES - Technology Upgrades & Campus Improvements,Campus Improvement,3,Scott Schmerelson,Northwest,1270601,13747,18722 Knapp St.,Northridge,91324,"Computer Lab purchase 36 PC desktop computers, 1 computer for teacher, install 37 data drops, purchase 1 printer/scanner, purchase 1 smart board, purchase and install new 6-ton AC unit for computer lab. Refurbish multipurpose room remove, abate and replace tile, install new wall folding tables, and install new door in hallway to prevent noise. Remove, abate and replace 2,000 square feet of tile in the main office. Purchase and install new 2,500 square foot shade shelter in main courtyard. Purchase 2 storage bins 8' x 20'. Remove floor radiator from main office and teachers' lounge. Purchase and install 27 white boards in classrooms throughout campus.",525,2012-Q3,2014-Q1,Closeout,20220630 Camellia ES,10367793,Camellia ES - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1272601,13587,7451 Camellia Ave.,North Hollywood,91605,Provide and install electronic marquee.,35,2016-Q2,2016-Q3,Closeout,20220630 Sunny Brae ES,10367796,Sunny Brae ES - Wall Fold Tables,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1698601,13737,20620 Arminta St.,Canoga Park,91306,Purchase and install wall-fold tables in school auditorium.,42,2016-Q3,2016-Q4,Closeout,20220630 Garfield HS,10366038,Garfield HS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1867901,13512,5101 E. 6th St.,Los Angeles,90022,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",750,2015-Q1,2015-Q3,Closeout,20220630 Bright ES,10370215,Bright ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1716401,13306,1771 W. 36th St.,Los Angeles,90018,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2025-Q4,2026-Q2,Planning,20220630 2nd St. ES,10367650,2nd St. ES - 2016-19 Prop 39,Charter Prop 39,2,Monica Garcia,East,1657501,13326,1942 E. 2nd St.,Los Angeles,90033,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-location as a charter school renovation for Extera Public School - 2nd St. This project included 1 charter office, 1 special education room, and 11 instructional spaces for charter students in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no change"" project with 1 charter office, 1 special education room, and 11 instructional spaces for charter students in grades K-8. The project was again amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/19.",74,2016-Q2,2016-Q3,Closeout,20220630 Porter MS,10369502,Porter MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1835401,13807,15960 Kingsbury St.,Granada Hills,91344,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2021-Q1,2023-Q4,Construction,20220630 Westport Heights ES,10367646,Westport Heights ES - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1771201,13592,6011 W. 79th St.,Los Angeles,90045,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",47,2016-Q3,2016-Q4,Closeout,20220630 Hoover ES,10367922,Hoover ES - Security Upgrades,Security System,5,Jackie Goldberg,Central,1458901,13298,2726 Francis Ave.,Los Angeles,90005,Provide and install Aiphone secure entry system to enhance and control the security of the campus.,21,2016-Q4,2017-Q1,Closeout,20220630 Angeles Mesa ES,10368139,Angeles Mesa ES - Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1212301,13427,2611 W. 52nd St.,Los Angeles,90043,Provide and install electronic marquee.,24,2017-Q1,2017-Q4,Closeout,20220630 Canoga Park HS,10369609,Canoga Park HS - Roofing & HVAC,Roofing,3,Scott Schmerelson,Northwest,1857101,13415,6850 Topanga Canyon Blvd.,Canoga Park,91303,"The project will replace approximately 139,000 square feet of deteriorated roofing campus-wide with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes replacing damaged wood, installing new gutters and downspouts, and painting to match existing areas affected in the roof demolition. As part of this roofing project, selected heating, ventilation, and air conditioning (HVAC) units and equipment will be replaced while the remaining roof-mounted HVAC units and ductwork will be protected in place.","3,036",2023-Q1,2023-Q4,Planning,20220630 Kahlo Continuation HS,10369953,Kahlo Continuation HS - Secure Entry System,Security System,2,Monica Garcia,Central,1877701,13945,1924 S. Los Angeles St.,Los Angeles,90011,Install new secure entry system,9,2019-Q1,2019-Q3,Closeout,20220630 Fishburn ES,10369980,Fishburn ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1384901,13532,5701 Fishburn Ave.,Maywood,90270,Install new secure entry system,22,2018-Q4,2019-Q1,Closeout,20220630 Heliotrope ES,10369981,Heliotrope ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,Install new secure entry system,19,2018-Q4,2019-Q1,Closeout,20220630 Hughes ES,10369982,Hughes ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1237501,13939,4242 Clara St.,Cudahy,90201,Install new secure entry system,17,2018-Q4,2019-Q1,Closeout,20220630 Santana Arts Academy,10369994,Santana Arts Academy - Secure Entry System,Security System,6,Kelly Gonez,Northwest,1740401,15165,9301 N. Columbus Ave.,North Hills,91343,Install new secure entry system,11,2018-Q4,2019-Q1,Closeout,20220630 Angel's Gate Continuation HS,10369998,Angel's Gate Continuation HS - Conference Room Projector,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1885201,13943,3607 S. Gaffey St.,San Pedro,90731,Install projector and screen in conference room,10,2018-Q4,2018-Q4,Closeout,20220630 Moneta Continuation HS,10370000,Moneta Continuation HS - Science Lab Sink,Plumbing/Irrigation/Drainage,7,Tanya Ortiz Franklin,South,1866601,16461,17951 Budlong Ave.,Gardena,90248,Provide new plumbing and a sink for science lab ,23,2018-Q4,2019-Q2,Closeout,20220630 Rise Kohyang HS,10370660,Rise Kohyang HS Augmentation Grant,Charter Augmentation Grant,2,Monica Garcia,Central,1757901,0,600 S. La Fayette Park Pl. 2nd Floor,Los Angeles,90057,"This augmentation grant was awarded for the acquisition and construction of a permanent high school facility to be built on approximately 1.2-acres of land and will provide permanent education facilities for approximately 600 students in 9th through 12th grades. The proposed project is comprised of approximately 50,000 square feet to include a two-story classroom building with 22 classrooms, a library/media room, administrative offices, storage, a lunch area, a food service area, an indoor gymnasium, boys' and girls' changing rooms, an outdoor area for assemblies and recess, and a underground parking garage, with onsite drop off under the building. The charter school anticipates funding the remainder of the project budget from State Charter School Facilities Program (CSFP) funding.","41,106",2021-Q4,2023-Q4,Construction,20220630 Ford ES,10369817,Ford ES - Install Surveillance System,Security System,2,Monica Garcia,East,1391801,13503,1112 S. Ford Blvd.,Los Angeles,90022,Install video surveillance (CCTV) system campus-wide.,62,2018-Q3,2019-Q2,Closeout,20220630 Southeast MS,10368956,Southeast MS - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1815301,16081,2560 Tweedy Blvd.,South Gate,90280,"Provide 210 Chromebooks, 6 charging carts, and necessary security upgrades to computer room.",83,2017-Q3,2019-Q1,Closeout,20220630 Liberty ES,10368823,Liberty ES - 2017-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1486301,13599,2728 Liberty Blvd.,South Gate,90280,"This project is a charter school renovation for KIPP Corazon Academy for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades K-1. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",182,2017-Q2,2017-Q3,Closeout,20220630 Hughes ES,10367969,Hughes ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1237501,13939,4242 Clara St.,Cudahy,90201,"Remove 2 portable buildings including request for environmental report, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprints.",112,2016-Q4,2018-Q1,Closeout,20220630 Haddon ES,10369236,Haddon ES - SEEDS,SEEDS,6,Kelly Gonez,Northeast,1432901,13527,10115 Haddon Ave.,Pacoima,91331,"Construct an outdoor learning space of approximately 1,750 square feet, consisting of the removal of asphalt, the installation of decomposed granite with paved areas, new irrigation system, concrete headers to create in-ground planting areas for native plants and tree wells, log stools and wooden raised beds for edible plants. It will be outfitted by the school site with native and edible plants.",65,2018-Q1,2018-Q4,Closeout,20220630 King ES,10364040,King ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1653401,13423,3989 S. Hobart Blvd.,Los Angeles,90062,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",560,2013-Q4,2014-Q2,Closeout,20220630 Cabrillo ES,10366347,Cabrillo ES - New Electric Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1268501,13552,732 S. Cabrillo Ave.,San Pedro,90731,Provide upgrades to the campus by removing existing marquee and providing a new electronic marquee,29,2016-Q1,2016-Q1,Closeout,20220630 Van Nuys HS,10366111,Van Nuys HS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1889301,13404,6535 Cedros Ave.,Van Nuys,91411,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",817,2015-Q1,2015-Q2,Closeout,20220630 Florence ES,10367820,Florence ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,East,1389001,13397,7211 Bell Ave.,Los Angeles,90001,"The project included the sale of 2 portable buildings as well as sampling and abatement of hazardous materials as needed, disconnection of low voltage and high voltage utilities, and repair/replacement of asphalt over the former building footprints.",91,2016-Q3,2017-Q4,Closeout,20220630 Miles ES,10368833,Miles ES - 2017-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1531501,13650,6720 Miles Ave.,Huntington Park,90255,"This project is a charter school renovation for KIPP Comienza Community Prep for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades 5-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",212,2017-Q2,2017-Q3,Closeout,20220630 Olive Vista MS,10363838,Olive Vista MS - Seismic Modernization,Seismic Modernization,6,Kelly Gonez,Northeast,1830601,13707,14600 Tyler St.,Sylmar,91342,"Remove the existing multipurpose building and provide a new multipurpose building with multipurpose room, food service and lunch pavilion/student store. Remove the existing physical education building and provide a new physical education building with gym, locker rooms, fitness room, and faculty office. Provide upgrades to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA) including path of travel improvements as required for both new buildings.","43,439",2017-Q1,2019-Q3,Closeout,20220630 Los Angeles Center for Enriched Studies,10366870,Los Angeles Center for Enriched Studies - New Science Labs,Reconfiguration,1,"Dr. George J. McKenna, III",West,1874101,13554,5931 W. 18th St.,Los Angeles,90035,"This project converts 2 existing classrooms, originally designed in the 1960s as a middle school science classroom and as a ceramics classroom, into 2 chemistry laboratories. The project also includes the conversion of a storage room into a chemistry workroom and abatement of hazardous materials found during the reconfiguration work. Upgrades to ensure compliance with the Americans with Disabilities Act (ADA) and Division of the State Architect (DSA) requirements are also provided. The 2 new laboratories meet District standards for new high school chemistry laboratories.","4,264",2017-Q2,2018-Q2,Closeout,20220630 O'Melveny ES,10367809,O'Melveny ES - Restroom Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1572601,13396,728 Woodworth St.,San Fernando,91340,Provide and install changing support station,4,2016-Q3,2016-Q4,Closeout,20220630 Apperson ES,10367805,Apperson ES - Restroom Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1216401,13608,10233 Woodward Ave.,Sunland,91040,Remove existing cabinet and shelf. Provide and install privacy curtains for changing table.,10,2016-Q3,2016-Q3,Closeout,20220630 Loma Vista ES,10369877,Loma Vista ES - Technology Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1491801,13586,3629 E. 58th St.,Maywood,90270,Purchase 36 MacBooks and 108 Chromebooks with 3 charging carts.,97,2018-Q3,2018-Q3,Closeout,20220630 Crenshaw Magnet HS: STEMM,10370026,Crenshaw Magnet HS - Baseball Scoreboard,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,Install scoreboard at baseball field,72,2019-Q1,2019-Q4,Closeout,20220630 Aragon ES,10367493,Aragon ES - Roofing,Roofing,2,Monica Garcia,Central,1217801,13372,1118 Aragon Ave.,Los Angeles,90065,"The project will upgrade 13,000 square feet of roofing at four buildings and a lunch shelter with a Polyvinyl Chloride (PVC) material. The roofs are over 20 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",383,2022-Q3,2023-Q1,Planning,20220630 32nd St./USC Performing Arts Magnet ES,10364015,32nd St./USC Performing Arts Magnet - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1713701,13299,822 W. 32nd St.,Los Angeles,90007,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",502,2014-Q1,2014-Q2,Closeout,20220630 Drew MS,10364030,Drew MS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1811201,13871,8511 Compton Ave.,Los Angeles,90001,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",633,2014-Q1,2014-Q3,Closeout,20220630 Corona ES,10365694,Corona ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,East,1321901,13453,3825 Bell Ave.,Bell,90201,Replace deteriorated playground matting systems to ensure the health and safety of students.,43,2014-Q1,2014-Q1,Closeout,20220630 Brentwood Science Magnet ES,10004586,Brentwood Science Magnet - Facelift,Facelift,4,Nick Melvoin,West,1250701,13394,740 Gretna Green Way,Los Angeles,90049,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",108,2012-Q3,2016-Q3,Closeout,20220630 Holmes ES,10004627,Holmes ES - Facelift,Facelift,5,Jackie Goldberg,East,1456201,13315,5108 Holmes Ave.,Los Angeles,90058,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",140,2012-Q2,2016-Q3,Closeout,20220630 Miles ES,10004628,Miles ES - Facelift,Facelift,5,Jackie Goldberg,East,1531501,13650,6720 Miles Ave.,Huntington Park,90255,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",98,2014-Q3,2015-Q1,Closeout,20220630 Woodlawn ES,10004633,Woodlawn ES - Facelift,Facelift,5,Jackie Goldberg,East,1790401,13572,6314 Woodlawn Ave.,Bell,90201,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",150,2012-Q2,2017-Q1,Closeout,20220630 112th St. ES,10004638,112th St. ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",175,2016-Q1,2016-Q3,Closeout,20220630 135th St. ES,10004651,135th St. ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1587701,13607,801 W. 135th St.,Gardena,90247,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",154,2013-Q2,2016-Q3,Closeout,20220630 Cleveland Infant Center,10005022,Cleveland Infant Center - Safety Upgrades and Improvements,Campus Improvement,3,Scott Schmerelson,Northwest,1949101,13753,19031 W. Strathern St.,Reseda,91335,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",79,2014-Q2,2015-Q1,Closeout,20220630 Stoner ES,10366266,Stoner ES - 2014-15 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1695201,13772,11735 Braddock Dr.,Culver City,90230,"This project was approved in Board of Education Report No. 342-13/14 as a charter school renovation for Citizens of the World Charter School - Mar Vista, however the charter school opted to vacate the site and will not continue occupancy in the 2014-15 school year. This project is amended to include the scope of work required to restore the LAUSD campus to its former condition. The required reconfiguration includes all low voltage systems (PA, telephone, intrusion alarm and data) to be put back on the LAUSD systems as well as rekeying of the charter's former classrooms.",14,2014-Q2,2014-Q3,Closeout,20220630 Chandler ES,10363903,Chandler Learning Academy - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1295901,13619,14030 Weddington St.,Van Nuys,91401,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",291,2014-Q3,2014-Q4,Closeout,20220630 Elizabeth Learning Center,10367614,Elizabeth Learning Center - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1354801,13480,4811 Elizabeth St.,Cudahy,90201,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",71,2016-Q3,2017-Q1,Closeout,20220630 Manhattan ES,10367625,Manhattan ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1511001,13685,1850 W. 96th St.,Los Angeles,90047,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",57,2016-Q3,2017-Q2,Closeout,20220630 Saturn ES,10366719,Saturn ES - Flooring Upgrades,Flooring,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,Provide flooring upgrades by removing deteriorated carpet and installing new vinyl composition tile throughout the classrooms and hallways of the main building,72,2015-Q1,2015-Q3,Closeout,20220630 Mack ES,10367485,Mack ES - Convert Storage Room,Access Compliance,1,"Dr. George J. McKenna, III",Central,1511301,13851,3020 S. Catalina St.,Los Angeles,90007,"Provide and install lavatory, privacy curtain, and exhaust fan for changing table to convert a storage room into a changing room.",15,2016-Q1,2016-Q2,Closeout,20220630 Le Conte MS,10366243,Le Conte MS - 2014-15 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"This project is a charter school renovation for Citizens of the World Charter School - Hollywood for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 16 classrooms for 396.58 charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",52,2014-Q2,2014-Q3,Closeout,20220630 Northridge MS,10366573,Northridge MS - SEEDS,SEEDS,3,Scott Schmerelson,Northwest,1828301,13740,17960 Chase St.,Northridge,91325,"Design and construct an outdoor learning space of approximately 1,600 square feet consisting of painting pavements areas, the installation of a hose bib and art poles. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",20,2015-Q1,2015-Q1,Closeout,20220630 Elizabeth Learning Center,10367420,Elizabeth Learning Center- Restroom Upgrades,Access Compliance,5,Jackie Goldberg,East,1354801,13480,4811 Elizabeth St.,Cudahy,90201,Provide and install restroom upgrades,6,2015-Q4,2016-Q1,Closeout,20220630 Virgil MS,10366578,Virgil MS - SEEDS,SEEDS,2,Monica Garcia,Central,1846201,13382,152 N. Vermont Ave.,Los Angeles,90004,"Improve and expand an existing outdoor learning space from approximately 800 square feet to approximately 1600 square feet consisting of the removal of asphalt and fencing, the installation of decomposed granite, hose bibs, irrigation system, point of connection for irrigating raised beds, perimeter fencing and gate. It will be outfitted by the school site (Virgil MS) with planter boxes, planting materials and outdoor seating.",29,2015-Q1,2015-Q2,Closeout,20220630 Corona ES,10367222,Corona ES-Provide & Install Restroom Upgrades,Access Compliance,5,Jackie Goldberg,East,1321901,13453,3825 Bell Ave.,Bell,90201,Provide and Install Restroom Upgrades,18,2015-Q4,2015-Q4,Closeout,20220630 Woodlawn ES,10368037,Woodlawn ES - Restroom Upgrades,Access Compliance,5,Jackie Goldberg,East,1790401,13572,6314 Woodlawn Ave.,Bell,90201,"Modify kindergarten restroom; provide and install folding changing table and privacy screen, and enlarge doorways.",2,2016-Q4,2017-Q1,Closeout,20220630 Wilmington STEAM Magnet MS,10369613,Wilmington STEAM Magnet MS - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1849001,13538,1700 Gulf Ave.,Wilmington,90744,Upgrade video surveillance system by installing additional cameras and connecting to the existing intrusion alarm.,148,2018-Q4,2019-Q3,Closeout,20220630 Cienega ES,10105899,Cienega ES - Compliance with State & Federal Access Requirements,Fire Alarm System,1,"Dr. George J. McKenna, III",West,1306801,13429,2611 S. Orange Dr.,Los Angeles,90016,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),439,2015-Q4,2016-Q2,Closeout,20220630 Markham MS,10366569,Markham MS - Storm Drain System,Plumbing/Irrigation/Drainage,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,"This project replaces the deteriorated storm drain system for the site which is part of the Compton Creek of the Los Angeles River Watershed and thus impacted by pollutants. The District received a Proposition 84 Stormwater Grant for $999,689 to address the storm drain issues on the campus. The scope of work includes storm drain improvements, replacement of deteriorated asphalt concrete pavement throughout the campus as needed, and replacement of a berm with a bioswale along the soccer field to reduce damage to the synthetic turf caused by soil transfers. Also included are the associated path of travel upgrades and other drainage systems required by DSA and the District's Stormwater Technical Manual.","6,052",2016-Q1,2018-Q3,Closeout,20220630 Huntington Park HS,10105658,Auditorium A/C Project,HVAC,5,Jackie Goldberg,East,1870001,13597,6020 Miles Ave.,Huntington Park,90255,Auditorium A/C Project,"3,372",2014-Q2,2015-Q1,Closeout,20220630 Telfair ES,10369559,Telfair ES - Electrical Upgrades in Classrooms,Electrical/Lighting,6,Kelly Gonez,Northeast,1706801,13616,10975 Telfair Ave.,Pacoima,91331,Install electrical outlets for wall-mounted projectors in 18 classrooms.,15,2018-Q1,2018-Q2,Closeout,20220630 Academy for Enriched Sciences Magnet ES,10367747,Academy for Enriched Sciences Magnet ES - Roofing,Roofing,3,Scott Schmerelson,Northwest,1225001,13615,17551 Miranda St.,Encino,91316,"This project is to replace approximately 37,000 square feet of deteriorated roofing with new Polyvinyl Chloride (PVC) material and install metal flashing at 9 buildings, associated arcades, and the lunch shelter. The roofs are over 20 years old. The scope of work includes abatement, removal and replacement of the deteriorated roofing systems, replacement of damaged wood, and painting to match existing areas affected in the roof demolition. The existing roof-mounted air conditioning units and conduits will be protected in place.",527,2017-Q3,2018-Q1,Closeout,20220630 Catskill ES,10368013,Catskill ES - Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1289001,13662,23536 Catskill Ave.,Carson,90745,"Modify kindergarten restroom; provide and install folding changing table, exhaust fan, and privacy screen.",6,2016-Q4,2017-Q1,Closeout,20220630 Beethoven ES,10367464,Beethoven ES - Renovate Computer Lab,Communications/Technology Upgrade,4,Nick Melvoin,West,1234201,15206,3711 Beethoven St.,Los Angeles,90066,"Renovate computer lab with replacement of deteriorated floor, patch and paint interior walls, secure doors and windows, provide new desks with cable management system, and purchase 20 laptops.",52,2016-Q3,2016-Q4,Closeout,20220630 Eastman ES,10368805,Eastman ES - 2017-19 Prop 39,Charter Prop 39,2,Monica Garcia,East,1352101,13520,4112 E. Olympic Blvd.,Los Angeles,90023,"This project was initially approved in BOE Report No. 530-16/17 for the 2017-18 Prop 39 co-locations as a charter school renovation for Extera Public School - Eastman. This project included 1 charter office and 6 instructional spaces for charter student seats in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/19.",252,2017-Q2,2017-Q3,Closeout,20220630 Bridge ES,10369548,Bridge ES - Security & Safety Upgrades,Security System,2,Monica Garcia,East,1252101,13297,605 N. Boyle Ave.,Los Angeles,90033,Security and safety upgrades: install new secure entry system and fencing to separate trash containers from playground.,38,2018-Q2,2018-Q3,Closeout,20220630 Dyer ES,10369506,Dyer ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1349301,13712,14500 Dyer St.,Sylmar,91342,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2023-Q1,2023-Q4,Planning,20220630 Loma Vista ES,10105873,Loma Vista ES - Compliance with State & Federal Access Requirements,Fire Alarm System,5,Jackie Goldberg,East,1491801,13586,3629 E. 58th St.,Maywood,90270,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),386,2015-Q2,2015-Q4,Closeout,20220630 President ES,10367213,President ES - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1614801,13765,1465 W. 243rd St.,Harbor City,90710,"This project is to upgrade 12,200 square feet of roofing on three buildings with a Polyvinyl Chloride (PVC) material. The roofs are over 15 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",264,2016-Q1,2016-Q2,Closeout,20220630 Palms MS,10366179,Palms MS - Paving,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1834001,13668,10860 Woodbine St.,Los Angeles,90034,"The 35-year-old asphalt concrete paving on the campus is severely damaged and in need of replacement. The scope of work includes replacement of deteriorated asphalt concrete pavement as needed, redesigning the outdoor athletic areas to meet current requirements, and replacement/upgrade of outdoor apparatus and fencing as necessary. Also included are the associated path of travel upgrades and drainage systems required by the Division of State Architect (DSA) and the District's Storm Water Technical Manual.","5,981",2016-Q4,2018-Q1,Closeout,20220630 Elizabeth Learning Center,10369874,Elizabeth Learning Center - Parking Fencing,Fencing,5,Jackie Goldberg,East,1354801,13480,4811 Elizabeth St.,Cudahy,90201,Install new parking lot fencing,20,2018-Q3,2018-Q3,Closeout,20220630 Heliotrope ES,10369687,Heliotrope ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,"Demolish and remove 2 portable buildings. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving and paint striping in the parking lot.",376,2018-Q2,2019-Q2,Closeout,20220630 Towne ES,10370051,Towne ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1720501,13755,18924 Towne Ave.,Carson,90746,Install new secure entry system,16,2018-Q4,2018-Q4,Closeout,20220630 O'Melveny ES,10367062,O'Melveny ES - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1572601,13396,728 Woodworth St.,San Fernando,91340,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 54 doors/hardware, 48 accessible paths of travel, 27 signs, 17 restrooms, 17 drinking fountains/sinks, 1 casework/counter, 1 assistive listening device/intercom/phone, 9 concrete ramps, 1 metal ramp, 12 pieces of accessible furniture, 1 assembly seat, 3 railings, 1 cafeteria counter, 1 new elevator, and 1 stage lift.","7,962",2016-Q4,2022-Q1,Closeout,20220630 Politi ES,10102126,Politi ES - Replace HVAC,HVAC,2,Monica Garcia,Central,1238401,13823,2481 W. 11th St.,Los Angeles,90006,Replace HVAC,175,2012-Q4,2014-Q2,Closeout,20220630 Pio Pico MS,10366520,Pio Pico MS - ADA Improvements,Access Compliance,1,"Dr. George J. McKenna, III",West,1498001,13903,1512 S. Arlington Ave.,Los Angeles,90019,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 174 doors/hardware, 95 accessible paths of travel, 137 signs, 31 restrooms, 12 drinking fountains/sinks, 24 pieces of accessible furniture, 14 railings, 1 existing elevator modification, 8 locker room modifications/lockers, 6 parking areas, 3 changing rooms, 2 new elevators/stage lifts, and 1 passenger/bus loading zone.","5,370",2019-Q3,2022-Q3,Construction,20220630 Rosewood Urban Planning & Design Magnet ES,10367634,Rosewood ES - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1638401,13579,503 N. Croft Ave.,Los Angeles,90048,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",56,2016-Q3,2017-Q1,Closeout,20220630 Valley Oaks Center for Enriched Studies,10368845,Sun Valley HS - 2017-18 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,"This project is a charter school renovation for North Valley Military Institute for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 24 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",61,2017-Q2,2017-Q3,Closeout,20220630 Russell ES,10367824,Russell ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1643801,15401,1263 E. Firestone Blvd.,Los Angeles,90001,"Remove 2 DSA portable buildings (24' x 60'), relocate contents of the portable buildings, provide temporary fencing, disconnect all utilities and data systems, reconnect all utilities to remaining buildings on site, repair asphalt paving over the former building footprints, and remove all construction-related debris.",174,2016-Q4,2018-Q1,Closeout,20220630 102nd St. EEC,10367284,102nd St. EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1954501,16301,1925 E. 102nd St.,Los Angeles,90002,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",80,2016-Q2,2016-Q2,Closeout,20220630 Liggett ES,10365119,Liggett ES - Purchase Devices,Communications/Technology Upgrade,6,Kelly Gonez,Northwest,1487001,13804,9373 Moonbeam Ave.,Panorama City,91402,Purchase devices and a cart to provide internet and intranet access for students and teachers.,28,2014-Q1,2014-Q1,Closeout,20220630 Belmont HS,10366217,Belmont HS - 2014-15 Prop 39 (Alliance College-Ready Academy HS #16),Charter Prop 39,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"This project is a charter school renovation for Alliance College-Ready Academy HS #16 for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 13 classrooms for 364 charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",53,2014-Q2,2014-Q2,Closeout,20220630 Lawrence MS,10367066,Lawrence MS - ADA Improvements,Access Compliance,3,Scott Schmerelson,Northwest,1821701,13695,10100 Variel Ave.,Chatsworth,91311,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 254 doors/hardware, 78 accessible paths of travel, 134 signs, 22 restrooms, 35 drinking fountains/sinks, 4 assistive listening devices/intercoms/phones, 6 concrete ramps, 3 metal ramps, 17 pieces of accessible furniture, 1 assembly seat, 12 railings, 3 locker room modifications/lockers, 1 parking area, 3 cafeteria counters, and 2 passenger/bus loading zones.","5,311",2016-Q4,2021-Q4,Closeout,20220630 Gledhill ES,10367776,Gledhill ES - Lunch Tables,Access Compliance,6,Kelly Gonez,Northwest,1413001,13746,16030 Gledhill St.,North Hills,91343,Provide and install 2 lunch tables.,2,2016-Q2,2016-Q3,Closeout,20220630 Fleming MS,10364359,Fleming MS - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1812701,13657,25425 Walnut St.,Lomita,90717,Demolish/Remove Portable Building(s),81,2013-Q3,2014-Q1,Closeout,20220630 Wilshire Crest ES,10107447,Wilshire Crest ES - Compliance with State & Federal Access Requirements,Access Compliance,1,"Dr. George J. McKenna, III",West,1779501,13524,5241 W. Olympic Blvd.,Los Angeles,90036,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) for Lunch Shelter,356,2016-Q1,2016-Q3,Closeout,20220630 Chatsworth Park ES,10366129,Chatsworth Park ES - New Swing Gate,Security System,3,Scott Schmerelson,Northwest,1302701,13389,22005 Devonshire St.,Chatsworth,91311,Upgrade the south parking lot entrance by providing a new swing gate,4,2014-Q1,2014-Q2,Closeout,20220630 Winnetka ES,10366134,"Winnetka ES - Computers, Smart Board, Printer",Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1783601,13515,8240 Winnetka Ave.,Canoga Park,91306,"Increase school's access to technology by providing new desktop computers, smart board, and a printer",47,2014-Q3,2014-Q3,Closeout,20220630 Coeur d'Alene ES,10366139,Coeur d'Alene ES - Electronic Camera Door Entry,Security System,4,Nick Melvoin,West,1634201,13578,810 Coeur D'Alene Ave.,Venice,90291,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance,23,2013-Q4,2014-Q3,Closeout,20220630 Ambler ES,10366142,Ambler ES - Panic Bar Hardware,Security System,7,Tanya Ortiz Franklin,South,1208901,13833,319 E. Sherman Dr.,Carson,90746,Upgrade security by providing new panic bar hardware and audible alarm systems at various gates,5,2014-Q4,2014-Q4,Closeout,20220630 Miller ES,10366143,Miller ES - Electronic Camera Door Entry,Security System,1,"Dr. George J. McKenna, III",South,1532101,13780,830 W. 77th St.,Los Angeles,90044,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance,14,2014-Q3,2015-Q2,Closeout,20220630 Graham ES,10366144,Graham ES - Electronic Camera Door Entry & Marquee,Campus Improvement,7,Tanya Ortiz Franklin,South,1421901,13476,8407 S. Fir Ave.,Los Angeles,90001,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance. Upgrade campus by providing a new wall-mounted marquee.,46,2014-Q3,2015-Q2,Closeout,20220630 Nevin ES,10364057,Nevin ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1546601,13390,1569 E. 32nd St.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",414,2014-Q1,2014-Q2,Closeout,20220630 Irving STEAM Magnet MS,10371872,Irving STEAM Magnet MS - 2021-22 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"This project is a charter school renovation for ISANA Octavia Academy for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 1 special education room, and 11 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The scope of work for this project included the reconfiguration of rooms back to District systems, this scope of work was not performed.",3,2021-Q3,2021-Q3,Closeout,20220630 Panorama HS,10371882,Panorama HS - 2021-23 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,"This project was initially approved in BOE Report No. 317-20/21 for the 2021-22 Prop 39 co-locations as a charter school renovation for Girls Athletic Leadership School. This project included 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades 6-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades 6-8 and an undefined scope of work.",25,2021-Q2,2021-Q3,Closeout,20220630 El Camino Real Charter HS,10366316,El Camino Real Charter HS - Ceiling System Improvements,Seismic Modernization,3,Scott Schmerelson,Northwest,1861701,13776,5440 Valley Circle Blvd.,Woodland Hills,91367,"Repair 11,000 square feet of suspended ceiling systems in 003DAR classroom building for seismic corrections and to improve structural integrity. Scope of work includes installation of new seismic compression struts, and hanger wire upgrades per code requirements, as well as abatement of asbestos and removing impacted components beyond their remaining service life.",586,2019-Q2,2019-Q3,Closeout,20220630 Brentwood Science Magnet ES,10371482,Brentwood Science Magnet ES - Water Bottle Filler,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1250701,13394,740 Gretna Green Way,Los Angeles,90049,Replace existing deteriorated drinking fountain with a new bottle filling station at the rear of the main building.,10,2020-Q4,2021-Q2,Closeout,20220630 West Vernon ES,10372016,West Vernon ES - Provide Exterior Lunch Tables,Furniture/Fixtures/Equipment,5,Jackie Goldberg,Central,1765401,13330,4312 S. Grand Ave.,Los Angeles,90037,Purchase (5) exterior lunch tables with fiberglass umbrellas. Install concrete footings to mount tables to.,23,2021-Q3,2022-Q2,Closeout,20220630 Westchester Enriched Sciences Magnets,10371347,Westchester Enriched Sciences Magnets - 2020-21 Prop 39 (WISH Academy HS),Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Academy HS for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 11 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",30,2020-Q3,2020-Q3,Closeout,20220630 University Charter HS,10371072,University Charter HS - Bungalows HVAC,HVAC,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,"Install heating, ventilation, and air conditioning (HVAC) units in two bungalows.",46,2020-Q3,2020-Q4,Closeout,20220630 Audubon MS,10372485,Audubon MS - 2022-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1802801,13564,4120 11th Ave.,Los Angeles,90008,"This project is a charter school renovation for Crenshaw Arts/Tech Charter HS (CATCH) for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 10 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",259,2022-Q3,2022-Q3,Planning,20220630 Stoner ES,10372515,Stoner ES - 2022-23 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1695201,13772,11735 Braddock Dr.,Culver City,90230,"This project is a charter school renovation for ICEF Vista Academy ES for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 6 instructional spaces for charter student seats in grades TK-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",17,2022-Q3,2022-Q3,Planning,20220630 Chavez ES,10366017,Chavez ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1764001,13947,5243 Oakland St.,Los Angeles,90032,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",355,2015-Q2,2015-Q3,Closeout,20220630 Clay MS,10366018,Clay MS - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1809901,13752,12226 S. Western Ave.,Los Angeles,90047,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",522,2015-Q1,2015-Q2,Closeout,20220630 Rowan ES,10371823,Rowan ES - Install Secure Entry System,Security System,2,Monica Garcia,East,1642501,13381,600 S. Rowan Ave.,Los Angeles,90023,Install new secure entry system at entrance to main building with two video receivers in main office.,43,2021-Q2,2021-Q3,Closeout,20220630 59th St. ES,10369299,59th St. ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1379501,13400,5939 Second Ave.,Los Angeles,90043,"Demolition of 1 portable DSA building. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprint.",145,2018-Q1,2021-Q2,Closeout,20220630 Encino Charter ES,10371999,Encino Charter ES - Install Wall-Fold Tables,Furniture/Fixtures/Equipment,4,Nick Melvoin,Northwest,1361601,13500,16941 Addison St.,Encino,91316,Install (4) wall-fold (pocket) tables in auditorium; (2) single tables and (2) double tables,43,2022-Q1,2022-Q1,Closeout,20220630 Westside Global Awareness Magnet,10372529,Westside Global Awareness Magnet - Roofing,Roofing,4,Nick Melvoin,West,1331101,13575,104 Anchorage St.,Marina Del Rey,90291,"This project is to provide approximately 14,472 square feet of new roofing at 11 buildings, including the installation of new gutters and downspouts and painting of affected areas.",354,2023-Q3,2023-Q4,Planning,20220630 Braddock ES,10105874,Braddock ES - Compliance with State & Federal Access Requirements,Fire Alarm System,4,Nick Melvoin,West,1247901,13536,4711 Inglewood Blvd.,Culver City,90230,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),278,2015-Q2,2015-Q3,Closeout,20220630 Granada Hills Charter HS,10366039,Granada Hills Charter HS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1868101,13769,10535 Zelzah Ave.,Granada Hills,91344,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,108",2015-Q1,2015-Q2,Closeout,20220630 Harmony ES,10366041,Harmony ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1468101,13535,899 E. 42nd Pl.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",297,2015-Q2,2015-Q3,Closeout,20220630 Berendo MS,10105880,Berendo MS - Compliance with State & Federal Access Requirements,Fire Alarm System,5,Jackie Goldberg,Central,1805701,13274,1157 S. Berendo St.,Los Angeles,90006,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),363,2015-Q1,2015-Q3,Closeout,20220630 Burton ES,10364096,Burton ES - HVAC,HVAC,6,Kelly Gonez,Northeast,1265801,13540,8111 Calhoun Ave.,Panorama City,91402,"The project will replace deteriorated and aged wall-hung heat pumps and rooftop air conditioning units in 14 buildings that serve classrooms, administrative and support areas, with rooftop units. The equipment is more than 25 years old, inefficient and requires frequent service. Maintenance & Operations received approximately 50 related service calls within the past 12 months prior to approval of this project.","4,070",2016-Q2,2017-Q4,Closeout,20220630 Hillcrest ES,10367689,Hillcrest ES - 2016-17 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1452801,13621,4041 Hillcrest Dr.,Los Angeles,90008,"This project is a charter school renovation for City Charter ES for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",25,2016-Q2,2016-Q3,Closeout,20220630 Portola Charter MS,10368342,Portola MS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,Northwest,1810701,13785,18720 Linnet St.,Tarzana,91356,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",182,2018-Q2,2019-Q1,Closeout,20220630 Bravo Medical Magnet HS,10366124,Bravo Medical Magnet HS - Fix Water Intrusion in Main Building,Plumbing/Irrigation/Drainage,2,Monica Garcia,East,1875401,13336,1200 N. Cornwell St.,Los Angeles,90033,"This project has been developed to relieve persistent site flooding issues. The scope includes the removal and replacement of drain pipes and damaged sidewalks, gutters, curbs, tree wells, and hardwood flooring at the main building; re-grading slopes, concrete, and sidewalks to prevent water intrusion; and providing a sump pump system for below grade-level drainage. Proposed improvements to the public right-of-way will be coordinated with the local government agency, including any necessary access and use agreements.","2,210",2017-Q1,2017-Q4,Closeout,20220630 Hesby Oaks Leadership Charter,10363953,Hesby Oaks Leadership Charter - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,Northwest,1452101,13717,15530 Hesby St.,Encino,91436,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",276,2014-Q2,2014-Q3,Closeout,20220630 Virginia ES,10366621,Virginia ES - Lunch Shelter & Arcade,Lunch/Shade Shelter,1,"Dr. George J. McKenna, III",West,1757501,13504,2925 Virginia Rd.,Los Angeles,90016,"This lunch shelter project includes removing and replacing deteriorated ceiling joists, beams, rain gutters, down spouts, tongue and groove sheeting, and clay tile roofing. The scope of work also includes removing and replacing the lights, security devices, camera, and intercom at the lunch shelter.",153,2016-Q1,2018-Q2,Closeout,20220630 Clinton MS,10366019,Clinton MS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1806201,13909,3500 S. Hill St.,Los Angeles,90007,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",445,2014-Q4,2015-Q1,Closeout,20220630 Danube ES,10365696,Danube ES - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1333501,13845,11220 Danube Ave.,Granada Hills,91344,Replace deteriorated playground matting systems to ensure the health and safety of students.,117,2014-Q2,2014-Q4,Closeout,20220630 Dayton Heights ES,10365697,Dayton Heights ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1335601,13352,607 N. Westmoreland Ave.,Los Angeles,90004,Replace deteriorated playground matting systems to ensure the health and safety of students.,33,2014-Q4,2014-Q4,Closeout,20220630 Crestwood ES,10365646,Crestwood ES - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1330201,13733,1946 W. Crestwood St.,Rancho Palos Verdes,90275,Provide upgrades to the campus by providing a new electronic marquee.,25,2014-Q1,2014-Q3,Closeout,20220630 San Antonio ES,10004948,San Antonio ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1464101,13827,6222 State St.,Huntington Park,90255,"Provide new flooring. Equip with tables, chairs, children's corner, storage cabinets, signage, media cart and computers. Replace doors and locks.",72,2013-Q4,2014-Q1,Closeout,20220630 Amestoy ES,10363876,Amestoy ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1209601,13426,1048 W. 149th St.,Gardena,90247,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",349,2014-Q4,2015-Q1,Closeout,20220630 Downtown Magnets HS: Downtown Business,10366024,Downtown Magnets HS Downtown Business Magnet - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1873801,13269,1081 W. Temple St.,Los Angeles,90012,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",246,2014-Q3,2014-Q4,Closeout,20220630 Cárdenas ES,10368960,Cárdenas ES - Shade Structure,Lunch/Shade Shelter,3,Scott Schmerelson,Northeast,1740101,193551,6900 Calhoun Ave.,Van Nuys,91405,Install a 20' x 50' metal shade structure in the kindergarten yard and provide Americans with Disabilities Act (ADA) path of travel upgrades.,246,2021-Q1,2021-Q3,Closeout,20220630 Laurel Span School,10369489,Laurel Span School - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1480801,13359,925 N. Hayworth Ave.,Los Angeles,90046,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",231,2020-Q1,2020-Q4,Closeout,20220630 Huntington ES,10369418,Huntington ES - Security Upgrades,Security System,2,Monica Garcia,East,1463001,13312,4435 N. Huntington Dr.,Los Angeles,90032,Install new secure entry system.,26,2018-Q1,2018-Q2,Closeout,20220630 Bridge ES,10363888,Bridge ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1252101,13297,605 N. Boyle Ave.,Los Angeles,90033,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",270,2014-Q4,2015-Q1,Closeout,20220630 Los Feliz STEMM Magnet ES,10107475,Los Feliz STEMM Magnet ES - Library Renovation,Library Renovation,2,Monica Garcia,Central,1498601,13344,1740 N. New Hampshire Ave.,Los Angeles,90027,Library Renovation,104,2016-Q2,2016-Q4,Closeout,20220630 Pomelo Community Charter ES,10369293,Pomelo Community Charter ES - Install Ramp,Access Compliance,3,Scott Schmerelson,Northwest,1614001,13764,7633 March Ave.,West Hills,91304,Install a ramp at classrooms 19 & 20,45,2017-Q4,2017-Q4,Closeout,20220630 Ranchito ES,10370529,Ranchito ES - Intrusion Alarm,Security System,6,Kelly Gonez,Northeast,1619201,13721,7940 Ranchito Ave.,Panorama City,91402,Install intrusion alarm throughout campus,53,2019-Q2,2019-Q3,Closeout,20220630 Woodlawn ES,10370231,Woodlawn ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1790401,13572,6314 Woodlawn Ave.,Bell,90201,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q2,2026-Q3,Planning,20220630 South Gate HS,10370273,South Gate HS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1887101,13262,3351 Firestone Blvd.,South Gate,90280,"Replace deteriorated interior walk-in cooler and interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, interior walk-in freezer/cooler combination unit, and refrigeration equipment.",182,2027-Q2,2027-Q4,Planning,20220630 Haddon ES,10366820,Haddon ES-ADA Repairs,Access Compliance,6,Kelly Gonez,Northeast,1432901,13527,10115 Haddon Ave.,Pacoima,91331,ADA repairs,19,2015-Q2,2015-Q2,Closeout,20220630 Banning HS,10366844,Banning HS - Wrought Iron Fence & Gate at Main Entrance,Fencing,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,Upgrade physical security of the campus by providing and installing a wrought iron fence and gate by the main entrance of the school.,74,2015-Q4,2016-Q4,Closeout,20220630 Caroldale Learning Community,10104839,Caroldale Learning Community - New Relocatable Changing Rooms,Portable Upgrade,7,Tanya Ortiz Franklin,South,1281501,13843,22424 Caroldale Ave.,Carson,90745,New Relocatable Changing Rooms,241,2013-Q4,2014-Q1,Closeout,20220630 Eagle Rock HS,10370681,Eagle Rock HS - Flooring,Flooring,5,Jackie Goldberg,Central,1861401,13553,1750 Yosemite Dr.,Los Angeles,90041,"This project is to replace approximately 145,000 square feet of deteriorated vinyl tile, rubber tile and hardwood flooring.","2,032",2023-Q1,2025-Q2,Planning,20220630 Canoga Park EEC,10004996,Canoga Park EEC - Nature Explore Classroom,Campus Improvement,3,Scott Schmerelson,Northwest,1959201,16297,7355 Vassar Ave.,Canoga Park,91303,Design and construct new nature explore classroom including required fire alarm upgrades.,"1,198",2016-Q1,2016-Q4,Closeout,20220630 Park ES,10372554,Park ES - Provide Tree Irrigation and Benches,Plumbing/Irrigation/Drainage,5,Jackie Goldberg,East,1600501,13861,8020 Park Ave.,Cudahy,90201,"Provide exterior benches and irrigation to support new trees. Remove approx. 1,000 sq ft of asphalt to create tree wells and trenches for irrigation. Prepare tree wells, install irrigation system, and plant (20) trees. Purchase (10) metal benches, install concrete pads and anchor them. Trees to be donated by LA Beautification team (LABT).",79,2022-Q3,2022-Q4,Planning,20220630 Telfair ES,10370777,Telfair ES - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1706801,13616,10975 Telfair Ave.,Pacoima,91331,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 24 door hardware, 9 thresholds, 23 accessible paths of travel, 25 signs, 9 restrooms, 6 drinking fountains, 10 sinks/sink cabinets, 1 assistive listening device/intercom/phone, 3 concrete ramps, 9 metal ramps, 1 piece of accessible furniture, 8 railings, 1 nurse's exam room modification, and DSA certification or replacement of 2 portable sanitary buildings.","6,203",2022-Q4,2024-Q2,Design,20220630 Marshall HS,10372456,Marshall HS - Purchase Classroom Furniture,Furniture/Fixtures/Equipment,2,Monica Garcia,Central,1875001,13571,3939 Tracy St.,Los Angeles,90027,"Purchase teacher and student furniture for (2) classrooms: tables, chairs, and storage (198 items total). Remove raised wiremold and floor-mounted electrical receptacles. These actions will convert (2) computer labs into standard classrooms.",78,2022-Q2,2022-Q4,Construction,20220630 Woodlawn ES,10371663,Woodlawn ES - Install Secure Entry System,Security System,5,Jackie Goldberg,East,1790401,13572,6314 Woodlawn Ave.,Bell,90201,Install new secure entry system at door to main office with three video receivers in main office.,20,2021-Q1,2021-Q2,Closeout,20220630 Park Western ES,10372299,Park Western ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1601301,13588,1214 Park Western Pl.,San Pedro,90732,Install new secure entry system at the Main Office.,29,2022-Q2,2022-Q3,Construction,20220630 Playa Del Rey ES,10372625,Playa Del Rey ES - Secure Entry System,Security System,4,Nick Melvoin,West,1611001,13559,12221 Juniette St.,Culver City,90230,Install new secure entry system at the Main Office.,38,2022-Q3,2022-Q3,Planning,20220630 Limerick ES,10372141,Limerick ES - Install Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1488101,13697,8530 Limerick Ave.,Canoga Park,91306,"Remove manual-type marquee from front of school. Install electronic free-standing marquee in same location, with new footing. Approx. 100 feet above-ground and 50 feet below-ground conduit required. Double-sided color LED displays.",67,2021-Q4,2022-Q3,Construction,20220630 Lemay ES,10372227,Lemay ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1484901,13684,17520 Vanowen St.,Lake Balboa,91406,Install new secure entry system at the Main Office,40,2022-Q1,2022-Q3,Construction,20220630 Dearborn Charter Academy ES,10372617,Dearborn Charter Academy ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1337701,13762,9240 Wish Ave.,Northridge,91325,Install new secure entry system at the Main Office.,75,2022-Q3,2022-Q3,Planning,20220630 Fulton College Preparatory School,10372494,Fulton College Preparatory School - 2022-23 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,"This project is a charter school renovation for Lashon Academy for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 27 instructional spaces for charter student seats in grades TK-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",57,2022-Q3,2022-Q3,Planning,20220630 Trinity EEC,10005002,Trinity EEC - Nature Explore Classroom,Campus Improvement,5,Jackie Goldberg,Central,1956901,16689,3816 Trinity St.,Los Angeles,90011,"Design and construct new nature explore classroom including required fire alarm upgrades, installation of new eight-foot barrier wall, accessibility upgrades to restrooms and parking lot, and installation of new drinking fountain and pedestrian gates.","1,431",2018-Q2,2019-Q1,Closeout,20220630 Hart ES,10372620,Hart ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1444501,13749,21040 Hart St.,Canoga Park,91303,Install new secure entry system at the Main Office.,37,2022-Q4,2022-Q3,Planning,20220630 Garfield HS,10003612,Garfield HS Renovation,Comprehensive Modernization,2,Monica Garcia,East,1867901,13512,5101 E. 6th St.,Los Angeles,90022,"The project consists of the construction of a 1,300-seat auditorium with a new flexible black box theater space as well as a main building with classrooms and administration. In addition to the performing arts space provided in the new auditorium, the project has a total of 14 new classrooms including science and art classrooms. A total of 34 temporary classrooms were installed for use as swing space for students and staff during the school's renovation. A memorial plaza dedicated to the memory of math teacher Jaime Escalante as well as a Career Technical Education project for media, performing & production arts are incorporated into the design of this project. The total budget for this project includes the budget for Garfield HS Renovation - CTE Media, Performing & Production Arts.","86,704",2011-Q4,2014-Q1,Closeout,20220630 View Park Continuation HS,10372172,View Park Continuation HS - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1860201,16526,4701 Rodeo Rd.,Los Angeles,90016,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",271,2022-Q4,2024-Q3,Planning,20220630 Bancroft MS,10366001,Bancroft MS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1803801,13565,929 N. Las Palmas Ave.,Los Angeles,90038,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",436,2015-Q2,2015-Q3,Closeout,20220630 Jones PC,10363919,Jones PC - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1511201,13914,1017 W. 47th St.,Los Angeles,90037,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",166,2014-Q4,2015-Q1,Closeout,20220630 El Sereno ES,10363921,El Sereno ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1356201,13387,3838 Rosemead Ave.,Los Angeles,90032,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",460,2015-Q2,2015-Q3,Closeout,20220630 Elysian Heights ES,10363923,Elysian Heights ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1357501,13411,1562 Baxter St.,Los Angeles,90026,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",370,2015-Q2,2015-Q3,Closeout,20220630 Lull Special Education Center,10367133,Lull Special Education Center - Library Renovation,Library Renovation,3,Scott Schmerelson,Northwest,1195901,13615,17551 Miranda St.,Encino,91316,Provide upgrades and renovate Room 6 into a new library to be used by Lull Special Education Center and the Academy for Enriched Sciences (AES). AES will be moving from Lockhurst ES to Lull Special Education Center.,54,2015-Q4,2016-Q2,Closeout,20220630 Reseda ES,10367143,Reseda ES - Interactive Whiteboards,Communications/Technology Upgrade,4,Nick Melvoin,Northwest,1623301,13398,7265 Amigo Ave.,Reseda,91335,Provide electrical upgrades and data upgrades to sixteen classrooms to install and use new interactive whiteboards.,29,2016-Q1,2016-Q1,Closeout,20220630 Reseda ES,10367144,Reseda ES - 16 Interactive LCD Projectors,Communications/Technology Upgrade,4,Nick Melvoin,Northwest,1623301,13398,7265 Amigo Ave.,Reseda,91335,Increase school's access to technology by providing 16 interactive LCD projectors with wall mounts for smart board use in various classrooms.,62,2015-Q4,2016-Q1,Closeout,20220630 Toluca Lake ES,10367151,Toluca Lake ES - New Swing Gates,Security System,6,Kelly Gonez,Northeast,1719201,13634,4840 Cahuenga Blvd.,North Hollywood,91601,Provide safety upgrades to the Front Parking Lot by installing a new swing gates for entering / exiting the lot.,9,2015-Q4,2016-Q1,Closeout,20220630 Wadsworth ES,10367216,Wadsworth ES - Removal of 2 Portables,Portable Removal,5,Jackie Goldberg,Central,1758901,13383,981 E. 41st St.,Los Angeles,90011,Removal of 2 portable buildings,95,2015-Q1,2016-Q3,Closeout,20220630 Carson HS,10367491,Carson HS - Temporary Ramp,Access Compliance,7,Tanya Ortiz Franklin,South,1857501,13869,22328 S. Main St.,Carson,90745,Provide and install 1 temporary ramp with common landing and skirting to connect classrooms X3 & X4,42,2016-Q1,2016-Q2,Closeout,20220630 42nd St. ES,10365669,42nd St. ES - Replace Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1395901,13487,4231 Fourth Ave.,Los Angeles,90008,Replace deteriorated playground matting systems to ensure the health and safety of students.,35,2015-Q2,2015-Q2,Closeout,20220630 Lassen ES,10367621,Lassen ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northwest,1479001,13803,15017 Superior St.,North Hills,91343,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",43,2016-Q3,2017-Q2,Closeout,20220630 Montague Charter Academy,10364121,Montague Charter Academy - HVAC,HVAC,6,Kelly Gonez,Northeast,1537001,13739,13000 Montague St.,Pacoima,91331,"The project will remove roof-mounted heating and cooling units in Buildings A, B, C, D, F, H, and K and replace them with new roof-mounted gas/electric units. The existing units are more than 25 years old and beyond their useful life and economic repair.","2,157",2014-Q2,2015-Q4,Closeout,20220630 Birmingham Community Charter HS,10367031,Birmingham Community Charter HS - Portable Removal,Portable Removal,3,Scott Schmerelson,Northwest,1855701,13667,17000 Haynes St.,Lake Balboa,91406,Environmental assessment (phase 1 & 2) for portable removal,8,2016-Q4,2016-Q4,Closeout,20220630 Garcetti Learning Academy,10369167,Garcetti Learning Academy - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",South,1679501,13318,612 W. 68th St.,Los Angeles,90044,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",62,2017-Q3,2018-Q4,Closeout,20220630 El Dorado ES,10367915,El Dorado ES - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1354101,13792,12749 El Dorado Ave.,Sylmar,91342,Provide and install electronic marquee.,35,2017-Q4,2017-Q4,Closeout,20220630 Dodson MS,10367246,Dodson MS - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1811001,13846,28014 Montereina Dr.,Rancho Palos Verdes,90275,"Provide and install 27 closed-circuit television (CCTV) cameras, rack, and monitoring system.",130,2017-Q1,2018-Q2,Closeout,20220630 Lemay ES,10367795,Lemay ES - Parking Upgrades,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1484901,13684,17520 Vanowen St.,Lake Balboa,91406,"Expand school parking lot and improve accessibility by providing new fencing, repaving, truncated domes, handicapped parking stalls, path of travel improvements in accordance with the Americans with Disabilities Act (ADA), signage, and accessible gates.",50,2017-Q3,2018-Q2,Closeout,20220630 Manual Arts HS,10369091,Manual Arts HS - Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",Central,1874301,13345,4131 S. Vermont Ave.,Los Angeles,90037,"Install new electronic marquee board, components, and wiring to existing pole/structure.",52,2018-Q1,2019-Q2,Closeout,20220630 Lowman Special Education & Career Transition Center,10370113,Lowman Special Education & Career Transition Center - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1194801,13544,12827 Saticoy St.,North Hollywood,91605,Remove existing school sign on Saticoy St. and install new electronic free-standing marquee. This Local District Northeast priority project includes a Board District 6 contribution towards approximately half the budget.,50,2019-Q1,2019-Q3,Closeout,20220630 Los Angeles Academy MS,10369019,Los Angeles Academy MS - Deteriorated Painting Project,Painting,7,Tanya Ortiz Franklin,Central,1820001,13890,644 E. 56th St.,Los Angeles,90011,Deterioration and peeling paint conditions on exterior painted surfaces. This is an RRGM funded repairs Project but execution is JOC.,57,2018-Q2,2018-Q3,Closeout,20220630 YES Academy at Hyde Park ES,10368185,YES Academy at Hyde Park ES - Wellness Center Expansion,Campus Improvement,1,"Dr. George J. McKenna, III",West,1465801,13465,3140 Hyde Park Blvd.,Los Angeles,90043,"This project will expand the medical and dental services provided by St. John's Well Child & Family Center in their existing clinic and will provide new mental health clinic space operated by LAUSD's Student Health and Human Services Department. The project consists of approximately 5,500 square feet of new construction and related site improvements.","10,528",2019-Q4,2022-Q4,Construction,20220630 Aragon ES,10368038,Aragon ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1217801,13372,1118 Aragon Ave.,Los Angeles,90065,"Remove 1 portable building including abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprint.",69,2016-Q4,2018-Q1,Closeout,20220630 South Gate MS,10368955,South Gate MS - Robotics/Computer Lab Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1837701,13261,4100 Firestone Blvd.,South Gate,90280,"Upgrade robotics lab with new power and data. The scope of work includes providing security upgrades and new technology, such as robotics kits, iMacs, 3-D printers, and Chromebooks.",66,2017-Q3,2018-Q3,Closeout,20220630 Lawrence MS,10366194,Lawrence MS - Desktop Computers & Printers,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1821701,13695,10100 Variel Ave.,Chatsworth,91311,Increase school's access to technology by providing new desktop computers and printers,56,2014-Q2,2014-Q3,Closeout,20220630 Clifford Math & Technology Magnet ES,10369127,Clifford Math & Technology Magnet ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1311001,13309,2150 Duane St.,Los Angeles,90039,"Modernize Parent & Family Center classroom by providing security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",52,2018-Q2,2018-Q4,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10369840,Sun Valley MS-Install ramp,Access Compliance,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,Purchase and install TMP ramp at rooms 18 & 19.,38,2018-Q3,2018-Q3,Closeout,20220630 El Sereno MS,10368217,El Sereno MS - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1811801,13412,2839 N. Eastern Ave.,Los Angeles,90032,"Modify restroom for changing room by providing and installing electrical outlet for changing table, removing 3 toilets and all partitions, and providing and installing a privacy curtain.",13,2017-Q2,2017-Q2,Closeout,20220630 Holmes MS,10369524,Holmes MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1818201,13835,9351 Paso Robles Ave.,Northridge,91325,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2023-Q4,2024-Q2,Planning,20220630 Carthay Environmental Studies Magnet ES,10366464,Carthay Cntr ES_Removal of (2) Portable Bldgs,Portable Removal,1,"Dr. George J. McKenna, III",West,1284901,13461,6351 W. Olympic Blvd.,Los Angeles,90048,"Removal of 2 Portable Buildings; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",86,2014-Q4,2014-Q4,Closeout,20220630 San Fernando ES,10372015,San Fernando ES - Install Audio/Video Equipment,Electrical/Lighting,6,Kelly Gonez,Northeast,1645201,13419,1130 Mott St.,San Fernando,91340,"Install ceiling-mounted projector, lights, and speakers, a wall-mounted TV, and an audio system rack. Provide power and data to devices. Project requires design services due to black steel ceiling.",76,2022-Q1,2022-Q3,Construction,20220630 Stanford ES,10372630,Stanford ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1690401,13478,2833 Illinois Ave.,South Gate,90280,Install new secure entry system at the Main Office.,33,2022-Q3,2022-Q4,Planning,20220630 West Athens ES,10372157,West Athens ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1764401,13317,1110 W. 119th St.,Los Angeles,90044,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",730,2022-Q3,2023-Q1,Planning,20220630 Harbor City ES,10370867,Harbor City ES - SEEDS,SEEDS,7,Tanya Ortiz Franklin,South,1442501,13406,1508 W. 254th St.,Harbor City,90710,"Construct an outdoor learning space of approximately 2,300 square feet. Project includes the removal of asphalt and installation of headers to create in-ground planting areas, the installation of solar reflective coating on asphalt, new automated irrigation system for both in-ground and raised bed areas, raised beds and benches, tables and storage unit. The project will be outfitted by the school site with both native and edible plants.",84,2021-Q2,2022-Q1,Closeout,20220630 Byrd MS,10371911,Byrd MS - Underground Hydronic Piping,HVAC,6,Kelly Gonez,Northeast,1808001,13895,8501 Arleta Ave.,Sun Valley,91352,"Install new underground hydronic piping on the school campus due to several reported leaks, including the main line from Byrd MS to the point of connection at the Polytechnic Freshman Center campus.","7,953",2023-Q2,2025-Q1,Design,20220630 Grant ES,10371639,Grant ES - Exterior Painting,Painting,5,Jackie Goldberg,West,1426001,13355,1530 N. Wilton Pl.,Los Angeles,90028,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",466,2021-Q2,2021-Q4,Closeout,20220630 Wright STEAM Magnet MS,10105900,Wright STEAM Magnet MS - Compliance with State & Federal Access Requirements,Fire Alarm System,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),561,2015-Q4,2016-Q3,Closeout,20220630 Marshall HS,10367799,Marshall HS - Auditorium Renovation,Auditorium Renovation,2,Monica Garcia,Central,1875001,13571,3939 Tracy St.,Los Angeles,90027,Install new acoustic panels and new motorized curtains in the auditorium.,164,2018-Q4,2020-Q1,Closeout,20220630 Moneta Continuation HS,10363936,Moneta Continuation HS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1866601,16461,17951 Budlong Ave.,Gardena,90248,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",14,2014-Q2,2014-Q3,Closeout,20220630 Gates ES,10363938,Gates ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1409601,13291,3333 Manitou Ave.,Los Angeles,90031,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",567,2015-Q2,2015-Q3,Closeout,20220630 Graham ES,10363944,Graham ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1421901,13476,8407 S. Fir Ave.,Los Angeles,90001,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",546,2015-Q1,2015-Q2,Closeout,20220630 107th St. ES,10365992,107th St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1585701,13857,147 E. 107th St.,Los Angeles,90003,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",347,2015-Q1,2015-Q2,Closeout,20220630 De La Torre ES,10366023,De La Torre ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1230101,14104,500 N. Island Ave.,Wilmington,90744,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",300,2015-Q1,2015-Q1,Closeout,20220630 Chapman ES,10365686,Chapman ES - Replace Playground Matting & Equipment,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1298601,13460,1947 Marine Ave.,Gardena,90249,Replace deteriorated playground matting systems and broken or outdated structures to ensure the health and safety of students.,142,2014-Q2,2014-Q4,Closeout,20220630 Grant HS,10145709,Grant HS - Purchase & Install Double-Sided Free Standing Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1868301,13674,13000 Oxnard St.,Van Nuys,91401,Purchase & Install Double-Sided Free Standing Marquee,118,2013-Q3,2014-Q1,Closeout,20220630 Monroe HS,10367627,Monroe HS - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northwest,1876801,13704,9229 Haskell Ave.,North Hills,91343,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",54,2016-Q4,2017-Q2,Closeout,20220630 Castle Heights ES,10366015,Castle Heights ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1287701,13680,9755 Cattaraugus Ave.,Los Angeles,90034,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",263,2014-Q4,2015-Q1,Closeout,20220630 Kennedy HS,10366049,Kennedy HS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1872501,13263,11254 Gothic Ave.,Granada Hills,91344,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",752,2014-Q4,2015-Q1,Closeout,20220630 28th St. ES,10367100,28th St. ES - Electronic Camera Door Entry System,Security System,5,Jackie Goldberg,Central,1728801,13325,2807 Stanford Ave.,Los Angeles,90011,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,16,2015-Q4,2016-Q2,Closeout,20220630 Westwood Charter ES,10106107,Westwood Charter ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1774001,13505,2050 Selby Ave.,Los Angeles,90025,Mitigate Lead in Water,56,2013-Q2,2015-Q1,Closeout,20220630 Weemes ES,10103407,Weemes ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,1,"Dr. George J. McKenna, III",Central,1715101,13322,1260 W. 36th Pl.,Los Angeles,90007,Mitigate Lead in Water,72,2012-Q2,2015-Q1,Closeout,20220630 Hillcrest ES,10366239,Hillcrest ES - 2014-15 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1452801,13621,4041 Hillcrest Dr.,Los Angeles,90008,"This project is a charter school renovation for City Charter ES for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 for Goethe International Charter School was revised when the charter school did not accept the original offer and an alternative charter school, City Charter ES, accepted the co-location to include 1 charter office and 8 classrooms for 168.76 charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",162,2014-Q2,2014-Q3,Closeout,20220630 Raymond ES,10366258,Raymond ES - 2014-15 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1621901,13469,7511 Raymond Ave.,Los Angeles,90044,"This project is a charter school renovation for TEACH Academy of Technologies for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 9 classrooms for 251.06 charter student seats in grades 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",204,2014-Q2,2014-Q3,Closeout,20220630 South Gate HS,10364127,South Gate HS - Roofing,Roofing,5,Jackie Goldberg,East,1887101,13262,3351 Firestone Blvd.,South Gate,90280,"The project will remove and replace 47,900 square feet of existing roofing on 2 storage units, the music building, 5 classroom buildings, and the gymnasium building. The roofing has separated in several areas leaving the plywood sheeting exposed.",396,2014-Q3,2014-Q4,Closeout,20220630 Franklin HS,10102659,Franklin HS - Non Air-Conditioned Classrooms & MDF Room,HVAC,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,Non Air-Conditioned Classrooms & MDF Room,129,2013-Q4,2014-Q2,Closeout,20220630 Cheremoya ES,10365689,Cheremoya ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,West,1304101,13410,6017 Franklin Ave.,Los Angeles,90028,Replace deteriorated playground matting systems to ensure the health and safety of students.,32,2014-Q2,2014-Q3,Closeout,20220630 Frost MS,10367499,Frost MS - Roofing,Roofing,3,Scott Schmerelson,Northwest,1813701,13777,12314 Bradford Pl.,Granada Hills,91344,"This project is to upgrade 59,000 square feet of roofing at the Gymnasium Building, Industrial Arts Building, and 6 classroom buildings with a Polyvinyl Chloride (PVC) material. The roofs are over 15 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",705,2017-Q2,2017-Q4,Closeout,20220630 University Charter HS,10101770,University HS - CTE Music & Performing Arts,Career Technical Education,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,This project provides facilities to support a Career Technical Education (CTE) instructional program at University HS. The project includes classroom alterations for music & performance arts to prepare students for a technical career or higher education upon graduation.,"1,922",2014-Q4,2015-Q4,Closeout,20220630 Van Nuys ES,10369490,Van Nuys ES - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northeast,1743801,13403,6464 Sylmar Ave.,Van Nuys,91401,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",211,2019-Q2,2020-Q3,Closeout,20220630 Fremont HS,10103285,Community Garden & Wellness Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1865001,13475,7676 S. San Pedro St.,Los Angeles,90003,Community Garden & Wellness Center,"5,329",2012-Q1,2017-Q2,Closeout,20220630 Dorsey HS,10369538,Dorsey HS - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1860001,13643,3537 Farmdale Ave.,Los Angeles,90016,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2024-Q1,2024-Q2,Planning,20220630 109th St. ES,10367481,109th St. ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1583601,13672,10915 McKinley Ave.,Los Angeles,90059,Install Aiphone secure entry system at Main Office entrance.,19,2016-Q4,2018-Q2,Closeout,20220630 Harrison ES,10366708,Harrison ES - Retaining Wall Repairs & Playground Improvements,Excavation,2,Monica Garcia,East,1443801,13528,3529 City Terrace Dr.,Los Angeles,90063,"A 110-foot section of retaining wall and chain link fence located in the northwest of the campus between 4 portable buildings and the playground area was failing due to storm water runoff penetration and subsequent corrosion. This project will replace the failing retaining wall, replace the chain link fence above the new retaining wall and the adjacent perimeter fence, and demolish the 4 portables to convert into additional playground space. The scope also includes the construction of a new ramp and stairs to provide access between the existing and new playgrounds as well as upgrades to meet accessibility requirements of the Americans with Disabilities Act (ADA) including path of travel, restroom and fire alarm improvements.","3,516",2017-Q4,2018-Q4,Closeout,20220630 Nimitz MS,10370802,Nimitz MS - Exterior Painting,Painting,5,Jackie Goldberg,East,1826801,13637,6021 Carmelita Ave.,Huntington Park,90255,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",972,2021-Q1,2021-Q3,Closeout,20220630 75th St. EEC,10005011,75th St. EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1955801,16683,242 W. 75th St.,Los Angeles,90003,"Upgrade entry control system, exterior gates, playground equipment, and exterior paint",121,2014-Q2,2016-Q4,Closeout,20220630 Madison ES,10364048,Madison ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1321001,13907,9820 Madison Ave.,South Gate,90280,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",308,2013-Q4,2014-Q2,Closeout,20220630 Fenton Charter ES,10366032,Fenton Charter ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1374701,13767,11828 Gain St.,Lake View Terrace,91342,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",410,2015-Q2,2015-Q2,Closeout,20220630 La Salle ES,10102431,La Salle ES - Replace HVAC,HVAC,1,"Dr. George J. McKenna, III",West,1478601,13507,8715 La Salle Ave.,Los Angeles,90047,Replace HVAC Systems with Classroom Units,"5,845",2013-Q3,2014-Q4,Closeout,20220630 Pinewood EEC,10367353,Pinewood EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1954901,16705,7051 Valmont St.,Tujunga,91042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",78,2016-Q3,2016-Q3,Closeout,20220630 Pinewood ES,10367928,Pinewood ES - Security Upgrades,Security System,6,Kelly Gonez,Northeast,1606801,13613,10111 Silverton Ave.,Tujunga,91042,Provide and install Aiphone secure entry system to enhance and control the security of the campus.,13,2016-Q4,2017-Q1,Closeout,20220630 Manchester ES,10367386,Manchester ES - Replace Steel Stairs,Campus Improvement,1,"Dr. George J. McKenna, III",South,1509601,13305,661 W. 87th St.,Los Angeles,90044,"This project replaces the corroded and deteriorated exterior steel stairs with new galvanized steel stairs at Building #2. To ensure the structural integrity of the new stairs, a free-standing stair structure will be designed in lieu of attaching the stairs to the adjacent classroom wall as before. The scope of work also includes relocating electrical boxes, fixing a drainage issue below the stairs, repairing damaged plaster, and patch and paint.",296,2017-Q3,2018-Q1,Closeout,20220630 San Fernando ES,10370196,San Fernando ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1645201,13419,1130 Mott St.,San Fernando,91340,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2024-Q3,2024-Q4,Planning,20220630 Cleveland Charter HS,10368084,Cleveland Charter HS - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1859001,13753,8140 Vanalden Ave.,Reseda,91335,Provide and install electronic marquee.,59,2018-Q1,2018-Q2,Closeout,20220630 Nestle Charter ES,10368312,Nestle Charter ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,Northwest,1545201,13614,5060 Nestle Ave.,Tarzana,91356,Provide and install electronic marquee.,39,2017-Q3,2017-Q4,Closeout,20220630 Lorne ES,10364044,Lorne ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1497301,13669,17440 Lorne St.,Northridge,91325,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",548,2013-Q3,2014-Q2,Closeout,20220630 Napa ES,10370521,Napa ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1544601,13701,19010 Napa St.,Northridge,91324,"Install new electronic, free-standing marquee",47,2019-Q2,2019-Q3,Closeout,20220630 Erwin ES,10370034,Erwin ES - Parking Fencing & Gates,Fencing,6,Kelly Gonez,Northeast,1363001,13624,13400 Erwin St.,Van Nuys,91401,Install fencing and gates at two parking lots,77,2018-Q4,2021-Q4,Closeout,20220630 Clinton MS,10370302,Clinton MS - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1806201,13909,3500 S. Hill St.,Los Angeles,90007,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",51,2019-Q1,2019-Q3,Closeout,20220630 Eastman EEC,10367312,Eastman EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,East,1951501,16303,1266 S. Gage Ave.,Los Angeles,90023,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",91,2016-Q2,2016-Q2,Closeout,20220630 Carnegie MS,10102193,Carnegie MS - Paving,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1809001,13761,21820 Bonita St.,Carson,90745,Asphalt Paving Repair & Resealing,58,2018-Q3,2018-Q3,Closeout,20220630 Russell ES,10204047,Russell ES - Install Perforated Fence Panels,Fencing,7,Tanya Ortiz Franklin,South,1643801,15401,1263 E. Firestone Blvd.,Los Angeles,90001,Install Perforated Fence Panels,10,2014-Q1,2014-Q3,Closeout,20220630 Audubon MS,10366878,Audubon MS - 2015-17 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1802801,13564,4120 11th Ave.,Los Angeles,90008,"This project is a charter school renovation for Crenshaw Arts/Tech Charter HS (CATCH) for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 9 classrooms for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfiguration, technology, furniture and equipment, and communication/safety purchases and upgrades. This project is amended to include an additional single-year term for Crenshaw Arts/Tech Charter HS (CATCH) with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 as a ""No Growth"" project includes 1 charter office and 9 instructional spaces for charter student seats in grades 9-12. The scope for this project is not yet defined.",3,2015-Q2,2016-Q2,Closeout,20220630 Griffin ES,10370161,Griffin ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1430101,13284,2025 Griffin Ave.,Los Angeles,90031,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2024-Q1,2024-Q2,Planning,20220630 Los Angeles HS,10367169,Girls Academic Leadership Academy - Upgrade at Los Angeles HS,Reconfiguration,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,"The GALA upgrade project will reconfigure and upgrade a standalone building with 14 classrooms at Los Angeles HS to allow for a separate and distinct space for the operation of the Girls Academic Leadership Academy (GALA). This project includes converting an existing classroom into administrative space, providing signage and telecommunication infrastructure upgrades, and equipping the facility with furniture, fixtures and equipment.",254,2016-Q1,2016-Q3,Closeout,20220630 Hart ES,10370700,Hart ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1444501,13749,21040 Hart St.,Canoga Park,91303,Install new electronic free-standing marquee,45,2019-Q3,2020-Q1,Closeout,20220630 Stevenson College & Career Preparatory,10370617,Stevenson College & Career Preparatory - 2019-20 Prop 39 (Animo Ellen Ochoa Charter MS),Charter Prop 39,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"Animo Ellen Ochoa Charter MS is vacating this site. This project was approved in Board of Education Report No. 343-18/19. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",64,2019-Q3,2019-Q3,Closeout,20220630 Virgil MS,10366749,Virgil MS - Parent & Family Center,Reconfiguration,2,Monica Garcia,Central,1846201,13382,152 N. Vermont Ave.,Los Angeles,90004,"Convert and renovate old coordinator's office into a new parent & family center by providing interior paint, flooring and lighting repairs, and providing security upgrades including new secure doors and panic hardware as well as security on windows. Patch up walls, repair existing sink and HVAC unit. Provide new classroom furniture and equip with new laptop computers and signage.",117,2015-Q3,2016-Q1,Closeout,20220630 San Fernando HS,10368095,San Fernando HS - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1884301,13670,11133 O'Melveny Ave.,San Fernando,91340,"Remove and sell 6 portable buildings and remove/demolish 1 bungalow, provide temporary fencing, disconnect all utilities and reconnect to the remaining buildings on site, repair asphalt paving (additional paving work is addressed by project #10366711), and provide striping for a small soccer field. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",325,2016-Q4,2018-Q2,Closeout,20220630 Virgil MS,10370625,Virgil MS - 2019-20 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1846201,13382,152 N. Vermont Ave.,Los Angeles,90004,"This project is a charter school renovation for Citizens of the World - Silver Lake for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office,1 special education room, and 9 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",75,2019-Q2,2019-Q3,Closeout,20220630 Middleton ES,10370182,Middleton ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1530101,13649,6537 Malabar St.,Huntington Park,90255,"Replace deteriorated interior walk-in cooler, interior walk-in freezer, and interior side-by-side walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, interior walk-in freezer, interior side-by-side walk-in cooler, and refrigeration equipment.",221,2026-Q2,2026-Q3,Planning,20220630 Jones PC,10370291,Jones PC - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1511201,13914,1017 W. 47th St.,Los Angeles,90037,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",58,2019-Q4,2020-Q4,Closeout,20220630 Reseda Charter HS,10371334,Reseda Charter HS - 2020-22 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,"This project was initially approved in BOE Report No. 313-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for Magnolia Science Academy #5. The project included 1 charter office, 2 special education rooms, and 11 instructional spaces for charter student seats in grades 6-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved in Board of Education Report No. 317-20/21 for 2021-22 Proposition 39 charter co-locations as a vacating project. Magnolia Science Academy #5 will not continue occupancy in the 2021-22 school year. Therefore, this project is amended to include the scope of work necessary to return the site to it previous conditions with all low voltage systems reconnected to District-operated programs.",268,2020-Q2,2020-Q3,Closeout,20220630 Arroyo Seco Museum Science Magnet,10371915,Arroyo Seco Museum Science Magnet - Energy Conservation Lighting,Electrical/Lighting,2,Monica Garcia,Central,1432201,13900,4805 Sycamore Terrace,Los Angeles,90042,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $269,226. Estimated energy savings is 545,097 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $67,461 which is 25.00% of the ECM costs.",68,2022-Q4,2023-Q1,Planning,20220630 Byrd MS,10371945,Byrd MS - Water Conservation Pilot (Rain Systems),Energy/Water Efficiency,6,Kelly Gonez,Northeast,1808001,13895,8501 Arleta Ave.,Sun Valley,91352,"Evaluate water conservation potential and water cost savings of implanting a cross-link polymer soil conditioner, known as hydrogels, into existing turf at three (3) LAUSD school campuses. Determine the effectiveness of Rain Systems' patented process of injection of hydrogels into existing turf in order to reduce water consumption for turf irrigation.",17,2022-Q3,2023-Q1,Planning,20220630 Morningside ES,10370800,Morningside ES - Exterior Painting,Painting,6,Kelly Gonez,Northeast,1539701,13414,576 N. Maclay Ave.,San Fernando,91340,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",353,2020-Q3,2020-Q4,Closeout,20220630 Park ES,10372201,Park ES - Install Privacy Fence,Fencing,5,Jackie Goldberg,East,1600501,13861,8020 Park Ave.,Cudahy,90201,"Replace approx. 1,320 feet of chain link fence with privacy fencing",70,2022-Q3,2023-Q1,Planning,20220630 Logan Academy of Global Ecology,10108777,Logan Academy of Global Ecology - Provide Security System with Camera & Buzzer,Security System,2,Monica Garcia,Central,1490401,13266,1711 W. Montana St.,Los Angeles,90026,Provide Security System with Camera & Buzzer,47,2015-Q4,2017-Q1,Closeout,20220630 Santee Education Complex,10372552,Santee Education Complex - Install Wrought Iron Fence,Fencing,5,Jackie Goldberg,Central,1871601,13945,1921 S. Maple Ave.,Los Angeles,90011,"Install approx. 2,200 feet of wrought iron fencing to cover perimeter of campus. A total of (12) pedestrian and drive gates will be fabricated and installed.",378,2022-Q4,2023-Q1,Planning,20220630 Bradley Global Awareness Magnet ES,10369058,Bradley Global Awareness Magnet ES - SEEDS,SEEDS,1,"Dr. George J. McKenna, III",West,1712301,13516,3875 Dublin Ave.,Los Angeles,90008,"Design and construct an outdoor learning space of approximately 5,000 square feet, consisting of the removal of asphalt, installation of decomposed granite, installation of a concrete brush off pad, a gate that complies with the Americans with Disabilities Act (ADA), a new irrigation system, a concrete curb and composite headers to create planting areas, new raised beds, log benches and stools, picnic tables, a demonstration table, an outdoor message board, a compost bin, and a shed. It will be outfitted by the school site partner with native and edible plants.",98,2018-Q1,2018-Q4,Closeout,20220630 Canterbury ES,10372191,Canterbury ES - Underground Plumbing,Plumbing/Irrigation/Drainage,6,Kelly Gonez,Northeast,1278101,13541,13670 Montague St.,Arleta,91331,This project is to provide new underground water and sewer pipes serving the entire campus and new water line at the heater room of the Kindergarten Building.,"4,943",2023-Q3,2024-Q3,Planning,20220630 Marianna ES,10371711,Marianna ES - Install Auditorium Upgrades,Electrical/Lighting,2,Monica Garcia,East,1513701,13479,4215 E. Gleason St.,Los Angeles,90063,"Retrofit house lighting and replace stage lighting in multipurpose room/auditorium. Replace ceiling-mounted projector, projector screen, and audio system. Purchase 60 folding chairs with a mobile rack.",116,2021-Q1,2021-Q2,Closeout,20220630 Carver MS,10364098,Carver MS - HVAC,HVAC,5,Jackie Goldberg,Central,1809401,13409,4410 McKinley Ave.,Los Angeles,90011,"The project replaces the existing heating, ventilation, and air conditioning (HVAC) systems in the Administration, Martin Luther King, and Malcolm X buildings that house 30 classrooms. The existing equipment is over 40 years old, beyond its service life and economic repair, resulting in multiple service calls. The scope of work repairs the existing primary hot water piping arrangement at 2 existing boilers and installs new equipment including: rooftop-mounted exhaust fans, a ceiling-suspended fan coil unit, 17 ceiling-suspended 4-pipe fan coil units, 2 rooftop-mounted chilled water pumps, chilled water piping and insulation at rooftop-mounted piping, 2 high efficiency hot water boilers, hot water piping insulation to existing fan coil units, a rooftop make-up air unit serving the cafeteria, a rooftop kitchen hood exhaust fan, and an energy management system. In the Malcolm X building, the following associated upgrades accommodate the new HVAC equipment and ductwork while preserving classroom space and sunlight: replace all classroom ceilings, abate hazardous materials during ceiling demolition, replace classroom lighting, remove and reinstall the fire alarm equipment at the ceilings, replace flooring as needed, and replace windows in 18 classrooms to allow air intake.","7,407",2017-Q4,2019-Q2,Closeout,20220630 Bassett ES,10368081,Bassett ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1232301,13813,15756 Bassett St.,Lake Balboa,91406,Provide and install electronic marquee.,39,2018-Q1,2018-Q1,Closeout,20220630 Edison MS,10366027,Edison MS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1811301,13555,6500 Hooper Ave.,Los Angeles,90001,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",550,2015-Q2,2015-Q3,Closeout,20220630 Cortines School of Visual and Performing Arts,10366022,Cortines School of Visual and Performing Arts - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1851601,13295,450 N. Grand Ave.,Los Angeles,90012,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",444,2015-Q1,2015-Q2,Closeout,20220630 66th St. ES,10107690,66th St. ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,7,Tanya Ortiz Franklin,South,1682201,13339,6600 S. San Pedro St.,Los Angeles,90003,Mitigate Lead in Water,118,2012-Q3,2014-Q2,Closeout,20220630 Griffith-Joyner ES,10370588,Griffith-Joyner ES - 2019-21 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1584901,13497,1963 E. 103rd St.,Los Angeles,90002,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for KIPP Ignite Academy. This project included 1 charter office, 2 special education rooms, and 13 instructional spaces for charter student seats in grades 1-3. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved in Board of Education Report No. 313-19/20 for 2020-21 Proposition 39 charter co-locations as a vacating project. KIPP Ignite Academy will not continue occupancy in the 2020-21 school year. Therefore, this project is amended to include the scope of work necessary to return the site to it previous conditions with all low voltage systems reconnected to District-operated programs.",573,2019-Q2,2019-Q3,Closeout,20220630 Wilmington STEAM Magnet MS,10370472,Wilmington STEAM Magnet MS - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1849001,13538,1700 Gulf Ave.,Wilmington,90744,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 119 doors/hardware, 19 accessible paths of travel, 78 signs, 22 restrooms, 14 drinking fountains, 10 sinks/sink cabinets, 1 assistive listening device/intercom/phone, 3 concrete ramps, 5 pieces of accessible furniture, 1 assembly seat, 13 railings, 2 locker room modifications/lockers, 1 playground component, 5 casework/counters, 1 door modification/auto opener, and 1 new elevator.","8,750",2022-Q4,2024-Q1,Design,20220630 Stonehurst STEAM Magnet ES,10372232,Stonehurst STEAM Magnet ES - Roofing,Roofing,6,Kelly Gonez,Northeast,1694501,13653,9851 Stonehurst Ave.,Sun Valley,91352,"The project to provide approximately 39,984 square feet of new roofing at nine buildings, including the installation of new gutters and downspouts and painting of affected areas.",896,2023-Q3,2023-Q4,Planning,20220630 Rosemont ES,10368735,Rosemont ES - Seismic Retrofit & HVAC in Main Building,Seismic Modernization,2,Monica Garcia,Central,1637001,13289,421 N. Rosemont Ave.,Los Angeles,90026,"The project provides a seismic retrofit of the main building with a total area of approximately 19,000 square feet. The building was built in 1922, underwent a major renovation in 1989, and has lateral force resisting systems comprised of concrete shear walls with flexible roof diaphragm. The scope of work includes constructing wall anchorage connections, cross-ties, and new wood beams and joist for a proper transfer of lateral loads and adequate structural capacity for life safety demand levels. The project also includes retrofitting the roof diaphragm and framing, new roofing, replacing heating, ventilation, and air conditioning (HVAC) equipment, and Americans with Disabilities Act (ADA) upgrades where required.","7,172",2022-Q1,2023-Q4,Construction,20220630 Virgil MS,10371343,Virgil MS - 2020-23 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1846201,13382,152 N. Vermont Ave.,Los Angeles,90004,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for Citizens of the World - Silver Lake. This project included 1 charter office, 2 special education rooms, and 7 instructional spaces for charter student seats in grades 5-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 7 instructional spaces for charter student seats in grades 6-8 and an undefined scope of work. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 7 instructional spaces for charter student seats in grades 6-8 and an undefined scope of work.",6,2021-Q3,2021-Q3,Closeout,20220630 Dena ES,10369713,Dena ES - ADA Improvements,Access Compliance,2,Monica Garcia,East,1331501,13277,1314 Dacotah St.,Los Angeles,90023,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 11 doors, 66 door hardware, 18 thresholds, accessible paths of travel, 53 signs, 9 restrooms, 27 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 2 concrete ramps, 3 metal ramps, 5 pieces of accessible furniture, 2 arcades, 1 cafeteria counter, 2 new elevators/stage lifts, and 1 passenger/bus loading zone.","6,101",2020-Q3,2025-Q2,Construction,20220630 Palisades Charter ES,10372142,Palisades Charter ES - Install Water Bottle Filler,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1595901,13443,800 Via De La Paz,Pacific Palisades,90272,"Replace center bubbler, from existing multi-bubbler fountain, with wall-mounted bottle filler.",2,2021-Q4,2022-Q1,Closeout,20220630 Chatsworth Park ES,10372129,Chatsworth Park ES - Install Ramp,Access Compliance,3,Scott Schmerelson,Northwest,1302701,13389,22005 Devonshire St.,Chatsworth,91311,Provide a temporary ramp to classroom 13. Adjust uneven pavement to connect to path of travel.,133,2021-Q4,2022-Q1,Closeout,20220630 Willenberg Special Education Center,10372150,Willenberg Special Education Center - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1195701,13545,308 Weymouth Ave.,San Pedro,90732,Install electronic free-standing marquee at corner of Western Ave. and Weymouth Ave. Approx. 150 feet underground and 120 feet above-ground conduit required. Single-sided color LED display.,74,2022-Q3,2022-Q4,Planning,20220630 Beachy ES,10372398,Beachy ES - Provide Outdoor Reading Area,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1232901,13666,9757 Beachy Ave.,Arleta,91331,"Remove approximately 3500 sq. ft. of existing asphalt and 60 cubic yards of base (where bungalows were recently removed). Asphalt has been tested negative by FETU already. Form & Pour (2) 15 ftX15ft concrete stages. Install new irrigation system & clock. Install new redwood headers at perimeter. Provide & install root barrier, 6in to 8in of new topsoil, lay new Sod & plant (4) 36inch box trees per landscape plan. Provide & install (7) new blue coated benches.",136,2022-Q4,2023-Q2,Planning,20220630 Marshall HS,10108866,Marshall HS - Tower Repair,Campus Improvement,2,Monica Garcia,Central,1875001,13571,3939 Tracy St.,Los Angeles,90027,"The project includes repairs and improvements to the historic façade of the administration building including the tower, replacement of the roofing on the administration building, seismic strengthening of the tower portion of the administration building, landscaping and irrigation improvements, and Americans with Disabilities Act (ADA) restroom and path of travel upgrades including modifications to provide an accessible entry to the school.","9,587",2018-Q3,2021-Q1,Closeout,20220630 Crenshaw Magnet HS: STEMM,10367672,Crenshaw HS - 2016-17 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,"This project was approved in Board of Education Report No. 373-15/16 as a co-location, however View Park Preparatory MS did not occupy Crenshaw HS during the 2016-17 school year. As a result, the scope of work changed from a co-location to vacating the site including the relocation of classrooms, cleaning, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",29,2016-Q3,2016-Q3,Closeout,20220630 West Athens ES,10370227,West Athens ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1764401,13317,1110 W. 119th St.,Los Angeles,90044,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q3,2027-Q1,Planning,20220630 Utah Span School,10370312,Utah Span School - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1737001,13328,255 Gabriel Garcia Marquez St.,Los Angeles,90033,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",60,2019-Q1,2019-Q4,Closeout,20220630 Widney Special Education HS,10370464,Widney Special Education HS - Restroom Modifications,Access Compliance,1,"Dr. George J. McKenna, III",Central,1191401,15163,2302 S. Gramercy Pl.,Los Angeles,90018,"Remove existing toilet fixtures, sink and fixed changing bench to provide room for two electric changing tables. Install two outlets and tables provided by school.",37,2019-Q1,2019-Q2,Closeout,20220630 Locke Charter HS,10105337,"Locke Charter HS - Athletic Field Renovation Including Lighting, Scoreboard, Restrooms",Gym/Athletic Facilities Renovation,7,Tanya Ortiz Franklin,South,1873301,13889,325 E. 111th St.,Los Angeles,90061,"Athletic Field Renovation Including Lighting, Scoreboard, Restrooms","3,052",2013-Q3,2014-Q3,Closeout,20220630 Gledhill ES,10363940,Gledhill ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northwest,1413001,13746,16030 Gledhill St.,North Hills,91343,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",383,2014-Q2,2014-Q3,Closeout,20220630 Herrick ES,10363952,Herrick ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1451501,13726,13350 Herrick Ave.,Sylmar,91342,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",463,2014-Q4,2015-Q2,Closeout,20220630 Lake PC,10363962,Lake PC - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1239301,13954,135 N. Lake St.,Los Angeles,90026,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",301,2015-Q2,2015-Q3,Closeout,20220630 University Charter HS,10363850,University Charter HS - Science Lab Improvements,Campus Improvement,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,"The project provides 3 chemistry labs and 1 Integrated/Coordinated Science (ICS) lab with workrooms and safety equipment including emergency shower/eyewash, fume hood, utility shutoff valves, and heating, ventilation, and air conditioning (HVAC) units to remove chemical fumes from classrooms and workrooms. The scope also provides chemical storage cabinets and eyewash in workrooms, fire sprinklers in chemistry labs and workrooms, reconfiguration of the HVAC system, functional repairs to plumbing, and Americans with Disabilities Act (ADA) path of travel, restroom and drinking fountain upgrades. The newly renovated chemistry labs require replacement of the acid waste system throughout the building with new piping and an acid sampling tank to keep waste away from underground utilities and nearby structures, which further requires the replacement of casework, structural support, utility and electrical lines, and flooring with asbestos abatement. Additionally, any unfinished scope that was part of the previously-approved science lab renovation project at this school will be completed.","5,552",2018-Q3,2020-Q4,Closeout,20220630 Wadsworth ES,10368777,Wadsworth ES - Secure Entry System,Security System,5,Jackie Goldberg,Central,1758901,13383,981 E. 41st St.,Los Angeles,90011,Provide and install two cameras and buzzer entry to the front gate.,31,2017-Q3,2018-Q1,Closeout,20220630 135th St. ES,10368168,135th St. ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1587701,13607,801 W. 135th St.,Gardena,90247,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 75 doors/hardware, 5 accessible paths of travel, 52 signs, 11 restrooms, 26 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 2 concrete ramps, 3 metal ramps, 4 pieces of accessible furniture, 1 assembly seat, 2 railings, and 1 passenger/bus loading zone.","2,844",2018-Q1,2020-Q4,Closeout,20220630 San Jose ES,10370442,San Jose ES - Marquee,Electrical/Lighting,6,Kelly Gonez,Northwest,1647901,13691,14928 Clymer St.,Mission Hills,91345,Install new electronic free-standing marquee,35,2019-Q2,2019-Q2,Closeout,20220630 Lexington PC,10369975,Lexington PC - Secure Entry System,Security System,2,Monica Garcia,Central,1517001,13847,4564 W. Lexington Ave.,Los Angeles,90029,Install new secure entry system,22,2019-Q1,2019-Q3,Closeout,20220630 Burroughs MS,10145714,Purchase & Install Outlet Whiteboards,Furniture/Fixtures/Equipment,1,"Dr. George J. McKenna, III",West,1807501,13448,600 S. Mc Cadden Pl.,Los Angeles,90005,Purchase & Install Outlet Whiteboards,8,2014-Q2,2014-Q2,Closeout,20220630 Reseda Charter HS,10366921,Reseda HS - 2015-18 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,"This project was initially approved in BOE Report No. 423-14/15 for 2015-16 Prop. 39 co-locations as a charter school renovation for Magnolia Science Academy #5. This reconfiguration project included 1 charter office and 8 instructional spaces for charter students in grades 6-12, and reduced the number of spaces previously allocated to Magnolia Science Academy #5 during the 2014-15 school year. The scope of work included facilities renovations and reconfigurations, recovery of furniture and equipment, and recovery of technology. The project was amended in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a ""no growth"" project with 1 charter office, 1 special education room, and 7 instructional spaces for charter students in grades 6-9. The project was again amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with 1 charter office, 1 special education room, and 8 instructional spaces for charter students in grades 6-12 and with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",8,2015-Q4,2016-Q3,Closeout,20220630 Fernangeles ES,10369054,Fernangeles ES-Install Ramp,Access Compliance,6,Kelly Gonez,Northeast,1375301,13594,12001 Art St.,Sun Valley,91352,Install a ramp at classroom 21 & 22.,24,2017-Q3,2017-Q3,Closeout,20220630 Evergreen Continuation HS,10367918,Evergreen Continuation HS - Security Upgrades,Security System,6,Kelly Gonez,Northeast,1887601,16584,13101 Dronfield Ave.,Sylmar,91342,Provide and install Aiphone secure entry system to enhance and control the security of the campus.,23,2016-Q4,2017-Q2,Closeout,20220630 Nobel Charter MS,10369120,Nobel Charter MS - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1827201,13805,9950 Tampa Ave.,Northridge,91324,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",54,2018-Q1,2018-Q3,Closeout,20220630 Castle Heights ES,10367731,Castle Heights ES - Install Accessible Loading Zone,Access Compliance,1,"Dr. George J. McKenna, III",West,1287701,13680,9755 Cattaraugus Ave.,Los Angeles,90034,Istallation of an ADA accessible loading zone.,46,2016-Q3,2016-Q4,Closeout,20220630 Gratts Learning Academy for Young Scholars,10368303,Gratts Learning Academy for Young Scholars - Paving,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1238501,13829,309 Lucas Ave.,Los Angeles,90017,"This project is to install approximately 95,000 square feet of new paving at the playground areas.","6,480",2019-Q4,2021-Q1,Closeout,20220630 Van Deene ES,10364076,Van Deene ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1741901,13788,826 W. Javelin St.,Torrance,90502,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",390,2014-Q1,2014-Q2,Closeout,20220630 McKinley ES,10368681,McKinley ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1665801,13506,7812 McKinley Ave.,Los Angeles,90001,Purchase and install Aiphone secure entry system to enhance and control the security of the campus.,30,2017-Q1,2017-Q3,Closeout,20220630 Willenberg Special Education Center,10367193,Willenberg Special Education Center - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1195701,13545,308 Weymouth Ave.,San Pedro,90732,"This project is to upgrade 52,300 square feet of roofing at the administration building with a Polyvinyl Chloride (PVC) material. The roofs are over 15 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",663,2016-Q1,2016-Q4,Closeout,20220630 Mendez HS,10367532,Mendez HS - Address Defective Synthetic Turf Field,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1861101,14521,1200 Plaza Del Sol,Los Angeles,90033,"This project will replace the approximately 65,000 square foot synthetic turf field. The scope of work also includes field drainage. On September 9, 2015, the Office of Environmental Health and Safety determined the synthetic turf field at Felicitas and Gonzalo Mendez High School is not safe for play and suspended all activities on the field until repairs are made. The Office of the General Counsel is seeking recourse from the contractor and synthetic turf installer.","1,374",2016-Q3,2016-Q4,Closeout,20220630 Kingsley ES,10366054,Kingsley ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,West,1617901,13927,5200 W. Virginia Ave.,Los Angeles,90029,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",373,2015-Q2,2015-Q4,Closeout,20220630 Bell HS,10366722,Bell HS - Install New Boys & Girls Lockers,Lockers,5,Jackie Goldberg,East,1853601,13488,4328 Bell Ave.,Bell,90201,Upgrade the main gym by installing new boys' and girls' lockers,284,2015-Q3,2016-Q1,Closeout,20220630 San Pedro HS,10366723,San Pedro HS - Install New Lockers & Partition Walls,Gym/Athletic Facilities Renovation,7,Tanya Ortiz Franklin,South,1885001,13377,1001 W. 15th St.,San Pedro,90731,Upgrade the varsity football locker room by providing and installing new lockers and a partition wall,39,2015-Q1,2015-Q2,Closeout,20220630 Heliotrope ES,10370591,Heliotrope ES - 2019-20 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,"Clemente Charter School is vacating this site. This project was approved in Board of Education Report No. 343-18/19. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",25,2019-Q2,2019-Q3,Closeout,20220630 Eastman ES,10370582,Eastman ES - 2019-20 Prop 39,Charter Prop 39,2,Monica Garcia,East,1352101,13520,4112 E. Olympic Blvd.,Los Angeles,90023,"This project is a charter school renovation for Extera Public School #2 for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",87,2019-Q2,2019-Q3,Closeout,20220630 Westchester Enriched Sciences Magnets,10370629,Westchester Enriched Sciences Magnets - 2019-20 Prop 39 (Westside Innovative School House (WISH) Academy HS),Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Academy HS for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 2 special education rooms, and 9 instructional spaces for charter student seats in grades 9-11. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",35,2019-Q2,2019-Q3,Closeout,20220630 Fairburn ES,10367851,Fairburn ES - Security Upgrades,Security System,4,Nick Melvoin,West,1372601,13445,1403 Fairburn Ave.,Los Angeles,90024,Provide and install an Aiphone secure entrance system.,20,2016-Q3,2017-Q1,Closeout,20220630 Parthenia Academy of Arts & Technology,10369121,Parthenia Academy of Arts & Technology - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1602701,13702,16825 Napa St.,North Hills,91343,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",52,2018-Q1,2018-Q3,Closeout,20220630 Grant HS,10369514,Grant HS - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1868301,13674,13000 Oxnard St.,Van Nuys,91401,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2024-Q1,2024-Q3,Planning,20220630 Langdon ES,10368130,Langdon ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northwest,1477501,13413,8817 Langdon Ave.,North Hills,91343,"Remove 2 portable buildings including abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprints.",79,2016-Q4,2018-Q1,Closeout,20220630 San Miguel ES,10364068,San Miguel ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1687501,14741,9801 San Miguel Ave.,South Gate,90280,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",562,2013-Q4,2014-Q2,Closeout,20220630 Sierra Vista ES,10363998,Sierra Vista ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1676701,13380,4342 Alpha St.,Los Angeles,90032,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",289,2015-Q1,2015-Q2,Closeout,20220630 Soto ES,10364000,Soto ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1684901,13424,1020 S. Soto St.,Los Angeles,90023,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",396,2015-Q2,2015-Q3,Closeout,20220630 Crenshaw Magnet HS: STEMM,10364027,Crenshaw HS - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,076",2014-Q1,2014-Q2,Closeout,20220630 Independence ES,10364038,Independence ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1688001,13912,8435 Victoria Ave.,South Gate,90280,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",386,2013-Q4,2014-Q2,Closeout,20220630 Playa Vista ES,10370876,Playa Vista ES - Water Bottle Filling Station,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1230601,14565,13150 W. Bluff Creek Dr.,Los Angeles,90045,Install water bottle filling station,15,2019-Q4,2020-Q1,Closeout,20220630 Sunrise ES,10371993,Sunrise ES - Install Ramp,Access Compliance,2,Monica Garcia,East,1698801,13395,2821 E. 7th St.,Los Angeles,90023,Install TMP Ramp at classroom 6.,80,2021-Q4,2022-Q1,Closeout,20220630 Sunland ES,10370384,Sunland ES - Exterior Painting,Painting,6,Kelly Gonez,Northeast,1697301,13451,8350 Hillrose St.,Sunland,91040,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",286,2020-Q2,2020-Q4,Closeout,20220630 Hubbard ES,10370708,Hubbard ES - Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1460301,13718,13325 Hubbard St.,Sylmar,91342,Install new electronic free-standing marquee,42,2020-Q1,2020-Q2,Closeout,20220630 Narbonne HS,10367946,Narbonne HS - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1877901,13407,24300 S. Western Ave.,Harbor City,90710,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 173 doors/hardware, 89 accessible paths of travel, 158 signs, 23 restrooms, 32 drinking fountains/sinks, 6 assistive listening devices/intercoms/phones, 4 concrete ramps, 23 metal ramps, 7 pieces of accessible furniture, 1 assembly seat, 5 railings, 3 locker room modifications/lockers, 1 parking area, 16 casework/counters, 2 door modifications/auto openers, 2 new elevators/stage lifts, and 2 passenger/bus loading zones.","9,792",2017-Q4,2022-Q3,Construction,20220630 Sylmar ES,10364072,Sylmar ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1701401,13604,13291 Phillippi Ave.,Sylmar,91342,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",840,2013-Q3,2014-Q2,Closeout,20220630 Purche ES,10364061,Purche ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1615801,13655,13210 Purche Ave.,Gardena,90249,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",426,2014-Q1,2014-Q2,Closeout,20220630 Verdugo Hills HS,10364078,Verdugo Hills HS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1891401,13642,10625 Plainview Ave.,Tujunga,91042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,176",2014-Q1,2014-Q2,Closeout,20220630 Widney Special Education HS,10364083,Widney Special Education HS - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1191401,15163,2302 S. Gramercy Pl.,Los Angeles,90018,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",495,2014-Q1,2014-Q2,Closeout,20220630 Hyde Park EEC,10372557,Hyde Park EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,1,"Dr. George J. McKenna, III",West,1952701,16295,6428 Eleventh Ave.,Los Angeles,90043,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 29,420 sq. ft. ADA upgrades for this project include approximately 6,900 sq. ft. of asphalt replacement at the parking lot, POT upgrades to gates, door hardware, handrails, and signage, as well as adjustments to existing restrooms. Additionally, we will replace deteriorated HVAC units and roofing, and make necessary upgrades to the fire alarm system, as required by current code.","5,424",2024-Q2,2025-Q3,Planning,20220630 Chandler ES,10367754,Chandler ES - ADA Improvements,Access Compliance,3,Scott Schmerelson,Northeast,1295901,13619,14030 Weddington St.,Van Nuys,91401,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 68 doors/hardware, 63 accessible paths of travel, 43 signs, 10 restrooms, 20 drinking fountains/sinks, 2 concrete ramps, 3 metal ramps, 1 piece of accessible furniture, 8 railings, 2 playground components, 2 parking areas, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","3,372",2017-Q4,2022-Q2,Closeout,20220630 San Miguel ES,10372432,San Miguel ES - Provide Changing Rooms,Access Compliance,5,Jackie Goldberg,East,1687501,14741,9801 San Miguel Ave.,South Gate,90280,Provide three areas for diaper changing tables for IDM students.,98,2022-Q3,2022-Q4,Design,20220630 Melvin ES,10372458,Melvin ES - Provide Steam Lab,Reconfiguration,3,Scott Schmerelson,Northwest,1523301,13719,7700 Melvin Ave.,Reseda,91335,"Convert classroom into STEAM lab. Install white boards, tack boards, ceiling-mounted projector, and projector screen. Purchase classroom furniture: tables, chairs, and storage (58 items). Purchase (2) exterior tables.",63,2022-Q3,2023-Q1,Planning,20220630 Tulsa ES,10370874,Tulsa ES - Purchase Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1724701,13693,10900 Hayvenhurst Ave.,Granada Hills,91344,Purchase classroom furniture (tables and chairs),48,2020-Q1,2021-Q1,Closeout,20220630 Ann ES,10365675,Ann ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1213701,13286,126 E. Bloom St.,Los Angeles,90012,Replace deteriorated playground matting systems to ensure the health and safety of students.,58,2013-Q4,2014-Q1,Closeout,20220630 Barrett ES,10365679,Barrett ES - Replace Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",South,1556201,13449,419 W. 98th St.,Los Angeles,90003,Replace deteriorated playground matting systems to ensure the health and safety of students.,113,2014-Q1,2014-Q1,Closeout,20220630 Bonita ES,10365682,Bonita ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1247301,13796,21929 Bonita St.,Carson,90745,Replace deteriorated playground matting systems to ensure the health and safety of students.,60,2014-Q2,2014-Q2,Closeout,20220630 Bushnell Way ES,10365685,Bushnell Way ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1267101,13375,5507 Bushnell Way,Los Angeles,90042,Replace deteriorated playground matting systems to ensure the health and safety of students.,40,2015-Q1,2015-Q1,Closeout,20220630 Bancroft MS,10366443,Bancroft MS - Roof Replacement,Roofing,4,Nick Melvoin,West,1803801,13565,929 N. Las Palmas Ave.,Los Angeles,90038,"This project is to replace the roofing on five classroom buildings. The roofing is more than 25 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",728,2015-Q4,2016-Q1,Closeout,20220630 Nevada ES,10366504,Nevada ES - Demolish/Remove DOH Portable Bldg,Portable Removal,3,Scott Schmerelson,Northwest,1545901,13783,22120 Chase St.,West Hills,91304,"Demolish/Remove Department of Housing (DOH) Portable Building; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",139,2015-Q2,2015-Q4,Closeout,20220630 186th St. ES,10365137,186th St. ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1575301,13303,1581 W. 186th St.,Gardena,90248,Provide upgrades to the campus by providing a new electronic marquee,44,2014-Q2,2015-Q2,Closeout,20220630 Dena ES,10004615,Dena ES - Facelift,Facelift,2,Monica Garcia,East,1331501,13277,1314 Dacotah St.,Los Angeles,90023,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",65,2015-Q1,2016-Q3,Closeout,20220630 Grant ES,10004610,Grant ES - Facelift,Facelift,5,Jackie Goldberg,West,1426001,13355,1530 N. Wilton Pl.,Los Angeles,90028,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",94,2012-Q2,2016-Q3,Closeout,20220630 Shenandoah ES,10004587,Shenandoah ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1667101,13491,2450 Shenandoah St.,Los Angeles,90034,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",97,2012-Q4,2016-Q3,Closeout,20220630 Vintage Math/Science/Technology Magnet ES,10004563,Vintage Math/Science/Technology Magnet - Facelift,Facelift,3,Scott Schmerelson,Northwest,1756201,13694,15848 Stare St.,North Hills,91343,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",159,2012-Q3,2014-Q1,Closeout,20220630 Los Angeles Academy MS,10100900,Los Angeles Academy MS - Replace Chiller Piping & Controls,HVAC,7,Tanya Ortiz Franklin,Central,1820001,13890,644 E. 56th St.,Los Angeles,90011,Replace Chiller Piping & Controls,"1,795",2013-Q4,2014-Q2,Closeout,20220630 Roosevelt HS,10364066,Roosevelt HS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1882901,13523,456 S. Mathews St.,Los Angeles,90033,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,268",2014-Q2,2014-Q3,Closeout,20220630 Aurora ES,10367107,Aurora ES - Electronic Camera Door Entry System,Security System,7,Tanya Ortiz Franklin,Central,1468501,13918,1050 E. 52nd Pl.,Los Angeles,90011,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,13,2016-Q1,2016-Q2,Closeout,20220630 Carver MS,10367115,Carver MS - Electronic Camera Door Entry System,Security System,5,Jackie Goldberg,Central,1809401,13409,4410 McKinley Ave.,Los Angeles,90011,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,12,2016-Q1,2016-Q2,Closeout,20220630 Columbus MS,10366020,Columbus MS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",587,2015-Q1,2015-Q2,Closeout,20220630 Lafayette Park PC,10367130,Lafayette Park PC - Electronic Camera Door Entry System,Security System,2,Monica Garcia,Central,1254301,13831,310 S. La Fayette Park Pl.,Los Angeles,90057,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,11,2016-Q1,2016-Q2,Closeout,20220630 Ochoa Learning Center,10366644,Ochoa Learning Center - New Computer Lab,Communications/Technology Upgrade,5,Jackie Goldberg,East,1237201,14062,5027 Live Oak St.,Cudahy,90201,"Provide a new computer lab including electrical power and circuitry upgrades to support the equipment, new computers and furniture.",103,2015-Q1,2015-Q2,Closeout,20220630 Hollywood HS,10366754,Hollywood HS - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1869301,13356,1521 N. Highland Ave.,Los Angeles,90028,"Upgrade and modernize school's existing parent & family center by providing interior paint, removing partition wall, and repairing ceiling. Provide security upgrades including new doors and panic hardware as well as security on windows. Install whiteboards/bulletin boards and new classroom furniture. Equip with new laptop computers and signage.",78,2015-Q3,2016-Q1,Closeout,20220630 Twain MS,10367219,Twain MS - Portable Removal,Portable Removal,4,Nick Melvoin,West,1842501,13630,2224 Walgrove Ave.,Los Angeles,90066,Removal of 4 DSA portable buildings from the campus per a request from the Superintendent in order to restore the garden area,96,2015-Q4,2016-Q2,Closeout,20220630 Westminster EEC,10004290,Westminster EEC - Shade Shelter,Lunch/Shade Shelter,4,Nick Melvoin,West,1957601,16724,1010 Main St.,Venice,90291,One shade structure was added to the site due to space limitations. Includes path of travel improvements to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA).,205,2013-Q4,2014-Q3,Closeout,20220630 San Pedro HS,10364366,"San Pedro HS - Facilities Upgrades - Academy Offices, Outdoor Spaces, Visual Identity",Small Learning Community/Academy,7,Tanya Ortiz Franklin,South,1885001,13377,1001 W. 15th St.,San Pedro,90731,"Facilities Upgrades - Academy Offices, Outdoor Spaces, Visual Identity","3,641",2013-Q3,2015-Q1,Closeout,20220630 Burton ES,10365204,Burton ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1265801,13540,8111 Calhoun Ave.,Panorama City,91402,Demolish/Remove 3 Portable Buildings,77,2014-Q3,2014-Q4,Closeout,20220630 186th St. ES,10370276,186th St. ES - Exterior Painting,Painting,7,Tanya Ortiz Franklin,South,1575301,13303,1581 W. 186th St.,Gardena,90248,"Prepare, paint, and refinish the exterior of all buildings and their appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site, at 186th St. Elementary School.",597,2020-Q1,2020-Q3,Closeout,20220630 Amestoy ES,10370123,Amestoy ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1209601,13426,1048 W. 149th St.,Gardena,90247,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2027-Q2,2027-Q3,Planning,20220630 Compton ES,10370139,Compton ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1320501,13498,1515 E. 104th St.,Los Angeles,90002,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2029-Q1,2029-Q2,Planning,20220630 Adams MS,10369519,Adams MS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1800901,13366,151 W. 30th St.,Los Angeles,90007,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2022-Q3,2023-Q2,Planning,20220630 Fullbright ES,10370381,Fullbright ES - Exterior Painting,Painting,4,Nick Melvoin,Northwest,1402701,13661,6940 Fullbright Ave.,Canoga Park,91306,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",646,2020-Q4,2021-Q2,Closeout,20220630 Corona ES,10369976,Corona ES - Electronic Marquee and Lunch Tables,Campus Improvement,5,Jackie Goldberg,East,1321901,13453,3825 Bell Ave.,Bell,90201,Install a new electronic wall-mounted marquee and replace 30 deteriorated lunch tables.,101,2019-Q2,2022-Q1,Closeout,20220630 Granada ES,10004564,Granada ES - Facelift,Facelift,3,Scott Schmerelson,Northwest,1423301,13561,17170 Tribune St.,Granada Hills,91344,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",111,2012-Q2,2016-Q3,Closeout,20220630 Franklin HS,10369372,Franklin HS - Seismic Retrofit of Auditorium,Seismic Modernization,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,"This project is to provide seismic retrofits at the Auditorium Building which encompasses a total area of approximately 40,200 square feet. The project includes providing Americans with Disabilities Act upgrades as required.","10,790",2022-Q1,2023-Q4,Construction,20220630 61st St. ES,10372115,61st St. ES - Energy Conservation Lighting,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1680801,13370,6020 S. Figueroa St.,Los Angeles,90003,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $433,761. Estimated energy savings is 178,133 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $110,090 which is 25.4% of the ECM costs.",110,2022-Q3,2023-Q3,Planning,20220630 Laurel EEC,10372091,Laurel EEC - Purchase Classroom Furniture and Lunch Tables,Furniture/Fixtures/Equipment,4,Nick Melvoin,West,1952901,16286,8023 Willoughby Ave.,Los Angeles,90046,Purchase (3) new student activity tables and (2) exterior picnic tables,6,2021-Q4,2022-Q1,Closeout,20220630 Hamlin Charter Academy ES,10372619,Hamlin Charter Academy ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1434901,13725,22627 Hamlin St.,West Hills,91307,Install new secure entry system at the Main Office.,37,2022-Q4,2022-Q3,Planning,20220630 Para Los Niños Gratts PC,10370651,Para Los Niños Gratts PC - Mitigate Water Intrusion,Plumbing/Irrigation/Drainage,2,Monica Garcia,Central,1216301,13931,474 S. Hartford Ave.,Los Angeles,90017,"This project is to mitigate water intrusion and correct water damage which consists of replacing concrete surfaces, playground matting, roofing, floor tile, interior ceiling and wall surfaces, door frame, gutters and downspouts. The scope of work also includes installing new storm water drain lines.","5,445",2021-Q4,2023-Q3,Construction,20220630 Lokrantz Special Education Center,10004570,Lokrantz Special Education Center - Facelift,Facelift,4,Nick Melvoin,Northwest,1194701,13795,19451 Wyandotte St.,Reseda,91335,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",128,2013-Q2,2016-Q3,Closeout,20220630 Napa ES,10004568,Napa ES - Facelift,Facelift,3,Scott Schmerelson,Northwest,1544601,13701,19010 Napa St.,Northridge,91324,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",129,2013-Q1,2016-Q3,Closeout,20220630 Dorsey HS,10365133,Dorsey HS - Campus Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1860001,13643,3537 Farmdale Ave.,Los Angeles,90016,"Upgrade the campus including security upgrades and surveillance, a new electronic marquee, and a motorized gate and buzzer system",140,2013-Q3,2014-Q2,Closeout,20220630 Brockton ES,10365186,Brockton ES - Security Upgrades,Security System,4,Nick Melvoin,West,1254801,13432,1309 Armacost Ave.,Los Angeles,90025,Upgrade physical security of the school by purchasing and installing a new gate and an electronic camera door entry system at the main entrance.,25,2014-Q4,2016-Q4,Closeout,20220630 Saturn ES,10365187,Saturn ES - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,Upgrade physical security of the campus by purchasing and installing an electronic camera door entry system for the main entrance.,18,2015-Q1,2016-Q4,Closeout,20220630 Fullbright ES,10366164,Fullbright ES - Portable Removal,Portable Removal,4,Nick Melvoin,Northwest,1402701,13661,6940 Fullbright Ave.,Canoga Park,91306,Demolish/Remove 1 Portable Building,75,2014-Q2,2015-Q1,Closeout,20220630 Wilmington Park EEC,10106660,Wilmington Park EEC - Add Window at Manager's Office,Ceiling/Wall System,7,Tanya Ortiz Franklin,South,1958501,16300,1419 Young St.,Wilmington,90744,Add Window at Manager's Office,11,2016-Q1,2016-Q2,Closeout,20220630 MacArthur Park ES for the Visual and Performing Arts,10366062,MacArthur Park ES for the Visual and Performing Arts - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1254401,13832,2300 W. 7th St.,Los Angeles,90057,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",228,2014-Q4,2015-Q1,Closeout,20220630 Sellery Special Education Center,10366098,Sellery Special Education Center - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1195601,13855,15805 S. Budlong Ave.,Gardena,90247,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",178,2015-Q1,2015-Q2,Closeout,20220630 San Fernando EEC,10004289,San Fernando EEC - Shade Shelter,Lunch/Shade Shelter,6,Kelly Gonez,Northeast,1955501,13419,1204 Woodworth St.,San Fernando,91340,Two shade structures were added to the site over the large play area. Includes path of travel improvements to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA).,125,2012-Q2,2014-Q2,Closeout,20220630 112th St. ES,10368785,112th St. ES - 2017-18 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"This project is a charter school renovation for Resolute Academy Charter for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 11 instructional spaces for charter student seats in grades 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",27,2017-Q2,2017-Q3,Closeout,20220630 Bethune MS,10368796,Bethune MS - 2017-18 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,"This project is a charter school renovation for Animo Florence-Firestone Charter MS for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades 6-7. The scope of work includes facilities renovations and reconfigurations, technology, and communication/safety purchases and upgrades.",80,2017-Q2,2017-Q3,Closeout,20220630 Dorsey HS,10366755,Dorsey HS - Parent & Family Center,Reconfiguration,1,"Dr. George J. McKenna, III",West,1860001,13643,3537 Farmdale Ave.,Los Angeles,90016,"Convert and renovate former Title 1 office into a new parent & family center by providing interior paint, flooring and lighting repairs, and security upgrades including new doors and panic hardware as well as security on windows. Remove deteriorated built-in cabinets and patch up walls and existing sink. Provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",68,2015-Q4,2016-Q1,Closeout,20220630 Barrett ES,10364262,Barrett ES - Portable Classrooms for Enrollment Growth,Portable Upgrade,1,"Dr. George J. McKenna, III",South,1556201,13449,419 W. 98th St.,Los Angeles,90003,Provide Additional Classroom Space for Enrollment Growth,135,2016-Q1,2017-Q2,Closeout,20220630 Sutter MS,10368847,Sutter MS - 2017-18 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,"This project is a charter school renovation for Ingenium Charter MS for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office,1 special education room, and 8 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",229,2017-Q2,2017-Q3,Closeout,20220630 Cleveland Charter HS,10003969,Cleveland HS - Entry Improvements,Fencing,3,Scott Schmerelson,Northwest,1859001,13753,8140 Vanalden Ave.,Reseda,91335,"Repair 9,500 linear feet of brick wall at the front of the school",365,2014-Q1,2014-Q2,Closeout,20220630 Polytechnic HS,10367023,Polytechnic HS - College Center,Reconfiguration,6,Kelly Gonez,Northeast,1863601,13734,12431 Roscoe Blvd.,Sun Valley,91352,Convert classroom previously used for ROTC (room 300) and adjacent workroom / storage room into a College Center,37,2015-Q3,2015-Q3,Closeout,20220630 Burbank ES,10367027,Burbank ES- Campus Improvements,Access Compliance,3,Scott Schmerelson,Northeast,1263001,13678,12215 Albers St.,North Hollywood,91607,Convert storage room for changing table,14,2015-Q3,2016-Q1,Closeout,20220630 Cohasset ES,10003970,Cohasset ES - Auditorium Renovation,Auditorium Renovation,3,Scott Schmerelson,Northwest,1313701,13542,15810 Saticoy St.,Lake Balboa,91406,"This auditorium renovation project consists of refurbishing approximately 180 chairs, removing and replacing the existing flooring, installing 6 new wall-mounted folding tables, replacing the stage curtain, and replacing acoustic ceiling tiles. In order to facilitate this project, the scope was revised to include re-roofing the auditorium building which was completed in January 2013.",161,2014-Q1,2014-Q4,Closeout,20220630 Dominguez ES,10364317,Dominguez ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1346601,13310,21250 Santa Fe Ave.,Carson,90810,Demolish/Remove Portable Building(s),91,2013-Q4,2014-Q4,Closeout,20220630 San Miguel ES,10365211,San Miguel ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1687501,14741,9801 San Miguel Ave.,South Gate,90280,Demolish/Remove 1 Portable Building,16,2013-Q4,2014-Q4,Closeout,20220630 Mulholland MS,10371222,Mulholland MS - Auditorium A/V Equipment,Electrical/Lighting,3,Scott Schmerelson,Northwest,1825901,15184,17120 Vanowen St.,Lake Balboa,91406,"Install audio/visual equipment in auditorium. Replace deteriorated ceiling-mounted projector and sound system. Sound system to include amplifiers, power distribution, sound processor, wireless microphones, audio mixing board, CD recorder, and speakers.",80,2021-Q3,2022-Q3,Construction,20220630 4th St. ES,10369867,4th St. ES - Secure Entry System,Security System,2,Monica Garcia,East,1397301,13482,420 Amalia Ave.,Los Angeles,90022,Install new secure entry system,28,2018-Q3,2018-Q4,Closeout,20220630 Gates ES,10369350,Gates ES - Security Upgrades,Security System,2,Monica Garcia,East,1409601,13291,3333 Manitou Ave.,Los Angeles,90031,Install Aiphone video/buzzer entry system at main entrance.,32,2018-Q4,2019-Q1,Closeout,20220630 Malabar ES,10367983,Malabar ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1508201,13314,3200 E. Malabar St.,Los Angeles,90063,"The project removed 3 portable buildings, abated hazardous materials, and disconnected low voltage and high voltage utilities. Portable removal projects typically repair or replace asphalt over the former building footprints, however this work was not required due to the creation of an educational garden under the SEEDS program (project #10369077).",244,2016-Q4,2017-Q4,Closeout,20220630 Taper ES,10368011,Taper ES - Accessibility Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1703501,13539,1824 Taper Ave.,San Pedro,90731,Modify girls' restroom for changing area; remove 3 toilets and partitions. Provide and install electrical outlet. Provide and install 5 ADA lunch tables. Relocate 5 non-ADA tables on site. Secure (bolt) and unsecure tables as needed.,11,2016-Q4,2016-Q4,Closeout,20220630 Stagg ES,10367004,Stagg ES - Paving,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1689001,13722,7839 Amestoy Ave.,Lake Balboa,91406,"The over 30-year-old asphalt concrete paving on the campus is severely damaged and in need of replacement. The scope of work includes replacing deteriorated asphalt concrete pavement, adding a solar reflective coating to the new playground pavement, redesigning the outdoor athletic areas to meet current requirements, replacing or repairing outdoor apparatus and fencing as needed, adding underground run-off water storage chambers, increasing the driveway entrance for fire truck access, and other paving improvements that were requested by the school for safety. In addition, the project includes drainage systems required by DSA and the District's Storm Water Technical Manual and associated Americans with Disabilities Act (ADA) upgrades for path of travel, restrooms, drinking fountain, and a changing table.","8,011",2017-Q2,2018-Q2,Closeout,20220630 Victoria ES,10370224,Victoria ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1750701,13493,3320 Missouri Ave.,South Gate,90280,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2027-Q1,2027-Q2,Planning,20220630 Grand View ES,10369671,Grand View ES - Water Bottle Stations,Campus Improvement,4,Nick Melvoin,West,1424701,13716,3951 Grand View Blvd.,Los Angeles,90066,Install three bottle-filling/drinking water combo fountains.,23,2018-Q2,2018-Q3,Closeout,20220630 Franklin ES,10369345,Franklin ES - Classroom Replacement,Addition,2,Monica Garcia,Central,1398601,13446,1910 N. Commonwealth Ave.,Los Angeles,90027,"Construction of a new Classroom Building with 13 classrooms, support spaces, Food Services Building, and underground parking that will be designed, constructed, and furnished/equipped to meet current code requirements and Los Angeles Unified design standards. Removal of 11 classrooms located in relocatable buildings and the food service hot shack. Installation of interim housing to support the school site during construction. Infrastructure and/or site upgrades as required to support the new facilities, including an enhanced Information Technology network convergence system and a new campuswide fire alarm system, and the replacement of the retaining wall along the eastern and southern portion of the site, upgrades to landscape, hardscape, parking, and playground areas where portables are removed or in other project-related areas; and site work, path of travel, and other required ADA improvements.","48,473",2023-Q1,2026-Q2,Design,20220630 Gage MS,10370337,Gage MS - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1815101,13598,2880 E. Gage Ave.,Huntington Park,90255,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new chairs. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",45,2019-Q2,2019-Q4,Closeout,20220630 Roosevelt HS,10365227,Roosevelt HS - Compliance with State & Federal Access Requirements,Access Compliance,2,Monica Garcia,East,1774901,13523,456 S. Mathews St.,Los Angeles,90033,"Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Upgrades to Restroom, Drinking Fountain, Temporary Ramps, and Path of Travel Improvements",18,2013-Q4,2014-Q1,Closeout,20220630 Our Community School,10366079,Our Community School - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1590201,13801,10045 Jumilla Ave.,Chatsworth,91311,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",323,2015-Q1,2015-Q2,Closeout,20220630 Marina Del Rey MS,10370972,Marina Del Rey MS - Security Upgrade,Security System,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,Install video surveillance (CCTV) system utilizing 2 new cameras and the existing door buzzer camera,43,2020-Q1,2020-Q4,Closeout,20220630 Bernstein HS,10371123,Bernstein HS - Auditorium Renovation,Auditorium Renovation,5,Jackie Goldberg,West,1869601,13953,1309 N. Wilton Pl.,Hollywood,90028,"Upgrade sound system, projector and screen in auditorium.",85,2020-Q2,2020-Q3,Closeout,20220630 Erwin ES,10371132,Erwin ES - Campus Improvement,Campus Improvement,6,Kelly Gonez,Northeast,1363001,13624,13400 Erwin St.,Van Nuys,91401,"Renovate stage curtains, install door buzzer and provide new lunch benches.",91,2020-Q1,2020-Q3,Closeout,20220630 East LA Occupational Center,10367170,East LA Occupational Center - Paving,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1908001,13893,2100 Marengo St.,Los Angeles,90033,"Replace asphalt paving in parking areas and in between buildings as well as meet accessibility requirements of the Americans with Disabilities Act (ADA) with upgrades to restrooms, drinking fountain, parking, and path of travel improvements.","3,408",2020-Q4,2021-Q1,Closeout,20220630 Arlington Heights ES,10370124,Arlington Heights ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1219201,15202,1717 Seventh Ave.,Los Angeles,90019,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q3,2028-Q4,Planning,20220630 El Sereno ES,10370144,El Sereno ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1356201,13387,3838 Rosemead Ave.,Los Angeles,90032,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2027-Q3,2027-Q4,Planning,20220630 15th St. ES,10370147,15th St. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1376701,13337,1527 S. Mesa St.,San Pedro,90731,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q2,2028-Q4,Planning,20220630 San Pedro ES,10370198,San Pedro ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1650701,13279,1635 S. San Pedro St.,Los Angeles,90015,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q4,2029-Q2,Planning,20220630 Sunrise ES,10370212,Sunrise ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1698801,13395,2821 E. 7th St.,Los Angeles,90023,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2028-Q1,2028-Q2,Planning,20220630 Manchester ES,10369094,Manchester ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",South,1509601,13305,661 W. 87th St.,Los Angeles,90044,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",48,2018-Q1,2018-Q2,Closeout,20220630 95th St. ES,10369096,95th St. ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1552101,13349,1109 W. 96th St.,Los Angeles,90044,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",47,2017-Q4,2018-Q4,Closeout,20220630 Hamilton HS,10369097,Hamilton HS - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1868601,13570,2955 Robertson Blvd.,Los Angeles,90034,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",64,2018-Q1,2018-Q3,Closeout,20220630 Grape ES,10365704,Grape ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1427401,13495,1940 E. 111th St.,Los Angeles,90059,Replace deteriorated playground matting systems to ensure the health and safety of students.,56,2014-Q1,2014-Q1,Closeout,20220630 Los Angeles Center for Enriched Studies,10369098,Los Angeles Center for Enriched Studies - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1874101,13554,5931 W. 18th St.,Los Angeles,90035,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",55,2017-Q3,2018-Q2,Closeout,20220630 Evergreen ES,10369102,Evergreen ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1369901,13569,2730 Ganahl St.,Los Angeles,90033,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",53,2018-Q1,2018-Q4,Closeout,20220630 Humphreys ES,10369107,Humphreys ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1461601,13437,500 S. Humphreys Ave.,Los Angeles,90022,"Modernize Parent & Family Center classroom by providing security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",39,2018-Q2,2018-Q4,Closeout,20220630 Multnomah ES,10369109,Multnomah ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1542501,13631,2101 N. Indiana Ave.,Los Angeles,90032,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",51,2017-Q4,2018-Q2,Closeout,20220630 Sunrise ES,10369111,Sunrise ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1698801,13395,2821 E. 7th St.,Los Angeles,90023,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",56,2018-Q1,2018-Q4,Closeout,20220630 Van Nuys MS,10369116,Van Nuys MS - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northeast,1843401,13605,5435 Vesper Ave.,Van Nuys,91411,"Modernize Parent & Family Center classroom by providing paint touch-up, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",59,2018-Q1,2018-Q3,Closeout,20220630 Kennedy HS,10369119,Kennedy HS - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1872501,13263,11254 Gothic Ave.,Granada Hills,91344,"Modernize Parent & Family Center classroom by providing paint touch-up, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",51,2017-Q4,2018-Q3,Closeout,20220630 Wilshire Crest ES,10370812,Wilshire Crest ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1779501,13524,5241 W. Olympic Blvd.,Los Angeles,90036,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",314,2021-Q1,2021-Q2,Closeout,20220630 Telfair EEC,10368874,Telfair EEC - Shade Shelter,Lunch/Shade Shelter,6,Kelly Gonez,Northeast,1958001,15442,10915 Telfair Ave.,Pacoima,91331,The project will install 1 shade structure over the play structure and provide path of travel improvements that comply with the Americans with Disabilities Act (ADA).,164,2022-Q3,2023-Q1,Design,20220630 Nava College Preparatory Academy,10369053,Nava College Preparatory Academy - Restroom Upgrade,Access Compliance,5,Jackie Goldberg,Central,1761401,13447,1319 E. 41st St.,Los Angeles,90011,provide changing table and outlet,3,2017-Q3,2017-Q3,Closeout,20220630 Van Nuys ES,10364004,Van Nuys ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1743801,13403,6464 Sylmar Ave.,Van Nuys,91401,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",387,2014-Q2,2014-Q3,Closeout,20220630 Normandie ES,10367254,Normandie ES - Paving,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",Central,1563001,13300,4505 S. Raymond Ave.,Los Angeles,90037,"The over 30-year-old asphalt concrete paving on the campus is severely deteriorated and in need of replacement. The scope of work replaces asphalt concrete pavement at the playground and in parking lots #1, #2, #3, and #4. The project also includes the addition of a soccer field, boardwalk, landscaping, concrete planters and pavers, and new matting and solar reflective coating for the playground area. The project provides upgrades to comply with the Americans with Disabilities Act (ADA) including path of travel, fencing and gates, and drinking fountains, as well as improvements to drainage systems required by DSA and the District's Storm Water Technical Manual.","6,036",2018-Q3,2020-Q3,Closeout,20220630 Stagg ES,10368320,Stagg ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1689001,13722,7839 Amestoy Ave.,Lake Balboa,91406,Provide and install electronic marquee.,41,2018-Q1,2018-Q2,Closeout,20220630 153rd St. ES,10363853,153rd St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1582201,13812,1605 W. 153rd St.,Gardena,90247,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",283,2014-Q4,2015-Q1,Closeout,20220630 Marlton Special Education School,10366703,Marlton Special Education School - New Motorized Gate,Security System,1,"Dr. George J. McKenna, III",West,1194901,13860,4000 Santo Tomas Dr.,Los Angeles,90008,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system and security cameras at the main entrance. Provide and install motorized roll gate at the staff parking lot.,137,2015-Q2,2015-Q3,Closeout,20220630 Lexington PC,10366058,Lexington PC - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1517001,13847,4564 W. Lexington Ave.,Los Angeles,90029,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",163,2015-Q1,2015-Q1,Closeout,20220630 Grant HS,10101110,Grant HS - Grandstands,Gym/Athletic Facilities Renovation,6,Kelly Gonez,Northeast,1868301,13674,13000 Oxnard St.,Van Nuys,91401,Grandstands,"1,734",2013-Q1,2014-Q2,Closeout,20220630 Griffith STEAM Magnet MS,10367619,Griffith MS - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1816801,13646,4765 E. 4th St.,Los Angeles,90022,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",61,2016-Q3,2017-Q1,Closeout,20220630 Sheridan ES,10367638,Sheridan ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1668501,13290,416 N. Cornwell St.,Los Angeles,90033,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",61,2016-Q2,2018-Q1,Closeout,20220630 Le Conte MS,10366640,Le Conte MS - 48 Laptops,Communications/Technology Upgrade,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,Increase school's access to technology by providing 48 laptop computers,44,2014-Q4,2015-Q1,Closeout,20220630 Twain MS,10366109,Twain MS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1842501,13630,2224 Walgrove Ave.,Los Angeles,90066,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",507,2015-Q2,2015-Q3,Closeout,20220630 Reseda ES,10365738,Reseda ES - Replace Playground Matting,Paving/Greening/Playground Equipment,4,Nick Melvoin,Northwest,1623301,13398,7265 Amigo Ave.,Reseda,91335,Replace deteriorated playground matting systems to ensure the health and safety of students.,123,2014-Q2,2014-Q2,Closeout,20220630 Ritter ES,10365739,Ritter ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1630101,13562,11108 Watts Ave.,Los Angeles,90059,Replace deteriorated playground matting systems to ensure the health and safety of students.,49,2013-Q4,2014-Q1,Closeout,20220630 Jordan HS,10107796,Jordan HS - Provide Manually-Operated Rolling Doors,Ceiling/Wall System,7,Tanya Ortiz Franklin,South,1872101,13494,2265 E. 103rd St.,Los Angeles,90002,Provide Manually-Operated Rolling Doors,1,2013-Q1,2014-Q2,Closeout,20220630 Northridge Academy HS,10367138,Northridge Academy HS - Electrical Upgrades & Surveillance,Security System,3,Scott Schmerelson,Northwest,1851301,13930,9601 Zelzah Ave.,Northridge,91325,"Provide physical security upgrades to the campus by installing electrical upgrades, raceways, and surveillance cameras in the main, multipurpose room, and gym buildings.",122,2016-Q1,2016-Q4,Closeout,20220630 Budlong ES,10366596,Budlong ES - SEEDS,SEEDS,1,"Dr. George J. McKenna, III",West,1261601,15162,5940 S. Budlong Ave.,Los Angeles,90044,"Design and construct an outdoor learning space of approximately 1,100 square feet consisting of the installation of permeable concrete pavers, decomposed granite, art poles, and a hose bib. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",19,2015-Q1,2015-Q3,Closeout,20220630 Bell HS,10145719,Bell HS - Install Scoreboard,Paving/Greening/Playground Equipment,5,Jackie Goldberg,East,1853601,13488,4328 Bell Ave.,Bell,90201,Install Scoreboard,43,2013-Q2,2014-Q2,Closeout,20220630 London Continuation HS,10367412,London Continuation HS - SEEDS,SEEDS,6,Kelly Gonez,Northeast,1868501,15441,12924 Oxnard St.,Van Nuys,91401,"Design and construct an outdoor learning space of approximately 350 square feet consisting of asphalt removal, new irrigation, and installation of new hose bibs. It will be outfitted by the school community (Jack London Continuation HS) with planting materials.",29,2016-Q2,2016-Q2,Closeout,20220630 Shirley ES,10365747,Shirley ES - Replace Playground Matting,Paving/Greening/Playground Equipment,4,Nick Melvoin,Northwest,1671201,13671,19452 Hart St.,Reseda,91335,Replace deteriorated playground matting systems to ensure the health and safety of students.,40,2014-Q3,2014-Q3,Closeout,20220630 Marvin ES,10366319,Marvin ES - Ceiling System Improvements,Seismic Modernization,1,"Dr. George J. McKenna, III",West,1517801,13573,2411 Marvin Ave.,Los Angeles,90016,"Repair 2,000 square feet of suspended ceiling systems in 003DCS classroom building for seismic corrections and to improve structural integrity. Scope of work includes installation of new seismic compression struts, and hanger wire upgrades per code requirements, as well as abatement of asbestos and removing impacted components beyond their remaining service life.",299,2021-Q2,2021-Q3,Closeout,20220630 Vinedale College Preparatory Academy,10368663,Vinedale ES - Accessibility Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1754801,13430,10150 La Tuna Canyon Rd.,Sun Valley,91352,Remove and replace existing door hardware at computer lab with compliant hardware. Replace or seal existing catch basin grill. Provide and install portable wheelchair lift with stage platform adaptation. Remove and replace auditorium doors and hardware.,41,2017-Q1,2017-Q2,Closeout,20220630 Nestle Charter ES,10367748,Nestle Charter ES - HVAC,HVAC,4,Nick Melvoin,Northwest,1545201,13614,5060 Nestle Ave.,Tarzana,91356,"This project will replace the heating, ventilation, and air conditioning (HVAC) systems in the administration, multipurpose room/cafeteria, and 15 classroom buildings. The HVAC systems are over 18 years old, deteriorated, and beyond economical repair resulting in frequent system failures and unreliable service.","2,418",2020-Q2,2022-Q3,Construction,20220630 West Hollywood ES,10368987,West Hollywood ES - Install Ramp,Access Compliance,4,Nick Melvoin,West,1764901,13364,670 N. Hammond St.,West Hollywood,90069,Provide and install two TMP ramps and purchase accessible lunch tables.,68,2017-Q2,2017-Q3,Closeout,20220630 Audubon MS,10370560,Audubon MS - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1802801,13564,4120 11th Ave.,Los Angeles,90008,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",617,2020-Q2,2020-Q4,Closeout,20220630 San Gabriel ES,10369420,San Gabriel ES - Security Lighting,Electrical/Lighting,5,Jackie Goldberg,East,1646601,13651,8628 San Gabriel Ave.,South Gate,90280,Install security lighting in front arcade.,5,2018-Q2,2018-Q3,Closeout,20220630 Belvedere MS,10371120,Belvedere MS - Auditorium Renovation,Auditorium Renovation,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,"Install new projector, screen, audio/visual equipment, and LED lighting in the auditorium.",96,2020-Q1,2020-Q4,Closeout,20220630 Toluca Lake ES,10367540,Toluca Lake ES - Parking Lot Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1719201,13634,4840 Cahuenga Blvd.,North Hollywood,91601,"Parking lot accessibility upgrades including repaving, installation of truncated domes, handicap stall, path of travel, signage, and accessible gates.",33,2016-Q2,2016-Q3,Closeout,20220630 Osceola ES,10367597,Osceola ES - Restroom Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1589401,13751,14940 Osceola St.,Sylmar,91342,"Modify kindergarten restrooms K2 & K4 including widening doors, relocating light switch, removing and replacing partition, and installing ACU-provided folding changing table. In the girls' restroom, remove and cap 2 toilet partitions, and provide and install privacy curtain.",28,2016-Q2,2016-Q2,Closeout,20220630 Buchanan ES,10367111,Buchanan ES - Electronic Camera Door Entry System,Security System,2,Monica Garcia,Central,1260301,13350,5024 Buchanan St.,Los Angeles,90042,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,14,2016-Q4,2017-Q1,Closeout,20220630 Manhattan ES,10366910,Manhattan ES - 2015-17 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1511001,13685,1850 W. 96th St.,Los Angeles,90047,"This project is a charter school renovation for Apple Academy Charter Public School ES for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 13 classrooms for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. This project is amended to include an additional single-year term for Apple Academy Charter Public School ES with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 as a ""No Growth"" project includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades K-5. The scope for this project is not yet defined.",19,2015-Q2,2015-Q2,Closeout,20220630 Grant HS,10365985,Grant HS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1868301,13674,13000 Oxnard St.,Van Nuys,91401,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",784,2014-Q2,2014-Q3,Closeout,20220630 Albion ES,10367653,Albion ES - 2016-18 Prop 39,Charter Prop 39,2,Monica Garcia,East,1201401,13296,322 S. Ave. 18,Los Angeles,90031,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a charter school renovation for Endeavor College Prep. This growth project included 1 charter office, 1 special education room, and 5 instructional spaces for charter students in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with an unspecified scope of work and a revised expiration date for the charter school of 6/30/18. The charter operator, Endeavor College Prep did not continue to occupy Albion ES during the 2017-18 academic year. As a result, the scope of work was defined as a vacancy which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",31,2017-Q3,2017-Q3,Closeout,20220630 Richland ES,10369717,Richland ES - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1626001,13576,11562 Richland Ave.,Los Angeles,90064,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 2 doors, 60 door hardware, 15 thresholds, accessible paths of travel, 69 signs, 9 restrooms, 24 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 3 concrete ramps, 4 metal ramps, 3 pieces of accessible furniture, 1 assembly seat, 5 railings, 2 parking areas, 1 cafeteria counter, 3 casework/counters, 1 new elevator/stage lift, 1 passenger/bus loading zone, and DSA certification of 5 portable buildings.","4,508",2020-Q2,2023-Q1,Construction,20220630 Dymally HS,10366231,Dymally HS - 2014-16 Prop 39 (Watts Learning Center Charter MS),Charter Prop 39,7,Tanya Ortiz Franklin,South,1892301,14581,8800 S. San Pedro St.,Los Angeles,90003,"This project is a charter school renovation for Watts Learning Center Charter MS for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 15 classrooms for 393 charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. This project is amended to include an additional single-year term for Watts Learning Center Charter MS with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 as a ""No Growth"" project includes 1 charter office and 15 classrooms for charter student seats in grades 6-8. The additional scope for this project is not yet defined.",50,2014-Q2,2014-Q2,Closeout,20220630 107th St. ES,10367554,107th St. ES - Fencing,Fencing,7,Tanya Ortiz Franklin,South,1585701,13857,147 E. 107th St.,Los Angeles,90003,Provide and install wrought iron fence in front perimeter of school.,44,2017-Q1,2017-Q2,Closeout,20220630 Loma Vista ES,10370879,Loma Vista ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1491801,13586,3629 E. 58th St.,Maywood,90270,Install new secure entry system,19,2019-Q4,2019-Q4,Closeout,20220630 O'Melveny ES,10372412,O'Melveny ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1572601,13396,728 Woodworth St.,San Fernando,91340,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 King Magnets MS,10367579,King MS Film & Media Magnet - Seismic Retrofit of Auditorium,Seismic Modernization,2,Monica Garcia,Central,1820801,13531,4201 Fountain Ave.,Los Angeles,90029,"This project constructs wall anchorage connections and cross-ties for transferring lateral loads in the Auditorium Building which was built in the 1960s and covers 12,849 square feet. The lateral force resisting system is comprised of concrete shear walls with a flexible roof diaphragm. In addition, the project replaces the auditorium roofing system, constructs a new outdoor stage area including stairs, walkways and lighting, and provides associated Americans with Disabilities Act (ADA) restroom upgrades.","2,615",2018-Q4,2019-Q4,Closeout,20220630 Le Conte MS,10370597,Le Conte MS - 2019-20 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"This project is a charter school renovation for Citizens of the World - Hollywood for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 23 instructional spaces for charter student seats in grades K-2. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. This project also executed scope to improve accessibility including: demolition of a concrete ramp, purchase and installation of a metal ramp with new landing, installation of a concrete walkway at the service gate, and other maintenance repairs for ADA compliance.",247,2019-Q2,2019-Q2,Closeout,20220630 Walnut Park ES,10372087,Walnut Park ES - Roofing,Roofing,5,Jackie Goldberg,East,1464001,13825,2642 E. Olive St.,Huntington Park,90255,"This project is to provide approximately 81,168 square feet of new roofing sitewide, including the installation of new gutters and downspouts and painting of affected areas.","1,728",2023-Q2,2023-Q4,Planning,20220630 Micheltorena ES,10371800,Micheltorena ES - Seismic Retrofits at Main Building,Seismic Modernization,5,Jackie Goldberg,Central,1528801,13329,1511 Micheltorena St.,Los Angeles,90026,"This project is to provide seismic retrofits at the Main Building with a total area of approximately 36,338 square feet. The scope of work includes ADA upgrades as required.","3,371",2024-Q1,2025-Q3,Planning,20220630 Harvard ES,10372222,Harvard ES - Secure Entry System,Security System,5,Jackie Goldberg,West,1204201,13946,330 N. Harvard Blvd.,Los Angeles,90004,Install new secure entry system at the Main Office,40,2021-Q4,2022-Q3,Construction,20220630 Cienega ES,10372286,Cienega ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1306801,13429,2611 S. Orange Dr.,Los Angeles,90016,Install new secure entry system at the Main Office.,48,2022-Q2,2022-Q3,Construction,20220630 Mosk ES,10370971,Mosk ES - Reading Garden,Paving/Greening/Playground Equipment,4,Nick Melvoin,Northwest,1740201,14302,7335 N. Lubao Ave.,Canoga Park,91306,"Provide a reading garden consisting of a new concrete planter with amphitheater seating, benches, trees, new irrigation, and new storm water drains",42,2020-Q2,2020-Q4,Closeout,20220630 Crenshaw Magnet HS: STEMM,10367764,Crenshaw Magnet HS - Gym Scoreboard,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,Remove and replace scoreboard in main gym.,42,2017-Q3,2017-Q4,Closeout,20220630 Cienega ES,10371459,Cienega ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1306801,13429,2611 S. Orange Dr.,Los Angeles,90016,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",574,2020-Q4,2021-Q1,Closeout,20220630 2nd St. ES,10368300,2nd St. ES - Campus Upgrades,Campus Improvement,2,Monica Garcia,East,1657501,13326,1942 E. 2nd St.,Los Angeles,90033,"The project will install new fencing, flooring, energy-efficient LED lighting, security screen systems, over 136,000 square feet of asphalt paving, and Americans with Disabilities Act (ADA) compliance work. The project includes modernization of the Auditorium to include new sound, lighting and wall systems.","5,177",2020-Q2,2022-Q1,Closeout,20220630 Menlo ES,10371876,Menlo ES - 2021-22 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1524701,13386,4156 Menlo Ave.,Los Angeles,90037,"This project is a charter school renovation for Global Education Academy for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 2 special education room, and 4 instructional spaces for charter student seats in grades 6-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",87,2021-Q2,2021-Q3,Closeout,20220630 Loreto ES,10372008,Loreto ES - Install Security Monitor System,Security System,2,Monica Garcia,East,1495901,13301,3408 Arroyo Seco Ave.,Los Angeles,90065,Install video surveillance (CCTV) system with 4 cameras,53,2021-Q4,2022-Q2,Closeout,20220630 Belvedere MS,10370570,Belvedere MS - 2019-21 Prop 39,Charter Prop 39,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for Collegiate Charter HS of Los Angeles. This project included 1 charter office, 2 special education rooms, and 11 instructional spaces for charter student seats in grades 9-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved in Board of Education Report No. 313-19/20 for 2020-21 Proposition 39 charter co-locations as a vacating project. Collegiate Charter HS of Los Angeles will not continue occupancy in the 2020-21 school year. Therefore, this project is amended to include the scope of work necessary to return the site to it previous conditions with all low voltage systems reconnected to District-operated programs.",211,2019-Q2,2019-Q3,Closeout,20220630 Saticoy ES,10370951,Saticoy ES- Install Ramp,Access Compliance,6,Kelly Gonez,Northeast,1656501,13363,7850 Ethel Ave.,North Hollywood,91605,Install TMP ramp at classroom.,59,2019-Q4,2020-Q1,Closeout,20220630 Reseda ES,10371364,Reseda ES - Secure Entry System,Security System,4,Nick Melvoin,Northwest,1623301,13398,7265 Amigo Ave.,Reseda,91335,Install new secure entry system at main gate,22,2021-Q1,2021-Q1,Closeout,20220630 Middleton ES,10365224,Middleton ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1530101,13649,6537 Malabar St.,Huntington Park,90255,Demolish/Remove 1 Portable Building,69,2014-Q4,2014-Q4,Closeout,20220630 Emelita ES,10365700,Emelita ES - Replace Playground Matting,Paving/Greening/Playground Equipment,4,Nick Melvoin,Northwest,1358901,13713,17931 Hatteras St.,Encino,91316,Replace deteriorated playground matting systems to ensure the health and safety of students.,61,2014-Q3,2014-Q4,Closeout,20220630 Los Angeles ES,10365712,Los Angeles ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1498201,13826,1211 S. Hobart Blvd.,Los Angeles,90006,Replace deteriorated playground matting systems to ensure the health and safety of students.,59,2014-Q2,2014-Q3,Closeout,20220630 Leichman Career Preparatory & Transition Center,10365715,Leichman Special Education HS - Replace Playground Matting,Paving/Greening/Playground Equipment,4,Nick Melvoin,Northwest,1190801,13887,19034 Gault St.,Reseda,91335,Replace deteriorated playground matting systems to ensure the health and safety of students.,88,2014-Q4,2014-Q4,Closeout,20220630 Monlux ES,10365724,Monlux ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1534201,13591,6051 Bellaire Ave.,North Hollywood,91606,Replace deteriorated playground matting systems to ensure the health and safety of students.,66,2014-Q1,2015-Q1,Closeout,20220630 Willenberg Special Education Center,10004162,Willenberg Special Education Center - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1195701,13545,308 Weymouth Ave.,San Pedro,90732,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",258,2011-Q4,2016-Q3,Closeout,20220630 107th St. ES,10004646,107th St. ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1585701,13857,147 E. 107th St.,Los Angeles,90003,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",153,2012-Q2,2014-Q1,Closeout,20220630 Beachy ES,10004577,Beachy ES - Facelift,Facelift,6,Kelly Gonez,Northeast,1232901,13666,9757 Beachy Ave.,Arleta,91331,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",110,2012-Q3,2016-Q3,Closeout,20220630 Justice Academy Charter ES,10004571,Justice ES - Facelift,Facelift,3,Scott Schmerelson,Northwest,1469201,13727,23350 Justice St.,West Hills,91304,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",89,2013-Q4,2016-Q3,Closeout,20220630 Murchison ES,10365726,Murchison ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1543801,13522,1501 Murchison St.,Los Angeles,90033,Replace deteriorated playground matting systems to ensure the health and safety of students.,17,2015-Q1,2015-Q1,Closeout,20220630 King Magnets MS,10366841,King MS - Paint Campus,Painting,2,Monica Garcia,Central,1820801,13531,4201 Fountain Ave.,Los Angeles,90029,Provide upgrades to the school by providing new paint to the existing campus.,295,2015-Q2,2016-Q2,Closeout,20220630 Mount Gleason MS,10366071,Mount Gleason MS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1824001,13744,10965 Mt. Gleason Ave.,Sunland,91040,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",446,2015-Q1,2015-Q2,Closeout,20220630 NEW Academy Canoga Park,10366072,NEW Academy Canoga Park - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1547701,13882,21425 Cohasset St.,Canoga Park,91303,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",231,2015-Q1,2015-Q2,Closeout,20220630 Northridge Academy HS,10366076,Northridge Academy HS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1851301,13930,9601 Zelzah Ave.,Northridge,91325,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",348,2015-Q1,2015-Q2,Closeout,20220630 Pacoima Charter ES,10366081,Pacoima Charter ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1597301,13417,11016 Norris Ave.,Pacoima,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",394,2015-Q1,2015-Q2,Closeout,20220630 75th St. ES,10363866,75th St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1663001,13470,142 W. 75th St.,Los Angeles,90003,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",451,2014-Q4,2015-Q1,Closeout,20220630 Porter Ranch Community School,10366869,Porter Ranch Community School - Classroom Addition,Addition,3,Scott Schmerelson,Northwest,1230301,14601,12450 Mason Ave.,Porter Ranch,91326,"This project will provide additional classroom capacity to accommodate an influx of neighborhood students projected over the next several years due to an increase in development and enable the school to continue to operate on a traditional two-semester calendar. The project will construct a new 2-story building of approximately 18,000 square feet for 9 classrooms and administrative space as well as expand the existing lunch shelter with a shade structure of approximately 3,000 square feet, provide surface level staff parking for 24 spaces, and install 8 interim portable classrooms.","15,830",2017-Q2,2018-Q3,Closeout,20220630 Independence ES,10369603,Independence ES - Technology Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1688001,13912,8435 Victoria Ave.,South Gate,90280,Purchase 70 Chromebooks and 2 charging carts,22,2018-Q2,2018-Q2,Closeout,20220630 South East HS,10372514,South East HS - 2022-23 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1888101,14161,2720 Tweedy Blvd.,South Gate,90280,"This project is a charter school renovation for Valiente College Preparatory Charter School for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 4 instructional spaces for charter student seats in grades 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",17,2022-Q3,2022-Q3,Planning,20220630 Gledhill EEC,10369851,Gledhill EEC - Nature Explore Classroom,Campus Improvement,6,Kelly Gonez,Northwest,1957801,16641,16058 Gledhill St.,North Hills,91343,"This project will create field-tested, research-based outdoor learning spaces that provide learning opportunities and support children's interaction with the natural world.  The outdoor learning spaces are divided into distinct activity areas to provide a wide-ranging mix of educational activities that support children with a variety of needs and learning styles.  The activity areas include art, building, music, climbing/balancing, flexing, gathering, gardening, messy materials, wheel toys, etc.","1,412",2021-Q3,2023-Q1,Construction,20220630 Lee Medical & Health Science Magnet ES,10004413,Central Region ES #20 - Photovoltaic Installation,Photovoltaic Installation,2,Monica Garcia,Central,1230701,15207,3600 Council St.,Los Angeles,90004,Rooftop Panels to Generate 100 kW of Solar Energy,620,2015-Q1,2015-Q2,Closeout,20220630 Belmont HS,10100965,Belmont HS - Upgrade Fire Alarm System,Fire Alarm System,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,Upgrade Fire Alarm System,"8,104",2014-Q3,2015-Q3,Closeout,20220630 Hamilton HS Humanities Magnet,10369864,Hamilton HS - Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1868603,13570,2955 Robertson Blvd.,Los Angeles,90034,Install new electronic free-standing marquee,63,2018-Q4,2019-Q1,Closeout,20220630 Nimitz MS,10369569,Nimitz MS - Concrete Ramp at Front Entrance,Access Compliance,5,Jackie Goldberg,East,1826801,13637,6021 Carmelita Ave.,Huntington Park,90255,"Construct an ADA ramp at main entrance to the school for parents with mobility issues. There is a side entry, but the school doesn't have staff to keep someone full time to provide accommodations via the side entry. In addition, it is not a historically protected campus and therefore the alternate entrance is unacceptable for use. Access at the Main Entrance is required in this situation.",167,2018-Q2,2018-Q3,Closeout,20220630 Pomelo Community Charter ES,10366730,Pomelo Community Charter ES - Shade Shelter,Lunch/Shade Shelter,3,Scott Schmerelson,Northwest,1614001,13764,7633 March Ave.,West Hills,91304,This project will provide a shade shelter over the existing play structure in the main playground plus associated accessibility improvements.,138,2016-Q1,2016-Q2,Closeout,20220630 Rodia Continuation HS,10370439,Rodia Continuation HS - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1872301,16061,2701 Sequoia Dr.,South Gate,90280,Purchase 40 Chromebooks and 1 storage cart and secure room for storage.,19,2019-Q2,2019-Q4,Closeout,20220630 Markham MS,10368117,Markham MS - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,Provide and install electronic marquee.,44,2017-Q3,2019-Q1,Closeout,20220630 Telfair ES,10370115,Telfair ES - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1706801,13616,10975 Telfair Ave.,Pacoima,91331,Remove existing marquee and install new electronic free-standing marquee,46,2019-Q2,2019-Q3,Closeout,20220630 2nd St. ES,10368299,2nd St. ES - HVAC,HVAC,2,Monica Garcia,East,1657501,13326,1942 E. 2nd St.,Los Angeles,90033,This project will install 2 new chillers serving the east and west buildings. These chiller units are more than 15 years old and beyond economical repair.,156,2017-Q1,2018-Q3,Closeout,20220630 Eagle Rock ES,10370328,Eagle Rock ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1350701,13499,2057 Fair Park Ave.,Los Angeles,90041,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",54,2019-Q2,2019-Q4,Closeout,20220630 Gompers MS,10370367,Gompers MS - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1816001,13581,234 E. 112th St.,Los Angeles,90061,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",60,2019-Q4,2020-Q4,Closeout,20220630 Kenter Canyon Charter ES,10366532,Kenter Canyon Charter ES - Plumbing Utilities Upgrades,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1469901,13626,645 N. Kenter Ave.,Los Angeles,90049,"The project replaces sanitary sewer and domestic water lines in 5 classrooms buildings E, F, G, H and J, as well as in an office building, auditorium, and restroom building L on the campus. In addition, upgrades to meet the accessibility requirements of the Americans with Disabilities Act (ADA) include: fully renovating the restrooms in building L and providing interim restroom facilities while work is underway; installing new ADA accessible sinks, cabinets, and drinking fountains in classroom buildings; implementing ADA barrier removal in 2 restrooms in the auditorium; and providing accessible parking, a secure entry system, and path of travel improvements in the north parking lot for staff. The project also replaces select deteriorated asphalt paving and sewer lines, installs new water laterals that connect to existing water mains, provides a new water supply for the irrigation system, repairs the gas distribution system as required, and removes and replaces trees that are damaging existing utilities and courtyards.","9,298",2017-Q2,2022-Q3,Construction,20220630 Compton EEC,10368883,Compton EEC - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1951101,13498,1512 E. 104th St.,Los Angeles,90002,"Remove 2 bungalows, abate hazardous materials, disconnect high and low voltage utilities, and repair/replace asphalt in the building footprints.",338,2017-Q3,2019-Q2,Closeout,20220630 Pinewood ES,10366456,Pinewood ES - Floor Repairs,Flooring,6,Kelly Gonez,Northeast,1606801,13613,10111 Silverton Ave.,Tujunga,91042,This project is to replace the floor covering in the 3-story main classroom building. The project will include asbestos abatement of existing 9X9 asbestos containing floor tiles.,256,2015-Q2,2015-Q3,Closeout,20220630 Marina Del Rey MS,10366818,Marina Del Rey MS-ADA Repairs,Access Compliance,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,ADA repairs,28,2015-Q2,2015-Q3,Closeout,20220630 Bellingham ES,10366632,Bellingham ES - Chainlink Fence Around Gas Meter,Fencing,6,Kelly Gonez,Northeast,1357701,13925,6728 Bellingham Ave.,North Hollywood,91606,Upgrade physical security of the school by installing a chain link fence around the gas meter area on the school site,9,2015-Q1,2015-Q1,Closeout,20220630 Playa Del Rey ES,10365734,Playa Del Rey ES - Replace Playground Matting,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1611001,13559,12221 Juniette St.,Culver City,90230,Replace deteriorated playground matting systems to ensure the health and safety of students.,84,2014-Q3,2015-Q1,Closeout,20220630 Saticoy ES,10365746,Saticoy ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1656501,13363,7850 Ethel Ave.,North Hollywood,91605,Replace deteriorated playground matting systems to ensure the health and safety of students.,37,2014-Q4,2015-Q1,Closeout,20220630 Superior Charter ES,10365750,Superior ES - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1700701,13810,9756 Oso Ave.,Chatsworth,91311,Replace deteriorated playground matting systems to ensure the health and safety of students.,42,2014-Q2,2014-Q4,Closeout,20220630 Vena ES,10365758,Vena ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1746601,13773,9377 Vena Ave.,Arleta,91331,Replace deteriorated playground matting systems to ensure the health and safety of students.,35,2014-Q2,2014-Q2,Closeout,20220630 Vermont ES,10365759,Vermont ES - Replace Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",Central,1747901,13273,1435 W. 27th St.,Los Angeles,90007,Replace deteriorated playground matting systems to ensure the health and safety of students.,80,2014-Q2,2014-Q2,Closeout,20220630 Franklin ES,10366035,Franklin ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1398601,13446,1910 N. Commonwealth Ave.,Los Angeles,90027,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",197,2015-Q1,2015-Q2,Closeout,20220630 Melvin ES,10229929,Melvin ES - Non Air-Conditioned Classroom & Equipment,HVAC,3,Scott Schmerelson,Northwest,1523301,13719,7700 Melvin Ave.,Reseda,91335,Non Air-Conditioned Classroom & Equipment,35,2013-Q4,2014-Q2,Closeout,20220630 Foshay Learning Center,10366034,Foshay Learning Center - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1813201,13474,3751 S. Harvard Blvd.,Los Angeles,90018,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",621,2015-Q1,2015-Q2,Closeout,20220630 Hawaiian ES,10366042,Hawaiian ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1446601,13648,540 Hawaiian Ave.,Wilmington,90744,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",325,2015-Q2,2015-Q3,Closeout,20220630 Kindergarten Learning Academy,10366052,Kindergarten Learning Academy - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1743901,13864,6555 Sylmar Ave.,Van Nuys,91401,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",103,2015-Q1,2015-Q2,Closeout,20220630 Vintage Math/Science/Technology Magnet ES,10365760,Vintage Math/Science/Technology Magnet - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1756201,13694,15848 Stare St.,North Hills,91343,Replace deteriorated playground matting systems to ensure the health and safety of students.,88,2014-Q3,2014-Q3,Closeout,20220630 Nueva Vista ES,10107726,Nueva Vista ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,5,Jackie Goldberg,East,1237801,13822,4412 Randolph St.,Bell,90201,Mitigate Lead in Water,97,2012-Q2,2014-Q4,Closeout,20220630 Fulton College Preparatory School,10372317,Fulton College Preparatory School - Install Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,"Install new electronic, wall-mounted marquee. Remove two inoperable wall-mounted marquees from auditorium building. Install new marquee in place of one of the marquees being removed. 10'x5' color LED display. NOTE: School also has a marquee at the entrance of the new admin building, which will remain in place.",75,2022-Q3,2022-Q4,Design,20220630 Selma ES,10371641,Selma ES - Exterior Painting,Painting,5,Jackie Goldberg,West,1658901,13360,6611 Selma Ave.,Los Angeles,90028,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",10,2022-Q3,2022-Q4,Planning,20220630 Balboa Gifted/High Ability Magnet ES,10370868,Balboa Gifted/High Ability Magnet ES - Purchase Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1226901,13840,17020 Labrador St.,Northridge,91325,Purchase classroom furniture (tables and chairs),26,2019-Q4,2020-Q2,Closeout,20220630 54th St. ES,10372480,54th St. ES - 2022-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1378101,13548,5501 S. Eileen Ave.,Los Angeles,90043,"This project is a charter school renovation for New Los Angeles Charter ES for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 2 instructional spaces for charter student seats in grades TK-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",210,2022-Q3,2022-Q3,Planning,20220630 White ES,10366116,White ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1254201,13830,2401 Wilshire Blvd.,Los Angeles,90057,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",232,2015-Q1,2015-Q2,Closeout,20220630 Middleton ES,10366612,Middleton ES - SEEDS,SEEDS,5,Jackie Goldberg,East,1530101,13649,6537 Malabar St.,Huntington Park,90255,"Design and construct an outdoor learning space of approximately 1,400 square feet consisting of asphalt removal, existing surface paint removal, painting pavement areas, the installation of permeable concrete pavers, art poles, and a hose bib. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",12,2015-Q1,2015-Q3,Closeout,20220630 Paseo del Rey Natural Science Magnet ES,10365733,Paseo del Rey Science Magnet - Replace Playground Matting & Equipment,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1605201,13784,7751 Paseo Del Rey,Playa Del Rey,90293,Replace deteriorated playground matting systems and broken or outdated structures to ensure the health and safety of students.,90,2015-Q2,2015-Q2,Closeout,20220630 Shirley ES,10366627,Shirley ES-Restroom Upgrade,Access Compliance,4,Nick Melvoin,Northwest,1671201,13671,19452 Hart St.,Reseda,91335,Provide & Install Ground-Fault Circuit Interrupter (GFCI) Electrical Outlet for Changing Table; Remove Existing Toilet Partition,6,2014-Q4,2015-Q1,Closeout,20220630 Russell ES,10370087,Russell ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1643801,15401,1263 E. Firestone Blvd.,Los Angeles,90001,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 33 doors/hardware, 13 accessible paths of travel, 62 signs, 13 restrooms, 5 drinking fountains, 5 sinks/sink cabinets, 2 assistive listening devices/intercoms/phones, 1 concrete ramp, 9 metal ramps, 1 assembly seat, 6 railings, 1 playground component, 1 door modification/auto opener, 1 passenger/bus loading zone, and DSA certification of 4 portable buildings.","4,495",2021-Q4,2023-Q1,Construction,20220630 Rancho Dominguez Preparatory School,10371669,Rancho Dominguez Preparatory School - Install Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1886801,193560,4110 Santa Fe Ave.,Long Beach,90810,Install new secure entry system at door to main office with three video receivers in main office.,25,2021-Q1,2021-Q2,Closeout,20220630 Blythe ES,10370424,Blythe ES - Parking Fencing & Gates,Fencing,3,Scott Schmerelson,Northwest,1247001,13758,18730 Blythe St.,Reseda,91335,Install new parking lot fence with pedestrian gates,15,2020-Q1,2020-Q1,Closeout,20220630 Sylmar Biotech Health & Engineering Magnet,10369678,Sylmar Biotech Health & Engineering Magnet - Relocate Main Office,Reconfiguration,6,Kelly Gonez,Northeast,1765801,13856,13050 Borden Ave.,Sylmar,91342,"Relocate main office. Carpentry will install new cabinets, swing gate, and countertops as well as remove and reinstall items such as white boards and existing cabinets. Electrical will install electrical outlets, phone and data lines/drops, and reinstall existing projector. Paint and touch up cabinets and walls.",145,2018-Q2,2021-Q1,Closeout,20220630 West Adams Preparatory HS,10366115,West Adams Preparatory HS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1874801,13949,1500 W. Washington Blvd.,Los Angeles,90006,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",704,2014-Q4,2015-Q1,Closeout,20220630 Grand View ES,10369239,Grand View ES - SEEDS,SEEDS,4,Nick Melvoin,West,1424701,13716,3951 Grand View Blvd.,Los Angeles,90066,"Construct an outdoor learning space of approximately 2,150 square feet, consisting of the removal of asphalt, installation of decomposed granite, installation of a concrete brush-off pad, a new 3-foot fence with a gate that complies with the Americans with Disabilities Act (ADA), new irrigation, composite wood headers to create in-ground planting areas, log benches and stools, and picnic tables. It will be outfitted by the school site partner with native and edible plants.",93,2018-Q1,2018-Q4,Closeout,20220630 109th St. ES,10371057,109th St. ES - Install Ramp,Access Compliance,7,Tanya Ortiz Franklin,South,1583601,13672,10915 McKinley Ave.,Los Angeles,90059,Construct a metal ramp to the West Classroom Building to improve accessibility for all students.,203,2020-Q4,2021-Q2,Closeout,20220630 Bernstein HS,10372483,Bernstein HS - 2022-23 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1869601,13953,1309 N. Wilton Pl.,Hollywood,90028,"This project is a charter school renovation for Academic Performance Excellence Academy (APEX) for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 3 special education rooms, and 12 instructional spaces for charter student seats in grades 7-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",30,2022-Q3,2022-Q3,Planning,20220630 Westchester Enriched Sciences Magnets,10372523,Westchester Enriched Sciences Magnets - 2022-23 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Academy HS for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 3 special education rooms, and 10 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",52,2022-Q3,2022-Q3,Planning,20220630 54th St. ES,10372405,54th St. ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1378101,13548,5501 S. Eileen Ave.,Los Angeles,90043,Install new secure entry system at the Main Office.,37,2022-Q1,2022-Q3,Construction,20220630 Kittridge ES,10369419,Kittridge ES - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1476001,13696,13619 Kittridge St.,Van Nuys,91401,Install a new free-standing electronic marquee at the front of the campus.,40,2019-Q3,2020-Q1,Closeout,20220630 Plummer ES,10366574,Plummer ES - SEEDS,SEEDS,6,Kelly Gonez,Northwest,1612301,13878,9340 Noble Ave.,North Hills,91343,"Design and construct an outdoor learning space of approximately 1,300 square feet consisting of painting pavement areas, relocating storage sheds, the installation of a hose bib and art poles. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders and signage poles.",17,2015-Q1,2015-Q1,Closeout,20220630 54th St. ES,10366571,54th St. ES - SEEDS,SEEDS,1,"Dr. George J. McKenna, III",West,1378101,13548,5501 S. Eileen Ave.,Los Angeles,90043,"Design and construct an outdoor learning space of approximately 2,000 square feet consisting of asphalt removal, painting pavement areas, the installation of concrete pavers, art poles, and a hose bib. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",7,2015-Q1,2015-Q2,Closeout,20220630 Burbank ES,10367025,Burbank ES-Provide Portable Wheelchair lift,Access Compliance,3,Scott Schmerelson,Northeast,1263001,13678,12215 Albers St.,North Hollywood,91607,Provide and install portable wheelchair lift,24,2015-Q3,2015-Q3,Closeout,20220630 Hawkins HS,10370299,Hawkins HS - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1871301,13933,825 W. 60th St.,Los Angeles,90044,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and interior painting. Provide new chairs. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",37,2019-Q4,2020-Q3,Closeout,20220630 Narbonne HS,10365986,Narbonne HS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1877901,13407,24300 S. Western Ave.,Harbor City,90710,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",799,2014-Q3,2014-Q4,Closeout,20220630 Gardner ES,10370041,Gardner ES - Secure Entry System,Security System,4,Nick Melvoin,West,1406801,13354,7450 Hawthorn Ave.,Los Angeles,90046,Install new secure entry system,17,2019-Q2,2019-Q3,Closeout,20220630 Lemay EEC,10369320,Lemay EEC - Restroom Upgrade,Access Compliance,3,Scott Schmerelson,Northwest,1953001,16662,17553 Lemay St.,Lake Balboa,91406,The project will provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,603,2021-Q1,2022-Q2,Closeout,20220630 Stanford PC,10370341,Stanford PC - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1690501,13853,3020 Kansas Ave.,South Gate,90280,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",57,2019-Q2,2019-Q4,Closeout,20220630 Banning HS,10370878,Banning HS - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,Install new electronic free-standing marquee,253,2021-Q3,2022-Q3,Construction,20220630 Castro MS,10367778,Castro MS - Flooring,Flooring,2,Monica Garcia,Central,1804501,14201,1575 W. 2nd St.,Los Angeles,90026,flooring in 9 classrooms.,33,2016-Q3,2016-Q3,Closeout,20220630 King Magnets MS,10366053,King MS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1820801,13531,4201 Fountain Ave.,Los Angeles,90029,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",637,2015-Q2,2015-Q3,Closeout,20220630 Perez Special Education Center,10004105,Perez Special Education Center - Facelift,Facelift,2,Monica Garcia,East,1195301,13489,4540 Michigan Ave.,Los Angeles,90022,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",172,2012-Q2,2016-Q3,Closeout,20220630 Elizabeth Learning Center,10004129,Elizabeth Learning Center - Facelift,Facelift,5,Jackie Goldberg,East,1354801,13480,4811 Elizabeth St.,Cudahy,90201,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",244,2011-Q4,2016-Q3,Closeout,20220630 Liechty MS,10366059,Liechty MS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1805801,13898,650 S. Union Ave.,Los Angeles,90017,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",390,2015-Q1,2015-Q2,Closeout,20220630 Maywood Academy HS,10366066,Maywood Academy HS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1888201,13922,6125 Pine Ave.,Maywood,90270,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",551,2015-Q2,2015-Q3,Closeout,20220630 Primary Academy for Success School,10365101,Primary Academy PC - Marquee,Electrical/Lighting,6,Kelly Gonez,Northwest,1477601,13865,9075 Willis Ave.,Panorama City,91402,Provide upgrades to the campus by providing a new electronic marquee,31,2014-Q1,2014-Q3,Closeout,20220630 O'Melveny State Preschool,10366468,O'Melveny ES-Restroom Upgrade,Access Compliance,6,Kelly Gonez,Northeast,1217901,13396,728 Woodworth St.,San Fernando,91340,Restroom Upgrade,1,2014-Q3,2014-Q4,Closeout,20220630 93rd St. ES,10363868,93rd St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1558201,13814,330 E. 93rd St.,Los Angeles,90003,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",818,2014-Q2,2015-Q3,Closeout,20220630 Burton ES,10363894,Burton ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1265801,13540,8111 Calhoun Ave.,Panorama City,91402,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",300,2014-Q1,2014-Q3,Closeout,20220630 Corona ES,10363913,Corona ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1321901,13453,3825 Bell Ave.,Bell,90201,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",413,2014-Q2,2014-Q3,Closeout,20220630 Glassell Park STEAM Magnet ES,10363939,Glassell Park ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1412301,13384,2211 W. Ave. 30,Los Angeles,90065,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",298,2014-Q2,2014-Q4,Closeout,20220630 Los Angeles HS,10101291,Los Angeles HS - Theater Lighting Upgrade,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,Theater Lighting Upgrade,12,2016-Q3,2016-Q4,Closeout,20220630 Reseda Charter HS,10366939,Reseda HS-Ramp to Outdoor Stage,Access Compliance,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,provide and install temporary ramp for outdoor stage,7,2015-Q2,2015-Q2,Closeout,20220630 186th St. ES,10364088,186th St. ES - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1575301,13303,1581 W. 186th St.,Gardena,90248,"The project will replace the 35-year-old roofing on 8 classroom buildings, the multipurpose room/lunch shelter and connecting arcades. The existing roofs consist of built-up layers of roofing materials, some of which have blown off in heavy winds, and have poor surface area drainage and water ponding issues. Multiple patchwork repairs prolonged the life of the roofs, but they are now deteriorated beyond economical repair. Within the last few years, Maintenance & Operations has received repetitive service calls related to the roofing.",294,2014-Q3,2014-Q4,Closeout,20220630 Vanalden ES,10364132,Vanalden ES - Roofing,Roofing,4,Nick Melvoin,Northwest,1741101,13724,19019 Delano St.,Reseda,91335,"The project will replace 63,682 square feet of roofing on 7 buildings, the lunch shelter and connecting arcades. The roofing is over 36 years old and consists of multiple layers, patches, and has water ponding issues.",381,2014-Q3,2014-Q4,Closeout,20220630 Madison MS,10367624,Madison MS - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1823001,13627,13000 Hart St.,North Hollywood,91605,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",54,2016-Q4,2017-Q2,Closeout,20220630 Monte Vista EEC,10369855,Monte Vista EEC - Nature Explore Classroom,Campus Improvement,2,Monica Garcia,Central,1959001,15741,5509 Ash St.,Los Angeles,90042,"This project will create field-tested, research-based outdoor learning spaces that provide learning opportunities and support children's interaction with the natural world. The outdoor learning spaces are divided into distinct activity areas to provide a wide-ranging mix of educational activities that support children with a variety of needs and learning styles. The activity areas include art, building, music, climbing/balancing, flexing, gathering, gardening, messy materials, wheel toys, etc.","2,634",2020-Q3,2021-Q2,Closeout,20220630 Los Angeles Academy MS,10367502,Los Angeles Academy MS - Fire Damage Repairs,Roofing,7,Tanya Ortiz Franklin,Central,1820001,13890,644 E. 56th St.,Los Angeles,90011,"The project will address damage caused by a campus fire in October 2015. The scope of work includes demolition, providing new framing, decking, and metal roofing, as well as replacing gypsum board ceilings above the janitor room, electrical room, and boys' restroom.",400,2020-Q1,2020-Q4,Closeout,20220630 Wilmington Park ES,10369517,Wilmington Park ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1778101,13378,1140 Mahar Ave.,Wilmington,90744,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2025-Q3,2025-Q4,Planning,20220630 Belmont HS,10369535,Belmont HS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"Replace deteriorated interior walk-in cooler and interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, interior walk-in freezer/cooler combination unit, and refrigeration equipment.",182,2022-Q4,2023-Q3,Planning,20220630 Lorena ES,10370030,Lorena ES - Electronic Marquee,Electrical/Lighting,2,Monica Garcia,East,1494501,13351,1015 S. Lorena St.,Los Angeles,90023,Install new electronic free-standing marquee (installation cost only),36,2019-Q1,2019-Q2,Closeout,20220630 Twain MS,10367583,Twain MS - Windows Improvements,Ceiling/Wall System,4,Nick Melvoin,West,1842501,13630,2224 Walgrove Ave.,Los Angeles,90066,The over 62-year-old windows at the Gymnasium building are deteriorated beyond economical repair. The windows leak rainwater onto the Gymnasium floor presenting a safety hazard as well as damaging the wood floor. The scope of work includes demolition of the current windows and replacement with new.,285,2017-Q1,2017-Q3,Closeout,20220630 Glassell Park STEAM Magnet ES,10369129,Glassell Park ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1412301,13384,2211 W. Ave. 30,Los Angeles,90065,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",58,2017-Q4,2018-Q3,Closeout,20220630 32nd St./USC Performing Arts Magnet ES,10368382,32nd St./USC Performing Arts Magnet ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",Central,1713701,13299,822 W. 32nd St.,Los Angeles,90007,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",155,2021-Q1,2022-Q4,Construction,20220630 Reseda ES,10368087,Reseda ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,Northwest,1623301,13398,7265 Amigo Ave.,Reseda,91335,Provide and install electronic marquee.,43,2017-Q1,2017-Q3,Closeout,20220630 99th St. ES,10369997,99th St. ES - Security Upgrade,Security System,7,Tanya Ortiz Franklin,South,1553401,13508,9900 S. Wadsworth Ave.,Los Angeles,90002,Install new secure entry system,21,2018-Q4,2019-Q1,Closeout,20220630 Stevenson College & Career Preparatory,10365098,Stevenson MS - Marquee & Parent Center Improvements,Campus Improvement,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,Provide upgrades to the campus by providing a new electronic marquee and parent & family center improvements,93,2013-Q3,2014-Q4,Closeout,20220630 Murchison EEC,10104860,Murchison EEC - Compliance with State & Federal Access Requirements,Access Compliance,2,Monica Garcia,East,1953701,16665,1537 Murchison St.,Los Angeles,90033,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) for New Shade Shelters,57,2014-Q2,2014-Q3,Closeout,20220630 Gates ES,10105861,Gates ES - Compliance with State & Federal Access Requirements,Fire Alarm System,2,Monica Garcia,East,1409601,13291,3333 Manitou Ave.,Los Angeles,90031,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),607,2016-Q3,2017-Q2,Closeout,20220630 Capistrano ES,10369069,Capistrano ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1280201,13759,8118 Capistrano Ave.,West Hills,91304,Provide and install new electronic marquee,22,2017-Q3,2018-Q1,Closeout,20220630 Eagle Rock ES,10367828,Eagle Rock ES - Portable Removal,Portable Removal,5,Jackie Goldberg,Central,1350701,13499,2057 Fair Park Ave.,Los Angeles,90041,"Remove 1 portable building including sampling and abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprint.",73,2016-Q3,2017-Q2,Closeout,20220630 Hillside ES,10368035,Hillside ES - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1453401,13293,120 E. Ave. 35,Los Angeles,90031,Modify kindergarten restroom; provide and install folding changing table and privacy screen.,1,2016-Q4,2017-Q1,Closeout,20220630 Edison MS,10368043,Edison MS - Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1811301,13555,6500 Hooper Ave.,Los Angeles,90001,"Provide and install electrical outlet, privacy curtain and appropriate signage.",3,2016-Q4,2016-Q4,Closeout,20220630 Girls Academic Leadership Academy: King School for STEM,10368302,Girls Academic Leadership Academy - New Sanitary Facilities,Plumbing/Irrigation/Drainage,1,"Dr. George J. McKenna, III",West,1608701,13361,1067 West Blvd.,Los Angeles,90019,"This project consists of the purchase and installation of two new sanitary buildings and related site preparation, building pad/foundation and utility connections.","2,016",2018-Q3,2019-Q4,Closeout,20220630 Haddon ES,10367756,Haddon ES - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1432901,13527,10115 Haddon Ave.,Pacoima,91331,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 15 doors/hardware, 19 accessible paths of travel, 8 signs, 12 restrooms, 17 drinking fountains/sinks, 1 concrete ramp, 1 assembly seat, 5 railings, 2 parking areas, 1 cafeteria counter, and 3 passenger/bus loading zones.","1,930",2017-Q4,2020-Q2,Closeout,20220630 118th St. ES,10365664,118th St. ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1574001,13321,144 E. 118th St.,Los Angeles,90061,Replace deteriorated playground matting systems to ensure the health and safety of students.,90,2014-Q1,2014-Q1,Closeout,20220630 Wilbur Charter for Enriched Academics,10370116,Wilbur Charter for Enriched Academics - Exterior Painting,Painting,4,Nick Melvoin,Northwest,1777401,13811,5213 Crebs Ave.,Tarzana,91356,"Prepare, paint, and refinish the exterior of all buildings and there appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site, at Wilbur Charter for Enriched Academics.",263,2020-Q2,2021-Q1,Closeout,20220630 Napa ES,10372411,Napa ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1544601,13701,19010 Napa St.,Northridge,91324,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Paseo del Rey Natural Science Magnet ES,10372542,Paseo del Rey Natural Science Magnet ES - Secure Entry System,Security System,4,Nick Melvoin,West,1605201,13784,7751 Paseo Del Rey,Playa Del Rey,90293,Install new secure entry system at the Main Office.,41,2022-Q3,2022-Q4,Planning,20220630 Bridge ES,10371918,Bridge ES - Energy Conservation Lighting,Electrical/Lighting,2,Monica Garcia,East,1252101,13297,605 N. Boyle Ave.,Los Angeles,90033,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $308,913. Estimated energy savings is 545,097 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $76,700 which is 24.83% of the ECM costs.",77,2022-Q4,2023-Q1,Planning,20220630 Holmes EEC,10372007,Holmes EEC - Install Security Monitor System,Security System,5,Jackie Goldberg,East,1952401,16292,1810 E. 52nd St.,Los Angeles,90058,Install video surveillance (CCTV) system with 5 cameras,69,2021-Q4,2022-Q3,Construction,20220630 Stoney Point Continuation HS,10367504,Stoney Point Continuation HS - HVAC,HVAC,3,Scott Schmerelson,Northwest,1858501,16422,10010 De Soto Ave.,Chatsworth,91311,"This project will upgrade the heating, ventilation, and air conditioning (HVAC) systems in 10 classroom buildings. The HVAC systems are over 18 years old and beyond economical repair.",503,2017-Q2,2019-Q1,Closeout,20220630 Canyon Charter ES,10370788,Canyon Charter ES - Chromebooks,Communications/Technology Upgrade,4,Nick Melvoin,West,1279501,13346,421 Entrada Dr.,Santa Monica,90402,Purchase (39) Chromebooks and (1) storage cart,13,2019-Q3,2019-Q4,Closeout,20220630 Gompers MS,10372019,Gompers MS - Provide Verizon Lab Infrastructure,Reconfiguration,7,Tanya Ortiz Franklin,South,1816001,13581,234 E. 112th St.,Los Angeles,90061,"Infrastructure upgrades in support of Verizon Innovative Learning Lab installation. Demo existing cabinets, white boards, tack boards, and counter tops; remove flooring and wall base; remove sinks and gas outlets and cap lines. Provide water and drain for new sink; provide data and power; secure doors; paint doors, trim and mullions. Heart of America/Verizon will donate roughly $500K of upgrades. New flooring, paint, lighting, ceiling work, iMacs, iPads, 3D printers, A/V equipment, robots, and furniture. ASU will provide instructional and professional development support.",84,2021-Q3,2022-Q1,Closeout,20220630 Panorama HS,10371333,Panorama HS - 2020-21 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,"This project is a charter school renovation for Girls Athletic Leadership School for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 9 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",84,2020-Q2,2020-Q3,Closeout,20220630 Parthenia Academy of Arts & Technology,10372587,Parthenia ES - Provide Exterior Tables,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1602701,13702,16825 Napa St.,North Hills,91343,Purchase (5) exterior lunch tables.,11,2022-Q3,2022-Q4,Planning,20220630 Hawaiian EEC,10372598,Hawaiian EEC - Provide Exterior Tables,Furniture/Fixtures/Equipment,7,Tanya Ortiz Franklin,South,1952201,16284,501 Hawaiian Ave.,Wilmington,90744,Purchase (7) exterior tables and umbrellas. M&O to anchor tables after upcoming outdoor classroom (Nature Explore) project is complete; budget for this task not included in this project.,16,2022-Q3,2022-Q4,Planning,20220630 Frost MS,10368193,Frost MS - Exterior Stairs & New Elevators,Campus Improvement,3,Scott Schmerelson,Northwest,1813701,13777,12314 Bradford Pl.,Granada Hills,91344,"This project replaces deteriorated exterior wood stairs, structures, bridges, and landings at the main and classroom buildings. The stairs and attached structures have required extensive repairs and are beyond economical repair. The deteriorated wood will be replaced with steel structures, supporting concrete over metal decking to prevent termite and dry rot damage. This project will consist of Americans with Disabilities Act (ADA) compliance work which includes the installation of 2 new elevators.","8,424",2019-Q2,2023-Q1,Closeout,20220630 Garfield HS,10372156,Garfield HS - Major Modernization,Major Modernization,2,Monica Garcia,East,1867901,13512,5101 E. 6th St.,Los Angeles,90022,"Site Due Diligence, Planning and Feasibility Activities.","1,704",-Q,-Q,Planning,20220630 State ES,10371078,State ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1691801,13639,3211 Santa Ana St.,South Gate,90280,Install new secure entry system,26,2020-Q3,2020-Q3,Closeout,20220630 Le Conte MS,10371105,Le Conte MS - Auditorium Upgrades,Auditorium Renovation,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,Install new LED lighting and audio/visual equipment in the auditorium.,89,2020-Q3,2020-Q3,Closeout,20220630 Hollenbeck MS,10372252,Hollenbeck MS - ADA Improvements,Access Compliance,2,Monica Garcia,East,1817901,13408,2510 E. 6th St.,Los Angeles,90023,"he site has been assigned a Category Two accessibility level. In order to meet the criteria for Category Two, various upgrades to 11 buildings and one elevator are required, including: corrections, installation or replacement of four assembly seat upgrades, two new assistive listening devices, nine casework/counter upgrades, 11 new concrete ramps, 87 new doors/jambs, 72 new door hardware, 17 drinking fountain upgrades, two existing elevator upgrades, 12 furniture accessibility upgrades, four locker room upgrades, 63 accessible path of travel upgrades, 31 new railings, 19 restroom upgrades, 76 new signs, five new sinks/cabinets, 21 new thresholds, one new elevator, and any other required improvements or mitigations to ensure compliance with local, state and/or federal facilities requirements.","18,931",2024-Q1,2025-Q3,Design,20220630 Eastman ES,10371506,Eastman ES - Install Secure Entry System,Security System,2,Monica Garcia,East,1352101,13520,4112 E. Olympic Blvd.,Los Angeles,90023,Install new secure entry system at main gate to campus with two video receivers in main office. Modify wrought iron gate to accommodate new system.,61,2020-Q4,2021-Q2,Closeout,20220630 Calvert Charter for Enriched Studies,10372407,Calvert Charter for Enriched Studies - Secure Entry System,Security System,4,Nick Melvoin,Northwest,1271201,13731,19850 Delano St.,Woodland Hills,91367,Install new secure entry system at the Main Office.,38,2022-Q3,2022-Q4,Planning,20220630 Grant ES,10372289,Grant ES - Secure Entry System,Security System,5,Jackie Goldberg,West,1426001,13355,1530 N. Wilton Pl.,Los Angeles,90028,Install new secure entry system at the Main Office.,34,2022-Q3,2022-Q4,Planning,20220630 Winnetka ES,10365767,Winnetka ES - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1783601,13515,8240 Winnetka Ave.,Canoga Park,91306,Replace deteriorated playground matting systems to ensure the health and safety of students.,71,2014-Q2,2014-Q2,Closeout,20220630 Markham MS,10365987,Markham MS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",99,2014-Q3,2014-Q3,Closeout,20220630 Santee Education Complex,10366625,Santee LC-Restroom Upgrade,Access Compliance,5,Jackie Goldberg,Central,1871601,13945,1921 S. Maple Ave.,Los Angeles,90011,Provide & Install 2 Ground-Fault Circuit Interrupter (GFCI) Electrical Outlets for Changing Tables,5,2014-Q4,2015-Q1,Closeout,20220630 Eastman EEC,10366947,Eastman EEC - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1951501,16303,1266 S. Gage Ave.,Los Angeles,90023,Remove and replace existing primary toilet with pre-kindergarten toilet and associated plumbing.,1,2015-Q2,2015-Q2,Closeout,20220630 Carver MS,10370237,Carver MS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1809401,13409,4410 McKinley Ave.,Los Angeles,90011,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2026-Q4,2027-Q1,Planning,20220630 Irving STEAM Magnet MS,10370246,Irving STEAM Magnet MS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2024-Q4,2025-Q2,Planning,20220630 Madison MS,10370250,Madison MS - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1823001,13627,13000 Hart St.,North Hollywood,91605,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2024-Q3,2025-Q1,Planning,20220630 Stevenson College & Career Preparatory,10370256,Stevenson College & Career Preparatory - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2025-Q2,2025-Q3,Planning,20220630 Carson HS,10370258,Carson HS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1857501,13869,22328 S. Main St.,Carson,90745,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2024-Q3,2024-Q4,Planning,20220630 Gardena HS,10370264,Gardena HS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2025-Q3,2025-Q4,Planning,20220630 King ES,10370199,King ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",Central,1653401,13423,3989 S. Hobart Blvd.,Los Angeles,90062,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2028-Q4,2029-Q1,Planning,20220630 Stoner ES,10370210,Stoner ES - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1695201,13772,11735 Braddock Dr.,Culver City,90230,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2025-Q4,2026-Q1,Planning,20220630 San Fernando EEC,10005065,San Fernando EEC - Safety Upgrades and Improvements,Campus Improvement,6,Kelly Gonez,Northeast,1955501,13419,1204 Woodworth St.,San Fernando,91340,"Upgrade entry control system, plumbing systems in restrooms, and exterior gates",48,2014-Q3,2015-Q2,Closeout,20220630 Panorama HS,10366257,Panorama HS - 2014-15 Prop 39 (Valor Academy Charter HS),Charter Prop 39,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,"This project is a charter school renovation for Valor Academy Charter HS for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 8 classrooms for 210.49 charter student seats in grades 9-10. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",37,2014-Q2,2014-Q3,Closeout,20220630 Carnegie MS,10366997,Carnegie MS - Upgrade Gym Floors & Wall Systems,Flooring,7,Tanya Ortiz Franklin,South,1809001,13761,21820 Bonita St.,Carson,90745,This project will replace the wood floors in the Gymnasium Building and rehabilitate adjacent wall systems. The existing floors are over 50 years old and are in poor condition resulting in a hazardous condition at the site.,264,2016-Q1,2016-Q2,Closeout,20220630 Estrella EEC,10367316,Estrella EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,Central,1944101,193549,120 E. 57th St.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",52,2016-Q2,2016-Q2,Closeout,20220630 Wilton ES,10368687,Wilton ES - Replace Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1780801,13433,745 S. Wilton Pl.,Los Angeles,90005,Replace deteriorated non-digital marquee with a new digital marquee.,28,2017-Q3,2018-Q1,Closeout,20220630 Valley Oaks Center for Enriched Studies,10370486,Sun Valley HS - Computer Lab Security,Security System,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,Provide security upgrades for computer lab,20,2019-Q2,2019-Q2,Closeout,20220630 Webster MS,10370646,Webster MS - Auditorium Upgrade,Electrical/Lighting,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,Install new A/V equipment in auditorium,47,2019-Q3,2019-Q4,Closeout,20220630 Trinity ES,10368848,Trinity ES - 2017-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,"This project is a charter school renovation for Gabriella Charter School for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades K-2. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",291,2017-Q2,2017-Q3,Closeout,20220630 Webster MS,10369797,Webster MS - 2018-19 Prop 39 (Citizens of the World - Mar Vista),Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project is a charter school renovation for Citizens of the World - Mar Vista for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office,1 special education room, and 9 instructional spaces for charter student seats in grades K-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",87,2018-Q2,2018-Q3,Closeout,20220630 Delevan ES,10367118,Delevan ES - Security Upgrades,Security System,5,Jackie Goldberg,Central,1339701,13455,4168 W. Ave. 42,Los Angeles,90065,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,15,2016-Q4,2017-Q1,Closeout,20220630 Gompers MS,10367463,Gompers MS - Camera Door Entry System,Security System,7,Tanya Ortiz Franklin,South,1816001,13581,234 E. 112th St.,Los Angeles,90061,Upgrade physical security of school by purchasing and installing an electronic camera door entry system.,21,2017-Q3,2017-Q3,Closeout,20220630 Jones ES,10363987,Jones ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1294301,193565,900 E. 33rd St.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",2,2014-Q4,2014-Q4,Closeout,20220630 Chatsworth Park ES,10372188,Chatsworth Park ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1302701,13389,22005 Devonshire St.,Chatsworth,91311,Install new secure entry system at the Main Office with three video receivers.,33,2021-Q4,2022-Q2,Closeout,20220630 Marina Del Rey MS,10367945,Marina Del Rey MS - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 212 doors/hardware, 47 accessible paths of travel, 105 signs, 16 restrooms, 15 drinking fountains/sinks, 3 assistive listening devices/intercoms/phones, 7 concrete ramps, 7 metal ramps, 8 pieces of accessible furniture, 5 railings, 2 locker room modifications/lockers, 3 parking areas, 2 dressing room modifications, and 1 new elevator/stage lift.","5,316",2017-Q4,2023-Q1,Construction,20220630 Strathern ES,10364001,Strathern ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1695901,13654,7939 St. Clair Ave.,North Hollywood,91605,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,013",2015-Q3,2015-Q3,Closeout,20220630 Northridge MS,10372379,Northridge MS - Portable Removal,Portable Removal,3,Scott Schmerelson,Northwest,1828301,13740,17960 Chase St.,Northridge,91325,"Removal of 3 portable classroom buildings. Removal of the portable/disconnect low voltage, high voltage, utilities/salvage all furniture and equipment from classroom by Jefferson HS and Richland projects. Abate all hazardous material. Monitor demolition phase and extract all debris. Provide playground stripping at footprint of portables.",184,2022-Q4,2023-Q4,Planning,20220630 El Sereno EEC,10372473,El Sereno EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,2,Monica Garcia,East,1958101,16304,3802 Pueblo Ave.,Los Angeles,90032,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 16,290 ft2. ADA upgrades for this project include (a) resurfacing the parking area - approximately 2,236 ft2 - to provide an ADA compliant path of travel and (b) providing an ADA compliant restroom. Additionally, we will replace deteriorated HVAC units, and make necessary upgrades to the fire alarm system, as required by current code","4,163",2024-Q1,2025-Q2,Planning,20220630 Monte Vista ES,10371369,Monte Vista ES - Secure Entry System,Security System,2,Monica Garcia,Central,1538401,13270,5423 Monte Vista St.,Los Angeles,90042,Install new secure entry system at door to main office,36,2020-Q3,2020-Q4,Closeout,20220630 Vintage Math/Science/Technology Magnet ES,10364080,Vintage Math/Science/Technology Magnet - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1756201,13694,15848 Stare St.,North Hills,91343,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",470,2013-Q4,2014-Q2,Closeout,20220630 Carpenter Community Charter ES,10371754,Carpenter Community Charter ES - Install Water Bottle Fillers,Plumbing/Irrigation/Drainage,3,Scott Schmerelson,Northeast,1282201,13518,3909 Carpenter Ave.,Studio City,91604,Remove two existing multi-bubbler fountains and replace with high-low fountains/bottle fillers.,60,2022-Q1,2022-Q3,Construction,20220630 Plasencia ES,10366465,Plasencia ES-Removal of Portable Bldg,Portable Removal,2,Monica Garcia,Central,1324701,13287,1321 Cortez St.,Los Angeles,90026,"Removal of Portable Building; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",323,2014-Q1,2014-Q4,Closeout,20220630 Corona ES,10370335,Corona ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1321901,13453,3825 Bell Ave.,Bell,90201,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new chairs. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",45,2019-Q2,2020-Q2,Closeout,20220630 Harbor Occupational Center,10367171,Harbor Occupational Center - Fencing,Fencing,7,Tanya Ortiz Franklin,South,1918001,13779,740 N. Pacific Ave.,San Pedro,90731,Replace chain link fence with wrought iron fence.,250,2017-Q3,2018-Q4,Closeout,20220630 Glen Alta Span School,10369257,Glen Alta Span School - Portable Removal,Portable Removal,2,Monica Garcia,East,1413701,13292,3410 Sierra St.,Los Angeles,90031,"Remove 1 portable building. Abatement of hazardous materials. Disconnect high and low voltage utilities, repair/replace asphalt in the building footprint, and relocate 2 ball boxes from the north side of the portable building to a new location per the Principal.",140,2018-Q1,2020-Q1,Closeout,20220630 Limerick ES,10372502,Limerick ES - 2022-23 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northwest,1488101,13697,8530 Limerick Ave.,Canoga Park,91306,"This project is a charter school renovation for Citizens of the World - West Valley for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 4 instructional spaces for charter student seats in grades TK-3. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",327,2022-Q3,2022-Q3,Planning,20220630 Los Angeles HS,10367253,Los Angeles HS - Auditorium Renovation,Auditorium Renovation,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,"The project replaces the damaged and deteriorated metal stud framing in the hallway of the 35-year-old Corwin Theater. The scope of work also includes replacing exterior tiles, ducts for heating, ventilation, and air conditioning (HVAC), sprinklers, light fixtures, smoke detectors, fire alarm, and fire alarm pull boxes in the Corwin Theater. Included in the project are the associated Americans with Disabilities Act (ADA) path of travel upgrades such as a main entry ramp and compliance work located northwest of the football field.","2,834",2018-Q1,2019-Q2,Closeout,20220630 Limerick ES,10370415,Limerick ES - Install Ramps,Access Compliance,3,Scott Schmerelson,Northwest,1488101,13697,8530 Limerick Ave.,Canoga Park,91306,Purchase and install metal ramps for two classrooms.,91,2019-Q2,2019-Q3,Closeout,20220630 Pomelo Community Charter ES,10370320,Pomelo Community Charter ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1614001,13764,7633 March Ave.,West Hills,91304,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms). Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",42,2020-Q1,2020-Q1,Closeout,20220630 Sustainability Initiatives,10371836,Hydropoint WaterCompass Water Conservation Pilot,Plumbing/Irrigation/Drainage,2,Monica Garcia,Central,1145301,13863,"333 S. Beaudry Ave., 22nd Floor",Los Angeles,90017,"This project is a continuation under the previous 2015-2020 LADWP MOU. Consultant shall evaluate water consumption, associated cost savings achieved through water use analytics and real-time leak detection with water leak detection devices. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in the MOU.",7,2020-Q2,2022-Q3,Construction,20220630 Vinedale College Preparatory Academy,10371921,Vinedale ES - Energy Conservation Lighting,Electrical/Lighting,6,Kelly Gonez,Northeast,1754801,13430,10150 La Tuna Canyon Rd.,Sun Valley,91352,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $322,718. Estimated energy savings is 545,097 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $79,917 which is 24.76% of the ECM costs.",80,2022-Q4,2023-Q1,Planning,20220630 Baldwin Hills ES,10371121,Baldwin Hills ES - Campus Improvement,Campus Improvement,1,"Dr. George J. McKenna, III",West,1227401,13595,5421 Rodeo Rd.,Los Angeles,90016,Provide and install new motorized gate and lunch tables and benches.,114,2020-Q1,2021-Q3,Closeout,20220630 Coldwater Canyon ES,10372316,Coldwater Canyon ES - Purchase Classroom Furniture,Furniture/Fixtures/Equipment,6,Kelly Gonez,Northeast,1315101,13663,6850 Coldwater Canyon Ave.,North Hollywood,91605,"Purchase (28) student desks, (79) student chairs/seats; (107) items total. School contribution of an additional $50,000 but not part of bond budget.",50,2022-Q3,2022-Q4,Planning,20220630 McKinley ES,10368162,McKinley ES - Comprehensive Modernization,Comprehensive Modernization,7,Tanya Ortiz Franklin,South,1665801,13506,7812 McKinley Ave.,Los Angeles,90001,"This project includes the construction of new buildings and site improvements with approximately 32 general and specialty classrooms, instructional support spaces, administration, library, multipurpose room, lunch shelter, hard courts, grass field, and parking. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of the main administration/classroom building, assembly hall/classroom building, kindergarten buildings #1 & #2, two arcades, lunch shelter, and 11 relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","90,773",2021-Q1,2025-Q1,Construction,20220630 Birmingham Community Charter HS,10372601,Birmingham Community Charter HS - Roofing,Roofing,3,Scott Schmerelson,Northwest,1855701,13667,17000 Haynes St.,Lake Balboa,91406,"This project is to replace approximately 308,302 square feet of deteriorated roofing on 42 of 68 buildings with new PVC roofing and metal flashing. The scope of work also includes the installation of new gutters and downspouts, and paint to match the affected areas. Buildings with existing roof mounted HVAC units and ductwork to be protected in place.","5,140",2023-Q3,2024-Q2,Planning,20220630 Reed MS,10371481,Reed MS - Install Privacy Fencing,Fencing,3,Scott Schmerelson,Northeast,1835501,13647,4525 Irvine Ave.,North Hollywood,91602,"Replace approximately 1,744' of perimeter fencing along Troost Ave., Colfax Ave., and Sarah St. with privacy fencing.",90,2021-Q4,2022-Q2,Closeout,20220630 Denker ES,10372468,Denker ES - Install Privacy Fence,Fencing,7,Tanya Ortiz Franklin,South,1342501,13638,1620 W. 162nd St.,Gardena,90247,Remove existing chain link fencing and embedded ivy. Install approx. 68 feet of chain link privacy fencing. Install new concrete along fence line to prevent ivy from growing again.,23,2022-Q3,2022-Q4,Planning,20220630 52nd St. ES,10004642,52nd St. ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1380801,13307,816 W. 51st St.,Los Angeles,90037,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",127,2013-Q1,2016-Q3,Closeout,20220630 Allesandro ES,10004600,Allesandro ES - Facelift,Facelift,5,Jackie Goldberg,Central,1206801,13367,2210 Riverside Dr.,Los Angeles,90039,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",98,2013-Q2,2016-Q3,Closeout,20220630 Ford ES,10004620,Ford ES - Facelift,Facelift,2,Monica Garcia,East,1391801,13503,1112 S. Ford Blvd.,Los Angeles,90022,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",88,2012-Q2,2016-Q3,Closeout,20220630 Virgil MS,10004106,Virgil MS - Facelift,Facelift,2,Monica Garcia,Central,1846201,13382,152 N. Vermont Ave.,Los Angeles,90004,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",225,2012-Q1,2017-Q1,Closeout,20220630 Woodcrest ES,10004649,Woodcrest ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1786301,13369,1151 W. 109th St.,Los Angeles,90044,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",105,2013-Q2,2017-Q1,Closeout,20220630 Loreto ES,10366492,Loreto ES - Demolish/Remove DOH Portable Bldg,Portable Removal,2,Monica Garcia,East,1495901,13301,3408 Arroyo Seco Ave.,Los Angeles,90065,"Demolish/Remove Department of Housing (DOH) Portable Building; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",83,2015-Q1,2015-Q1,Closeout,20220630 Crenshaw Magnet HS: STEMM,10107360,Crenshaw Magnet HS: STEMM - Wellness Center,Addition,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,Wellness Center,"3,258",2013-Q2,2014-Q2,Closeout,20220630 Haskell STEAM Magnet ES,10363950,Haskell ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1445201,13736,15850 Tulsa St.,Granada Hills,91344,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",275,2014-Q4,2014-Q4,Closeout,20220630 Kittridge ES,10363961,Kittridge ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1476001,13696,13619 Kittridge St.,Van Nuys,91401,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",377,2014-Q2,2014-Q3,Closeout,20220630 Lankershim ES,10363963,Lankershim ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1478101,13358,5250 Bakman Ave.,North Hollywood,91601,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",476,2015-Q2,2015-Q4,Closeout,20220630 Middleton PC,10363975,Middleton PC - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1530201,13926,2410 Zoe Ave.,Huntington Park,90255,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",188,2014-Q2,2014-Q3,Closeout,20220630 Sharp ES,10363996,Sharp ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1666501,13809,13800 Pierce St.,Arleta,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",488,2014-Q4,2015-Q2,Closeout,20220630 Lanai ES,10104533,Lanai ES - Compliance with State & Federal Access Requirements,Access Compliance,4,Nick Melvoin,Northwest,1476401,13703,4241 Lanai Rd.,Encino,91436,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Conversion of Classroom 7,95,2011-Q3,2014-Q1,Closeout,20220630 Normandie ES,10366479,Normandie ES - Electronic Camera Main Door Entry,Security System,1,"Dr. George J. McKenna, III",Central,1563001,13300,4505 S. Raymond Ave.,Los Angeles,90037,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance,16,2015-Q2,2015-Q3,Closeout,20220630 Brainard ES,10367884,Brainard ES - Accessibility Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1248601,13834,11407 Brainard Ave.,Lake View Terrace,91342,"remove existing changing table and save for future use. Provide and install ADA toilet and all related accessories; Including grab bars, toilet paper dispenser, etc.",10,2016-Q3,2016-Q4,Closeout,20220630 Rosemont EEC,10367357,Rosemont EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1955301,16761,430 N. Rosemont Ave.,Los Angeles,90026,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",79,2016-Q3,2016-Q3,Closeout,20220630 15th St. ES,10368678,15th St. ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1376701,13337,1527 S. Mesa St.,San Pedro,90731,Provide security upgrades to the computer classroom by removing and replacing 2 metal doors with panic hardware.,8,2017-Q1,2017-Q3,Closeout,20220630 Lomita STEAM Magnet ES,10369491,Lomita STEAM Magnet ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1493201,13313,2211 247th St.,Lomita,90717,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2024-Q4,2025-Q1,Planning,20220630 Sheridan ES,10370032,Sheridan ES - Secure Entry System,Security System,2,Monica Garcia,East,1668501,13290,416 N. Cornwell St.,Los Angeles,90033,Install new secure entry system,22,2019-Q2,2019-Q3,Closeout,20220630 Kester ES,10366050,Kester ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1472601,13683,5353 Kester Ave.,Van Nuys,91411,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",376,2014-Q4,2015-Q1,Closeout,20220630 1st St. ES,10363836,1st St. ES - Seismic Modernization,Seismic Modernization,2,Monica Garcia,East,1383601,13267,2820 E. 1st St.,Los Angeles,90033,"This project will seismically retrofit the 2-story classroom building (006CDT) as well as modernize 10 classrooms, the food service area, indoor dining, and the existing lunch pavilion. The project will also relocate the trash enclosure to an area closer to the public street, construct a new additional lunch pavilion near the existing food services and lunch pavilion, and provide upgrades to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA) including path of travel improvements. During construction, interim housing will be provided for 10 classrooms, 2 restrooms, a lunch shelter, and a modular kitchen which necessitates site adaptations, underground utilities, and repaving once the interim facilities are removed.","26,122",2018-Q3,2020-Q4,Closeout,20220630 Fremont HS,10368684,Fremont HS - Wellness Center Expansion,Campus Improvement,7,Tanya Ortiz Franklin,South,1865001,13475,7676 S. San Pedro St.,Los Angeles,90003,"The project will expand the existing wellness center, operated by the University Muslim Medical Association (UMMA) Community Clinics, to provide dental services in addition to the medical and mental health services offered. The project consists of approximately 2,900 square feet of new construction including dental stations, support spaces, parking and related site improvements adjacent to the existing wellness center, and the reconfiguration of the existing parking lot for the wellness center.","7,019",2019-Q4,2021-Q4,Closeout,20220630 Westchester Enriched Sciences Magnets,10371148,Westchester Enriched Sciences Magnets - Security Upgrades and Lunch Tables,Campus Improvement,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,Install three new CCTV cameras and new lunch tables.,100,2020-Q4,2021-Q2,Closeout,20220630 Miles EEC,10367342,Miles EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1953501,16663,2855 Saturn Ave.,Huntington Park,90255,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",53,2016-Q2,2016-Q2,Closeout,20220630 Marvin EEC,10367338,Marvin EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1958401,16293,2341 S. Curson Ave.,Los Angeles,90016,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",83,2016-Q2,2016-Q3,Closeout,20220630 Evergreen ES,10367847,Evergreen ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1369901,13569,2730 Ganahl St.,Los Angeles,90033,"Remove 1 portable building (24' x 60') and demolish 1 bungalow (24' x 60'), provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to remaining buildings on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",170,2016-Q4,2018-Q1,Closeout,20220630 Wilshire Crest ES,10365765,Wilshire Crest ES - Replace Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1779501,13524,5241 W. Olympic Blvd.,Los Angeles,90036,Replace deteriorated playground matting systems to ensure the health and safety of students.,52,2014-Q4,2015-Q1,Closeout,20220630 Sharp ES,10365102,Sharp ES - Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1666501,13809,13800 Pierce St.,Arleta,91331,Provide upgrades to the campus by providing a new electronic marquee,35,2014-Q1,2014-Q3,Closeout,20220630 White MS,10370003,White MS - Robotics Lab,Communications/Technology Upgrade,7,Tanya Ortiz Franklin,South,1848701,13708,22102 S. Figueroa St.,Carson,90745,Provide new robotics lab (rooms 51 & 53),182,2019-Q2,2020-Q3,Closeout,20220630 Rosewood Urban Planning & Design Magnet ES,10370428,Rosewood Urban Planning & Design Magnet ES - Student Furniture,Furniture/Fixtures/Equipment,4,Nick Melvoin,West,1638401,13579,503 N. Croft Ave.,Los Angeles,90048,Purchase student furniture for two classrooms,40,2019-Q1,2019-Q2,Closeout,20220630 Strathern ES,10367741,Strathern ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1695901,13654,7939 St. Clair Ave.,North Hollywood,91605,"Remove and sell 2 DSA portable buildings (24' x 60'), provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to remaining buildings on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",155,2016-Q3,2018-Q1,Closeout,20220630 Euclid ES,10370145,Euclid ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1367101,13319,806 Euclid Ave.,Los Angeles,90023,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2024-Q3,2024-Q4,Planning,20220630 Murchison ES,10370185,Murchison ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1543801,13522,1501 Murchison St.,Los Angeles,90033,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2028-Q3,2029-Q1,Planning,20220630 42nd St. ES,10371731,42nd St ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1395901,13487,4231 Fourth Ave.,Los Angeles,90008,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",454,2021-Q4,2022-Q3,Construction,20220630 Huerta ES,10370656,Huerta ES - Synthetic Turf,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1294401,193564,260 E. 31st St.,Los Angeles,90011,"This project is to replace approximately 13,000 square feet of deteriorated synthetic turf at the southeast and northwest playfields. The scope of work includes the replacement of asphalt, concrete, and addressing drainage deficiencies.","1,826",2021-Q2,2022-Q1,Closeout,20220630 Washington Preparatory HS,10365988,Washington Preparatory HS - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1892801,13560,10860 S. Denker Ave.,Los Angeles,90047,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",21,2014-Q2,2015-Q2,Closeout,20220630 Haddon ES,10363946,Haddon ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1432901,13527,10115 Haddon Ave.,Pacoima,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",571,2015-Q1,2015-Q2,Closeout,20220630 Harding ES,10363947,Harding ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1443101,13819,13060 Harding St.,Sylmar,91342,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",328,2014-Q3,2014-Q4,Closeout,20220630 Kennedy ES,10363960,Kennedy ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1469601,13886,4010 E. Ramboz Dr.,Los Angeles,90063,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",237,2014-Q3,2014-Q4,Closeout,20220630 Latona ES,10363965,Latona ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1479501,13374,4312 Berenice Ave.,Los Angeles,90031,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",323,2015-Q2,2015-Q2,Closeout,20220630 Loreto ES,10363968,Loreto ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1495901,13301,3408 Arroyo Seco Ave.,Los Angeles,90065,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",260,2014-Q2,2014-Q4,Closeout,20220630 Graham ES,10370082,Graham ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1421901,13476,8407 S. Fir Ave.,Los Angeles,90001,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 76 doors/hardware, 9 accessible paths of travel, 79 signs, 11 restrooms, 4 drinking fountains, 5 sinks/sink cabinets, 2 assistive listening devices/intercoms/phones, 2 new rows of assembly seat, 7 railings, 1 cafeteria counter, 1 modular elevator, and 1 stage lift.","7,871",2022-Q2,2024-Q1,Construction,20220630 Canfield ES,10372536,Canfield ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1274001,13556,9233 Airdrome St.,Los Angeles,90035,Install new secure entry system at the Main Office.,40,2022-Q3,2022-Q4,Planning,20220630 Belvedere ES,10371041,Belvedere ES - Accessibility Upgrades,Access Compliance,2,Monica Garcia,East,1239701,13373,3724 E. 1st St.,Los Angeles,90063,Install sloped walkway to kindergarten classroom #2 and provide hi-lo changing table and changing room in nurse's office.,147,2020-Q3,2020-Q3,Closeout,20220630 Maclay MS,10371113,Maclay MS - Auditorium Upgrades,Auditorium Renovation,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"Install new projector, screen, and audio/visual equipment in the auditorium.",65,2020-Q2,2020-Q3,Closeout,20220630 Hawaiian ES,10370278,Hawaiian ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1446601,13648,540 Hawaiian Ave.,Wilmington,90744,"Demolish 2 portable buildings, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",386,2019-Q1,2019-Q3,Closeout,20220630 Sunny Brae ES,10367520,Sunny Brae ES - Renovate Boys Restroom,Access Compliance,3,Scott Schmerelson,Northwest,1698601,13737,20620 Arminta St.,Canoga Park,91306,"Remove 3 lavatories, provide electrical outlet and privacy lock.",8,2016-Q1,2016-Q2,Closeout,20220630 Ivanhoe ES,10365709,Ivanhoe ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1467101,13357,2828 Herkimer St.,Los Angeles,90039,Replace deteriorated playground matting systems to ensure the health and safety of students.,35,2015-Q1,2015-Q2,Closeout,20220630 White MS,10367647,White MS - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1848701,13708,22102 S. Figueroa St.,Carson,90745,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",45,2016-Q2,2016-Q4,Closeout,20220630 Fernangeles ES,10372539,Fernangeles ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1375301,13594,12001 Art St.,Sun Valley,91352,Install new secure entry system at the Main Office.,31,2022-Q3,2022-Q4,Planning,20220630 Cochran MS,10370844,Cochran MS - Restroom Upgrades,Access Compliance,1,"Dr. George J. McKenna, III",West,1824501,13574,4066 Johnnie Cochran Vista,Los Angeles,90019,Provide accessible stall in boys' restroom near room 109.,100,2019-Q4,2019-Q4,Closeout,20220630 Highland Park Continuation HS,10100956,Highland Park Continuation HS - Upgrade Fire Alarm System,Fire Alarm System,2,Monica Garcia,Central,1864501,16421,928 N. Ave. 53,Los Angeles,90042,Upgrade Fire Alarm System,115,2009-Q2,2015-Q1,Closeout,20220630 Mariposa-Nabi PC,10363971,Mariposa-Nabi PC - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1498301,13948,987 S. Mariposa Ave.,Los Angeles,90006,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",292,2014-Q2,2015-Q3,Closeout,20220630 Garvanza Technology & Leadership Magnet ES,10370432,Garvanza Technology & Leadership Magnet ES - STEAM Lab,Communications/Technology Upgrade,2,Monica Garcia,Central,1408201,15329,317 N. Ave. 62,Los Angeles,90042,Provide new STEAM lab,72,2019-Q1,2019-Q3,Closeout,20220630 6th Ave. ES,10371300,6th Ave. ES - 2020-21 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1678101,13425,3109 Sixth Ave.,Los Angeles,90018,"This project is a charter school renovation for Lashon Academy - City Campus for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades K-3. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",40,2020-Q2,2020-Q2,Closeout,20220630 Lake Balboa College Preparatory Magnet,10371760,Lake Balboa College Preparatory Magnet - Security System,Security System,3,Scott Schmerelson,Northwest,1739001,15185,6701 Balboa Blvd.,Lake Balboa,91406,Install 4 cameras around campus.,59,2021-Q1,2021-Q4,Closeout,20220630 Sheridan ES,10372548,Sheridan ES - Install Bridge Safety Grates,Fencing,2,Monica Garcia,East,1668501,13290,416 N. Cornwell St.,Los Angeles,90033,Install new wrought iron safety grates on pedestrian bridge. Remove existing 3 foot safety grates. Install new wrought iron safety grates to produce a total of 8 foot tall coverage from floor to top. Principal is concerned students can hop over the existing fencing.,20,2022-Q3,2022-Q4,Planning,20220630 Dymally HS,10372489,Dymally HS - 2022-23 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1766701,14581,8800 S. San Pedro St.,Los Angeles,90003,"This project is a charter school renovation for Watts Learning Center Charter MS for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 18 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, and communication/safety purchases and upgrades.",63,2022-Q3,2022-Q3,Planning,20220630 Telfair EEC,10371819,Telfair EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,6,Kelly Gonez,Northeast,1958001,15442,10915 Telfair Ave.,Pacoima,91331,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 12,724 ft2. ADA upgrades for this project include (a) resurfacing the parking area - approximately 915 ft2 - to provide an ADA compliant path of travel and (b) providing an ADA compliant restroom. Additionally, we will replace deteriorated HVAC units, roofing, and make necessary upgrades to the fire alarm system, as required by current code.","4,239",2023-Q4,2024-Q4,Design,20220630 Marshall HS,10105940,"Marshall HS - Facilities Upgrades - Academy Offices, Outdoor Spaces, Visual Identity",Small Learning Community/Academy,2,Monica Garcia,Central,1875001,13571,3939 Tracy St.,Los Angeles,90027,"Facilities Upgrades - Academy Offices, Outdoor Spaces, Visual Identity","2,950",2014-Q2,2015-Q3,Closeout,20220630 Vine ES,10364006,Vine ES - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1753401,13342,955 N. Vine St.,Los Angeles,90038,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",307,2014-Q2,2014-Q3,Closeout,20220630 Vinedale College Preparatory Academy,10364007,Vinedale ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1754801,13430,10150 La Tuna Canyon Rd.,Sun Valley,91352,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",364,2014-Q4,2015-Q2,Closeout,20220630 Walnut Park ES,10364008,Walnut Park ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1464001,13825,2642 E. Olive St.,Huntington Park,90255,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",392,2014-Q3,2014-Q4,Closeout,20220630 Rosemont ES,10370303,Rosemont ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1637001,13289,421 N. Rosemont Ave.,Los Angeles,90026,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",63,2019-Q3,2020-Q2,Closeout,20220630 Canoga Park EEC,10372460,Canoga Park EEC - Purchase Classroom Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1959201,16297,7355 Vassar Ave.,Canoga Park,91303,"Purchase new classroom furniture: tables, chairs, and storage.",20,2022-Q3,2022-Q4,Planning,20220630 San Fernando MS,10105888,San Fernando MS - Compliance with State & Federal Access Requirements,Fire Alarm System,6,Kelly Gonez,Northeast,1835801,13420,130 N. Brand Blvd.,San Fernando,91340,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),230,2015-Q1,2015-Q4,Closeout,20220630 Westport Heights ES,10104821,Shade Structure at Pre-Kindergarten Yard,Lunch/Shade Shelter,4,Nick Melvoin,West,1771201,13592,6011 W. 79th St.,Los Angeles,90045,Shade Structure at Pre-Kindergarten Yard,247,2013-Q4,2014-Q1,Closeout,20220630 Dodson MS,10108793,Dodson MS - Replace Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1811001,13846,28014 Montereina Dr.,Rancho Palos Verdes,90275,Replace Marquee,41,2012-Q3,2014-Q1,Closeout,20220630 Pomelo Community Charter ES,10365736,Pomelo ES - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1614001,13764,7633 March Ave.,West Hills,91304,Replace deteriorated playground matting systems to ensure the health and safety of students.,137,2014-Q2,2015-Q1,Closeout,20220630 Monlux ES,10366191,Monlux ES - Laptops & Media Carts,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1534201,13591,6051 Bellaire Ave.,North Hollywood,91606,Increase school's access to technology by providing laptops and media carts,52,2014-Q3,2014-Q3,Closeout,20220630 Huntington Park HS,10108784,Huntington Park HS - Provide Safety Screen at the Exterior Stairwell,Fencing,5,Jackie Goldberg,East,1870001,13597,6020 Miles Ave.,Huntington Park,90255,Provide Safety Screen at the Exterior Stairwell,7,2014-Q2,2014-Q3,Closeout,20220630 Polytechnic HS,10366605,Poly HS-Restroom Upgrade,Access Compliance,6,Kelly Gonez,Northeast,1863601,13734,12431 Roscoe Blvd.,Sun Valley,91352,Add electrical GFCI outlet for changing table,8,2014-Q4,2014-Q4,Closeout,20220630 Henry MS,10366190,Henry MS - Desktop Computers,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1817401,13658,17340 San Jose St.,Granada Hills,91344,Increase school's access to technology by providing new desktop computers,44,2014-Q2,2015-Q2,Closeout,20220630 Tulsa ES,10366193,Tulsa ES - Desktop Computers,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1724701,13693,10900 Hayvenhurst Ave.,Granada Hills,91344,Increase schools access to technology by providing desktop computers,63,2014-Q3,2014-Q3,Closeout,20220630 Hamilton HS,10367207,Hamilton HS - Modernize Girls Softball Field,Gym/Athletic Facilities Renovation,1,"Dr. George J. McKenna, III",West,1868601,13570,2955 Robertson Blvd.,Los Angeles,90034,Modernize girls' softball field by providing concrete dugouts with chain link fence enclosure,135,2016-Q1,2016-Q2,Closeout,20220630 Mulholland MS,10366176,Mulholland MS - Robotics Lab,Reconfiguration,3,Scott Schmerelson,Northwest,1825901,15184,17120 Vanowen St.,Lake Balboa,91406,"The project converts an existing shop to a robotics lab. The project includes renovating the classroom; providing electrical upgrades; and purchasing and installing a teacher station, student tables and stools, demonstration table, projector, 20 laptop computers, a media cart, and associated robotics equipment.",109,2014-Q2,2015-Q1,Closeout,20220630 Muir MS,10369774,Muir MS - 2018-19 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1825501,13436,5929 S. Vermont Ave.,Los Angeles,90044,"This project is a charter school renovation for California Collegiate Charter School for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",68,2018-Q2,2018-Q3,Closeout,20220630 Panorama HS,10369775,Panorama HS - 2018-19 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,"This project is a charter school renovation for Girls Athletic Leadership School for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 11 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",202,2018-Q2,2018-Q3,Closeout,20220630 Newcastle ES,10368255,Newcastle ES - Restroom Upgrades,Access Compliance,4,Nick Melvoin,Northwest,1547901,13720,6520 Newcastle Ave.,Reseda,91335,"Lower lavatory for kindergarten restroom; Provide and install ""push"" faucets for lavatory and classroom sinks.",5,2017-Q1,2017-Q2,Closeout,20220630 San Pascual STEAM Magnet ES,10369132,San Pascual STEAM Magnet ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1649301,13440,815 San Pascual Ave.,Los Angeles,90042,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",56,2017-Q4,2018-Q4,Closeout,20220630 Breed ES,10368798,Breed ES - 2017-19 Prop 39,Charter Prop 39,2,Monica Garcia,East,1249301,13281,2226 E. 3rd St.,Los Angeles,90033,"This project was initially approved in BOE Report No. 530-16/17 for the 2017-18 Prop 39 co-locations as a charter school renovation for Extera Public School - Breed. This project included 1 charter office and 13 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/19.",23,2017-Q2,2017-Q3,Closeout,20220630 Dorsey HS,10364029,Dorsey HS - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1860001,13643,3537 Farmdale Ave.,Los Angeles,90016,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",707,2014-Q1,2014-Q3,Closeout,20220630 Bernstein HS,10370572,Bernstein HS - 2019-20 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1869601,13953,1309 N. Wilton Pl.,Hollywood,90028,"This project is a charter school renovation for Academic Performance Excellence Academy (APEX) for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 2 special education rooms, and 14 instructional spaces for charter student seats in grades 7-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",25,2019-Q2,2019-Q3,Closeout,20220630 Independence Continuation HS,10369669,Independence Continuation HS - Technology & Security Upgrades,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1855901,15186,6501 Balboa Blvd.,Lake Balboa,91406,Purchase 20 Chromebooks and one charging cart; provide security upgrades.,12,2018-Q2,2018-Q2,Closeout,20220630 Romer MS,10366922,Romer MS - 2015-17 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1811601,13894,6501 Laurel Canyon Blvd.,North Hollywood,91606,"This project is a charter school renovation for Celerity Palmati Charter School for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 19 classrooms for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. This project is amended to include an additional single-year term for Celerity Palmati Charter School with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 as a ""No Growth"" project includes 1 charter office and 19 instructional spaces for charter student seats in grades K-8. The scope for this project is not yet defined.",57,2015-Q2,2015-Q3,Closeout,20220630 Victory ES,10368363,Victory ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1752101,13442,6315 Radford Ave.,North Hollywood,91606,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",155,2018-Q2,2018-Q3,Closeout,20220630 Carthay Environmental Studies Magnet ES,10103589,Carthay Center ES - Community Park Greening,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1284901,13461,6351 W. Olympic Blvd.,Los Angeles,90048,Community Park Greening,589,2015-Q3,2016-Q1,Closeout,20220630 Shenandoah ES,10370204,Shenandoah ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1667101,13491,2450 Shenandoah St.,Los Angeles,90034,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q1,2026-Q3,Planning,20220630 28th St. ES,10370218,28th St. ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1728801,13325,2807 Stanford Ave.,Los Angeles,90011,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q2,2028-Q3,Planning,20220630 Harmony ES,10369130,Harmony ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1468101,13535,899 E. 42nd Pl.,Los Angeles,90011,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",60,2018-Q2,2018-Q4,Closeout,20220630 City Terrace ES,10369133,City Terrace ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1309601,13490,4350 City Terrace Dr.,Los Angeles,90063,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",58,2018-Q1,2019-Q1,Closeout,20220630 Bellingham ES,10369143,Bellingham ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1357701,13925,6728 Bellingham Ave.,North Hollywood,91606,"Modernize Parent & Family Center classroom by providing paint touch-up, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",35,2018-Q1,2018-Q3,Closeout,20220630 Coughlin ES,10369146,Coughlin ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1501601,13915,11035 Borden Ave.,Pacoima,91331,"Modernize Parent & Family Center classroom by providing paint touch-up, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",33,2018-Q1,2018-Q3,Closeout,20220630 Haddon ES,10369149,Haddon ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1432901,13527,10115 Haddon Ave.,Pacoima,91331,"Modernize Parent & Family Center classroom by providing paint touch-up, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",49,2017-Q4,2018-Q1,Closeout,20220630 Harding ES,10369150,Harding ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1443101,13819,13060 Harding St.,Sylmar,91342,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",54,2018-Q1,2018-Q3,Closeout,20220630 Le Conte MS,10369761,Le Conte MS - 2018-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"This project is a charter school renovation for Citizens of the World - Hollywood for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 19 instructional spaces for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",8,2018-Q2,2018-Q3,Closeout,20220630 Glassell Park STEAM Magnet ES,10369854,Glassell Park ES - Accessible Entrance,Access Compliance,5,Jackie Goldberg,Central,1412301,13384,2211 W. Ave. 30,Los Angeles,90065,"The main entrance to the school does not currently allow access for students, staff or visitors with disabilities. The scope of this project includes the construction of an alternate entrance and a secure single-point of entry including a camera/intercom/buzzer. Due to the historic significance of this building, the alternate entrance will be created with the construction of a new concrete ramp from the public right-of-way at the side of the building.",839,2019-Q2,2021-Q4,Closeout,20220630 Huntington Park HS,10366046,Huntington Park HS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1870001,13597,6020 Miles Ave.,Huntington Park,90255,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",92,2015-Q2,2015-Q3,Closeout,20220630 Broadous ES,10004578,Broadous ES - Facelift,Facelift,6,Kelly Gonez,Northeast,1382901,13768,12561 Filmore St.,Pacoima,91331,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",105,2012-Q4,2016-Q3,Closeout,20220630 Wilton ES,10004594,Wilton ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1780801,13433,745 S. Wilton Pl.,Los Angeles,90005,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",0,2014-Q3,2016-Q3,Closeout,20220630 Braddock ES,10370374,Braddock ES - Technology Upgrades,Communications/Technology Upgrade,4,Nick Melvoin,West,1247901,13536,4711 Inglewood Blvd.,Culver City,90230,Purchase 43 iPads and 1 storage cart.,27,2019-Q1,2019-Q1,Closeout,20220630 Revere Charter MS,10369968,Revere Charter MS - Secure Entry System,Security System,4,Nick Melvoin,West,1835601,13665,1450 Allenford Ave.,Los Angeles,90049,Install new secure entry system,18,2019-Q2,2019-Q2,Closeout,20220630 Dahlia Heights ES,10004603,Dahlia Heights ES - Facelift,Facelift,5,Jackie Goldberg,Central,1332901,13308,5063 Floristan Ave.,Los Angeles,90041,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",103,2013-Q2,2016-Q3,Closeout,20220630 Delevan ES,10004604,Delevan ES - Facelift,Facelift,5,Jackie Goldberg,Central,1339701,13455,4168 W. Ave. 42,Los Angeles,90065,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",165,2013-Q1,2016-Q3,Closeout,20220630 Plasencia ES,10004608,Plasencia ES - Facelift,Facelift,2,Monica Garcia,Central,1324701,13287,1321 Cortez St.,Los Angeles,90026,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",46,2012-Q3,2016-Q3,Closeout,20220630 Southeast MS,10366102,Southeast MS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1815301,16081,2560 Tweedy Blvd.,South Gate,90280,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",406,2015-Q2,2015-Q3,Closeout,20220630 Catskill ES,10368349,Catskill ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1289001,13662,23536 Catskill Ave.,Carson,90745,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",174,2018-Q2,2018-Q4,Closeout,20220630 Los Angeles ES,10368989,Los Angeles ES-Convert room to changing room,Access Compliance,5,Jackie Goldberg,Central,1498201,13826,1211 S. Hobart Blvd.,Los Angeles,90006,"Empty two rooms and add electrical outlet, install exhaust fan on timer, Purchase and install window coverings, accessible hi-lo DF with wing guards and accessible lunch table.",32,2017-Q2,2017-Q3,Closeout,20220630 Weigand ES,10369366,Weigand ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1763401,13611,10401 Weigand Ave.,Los Angeles,90002,Install Aiphone video/buzzer entry system at main entrance.,19,2018-Q2,2018-Q3,Closeout,20220630 Manhattan ES,10370422,Manhattan ES - Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1511001,13685,1850 W. 96th St.,Los Angeles,90047,Install new electronic free-standing marquee,35,2019-Q2,2019-Q3,Closeout,20220630 Curtiss MS,10370580,Curtiss MS - 2019-20 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1810301,13775,1254 E. Helmick St.,Carson,90746,"This project is a charter school renovation for Magnolia Science Academy #3 for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 2 special education rooms, and 14 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",28,2019-Q2,2019-Q3,Closeout,20220630 Fishburn ES,10367680,Fishburn ES - 2016-17 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1384901,13532,5701 Fishburn Ave.,Maywood,90270,"This project is a charter school renovation for Clemente Charter School for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",19,2016-Q2,2016-Q3,Closeout,20220630 Los Angeles Center for Enriched Studies,10370795,Los Angeles Center for Enriched Studies - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1874101,13554,5931 W. 18th St.,Los Angeles,90035,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",869,2021-Q1,2021-Q3,Closeout,20220630 156th St. ES,10368322,156th St. ES - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1580801,13673,2100 W. 156th St.,Gardena,90249,Provide and install electronic marquee.,62,2018-Q1,2018-Q4,Closeout,20220630 Harvard ES,10368036,Harvard ES - Restroom Upgrades,Access Compliance,5,Jackie Goldberg,West,1204201,13946,330 N. Harvard Blvd.,Los Angeles,90004,Modify kindergarten restrooms; provide and install folding changing tables.,2,2016-Q4,2016-Q4,Closeout,20220630 Wright STEAM Magnet MS,10366274,Wright MS - 2014-15 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Charter ES for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 2 charter office and 20 classrooms for 392.15 charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",61,2014-Q2,2014-Q3,Closeout,20220630 Maclay MS,10369153,Maclay MS - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"Modernize Parent & Family Center classroom by providing paint touch-up, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",54,2018-Q2,2018-Q4,Closeout,20220630 Saticoy ES,10369157,Saticoy ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1656501,13363,7850 Ethel Ave.,North Hollywood,91605,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",59,2018-Q1,2018-Q4,Closeout,20220630 Sylmar ES,10369159,Sylmar ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1701401,13604,13291 Phillippi Ave.,Sylmar,91342,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",48,2017-Q4,2018-Q3,Closeout,20220630 Anatola ES,10369163,Anatola ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1211001,13609,7364 Anatola Ave.,Lake Balboa,91406,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",44,2018-Q1,2018-Q3,Closeout,20220630 Lane ES,10366826,Lane ES-ADA Repairs,Access Compliance,2,Monica Garcia,East,1476701,13629,1500 Avenida Cesar Chavez,Monterey Park,91754,ADA Repairs,78,2015-Q2,2015-Q3,Closeout,20220630 Lemay EEC,10005045,Lemay EEC - Safety Upgrades and Improvements,Campus Improvement,3,Scott Schmerelson,Northwest,1953001,16662,17553 Lemay St.,Lake Balboa,91406,"Upgrade wall systems in classrooms and restrooms, entry control system, exterior gates, and playground equipment; provide new shade shelter",232,2015-Q1,2015-Q2,Closeout,20220630 Barton Hill ES,10363882,Barton Hill ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1231501,13340,423 N. Pacific Ave.,San Pedro,90731,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",338,2014-Q4,2015-Q1,Closeout,20220630 Overland ES,10369865,Overland ES - Kindergarten Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1590401,13486,10650 Ashby Ave.,Los Angeles,90064,Install playground matting in the kindergarten yard.,51,2018-Q4,2018-Q4,Closeout,20220630 Pinewood ES,10370346,Pinewood ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1606801,13613,10111 Silverton Ave.,Tujunga,91042,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",55,2019-Q1,2019-Q2,Closeout,20220630 Park ES,10370190,Park ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1600501,13861,8020 Park Ave.,Cudahy,90201,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2025-Q2,2025-Q3,Planning,20220630 Wilmington STEAM Magnet MS,10105896,Wilmington STEAM Magnet MS - Compliance with State & Federal Access Requirements,Fire Alarm System,7,Tanya Ortiz Franklin,South,1849001,13538,1700 Gulf Ave.,Wilmington,90744,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),401,2015-Q2,2015-Q4,Closeout,20220630 Ambler ES,10370360,Ambler ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1208901,13833,319 E. Sherman Dr.,Carson,90746,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",52,2019-Q1,2019-Q4,Closeout,20220630 Camellia ES,10370136,Camellia ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1272601,13587,7451 Camellia Ave.,North Hollywood,91605,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2025-Q3,2025-Q4,Planning,20220630 Fishburn ES,10367919,Fishburn ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1384901,13532,5701 Fishburn Ave.,Maywood,90270,Purchase 80 Chromebooks and 24 laptops; upgrade classroom security features including door hardware and installation of metal skins on doors.,42,2016-Q4,2017-Q1,Closeout,20220630 Bravo Medical Magnet HS,10369424,Bravo Medical Magnet HS - SEEDS,SEEDS,2,Monica Garcia,East,1875401,13336,1200 N. Cornwell St.,Los Angeles,90033,"Construct an outdoor learning space of approximately 2,500 square feet including a new 12' and 3' chain link fencing with a new gate that complies with the Americans with Disabilities Act (ADA), the installation of decomposed granite and a cement brush-off area, a new irrigation system, a solar-powered controller, points of connection for raised beds and planter areas, installation of composite wood headers and 2"" of mulch to create in-ground planting areas, raised planter beds, log benches and stools, and wood benches. The project will be outfitted by the school site and its partner organizations, Alliance for a Healthier Generation and Tree People, with native and edible plants.",89,2018-Q1,2018-Q4,Closeout,20220630 Kester ES,10370315,Kester ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northeast,1472601,13683,5353 Kester Ave.,Van Nuys,91411,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms). Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",48,2020-Q2,2020-Q3,Closeout,20220630 Darby ES,10370387,Darby ES - Exterior Painting,Painting,3,Scott Schmerelson,Northwest,1334001,13797,10818 Darby Ave.,Northridge,91326,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",244,2019-Q4,2020-Q1,Closeout,20220630 Webster MS,10371345,Webster MS - 2020-21 Prop 39 (Magnolia Science Academy #4),Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project is a charter school renovation for Magnolia Science Academy #4 for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 5 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",39,2020-Q3,2020-Q3,Closeout,20220630 Lake PC,10372540,Lake PC - Secure Entry System,Security System,2,Monica Garcia,Central,1239301,13954,135 N. Lake St.,Los Angeles,90026,Install new secure entry system at the Main Office.,41,2022-Q3,2022-Q4,Planning,20220630 De La Torre ES,10371617,De La Torre ES - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1230101,14104,500 N. Island Ave.,Wilmington,90744,Install new electronic wall-mounted marquee on the Administration Building facing Island Ave. north of the main entrance.,44,2021-Q3,2021-Q4,Closeout,20220630 Henry MS,10370517,Henry MS - Parking Lot Fencing,Fencing,3,Scott Schmerelson,Northwest,1817401,13658,17340 San Jose St.,Granada Hills,91344,Install parking lot swing gates,37,2020-Q4,2021-Q3,Closeout,20220630 2nd St. ES,10372478,2nd St. ES - 2022-23 Prop 39,Charter Prop 39,2,Monica Garcia,East,1657501,13326,1942 E. 2nd St.,Los Angeles,90033,"This project is a charter school renovation for Extera Public School for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",17,2022-Q3,2022-Q3,Planning,20220630 Alta Loma ES,10372081,Alta Loma ES - Roofing,Roofing,1,"Dr. George J. McKenna, III",West,1208201,13402,1745 Vineyard Ave.,Los Angeles,90019,"This project is to provide approximately 45,398 square feet of new roofing sitewide, including the installation of new gutters and downspouts and painting of affected areas.","1,028",2023-Q2,2023-Q3,Planning,20220630 Woodcrest ES,10372171,Woodcrest ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1786301,13369,1151 W. 109th St.,Los Angeles,90044,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",415,2022-Q4,2024-Q3,Planning,20220630 Lankershim ES,10372248,Lankershim ES - SEEDS,SEEDS,6,Kelly Gonez,Northeast,1478101,13358,5250 Bakman Ave.,North Hollywood,91601,"Construct an outdoor learning and gathering space of approximately 2,100 square feet. Includes the installation of decomposed granite, redwood headers to create in-ground planting areas, new trees, mulch, a new irrigation system, log benches and stools to create a classroom gathering space, and picnic tables to create an outdoor dining garden. The project will be outfitted by the school site with drought tolerant shrubs.",100,2022-Q3,2023-Q2,Planning,20220630 Topeka Charter School for Advanced Studies,10371602,Topeka ES - Install Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1720101,13821,9815 Topeka Dr.,Northridge,91324,Install new secure entry system at door to main office with three video receivers in main office.,14,2021-Q1,2021-Q2,Closeout,20220630 Calvert Charter for Enriched Studies,10370787,Calvert ES - Chromebooks,Communications/Technology Upgrade,4,Nick Melvoin,Northwest,1271201,13731,19850 Delano St.,Woodland Hills,91367,Purchase (105) Chromebooks and (3) storage carts,37,2019-Q3,2020-Q1,Closeout,20220630 112th St. ES,10370098,112th St. ES - Flooring,Flooring,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"This project is to replace approximately 50,000 square feet of deteriorated flooring in nine classroom buildings. The scope of work includes addressing floor slab settlement in Buildings A and B and ADA work as required.","1,895",2022-Q3,2023-Q2,Design,20220630 49th St. ES,10372219,49th St. ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,Central,1393201,13348,750 E. 49th St.,Los Angeles,90011,Install new secure entry system at the Main Office,41,2021-Q4,2022-Q3,Construction,20220630 Gardena HS,10371870,Gardena HS - 2021-22 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"This project is a charter school renovation for New Millennium Secondary School for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 2 special education rooms, and 5 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The scope of work for this project included the reconfigurations of rooms back to District systems, this scope of work was not performed.",0,2021-Q3,2021-Q3,Closeout,20220630 Heliotrope ES,10370338,Heliotrope ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new chairs. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",43,2019-Q2,2019-Q4,Closeout,20220630 24th St. ES,10370563,24th St. ES - 2019-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1730101,13335,2055 W. 24th St.,Los Angeles,90018,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for Crown Preparatory Academy. This project included 1 charter office, 2 special education rooms, and 21 instructional spaces for charter student seats in grades 5-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was then approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 3 special education rooms, and 18 instructional spaces for charter student seats in grades 5-8 and an undefined scope of work. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 3 special education rooms, and 18 instructional spaces for charter student seats in grades 5-8 and an undefined scope of work. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 3 special education rooms, and 18 instructional spaces for charter student seats in grades 5-8 and an undefined scope of work.",16,2022-Q3,2022-Q3,Planning,20220630 Wilson HS,10369719,Wilson HS - Visual and Performing Arts Facilities Improvement,Addition,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,"The school is well known for its visual and performing arts programs which operate in a limited capacity in facilities that are outdated, undersized and in some instances, unusable. Included in the project design is a new facility with approximately 14,000 square feet consisting of specialized classroom space to support small student performances, drama, production, choral, dance, and instrumental music programs, and support spaces; site infrastructure to support the new facilities; specialized furniture and equipment to support the robust performing arts programs; and site work, path of travel, and other required ADA improvements.","26,191",2022-Q4,2025-Q2,Design,20220630 Angeles Mesa ES,10372454,Angeles Mesa ES - Install Privacy Fence And Purchase Exterior Tables,Campus Improvement,1,"Dr. George J. McKenna, III",West,1212301,13427,2611 W. 52nd St.,Los Angeles,90043,"Install chain link privacy fence and provide lunch tables. Replace existing chain link fencing with approx. 1,450 feet of privacy fencing (campus-wide). Replace (3) roll gates, (4) pedestrian gates, and (2) double drive gates. Purchase (38) lunch tables with (6) umbrellas.",206,2022-Q3,2022-Q4,Planning,20220630 Madison MS,10367944,Madison MS - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1823001,13627,13000 Hart St.,North Hollywood,91605,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 320 doors/hardware, 103 accessible paths of travel, 277 signs, 27 restrooms, 34 drinking fountains/sinks, 6 assistive listening devices/intercoms/phones, 8 concrete ramps, 19 metal ramps, 18 pieces of accessible furniture, 2 assembly seats, 4 railings, 12 locker room modifications/lockers, 3 parking areas, 30 casework/counters, and 7 door modifications/auto openers.","6,712",2017-Q4,2023-Q1,Construction,20220630 Park ES,10369987,Park ES - Electronic Marquee and Secure Entry System,Electrical/Lighting,5,Jackie Goldberg,East,1600501,13861,8020 Park Ave.,Cudahy,90201,Install new electronic wall-mounted marquee and install new secure entry system,72,2020-Q3,2020-Q3,Closeout,20220630 Panorama City ES,10363982,Panorama City ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northwest,1560401,13874,8600 Kester Ave.,Panorama City,91402,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",411,2014-Q4,2015-Q2,Closeout,20220630 Roscoe ES,10363992,Roscoe ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1635601,13362,10765 Strathern St.,Sun Valley,91352,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",521,2014-Q4,2015-Q2,Closeout,20220630 Commonwealth ES,10366721,Commonwealth ES - Install Fencing on South Side of Playground,Fencing,2,Monica Garcia,Central,1319201,13392,215 S. Commonwealth Ave.,Los Angeles,90004,Upgrade physical security of the school by installing a 300 ft. privacy chain link fence around the south side of the playground,7,2015-Q1,2015-Q1,Closeout,20220630 San Fernando HS,10102636,San Fernando HS - Non Air-Conditioned Classrooms & MDF Room,HVAC,6,Kelly Gonez,Northeast,1884301,13670,11133 O'Melveny Ave.,San Fernando,91340,Non Air-Conditioned Classrooms & MDF Room,184,2013-Q1,2014-Q1,Closeout,20220630 Mack ES,10365710,Mack ES - Replace Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",Central,1511301,13851,3020 S. Catalina St.,Los Angeles,90007,Replace deteriorated playground matting systems to ensure the health and safety of students.,79,2014-Q1,2015-Q4,Closeout,20220630 Haddon ES,10365705,Haddon ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1432901,13527,10115 Haddon Ave.,Pacoima,91331,Replace deteriorated playground matting systems to ensure the health and safety of students.,38,2014-Q2,2014-Q2,Closeout,20220630 Para Los Niños Gratts PC,10366953,Para Los Niños Gratts PC - SEEDS,SEEDS,2,Monica Garcia,Central,1239001,13931,474 S. Hartford Ave.,Los Angeles,90017,"Design and construct an outdoor learning space of approximately 700 square feet consisting of the installation of concrete, a hose bib and art poles. The outdoor learning space will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders and signage poles.",26,2015-Q4,2016-Q1,Closeout,20220630 Salvin Special Education Center,10365743,Salvin Special Education Center - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1195501,13275,1925 Budlong Ave.,Los Angeles,90007,Replace deteriorated playground matting systems to ensure the health and safety of students.,117,2014-Q2,2014-Q3,Closeout,20220630 Miller ES,10365718,Miller ES - Replace Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",South,1532101,13780,830 W. 77th St.,Los Angeles,90044,Replace deteriorated playground matting systems to ensure the health and safety of students.,51,2014-Q2,2014-Q2,Closeout,20220630 San Jose ES,10365745,San Jose ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northwest,1647901,13691,14928 Clymer St.,Mission Hills,91345,Replace deteriorated playground matting systems to ensure the health and safety of students.,44,2014-Q3,2015-Q1,Closeout,20220630 Hollenbeck MS,10366296,Pilot School - Boyle Heights STEM HS at Hollenbeck MS,Reconfiguration,2,Monica Garcia,East,1817901,13408,2510 E. 6th St.,Los Angeles,90023,"Reconfigure and upgrade 8 classrooms and 1 administrative office at Hollenbeck MS to create separate and distinct facilities space that enables the successful operation of Boyle Heights Science, Technology, Engineering & Mathematics (STEM) HS.",354,2014-Q2,2014-Q3,Closeout,20220630 Lawrence MS,10366817,Lawrence MS-ADA Repairs,Access Compliance,3,Scott Schmerelson,Northwest,1821701,13695,10100 Variel Ave.,Chatsworth,91311,ADA Repairs,31,2015-Q2,2015-Q2,Closeout,20220630 Rivera Learning Complex,10366822,Rivera Learning Complex - Replace Synthetic Turf Field,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1886701,193559,6100 S. Central Ave.,Los Angeles,90001,"This project addresses the defective synthetic turf field of approximately 100,000 square feet by removing and replacing the field with one that will perform better for instructional and extracurricular activities.","1,346",2015-Q3,2015-Q4,Closeout,20220630 South Gate MS,10369289,South Gate MS - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1837701,13261,4100 Firestone Blvd.,South Gate,90280,"Remove 3 bungalows and 1 sanitary building, provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to the existing buildings remaining on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite as well as perform Phase I, II and III onsite monitoring.",111,2018-Q1,2018-Q2,Closeout,20220630 Nestle Charter ES,10365727,Nestle Charter ES - New Playground Matting,Paving/Greening/Playground Equipment,4,Nick Melvoin,Northwest,1545201,13614,5060 Nestle Ave.,Tarzana,91356,Replace deteriorated playground matting systems to ensure the health and safety of students.,116,2014-Q4,2015-Q1,Closeout,20220630 Cowan ES,10367556,Cowan ES - Storage Room Conversion,Access Compliance,4,Nick Melvoin,West,1326001,13622,7615 Cowan Ave.,Los Angeles,90045,"Convert 1/3 of a storage room into a changing area. Scope of work includes install electrical outlet, purchase and install a new electric changing table, adjust soap and paper towel dispensers to ADA appropriate height, provide and install interior partitions, provide and install exhaust fan to operate concurrently with light switch, as well as carpentry work to remove storage shelves, plumbing work, and paint repairs.",27,2016-Q2,2016-Q3,Closeout,20220630 Lillian ES,10368057,Lillian ES - Restroom Upgrades,Access Compliance,5,Jackie Goldberg,East,1487701,13468,5909 Lillian St.,Los Angeles,90001,Provide and install wall mounted changing table in Nurse's Office Restroom,6,2016-Q4,2017-Q1,Closeout,20220630 Romer MS,10366261,Romer MS - 2014-15 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1811601,13894,6501 Laurel Canyon Blvd.,North Hollywood,91606,"This project is a charter school renovation for Celerity Palmati Charter School for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 18 classrooms for 439.31 charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",69,2014-Q2,2014-Q3,Closeout,20220630 Figueroa ES,10370149,Figueroa ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",South,1382201,13502,510 W. 111th St.,Los Angeles,90044,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q1,2026-Q2,Planning,20220630 Alta California ES,10367904,Alta California ES - New Backstop,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northwest,1739801,193552,14859 Rayen St.,Panorama City,91402,Provide and install a backstop in play yard.,11,2016-Q4,2017-Q2,Closeout,20220630 Solis Learning Academy,10370616,Solis Learning Academy - 2019-20 Prop 39,Charter Prop 39,2,Monica Garcia,East,1775201,14564,319 N. Humphreys Ave.,Los Angeles,90022,"This project is a charter school renovation for USC College Prep - Orange Campus for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 2 charter offices, 1 special education room, and 6 instructional spaces for charter student seats in grades 9-11. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",15,2019-Q2,2019-Q3,Closeout,20220630 Nevada ES,10370479,Nevada ES - Library Technology,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1545901,13783,22120 Chase St.,West Hills,91304,Purchase 4 computers and 1 printer for the library.,5,2019-Q2,2019-Q2,Closeout,20220630 Castelar ES,10370138,Castelar ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1286301,13283,840 Yale St.,Los Angeles,90012,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2027-Q2,2027-Q3,Planning,20220630 32nd St./USC Performing Arts Magnet ES,10105885,32nd St./USC Performing Arts Magnet ES - Compliance with State & Federal Access Requirements,Fire Alarm System,1,"Dr. George J. McKenna, III",Central,1713701,13299,822 W. 32nd St.,Los Angeles,90007,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),255,2014-Q4,2015-Q1,Closeout,20220630 Broad ES,10105889,Broad ES - Compliance with State & Federal Access Requirements,Fire Alarm System,7,Tanya Ortiz Franklin,South,1252701,13774,24815 Broad Ave.,Wilmington,90744,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),375,2015-Q2,2015-Q3,Closeout,20220630 Valley Oaks Center for Enriched Studies,10366104,Sun Valley HS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",520,2015-Q2,2015-Q3,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10366105,Sun Valley MS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",588,2015-Q1,2015-Q2,Closeout,20220630 59th St. ES,10368150,59th St. ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1379501,13400,5939 Second Ave.,Los Angeles,90043,"Replace deteriorated walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new walk-in freezer, walk-in cooler, refrigeration equipment, and refrigeration lines.",142,2017-Q2,2017-Q3,Closeout,20220630 Glen Alta Span School,10370158,Glen Alta Span School - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1413701,13292,3410 Sierra St.,Los Angeles,90031,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q3,2026-Q4,Planning,20220630 74th St. ES,10370202,74th St. ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1664401,13549,2112 W. 74th St.,Los Angeles,90047,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2025-Q3,2025-Q4,Planning,20220630 Hollywood HS,10101363,"Hollywood HS - Facilities Upgrades - Outdoor Spaces, Visual Identity, Compliance with State & Federal Access Requirements",Small Learning Community/Academy,4,Nick Melvoin,West,1869301,13356,1521 N. Highland Ave.,Los Angeles,90028,"Facilities Upgrades - Outdoor Spaces, Visual Identity, Compliance with State & Federal Access Requirements","1,770",2013-Q2,2014-Q2,Closeout,20220630 Cochran MS,10368371,Cochran MS - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1824501,13574,4066 Johnnie Cochran Vista,Los Angeles,90019,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",262,2018-Q4,2020-Q4,Closeout,20220630 Roybal Learning Center,10367708,Roybal Learning Center - 2016-17 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1854401,13875,1200 W. Colton St.,Los Angeles,90026,"This project is a charter school renovation for Los Angeles Academy of Arts and Enterprise for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 15 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",88,2016-Q2,2016-Q3,Closeout,20220630 White Point ES,10366712,White Point ES - Deteriorated Asphalt Concrete Paving,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1776701,13617,1410 Silvius Ave.,San Pedro,90731,"The 20-year-old asphalt concrete paving on the campus is severely deteriorated and in need of replacement. The scope of work includes replacement of deteriorated asphalt concrete pavement as needed, redesigning the outdoor athletic areas to meet current requirements, and replacement or repair of outdoor apparatus and fencing as necessary. Also included are the associated path of travel upgrades and drainage systems required by the Division of State Architect (DSA) and the District's Storm Water Technical Manual.","2,762",2017-Q2,2018-Q1,Closeout,20220630 Braddock ES,10369873,Braddock ES - Secure Entry System,Security System,4,Nick Melvoin,West,1247901,13536,4711 Inglewood Blvd.,Culver City,90230,Install new secure entry system,19,2018-Q3,2018-Q4,Closeout,20220630 Winnetka ES,10370321,Winnetka ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1783601,13515,8240 Winnetka Ave.,Canoga Park,91306,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",45,2020-Q1,2020-Q3,Closeout,20220630 Hamlin Charter Academy ES,10370478,Hamlin Charter Academy ES - Parking Gates,Fencing,3,Scott Schmerelson,Northwest,1434901,13725,22627 Hamlin St.,West Hills,91307,Install parking lot gates,12,2021-Q3,2022-Q1,Closeout,20220630 Valley Oaks Center for Enriched Studies,10371627,Valley Oaks Center for Enriched Studies - Clear Vision Studio,Career Technical Education,6,Kelly Gonez,Northeast,1789501,13842,9171 Telfair Ave.,Sun Valley,91352,"The project includes upgrading three existing classrooms into a recording studio, projection room and media classroom. This work includes ADA accessibility upgrades as necessary, and also includes specialized technology.","3,014",2021-Q1,2022-Q3,Construction,20220630 Northridge MS,10366180,Northridge MS - Paving & Plumbing,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1828301,13740,17960 Chase St.,Northridge,91325,"The nearly 30-year-old asphalt concrete paving on the campus is severely damaged and in need of replacement. The scope of work includes replacement of deteriorated asphalt concrete pavement as needed, redesigning the outdoor athletic areas to meet current requirements, and replacement/upgrade of outdoor apparatus and fencing as necessary. The project also replaces the 50-year-old deteriorated underground utilities including storm drain, sanitary sewer, domestic water, and natural gas lines. Also included are the associated path of travel upgrades and drainage systems required by the Division of State Architect (DSA) and the District's Storm Water Technical Manual.","20,261",2018-Q1,2020-Q2,Closeout,20220630 Union ES,10372453,Union ES - Secure Entry System,Security System,2,Monica Garcia,Central,1735601,13294,150 S. Burlington Ave.,Los Angeles,90057,Install new secure entry system at the Main Office.,43,2022-Q2,2022-Q4,Construction,20220630 Emelita ES,10108864,Emelita ES - Arcade Structural Repairs,Roofing,4,Nick Melvoin,Northwest,1358901,13713,17931 Hatteras St.,Encino,91316,"The arcade, built in 1954, has deteriorated as a result of water and termite damage as well as the addition of rooftop conduits which the structure had not been designed to support. This project repairs the arcade with the installation of structural members to restore its structural integrity and support the rooftop conduits, the replacement of roofing with a Polyvinyl Chloride (PVC) system and new gutters in place of roof drains to direct water off roofs and away from walkways, and the replacement of rooftop conduits to facilitate these repairs. The project also includes upgrades to the lunch shelter and pavilion as well as asbestos abatement throughout the site. Campus-wide upgrades to restrooms and the path of travel including slope, parking areas, gates, and signage to comply with the Americans with Disabilities Act (ADA) are also part of the project scope.","3,420",2016-Q3,2018-Q2,Closeout,20220630 36th St. EEC,10100497,36th St. EEC - Paint Building Exterior,Painting,1,"Dr. George J. McKenna, III",West,1956601,16722,3556 S. St. Andrews Pl.,Los Angeles,90018,Paint Building Exterior,38,2016-Q3,2016-Q3,Closeout,20220630 Palisades Charter HS,10371076,Palisades Charter HS - Technology Upgrade,Communications/Technology Upgrade,4,Nick Melvoin,West,1879801,13742,15777 Bowdoin St.,Pacific Palisades,90272,Purchase 85 Chromebooks (11.6 inch Lenovo 500e model).,36,2020-Q1,2020-Q2,Closeout,20220630 Westwood Charter ES,10368926,Westwood Charter ES - Roofing & HVAC,Roofing,4,Nick Melvoin,West,1774001,13505,2050 Selby Ave.,Los Angeles,90025,"The project will replace approximately 44,500 square feet of deteriorated roofing with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes replacing heating, ventilation, and air conditioning (HVAC) units, replacing damaged wood, installing new gutters and downspouts, and painting to match existing areas affected in the roof demolition.",849,2018-Q3,2019-Q1,Closeout,20220630 Holmes EEC,10369319,Holmes EEC - Restroom Upgrade,Access Compliance,5,Jackie Goldberg,East,1952401,16292,1810 E. 52nd St.,Los Angeles,90058,The project will provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,369,2022-Q2,2023-Q1,Construction,20220630 Harbor City ES,10367757,Harbor City ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1442501,13406,1508 W. 254th St.,Harbor City,90710,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 13 doors/hardware, 36 accessible paths of travel, 38 signs, 8 restrooms, 10 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 1 concrete ramp, 8 pieces of accessible furniture, 2 assembly seats, 2 railings, 1 parking area, 5 casework/counters, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","3,281",2017-Q3,2022-Q3,Construction,20220630 West Hollywood ES,10371231,West Hollywood ES - Parking Lot Fence,Fencing,4,Nick Melvoin,West,1764901,13364,670 N. Hammond St.,West Hollywood,90069,Install approximately 200' of chain link fence with double pedestrian gates at the north parking lot to separate it from the campus.,27,2020-Q3,2020-Q3,Closeout,20220630 Toluca Lake ES,10371605,Toluca Lake ES - Install Pedestrian Gate,Fencing,6,Kelly Gonez,Northeast,1719201,13634,4840 Cahuenga Blvd.,North Hollywood,91601,Install pedestrian/reunion gate at the front of campus near the west end of the South Building.,12,2021-Q2,2021-Q3,Closeout,20220630 75th St. EEC,10372101,75th Street ES - SEEDS,SEEDS,7,Tanya Ortiz Franklin,South,1955801,16683,242 W. 75th St.,Los Angeles,90003,"Construct an outdoor learning and gathering space of approximately 4,300 square feet. Includes the installation of decomposed granite, permeable pavers, composite wood headers to create in-ground planting areas and pathways, an irrigation system, trees, log benches and stools to create a classroom gathering space gathering space, and picnic tables to create an outdoor dining garden. The project will be outfitted by the school site with native and flowering plants to attract hummingbirds and butterflies. The project will incorporate an existing 1,200 sf shade structure.",100,2022-Q3,2022-Q4,Planning,20220630 South East HS,10371949,South East HS - Water Conservation Pilot (Rain Systems),Energy/Water Efficiency,5,Jackie Goldberg,East,1888101,14161,2720 Tweedy Blvd.,South Gate,90280,"Evaluate water conservation potential and water cost savings of implanting a cross-link polymer soil conditioner, known as hydrogels, into existing turf at three (3) LAUSD school campuses. Determine the effectiveness of Rain Systems' patented process of injection of hydrogels into existing turf in order to reduce water consumption for turf irrigation.",15,2022-Q4,2023-Q1,Planning,20220630 Venice HS,10366376,Venice HS - Compliance with State & Federal Access Requirements,Access Compliance,4,Nick Melvoin,West,1890701,13513,13000 Venice Blvd.,Los Angeles,90066,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),13,2014-Q3,2014-Q3,Closeout,20220630 Overland ES,10366717,Overland ES - Install Electronic Camera Entry System,Security System,1,"Dr. George J. McKenna, III",West,1590401,13486,10650 Ashby Ave.,Los Angeles,90064,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance,24,2015-Q1,2015-Q3,Closeout,20220630 Richland ES,10372084,Richland ES - Roofing,Roofing,4,Nick Melvoin,West,1626001,13576,11562 Richland Ave.,Los Angeles,90064,"This project is to provide approximately 52,238 square feet of new roofing sitewide, including the installation of new gutters and downspouts and painting of affected areas.","1,093",2023-Q2,2023-Q3,Planning,20220630 Ochoa Learning Center,10372200,Ochoa Learning Center - Install Electronic Marquee,Electrical/Lighting,5,Jackie Goldberg,East,1237201,14062,5027 Live Oak St.,Cudahy,90201,"Remove manual-type marquee near front of school. Install electronic free-standing marquee in same location, with new footing. Approx. 100 feet above-ground and 150 feet underground conduit required. Double-sided color LED displays.",73,2022-Q3,2023-Q1,Planning,20220630 San Pedro ES,10372255,San Pedro ES - ADA Improvements,Access Compliance,5,Jackie Goldberg,Central,1650701,13279,1635 S. San Pedro St.,Los Angeles,90015,"The site has been assigned a Category Two accessibility level. In order to meet the criteria for Category Two, various upgrades to five buildings are required, including: corrections, installation, or replacement of one assembly seat upgrade, two new assistive listening devices, seven new automatic door openers, 26 new door hardware, nine drinking fountain upgrades, six existing elevator upgrades, four furniture accessibility upgrades, two new intercoms, three parking lot upgrades, one playground component/matting upgrade, 33 accessible path of travel upgrades, five new railings, ten restroom upgrades, 24 new signs, one new sink/cabinet, six new thresholds, one new TMP ramp, and any other required improvements or mitigations to ensure compliance with local, state and/or federal facilities requirements.","5,200",2024-Q1,2025-Q3,Design,20220630 Sutter MS,10372517,Sutter MS - 2022-23 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,"This project is a charter school renovation for Ingenium Charter School for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 8 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",302,2022-Q3,2022-Q3,Planning,20220630 Washington Preparatory HS,10372528,Washington Preparatory HS - Synthetic Turf,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1892801,13560,10860 S. Denker Ave.,Los Angeles,90047,"This project is to replace approximately 80,000 square feet of synthetic turf on the football field and it will be executed with a negotiated contract with the turf manufacturer.",830,2022-Q3,2022-Q4,Planning,20220630 Camellia ES,10372221,Camellia ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1272601,13587,7451 Camellia Ave.,North Hollywood,91605,Install new secure entry system at the Main Office,39,2022-Q3,2023-Q1,Planning,20220630 Wilmington Park ES,10371638,Wilmington Park ES - Exterior Painting,Painting,7,Tanya Ortiz Franklin,South,1778101,13378,1140 Mahar Ave.,Wilmington,90744,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",549,2021-Q2,2021-Q3,Closeout,20220630 186th St. ES,10365208,186th St. ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1575301,13303,1581 W. 186th St.,Gardena,90248,Demolish/Remove 2 Portable Buildings,127,2013-Q2,2015-Q1,Closeout,20220630 Valley Oaks Center for Enriched Studies,10365215,Valley Oaks Center for Enriched Studies - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,Demolish/Remove 1 Portable Building,31,2013-Q4,2015-Q2,Closeout,20220630 24th St. ES,10371109,24th St. ES - Motorized Gates,Security System,1,"Dr. George J. McKenna, III",Central,1730101,13335,2055 W. 24th St.,Los Angeles,90018,Provide two motorized gates and replace asphalt with concrete.,94,2020-Q1,2020-Q4,Closeout,20220630 Danube ES,10372313,Danube ES - Purchase Exterior Benches,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1333501,13845,11220 Danube Ave.,Granada Hills,91344,Purchase (45) exterior benches.,27,2022-Q3,2022-Q4,Planning,20220630 Griffith STEAM Magnet MS,10364108,Griffith STEAM Magnet MS - HVAC,HVAC,2,Monica Garcia,East,1816801,13646,4765 E. 4th St.,Los Angeles,90022,"The project will remove and replace a 50-ton Trane air-cooled chiller, fan coils, and air handlers. This system provides heating and cooling for the physical education building and a classroom building serving 25 classrooms. This project also includes replacing 4 roof-mounted, multi-zone air handling units, and 1 existing air-cooled chiller serving classroom building #1. The existing units are more than 20 years old and in very bad condition resulting in numerous service calls.","5,843",2017-Q1,2018-Q3,Closeout,20220630 Los Feliz STEMM Magnet ES,10369306,Los Feliz STEMM Magnet ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1498601,13344,1740 N. New Hampshire Ave.,Los Angeles,90027,Demolition of 1 bungalow building. Abatement of hazardous materials. Disconnection of low and high voltage utilities and repair/replacement of asphalt at building footprint.,183,2018-Q1,2019-Q4,Closeout,20220630 Gulf ES,10004647,Gulf ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1431501,13464,828 W. L St.,Wilmington,90744,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",124,2013-Q1,2016-Q3,Closeout,20220630 Loma Vista ES,10004632,Loma Vista ES - Facelift,Facelift,5,Jackie Goldberg,East,1491801,13586,3629 E. 58th St.,Maywood,90270,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",99,2012-Q3,2016-Q3,Closeout,20220630 Verdugo Hills HS,10367462,Verdugo Hills HS - Renovate Library,Library Renovation,6,Kelly Gonez,Northeast,1891401,13642,10625 Plainview Ave.,Tujunga,91042,"Provide electrical upgrade, including power and data in support of new technology, and new computer desks with cable management",76,2016-Q3,2016-Q2,Closeout,20220630 Garfield HS,10004110,Garfield HS - Facelift,Facelift,2,Monica Garcia,East,1867901,13512,5101 E. 6th St.,Los Angeles,90022,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",194,2012-Q2,2016-Q3,Closeout,20220630 West Athens ES,10367204,West Athens ES - Portable Removal & Demolition,Portable Removal,1,"Dr. George J. McKenna, III",West,1764401,13317,1110 W. 119th St.,Los Angeles,90044,"Demolish and remove portable buildings AA-2427, AA-474 and AA-1268. The Superintendent requested that the 3 bungalows be removed from the campus in order to recapture playground acreage and parking.",244,2015-Q4,2016-Q3,Closeout,20220630 Twain MS,10366778,Twain MS - SEEDS,SEEDS,4,Nick Melvoin,West,1842501,13630,2224 Walgrove Ave.,Los Angeles,90066,"Improve an existing outdoor learning space that is approximately 14,100 square feet by installing an irrigation system, including a backflow device, remote control valves, spray heads, water lines and hose bibs. The outdoor learning space will be outfitted by the school site (Mark Twain MS) with raised beds and planting materials.",26,2015-Q2,2015-Q3,Closeout,20220630 Perez Special Education Center,10366733,Perez Sp Ed-Replace 4 Toilets,Access Compliance,2,Monica Garcia,East,1195301,13489,4540 Michigan Ave.,Los Angeles,90022,Replace 4 Toilets,12,2015-Q1,2015-Q1,Closeout,20220630 Johnston Community Day School,10367089,Johnston Community Day School - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1858901,13854,2210 Taper Ave.,San Pedro,90731,"This project is to upgrade 20,000 square feet of roofing on 6 buildings, a lunch shelter and all of the arcades throughout the campus with a PVC material. The roofs are over 20 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",361,2016-Q1,2016-Q2,Closeout,20220630 Parks Learning Center,10368736,Parks Learning Center - SEEDS,SEEDS,6,Kelly Gonez,Northwest,1357601,13852,8855 Noble Ave.,North Hills,91343,"Design and construct an outdoor learning space of approximately 6,500 square feet within a currently undeveloped field area, consisting of the installation of irrigation, decomposed granite and bench seating. The project will be outfitted by the school site with drought tolerant planting materials.",100,2019-Q4,2020-Q3,Closeout,20220630 Miles ES,10366503,Miles ES - Demolish/Remove DOH Portable Bldg,Portable Removal,5,Jackie Goldberg,East,1531501,13650,6720 Miles Ave.,Huntington Park,90255,"Demolish/Remove Department of Housing (DOH) Portable Building; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",1,2015-Q1,2016-Q4,Closeout,20220630 Walnut Park ES,10108822,Walnut Park ES - Replace Failing Roof,Roofing,5,Jackie Goldberg,East,1464001,13825,2642 E. Olive St.,Huntington Park,90255,Replace Failing Roof,420,2014-Q4,2015-Q3,Closeout,20220630 1st St. ES,10366438,1st St ES - Roof Replacement,Roofing,2,Monica Garcia,East,1383601,13267,2820 E. 1st St.,Los Angeles,90033,"This project is to replace the roofing on five classroom buildings. The roofing is more than 18 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",232,2015-Q2,2015-Q3,Closeout,20220630 Woodland Hills Academy,10367379,Woodland Hills Academy- Renovate Locker@ Girls Gym,Access Compliance,4,Nick Melvoin,Northwest,1834401,13806,20800 Burbank Blvd.,Woodland Hills,91367,Renovate locker @ girls gym,1,2015-Q4,2016-Q1,Closeout,20220630 London Community Day School,10366580,Jack London CDS - SEEDS,SEEDS,6,Kelly Gonez,Northeast,1809201,15541,12924-A Oxnard St.,Van Nuys,91401,"Improve an existing outdoor learning environment through the installation of hose bibs, a power outlet, and an irrigation system. The school site (Jack London CDS) will supply planter boxes, planting materials, and outdoor seating.",31,2015-Q1,2015-Q1,Closeout,20220630 King ES,10366242,King ES - 2014-15 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1653401,13423,3989 S. Hobart Blvd.,Los Angeles,90062,"This project is a charter school renovation for New Heights Charter School for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 17 classrooms for 410.27 charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",113,2014-Q2,2014-Q3,Closeout,20220630 Evergreen EEC,10367317,Evergreen EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,East,1958601,16763,1027 N. Evergreen Ave.,Los Angeles,90033,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",85,2016-Q3,2016-Q3,Closeout,20220630 Fairfax HS,10003954,Fairfax HS - Auditorium Upgrades,Auditorium Renovation,4,Nick Melvoin,West,1862101,13473,7850 Melrose Ave.,Los Angeles,90046,Auditorium sound and lighting upgrade; upgrades to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA) including path of travel improvements,"1,835",2013-Q2,2014-Q3,Closeout,20220630 Webster MS,10366932,Webster MS - 2015-16 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project is a charter school renovation for Magnolia Science Academy #4 for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 11 classrooms for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",10,2015-Q2,2015-Q3,Closeout,20220630 42nd St. ES,10371112,42nd St. ES - Campus Improvement,Campus Improvement,1,"Dr. George J. McKenna, III",West,1395901,13487,4231 Fourth Ave.,Los Angeles,90008,Provide and install projector with screen in multipurpose room and install one bottle filling station.,86,2020-Q1,2020-Q2,Closeout,20220630 Virgil MS,10371154,Virgil MS - Auditorium Upgrades,Auditorium Renovation,2,Monica Garcia,Central,1846201,13382,152 N. Vermont Ave.,Los Angeles,90004,"Upgrade public address system, stage lighting, projector and screen in auditorium.",96,2020-Q1,2020-Q3,Closeout,20220630 Lassen ES,10367973,Lassen ES - Library Roofing,Roofing,6,Kelly Gonez,Northwest,1479001,13803,15017 Superior St.,North Hills,91343,This project repairs the library building that was damaged by a fallen tree which has since been removed. The roof and arcade structures were damaged and required replacement.,385,2017-Q2,2017-Q4,Closeout,20220630 Pomelo Community Charter ES,10371223,Pomelo Community Charter ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1614001,13764,7633 March Ave.,West Hills,91304,Remove the existing wall-mounted marquee and replace with a new 2-sided electronic marquee standing less than 8' high on the front lawn on March Ave.,65,2021-Q3,2022-Q2,Closeout,20220630 Gage MS,10370946,Gage MS - Dental Clinic Utility Upgrades,Campus Improvement,5,Jackie Goldberg,East,1815101,13598,2880 E. Gage Ave.,Huntington Park,90255,"This project funds a portion of the utilities connections required for the mobile dental clinic on campus to be converted to a permanent dental clinic including electrical, plumbing and waste utilities. In addition to the bond funds allocated to this project budget, the school has contributed $22,500 for this upgrade (project #10370901).",18,2019-Q4,2020-Q1,Closeout,20220630 Wright STEAM Magnet MS,10370945,Wright STEAM Magnet MS - Technology Upgrade,Communications/Technology Upgrade,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,Purchase 43 iPads and 2 storage carts.,28,2020-Q2,2020-Q3,Closeout,20220630 Coliseum ES,10364026,Coliseum ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1317801,13593,4400 Coliseum St.,Los Angeles,90016,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",476,2013-Q4,2014-Q2,Closeout,20220630 Gardena HS,10364033,Gardena HS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,137",2014-Q1,2014-Q3,Closeout,20220630 Loma Vista ES,10364043,Loma Vista ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1491801,13586,3629 E. 58th St.,Maywood,90270,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",484,2013-Q4,2014-Q2,Closeout,20220630 Mann MS,10364050,Mann MS - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1823601,13534,7001 S. St. Andrews Pl.,Los Angeles,90047,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",708,2014-Q1,2014-Q2,Closeout,20220630 Vena ES,10364077,Vena ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1746601,13773,9377 Vena Ave.,Arleta,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",528,2014-Q4,2015-Q1,Closeout,20220630 Monlux ES,10366643,"Monlux ES - 40 Laptops, 7 Projectors",Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1534201,13591,6051 Bellaire Ave.,North Hollywood,91606,Increase school's access to technology by providing 40 laptop computers and 7 projectors,50,2014-Q4,2015-Q1,Closeout,20220630 Middleton PC,10107274,Middleton PC - Parent Center Upgrades,Campus Improvement,5,Jackie Goldberg,East,1530201,13926,2410 Zoe Ave.,Huntington Park,90255,Parent Center Upgrades,63,2012-Q2,2014-Q1,Closeout,20220630 Marina Del Rey MS,10005162,Marina Del Rey MS - 2013-15 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"This project was first approved in Board of Education Report No. 233-12/13 as a vacating site, however an alternative agreement was executed to allow Goethe International Charter School to occupy Marina Del Rey MS for the 2013-14 school year. The 2013-14 Prop. 39 co-location includes 1 charter office and 17 classrooms for 232.03 charter student seats in grades K-5. This project was next approved in Board of Education Report No. 342-13/14 as a vacating site, however an alternative agreement was executed again to allow Goethe International Charter School to occupy Marina Del Rey MS for the 2014-15 school year. The scope of work includes relocation of classrooms, cleaning, miscellaneous repairs, remedial construction, purchase of furniture and equipment, and ITD installation of a separate data and telephone network.",1,-Q,2014-Q3,Closeout,20220630 Budlong ES,10366884,Budlong ES - 2015-16 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1261601,15162,5940 S. Budlong Ave.,Los Angeles,90044,"This project is a charter school renovation for Lou Dantzler Preparatory ES for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 13 classrooms for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, and communication/safety purchases and upgrades.",22,2015-Q2,2015-Q3,Closeout,20220630 Bradley Global Awareness Magnet ES,10366883,Bradley Global Awareness Magnet - 2015-16 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1712301,13516,3875 Dublin Ave.,Los Angeles,90008,"This project is a charter school renovation for Libertas College Preparatory for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 5 classrooms for charter student seats in grades 4-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",167,2015-Q2,2015-Q3,Closeout,20220630 Columbus MS,10366888,Columbus MS - 2015-16 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,"This project is a charter school renovation for Ingenium Charter School for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 21 classrooms for 290.7 charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",151,2015-Q2,2016-Q1,Closeout,20220630 Annandale ES,10365676,Annandale ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1215101,13371,6125 Poppy Peak Dr.,Los Angeles,90042,Replace deteriorated playground matting systems to ensure the health and safety of students.,41,2015-Q1,2015-Q2,Closeout,20220630 Elizabeth Learning Center,10366028,Elizabeth Learning Center - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1354801,13480,4811 Elizabeth St.,Cudahy,90201,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",502,2015-Q2,2015-Q3,Closeout,20220630 San Pedro HS,10004950,San Pedro HS - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1885001,13377,1001 W. 15th St.,San Pedro,90731,"Equip with tables, chairs, children's corner, media cart, computers, whiteboards, and signage. Remove counter and built-in cabinets and install new cabinets.",100,2013-Q2,2014-Q1,Closeout,20220630 59th St. ES,10370969,59th St. ES - Exterior Furniture,Furniture/Fixtures/Equipment,1,"Dr. George J. McKenna, III",West,1379501,13400,5939 Second Ave.,Los Angeles,90043,Purchase 20 new exterior benches and 6 new exterior tables and replace existing deteriorated benches and tables.,25,2020-Q2,2020-Q3,Closeout,20220630 Woodlake Community Charter ES,10371227,Woodlake Community Charter ES - Technology Upgrade,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1787701,13686,23231 Hatteras St.,Woodland Hills,91367,Purchase 70 Chromebooks and 2 storage carts.,27,2020-Q4,2021-Q3,Closeout,20220630 Burbank Arts Tech Community Magnet MS,10370973,Burbank Arts Tech Community Magnet MS - Athletic Obstacle Course,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1806601,13551,6460 N. Figueroa St.,Los Angeles,90042,"Provide an athletic obstacle course by trenching and removing soil and installing obstacle course equipment, sand fall zones, and fencing. This Local District Central priority project includes a contribution of $10,000 from the school's student body.",105,2020-Q3,2022-Q1,Closeout,20220630 Hale Charter Academy MS,10371217,Hale Charter Academy MS - Auditorium Lighting,Electrical/Lighting,3,Scott Schmerelson,Northwest,1816901,13873,23830 Califa St.,Woodland Hills,91367,"Remove existing light fixtures from the multipurpose room ceiling, replace damaged cord caps, and install new stage lights.",99,2022-Q3,2023-Q2,Planning,20220630 Menlo ES,10371218,Menlo ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",Central,1524701,13386,4156 Menlo Ave.,Los Angeles,90037,"Demolish and remove 3 portable buildings; remove/relocate furniture and equipment; disconnect all ITD components and utilities and reconnect to existing onsite buildings; remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring; and repair/replace asphalt paving.",336,2020-Q4,2022-Q4,Construction,20220630 Canfield ES,10004593,Canfield ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1274001,13556,9233 Airdrome St.,Los Angeles,90035,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",121,2013-Q1,2017-Q1,Closeout,20220630 Micheltorena ES,10366780,Micheltorena ES - SEEDS,SEEDS,5,Jackie Goldberg,Central,1528801,13329,1511 Micheltorena St.,Los Angeles,90026,"Design and construct an outdoor learning space that is approximately 1,700 square feet consisting of the installation of a decomposed granite pathway, concrete entrance pads and a hose bib. Additionally, install a grass play field that is approximately 3,800 square feet consisting of sod and an irrigation system. The outdoor learning space will be outfitted by the partner organization (Friends of Micheltorena) with planting materials.",73,2016-Q1,2016-Q4,Closeout,20220630 Maclay MS,10366529,Maclay MS - HVAC,HVAC,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"This project provides a campus-wide upgrade to the heating, ventilation, and air conditioning (HVAC) system. The existing systems are over 20 years old and in poor condition resulting in frequent system failures and unreliable service. The scope of work also includes electrical infrastructure upgrades such as a new transformer that is needed to accommodate the new HVAC system.","14,904",2017-Q3,2021-Q4,Closeout,20220630 Drew MS,10370364,Drew MS - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1811201,13871,8511 Compton Ave.,Los Angeles,90001,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",62,2019-Q2,2019-Q4,Closeout,20220630 Sharp ES,10370203,Sharp ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1666501,13809,13800 Pierce St.,Arleta,91331,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2024-Q2,2024-Q3,Planning,20220630 Angeles Mesa ES,10369283,Angeles Mesa ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1212301,13427,2611 W. 52nd St.,Los Angeles,90043,"Removal of 1 DSA portable building. Provide temporary fencing. Disconnect all utilities, including low voltage and power to 3 DSA buildings and 1 sanitary building. Reconnect all utilities to existing buildings remaining onsite. Abate and transport all asbestos, lead and other hazardous materials offsite. Perform Phase I, II and III onsite monitoring and restore asphalt paving (and court markings) as needed.",165,2018-Q1,2019-Q3,Closeout,20220630 Leland ES,10370050,Leland ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1483601,13439,2120 S. Leland St.,San Pedro,90731,Install new secure entry system,26,2019-Q1,2019-Q1,Closeout,20220630 Banneker Career & Transition Center,10370118,Banneker Career & Transition Center - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1194101,15142,14024 S. San Pedro St.,Los Angeles,90061,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q2,2027-Q3,Planning,20220630 Wilson HS,10369089,Wilson HS-Protocol Restroom Modifications,Access Compliance,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,"Convert a multi-user restroom to a single occupancy, all-gender restroom by removing the existing toilet compartment door and partition, removing two urinals, and replacing door hardware.",6,2017-Q3,2017-Q3,Closeout,20220630 Sherman Oaks Charter ES,10369960,Sherman Oaks Charter ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northeast,1669901,13517,14755 Greenleaf St.,Sherman Oaks,91403,"Install a new electronic free-standing marquee. This Local District Northeast priority project includes a school contribution (work order #28511802), however the budget represents only the bond‐funded portion.",13,2018-Q4,2019-Q1,Closeout,20220630 92nd St. ES,10368355,92nd St. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1554801,13511,9211 Grape St.,Los Angeles,90002,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",182,2018-Q3,2018-Q4,Closeout,20220630 Nueva Vista ES,10369333,Nueva Vista ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1237801,13822,4412 Randolph St.,Bell,90201,"Removal of 1 portable building. Salvage all furniture and equipment from classrooms, abate hazardous materials, disconnect low and high voltage utilities, and repair/replace asphalt in the building footprint.",51,2017-Q4,2019-Q1,Closeout,20220630 London Continuation HS,10370933,London Continuation HS - Security Upgrades,Security System,6,Kelly Gonez,Northeast,1868501,15441,12924 Oxnard St.,Van Nuys,91401,Install video surveillance (CCTV) system,50,2020-Q1,2020-Q4,Closeout,20220630 Chapman ES,10369587,Chapman ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1298601,13460,1947 Marine Ave.,Gardena,90249,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 12 doors, 41 door hardware, 16 thresholds, 9 accessible paths of travel, 53 signs, 6 restrooms, 18 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 1 concrete ramp, 4 metal ramps, 3 pieces of accessible furniture, 1 assembly seat, 3 railings, 1 parking space, 1 cafeteria counter, 1 door auto opener, 1 new elevator/stage lift, 1 passenger/bus loading zone, and DSA certification of 1 portable building.","4,132",2019-Q3,2021-Q2,Closeout,20220630 Marianna ES,10367768,Marianna ES - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1513701,13479,4215 E. Gleason St.,Los Angeles,90063,Modify kindergarten restrooms for changing tables.,24,2016-Q2,2016-Q4,Closeout,20220630 Cahuenga ES,10364340,Cahuenga ES - Portable Removal,Portable Removal,5,Jackie Goldberg,Central,1269901,13341,220 S. Hobart Blvd.,Los Angeles,90004,Demolish/Remove Portable Building(s),164,2014-Q1,2014-Q4,Closeout,20220630 South Gate HS,10364350,South Gate HS - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1887101,13262,3351 Firestone Blvd.,South Gate,90280,Demolish/Remove Portable Building(s),455,2013-Q4,2014-Q2,Closeout,20220630 Baldwin Hills ES,10369729,Baldwin Hills ES - 2018-20 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1227401,13595,5421 Rodeo Rd.,Los Angeles,90016,"This project was initially approved in BOE Report No. 429-17/18 for the 2018-19 Prop 39 co-locations as a charter school renovation for New Los Angeles Charter ES. This project included 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades K-3. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 11 spaces allocated to the charter and a scope of work that is not yet defined.",23,2018-Q2,2018-Q3,Closeout,20220630 Eagle Rock ES,10370083,Eagle Rock ES - ADA Improvements,Access Compliance,5,Jackie Goldberg,Central,1350701,13499,2057 Fair Park Ave.,Los Angeles,90041,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 36 doors/hardware, 7 accessible paths of travel, 84 signs, 11 restrooms, 9 drinking fountains, 11 sinks/sink cabinets, 1 assistive listening device/intercom/phone, 8 concrete ramps, 6 metal ramps, 1 assembly seat, 19 railings, 2 existing elevator modifications, 5 casework/counters, 13 door modifications/auto openers, 1 stage lift, 1 passenger/bus loading zone, and DSA certification of 2 portable buildings.","5,731",2023-Q3,2025-Q1,Design,20220630 Eshelman ES,10370444,Eshelman ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1364001,13501,25902 Eshelman Ave.,Lomita,90717,Install new secure entry system,20,2019-Q2,2019-Q3,Closeout,20220630 112th St. ES,10369166,112th St. ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",46,2017-Q4,2018-Q1,Closeout,20220630 Western TECH Magnet School,10364363,Western TECH Magnet School - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1767101,13338,1724 W. 53rd St.,Los Angeles,90062,Demolish/Remove Portable Building(s),100,2014-Q3,2015-Q3,Closeout,20220630 Farmdale ES,10364364,Farmdale ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1374001,15166,2660 Ruth Swiggett Dr.,Los Angeles,90032,Demolish/Remove Portable Building(s),120,2013-Q4,2015-Q1,Closeout,20220630 Baca Arts Academy,10369170,Baca Arts Academy - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1688601,193558,1536 E. 89th St.,Los Angeles,90002,"Modernize Parent & Family Center classroom by providing paint touch-up, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",40,2018-Q1,2018-Q4,Closeout,20220630 Hollywood HS,10103566,Hollywood HS - Track & Field Improvement,Gym/Athletic Facilities Renovation,4,Nick Melvoin,West,1869301,13356,1521 N. Highland Ave.,Los Angeles,90028,Track & Field Improvement,"5,887",2013-Q2,2014-Q2,Closeout,20220630 Castle Heights ES,10369860,Castle Heights ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1287701,13680,9755 Cattaraugus Ave.,Los Angeles,90034,Install new secure entry system,30,2018-Q4,2019-Q1,Closeout,20220630 San Gabriel ES,10369606,San Gabriel ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1646601,13651,8628 San Gabriel Ave.,South Gate,90280,Purchase 4 iMac computers for school library; install security upgrades as needed,6,2018-Q2,2018-Q3,Closeout,20220630 52nd St. ES,10368364,52nd St. ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1380801,13307,816 W. 51st St.,Los Angeles,90037,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",191,2017-Q4,2018-Q2,Closeout,20220630 Van Nuys MS,10368343,Van Nuys MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northeast,1843401,13605,5435 Vesper Ave.,Van Nuys,91411,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",134,2017-Q4,2018-Q2,Closeout,20220630 Woodland Hills Academy,10368344,Woodland Hills Academy - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,Northwest,1834401,13806,20800 Burbank Blvd.,Woodland Hills,91367,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",132,2017-Q4,2018-Q2,Closeout,20220630 Apperson ES,10367550,Apperson ES - Accessibility Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1216401,13608,10233 Woodward Ave.,Sunland,91040,Provide and install new 4' high chain link fence with ADA gate; Make appropriate ADA upgrades to ramp and entry to classroom.,16,2016-Q2,2016-Q3,Closeout,20220630 Anton ES,10368040,Anton ES - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1435601,14382,831 N. Bonnie Beach Pl.,Los Angeles,90063,"Remove and replace fixtures (urinal, toilet and lavatory) for appropriate height.",1,2016-Q4,2016-Q4,Closeout,20220630 Meyler ES,10370220,Meyler ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1734201,13730,1123 W. 223rd St.,Torrance,90502,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2026-Q4,2027-Q2,Planning,20220630 Burton ES,10370528,Burton ES - Chromebooks and Security,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1265801,13540,8111 Calhoun Ave.,Panorama City,91402,Purchase (20) Chromebooks and (1) charging cart; provide security upgrades as needed,17,2019-Q2,2019-Q2,Closeout,20220630 Dahlia Heights ES,10367913,Dahlia Heights ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1332901,13308,5063 Floristan Ave.,Los Angeles,90041,"Purchase 40 Chromebooks, 40 laptops and 4 syncing carts; upgrade classroom security features including door hardware and installation of metal skins on doors.",55,2016-Q4,2017-Q1,Closeout,20220630 Bertrand ES,10368090,Bertrand ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,Northwest,1243801,13610,7021 Bertrand Ave.,Reseda,91335,Provide and install electronic marquee.,37,2017-Q1,2017-Q2,Closeout,20220630 Mann UCLA Community School,10372196,Mann UCLA Community School - Install Gym Scoreboards,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1757401,13534,7001 S. St. Andrews Pl.,Los Angeles,90047,"Install (2) scoreboards and shot clocks in gym; one set at each end of basketball court. Add minor structural support/bracing to wall studs. Remove non-regulation scoreboard. Regulation scoreboards needed for competitive play; in 2017, the school changed from Middle School to a UCLA Magnet Span 6-12th grade.",128,2022-Q4,2023-Q1,Design,20220630 Montara ES,10372297,Montara ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1687801,13940,10018 Montara Ave.,South Gate,90280,Install new secure entry system at the Main Office.,39,2022-Q2,2022-Q3,Construction,20220630 Westchester Enriched Sciences Magnets,10371722,Westchester Enriched Sciences Magnets - Portable Removal,Portable Removal,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"Demolish and remove 4 portable buildings and 1 sanitary building, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",370,2021-Q2,2022-Q3,Construction,20220630 Fairfax HS,10369586,Fairfax HS - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1862101,13473,7850 Melrose Ave.,Los Angeles,90046,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 20 doors, 249 door hardware, 55 thresholds, accessible paths of travel, 229 signs, 17 restrooms, 25 drinking fountains/sinks, 8 assistive listening devices/intercoms/phones, 5 concrete ramps, 1 metal ramp, 51 pieces of accessible furniture, 3 assembly seats, 18 railings, 3 locker room modifications/lockers, 1 parking area, 28 casework/counters, 9 door modifications/auto openers, 3 changing rooms, 1 new elevator/stage lift and associated upgrades to 2 stages, 1 passenger/bus loading zone, and DSA certification of 2 portable buildings.","8,681",2023-Q2,2024-Q4,Design,20220630 96th St. ES,10372277,96th St. ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1557501,13496,1471 E. 96th St.,Los Angeles,90002,"Demolish and remove 2 portable buildings, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/Replace asphalt paving.",295,2022-Q3,2023-Q4,Planning,20220630 42nd St. ES,10372479,42nd St. ES - 2022-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1395901,13487,4231 Fourth Ave.,Los Angeles,90008,"This project is a charter school renovation for ISANA Nascent Academy for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 12 instructional spaces for charter student seats in grades TK-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",30,2022-Q3,2022-Q3,Planning,20220630 Tweedy Learning Center,10367175,Tweedy Learning Center - Paving,Paving/Greening/Playground Equipment,5,Jackie Goldberg,East,1903701,13635,5115 Southern Ave.,South Gate,90280,"Replace asphalt paving in parking areas and in between buildings as well as meet accessibility requirements of the Americans with Disabilities Act (ADA) with upgrades to restrooms, drinking fountain, parking, and path of travel improvements.","2,071",2018-Q2,2019-Q3,Closeout,20220630 Academy for Enriched Sciences Magnet ES,10371756,Academy for Enriched Sciences Elementary Magnet - Provide Outdoor STEAM Lab,Campus Improvement,3,Scott Schmerelson,Northwest,1225001,13615,17551 Miranda St.,Encino,91316,"Clear outdoor area of 15 above-ground abandoned planters in order to make way for an outdoor STEAM lab. Provide access to power and data for a rolling Promethean ActivPanel interactive display and purchase picnic tables, mobile sink, and mobile teacher's station for outdoor instruction.",62,2022-Q3,2022-Q4,Planning,20220630 Cimarron ES,10372441,Cimarron ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1308201,13660,11559 Cimarron Ave.,Hawthorne,90250,Install new secure entry system at the Main Office.,33,2022-Q2,2022-Q4,Construction,20220630 El Sereno MS,10367060,El Sereno MS - ADA Improvements,Access Compliance,2,Monica Garcia,East,1811801,13412,2839 N. Eastern Ave.,Los Angeles,90032,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 158 doors/hardware, 60 accessible paths of travel, 149 signs, 16 restrooms, 4 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 5 concrete ramps, 6 metal ramps, 3 pieces of accessible furniture, 1 assembly seat, 3 locker room modifications/lockers, 1 parking area, and 2 new elevators/stage lifts.","5,885",2016-Q4,2023-Q3,Construction,20220630 Miles EEC,10100403,Miles EEC - Cabinet & Countertop Improvements,Ceiling/Wall System,5,Jackie Goldberg,East,1953501,16663,2855 Saturn Ave.,Huntington Park,90255,Repair or replace built-in cabinets or countertops.,18,2020-Q4,2021-Q1,Closeout,20220630 Haskell STEAM Magnet ES,10371214,Haskell STEAM Magnet ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1445201,13736,15850 Tulsa St.,Granada Hills,91344,Remove the existing marquee and footing near the main entrance on Tulsa St. and replace with a new 2-sided electronic marquee standing less than 8' high.,53,2021-Q2,2021-Q2,Closeout,20220630 Taft Charter HS,10366833,Taft Charter HS - Plumbing Utilities Upgrades,Plumbing/Irrigation/Drainage,4,Nick Melvoin,Northwest,1888001,13787,5461 Winnetka Ave.,Woodland Hills,91364,"The project replaces deteriorated pipes for underground utilities inclusive of domestic water, sewer, and fire protection systems as well as natural gas to within five feet of all buildings on the site. The existing utilities are over 50 years old and in poor condition resulting in unreliable service.","18,643",2021-Q1,2022-Q4,Construction,20220630 Normandie EEC,10369858,Normandie EEC - Nature Explore Classroom,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1954101,16667,4407 S. Raymond Ave.,Los Angeles,90037,"This project will create field-tested, research-based outdoor learning spaces that provide learning opportunities and support children's interaction with the natural world. The outdoor learning spaces are divided into distinct activity areas to provide a wide-ranging mix of educational activities that support children with a variety of needs and learning styles. The activity areas include art, building, music, climbing/balancing, flexing, gathering, gardening, messy materials, wheel toys, etc.","1,412",2022-Q3,2023-Q1,Design,20220630 Franklin ES,10365641,Franklin ES - Electronic Camera Entry System,Security System,2,Monica Garcia,Central,1398601,13446,1910 N. Commonwealth Ave.,Los Angeles,90027,Upgrade physical security of the campus by purchasing and installing an electronic camera door entry system for the main entrance.,18,2014-Q1,2016-Q4,Closeout,20220630 Bonita ES,10365652,Bonita ES - Compliance with State & Federal Access Requirements,Access Compliance,7,Tanya Ortiz Franklin,South,1247301,13796,21929 Bonita St.,Carson,90745,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Upgrades to Restroom,9,2014-Q1,2014-Q3,Closeout,20220630 Century Park ES,10105871,Century Park ES - Compliance with State & Federal Access Requirements,Fire Alarm System,1,"Dr. George J. McKenna, III",West,1294501,13675,10935 S. Spinning Ave.,Inglewood,90303,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),486,2015-Q1,2015-Q3,Closeout,20220630 Kennedy ES,10105877,Kennedy ES - Compliance with State & Federal Access Requirements,Fire Alarm System,2,Monica Garcia,East,1469601,13886,4010 E. Ramboz Dr.,Los Angeles,90063,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),268,2014-Q4,2015-Q2,Closeout,20220630 Solano ES,10372312,Solano ES - Install Parking Lot Gates,Fencing,2,Monica Garcia,East,1683601,13343,615 Solano Ave.,Los Angeles,90012,Install one set of swing gates to secure parking lot with one entrance.,13,2022-Q1,2022-Q2,Closeout,20220630 Broad ES,10371242,Broad ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1252701,13774,24815 Broad Ave.,Wilmington,90744,Install new secure entry system at main office with two intercoms and three video receivers. One intercom is for the public entrance and one intercom is for the door leading to the campus for use by students.,27,2020-Q3,2021-Q1,Closeout,20220630 Chase ES,10372440,Chase ES - Secure Entry System,Security System,6,Kelly Gonez,Northwest,1301401,13620,14041 Chase St.,Panorama City,91402,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Chandler ES,10004815,Chandler ES - Technology Upgrades,Communications/Technology Upgrade,3,Scott Schmerelson,Northeast,1295901,13619,14030 Weddington St.,Van Nuys,91401,"Purchase, configure and install 12 laptops, 42 tablets, 2 projectors, 2 Smartboards and required technology accessories.",74,2012-Q3,2014-Q1,Closeout,20220630 Logan EEC,10005047,Logan EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,Central,1953201,16290,1712 W. Montana St.,Los Angeles,90026,"Upgrade entry control system, plumbing systems in restrooms, and playground equipment",80,2014-Q1,2014-Q3,Closeout,20220630 Glenfeliz EEC,10005034,Glenfeliz EEC - Safety Upgrades and Improvements,Campus Improvement,5,Jackie Goldberg,Central,1951701,16661,3745 Dover Pl.,Los Angeles,90039,"Upgrade window system, entry control system, exterior gates, and playground equipment",69,2014-Q3,2015-Q4,Closeout,20220630 Trinity EEC,10005070,Trinity EEC - Safety Upgrades and Improvements,Campus Improvement,5,Jackie Goldberg,Central,1956901,16689,3816 Trinity St.,Los Angeles,90011,"Upgrade entry control system, exterior gates, and playground equipment",24,2014-Q2,2015-Q2,Closeout,20220630 Hobart EEC,10005040,Hobart EEC - Safety Upgrades and Improvements,Campus Improvement,5,Jackie Goldberg,Central,1958301,15562,982 S. Serrano Ave.,Los Angeles,90066,"Upgrade plumbing and wall systems in restrooms, entry control system, and exterior gates",42,2014-Q1,2015-Q4,Closeout,20220630 Plummer ES,10004565,Plummer ES - Facelift,Facelift,6,Kelly Gonez,Northwest,1612301,13878,9340 Noble Ave.,North Hills,91343,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",111,2012-Q3,2016-Q3,Closeout,20220630 Utah Span School,10004613,Utah ES - Facelift,Facelift,2,Monica Garcia,East,1737001,13328,255 Gabriel Garcia Marquez St.,Los Angeles,90033,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",144,2012-Q2,2014-Q1,Closeout,20220630 Fleming MS,10004131,Fleming MS - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1812701,13657,25425 Walnut St.,Lomita,90717,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",224,2012-Q1,2016-Q3,Closeout,20220630 Lorena ES,10366244,Lorena ES - 2014-15 Prop 39,Charter Prop 39,2,Monica Garcia,East,1494501,13351,1015 S. Lorena St.,Los Angeles,90023,"This project is a charter school renovation for Extera Public School - Lorena for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 9 classrooms for 203.3 charter student seats in grades K-3. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",101,2014-Q2,2014-Q2,Closeout,20220630 Monroe HS,10366249,Monroe HS - 2014-15 Prop 39,Charter Prop 39,6,Kelly Gonez,Northwest,1876801,13704,9229 Haskell Ave.,North Hills,91343,"This project is a charter school renovation for Valley Charter MS for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 9 classrooms for 236.17 charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",9,2014-Q2,2014-Q3,Closeout,20220630 Saturn ES,10106104,Saturn ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,Mitigate Lead in Water,30,2012-Q4,2015-Q3,Closeout,20220630 Yorkdale ES,10367161,Yorkdale ES - New Vinyl Composition Tile,Flooring,2,Monica Garcia,Central,1795901,13385,5657 Meridian St.,Los Angeles,90042,Provide upgrades to the campus by installing new vinyl composition tile throughout the newer 2-story classroom building,31,2016-Q1,2016-Q2,Closeout,20220630 Escutia PC,10366030,Escutia PC - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1322001,13923,6401 Bear Ave.,Bell,90201,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",296,2015-Q1,2015-Q2,Closeout,20220630 Belvedere MS,10107787,Belvedere MS - Replace Deteriorating Irrigation Controllers,Plumbing/Irrigation/Drainage,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,Replace Deteriorating Irrigation Controllers,85,2014-Q1,2015-Q3,Closeout,20220630 Dymally HS,10366893,Dymally HS - 2015-16 Prop 39 (Pathways Community School),Charter Prop 39,7,Tanya Ortiz Franklin,South,1892301,14581,8800 S. San Pedro St.,Los Angeles,90003,"This project is a charter school renovation for Pathways Community School for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 9 classrooms for charter student seats in grades 9-10. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",60,2015-Q2,2015-Q3,Closeout,20220630 Clinton MS,10366887,Clinton MS - 2015-16 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1806201,13909,3500 S. Hill St.,Los Angeles,90007,"This project is a charter school renovation for Animo Jackie Robinson Charter HS for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 20 classrooms for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, and communication/safety purchases and upgrades.",100,2015-Q2,2015-Q3,Closeout,20220630 Belmont HS,10366218,Belmont HS - 2014-15 Prop 39 (Camino Nuevo Charter Academy Harvard Campus),Charter Prop 39,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"This project is a charter school renovation for Camino Nuevo Charter Academy Harvard Campus for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 22 classrooms for 479.64 charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",499,2014-Q2,2014-Q3,Closeout,20220630 Verdugo Hills HS,10367729,Verdugo Hills HS - Ramp & Path of Travel for Graduation,Access Compliance,6,Kelly Gonez,Northeast,1891401,13642,10625 Plainview Ave.,Tujunga,91042,Provide and install portable ramp and path of travel for graduation,18,2016-Q2,2016-Q2,Closeout,20220630 Marshall HS,10366384,Marshall HS - Replace Walk Decks,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1875001,13571,3939 Tracy St.,Los Angeles,90027,"The concrete membrane of the upper deck walkway and landings has deteriorated, which has created a tripping hazard. The scope of work includes completely removing and replacing the concrete membrane of the upper deck walkway of the 500 and 700 buildings.",85,2014-Q3,2015-Q1,Closeout,20220630 La Salle ES,10368329,La Salle ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1478601,13507,8715 La Salle Ave.,Los Angeles,90047,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",133,2017-Q2,2017-Q3,Closeout,20220630 Ramona ES,10367707,Ramona ES - 2016-17 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1617801,13353,1133 N. Mariposa Ave.,Los Angeles,90029,"This project is a charter school renovation for Citizens of the World Charter School - Silver Lake for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office and 4 instructional spaces for charter student seats in grades K-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",163,2016-Q2,2016-Q3,Closeout,20220630 4th St. PC,10370029,4th St. PC - Secure Entry System,Security System,2,Monica Garcia,East,1397401,13883,469 Amalia Ave.,Los Angeles,90022,Install new secure entry system,19,2018-Q4,2019-Q1,Closeout,20220630 Nightingale MS,10369035,Nightingale MS - Portable Removal,Portable Removal,2,Monica Garcia,East,1826401,13584,3311 N. Figueroa St.,Los Angeles,90065,"Removal of 1 bungalow. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprint.",377,2017-Q3,2019-Q3,Closeout,20220630 San Pedro ES,10368179,San Pedro ES - Accessibility Upgrade,Access Compliance,5,Jackie Goldberg,Central,1650701,13279,1635 S. San Pedro St.,Los Angeles,90015,Installation of an accessible passenger loading zone for parents to drop off students.,12,2016-Q4,2017-Q1,Closeout,20220630 Hale Charter Academy MS,10369471,Hale Charter Academy MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1816901,13873,23830 Califa St.,Woodland Hills,91367,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2023-Q4,2024-Q2,Planning,20220630 Century Park ES,10364024,Century Park ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1294501,13675,10935 S. Spinning Ave.,Inglewood,90303,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",477,2014-Q1,2014-Q2,Closeout,20220630 Vladovic Harbor Teacher Preparation Academy,10364035,Harbor Teacher Preparation Academy - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1851801,14589,1111 Figueroa Pl.,Wilmington,90744,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",182,2013-Q4,2014-Q2,Closeout,20220630 Sutter MS,10368336,Sutter MS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",134,2017-Q4,2018-Q2,Closeout,20220630 Burbank Arts Tech Community Magnet MS,10370235,Burbank Arts Tech Community Magnet MS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1806601,13551,6460 N. Figueroa St.,Los Angeles,90042,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2026-Q4,2027-Q1,Planning,20220630 Breed ES,10371127,Breed ES - Campus Improvement,Campus Improvement,2,Monica Garcia,East,1249301,13281,2226 E. 3rd St.,Los Angeles,90033,"Library upgrades and refurbish student lunch tables. Library upgrades include overhead projector, motorized projection screen, and furniture.",89,2020-Q2,2021-Q2,Closeout,20220630 Gledhill ES,10370350,Gledhill ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northwest,1413001,13746,16030 Gledhill St.,North Hills,91343,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",53,2019-Q2,2019-Q4,Closeout,20220630 Euclid ES,10369027,Euclid ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1367101,13319,806 Euclid Ave.,Los Angeles,90023,"Remove 1 portable building. Abatement of hazardous materials, disconnection of high and low voltage utilities, and repair/replace asphalt in the building footprint.",63,2017-Q4,2018-Q2,Closeout,20220630 Heliotrope ES,10366899,Heliotrope ES - 2015-17 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,"This project is a charter school renovation for Clemente Charter School for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 6 classrooms for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. This project is amended to include an additional single-year term for Clemente Charter School with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 as a ""No Growth"" project includes 1 charter office and 6 instructional spaces for charter student seats in grades K-6. The scope for this project is not yet defined.",87,2015-Q2,2015-Q3,Closeout,20220630 Lowman Special Education & Career Transition Center,10364045,Lowman Special Education Center - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1194801,13544,12827 Saticoy St.,North Hollywood,91605,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",420,2013-Q4,2014-Q2,Closeout,20220630 Manhattan ES,10367759,Manhattan ES - ADA Improvements,Access Compliance,1,"Dr. George J. McKenna, III",West,1511001,13685,1850 W. 96th St.,Los Angeles,90047,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 66 doors/hardware, 21 thresholds, 28 accessible paths of travel, 80 signs, 7 restrooms, 31 drinking fountains/sinks, 17 casework/counters, 1 assistive listening device/intercom/phone, 9 concrete ramps, 2 metal ramps, 4 pieces of accessible furniture, 2 assembly seats, 4 railings, 1 parking area, 1 cafeteria counter, 1 nurse's exam room modification, and 1 new elevator/stage lift.","8,073",2017-Q3,2022-Q3,Construction,20220630 Monroe HS,10369493,Monroe HS - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northwest,1876801,13704,9229 Haskell Ave.,North Hills,91343,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",353,2020-Q3,2021-Q3,Closeout,20220630 Canoga Park ES,10369541,Canoga Park ES - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1275301,13416,7438 Topanga Canyon Blvd.,Canoga Park,91303,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2025-Q1,2025-Q2,Planning,20220630 Cowan ES,10368800,Cowan ES - 2017-18 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1326001,13622,7615 Cowan Ave.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Charter MS for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, and communication/safety purchases and upgrades.",127,2017-Q2,2017-Q3,Closeout,20220630 Maclay MS,10368827,Maclay MS - 2017-18 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"This project is a charter school renovation for YPI Valley Public Charter HS for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",72,2017-Q2,2017-Q3,Closeout,20220630 Micheltorena ES,10366542,Micheltorena ES-Removal of 2 Portables,Portable Removal,5,Jackie Goldberg,Central,1528801,13329,1511 Micheltorena St.,Los Angeles,90026,"Removal of 2 Portables; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",125,2016-Q1,2016-Q4,Closeout,20220630 Wilson HS,10105092,Wilson HS - Facilities Upgrades (Phase 2),Small Learning Community/Academy,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,Facilities Upgrades (Phase 2),"2,663",2014-Q4,2015-Q3,Closeout,20220630 Fishburn ES,10370150,Fishburn ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1384901,13532,5701 Fishburn Ave.,Maywood,90270,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2027-Q3,2027-Q4,Planning,20220630 Vena ES,10367602,Vena ES - Restroom Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1746601,13773,9377 Vena Ave.,Arleta,91331,"Modify kindergarten restrooms K1 & K2 including widening doors, relocating light switch, removing and replacing partition, and installing ACU-provided folding changing table.",25,2016-Q2,2016-Q2,Closeout,20220630 Roosevelt HS,10367773,Roosevelt HS - Electrical Outlet for Changing Tables,Access Compliance,2,Monica Garcia,East,1774901,13523,456 S. Mathews St.,Los Angeles,90033,Provide and install electrical outlet for changing table,5,2016-Q2,2016-Q3,Closeout,20220630 Euclid ES,10367825,Euclid ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1367101,13319,806 Euclid Ave.,Los Angeles,90023,"Remove 2 portable buildings including abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprints.",99,2016-Q4,2017-Q2,Closeout,20220630 Wilmington STEAM Magnet MS,10368745,Wilmington STEAM Magnet MS - Wheelchair Lift,Access Compliance,7,Tanya Ortiz Franklin,South,1849001,13538,1700 Gulf Ave.,Wilmington,90744,Provide and Install portable wheelchair lift in auditorium.,22,2017-Q2,2017-Q2,Closeout,20220630 118th St. ES,10368348,118th St. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1574001,13321,144 E. 118th St.,Los Angeles,90061,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2018-Q4,2019-Q1,Closeout,20220630 Chapman ES,10368327,Chapman ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1298601,13460,1947 Marine Ave.,Gardena,90249,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",195,2018-Q2,2018-Q4,Closeout,20220630 Kingsley ES,10369677,Kingsley ES - Secure Entry Monitoring Stations,Security System,5,Jackie Goldberg,West,1617901,13927,5200 W. Virginia Ave.,Los Angeles,90029,Upgrade secure entry system by adding three access monitoring stations in main office.,12,2018-Q2,2018-Q3,Closeout,20220630 Webster MS,10372522,Webster MS - 2022-23 Prop 39 (Citizens of the World - Mar Vista),Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project is a charter school renovation for Citizens of the World - Mar Vista for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 6 instructional spaces for charter student seats in grades TK-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",30,2022-Q3,2022-Q3,Planning,20220630 Escalante ES,10371611,Escalante ES - Install Secure Entry System,Security System,5,Jackie Goldberg,East,1687301,193566,4443 Live Oak St.,Cudahy,90201,Install new secure entry system at door to main office with three video receivers in main office.,23,2020-Q4,2021-Q2,Closeout,20220630 Arlington Heights ES,10371305,Arlington Heights ES - 2020-21 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1219201,15202,1717 Seventh Ave.,Los Angeles,90019,"This project is a charter school renovation for Global Education Academy #2 for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",17,2020-Q2,2020-Q3,Closeout,20220630 Crenshaw Magnet HS: STEMM,10371845,Crenshaw Magnet HS: STEMM - Energy Conservation Lighting,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,"LADWP will be upgrading existing interior and exterior lights with LED kits or fixtures throughout the campus for increased energy savings. LADPW will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will preform this work with their own funds for an estimated $1,662,796.89. Estimated energy savings is 592,988 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration task and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $344,364 which is 20.71% of the ECM costs.",486,2021-Q2,2021-Q3,Closeout,20220630 Magnolia ES,10368097,Magnolia ES - Portable Removal,Portable Removal,5,Jackie Goldberg,Central,1505501,13302,1626 S. Orchard Ave.,Los Angeles,90006,"Remove/demolish 2 bungalows (28' x 60') and 1 bungalow (24' x 72'), provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to remaining buildings on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",394,2016-Q4,2020-Q1,Closeout,20220630 Bell HS,10104134,Bell HS - Repairs for Compliance with State & Federal Access Requirements,Fire Alarm System,5,Jackie Goldberg,East,1853601,13488,4328 Bell Ave.,Bell,90201,Repairs to Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),275,2015-Q1,2015-Q2,Closeout,20220630 Mount Gleason MS,10372203,Mount Gleason MS - Install Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1824001,13744,10965 Mt. Gleason Ave.,Sunland,91040,Install new electronic free-standing marquee near main pedestrian entrance to school. Single-sided color LED display. Relocate section of chain link fence. Marquee will be installed near top of small hillside.,77,2021-Q4,2022-Q3,Construction,20220630 Atwater ES,10370792,Atwater ES - Secure Entry System,Security System,5,Jackie Goldberg,Central,1223301,13457,3271 Silver Lake Blvd.,Los Angeles,90039,Install new secure entry system,39,2019-Q4,2019-Q4,Closeout,20220630 Banning HS,10371394,Banning HS - CCTV System,Security System,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,Install video surveillance (CCTV) system.,149,2020-Q2,2020-Q2,Closeout,20220630 Gardner ES,10370941,Gardner ES - Technology Upgrade,Communications/Technology Upgrade,4,Nick Melvoin,West,1406801,13354,7450 Hawthorn Ave.,Los Angeles,90046,Purchase (80) Chromebooks and (2) storage carts,26,2019-Q4,2020-Q1,Closeout,20220630 Henry MS,10370871,Henry MS - Purchase Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1817401,13658,17340 San Jose St.,Granada Hills,91344,Purchase classroom furniture (tables and chairs),94,2019-Q4,2020-Q1,Closeout,20220630 Nevin ES,10372228,Nevin ES - Secure Entry System,Security System,5,Jackie Goldberg,Central,1546601,13390,1569 E. 32nd St.,Los Angeles,90011,Install new secure entry system at the Main Office,39,2022-Q1,2022-Q3,Construction,20220630 Westchester Enriched Sciences Magnets,10370630,Westchester Enriched Sciences Magnets - 2019-20 Prop 39 (Westside Innovative School House (WISH) Community School),Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Community School for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 2 charter offices, 1 special education room, and 7 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",34,2019-Q2,2019-Q3,Closeout,20220630 Angeles Mesa ES,10371457,Angeles Mesa ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1212301,13427,2611 W. 52nd St.,Los Angeles,90043,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",480,2020-Q4,2021-Q1,Closeout,20220630 Sunrise ES,10369792,Sunrise ES - 2018-23 Prop 39,Charter Prop 39,2,Monica Garcia,East,1698801,13395,2821 E. 7th St.,Los Angeles,90023,"This project was initially approved in BOE Report No. 429-17/18 for the 2018-19 Prop 39 co-locations as a charter school renovation for Excelencia Charter Academy. This project included 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades K-1. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 7 spaces allocated to the charter and an undefined scope of work. The project was then approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades K-1 and an undefined scope of work. However, the charter school opted to vacate the site and did not continue occupancy in the 2020-21 school year. As a result, the project was amended to include the scope of work required to restore the LAUSD campus to its former condition. The project was next approved in Board of Education Report No. 291-21/22 for 2022-23 Proposition 39 charter co-locations as a vacating project. Therefore, this project is amended to include the scope of work necessary to return the site to it previous conditions, as appropriate.",324,2020-Q3,2020-Q3,Closeout,20220630 3rd St. ES,10369711,3rd St. ES - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1711001,13399,201 S. June St.,Los Angeles,90004,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 13 doors, 46 door hardware, 25 thresholds, accessible paths of travel, 60 signs, 9 restrooms, 4 drinking fountains, 1 assistive listening devices/intercoms/phones, 2 concrete ramps, 2 metal ramps, 7 assembly seats, 2 playground component (playground matting), 1 cafeteria counter, and 1 new elevator/stage lift.","3,911",2021-Q3,2022-Q4,Construction,20220630 Escalante ES,10367615,Escalante ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1687301,193566,4443 Live Oak St.,Cudahy,90201,Modernize parent & family center by providing interior paint and refinishing floors. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.,27,2016-Q2,2017-Q2,Closeout,20220630 Breed ES,10371917,Breed ES - Energy Conservation Lighting,Electrical/Lighting,2,Monica Garcia,East,1249301,13281,2226 E. 3rd St.,Los Angeles,90033,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $449,652. Estimated energy savings is 545,097 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $111,938 which is 24.89% of the ECM costs.",112,2022-Q4,2023-Q1,Planning,20220630 Gledhill ES,10371973,Gledhill ES - Install Ramp,Access Compliance,6,Kelly Gonez,Northwest,1413001,13746,16030 Gledhill St.,North Hills,91343,Install TMP ramp at classroom 28. Convert psych eval office to changing room and provide hi-lo changing table.,108,2021-Q4,2022-Q1,Closeout,20220630 Highland Park Continuation HS,10371661,Highland Park Continuation HS - Replace Faculty Kitchenette,Campus Improvement,2,Monica Garcia,Central,1864501,16421,928 N. Ave. 53,Los Angeles,90042,"Remove and replace deteriorated kitchenette and cabinets in faculty lounge with new cabinets, countertops, and sink.",32,2021-Q1,2021-Q2,Closeout,20220630 Short ES,10371623,Short ES - Purchase New Classroom Furniture,Furniture/Fixtures/Equipment,4,Nick Melvoin,West,1674001,13679,12814 Maxella Ave.,Los Angeles,90066,"Purchase new furniture for rooms 2, 7, and 27 for 1st grade students: 12 student tables, 6 storage benches, and 9 bookcases.",14,2021-Q2,2021-Q2,Closeout,20220630 Malabar ES,10371508,Malabar ES - Install Secure Entry System,Security System,2,Monica Garcia,East,1508201,13314,3200 E. Malabar St.,Los Angeles,90063,Install new secure entry system at entrance to main office with two video receivers in main office.,42,2020-Q4,2020-Q4,Closeout,20220630 Plummer ES,10367092,Plummer ES - Antiquated Roofing,Roofing,6,Kelly Gonez,Northwest,1612301,13878,9340 Noble Ave.,North Hills,91343,"This project is to upgrade 52,900 square feet of roofing on 13 buildings and all of the arcades throughout the campus with a PVC material. The roofs are over 40 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",545,2016-Q1,2016-Q4,Closeout,20220630 Vaughn Next Century Learning Center,10366112,Vaughn Next Century Learning Center - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1745201,13756,13330 Vaughn St.,San Fernando,91340,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",325,2015-Q2,2015-Q3,Closeout,20220630 White MS,10366117,White MS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1848701,13708,22102 S. Figueroa St.,Carson,90745,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",555,2015-Q2,2015-Q3,Closeout,20220630 156th St. ES,10363854,156th St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1580801,13673,2100 W. 156th St.,Gardena,90249,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",218,2014-Q4,2015-Q1,Closeout,20220630 61st St. ES,10363863,61st St. ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1680801,13370,6020 S. Figueroa St.,Los Angeles,90003,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",279,2014-Q4,2015-Q1,Closeout,20220630 Ann ES,10363877,Ann ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1213701,13286,126 E. Bloom St.,Los Angeles,90012,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",356,2015-Q2,2016-Q1,Closeout,20220630 Brainard ES,10363886,Brainard ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1248601,13834,11407 Brainard Ave.,Lake View Terrace,91342,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",239,2014-Q3,2014-Q4,Closeout,20220630 Brentwood Science Magnet ES,10363887,Brentwood Science Magnet - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1250701,13394,740 Gretna Green Way,Los Angeles,90049,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",437,2014-Q2,2014-Q3,Closeout,20220630 Clifford Math & Technology Magnet ES,10363907,Clifford ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1311001,13309,2150 Duane St.,Los Angeles,90039,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",168,2014-Q4,2015-Q1,Closeout,20220630 Alta Loma ES,10103387,Alta Loma ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,1,"Dr. George J. McKenna, III",West,1208201,13402,1745 Vineyard Ave.,Los Angeles,90019,Mitigate Lead in Water,194,2013-Q2,2015-Q3,Closeout,20220630 City Terrace ES,10366345,City Terrace ES - Laptops,Communications/Technology Upgrade,2,Monica Garcia,East,1309601,13490,4350 City Terrace Dr.,Los Angeles,90063,Increase school's access to technology by providing laptop computers,36,2014-Q3,2014-Q3,Closeout,20220630 El Sereno ES,10365191,El Sereno ES - Security Upgrades,Security System,2,Monica Garcia,East,1356201,13387,3838 Rosemead Ave.,Los Angeles,90032,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,16,2014-Q1,2016-Q4,Closeout,20220630 Magnolia ES,10365719,Magnolia ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1505501,13302,1626 S. Orchard Ave.,Los Angeles,90006,Replace deteriorated playground matting systems to ensure the health and safety of students.,39,2015-Q3,2015-Q3,Closeout,20220630 Pacific ES,10366080,Pacific ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1464201,13936,2660 E. 57th St.,Huntington Park,90255,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",382,2015-Q1,2015-Q2,Closeout,20220630 Westchester Enriched Sciences Magnets,10368783,Westchester Enriched Sciences Magnets - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 14 doors, 42 door hardware, 10 thresholds, accessible paths of travel, 51 signs, 19 restrooms, 14 drinking fountains/sinks, 7 assistive listening devices/intercoms/phones, 13 concrete ramps, 4 metal ramps, 1 piece of accessible furniture, 1 assembly seat, 6 arcades, 2 railings, 3 locker room modifications/lockers, 4 casework/counters, 1 changing room, 3 new elevators/stage lifts and associated upgrades to 3 stages, and 1 passenger/bus loading zone.","19,813",2021-Q4,2023-Q4,Construction,20220630 Angel's Gate Continuation HS,10365996,Angel's Gate Continuation HS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1885201,13943,3607 S. Gaffey St.,San Pedro,90731,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",110,2014-Q4,2015-Q1,Closeout,20220630 Taper ES,10366813,Taper ES- ADA Repairs,Access Compliance,7,Tanya Ortiz Franklin,South,1703501,13539,1824 Taper Ave.,San Pedro,90731,ADA repairs,16,2015-Q2,2015-Q3,Closeout,20220630 Leichman Career Preparatory & Transition Center,10366057,Leichman Special Education HS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,Northwest,1190801,13887,19034 Gault St.,Reseda,91335,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",194,2014-Q4,2015-Q1,Closeout,20220630 Saticoy ES,10363995,Saticoy ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1656501,13363,7850 Ethel Ave.,North Hollywood,91605,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",382,2014-Q2,2014-Q4,Closeout,20220630 Wilmington Park EEC,10367370,Wilmington Park EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1958501,16300,1419 Young St.,Wilmington,90744,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",92,2016-Q3,2016-Q4,Closeout,20220630 Griffith STEAM Magnet MS,10367183,Griffith MS-Stage Lift,Access Compliance,2,Monica Garcia,East,1816801,13646,4765 E. 4th St.,Los Angeles,90022,Provide and install portable stage lift.,31,2015-Q3,2015-Q4,Closeout,20220630 Fulton College Preparatory School,10366236,Fulton College Preparatory School - 2014-15 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,"This project is a charter school renovation for Lashon Academy for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 7 classrooms for 162.24 charter student seats in grades K-2. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",182,2014-Q2,2014-Q3,Closeout,20220630 Bravo Medical Magnet HS,10107476,Bravo Medical Magnet HS - CTE Bioengineering Lab,Career Technical Education,2,Monica Garcia,East,1875401,13336,1200 N. Cornwell St.,Los Angeles,90033,Procure Medical Equipment for Bioengineering Lab,156,2014-Q1,2014-Q2,Closeout,20220630 Trinity EEC,10367364,Trinity EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1956901,16689,3816 Trinity St.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",80,2016-Q3,2016-Q3,Closeout,20220630 Monroe HS,10345939,Monroe HS - Health Center,Campus Improvement,6,Kelly Gonez,Northwest,1876801,13704,9229 Haskell Ave.,North Hills,91343,Health Center,"1,000",2014-Q1,2014-Q4,Closeout,20220630 Warner ES,10366581,Warner ES - Security & Safety Upgrades,Campus Improvement,4,Nick Melvoin,West,1761601,13481,615 Holmby Ave.,Los Angeles,90024,Provide security upgrades by installing new security lighting in the entrance courtyard. Provide safety upgrades by installing one HVAC mini split system in the MDF server room to prevent data systems from overheating and shutting down.,16,2015-Q1,2015-Q3,Closeout,20220630 Dana MS,10367085,Dana MS - Antiquated Roofing,Roofing,7,Tanya Ortiz Franklin,South,1810401,15063,1501 S. Cabrillo Ave.,San Pedro,90731,"This project is to upgrade 37,000 square feet of roofing on 8 buildings with a Polyvinyl Chloride (PVC) material. The roofs are over 24 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",501,2016-Q1,2016-Q2,Closeout,20220630 107th St. ES,10367479,107th St. ES - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1585701,13857,147 E. 107th St.,Los Angeles,90003,Provide and install electronic marquee.,32,2017-Q3,2018-Q1,Closeout,20220630 Ambler ES,10367543,Ambler ES - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1208901,13833,319 E. Sherman Dr.,Carson,90746,Provide and install electronic marquee.,52,2018-Q4,2019-Q1,Closeout,20220630 Nobel Charter MS,10367262,Nobel MS- Campus Improvements,Access Compliance,3,Scott Schmerelson,Northwest,1827201,13805,9950 Tampa Ave.,Northridge,91324,restroom upgrades,1,2015-Q4,2015-Q4,Closeout,20220630 Fries ES,10366760,Fries ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1401401,13463,1301 Fries Ave.,Wilmington,90744,"Modernize and upgrade school's existing parent & family center by providing interior paint, flooring and lighting repairs, and security upgrades including new doors and hardware as well as security on windows. Provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",84,2015-Q1,2015-Q4,Closeout,20220630 Kennedy HS,10102222,"Kennedy HS - Facilities Upgrades - Academy Offices, Outdoor Spaces, Visual Identity",Small Learning Community/Academy,3,Scott Schmerelson,Northwest,1872501,13263,11254 Gothic Ave.,Granada Hills,91344,"Facilities Upgrades - Academy Offices, Outdoor Spaces, Visual Identity","1,744",2013-Q3,2014-Q2,Closeout,20220630 Albion ES,10367769,Albion ES - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1201401,13296,322 S. Ave. 18,Los Angeles,90031,Modify kindergarten & girls' restrooms for changing tables.,26,2016-Q2,2016-Q3,Closeout,20220630 West Hollywood Community Day School,10369551,West Hollywood Community Day School - Security & Safety Upgrades,Security System,4,Nick Melvoin,West,1873001,13901,1049 N. Fairfax Ave.,West Hollywood,90046,Provide security and safety upgrades by installing a chain link fence and pedestrian gate with a secure entry system at the front of the school.,33,2018-Q2,2018-Q3,Closeout,20220630 Pacoima MS,10369043,Pacoima MS - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1832101,13750,9919 Laurel Canyon Blvd.,Pacoima,91331,"Removal of 6 bungalow buildings (sell 2 and demolish 4). Request environmental reports. Abatement of hazardous materials, disconnect high and low voltage utilities, and repair/replace asphalt at building footprints.",455,2017-Q3,2019-Q1,Closeout,20220630 Curtiss MS,10368340,Curtiss MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1810301,13775,1254 E. Helmick St.,Carson,90746,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",126,2017-Q4,2018-Q2,Closeout,20220630 2nd St. ES,10371110,2nd St. ES - Campus Improvement,Campus Improvement,2,Monica Garcia,East,1657501,13326,1942 E. 2nd St.,Los Angeles,90033,Provide and install new automatic rolling gate with pedestal video buzzer and card reader.,58,2020-Q1,2020-Q4,Closeout,20220630 Broadous ES,10368959,Broadous ES - Shade Shelter,Lunch/Shade Shelter,6,Kelly Gonez,Northeast,1382901,13768,12561 Filmore St.,Pacoima,91331,Install 1 shade structure at kindergarten yard and provide Americans with Disabilities Act (ADA) compliant path of travel.,240,2020-Q2,2021-Q2,Closeout,20220630 King-Drew Medicine & Science Magnet HS,10367507,King-Drew Medicine & Science Magnet HS - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1872701,14561,1656 E. 118th St.,Los Angeles,90059,"This project replaces approximately 64,859 square feet of deteriorated roofing with new PVC roofing and metal flashing. The project will remove and replace deteriorated Kalwall panels throughout as well as the deteriorated waterproofing system at the exterior basketball court. The scope of work also includes the replacement of damaged wood in kind and deteriorated roof insulation; painting to match existing areas affected in the roof demolition; and existing roof-mounted HVAC units and ductwork will be protected in place.","1,223",2022-Q3,2023-Q3,Planning,20220630 Hawaiian ES,10368034,Hawaiian ES - Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1446601,13648,540 Hawaiian Ave.,Wilmington,90744,Modify kindergarten Jack & Jill restroom; provide and install folding changing table.,4,2016-Q4,2017-Q1,Closeout,20220630 Belvedere MS,10105892,Belvedere MS - Compliance with State & Federal Access Requirements,Fire Alarm System,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),726,2016-Q2,2016-Q4,Closeout,20220630 Baldwin Hills ES,10369665,Baldwin Hills ES - Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1227401,13595,5421 Rodeo Rd.,Los Angeles,90016,Install new electronic free-standing marquee.,30,2018-Q2,2018-Q3,Closeout,20220630 Langdon ES,10365103,Langdon ES - Provide New Literacy Garden,Library Renovation,6,Kelly Gonez,Northwest,1477501,13413,8817 Langdon Ave.,North Hills,91343,"Provide a new literacy garden by including concrete work, seating area, new irrigation and landscaping.",50,2015-Q1,2016-Q1,Closeout,20220630 Fairburn ES,10369071,Fairburn ES - Playground Upgrades,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1372601,13445,1403 Fairburn Ave.,Los Angeles,90024,Modify the large playground equipment by replacing overhead climbing bars and ladders with safer enclosed tunnels and slides.,35,2017-Q4,2018-Q2,Closeout,20220630 Stevenson College & Career Preparatory,10366321,Stevenson College & Career Preparatory - Ceiling System Improvements,Seismic Modernization,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"Repair 1,000 square feet of suspended ceiling systems in 017CAS classroom building for seismic corrections and to improve structural integrity. Scope of work includes installation of new seismic compression struts, and hanger wire upgrades per code requirements, as well as abatement of asbestos and removing impacted components beyond their remaining service life.",150,2019-Q4,2020-Q1,Closeout,20220630 Polytechnic HS,10367093,Polytechnic HS - Gym Wood Floors & Wall Systems,Flooring,6,Kelly Gonez,Northeast,1863601,13734,12431 Roscoe Blvd.,Sun Valley,91352,This project will replace the wood floors in the Gymnasium Building and rehabilitate adjacent wall systems. The existing floors are over 50 years old and are in poor condition resulting in a hazardous condition at the site.,631,2016-Q1,2016-Q3,Closeout,20220630 Bethune MS,10370682,Bethune MS - Flooring,Flooring,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,"This project is to replace approximately 126,000 square feet of deteriorated vinyl tile, rubber tile and hardwood flooring.","4,812",2022-Q4,2024-Q4,Planning,20220630 Allesandro ES,10370121,Allesandro ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1206801,13367,2210 Riverside Dr.,Los Angeles,90039,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2025-Q2,2025-Q3,Planning,20220630 Harbor Occupational Center,10003632,Fort MacArthur Auto Shop Conversion,Reconfiguration,7,Tanya Ortiz Franklin,South,1918001,13779,740 N. Pacific Ave.,San Pedro,90731,"This project includes developing an auto shop with 6 above ground lifts, one new classroom on the existing second floor space east of the auto shop, new boys' and girls' as well as faculty unisex restrooms, and new level outdoor area in the courtyard to be accessible to the second floor.","4,728",2015-Q4,2017-Q4,Closeout,20220630 Dolores ES,10369481,Dolores ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1345201,13711,22526 Dolores St.,Carson,90745,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",225,2022-Q4,2023-Q3,Planning,20220630 Lawrence MS,10366560,Lawrence MS-Demolish 2 Portables,Portable Removal,3,Scott Schmerelson,Northwest,1821701,13695,10100 Variel Ave.,Chatsworth,91311,"Removal of 2 Portables; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",176,2015-Q4,2016-Q2,Closeout,20220630 Ford ES,10363931,Ford ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1391801,13503,1112 S. Ford Blvd.,Los Angeles,90022,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",435,2014-Q3,2014-Q4,Closeout,20220630 Fremont HS,10363934,Fremont HS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1865001,13475,7676 S. San Pedro St.,Los Angeles,90003,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",60,2014-Q4,2016-Q1,Closeout,20220630 Hillcrest ES,10370419,Hillcrest ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1452801,13621,4041 Hillcrest Dr.,Los Angeles,90008,Install new secure entry system,31,2019-Q2,2019-Q3,Closeout,20220630 Washington Preparatory HS,10367408,Washington Preparatory HS - Roofing,Roofing,1,"Dr. George J. McKenna, III",West,1892801,13560,10860 S. Denker Ave.,Los Angeles,90047,"This project is to upgrade 26,800 square feet of roofing on 7 buildings and arcades with a Polyvinyl Chloride (PVC) material. The roofs are over 25 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",465,2016-Q2,2016-Q2,Closeout,20220630 Haynes Charter for Enriched Studies,10366726,Haynes Charter for Enriched Studies - Shade Structure,Lunch/Shade Shelter,3,Scott Schmerelson,Northwest,1447301,13793,6624 Lockhurst Dr.,West Hills,91307,This project will provide a shade shelter over the existing play structure in the main playground plus associated accessibility improvements.,184,2016-Q1,2016-Q3,Closeout,20220630 Carver MS,10369943,Carver MS - Replace Synthetic Turf Soccer Field,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1809401,13409,4410 McKinley Ave.,Los Angeles,90011,"This project is to replace approximately 88,000 square feet of deteriorated synthetic turf at the soccer field. The scope of work includes installing new drainage and irrigation systems and cleaning the existing field drainage and providing irrigation repairs.","1,560",2019-Q1,2019-Q3,Closeout,20220630 Peary MS,10368331,Peary MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1835201,13625,1415 W. Gardena Blvd.,Gardena,90247,"Replace deteriorated interior walk-in cooler and exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",205,2018-Q2,2019-Q1,Closeout,20220630 Harrison ES,10368365,Harrison ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1443801,13528,3529 City Terrace Dr.,Los Angeles,90063,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",173,2017-Q3,2018-Q3,Closeout,20220630 Marina Del Rey MS,10364052,Marina Del Rey MS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",632,2014-Q1,2014-Q3,Closeout,20220630 Coliseum ES,10369262,Coliseum ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1317801,13593,4400 Coliseum St.,Los Angeles,90016,"Removal of 3 portable buildings. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprints.",92,2018-Q1,2018-Q2,Closeout,20220630 Westchester Enriched Sciences Magnets,10368352,Westchester Enriched Sciences Magnets - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",231,2019-Q1,2020-Q1,Closeout,20220630 Venice HS,10105219,Venice HS - A/C for Classrooms + Office,HVAC,4,Nick Melvoin,West,1890701,13513,13000 Venice Blvd.,Los Angeles,90066,A/C for Classrooms + Office,"15,345",2014-Q3,2016-Q3,Closeout,20220630 Playa Del Rey ES,10367882,Playa Del Rey ES - HVAC,HVAC,4,Nick Melvoin,West,1611001,13559,12221 Juniette St.,Culver City,90230,Provide new air conditioning unit for resource room in bungalow A-307.,68,2018-Q1,2018-Q3,Closeout,20220630 Doyle Career & Transition Center,10369820,Doyle Career & Transition Center - Secure Entry Systems,Security System,7,Tanya Ortiz Franklin,South,1191201,13855,15805 S. Budlong Ave.,Gardena,90247,Install one secure entry system at the main entrance and one at the entrance to the Therapy Unit.,43,2018-Q3,2019-Q1,Closeout,20220630 Arminta EEC,10367298,Arminta EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1950301,16687,7911 Goll Ave.,North Hollywood,91605,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",74,2016-Q3,2016-Q3,Closeout,20220630 Marianna ES,10363970,Marianna ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1513701,13479,4215 E. Gleason St.,Los Angeles,90063,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",295,2014-Q3,2014-Q4,Closeout,20220630 Monroe HS,10363977,Monroe HS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northwest,1876801,13704,9229 Haskell Ave.,North Hills,91343,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",60,2014-Q2,2014-Q3,Closeout,20220630 Ranchito ES,10363988,Ranchito ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1619201,13721,7940 Ranchito Ave.,Panorama City,91402,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",334,2014-Q2,2014-Q3,Closeout,20220630 1st St. ES,10105884,1st St. ES - Compliance with State & Federal Access Requirements,Fire Alarm System,2,Monica Garcia,East,1383601,13267,2820 E. 1st St.,Los Angeles,90033,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),433,2015-Q1,2015-Q2,Closeout,20220630 Cochran MS,10367250,Cochran MS - Roofing,Roofing,1,"Dr. George J. McKenna, III",West,1824501,13574,4066 Johnnie Cochran Vista,Los Angeles,90019,"This project is to upgrade 87,552 square feet of roofing on sight buildings and arcades with a Polyvinyl Chloride (PVC) material. The roofs are over 25 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.","2,036",2017-Q1,2017-Q3,Closeout,20220630 Granada ES,10369118,Granada Community Charter ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1423301,13561,17170 Tribune St.,Granada Hills,91344,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",36,2018-Q1,2018-Q3,Closeout,20220630 Locke EEC,10372555,Locke EEC - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1953101,16288,320 E. 111th St.,Los Angeles,90061,"Install new electronic, free-standing marquee. No existing marquee. Install new marquee near the front of the school at corner of 111th St. & San Pedro St. Approx. 80 feet underground and 100 feet above-ground conduit required. Double-sided 8 ftx5ft color LED display.",79,2022-Q3,2022-Q4,Planning,20220630 Camino Nuevo Academy #4: Cisneros Learning Academy,10372604,Camino Nuevo Academy #4: Cisneros Learning Academy - Secure Entry System,Security System,5,Jackie Goldberg,Central,1225101,14583,1018 Mohawk St.,Los Angeles,90026,This project is to provide a secure entry system at the main entrance.,36,2022-Q3,2022-Q3,Planning,20220630 Pacoima Charter ES,10370511,Pacoima Charter ES - Roofing,Roofing,6,Kelly Gonez,Northeast,1597301,13417,11016 Norris Ave.,Pacoima,91331,"This project is to provide approximately 34,000 square feet of new roofing at nine buildings (including Annex), including new gutters and downspouts, and painting of affected areas.",908,2021-Q4,2022-Q3,Construction,20220630 Stonehurst STEAM Magnet ES,10370838,Stonehurst STEAM Magnet ES - Accessibility Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1694501,13653,9851 Stonehurst Ave.,Sun Valley,91352,Provide ADA access to kindergarten play area.,82,2019-Q4,2021-Q1,Closeout,20220630 Garcetti Learning Academy,10372406,Garcetti Learning Academy - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",South,1679501,13318,612 W. 68th St.,Los Angeles,90044,Install new secure entry system at the Main Office.,31,2022-Q2,2022-Q3,Construction,20220630 Grant EEC,10005036,Grant EEC - Safety Upgrades and Improvements,Campus Improvement,5,Jackie Goldberg,West,1951901,16688,1559 N. St. Andrews Pl.,Los Angeles,90028,"Upgrade entry control system, plumbing systems in restrooms, and exterior gates",32,2014-Q1,2015-Q1,Closeout,20220630 Wilmington STEAM Magnet MS,10364151,Wilmington STEAM Magnet MS - Remove Damaged Building,Portable Removal,7,Tanya Ortiz Franklin,South,1849001,13538,1700 Gulf Ave.,Wilmington,90744,Remove Damaged Building,178,2012-Q3,2014-Q4,Closeout,20220630 Pueblo de LA Continuation HS,10366576,Pueblo de LA Continuation HS - SEEDS,SEEDS,2,Monica Garcia,East,1873101,16522,2506 Alta St.,Los Angeles,90031,"Design and construct an outdoor learning space of approximately 1,000 square feet consisting of the installation of decomposed granite, concrete pavers, concrete perimeter header and art poles. It will be outfitted by the school site (Pueblo de LA Continuation HS) with planting materials, outdoor seating and art poles.",14,2015-Q1,2015-Q2,Closeout,20220630 Miles EEC,10106724,Miles EEC - Repair Security Chainlink Fence with Pedestrian Gate,Fencing,5,Jackie Goldberg,East,1953501,16663,2855 Saturn Ave.,Huntington Park,90255,Repair Security Chainlink Fence with Pedestrian Gate,13,2014-Q2,2014-Q2,Closeout,20220630 Collins EEC,10104614,Collins EEC - Paint All Exteriors & Interiors,Painting,1,"Dr. George J. McKenna, III",West,1951601,16625,901 W. 52nd St.,Los Angeles,90037,Paint All Exteriors & Interiors,113,2015-Q4,2016-Q4,Closeout,20220630 Manhattan ES,10369542,Manhattan ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1511001,13685,1850 W. 96th St.,Los Angeles,90047,"Removal of 2 portable buildings. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprints.",330,2018-Q3,2019-Q3,Closeout,20220630 Fremont HS,10370102,Fremont HS - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1865001,13475,7676 S. San Pedro St.,Los Angeles,90003,"The project will replace approximately 4,000 square feet of deteriorated roofing on three classroom buildings with new PVC roofing membrane. Additionally, the project will replaced 70 lineal feet of deteriorated gutter and 700 square feet of deteriorated pedestrian traffic coating on a two-story classroom building.",110,2019-Q2,2019-Q2,Closeout,20220630 Sierra Park ES,10371690,Sierra Park ES - Install Secure Entry System,Security System,2,Monica Garcia,East,1675301,13391,3170 Budau Ave.,Los Angeles,90032,Install new secure entry system at main entrance gate with three receivers in the main office.,43,2021-Q1,2021-Q2,Closeout,20220630 Castle Heights ES,10369342,Castle Heights ES - Classroom Replacement,Addition,1,"Dr. George J. McKenna, III",West,1287701,13680,9755 Cattaraugus Ave.,Los Angeles,90034,"The school has 10 classrooms located in 7 relocatable buildings with 4 of the classrooms in 2 DOH portables that do not comply with State standards for school buildings, although 1 classroom is projected to continue to be excess capacity. Included in the project design are approximately 9 classrooms and support spaces; infrastructure to support the new facilities including an enhanced information technology network convergence system; upgrades to landscape, hardscape, parking, and playground areas where portables are removed or in other project-related areas; and site work, path of travel, and other required ADA improvements.","28,541",2022-Q4,2026-Q1,Design,20220630 Parthenia Academy of Arts & Technology,10003984,Parthenia ES - Library & Kitchen Upgrades,Campus Improvement,3,Scott Schmerelson,Northwest,1602701,13702,16825 Napa St.,North Hills,91343,Expand library by converting a classroom to a reading room; Add an extra serving window to the kitchen,127,2014-Q4,2015-Q2,Closeout,20220630 Fremont-Washington Community Adult School,10365658,Fremont-Washington Community Adult School - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1915401,13475,7676 S. San Pedro St.,Los Angeles,90003,"Demolish/Remove 1 Portable Building; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",105,2014-Q4,2015-Q3,Closeout,20220630 Southeast MS,10366480,Southeast MS - New Concrete Walkways,Paving/Greening/Playground Equipment,5,Jackie Goldberg,East,1815301,16081,2560 Tweedy Blvd.,South Gate,90280,Provide new concrete walkways to prevent dirt from being tracked into classrooms,35,2014-Q4,2014-Q4,Closeout,20220630 Monlux ES,10364120,Monlux ES - HVAC,HVAC,6,Kelly Gonez,Northeast,1534201,13591,6051 Bellaire Ave.,North Hollywood,91606,The project will replace deteriorated rooftop units in eight classroom buildings with new energy efficient rooftop units. The equipment is more than 30 years old and requires frequent service.,419,2014-Q1,2014-Q4,Closeout,20220630 Hooper PC,10363956,Hooper PC - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1457601,13849,1280 E. 52nd St.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",273,2014-Q2,2015-Q3,Closeout,20220630 Arminta ES,10363879,Arminta ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1220501,13710,11530 Strathern St.,North Hollywood,91605,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",303,2014-Q3,2014-Q4,Closeout,20220630 Vladovic Harbor Teacher Preparation Academy,10003668,Harbor Teacher Preparation Academy Redevelopment,New School,7,Tanya Ortiz Franklin,South,1851801,14589,1111 Figueroa Pl.,Wilmington,90744,"The District intends to build a new permanent facility for the existing Harbor Teacher Preparation Academy (HTPA) on the Los Angeles Harbor College (LAHC) campus. The project will provide a permanent facility for HTPA, which has been housed in temporary portable classrooms on the LAHC campus, and includes classrooms, administration offices, food service area, lunch shelter, and library. The District and Los Angeles Community College District (LACCD) entered into a Development and Long-Term Lease Agreement in March 2014 which allowed LACCD to initiate planning and design of the project.","31,495",2017-Q1,2018-Q3,Closeout,20220630 Manhattan ES,10372165,Manhattan ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1511001,13685,1850 W. 96th St.,Los Angeles,90047,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",548,2022-Q2,2022-Q4,Construction,20220630 Gage MS,10371077,Gage MS - Secure Entry System,Security System,5,Jackie Goldberg,East,1815101,13598,2880 E. Gage Ave.,Huntington Park,90255,Install new secure entry system,28,2020-Q2,2020-Q3,Closeout,20220630 Woodlake Community Charter ES,10372303,Woodlake ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1787701,13686,23231 Hatteras St.,Woodland Hills,91367,Install new secure entry system at the Main Office.,37,2022-Q3,2022-Q4,Planning,20220630 Harte Preparatory MS,10372496,Harte Preparatory MS - 2022-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1817001,13612,9301 S. Hoover St.,Los Angeles,90044,"This project is a charter school renovation for VOX Collegiate of Los Angeles for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 9 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",672,2022-Q3,2022-Q3,Planning,20220630 Hobart ES,10372627,Hobart ES - Secure Entry System,Security System,5,Jackie Goldberg,Central,1454801,13331,980 S. Hobart Blvd.,Los Angeles,90006,Install new secure entry system at the Main Office.,58,2022-Q3,2022-Q3,Planning,20220630 Dayton Heights ES,10363915,Dayton Heights ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1335601,13352,607 N. Westmoreland Ave.,Los Angeles,90004,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",280,2014-Q3,2014-Q4,Closeout,20220630 Carver MS,10102674,Carver MS - Non Air-Conditioned Classrooms & MDF Room,HVAC,5,Jackie Goldberg,Central,1809401,13409,4410 McKinley Ave.,Los Angeles,90011,Non Air-Conditioned Classrooms & MDF Room,53,2014-Q1,2014-Q2,Closeout,20220630 Dahlia Heights ES,10365128,Dahlia Heights ES - Laptops,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1332901,13308,5063 Floristan Ave.,Los Angeles,90041,Purchase laptop computers to provide internet and intranet access for students and teachers,38,2014-Q3,2014-Q3,Closeout,20220630 President ES,10372020,President ES - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1614801,13765,1465 W. 243rd St.,Harbor City,90710,Install new electronic free-standing marquee at corner of President Ave. and 243rd St. Remove deteriorated wall-mounted marquee from Main Bldg.,71,2022-Q1,2022-Q3,Construction,20220630 Middleton PC,10370437,Middleton PC - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1530201,13926,2410 Zoe Ave.,Huntington Park,90255,Purchase 120 iPads and 3 charging carts and secure room for storage.,75,2019-Q1,2019-Q2,Closeout,20220630 Widney Special Education HS,10372544,Widney Special Education HS - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",Central,1191401,15163,2302 S. Gramercy Pl.,Los Angeles,90018,Install new secure entry system at the Main Office.,41,2024-Q2,2024-Q3,Planning,20220630 Sunrise ES,10371150,Sunrise ES - Auditorium Upgrades,Auditorium Renovation,2,Monica Garcia,East,1698801,13395,2821 E. 7th St.,Los Angeles,90023,"Provide and install new audio, visual and lighting equipment in auditorium.",88,2020-Q2,2020-Q3,Closeout,20220630 Burbank Arts Tech Community Magnet MS,10369428,Burbank Arts Tech Community Magnet MS - Roofing,Roofing,2,Monica Garcia,Central,1806601,13551,6460 N. Figueroa St.,Los Angeles,90042,"The project replaces 55,326 square feet of deteriorated roofing with new Polyvinyl Chloride (PVC) material and metal flashing on 11 buildings. The scope of work also includes replacing damaged wood, installing new gutters and downspouts, painting to match existing areas affected in the roof demolition, and replacing skylight windows in 1 building. The project removes and replaces existing heating, ventilation, and air conditioning (HVAC) units and equipment on 3 buildings. The remaining buildings with existing roof-mounted HVAC units and ductwork will have the equipment protected in place.","1,152",2018-Q3,2019-Q2,Closeout,20220630 Aldama ES,10372198,Aldama ES - Purchase Lunch Tables,Furniture/Fixtures/Equipment,2,Monica Garcia,Central,1202701,13401,632 N. Ave. 50,Los Angeles,90042,Purchase (4) exterior lunch tables with umbrellas,13,2021-Q4,2022-Q3,Construction,20220630 Murchison EEC,10372103,Murchison EEC - SEEDS,SEEDS,2,Monica Garcia,East,1953701,16665,1537 Murchison St.,Los Angeles,90033,"Construct an outdoor learning and gathering space of approximately 2,000 square feet. Includes the installation of decomposed granite and cement brush off areas, composite wood headers to create in-ground planting areas, new trees, a new irrigation system, log benches and stools to create a classroom gathering space gathering space. The project will be outfitted by the school site with native and flowering plants to attract hummingbirds and butterflies.",100,2022-Q3,2022-Q4,Planning,20220630 Revere Charter MS,10372314,Revere Charter MS - Provide Outdoor Reading Area,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1835601,13665,1450 Allenford Ave.,Los Angeles,90049,Install concrete in grass/dirt area on campus. Cap irrigation and install trough drainage system. Preparing areas for concrete benches the school will purchase.,33,2022-Q2,2022-Q4,Construction,20220630 Miramonte ES,10368358,Miramonte ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1532901,13323,1400 E. 68th St.,Los Angeles,90001,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",155,2022-Q3,2023-Q2,Planning,20220630 Hillcrest ES,10368816,Hillcrest ES - 2017-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1452801,13621,4041 Hillcrest Dr.,Los Angeles,90008,"This project was approved in Board of Education Report No. 530-16/17 as a 2017-18 Proposition 39 charter co-location. The charter operator, City Language Immersion Charter did not occupy Hillcrest ES during the 2017-18 academic year. As a result, the scope of work changed from a co-location to vacating the site which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",9,2017-Q2,2017-Q2,Closeout,20220630 Mikes EEC,10005000,Mikes EEC - Nature Explore Classroom,Campus Improvement,1,"Dr. George J. McKenna, III",South,1959101,16682,7720 S. Vermont Ave.,Los Angeles,90044,Design and construct new nature explore classroom including required fire alarm upgrades and restroom accessibility upgrades.,"2,047",2016-Q3,2017-Q3,Closeout,20220630 Reseda Charter HS,10368332,Reseda Charter HS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",137,2017-Q3,2018-Q2,Closeout,20220630 Lane ES,10371852,Lane ES - Purchase Lunch Tables,Furniture/Fixtures/Equipment,2,Monica Garcia,East,1476701,13629,1500 Avenida Cesar Chavez,Monterey Park,91754,Replace (10) deteriorated folding lunch tables with (12) new folding lunch tables.,28,2021-Q2,2021-Q4,Closeout,20220630 Shirley ES,10372105,Shirley ES - ADA Changing Room,Access Compliance,4,Nick Melvoin,Northwest,1671201,13671,19452 Hart St.,Reseda,91335,Convert an existing storage room next to Room 10 into a Restroom & Changing room. Provide necessary ADA upgrades for DSA certification.,247,2022-Q3,2022-Q4,Design,20220630 Mann UCLA Community School,10370251,Mann UCLA Community School - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1757401,13534,7001 S. St. Andrews Pl.,Los Angeles,90047,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q4,2028-Q1,Planning,20220630 6th Ave. ES,10370513,6th Ave. ES - Parking Lot Fencing,Fencing,1,"Dr. George J. McKenna, III",West,1678101,13425,3109 Sixth Ave.,Los Angeles,90018,Install chain link fence to expand northwest parking lot,23,2019-Q2,2019-Q3,Closeout,20220630 42nd St. ES,10371302,42nd St. ES - 2020-22 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1395901,13487,4231 Fourth Ave.,Los Angeles,90008,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for ISANA Nascent Academy. This project included 1 charter office, 1 special education room, and 14 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 13 instructional spaces for charter student seats in grades K-8 and an undefined scope of work.",99,2021-Q3,2021-Q3,Closeout,20220630 Maclay MS,10371919,Maclay MS - Energy Conservation Lighting,Electrical/Lighting,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $1,525,308. Estimated energy savings is 545,097 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $276,735 which is 18.14% of the ECM costs.",277,2022-Q4,2023-Q1,Planning,20220630 Burton ES,10371943,Burton ES - HVAC Pilot (Climate Wizard),HVAC,6,Kelly Gonez,Northeast,1265801,13540,8111 Calhoun Ave.,Panorama City,91402,"This project will replace two (2) existing 5 ton Trane HVAC roof top units (RTUs) with two (2) new Seeley CW-DX Hybrid Heat Pump RTUs at the following District site, Burton Elementary School on Building 'D' to demonstrate energy consumption savings and energy cost savings. This Pilot Project will test an emerging technology and the measurement and verification (M&V) program will monitor, measure and document energy savings. M&V will be performed and evaluated by a third-party addressed on a separate agreement after installation and commissioning during a 10-month performance period.",129,2023-Q1,2023-Q2,Planning,20220630 Foshay Learning Center,10363837,Foshay Learning Center - Seismic Modernization,Seismic Modernization,1,"Dr. George J. McKenna, III",Central,1813201,13474,3751 S. Harvard Blvd.,Los Angeles,90018,Remove the existing 2-story north classroom building and 19 portable classrooms; replace with a 3-story classroom building providing 35 classrooms. Remove existing lunch pavilion/student store building and instrument music building; replace with new student store and lunch pavilion. Provide new playfields including turf field to meet State & District standards. Provide an efficient parking area with increased parking count and new fencing and gates. Provide upgrades to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA) including path of travel improvements as required.,"79,757",2017-Q1,2020-Q1,Closeout,20220630 Webster MS,10370628,Webster MS - 2019-20 Prop 39 (Magnolia Science Academy #4),Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project is a charter school renovation for Magnolia Science Academy #4 for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office,1 special education room, and 5 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",0,2019-Q3,2019-Q3,Closeout,20220630 Hancock Park ES,10370043,Hancock Park ES - Fencing & Gates,Fencing,4,Nick Melvoin,West,1439701,13582,408 S. Fairfax Ave.,Los Angeles,90036,Install wrought iron fencing with pedestrian gates at front of school,54,2018-Q4,2019-Q2,Closeout,20220630 Erwin ES,10369745,Erwin ES - 2018-22 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1363001,13624,13400 Erwin St.,Van Nuys,91401,"This project was initially approved in BOE Report No. 429-17/18 for the 2018-19 Prop 39 co-locations as a charter school renovation for Ararat Charter School. This project included 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 10 spaces allocated to the charter and an undefined scope of work. The project was then approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades K-5 and an undefined scope of work. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades K-5 and an undefined scope of work.",30,2021-Q3,2021-Q3,Closeout,20220630 King Magnets MS,10368195,King MS Film & Media Magnet - Synthetic Turf Field,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1820801,13531,4201 Fountain Ave.,Los Angeles,90029,"The project includes replacing approximately 70,000 square feet of deteriorated synthetic turf field, cleaning of field drainage, and repairing irrigation for cooling. The warranty for the synthetic turf field has expired.","1,025",2018-Q1,2018-Q3,Closeout,20220630 Fairfax HS,10369195,Fairfax HS - Install Sink,Access Compliance,4,Nick Melvoin,West,1862101,13473,7850 Melrose Ave.,Los Angeles,90046,Remove existing trough sink and install stainless sink provided by Marlton School.,15,2017-Q3,2017-Q4,Closeout,20220630 Escalante ES,10369978,Escalante ES - Electronic Marquee,Electrical/Lighting,5,Jackie Goldberg,East,1687301,193566,4443 Live Oak St.,Cudahy,90201,Install new electronic wall-mounted marquee,48,2019-Q3,2019-Q4,Closeout,20220630 Harmony ES,10369974,Harmony ES - Secure Entry System,Security System,5,Jackie Goldberg,Central,1468101,13535,899 E. 42nd Pl.,Los Angeles,90011,Install new secure entry system,26,2019-Q2,2019-Q4,Closeout,20220630 Vanalden ES,10370935,Vanalden ES - Security Upgrade,Security System,4,Nick Melvoin,Northwest,1741101,13724,19019 Delano St.,Reseda,91335,Install new secure entry system,20,2020-Q3,2021-Q1,Closeout,20220630 Darby ES,10371216,Darby ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1334001,13797,10818 Darby Ave.,Northridge,91326,Remove the existing marquee and footing at Darby Ave. and Tribune St. and replace with a new 2-sided electronic marquee standing less than 8' high near the main entrance on Darby Ave.,51,2020-Q3,2021-Q2,Closeout,20220630 King ES,10371325,King ES - 2020-22 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1653401,13423,3989 S. Hobart Blvd.,Los Angeles,90062,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for New Heights Charter School. This project included 1 charter office and 14 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 12 instructional spaces for charter student seats in grades K-8 and an undefined scope of work. However, the co-located charter school notified Charter Schools Division - Prop. 39 that they purchased their own furniture in order to improve the COVID-19 spacing requirements in their instructional spaces. This resulted in excess District Prop. 39-owned furniture which was returned to storage for repurposing to other charters. As a result, this project is amended to include the scope of work required to retrieve the furniture.",14,2021-Q2,2021-Q3,Closeout,20220630 Le Conte MS,10371875,Le Conte MS - 2021-22 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"This project is a charter school renovation for Citizens of the World - Hollywood for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 3 special education rooms, and 21 instructional spaces for charter student seats in grades TK-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The scope of work for this project included the reconfigurations of rooms back to District systems, this scope of work was not performed.",0,2021-Q3,2021-Q3,Closeout,20220630 Gardena HS,10372495,Gardena HS - 2022-23 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"This project is a charter school renovation for New Millennium Secondary School for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 6 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",57,2022-Q3,2022-Q3,Planning,20220630 Hawaiian ES,10367428,Hawaiian ES - Replace Roof,Roofing,7,Tanya Ortiz Franklin,South,1446601,13648,540 Hawaiian Ave.,Wilmington,90744,"This project is to upgrade 61,000 square feet of roofing on thirteen buildings with a Polyvinyl Chloride (PVC) material. The roofs are over 40 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",792,2016-Q2,2017-Q1,Closeout,20220630 Fullbright ES,10366952,Fullbright ES - SEEDS,SEEDS,4,Nick Melvoin,Northwest,1402701,13661,6940 Fullbright Ave.,Canoga Park,91306,"Design and construct an outdoor learning space that is approximately 2,300 square feet consisting of the installation of decomposed granite, mulch, redwood headers, a concrete entrance pad, art poles, relocation of a hose bib and fence removal. The outdoor learning space will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders and signage poles.",17,2015-Q3,2015-Q3,Closeout,20220630 Fishburn ES,10366233,Fishburn ES - 2014-15 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1384901,13532,5701 Fishburn Ave.,Maywood,90270,"This project is a charter school renovation for Clemente Charter School for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 7 classrooms for 153.9 charter student seats in grades K-3. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",153,2014-Q2,2014-Q3,Closeout,20220630 Welby Way Charter ES,10003988,Welby Way ES - Technology & Playground Upgrades,Campus Improvement,3,Scott Schmerelson,Northwest,1763701,13789,23456 Welby Way,West Hills,91307,"Computer Lab add wiring for 36 existing computer stations, purchase 1 network printer/scanner, and purchase 1 smart board; Purchase 1 laptop cart for upper grade classes; Purchase and install 400 square foot shade shelter for kindergarten yard; Purchase and install 400 square feet of new playground matting",252,2012-Q3,2014-Q1,Closeout,20220630 Westside Global Awareness Magnet,10370325,Westside Global Awareness Magnet - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1331101,13575,104 Anchorage St.,Marina Del Rey,90291,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",58,2019-Q1,2019-Q3,Closeout,20220630 Dymally HS,10369941,Dymally HS - Replace Synthetic Turf Football Field,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1766701,14581,8800 S. San Pedro St.,Los Angeles,90003,"This project is to replace approximately 79,000 square feet of deteriorated synthetic turf at the football field. The scope of work includes installing new drainage and irrigation systems and cleaning the existing field drainage and providing irrigation repairs.","2,115",2019-Q1,2019-Q3,Closeout,20220630 Drew MS,10364104,Drew MS - HVAC,HVAC,7,Tanya Ortiz Franklin,South,1811201,13871,8511 Compton Ave.,Los Angeles,90001,"The project will remove and replace the existing air handlers, pumps and controls, that provide heating and cooling for the multipurpose room, 20 classrooms, dining room, and offices in buildings 1 and 2. The equipment is more than 50 years old and is in poor condition resulting in unreliable service.","5,957",2017-Q1,2017-Q4,Closeout,20220630 Eagle Rock ES,10370414,Eagle Rock ES - Auditorium Handrails,Access Compliance,5,Jackie Goldberg,Central,1350701,13499,2057 Fair Park Ave.,Los Angeles,90041,Design and install handrails at the auditorium entrance.,15,2019-Q2,2019-Q2,Closeout,20220630 Santee Education Complex,10369370,Santee Education Complex - HVAC,HVAC,5,Jackie Goldberg,Central,1871601,13945,1921 S. Maple Ave.,Los Angeles,90011,The project replaces a failed 300-ton chiller as well as additional electrical equipment. A rental unit has been used as a temporary replacement for the failed chiller.,362,2018-Q3,2019-Q3,Closeout,20220630 Chapman ES,10371246,Chapman ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1298601,13460,1947 Marine Ave.,Gardena,90249,Remove the existing marquee and footing at Marine Ave. and Gramercy Pl. and replace with a new 2-sided electronic marquee standing less than 8' high.,61,2020-Q4,2021-Q2,Closeout,20220630 Solis Learning Academy,10369785,Solis Learning Academy - 2018-19 Prop 39,Charter Prop 39,2,Monica Garcia,East,1775201,14564,319 N. Humphreys Ave.,Los Angeles,90022,"This project is a charter school renovation for USC College Prep - Orange Campus for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades 9-10. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",16,2018-Q2,2018-Q3,Closeout,20220630 Glenfeliz ES,10368056,Glenfeliz ES - Portable Removal,Portable Removal,5,Jackie Goldberg,Central,1416401,13526,3955 Glenfeliz Blvd.,Los Angeles,90039,"Remove/demolish 3 bungalows including abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprints.",398,2016-Q4,2019-Q1,Closeout,20220630 Coldwater Canyon ES,10364100,Coldwater Canyon ES - HVAC,HVAC,6,Kelly Gonez,Northeast,1315101,13663,6850 Coldwater Canyon Ave.,North Hollywood,91605,"The project replaces the deteriorated heating, ventilation, and air conditioning (HVAC) equipment in 18 buildings which is more than 25 years old, inefficient and requires frequent service. The wall-mounted heat pumps in the classroom buildings will be replaced with new equipment and the HVAC system in the multipurpose building will be upgraded with rooftop units. In addition, heat pumps in 9 portables will be repaired or replaced as needed, an energy management system will be added, and a fire suppression system in the kitchen will be installed. During construction, the project provides interim housing consisting of 2 classrooms and restrooms, with upgrades to meet the accessibility requirements of the Americans with Disabilities Act (ADA) including paving, ramps, restrooms, and drinking fountains.","6,458",2017-Q2,2018-Q4,Closeout,20220630 Marina Del Rey MS,10369184,Marina Del Rey MS - Roofing & HVAC,Roofing,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"The project will replace approximately 203,529 square feet of deteriorated roofing with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes replacing heating, ventilation, and air conditioning (HVAC) units, replacing damaged wood, installing new gutters and downspouts, and painting to match existing areas affected in the roof demolition.","3,822",2018-Q1,2019-Q1,Closeout,20220630 Chase EEC,10367991,Chase EEC - Playground Upgrades,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northwest,1946001,16744,8635 N. Colbath Ave.,Panorama City,91402,Replace the outdated rubber matting with a new rubber matting system on the existing playground and provide a new 15' x 15' area with a synthetic turf system.,93,2020-Q3,2020-Q3,Closeout,20220630 Menlo ES,10372503,Menlo ES - 2022-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1524701,13386,4156 Menlo Ave.,Los Angeles,90037,"This project is a charter school renovation for Global Education Academy for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education room, and 6 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",248,2022-Q3,2022-Q3,Planning,20220630 Reed MS,10366457,Reed MS - Boiler Replacement,Plumbing/Irrigation/Drainage,3,Scott Schmerelson,Northeast,1835501,13647,4525 Irvine Ave.,North Hollywood,91602,"This project will replace three hot water boilers with four new hot water boilers and one hot water pump that are more energy efficient in the administration building. Field findings revealed that the hot water boilers and hot water pump are aged, deteriorated, break often, require frequent/extensive maintenance, and are not energy efficient.",985,2015-Q3,2016-Q1,Closeout,20220630 Arminta ES,10370467,Arminta ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1220501,13710,11530 Strathern St.,North Hollywood,91605,"Demolish 2 portable buildings, provide temporary fencing, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",300,2019-Q2,2020-Q1,Closeout,20220630 Reseda Charter HS,10370610,Reseda Charter HS - 2019-20 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,"This project is a charter school renovation for Magnolia Science Academy #5 for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 2 special education rooms, and 10 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",20,2019-Q2,2019-Q3,Closeout,20220630 YES Academy at Hyde Park ES,10369181,Yes Academy at Hyde Park ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1465801,13465,3140 Hyde Park Blvd.,Los Angeles,90043,"Removal of 6 portable buildings. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprints.",372,2017-Q4,2019-Q1,Closeout,20220630 Lomita STEAM Magnet ES,10365717,Lomita Math/Science Magnet School - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1493201,13313,2211 247th St.,Lomita,90717,Replace deteriorated playground matting systems to ensure the health and safety of students.,34,2014-Q2,2014-Q2,Closeout,20220630 Coldwater Canyon ES,10365691,Coldwater Canyon ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1315101,13663,6850 Coldwater Canyon Ave.,North Hollywood,91605,Replace deteriorated playground matting systems to ensure the health and safety of students.,31,2015-Q1,2015-Q1,Closeout,20220630 Nobel Charter MS,10107801,Nobel Charter MS - Replace Boilers/Chillers,HVAC,3,Scott Schmerelson,Northwest,1827201,13805,9950 Tampa Ave.,Northridge,91324,Replace Boilers/Chillers,"3,040",2012-Q3,2014-Q4,Closeout,20220630 Ambler ES,10367051,Ambler ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1208901,13833,319 E. Sherman Dr.,Carson,90746,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 98 doors/hardware, 12 accessible paths of travel, 48 signs, 13 restrooms, 39 drinking fountains/sinks, 28 casework/counters, 1 assistive listening device/intercom/phone, 18 concrete ramps, 7 asphalt ramps, 4 metal ramps, 10 pieces of accessible furniture, 8 railings, 1 playground component, 2 parking areas, 1 stage lift, and 1 passenger/bus loading zone.","3,934",2016-Q4,2022-Q4,Construction,20220630 Van Nuys MS,10369796,Van Nuys MS - 2018-19 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northeast,1843401,13605,5435 Vesper Ave.,Van Nuys,91411,"This project is a charter school renovation for High Tech Los Angeles MS for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office,1 special education room, and 4 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",104,2018-Q2,2018-Q3,Closeout,20220630 Fries ES,10371248,Fries ES - Fencing,Fencing,7,Tanya Ortiz Franklin,South,1401401,13463,1301 Fries Ave.,Wilmington,90744,Remove existing chain link fence and replace with approximately 180' of chain link privacy fence on the east perimeter of the kindergarten play yard along Fries Ave.,17,2020-Q3,2020-Q4,Closeout,20220630 Pacoima EEC,10368000,Pacoima EEC - Campus Upgrades,Campus Improvement,6,Kelly Gonez,Northeast,1954701,16781,11059 Herrick Ave.,Pacoima,91331,"Provide privacy-slatted chain link fence in front of the school for improved safety, replace Vinyl Composite Tile (VCT) flooring with new flooring system throughout the entire center, replace unsanitary linoleum floor with new VCT, and paint interior.",114,2018-Q2,2019-Q1,Closeout,20220630 Logan Academy of Global Ecology,10368113,Logan Academy of Global Ecology - Paving,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1490401,13266,1711 W. Montana St.,Los Angeles,90026,"This project will replace approximately 74,000 square feet of deteriorated asphalt paving, which is over 15 years old, in playground areas.","1,721",2019-Q1,2019-Q4,Closeout,20220630 El Camino Real Charter HS,10105087,"El Camino Real Charter HS - Facilities Upgrades - Academy Offices, Outdoor Spaces, Visual Identity",Small Learning Community/Academy,3,Scott Schmerelson,Northwest,1861701,13776,5440 Valley Circle Blvd.,Woodland Hills,91367,"Facilities Upgrades - Academy Offices, Outdoor Spaces, Visual Identity","2,357",2014-Q2,2015-Q2,Closeout,20220630 Harding ES,10369045,Harding ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1443101,13819,13060 Harding St.,Sylmar,91342,"Removal of 3 uncertified portable buildings. Request environmental reports, disconnect low and high voltage utilities, and repair/replace asphalt at building footprints.",161,2018-Q1,2018-Q2,Closeout,20220630 Fletcher ES,10370430,Fletcher ES - Secure Entry System,Security System,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,Install new secure entry system,23,2019-Q2,2019-Q3,Closeout,20220630 Plasencia ES,10371736,Plasencia ES - Exterior Painting,Painting,2,Monica Garcia,Central,1324701,13287,1321 Cortez St.,Los Angeles,90026,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",477,2021-Q4,2022-Q2,Closeout,20220630 Crescent Heights Language Arts/Social Justice Magnet ES,10371065,Crescent Heights Language Arts/Social Justice Magnet ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1328801,13454,1661 S. Crescent Heights Blvd.,Los Angeles,90035,"Remove deteriorated secure entry system and replace with new secure entry system at the door to the main office of the school. Additionally, provide power and a new door locking mechanism, and connect the new system to the IT network.",23,2020-Q3,2020-Q3,Closeout,20220630 Muir MS,10370300,Muir MS - Parent & Family Center 2018,Campus Improvement,1,"Dr. George J. McKenna, III",West,1825501,13436,5929 S. Vermont Ave.,Los Angeles,90044,"Modernize parent & family center as needed by installing new window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new chairs. Provide 20 new Chromebooks with a storage/charging cart and 1 laptop for the Parent Coordinator.",51,2019-Q4,2020-Q4,Closeout,20220630 Venice HS,10363839,Venice HS - Seismic Modernization,Seismic Modernization,4,Nick Melvoin,West,1890701,13513,13000 Venice Blvd.,Los Angeles,90066,"Remove existing lunch pavilion/student store structure, 4 portable classroom buildings, a portable sanitary building, and a storage building west of the existing pavilion. Provide a new lunch pavilion/student store and improvements to the quad area newly vacated by the existing structure per the campus master plan. Provide upgrades to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA) including path of travel improvements as required.","9,235",2017-Q2,2019-Q3,Closeout,20220630 Northridge EEC,10004286,Northridge EEC - Shade Shelter,Lunch/Shade Shelter,3,Scott Schmerelson,Northwest,1828401,16622,18050 Chase St.,Northridge,91325,Three shade structures were added to the site with one over the larger apparatus as this is a very large site located in a part of town with warmer temperatures. Includes path of travel improvements to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA).,223,2012-Q2,2014-Q2,Closeout,20220630 Berendo MS,10370234,Berendo MS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1805701,13274,1157 S. Berendo St.,Los Angeles,90006,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2024-Q1,2024-Q2,Planning,20220630 Franklin HS,10370263,Franklin HS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q2,2027-Q3,Planning,20220630 Delevan ES,10369344,Delevan ES - Classroom Replacement,Addition,5,Jackie Goldberg,Central,1339701,13455,4168 W. Ave. 42,Los Angeles,90065,"The school has 15 classrooms located in 9 relocatable buildings with 4 of the classrooms in 2 DOH portables that do not comply with State standards for school buildings. Included in the project design are approximately 15 classrooms and support spaces; a new food service facility; infrastructure to support the new facilities including an enhanced information technology network convergence system; upgrades to landscape, hardscape, parking, and playground areas where portables are removed or in other project-related areas; and site work, path of travel, and other required ADA improvements.","47,462",2022-Q4,2025-Q4,Design,20220630 Franklin HS,10371995,Franklin HS - Concrete Ramp,Access Compliance,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,"Construction of a new concrete ramp with railings to provide accessibility from the interior of the school campus to the auditorium assembly space, and any other improvements or mitigations to ensure compliance with related requirements.","1,056",2022-Q3,2023-Q1,Design,20220630 Wonderland ES,10371769,Wonderland ES - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1784901,13485,8510 Wonderland Ave.,Los Angeles,90046,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 2 doors/jambs, 3 door hardware, 4 thresholds, 1 accessible path of travel, 10 signs, 3 restrooms, 9 restroom accessories, 2 drinking fountains, 1 sink/sink cabinet, 2 assistive listening devices/intercoms/phones, 1 concrete ramp, 2 pieces of accessible furniture, 2 railings, 2 existing elevator modifications, 1 casework/counter, and 1 door modification/auto opener.","1,531",2023-Q3,2024-Q4,Design,20220630 San Fernando MS,10370489,San Fernando MS - Roofing & Water Damage Repairs,Roofing,6,Kelly Gonez,Northeast,1835801,13420,130 N. Brand Blvd.,San Fernando,91340,"This project is to provide approximately 60,000 square feet of new roofing at 14 buildings, including new gutters and downspouts, and painting of affected areas. The scope of work includes water damage repairs to the south wall of the cafeteria building.","2,496",2021-Q4,2022-Q3,Construction,20220630 Collins EEC,10369314,Collins EEC - Fire Alarm & Restroom Upgrades,Access Compliance,1,"Dr. George J. McKenna, III",West,1951601,16625,901 W. 52nd St.,Los Angeles,90037,"This project upgrades the fire alarm system, existing restroom and path of travel, to comply with current Americans with Disabilities Act (ADA) standards.",510,2020-Q2,2022-Q3,Construction,20220630 Braddock ES,10370038,Braddock ES - Parking Gates,Fencing,4,Nick Melvoin,West,1247901,13536,4711 Inglewood Blvd.,Culver City,90230,Install parking lot gates,9,2019-Q4,2020-Q1,Closeout,20220630 Olive Vista MS,10368198,Olive Vista MS - Library Improvements,Library Renovation,6,Kelly Gonez,Northeast,1830601,13707,14600 Tyler St.,Sylmar,91342,"Renovate the library by upgrading electrical systems, including power and data connections, in support of new technology. The project also provides new chairs, computer tables with cable management, furniture for the reading lounge area, and a ceiling-mounted projector and screen.",71,2017-Q2,2017-Q4,Closeout,20220630 24th St. EEC,10368869,24th St. EEC - Shade Shelter,Lunch/Shade Shelter,1,"Dr. George J. McKenna, III",Central,1957001,16624,2101 W. 24th St.,Los Angeles,90018,The project will install 1 shade structure over the play structure and provide path of travel improvements that comply with the Americans with Disabilities Act (ADA).,251,2021-Q2,2022-Q4,Construction,20220630 Markham MS,10368982,Markham MS - Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,Reconfigure restrooms to improve accessibility including: remove 2 lavatory sinks while leaving the 2 sinks located in the middle; replace 1 of the 2 remaining lavatories with an accessible lavatory; relocate the privacy panel at entry; remove 1 water closet and 3 urinals; make the compartment accessible with the door swinging inward; change all partitions to match; install electric outlet for changing table; and patch tile as needed.,25,2017-Q2,2017-Q3,Closeout,20220630 Northridge EEC,10367349,Northridge EEC - Technology Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1828401,16622,18050 Chase St.,Northridge,91325,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",54,2016-Q2,2016-Q3,Closeout,20220630 Bradley Global Awareness Magnet ES,10368797,Bradley Global Awareness Magnet - 2017-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1712301,13516,3875 Dublin Ave.,Los Angeles,90008,"This project is a charter school renovation for Libertas College Preparatory Charter School for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades 4-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",72,2017-Q2,2017-Q3,Closeout,20220630 Caroldale Learning Community,10372402,Caroldale Learning Community - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1281501,13843,22424 Caroldale Ave.,Carson,90745,"Remove manual-type marquee near front of school. Install new free-standing marquee in same location, with new footing. Approx. 160ft underground and 100ft above-ground conduit required. Double-sided 8ftx5ft color LED display.",75,2022-Q3,2023-Q1,Planning,20220630 Clinton MS,10370578,Clinton MS - 2019-23 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1806201,13909,3500 S. Hill St.,Los Angeles,90007,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for Animo Jackie Robinson Charter HS. This project included 1 charter office, 4 special education rooms, and 21 instructional spaces for charter student seats in grades 5-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was then approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 4 special education rooms, and 21 instructional spaces for charter student seats in grades 9-12 and an undefined scope of work. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 4 special education rooms, and 21 instructional spaces for charter student seats in grades 9-12 and an undefined scope of work. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 4 special education rooms, and 21 instructional spaces for charter student seats in grades 9-12 and an undefined scope of work.",12,2021-Q3,2021-Q3,Closeout,20220630 Maclay MS,10371879,Maclay MS - 2021-23 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"This project was initially approved in BOE Report No. 317-20/21 for the 2021-22 Prop 39 co-locations as a charter school renovation for YPI Valley Public Charter HS. This project included 1 charter office, 3 special education rooms, and 7 instructional spaces for charter student seats in grades 9-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The scope of work for this project included the reconfiguration of rooms back to District systems, this scope of work was not performed. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 3 special education rooms, and 7 instructional spaces for charter student seats in grades 9-12 and an undefined scope of work.",3,2021-Q3,2021-Q3,Closeout,20220630 15th St. ES,10363855,15th St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1376701,13337,1527 S. Mesa St.,San Pedro,90731,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",274,2015-Q1,2015-Q1,Closeout,20220630 4th St. ES,10363861,4th St. ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1397301,13482,420 Amalia Ave.,Los Angeles,90022,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",494,2014-Q1,2014-Q3,Closeout,20220630 Garcetti Learning Academy,10363865,68th St. ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",South,1679501,13318,612 W. 68th St.,Los Angeles,90044,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",307,2015-Q1,2015-Q1,Closeout,20220630 96th St. ES,10363869,96th St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1557501,13496,1471 E. 96th St.,Los Angeles,90002,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",593,2015-Q1,2015-Q2,Closeout,20220630 Alexandria ES,10363874,Alexandria ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1204101,13456,4211 Oakwood Ave.,Los Angeles,90004,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",315,2014-Q2,2014-Q4,Closeout,20220630 Dorris ES,10365136,Dorris ES - Security Upgrades,Security System,5,Jackie Goldberg,Central,1347901,13510,2225 Dorris Pl.,Los Angeles,90031,Upgrade physical security of the campus by providing and installing new gates with an electronic entry and monitoring system.,31,2014-Q1,2014-Q3,Closeout,20220630 Pio Pico MS,10368837,Pio Pico MS - 2017-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1498001,13903,1512 S. Arlington Ave.,Los Angeles,90019,"This project is a charter school renovation for Global Education Academy MS for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",76,2017-Q2,2017-Q3,Closeout,20220630 Holmes MS,10366737,Holmes MS - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1818201,13835,9351 Paso Robles Ave.,Northridge,91325,"Upgrade the school's existing parent & family center by providing interior paint, lighting repairs, and security upgrades including new doors and panic hardware. Equip the room with new classroom furniture, laptop computers and signage.",64,2015-Q2,2015-Q4,Closeout,20220630 Selma ES,10366753,Selma ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,West,1658901,13360,6611 Selma Ave.,Los Angeles,90028,Upgrade school's existing parent & family center by providing interior paint and new tile flooring. Provide security upgrades including new doors and hardware as well as security on windows. Provide new classroom furniture and equip with new laptop computers and signage.,68,2015-Q3,2015-Q4,Closeout,20220630 Purche ES,10366756,Purche ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1615801,13655,13210 Purche Ave.,Gardena,90249,"Modernize and upgrade school's existing parent & family center by providing interior paint, new flooring, and security upgrades including new doors and hardware as well as security on windows. Provide whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",95,2015-Q1,2015-Q4,Closeout,20220630 Aldama ES,10369675,Aldama ES - Technology Upgrades,Communications/Technology Upgrade,2,Monica Garcia,Central,1202701,13401,632 N. Ave. 50,Los Angeles,90042,Purchase 70 iPads with two charging carts and 108 Chromebooks with three charging carts.,77,2018-Q2,2018-Q3,Closeout,20220630 Hillside ES,10370163,Hillside ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1453401,13293,120 E. Ave. 35,Los Angeles,90031,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2028-Q1,2028-Q3,Planning,20220630 Leichman Career Preparatory & Transition Center,10368102,Leichman Special Education HS - Accessibility Upgrades,Access Compliance,4,Nick Melvoin,Northwest,1190801,13887,19034 Gault St.,Reseda,91335,Provide and install changing support station.,10,2016-Q4,2016-Q4,Closeout,20220630 Esperanza ES,10364233,Esperanza ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1238301,13824,680 Little St.,Los Angeles,90017,Demolish/Remove Portable Building(s),50,2016-Q1,2016-Q1,Closeout,20220630 Normandie EEC,10369318,Normandie EEC - Restroom Upgrade,Access Compliance,1,"Dr. George J. McKenna, III",Central,1954101,16667,4407 S. Raymond Ave.,Los Angeles,90037,The project will provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,348,2022-Q3,2023-Q1,Design,20220630 Fernangeles ES,10369353,Fernangeles ES - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1375301,13594,12001 Art St.,Sun Valley,91352,Replace the existing marquee with a double-sided electronic marquee in the same location.,45,2018-Q1,2018-Q3,Closeout,20220630 Beethoven ES,10367474,Beethoven ES - New Digital Marquee,Electrical/Lighting,4,Nick Melvoin,West,1234201,15206,3711 Beethoven St.,Los Angeles,90066,Replace deteriorated school marquee with digital display message board.,43,2016-Q2,2016-Q4,Closeout,20220630 Calahan ES,10367205,Calahan Community Charter ES - Roofing,Roofing,3,Scott Schmerelson,Northwest,1270601,13747,18722 Knapp St.,Northridge,91324,"Replace approximately 22,400 square feet of deteriorated roofing with new PVC roofing and metal flashing installation at 6 buildings, lunch shelter and arcades, replace damaged wood in kind, and paint to match existing areas affected in the roof demolition. The existing roof-mounted HVAC units and ductwork will be protected in place.",378,2016-Q1,2016-Q2,Closeout,20220630 Twain MS,10367516,Twain MS - Security Upgrades,Security System,4,Nick Melvoin,West,1842501,13630,2224 Walgrove Ave.,Los Angeles,90066,Install secure entrance system including new gate and camera/buzzer system.,22,2016-Q1,2016-Q4,Closeout,20220630 96th St. ES,10367542,96th St. ES - Technology Upgrades,Communications/Technology Upgrade,7,Tanya Ortiz Franklin,South,1557501,13496,1471 E. 96th St.,Los Angeles,90002,Provide 32 MacBook Air devices and cart for computer lab.,53,2016-Q2,2016-Q2,Closeout,20220630 36th St. EEC,10367288,36th St. EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1956601,16722,3556 S. St. Andrews Pl.,Los Angeles,90018,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",78,2016-Q3,2016-Q3,Closeout,20220630 37th St. EEC,10367289,37th St. EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1959301,16741,1204 W. 36th Pl.,Los Angeles,90007,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",77,2016-Q3,2016-Q3,Closeout,20220630 Albion EEC,10367295,Albion EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,East,1950001,16685,348 S. Ave. 18,Los Angeles,90031,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",81,2016-Q3,2016-Q3,Closeout,20220630 Laurel EEC,10367333,Laurel EEC - Technology Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1952901,16286,8023 Willoughby Ave.,Los Angeles,90046,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",71,2016-Q3,2016-Q4,Closeout,20220630 Vanalden EEC,10367365,Vanalden EEC - Technology Upgrade,IT Network Upgrade,4,Nick Melvoin,Northwest,1954201,16723,6212 Vanalden Ave.,Reseda,91335,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",74,2016-Q3,2016-Q4,Closeout,20220630 Lowman Special Education & Career Transition Center,10367382,Lowman Special Education Center - Renovate 2 Changing Tables,Access Compliance,6,Kelly Gonez,Northeast,1194801,13544,12827 Saticoy St.,North Hollywood,91605,"Renovate two changing table locations to accommodate Hoyer lifts, Installation of 2 electrical outlets in Boys & Girls restrooms.",19,2015-Q4,2016-Q1,Closeout,20220630 Perez Special Education Center,10370061,Perez Special Education Center - Accessibility Upgrade,Access Compliance,2,Monica Garcia,East,1195301,13489,4540 Michigan Ave.,Los Angeles,90022,Remove existing hard tile changing tables and replace with the installation of one 6' changing table including electrical outlets.,47,2018-Q4,2018-Q4,Closeout,20220630 Serrania Charter for Enriched Studies,10367880,Serrania Charter for Enriched Studies - Fencing & Gates,Fencing,4,Nick Melvoin,Northwest,1660601,13800,5014 Serrania Ave.,Woodland Hills,91364,Install new fence and rolling gate at school parking lot.,30,2016-Q3,2017-Q1,Closeout,20220630 Harding ES,10368961,Harding ES - Exterior Lighting,Electrical/Lighting,6,Kelly Gonez,Northeast,1443101,13819,13060 Harding St.,Sylmar,91342,"Provide additional lighting behind rooms 24-27, in front of and behind rooms 21 and 22, in front of rooms 38 and 39, and in front of lunch shelter facing playground.",19,2017-Q3,2017-Q4,Closeout,20220630 Verdugo Hills HS,10369329,Verdugo Hills HS - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1891401,13642,10625 Plainview Ave.,Tujunga,91042,"Remove/demolish 4 portable buildings. Remove/relocate furniture and equipment, disconnect low voltage ITD components and utilities, restore areas with asphalt paving in the building footprints.",252,2018-Q1,2019-Q1,Closeout,20220630 Nightingale MS,10366073,Nightingale MS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1826401,13584,3311 N. Figueroa St.,Los Angeles,90065,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",588,2015-Q2,2015-Q3,Closeout,20220630 Roybal Learning Center,10366093,Roybal Learning Center - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1854401,13875,1200 W. Colton St.,Los Angeles,90026,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",624,2015-Q1,2015-Q2,Closeout,20220630 Millikan Charter MS,10003982,Millikan MS - Auditorium Renovation,Auditorium Renovation,3,Scott Schmerelson,Northeast,1823801,13728,5041 Sunnyslope Ave.,Sherman Oaks,91423,"Auditorium renovation: upgrade lighting, dimmer board, power panel, add security camera, repair stage floor, repair and replace rigging rope and draperies, and possible upgrades to staff restrooms and ramp systems to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA) including path of travel improvements","1,249",2014-Q2,2014-Q4,Closeout,20220630 Sylmar Charter HS,10366107,Sylmar Charter HS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1887801,13856,13050 Borden Ave.,Sylmar,91342,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",865,2015-Q2,2015-Q3,Closeout,20220630 Vista MS,10367775,Vista MS - Accessibility Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1811701,13896,15040 Roscoe Blvd.,Panorama City,91402,Provide and install new carpet and assisted listening devices for 3 classrooms. Provide and install passing lights tied into school bell system for 3 classrooms.,15,2016-Q2,2016-Q3,Closeout,20220630 Ivanhoe ES,10367872,Ivanhoe ES - Accessibility Upgrades,Access Compliance,5,Jackie Goldberg,Central,1467101,13357,2828 Herkimer St.,Los Angeles,90039,Provide and install 3 concrete curb ramps. Adjust door closers and modify threshold.,7,2016-Q3,2016-Q3,Closeout,20220630 Banneker Career & Transition Center,10367883,Banneker Special Education Center - Accessibility Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1194101,15142,14024 S. San Pedro St.,Los Angeles,90061,Resurface asphalt paving area near agriculture area. Provide and install modular stage and ADA Ramp.,23,2016-Q3,2016-Q3,Closeout,20220630 Madison MS,10366517,Madison MS-Stage Lift,Access Compliance,6,Kelly Gonez,Northeast,1823001,13627,13000 Hart St.,North Hollywood,91605,Provide and Install Portable Stage Lift for Auditorium,33,2014-Q4,2014-Q4,Closeout,20220630 Gledhill EEC,10367994,Gledhill EEC - Campus Upgrades,Campus Improvement,6,Kelly Gonez,Northwest,1957801,16641,16058 Gledhill St.,North Hills,91343,"Replace all built-in wood cabinets which are beyond economical repair, replace the existing roof, replace all polycarbonate (Lexan) windows with glass windows for improved visibility and site safety, and provide a new pedestrian gate at the back of the center which complies with the Americans with Disabilities Act (ADA).",406,2017-Q3,2018-Q2,Closeout,20220630 Cienega ES,10103596,Cienega ES - Playing Field/Learning Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1306801,13429,2611 S. Orange Dr.,Los Angeles,90016,Playing Field/Learning Center,"1,652",2013-Q2,2014-Q2,Closeout,20220630 97th St. EEC,10367294,97th St. EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",South,1953901,16743,430 W. Colden Ave.,Los Angeles,90003,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",76,2016-Q3,2016-Q3,Closeout,20220630 Graham EEC,10367324,Graham EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1951801,16291,8332 S. Elm St.,Los Angeles,90001,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",78,2016-Q3,2016-Q4,Closeout,20220630 Grant EEC,10367325,Grant EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,West,1951901,16688,1559 N. St. Andrews Pl.,Los Angeles,90028,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",80,2016-Q3,2016-Q4,Closeout,20220630 Lemay EEC,10367334,Lemay EEC - Technology Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1953001,16662,17553 Lemay St.,Lake Balboa,91406,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",67,2016-Q3,2016-Q4,Closeout,20220630 Normont EEC,10367348,Normont EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1954301,16706,25028 Petroleum Ave.,Harbor City,90710,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",85,2016-Q3,2016-Q4,Closeout,20220630 6th Ave. ES,10365670,6th Ave. ES - Replace Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1678101,13425,3109 Sixth Ave.,Los Angeles,90018,Replace deteriorated playground matting systems to ensure the health and safety of students.,71,2014-Q4,2015-Q1,Closeout,20220630 Sepulveda MS,10366100,Sepulveda MS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northwest,1836301,13786,15330 Plummer St.,North Hills,91343,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",710,2015-Q2,2015-Q3,Closeout,20220630 Sutter MS,10366106,Sutter MS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",527,2015-Q2,2015-Q3,Closeout,20220630 Maclay MS,10104929,Maclay MS - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,Demolish/Remove Portable Building(s),26,2010-Q2,2014-Q1,Closeout,20220630 102nd St. EEC,10005003,102nd St. EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1954501,16301,1925 E. 102nd St.,Los Angeles,90002,"Upgrade entry control system, exterior gates, playground equipment, and window systems",83,2014-Q3,2016-Q1,Closeout,20220630 Lassen ES,10367594,Lassen ES - Restroom Upgrades,Access Compliance,6,Kelly Gonez,Northwest,1479001,13803,15017 Superior St.,North Hills,91343,"Modify kindergarten restrooms K1 & K2 including widening doors, relocating light switch, removing and replacing partition, and installing ACU-provided folding changing table.",26,2016-Q2,2016-Q2,Closeout,20220630 96th St. ES,10105891,96th St. ES - Compliance with State & Federal Access Requirements,Fire Alarm System,7,Tanya Ortiz Franklin,South,1557501,13496,1471 E. 96th St.,Los Angeles,90002,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),392,2015-Q3,2015-Q4,Closeout,20220630 Porter MS,10366192,Porter MS - Desktops Computers & LCD Projectors,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1835401,13807,15960 Kingsbury St.,Granada Hills,91344,"Increase school's access to technology by providing desktop computers, ELMO document cameras, and LCD projectors",71,2014-Q2,2014-Q3,Closeout,20220630 Bancroft MS,10364095,Bancroft MS - Emergency Generator & Lighting System,Electrical/Lighting,4,Nick Melvoin,West,1803801,13565,929 N. Las Palmas Ave.,Los Angeles,90038,"The project will remove and replace the existing emergency generator and five non-functioning emergency power inverters and battery storage cabinets. These emergency systems are out of compliance with the building code, at the end of their life cycle and need to be replaced.",264,2014-Q2,2014-Q4,Closeout,20220630 Burbank Arts Tech Community Magnet MS,10366885,Burbank MS - 2015-16 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1806601,13551,6460 N. Figueroa St.,Los Angeles,90042,"This project is a charter school renovation for Celerity Troika Charter School for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 16 classrooms for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",55,2015-Q2,2015-Q4,Closeout,20220630 Bernstein HS,10371307,Bernstein HS - 2020-21 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1869601,13953,1309 N. Wilton Pl.,Hollywood,90028,"This project is a charter school renovation for Academic Performance Excellence Academy (APEX) for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 1 special education room, and 17 instructional spaces for charter student seats in grades 7-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",26,2020-Q2,2020-Q3,Closeout,20220630 Marina Del Rey MS,10371330,Marina Del Rey MS - 2020-21 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"This project is a charter school renovation for Goethe International Charter School for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 18 instructional spaces for charter student seats in grades K-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",4,2020-Q2,2020-Q3,Closeout,20220630 Menlo ES,10370180,Menlo ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",Central,1524701,13386,4156 Menlo Ave.,Los Angeles,90037,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q3,2027-Q1,Planning,20220630 Los Angeles Center for Enriched Studies,10370863,Los Angeles Center for Enriched Studies - Roofing,Roofing,1,"Dr. George J. McKenna, III",West,1874101,13554,5931 W. 18th St.,Los Angeles,90035,"This project is to provide approximately 20,000 square feet of new roofing at 8 buildings, including the installation of new gutters and downspouts and painting of affected areas. The scope of work also includes addressing water damage repairs at the lunch shelter by replacing deteriorated wood beams, attic vents, and providing new acoustic ceiling material.","1,252",2023-Q2,2023-Q4,Planning,20220630 Washington PC,10367460,Washington PC - New Wall-Mounted Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",South,1763001,13917,860 W. 112th St.,Los Angeles,90044,Provide and install new wall-mounted electronic marquee at front of school.,39,2017-Q1,2017-Q4,Closeout,20220630 Jefferson HS,10366902,Jefferson HS - 2015-16 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1871401,13447,1319 E. 41st St.,Los Angeles,90011,"This project is a charter school renovation for Student Empowerment Academy for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 10 classrooms for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",38,2015-Q2,2015-Q3,Closeout,20220630 Haddon ES,10367244,Haddon ES-ADA Repairs,Access Compliance,6,Kelly Gonez,Northeast,1432901,13527,10115 Haddon Ave.,Pacoima,91331,"Provide and install GFCI outlet in classroom 6, restroom for changing table and provide and install temp ramp at classroom 6.",26,2015-Q4,2015-Q4,Closeout,20220630 Cheremoya ES,10105681,Auditorium A/C Project,HVAC,5,Jackie Goldberg,West,1304101,13410,6017 Franklin Ave.,Los Angeles,90028,Auditorium A/C Project,356,2013-Q1,2014-Q1,Closeout,20220630 102nd St. EEC,10004273,102nd St. EEC - Shade Shelter,Lunch/Shade Shelter,7,Tanya Ortiz Franklin,South,1954501,16301,1925 E. 102nd St.,Los Angeles,90002,Two shade structures were added to the site. Includes path of travel improvements to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA).,177,2013-Q4,2014-Q2,Closeout,20220630 Parks Learning Center,10370352,Parks Learning Center - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northwest,1357601,13852,8855 Noble Ave.,North Hills,91343,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",61,2019-Q3,2019-Q4,Closeout,20220630 Maywood Academy HS,10372099,Maywood Academy HS - Add Cameras To Security Monitor System,Security System,5,Jackie Goldberg,East,1888201,13922,6125 Pine Ave.,Maywood,90270,"Add (3) cameras to existing video surveillance (CCTV) system. School's current system has 8 cameras, but none in the parking lot area.",38,2021-Q4,2022-Q3,Construction,20220630 Dorsey HS,10372118,Dorsey HS - Energy Conservation Lighting,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1860001,13643,3537 Farmdale Ave.,Los Angeles,90016,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $1,511,631. Estimated energy savings is 511,862 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $372,443 which is 24.6% of the ECM costs.",372,2022-Q3,2023-Q1,Planning,20220630 Pacoima EEC,10369321,Pacoima EEC - Restroom Upgrade,Access Compliance,6,Kelly Gonez,Northeast,1954701,16781,11059 Herrick Ave.,Pacoima,91331,The project will provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,413,2021-Q1,2021-Q2,Closeout,20220630 Raymond ES,10372169,Raymond ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1621901,13469,7511 Raymond Ave.,Los Angeles,90044,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",415,2022-Q2,2022-Q4,Construction,20220630 Dyer ES,10368780,Dyer ES - Technology Upgrades,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1349301,13712,14500 Dyer St.,Sylmar,91342,Purchase 18 Lenovo ThinkPads for existing computer lab.,15,2017-Q4,2017-Q4,Closeout,20220630 Figueroa ES,10369822,Figueroa ES - Concrete Walkway and Fence,Access Compliance,1,"Dr. George J. McKenna, III",South,1382201,13502,510 W. 111th St.,Los Angeles,90044,"Install a concrete sloped walkway from the main building to the yard, and modify an existing fence and gate to allow access to the preschool play area.",28,2018-Q3,2018-Q3,Closeout,20220630 Mountain View ES,10370797,Mountain View ES - Exterior Painting,Painting,6,Kelly Gonez,Northeast,1540401,13706,6410 Olcott St.,Tujunga,91042,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",291,2020-Q4,2021-Q2,Closeout,20220630 Columbus MS,10368799,Columbus MS - 2017-18 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,"This project is a charter school renovation for Ingenium Charter School for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 25 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, and communication/safety purchases and upgrades.",52,2017-Q2,2017-Q3,Closeout,20220630 3rd St. ES,10367101,3rd St. ES - Security Upgrades,Security System,4,Nick Melvoin,West,1711001,13399,201 S. June St.,Los Angeles,90004,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,30,2016-Q1,2016-Q2,Closeout,20220630 Angelou Community HS,10367388,Angelou Community HS - Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,Central,1772201,13866,300 E. 53rd St.,Los Angeles,90011,Provide and install restroom upgrades for changing tables,8,2016-Q2,2016-Q3,Closeout,20220630 Cimarron ES,10367609,Cimarron ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1308201,13660,11559 Cimarron Ave.,Hawthorne,90250,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",46,2016-Q3,2017-Q2,Closeout,20220630 Anton EEC,10367297,Anton EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,East,1952101,14382,831 N. Bonnie Beach Pl.,Los Angeles,90063,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",47,2016-Q2,2016-Q3,Closeout,20220630 Gardena EEC,10367319,Gardena EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1916501,16462,1350 W. 177th St.,Gardena,90248,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",44,2016-Q2,2016-Q2,Closeout,20220630 Brooklyn EEC,10367301,Brooklyn EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,East,1957901,16305,329 N. Arizona Ave.,Los Angeles,90022,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",89,2016-Q2,2016-Q2,Closeout,20220630 Tarzana ES,10367932,Tarzana ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,Northwest,1704101,13585,5726 Topeka Dr.,Tarzana,91356,Provide and install electronic marquee.,33,2017-Q1,2017-Q2,Closeout,20220630 Ochoa Learning Center,10365729,Ochoa Learning Center - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,East,1237201,14062,5027 Live Oak St.,Cudahy,90201,Replace deteriorated playground matting systems to ensure the health and safety of students.,82,2014-Q1,2015-Q4,Closeout,20220630 Castle Heights ES,10369611,Castle Heights ES - HVAC,HVAC,1,"Dr. George J. McKenna, III",West,1287701,13680,9755 Cattaraugus Ave.,Los Angeles,90034,"This project is to replace Heating, Ventilation and Air Conditioning systems at multiple buildings.","8,095",2022-Q4,2024-Q2,Design,20220630 Justice Academy Charter ES,10366727,Justice Academy Charter ES - Shade Shelter,Lunch/Shade Shelter,3,Scott Schmerelson,Northwest,1469201,13727,23350 Justice St.,West Hills,91304,This project will provide a shade shelter over the existing play structure in the kindergarten yard plus associated accessibility improvements.,91,2015-Q4,2016-Q1,Closeout,20220630 Muir MS,10104802,Auditorium A/C Project,HVAC,1,"Dr. George J. McKenna, III",West,1825501,13436,5929 S. Vermont Ave.,Los Angeles,90044,Auditorium A/C Project,"2,567",2013-Q3,2016-Q2,Closeout,20220630 Strathern ES,10366744,Strathern ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1695901,13654,7939 St. Clair Ave.,North Hollywood,91605,"Modernize and upgrade school's existing parent & family center by providing interior paint, new flooring, and security upgrades including new doors and hardware as well as security on windows. Provide whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",75,2015-Q2,2015-Q4,Closeout,20220630 Nightingale MS,10371778,Nightingale MS - Energy Efficiency Lighting,Electrical/Lighting,2,Monica Garcia,East,1826401,13584,3311 N. Figueroa St.,Los Angeles,90065,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $990,507. Estimated energy savings is 582,821 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work.",269,2021-Q2,2021-Q2,Closeout,20220630 El Sereno MS,10367613,El Sereno MS - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1811801,13412,2839 N. Eastern Ave.,Los Angeles,90032,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",70,2016-Q3,2017-Q1,Closeout,20220630 Park ES,10367629,Park ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1600501,13861,8020 Park Ave.,Cudahy,90201,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",14,2016-Q3,2017-Q1,Closeout,20220630 Trinity ES,10367640,Trinity ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",44,2016-Q3,2016-Q4,Closeout,20220630 Heliotrope ES,10369753,Heliotrope ES - 2018-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,"This project is a charter school renovation for Clemente Charter School for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office and 6 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",25,2018-Q2,2018-Q3,Closeout,20220630 24th St. ES,10367649,24th St. ES - 2016-17 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1730101,13335,2055 W. 24th St.,Los Angeles,90018,"This project is a charter school renovation for Crown Preparatory Academy for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 17 instructional spaces for charter student seats in grades 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",111,2016-Q2,2016-Q3,Closeout,20220630 Wilson HS,10367961,Wilson HS - Portable Removal,Portable Removal,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,"The project removed 4 portable buildings and 3 bungalows, abated hazardous materials, and disconnected low voltage and high voltage utilities. The scope of work also included paving over the former building footprints, but not all of this area could be accessed due to its use as a staging area for HVAC work on the campus which will later include that paving scope (project #10108868).",364,2017-Q1,2018-Q1,Closeout,20220630 Van Nuys MS,10369275,Van Nuys MS - Portable Removal,Portable Removal,3,Scott Schmerelson,Northeast,1843401,13605,5435 Vesper Ave.,Van Nuys,91411,"Remove/sell 3 portable buildings. Remove/relocate furniture and equipment, disconnect low voltage ITD components, restore areas with asphalt paving at building footprints.",180,2018-Q1,2019-Q4,Closeout,20220630 Curtiss MS,10369742,Curtiss MS - 2018-19 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1810301,13775,1254 E. Helmick St.,Carson,90746,"This project is a charter school renovation for Magnolia Science Academy #3 for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 13 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",15,2018-Q2,2018-Q3,Closeout,20220630 Monte Vista ES,10370332,Monte Vista ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1538401,13270,5423 Monte Vista St.,Los Angeles,90042,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",82,2019-Q2,2020-Q1,Closeout,20220630 Leapwood ES,10370438,Leapwood ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1482901,13817,19302 Leapwood Ave.,Carson,90746,Install new electronic wall-mounted marquee,57,2019-Q4,2020-Q1,Closeout,20220630 Marquez Charter ES,10364117,Marquez Charter ES - Outdoor Learning Center,Campus Improvement,4,Nick Melvoin,West,1516401,13628,16821 Marquez Ave.,Pacific Palisades,90272,"Marquez Charter School has had soil instability issues at the hillside supporting the playground and a classroom building. The condition of the slope worsened, prompting the District to relocate students in the classroom building to bungalows sited elsewhere on the campus. Initially, a project was developed to repair the slope by reinforcing the hillside so the building could remain on the campus. Upon further analysis during the design phase of the project, it was determined that this was a costly solution that could not be guaranteed to be successful in the long term. The redefined project entails the demolition of a portion of the existing 14,000 square foot classroom building (Classroom Building 004DAM), and the rehabilitation of the building's outer restrooms, as well as work, storage and electrical rooms. In the footprint of the demolished portion of the building and yard, an outdoor learning center and courtyard will be constructed consisting of a student assembly area for performing arts activities, instructional areas with benches, and a learning garden, all in accordance with Americans with Disabilities Act (ADA) requirements including a ramp to the lower playground.","8,157",2015-Q2,2017-Q4,Closeout,20220630 Canyon Charter ES,10369810,Canyon Charter ES - Secure Entry System,Security System,4,Nick Melvoin,West,1279501,13346,421 Entrada Dr.,Santa Monica,90402,Install new secure entry system at main entrance.,19,2018-Q3,2018-Q4,Closeout,20220630 Norwood ES,10366253,Norwood ES - 2014-15 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1569901,13271,2020 Oak St.,Los Angeles,90007,"This project is a charter school renovation for Global Education Academy for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 5 classrooms for 101.98 charter student seats in grades K-2. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",114,2014-Q2,2014-Q3,Closeout,20220630 Balboa Gifted/High Ability Magnet ES,10367108,Balboa Gifted/High Ability Magnet ES - Safety Upgrades,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1226901,13840,17020 Labrador St.,Northridge,91325,Provide safety upgrades by placing new concrete steps in the narrow walking path near the main office.,9,2015-Q4,2015-Q4,Closeout,20220630 Van Nuys Community Adult School,10366783,Van Nuys Community Adult School - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1944201,13404,6535 Cedros Ave.,Van Nuys,91411,"Disconnect, remove and sell 1 Department of Housing (DOH) portable building as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",34,2015-Q2,2015-Q3,Closeout,20220630 Olive Vista MS,10366917,Olive Vista MS - 2015-16 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1830601,13707,14600 Tyler St.,Sylmar,91342,"Triumph Charter Academy is vacating this site. This project was approved in Board of Education Report No. 423-14/15 . The scope of work includes relocation of classrooms, remedial construction, and reconnecting of all low voltage systems to the District operated program.",18,2015-Q3,2015-Q3,Closeout,20220630 Van Nuys MS,10371341,Van Nuys MS - 2020-21 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northeast,1843401,13605,5435 Vesper Ave.,Van Nuys,91411,"This project is a charter school renovation for High Tech Los Angeles MS for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office,1 special education room, and 6 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",31,2020-Q2,2020-Q3,Closeout,20220630 Barrett ES,10372332,Barrett ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",South,1556201,13449,419 W. 98th St.,Los Angeles,90003,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",90,2022-Q3,2022-Q4,Planning,20220630 Bryson ES,10369474,Bryson ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1258901,13558,4470 Missouri Ave.,South Gate,90280,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",155,2024-Q2,2024-Q4,Planning,20220630 Ambler ES,10368966,Ambler ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1208901,13833,319 E. Sherman Dr.,Carson,90746,Install new secure entry system.,33,2018-Q1,2018-Q3,Closeout,20220630 Westchester Enriched Sciences Magnets,10370429,Westchester Enriched Sciences Magnets - Video Surveillance (CCTV) System,Security System,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,Install video surveillance (CCTV) system,59,2019-Q2,2021-Q4,Closeout,20220630 Kennedy ES,10366521,Kennedy ES - Access Compliance Repairs,Access Compliance,2,Monica Garcia,East,1469601,13886,4010 E. Ramboz Dr.,Los Angeles,90063,"Install new ADA compliant drinking fountains and new concrete landings, improve accessibility in doorway entrances, install new cabinets and countertops, upgrade bathroom for proper entrance clearances and accessible compartments, and install ADA compliant lunch tables.",483,2015-Q2,2015-Q4,Closeout,20220630 Hancock Park ES,10107445,Hancock Park ES - Compliance with State & Federal Access Requirements,Access Compliance,4,Nick Melvoin,West,1439701,13582,408 S. Fairfax Ave.,Los Angeles,90036,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) for Lunch Shelter,321,2016-Q1,2016-Q3,Closeout,20220630 Audubon MS,10370568,Audubon MS - 2019-20 Prop 39 (Crenshaw Arts/Tech Charter HS (CATCH)),Charter Prop 39,1,"Dr. George J. McKenna, III",West,1802801,13564,4120 11th Ave.,Los Angeles,90008,"This project is a charter school renovation for Crenshaw Arts/Tech Charter HS (CATCH) for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 11 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",69,2019-Q2,2019-Q3,Closeout,20220630 59th St. ES,10370296,59th St. ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1379501,13400,5939 Second Ave.,Los Angeles,90043,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",66,2019-Q1,2019-Q4,Closeout,20220630 Vanalden EEC,10371821,Vanalden EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,4,Nick Melvoin,Northwest,1954201,16723,6212 Vanalden Ave.,Reseda,91335,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 11,223 sqft. ADA upgrades for this project include (a) regarding the walkway from the parking lot to provide an ADA compliant path of travel and (b) providing an ADA compliant restroom. Additionally, we will replace deteriorated HVAC units, roofing, and make necessary upgrades to the fire alarm system, as required by current code.","3,818",2023-Q3,2024-Q3,Design,20220630 Mulholland MS,10369529,Mulholland MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1825901,15184,17120 Vanowen St.,Lake Balboa,91406,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2024-Q2,2024-Q3,Planning,20220630 Eastman ES,10365205,Eastman ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1352101,13520,4112 E. Olympic Blvd.,Los Angeles,90023,Demolish/Remove 4 Portable Buildings,236,2014-Q3,2015-Q1,Closeout,20220630 Polytechnic HS,10365218,Polytechnic HS - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1863601,13734,12431 Roscoe Blvd.,Sun Valley,91352,Demolish/Remove 2 Portable Buildings,115,2013-Q4,2014-Q3,Closeout,20220630 Hyde Park EEC,10005043,Hyde Park EEC - Safety Upgrades and Improvements,Campus Improvement,1,"Dr. George J. McKenna, III",West,1952701,16295,6428 Eleventh Ave.,Los Angeles,90043,"Upgrade entry control system, exterior gates, and playground equipment",72,2014-Q3,2014-Q4,Closeout,20220630 95th St. ES,10368375,95th St. ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1552101,13349,1109 W. 96th St.,Los Angeles,90044,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2023-Q1,2023-Q4,Planning,20220630 Westwood Charter ES,10370096,Westwood Charter ES - Exterior Painting,Painting,4,Nick Melvoin,West,1774001,13505,2050 Selby Ave.,Los Angeles,90025,"Prepare, paint, and refinish the exterior of all buildings and there appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",237,2019-Q4,2020-Q1,Closeout,20220630 Tulsa ES,10372090,Tulsa ES - Purchase Lunch Tables,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1724701,13693,10900 Hayvenhurst Ave.,Granada Hills,91344,Purchase (30) new exterior picnic tables (12 are ADA compliant),54,2021-Q4,2022-Q3,Construction,20220630 Plasencia ES,10367978,Plasencia ES - Seismic Retrofit of Main Building,Seismic Modernization,2,Monica Garcia,Central,1324701,13287,1321 Cortez St.,Los Angeles,90026,"The main building was built in 1926 with 37,400 square feet and will require upgrades to structural connections at the roof, wall, and foundation to meet current seismic requirements.","11,133",2019-Q1,2021-Q3,Closeout,20220630 El Dorado ES,10369922,El Dorado ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1354101,13792,12749 El Dorado Ave.,Sylmar,91342,"Demolish 1 portable building, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving and provide playground striping at the footprint of the building.",119,2018-Q4,2019-Q3,Closeout,20220630 Breed ES,10370066,Breed ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1249301,13281,2226 E. 3rd St.,Los Angeles,90033,"Demolish 1 portable building, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving and provide playground striping at the footprint of the building.",133,2019-Q1,2019-Q3,Closeout,20220630 Venice Skills Center,10372395,Venice Skills Center - Purchase Interactive Displays,Communications/Technology Upgrade,4,Nick Melvoin,West,1168601,13452,611 5th Ave.,Venice,90291,Purchase (4) interactive displays with mobile stands,16,2022-Q3,2022-Q4,Planning,20220630 Raymond ES,10370286,Raymond ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1621901,13469,7511 Raymond Ave.,Los Angeles,90044,"Demolish 3 portable buildings, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",344,2019-Q1,2019-Q3,Closeout,20220630 Logan Academy of Global Ecology,10372457,Logan Academy of Global Ecology - Install Motorized Parking Lot Gates,Fencing,2,Monica Garcia,Central,1490401,13266,1711 W. Montana St.,Los Angeles,90026,Install motorized gates at parking structure. Remove existing hung-style roll gates. Fabricate new wrought iron roll gates to function with motorized openers. Run approx. 200 feet of conduit.,97,2022-Q2,2022-Q4,Construction,20220630 West Valley EEC,10372470,West Valley EEC - Reopening and Campus Upgrade,Campus Improvement,4,Nick Melvoin,Northwest,1207701,13659,6200 Winnetka Ave.,Woodland Hills,91367,"Re-opening of closed EEC site. Improvements will include new flooring, interior and exterior paint, and roofing, upgrades to the fire alarm system, a new secure entry system, landscape upgrades, solar reflective asphalt coating, and new exterior furniture.","1,039",2023-Q3,2023-Q4,Planning,20220630 Pacific ES,10371612,Pacific ES - Install Secure Entry System,Security System,5,Jackie Goldberg,East,1464201,13936,2660 E. 57th St.,Huntington Park,90255,Install new secure entry system at main entrance to school with three video receivers in main office.,25,2021-Q1,2021-Q2,Closeout,20220630 Ochoa Learning Center,10371610,Ochoa Learning Center - Install Secure Entry System,Security System,5,Jackie Goldberg,East,1237201,14062,5027 Live Oak St.,Cudahy,90201,Install new secure entry system at door to main office with three video receivers in main office.,24,2020-Q4,2021-Q2,Closeout,20220630 Bell HS,10368202,Bell HS - Technology and Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1853601,13488,4328 Bell Ave.,Bell,90201,Purchase 40 Microsoft Surface Pro devices and cart; upgrade security features including door hardware and installation of metal skins on doors.,66,2017-Q1,2017-Q1,Closeout,20220630 Locke Charter HS,10367164,Locke Charter HS - Fire Damage Restoration,Auditorium Renovation,7,Tanya Ortiz Franklin,South,1873301,13889,325 E. 111th St.,Los Angeles,90061,"In 2008, a fire damaged the oral arts classroom in Nelson Hall (Room 100). Some repairs were completed immediately following the fire, but the room remained unfinished and was used for storage. This project includes repairs to the suspended ceiling, light fixtures, interior painting, flooring, and upgrades to the fire alarm, security, and heating, ventilation, and air conditioning (HVAC) systems. The scope of work also includes the installation of new auditorium-style seating, a stage curtain, theatrical lighting, and sound system; the addition of an audio/visual control room; the conversion of a compressor room into 2 gender neutral restrooms which necessitates the relocation of the compressors; and associated Americans with Disabilities Act (ADA) improvements to restrooms and the path of travel.","3,875",2018-Q1,2019-Q1,Closeout,20220630 6th Ave. ES,10370565,6th Ave. ES - 2019-20 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1678101,13425,3109 Sixth Ave.,Los Angeles,90018,"This project is a charter school renovation for Lashon Academy City for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room and 6 instructional spaces for charter student seats in grades K-3. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",127,2019-Q2,2019-Q3,Closeout,20220630 Griffin ES,10364107,Griffin ES - HVAC,HVAC,2,Monica Garcia,East,1430101,13284,2025 Griffin Ave.,Los Angeles,90031,"The project will remove and replace the 45-ton chiller, evaporator cooler, and fan coils in the main building and cafeteria building that provides heating and cooling for 15 classrooms, offices, and the kitchen. This project also includes removing electronic controls and electrical panels for the chilled water system. The existing equipment is 25 years old and in very poor condition resulting in frequent breakdowns.","2,777",2016-Q4,2018-Q1,Closeout,20220630 42nd St. ES,10367651,42nd St. ES - 2016-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1395901,13487,4231 Fourth Ave.,Los Angeles,90008,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a charter school renovation for Celerity Nascent Charter School. This growth project included 1 charter office, 1 special education room, and 14 instructional spaces for charter students in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",46,2016-Q2,2016-Q3,Closeout,20220630 Barrett ES,10369497,Barrett ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",South,1556201,13449,419 W. 98th St.,Los Angeles,90003,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2024-Q3,2024-Q4,Planning,20220630 San Miguel ES,10368954,San Miguel ES - Security Upgrades,Security System,5,Jackie Goldberg,East,1687501,14741,9801 San Miguel Ave.,South Gate,90280,Provide and install new Aiphone secure entry system at the main entrance.,28,2017-Q2,2018-Q1,Closeout,20220630 Bertrand ES,10367607,Bertrand ES - Parent & Family Center,Campus Improvement,4,Nick Melvoin,Northwest,1243801,13610,7021 Bertrand Ave.,Reseda,91335,Modernize parent & family center by providing security upgrades (replace door locks and provide metal skins) and directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.,31,2016-Q3,2016-Q4,Closeout,20220630 Haddon ES,10372202,Haddon ES - Install Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1432901,13527,10115 Haddon Ave.,Pacoima,91331,Install electronic free-standing marquee at front of school. Approx. 100 feet total underground/above-ground conduit required. Double-sided color LED displays.,68,2022-Q2,2022-Q4,Construction,20220630 Cimarron ES,10372236,Cimarron ES - Install Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1308201,13660,11559 Cimarron Ave.,Hawthorne,90250,"Install new electronic, free-standing marquee. Remove manual-type marquee near front of school. Install new marquee in same location and use existing footing. Install pathway inside building for data. Double-sided 8 feet x4 feet color LED display.",46,2022-Q3,2023-Q1,Planning,20220630 East Valley HS,10102218,Shade Shelter & Landscaping,Lunch/Shade Shelter,6,Kelly Gonez,Northeast,1860701,13951,5525 Vineland Ave.,North Hollywood,91601,Shade Shelter & Landscaping,994,2011-Q1,2014-Q1,Closeout,20220630 Evans Community Adult School,10372448,Evans Community Adult School - ADA Upgrades,Access Compliance,2,Monica Garcia,Central,1909201,13288,717 N. Figueroa St.,Los Angeles,90012,The project scope is to complete ADA upgrades on the first floor of main classroom/cafeteria building due to the removal of existing exit walkway. This project will replace double-doors leading to the first floor¿s hallway exit with a fixed store-front window. The hallways will be reconfigured to support the path of travel modifications including upgrades to the elevator lobby and entrance to the school¿s kitchen & cafeteria. Upgrades will be made to two restrooms to meet DSA ADA requirements.,589,2024-Q2,2025-Q2,Planning,20220630 Baldwin Hills ES,10367657,Baldwin Hills ES - 2016-17 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1227401,13595,5421 Rodeo Rd.,Los Angeles,90016,"This project is a charter school renovation for New Los Angeles Charter ES for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades K-1. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",170,2016-Q2,2016-Q3,Closeout,20220630 42nd St. ES,10366875,42nd St. ES - 2015-16 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1395901,13487,4231 Fourth Ave.,Los Angeles,90008,"This project is a charter school renovation for Celerity Nascent Charter School for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 13 classrooms for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",110,2015-Q2,2015-Q3,Closeout,20220630 Fishburn ES,10370336,Fishburn ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1384901,13532,5701 Fishburn Ave.,Maywood,90270,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",44,2019-Q2,2020-Q1,Closeout,20220630 El Sereno MS,10366999,El Sereno MS - Roofing,Roofing,2,Monica Garcia,East,1811801,13412,2839 N. Eastern Ave.,Los Angeles,90032,"This project is to upgrade 148,000 square feet of roofing on 28 buildings and two arcades. The age of the roofs range from 15 to 20 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.","1,975",2016-Q3,2017-Q2,Closeout,20220630 State EEC,10005067,State EEC - Safety Upgrades and Improvements,Campus Improvement,5,Jackie Goldberg,East,1956301,16704,3210 Broadway,Huntington Park,90255,"Upgrade entry control system, exterior gates, electrical system, and replace playground equipment.",266,2016-Q3,2017-Q2,Closeout,20220630 Bandini ES,10368205,Bandini ES - SEEDS,SEEDS,7,Tanya Ortiz Franklin,South,1228801,13458,425 N. Bandini St.,San Pedro,90731,"Design and construct an outdoor learning space of approximately 1,500 square feet consisting of the installation of pavers, concrete headers, a hose bib, irrigation system, seating boulders and benches, art poles, planter boxes, trees, and soil. It will be outfitted by the school site and the partner organization (The Kitchen Community) providing planting materials and garden installation.",80,2018-Q2,2019-Q4,Closeout,20220630 Narbonne HS,10370272,Narbonne HS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1877901,13407,24300 S. Western Ave.,Harbor City,90710,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2028-Q2,2028-Q3,Planning,20220630 Humphreys ES,10367982,Humphreys ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1461601,13437,500 S. Humphreys Ave.,Los Angeles,90022,"Remove 2 portable buildings including assessment and abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprints.",178,2016-Q4,2018-Q1,Closeout,20220630 San Fernando HS,10105841,San Fernando HS - Science Lab Renovation,Campus Improvement,6,Kelly Gonez,Northeast,1884301,13670,11133 O'Melveny Ave.,San Fernando,91340,Science Lab Renovation,"1,572",2015-Q2,2016-Q3,Closeout,20220630 Sutter MS,10371228,Sutter MS - Secure Entry System,Security System,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,Install ADA compliant chain-link pedestrian gate with secure entry system intercom to create new main entrance to the school on the south side of the administration building. Install additional chain-link fence to require visitors entering the campus to contact the main office and guide them directly to the main office. Additional chain-link fence will include two pedestrian gates for staff access.,61,2021-Q2,2022-Q2,Closeout,20220630 Fairfax HS,10371229,Fairfax HS - Softball Field Fencing,Fencing,4,Nick Melvoin,West,1862101,13473,7850 Melrose Ave.,Los Angeles,90046,Remove and replace approximately 45 linear feet of existing deteriorated fencing with 8' high chain-link fence. Install covered dugouts with benches on both sides of the infield for home and visiting teams.,28,2020-Q4,2020-Q4,Closeout,20220630 Madison MS,10371479,Madison MS - Purchase Exterior Lunch Furniture,Furniture/Fixtures/Equipment,6,Kelly Gonez,Northeast,1823001,13627,13000 Hart St.,North Hollywood,91605,"Purchase, install, and anchor exterior lunch furniture including 26 tables, 11 benches, and 14 umbrellas with stands.",38,2020-Q3,2021-Q1,Closeout,20220630 Coldwater Canyon ES,10371714,Coldwater Canyon ES - Install Secure Entry System,Security System,6,Kelly Gonez,Northeast,1315101,13663,6850 Coldwater Canyon Ave.,North Hollywood,91605,Install new secure entry system at main office entrance with 2 video receivers in the office.,35,2022-Q1,2022-Q3,Construction,20220630 Webster MS,10368667,Webster MS - Flooring,Flooring,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"The project will replace approximately 79,000 square feet of flooring campus-wide with vinyl composite tile flooring.",973,2022-Q3,2023-Q4,Planning,20220630 Pacoima MS,10369547,Pacoima MS - Roofing & HVAC,Roofing,6,Kelly Gonez,Northeast,1832101,13750,9919 Laurel Canyon Blvd.,Pacoima,91331,"The project will replace approximately 245,400 square feet of deteriorated roofing campus-wide with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes replacing damaged wood, installing new gutters and downspouts, and painting to match existing areas affected in the roof demolition. As part of this roofing project, selected heating, ventilation, and air conditioning (HVAC) units and equipment will be replaced while the remaining roof-mounted HVAC units and ductwork will be protected in place.","4,591",2019-Q2,2021-Q4,Closeout,20220630 9th St. ES,10371066,9th St. ES - Secure Entry System,Security System,2,Monica Garcia,Central,1550501,13268,835 Stanford Ave.,Los Angeles,90021,Install new secure entry system.,15,2020-Q3,2020-Q3,Closeout,20220630 Leland ES,10368338,Leland ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1483601,13439,2120 S. Leland St.,San Pedro,90731,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",155,2028-Q4,2029-Q1,Planning,20220630 Hubbard ES,10369041,Hubbard ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1460301,13718,13325 Hubbard St.,Sylmar,91342,"Removal of 5 uncertified portable buildings. Request environmental reports, disconnect low and high voltage utilities, and repair/replace asphalt at building footprints.",224,2017-Q3,2018-Q3,Closeout,20220630 Griffith-Joyner ES,10368009,Griffith-Joyner ES - Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1584901,13497,1963 E. 103rd St.,Los Angeles,90002,Modify Kinder Jack and Jill Restroom; Provide and install folding changing table.,3,2016-Q4,2017-Q1,Closeout,20220630 Canoga Park HS,10367402,Canoga Park HS - HVAC in Competition Gym,HVAC,3,Scott Schmerelson,Northwest,1857101,13415,6850 Topanga Canyon Blvd.,Canoga Park,91303,"The project addresses cooling needs in the gymnasium building with the installation of a new heating, ventilation, and air conditioning (HVAC) system. The scope of work also includes equipment demolition, asbestos abatement, cleaning and leak test for ducts, structural upgrades, the addition of several fire dampers, and patch and paint. As there is insufficient power in the gym for the new HVAC system, the project also provides electrical upgrades including the installation of a new electrical duct bank and connections to the main electrical vault on the other end of the campus.","4,375",2017-Q4,2019-Q3,Closeout,20220630 Tweedy ES,10372189,Tweedy ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1726001,13955,9724 Pinehurst Ave.,South Gate,90280,Install new secure entry system at the Main Building three video receivers.,29,2022-Q1,2022-Q3,Construction,20220630 Osceola ES,10372438,Osceola ES - Underground Plumbing,Plumbing/Irrigation/Drainage,6,Kelly Gonez,Northeast,1589401,13751,14940 Osceola St.,Sylmar,91342,This project is to provide new underground water and sewer pipes serving the entire campus and replacement of gas and irrigation lines.,"1,588",2023-Q4,2024-Q4,Planning,20220630 Strathern ES,10372451,Strathern ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1695901,13654,7939 St. Clair Ave.,North Hollywood,91605,Install new secure entry system at the Main Office.,38,2022-Q3,2022-Q4,Planning,20220630 Gledhill ES,10371375,Gledhill ES - Marquee,Electrical/Lighting,6,Kelly Gonez,Northwest,1413001,13746,16030 Gledhill St.,North Hills,91343,Replace existing marquee with the installation of a new electronic free-standing marquee in front of the school.,52,2021-Q2,2021-Q3,Closeout,20220630 6th Ave. ES,10372481,6th Ave. ES - 2022-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1678101,13425,3109 Sixth Ave.,Los Angeles,90018,"This project is a charter school renovation for Lashon Academy City for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades TK-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",107,2022-Q3,2022-Q3,Planning,20220630 Budlong ES,10372488,Budlong ES - 2022-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1261601,15162,5940 S. Budlong Ave.,Los Angeles,90044,"This project is a charter school renovation for Crete Academy for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",641,2022-Q3,2022-Q3,Planning,20220630 Columbus MS,10372550,Columbus MS - Provide Magnet Center and Art Media Lab,Reconfiguration,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,"Provide magnet center and art media lab. The school recently opened a Media Arts & Communication Magnet and would like to upgrade the furniture to support the new program as well as provide the program with a counselors office / restorative justice classroom. Replace and secure (6) doors total for three rooms in order to protect technology investments. Purchase tables, chairs, storage (149 items total), and (2) interactive displays w/ mobile stands.",119,2022-Q3,2022-Q4,Planning,20220630 Marvin ES,10367000,Marvin ES - HVAC,HVAC,1,"Dr. George J. McKenna, III",West,1517801,13573,2411 Marvin Ave.,Los Angeles,90016,"This project will upgrade the heating, ventilation and air conditioning systems in the classroom A, classroom B and cafeteria buildings. The HVAC systems are over 20 years old and have completely failed. The District is renting a temporary chiller that provides cooling to these buildings pending completion of this replacement project.","2,691",2017-Q2,2018-Q1,Closeout,20220630 Gompers MS,10370075,Gompers MS - Portable Ramp,Access Compliance,7,Tanya Ortiz Franklin,South,1816001,13581,234 E. 112th St.,Los Angeles,90061,Purchase and install portable/temporary ramp to cafeteria.,4,2018-Q4,2018-Q4,Closeout,20220630 Fair ES,10368173,Fair ES - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1371201,13600,6501 Fair Ave.,North Hollywood,91606,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 88 doors/hardware, 34 accessible paths of travel, 51 signs, 14 restrooms, 21 drinking fountains/sinks, 3 assistive listening devices/intercoms/phones, 1 concrete ramp, 3 metal ramps, 11 pieces of accessible furniture, 1 assembly seat, 12 railings, 2 cafeteria counters, 1 nurse's exam room modification, 1 new elevator/stage lift, and 2 passenger/bus loading zones.","3,950",2017-Q4,2023-Q1,Construction,20220630 Emerson Community Charter MS,10369543,Emerson Community Charter MS - Fire Damage Repairs,Campus Improvement,4,Nick Melvoin,West,1812301,13641,1650 Selby Ave.,Los Angeles,90024,"The project will provide fire damage repairs to classrooms #2 & #3 at Craft Building #1. Major repairs consist of the removal and replacement of roofing, framing, doors, windows and grills, interior plaster walls, ceiling plaster, flooring, ductwork for heating, ventilation, and air conditioning (HVAC), electrical systems, low voltage systems, fire alarm, interior casework, marker boards, and projection screens.","4,121",2020-Q3,2022-Q3,Construction,20220630 Bassett ES,10371044,Bassett ES - Install Ramp,Access Compliance,3,Scott Schmerelson,Northwest,1232301,13813,15756 Bassett St.,Lake Balboa,91406,Install a temporary ramp at classroom 41.,80,2020-Q2,2020-Q3,Closeout,20220630 Kester ES,10370277,Kester ES - Exterior Painting,Painting,3,Scott Schmerelson,Northeast,1472601,13683,5353 Kester Ave.,Van Nuys,91411,"Prepare, paint, and refinish the exterior of all buildings and their appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site, at Kester Elementary School.",358,2019-Q4,2020-Q1,Closeout,20220630 112th St. ES,10370562,112th St. ES - 2019-20 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"This project is a charter school renovation for Resolute Academy Charter for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",74,2019-Q2,2019-Q3,Closeout,20220630 White Point ES,10370385,White Point ES - Exterior Painting,Painting,7,Tanya Ortiz Franklin,South,1776701,13617,1410 Silvius Ave.,San Pedro,90731,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",351,2020-Q2,2020-Q3,Closeout,20220630 Dana MS,10372117,Dana MS - Energy Conservation Lighting,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1810401,15063,1501 S. Cabrillo Ave.,San Pedro,90731,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $1,049,178. Estimated energy savings is 511,862 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $275,328 which is 26.2% of the ECM costs.",275,2022-Q3,2022-Q3,Planning,20220630 Woodlawn ES,10368669,Woodlawn ES - Flooring,Flooring,5,Jackie Goldberg,East,1790401,13572,6314 Woodlawn Ave.,Bell,90201,"The project removes existing floor tiles containing asbestos material as well as carpet in 13 classrooms, corridors and offices throughout the site and replace with new rubber tile flooring.",426,2017-Q3,2019-Q1,Closeout,20220630 Reed MS,10370253,Reed MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northeast,1835501,13647,4525 Irvine Ave.,North Hollywood,91602,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2024-Q3,2024-Q4,Planning,20220630 Kingsley ES,10370342,Kingsley ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,West,1617901,13927,5200 W. Virginia Ave.,Los Angeles,90029,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",78,2019-Q3,2019-Q4,Closeout,20220630 San Gabriel ES,10369140,San Gabriel ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1646601,13651,8628 San Gabriel Ave.,South Gate,90280,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",42,2018-Q1,2018-Q3,Closeout,20220630 Sharp ES,10372401,Sharp ES - Install Chain Link Fence,Fencing,6,Kelly Gonez,Northeast,1666501,13809,13800 Pierce St.,Arleta,91331,Install approx. 60ft of 8ft tall chain link fence with two swing gates. New install at back of campus to enclose District property at cul-de-sac on Vena Ave.,27,2022-Q1,2022-Q3,Construction,20220630 Shirley ES,10372623,Shirley ES - Secure Entry System,Security System,4,Nick Melvoin,Northwest,1671201,13671,19452 Hart St.,Reseda,91335,Install new secure entry system at the Main Office.,33,2022-Q3,2022-Q4,Planning,20220630 Leland ES,10366122,Leland ES - Fix Deteriorated Arcade,Roofing,7,Tanya Ortiz Franklin,South,1483601,13439,2120 S. Leland St.,San Pedro,90731,"The structural integrity of the arcade has been compromised by severe corrosion at the base of the vertical support members and studs. Replacement and/or alterations to the arcade are required to address this critical school repair need. Temporary shoring has been installed to provide limited access to the area until a permanent solution is in place. The project scope, schedule and budget are based on the expectation that the arcade and associated retaining wall, footings, flatwork and stairs will be removed and replaced.","1,431",2016-Q3,2018-Q1,Closeout,20220630 Erwin ES,10371645,Erwin ES - Exterior Painting,Painting,6,Kelly Gonez,Northeast,1363001,13624,13400 Erwin St.,Van Nuys,91401,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",666,2021-Q2,2022-Q3,Construction,20220630 Yorkdale ES,10372002,Yorkdale ES - Upgrade Telephone System,Communications/Technology Upgrade,2,Monica Garcia,Central,1795901,13385,5657 Meridian St.,Los Angeles,90042,"Upgrade phone equipment & re-program 8 existing PBX lines in admin offices. Install 2 new wiring & phone equipment in room 3, plus one in library. Lift long distance restrictions from SAA phone extension. Test all functions.",18,2021-Q4,2021-Q4,Closeout,20220630 Independence Continuation HS,10370774,Independence Continuation HS - Exterior Painting,Painting,3,Scott Schmerelson,Northwest,1855901,15186,6501 Balboa Blvd.,Lake Balboa,91406,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",96,2020-Q2,2020-Q4,Closeout,20220630 Canoga Park HS,10372109,Canoga Park HS - Major Modernization,Major Modernization,3,Scott Schmerelson,Northwest,1857101,13415,6850 Topanga Canyon Blvd.,Canoga Park,91303,"Site Due Diligence, Planning and Feasibility Activities.","1,632",-Q,-Q,Planning,20220630 Walnut Park ES,10367398,Walnut Park ES - Replace Steel Stairs,Campus Improvement,5,Jackie Goldberg,East,1464001,13825,2642 E. Olive St.,Huntington Park,90255,"This project replaces the corroded and deteriorated steel stairs located between Classroom Buildings 1 & 2 with new galvanized steel stairs. The scope of work also includes installing a barrier wall and double door entry to the stairs, modifying stair treads and 2 concrete landings, rerouting the electrical conduits in the elevator room, repairing damaged plaster, and patch and paint.",350,2017-Q1,2017-Q3,Closeout,20220630 24th St. ES,10370842,24th St. ES - Accessibility Upgrades,Access Compliance,1,"Dr. George J. McKenna, III",Central,1730101,13335,2055 W. 24th St.,Los Angeles,90018,Purchase and deliver hi-lo changing tables. Provide privacy curtain and window coverings.,18,2019-Q3,2019-Q4,Closeout,20220630 Washington Preparatory HS,10371739,Washington Preparatory HS - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1892801,13560,10860 S. Denker Ave.,Los Angeles,90047,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.","1,470",2022-Q2,2023-Q2,Construction,20220630 Marianna ES,10369205,Marianna ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1513701,13479,4215 E. Gleason St.,Los Angeles,90063,"Removal of 4 portable buildings. Salvage all furniture and equipment from classrooms, abate hazardous materials, disconnect low and high voltage utilities, and repair/replace asphalt at building footprints.",315,2017-Q4,2019-Q1,Closeout,20220630 Knox ES,10369823,Knox ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1686901,193553,8919 S. Main St.,Los Angeles,90003,Install new secure entry system at main office.,12,2018-Q4,2018-Q4,Closeout,20220630 Dominguez ES,10368356,Dominguez ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1346601,13310,21250 Santa Fe Ave.,Carson,90810,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",257,2021-Q3,2022-Q4,Construction,20220630 Hillcrest ES,10368383,Hillcrest ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1452801,13621,4041 Hillcrest Dr.,Los Angeles,90008,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",217,2019-Q1,2019-Q3,Closeout,20220630 Trinity ES,10371152,Trinity ES - Auditorium Upgrades,Auditorium Renovation,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,Provide and install projector and screen at auditorium.,66,2020-Q2,2020-Q3,Closeout,20220630 Lockwood ES,10370436,Lockwood ES - Technology & Security Upgrades,Communications/Technology Upgrade,2,Monica Garcia,Central,1489001,13311,4345 Lockwood Ave.,Los Angeles,90029,Purchase 40 Chromebooks and 1 storage cart and secure room for storage.,81,2019-Q2,2019-Q4,Closeout,20220630 Ramona ES,10369777,Ramona ES - 2018-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1617801,13353,1133 N. Mariposa Ave.,Los Angeles,90029,"This project is a charter school renovation for Citizens of the World - Silver Lake for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office and 8 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",18,2018-Q2,2018-Q3,Closeout,20220630 Le Conte MS,10108820,Le Conte MS - Lunch Pavilion Beam Repair,Lunch/Shade Shelter,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,Lunch Pavilion Beam Repair,470,2016-Q2,2016-Q3,Closeout,20220630 Ramona ES,10370084,Ramona ES - ADA Improvements,Access Compliance,5,Jackie Goldberg,West,1617801,13353,1133 N. Mariposa Ave.,Los Angeles,90029,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 36 doors/hardware, 21 accessible paths of travel, 41 signs, 13 restrooms, 4 drinking fountains, 20 sinks/sink cabinets, 3 assistive listening devices/intercoms/phones, 3 concrete ramps, 10 railings, 1 parking area, and 1 stage lift.","6,650",2022-Q1,2024-Q1,Construction,20220630 Saturn ES,10371206,Saturn ES - Paving,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,"This project provides approximately 73,500 square feet of new asphalt paving campus-wide, including greening areas and a new parking area. The scope of work also includes accessibility upgrades to the boys' and girls' restrooms.","6,253",2022-Q2,2024-Q1,Construction,20220630 Lake Balboa College Preparatory Magnet,10367153,Lake Balboa College Preparatory Magnet - Technology Upgrades,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1739001,15185,6701 Balboa Blvd.,Lake Balboa,91406,"Increase school's access to technology by providing 10 desktop computers, 24 laptops, and 10 media carts for computer lab and classrooms.",56,2016-Q1,2016-Q1,Closeout,20220630 Arlington Heights ES,10368789,Arlington Heights ES - 2017-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1219201,15202,1717 Seventh Ave.,Los Angeles,90019,"This project is a charter school renovation for Global Education Academy 2 for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",208,2017-Q2,2017-Q3,Closeout,20220630 Hillside ES,10368298,Hillside ES - Campus Upgrades,Campus Improvement,2,Monica Garcia,East,1453401,13293,120 E. Ave. 35,Los Angeles,90031,The project will install new security screens and fencing systems. The scope of work also includes modernization of the multipurpose room by installing new lighting and sound systems.,"1,601",2022-Q3,2023-Q2,Planning,20220630 Roybal Learning Center,10370612,Roybal Learning Center - 2019-23 Prop 39 (Los Angeles Academy of Arts and Enterprise),Charter Prop 39,2,Monica Garcia,Central,1854401,13875,1200 W. Colton St.,Los Angeles,90026,"This project was initially approved in BOE Report No. 343-18/19 for 2019-20 Prop 39 co-locations as a charter school renovation for Los Angeles Academy of Arts and Enterprise. This project included 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades 6-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved in BOE Report No. 313-19/20 for 2020-21 Prop 39 co-locations as a vacating project. Therefore, the project was amended to include the scope of work necessary to return the site to its previous conditions with all low voltage systems reconnected to District-operated programs. After this approval, an alternative agreement was executed that provided Los Angeles Academy of Arts and Enterprise access to the exact same room roster as they occupied in 2019-20. As a result, the scope of work changed from a vacating co-location to a ""no change"" co-location for the 2020-21 school year with no additional work required. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades 6-12 and an undefined scope of work. The project was next approved in Board of Education Report No. 291-21/22 for 2022-23 Proposition 39 charter co-locations as a vacating project. Los Angeles Academy of Arts and Enterprise will not continue occupancy in the 2022-23 school year. Therefore, this project is amended to include the scope of work necessary to return the site to it previous conditions, as appropriate.",218,2021-Q3,2021-Q3,Closeout,20220630 Dixie Canyon Community Charter ES,10369811,Dixie Canyon ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northeast,1343801,13677,4220 Dixie Canyon Ave.,Sherman Oaks,91423,Install new electronic marquee.,41,2018-Q3,2018-Q3,Closeout,20220630 Fair EEC,10368872,Fair EEC - Shade Shelter,Lunch/Shade Shelter,6,Kelly Gonez,Northeast,1958201,16765,11300 Kittridge St.,North Hollywood,91606,The project will install 1 shade structure and provide path of travel improvements that comply with the Americans with Disabilities Act (ADA).,116,2022-Q3,2023-Q1,Design,20220630 10th St. ES,10367492,10th St. ES - Roofing,Roofing,2,Monica Garcia,Central,1708201,13265,1000 Grattan St.,Los Angeles,90015,"The project replaces approximately 29,000 square feet of roofing at two buildings and their connecting arcade with a Polyvinyl Chloride (PVC) material. The project includes the replacement of roof hatches and two gabled skylights, installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition. The schedule reflects coordination with an already-approved HVAC project.",617,2018-Q3,2020-Q2,Closeout,20220630 Contreras Learning Complex,10370650,Contreras Learning Complex - Synthetic Turf & Slope Remediation,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1851701,13932,322 S. Lucas Ave.,Los Angeles,90017,"This project replaces approximately 185,400 square feet of synthetic turf on the baseball and football fields, installs 33,000 square feet of synthetic running track, and installs 47,000 square feet of geogrid in the northern area of the football field to stabilize the slope adjacent to the fields. The scope of work includes the installation of irrigation and drainage systems as well as upgrades to comply with the Americans with Disabilities Act (ADA) as required.","15,984",2021-Q4,2023-Q4,Construction,20220630 Carson HS,10372133,Carson HS - Synthetic Turf,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1857501,13869,22328 S. Main St.,Carson,90745,"This project is to provide approximately 80,000 square feet of synthetic turf on the football field. The scope of work also includes re-grading the field and surrounding areas, installation of drainage and irrigation systems, replacement of deteriorated sections of the running track, and Americans with Disabilities Act (ADA) upgrades as required.","3,312",2023-Q3,2024-Q1,Design,20220630 Coldwater Canyon ES,10369259,Coldwater Canyon ES - Security Upgrades,Security System,6,Kelly Gonez,Northeast,1315101,13663,6850 Coldwater Canyon Ave.,North Hollywood,91605,Upgrade the outdated intrusion alarm system for the campus to comply with new intrusion system specifications.,53,2017-Q4,2018-Q2,Closeout,20220630 Granada ES,10367448,Granada Community Charter ES - Roofing,Roofing,3,Scott Schmerelson,Northwest,1423301,13561,17170 Tribune St.,Granada Hills,91344,"This project is to upgrade 49,000 square feet of roofing at four buildings and the arcades with a Polyvinyl Chloride (PVC) material. The roofs are over 20 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",704,2017-Q2,2017-Q4,Closeout,20220630 Wilson HS,10370649,Wilson HS - Flooring,Flooring,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,"This project is to replace approximately 279,000 square feet of deteriorated flooring.","2,254",2023-Q1,2025-Q2,Planning,20220630 Mount Gleason MS,10369863,Mount Gleason MS - Plumbing Upgrades,Plumbing/Irrigation/Drainage,6,Kelly Gonez,Northeast,1824001,13744,10965 Mt. Gleason Ave.,Sunland,91040,"This project provides plumbing upgrades by replacing the domestic water plumbing system which serves the entire campus. The pipes were originally installed in 1959, are severely deteriorated, and the system has recently experienced failures. Temporary repairs have been made in the interim until the deteriorated water piping can be replaced.","4,285",2019-Q1,2022-Q1,Closeout,20220630 Logan Academy of Global Ecology,10372144,Logan Academy of Global Ecology - Install Electronic Marquee,Electrical/Lighting,2,Monica Garcia,Central,1490401,13266,1711 W. Montana St.,Los Angeles,90026,Install electronic free-standing marquee near corner of Montana St. and Logan St. Obtain power from electrical panel in adjacent building. Single-sided color LED display.,37,2021-Q4,2022-Q1,Closeout,20220630 Hamilton HS,10364034,Hamilton HS - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1868601,13570,2955 Robertson Blvd.,Los Angeles,90034,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,087",2014-Q1,2014-Q2,Closeout,20220630 Woodland Hills Charter ES,10372197,Woodland Hills Charter ES - Upgrade Kindergarten Yard,Paving/Greening/Playground Equipment,4,Nick Melvoin,Northwest,1789001,13492,22201 San Miguel St.,Woodland Hills,91364,Remove deteriorated rubber play matting. Install tricycle track with new trees and irrigation system.,100,2023-Q1,2023-Q2,Planning,20220630 Soto ES,10372585,Soto ES - Install Handrail,Access Compliance,2,Monica Garcia,East,1684901,13424,1020 S. Soto St.,Los Angeles,90023,Provide a handrail at 7th St. staircase entrance to main building.,55,2022-Q3,2023-Q4,Design,20220630 Stevenson College & Career Preparatory,10372600,Stevenson College & Career Prep - Upgrade Athletic Facility,Campus Improvement,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"This project will install new exterior basketball and volleyball courts, including stanchions, netting, and solar reflective game lines, upgrade boys and girls locker rooms by providing a new storage room and new benches, and install new security grilles over the gym windows.","2,000",2024-Q3,2024-Q4,Planning,20220630 Capistrano ES,10372618,Capistrano ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1280201,13759,8118 Capistrano Ave.,West Hills,91304,Install new secure entry system at the Main Office.,37,2022-Q3,2022-Q3,Planning,20220630 Banning HS,10367083,Banning HS - HVAC at Multiple Buildings,HVAC,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,"The project will upgrade the heating, ventilation, and air conditioning (HVAC) systems in the main, multipurpose, shop #1 and shop #3 buildings. The HVAC systems are over 40 years old and beyond economical repair. The project will also address cooling needs in the gymnasium building. The scope of work includes installing a new heating, ventilation, and air conditioning (HVAC) system and upgrading the fire alarm system. The project also includes equipment demolition, asbestos abatement, cleaning and leak test for ducts, structural upgrade, electrical power upgrade, patch and paint if required.","22,071",2021-Q4,2024-Q1,Construction,20220630 Los Angeles ES,10372628,Los Angeles ES - Secure Entry System,Security System,5,Jackie Goldberg,Central,1498201,13826,1211 S. Hobart Blvd.,Los Angeles,90006,Install new secure entry system at the Main Office.,38,2022-Q3,2022-Q3,Planning,20220630 Garden Grove ES,10372246,Garden Grove ES - Install Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,Northwest,1405501,13715,18141 Valerio St.,Reseda,91335,"Install new electronic, free-standing marquee. Remove manual-type marquee at corner of Valerio St. and Garden Grove Ave. Install new marquee in same location, with new footing. Approx. 100 feet underground/above-ground conduit required. Double-sided 8 feet x4 feet color LED display.",65,2022-Q3,2023-Q1,Planning,20220630 Gardena HS,10371321,Gardena HS - 2020-21 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"This project is a charter school renovation for New Millennium Secondary School for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 6 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",22,2020-Q2,2020-Q3,Closeout,20220630 Slawson Occupational Center,10372217,Slawson Occupational Center - Security Monitor System,Security System,5,Jackie Goldberg,East,1932801,15621,5500 Rickenbacker Rd.,Bell,90201,Install a video surveillance (CCTV) system with (31) cameras located throughout the campus and (3) speakers for an audio deterrent.,448,2022-Q1,2022-Q4,Construction,20220630 Stevenson College & Career Preparatory,10369787,Stevenson College & Career Preparatory - 2018-19 Prop 39 (Animo Ellen Ochoa Charter MS),Charter Prop 39,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"This project is a charter school renovation for Animo Ellen Ochoa Charter MS for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",29,2018-Q2,2018-Q3,Closeout,20220630 Sutter MS,10371151,Sutter MS - Fencing and Gates,Fencing,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,Provide and install security fencing and gates.,72,2020-Q3,2020-Q4,Closeout,20220630 Harrison ES,10104070,Harrison ES - Completion of Phases II & III of Ceiling Repair,Ceiling/Wall System,2,Monica Garcia,East,1443801,13528,3529 City Terrace Dr.,Los Angeles,90063,Completion of Phases II & III of Ceiling Repair,"2,615",2013-Q2,2014-Q3,Closeout,20220630 109th St. ES,10363851,109th St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1583601,13672,10915 McKinley Ave.,Los Angeles,90059,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",710,2014-Q1,2016-Q2,Closeout,20220630 Canoga Park HS,10370091,Canoga Park HS - Visual and Performing Arts Facilities Upgrade,Campus Improvement,3,Scott Schmerelson,Northwest,1857101,13415,6850 Topanga Canyon Blvd.,Canoga Park,91303,"Provide various visual and performing arts upgrades to the existing Assembly Hall, Oral Arts Room, Instrumental Music Room, and Choral Room, including new stage lighting and sound systems, new projection systems, a new automatic theatrical rigging system, new fixed seating, new flooring, interior paint, exterior lighting, and convert the existing Shop Building into a dance room. New specialized furniture and equipment will also be provided. Additionally, the project includes various upgrades for ADA and path of travel requirements, and any other required improvements or mitigations to ensure compliance with local, State and/or Federal facilities requirements.","8,688",2020-Q4,2022-Q3,Construction,20220630 Madison MS,10371210,Madison MS - Video Surveillance (CCTV) System,Security System,6,Kelly Gonez,Northeast,1823001,13627,13000 Hart St.,North Hollywood,91605,Install video surveillance (CCTV) system with two cameras on the assembly building and one at the lunch pavilion.,52,2020-Q2,2021-Q3,Closeout,20220630 Obama Global Preparation Academy,10372418,Obama Global Preparation Academy,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1686801,193550,1700 W. 46th St.,Los Angeles,90062,"Install privacy fencing on chain link fence on west side of school. It will include about 370 linear feet of 8 ft high of privacy fence with 4 ft on top of chain link fence. Also, install approximately 90 linear feet of privacy screen on the wrought iron fence. Purchase new STEM lab technology: (35) 3D virtual reality systems, (4) interactive displays with mobile stands, and (10) iPads.",99,2022-Q3,2022-Q4,Planning,20220630 Curtiss MS,10371130,Curtiss MS - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1810301,13775,1254 E. Helmick St.,Carson,90746,Provide and install CCTV cameras and monitors.,95,2020-Q3,2020-Q4,Closeout,20220630 Lockwood ES,10371803,Lockwood ES - Seismic Retrofits & HVAC at Main Building,Seismic Modernization,2,Monica Garcia,Central,1489001,13311,4345 Lockwood Ave.,Los Angeles,90029,"This project is to provide seismic retrofits and HVAC systems at the Main Building with a total area of approximately 11,480 square feet. The scope of work includes ADA upgrades as required.","8,003",2024-Q2,2025-Q3,Design,20220630 Sheridan ES,10369301,Sheridan ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1668501,13290,416 N. Cornwell St.,Los Angeles,90033,"Removal of 2 portable buildings. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprints.",179,2017-Q4,2019-Q4,Closeout,20220630 Serrania Charter for Enriched Studies,10372626,Serrania Charter for Enriched Studies - Secure Entry System,Security System,4,Nick Melvoin,Northwest,1660601,13800,5014 Serrania Ave.,Woodland Hills,91364,Install new secure entry system at the Main Office.,39,2022-Q3,2022-Q3,Planning,20220630 Carver MS,10369585,Carver MS - ADA Improvements,Access Compliance,5,Jackie Goldberg,Central,1809401,13409,4410 McKinley Ave.,Los Angeles,90011,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 17 doors, 50 door hardware, 14 thresholds, accessible paths of travel, 120 signs, 10 restrooms, 38 drinking fountains/sinks, 3 assistive listening devices/intercoms/phones, 4 pieces of accessible furniture, 1 assembly seat, 5 railings, 2 locker room modifications/lockers, 10 casework/counters, 10 door modifications/auto openers, and 1 concrete interior ramp.","5,681",2021-Q3,2023-Q4,Construction,20220630 La Salle ES,10368937,La Salle ES - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1478601,13507,8715 La Salle Ave.,Los Angeles,90047,Provide and install new Aiphone secure entry system at the main entrance.,23,2017-Q3,2018-Q1,Closeout,20220630 Budlong ES,10365683,Budlong ES - Replace Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1261601,15162,5940 S. Budlong Ave.,Los Angeles,90044,Replace deteriorated playground matting systems to ensure the health and safety of students.,83,2014-Q3,2014-Q3,Closeout,20220630 El Sereno ES,10367845,El Sereno ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1356201,13387,3838 Rosemead Ave.,Los Angeles,90032,"Remove 2 DSA portable buildings (24' x 60'), provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to remaining buildings on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",91,2016-Q4,2017-Q4,Closeout,20220630 Ford ES,10370111,Ford ES - Technology and Security Upgrade,Communications/Technology Upgrade,2,Monica Garcia,East,1391801,13503,1112 S. Ford Blvd.,Los Angeles,90022,Purchase 175 Chromebooks and 5 storage carts. Install adequate electrical outlets and secure doors for storage in rooms 23 and 24.,75,2018-Q4,2019-Q1,Closeout,20220630 Apperson ES,10366773,Apperson ES - HVAC,HVAC,6,Kelly Gonez,Northeast,1216401,13608,10233 Woodward Ave.,Sunland,91040,"This project will upgrade the existing heating, ventilation, and air conditioning (HVAC) system in the classroom buildings, multipurpose room, and library building. The existing systems are over 50 years old and in poor condition resulting in unreliable service. The scope includes installation of a fire suppression system for the kitchen hood and abatement of all hazardous materials impacted by the project.","2,320",2017-Q1,2018-Q2,Closeout,20220630 Eastman ES,10368380,Eastman ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1352101,13520,4112 E. Olympic Blvd.,Los Angeles,90023,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",206,2018-Q3,2019-Q1,Closeout,20220630 Glenwood ES,10372493,Glenwood ES - 2022-23 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1419201,13590,8001 Ledge Ave.,Sun Valley,91352,"This project is a charter school renovation for ISANA Palmati Academy for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 3 instructional spaces for charter student seats in grades TK-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",52,2022-Q3,2022-Q3,Planning,20220630 Roosevelt HS,10366803,Roosevelt HS - Comprehensive Modernization,Comprehensive Modernization,2,Monica Garcia,East,1882901,13523,456 S. Mathews St.,Los Angeles,90033,"This project includes the construction of new buildings and site improvements with 78 general and specialty classrooms, instructional support spaces, administration, auditorium, gymnasium, lunch shelter, basketball and tennis courts, and wellness center. Existing school facilities will be upgraded including the reuse or recreation of certain historical and/or cultural elements, as well as the potential development of a community learning center. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of the auditorium/classroom building, gymnasium, industrial arts building, building C, lunch shelter, maintenance and operations building, two music buildings, and 30 classrooms in relocatable buildings. Additionally, a new natural turf football field, synthetic competition track with sports field lighting and ancillary support buildings, and a new combination baseball and softball field with sports field lighting will be constructed. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved..","216,391",2019-Q1,2025-Q2,Construction,20220630 42nd St. ES,10368369,42nd St. ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1395901,13487,4231 Fourth Ave.,Los Angeles,90008,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",228,2018-Q3,2019-Q2,Closeout,20220630 Nobel Charter MS,10369451,Nobel Charter MS - Portable Wheelchair Lift,Access Compliance,3,Scott Schmerelson,Northwest,1827201,13805,9950 Tampa Ave.,Northridge,91324,Provide and Install portable wheelchair lift in auditorium,33,2018-Q1,2018-Q1,Closeout,20220630 Kennedy HS,10368160,Kennedy HS - Comprehensive Modernization,Comprehensive Modernization,3,Scott Schmerelson,Northwest,1872501,13263,11254 Gothic Ave.,Granada Hills,91344,"This project includes the construction of new buildings and site improvements with approximately 11 general and specialty classrooms, and instructional support spaces. Existing school facilities will be upgraded including the modernization and seismic retrofit of library building B, science building C, classroom building D, cafeteria/lunch shelter/student store building E, music complex/auditorium/special education building F, and shop building G. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of 19 relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","186,055",2023-Q1,2027-Q4,Design,20220630 Dana MS,10366828,Dana MS - Gym Upgrades,Flooring,7,Tanya Ortiz Franklin,South,1810401,15063,1501 S. Cabrillo Ave.,San Pedro,90731,This project will replace the wood floors in the Gymnasium Building and rehabilitate adjacent wall systems. The existing floors are over 60 years old and are in poor condition resulting in a hazardous condition at the site.,318,2015-Q4,2016-Q1,Closeout,20220630 Emerson Community Charter MS,10370557,Emerson Community Charter MS - Exterior Painting,Painting,4,Nick Melvoin,West,1812301,13641,1650 Selby Ave.,Los Angeles,90024,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",913,2020-Q4,2021-Q4,Closeout,20220630 Pearl Journalism/Communications Magnet HS,10371363,Pearl Journalism/Communications Magnet HS - Library Upgrades,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1855801,15701,6649 Balboa Blvd.,Lake Balboa,91406,"Relocate bookshelves and electrical receptacles and purchase new tables, chairs, and couches.",34,2020-Q4,2021-Q3,Closeout,20220630 Weigand ES,10372322,Weigand ES - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1763401,13611,10401 Weigand Ave.,Los Angeles,90002,"Install new electronic, wall-mounted marquee on east wall of auditorium building. 8'x5' color LED display.",62,2022-Q3,2022-Q4,Design,20220630 Millikan Charter MS,10369469,Millikan Charter MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northeast,1823801,13728,5041 Sunnyslope Ave.,Sherman Oaks,91423,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",227,2019-Q1,2020-Q1,Closeout,20220630 San Miguel ES,10371761,San Miguel ES - Install Privacy Fence,Fencing,5,Jackie Goldberg,East,1687501,14741,9801 San Miguel Ave.,South Gate,90280,Replace lower half of existing 12-foot-high chain-link fence around the playground with 6-foot-high privacy fence extending approximately 400 linear feet.,37,2021-Q2,2021-Q3,Closeout,20220630 Fair ES,10371317,Fair ES - 2020-23 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1371201,13600,6501 Fair Ave.,North Hollywood,91606,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for New Horizons Charter Academy. This project included 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades 4-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 7 instructional spaces for charter student seats in grades 4-8 and an undefined scope of work. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 7 instructional spaces for charter student seats in grades 4-8 and an undefined scope of work.",10,2021-Q3,2021-Q3,Closeout,20220630 Gompers MS,10372606,Gompers MS - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1816001,13581,234 E. 112th St.,Los Angeles,90061,"This project is to provide approximately 121,290 square feet of new roofing at 29 buildings, including the installation of new gutters and downspouts and painting of affected areas.","3,159",2023-Q3,2024-Q1,Planning,20220630 Griffith-Joyner ES,10369365,Griffith-Joyner ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1584901,13497,1963 E. 103rd St.,Los Angeles,90002,Install Aiphone video/buzzer entry system at main entrance.,15,2017-Q4,2018-Q2,Closeout,20220630 Fries ES,10370155,Fries ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1401401,13463,1301 Fries Ave.,Wilmington,90744,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q2,2026-Q3,Planning,20220630 112th St. EEC,10369315,112th St. EEC - Restroom Upgrade,Access Compliance,7,Tanya Ortiz Franklin,South,1954601,16623,1319 E. 112th St.,Los Angeles,90059,The project will provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,405,2022-Q1,2022-Q4,Construction,20220630 Wilshire Crest ES,10370784,Wilshire Crest ES - Parking Lot Fence,Fencing,1,"Dr. George J. McKenna, III",West,1779501,13524,5241 W. Olympic Blvd.,Los Angeles,90036,Install parking lot fence and gates,38,2019-Q3,2020-Q1,Closeout,20220630 Parmelee ES,10368373,Parmelee ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1602101,13815,1338 E. 76th Pl.,Los Angeles,90001,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2028-Q2,2028-Q3,Planning,20220630 Sharp ES,10370905,Sharp ES - Install Ramp,Access Compliance,6,Kelly Gonez,Northeast,1666501,13809,13800 Pierce St.,Arleta,91331,Install TMP ramp at classroom.,92,2019-Q4,2020-Q1,Closeout,20220630 Marina Del Rey MS,10369966,Marina Del Rey MS - Secure Entry System and Fencing,Security System,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,Install wrought iron fence and a secure entry system at the front of the school to improve security and safety.,59,2018-Q3,2019-Q2,Closeout,20220630 Clay MS,10367667,Clay MS - 2016-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1809901,13752,12226 S. Western Ave.,Los Angeles,90047,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a charter school renovation for Animo South LA Charter HS. This reconfiguration project included 1 charter office and 13 instructional spaces for charter students in grades 9-12, and reduced the number of spaces previously allocated to Animo South LA Charter HS during the 2015-16 school year. The scope of work included facilities renovations and reconfigurations, recovery of furniture and equipment, and recovery of technology. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",1,2016-Q3,2016-Q3,Closeout,20220630 Nevin ES,10367628,Nevin ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1546601,13390,1569 E. 32nd St.,Los Angeles,90011,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",55,2016-Q3,2017-Q1,Closeout,20220630 Fairfax HS,10366821,Fairfax HS - Replace Synthetic Turf Field,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1862101,13473,7850 Melrose Ave.,Los Angeles,90046,"This project addresses the defective synthetic turf field of approximately 115,000 square feet by removing and replacing the field with one that will perform better for instructional and extracurricular activities.","1,352",2015-Q3,2015-Q4,Closeout,20220630 Wilmington STEAM Magnet MS,10366118,Wilmington MS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1849001,13538,1700 Gulf Ave.,Wilmington,90744,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",526,2015-Q1,2015-Q2,Closeout,20220630 Narbonne HS,10366816,Narbonne HS-ADA Repairs,Access Compliance,7,Tanya Ortiz Franklin,South,1877901,13407,24300 S. Western Ave.,Harbor City,90710,ADA repairs,16,2015-Q2,2015-Q3,Closeout,20220630 Hillside ES,10366126,Hillside ES - Fix Upper Deck Concrete Walkway,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1453401,13293,120 E. Ave. 35,Los Angeles,90031,"The concrete membrane of the upper deck walkway connecting the Multipurpose and Classroom Building has deteriorated, which has created a tripping hazard. The scope of work includes completely removing and replacing the concrete membrane of the upper deck, and repairing the deteriorated areas of the connected stairwell and landings.",37,2014-Q2,2014-Q2,Closeout,20220630 Melvin ES,10366131,Melvin ES - Laptops & Carts,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1523301,13719,7700 Melvin Ave.,Reseda,91335,Increase school's access to technology by providing laptops and media carts,49,2014-Q3,2014-Q3,Closeout,20220630 Columbus MS,10366132,Columbus MS - Desktop Computers,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,Increase school's access to technology by providing new desktop computers,80,2014-Q3,2014-Q3,Closeout,20220630 Soto ES,10366136,Soto ES - Install A/C Units & Roofing in Food Prep Area,Campus Improvement,2,Monica Garcia,East,1684901,13424,1020 S. Soto St.,Los Angeles,90023,Upgrade the campus by installing air conditioning units in the food preparation/eating area and teachers' lounge and installing a roof covering in the food preparation/eating area,30,2015-Q2,2015-Q3,Closeout,20220630 Stanford ES,10366538,Stanford ES - SEEDS,SEEDS,5,Jackie Goldberg,East,1690401,13478,2833 Illinois Ave.,South Gate,90280,"Design and construct an outdoor learning space that is approximately 1,300 square feet and consists of the removal of asphalt, and the installation of decomposed granite, concrete header and pavers, and a hose bib. It will be outfitted by the school site (Stanford ES) with raised garden beds, benches, tables, and planting materials.",48,2015-Q2,2015-Q4,Closeout,20220630 Hobart ES,10105897,Hobart ES - Compliance with State & Federal Access Requirements,Fire Alarm System,5,Jackie Goldberg,Central,1454801,13331,980 S. Hobart Blvd.,Los Angeles,90006,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),394,2014-Q4,2015-Q2,Closeout,20220630 City of Angels Independent Studies,10367819,City of Angels Independent Studies - Security Upgrades,Security System,2,Monica Garcia,East,1880101,16221,221 S. Eastman Ave.,Los Angeles,90063,Provide and install Aiphone secure entrance system.,36,2016-Q3,2016-Q4,Closeout,20220630 Delevan ES,10367914,Delevan ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1339701,13455,4168 W. Ave. 42,Los Angeles,90065,"Purchase 36 Chromebooks, 36 laptops and 2 syncing carts; upgrade classroom security features including door hardware and installation of metal skins on doors.",47,2016-Q4,2016-Q4,Closeout,20220630 Perez Special Education Center,10364124,Perez Special Education Center - Roofing,Roofing,2,Monica Garcia,East,1195301,13489,4540 Michigan Ave.,Los Angeles,90022,"The project will remove and replace 83,000 square feet of cap sheet roofing for classroom building #003DAV. The roofing material is more than 30 years old and has required numerous repairs/patches over the past several years.",448,2014-Q3,2014-Q3,Closeout,20220630 Glen Alta Span School,10368218,Glen Alta ES - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1413701,13292,3410 Sierra St.,Los Angeles,90031,Provide and install grab bars at restroom K3.,3,2016-Q4,2017-Q1,Closeout,20220630 Stagg ES,10368219,Stagg ES - Accessibility Upgrades,Access Compliance,3,Scott Schmerelson,Northwest,1689001,13722,7839 Amestoy Ave.,Lake Balboa,91406,Provide and install 2 new accessible auditorium doors and thresholds. Provide and install wall-mounted changing table. Modify kindergarten doors and light switches.,14,2017-Q1,2017-Q1,Closeout,20220630 Jefferson HS,10366241,Jefferson HS - 2014-15 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1871401,13447,1319 E. 41st St.,Los Angeles,90011,"This project is a charter school renovation for Student Empowerment Academy for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 12 classrooms for 345.6 charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",28,2014-Q2,2014-Q2,Closeout,20220630 King Magnets MS,10367009,King MS- Access Compliance Repair,Access Compliance,2,Monica Garcia,Central,1820801,13531,4201 Fountain Ave.,Los Angeles,90029,Remove non structural partition and system dividing Classroom. Classroom will be converted for special ed.,24,2015-Q2,2015-Q3,Closeout,20220630 Olive Vista MS,10366771,Olive Vista MS-Remove/Sale 8 Portable Classroom Bldgs.,Portable Removal,6,Kelly Gonez,Northeast,1830601,13707,14600 Tyler St.,Sylmar,91342,"Removal/Sale of 8 Department of Housing (DOH) Portable Buildings; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",284,2015-Q3,2016-Q4,Closeout,20220630 Toluca Lake ES,10365213,Toluca Lake ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1719201,13634,4840 Cahuenga Blvd.,North Hollywood,91601,Demolish/Remove 1 Portable Building,124,2014-Q4,2015-Q2,Closeout,20220630 Central Continuation HS,10363902,Central Continuation HS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1858001,14201,"716 E. 14th St., 2nd Floor",Los Angeles,90021,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",129,2014-Q4,2015-Q1,Closeout,20220630 Irving STEAM Magnet MS,10366490,Irving MS-Bus Dropoff & Parking Restripe,Access Compliance,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,Provide Bus Dropoff & Accessible Parking Restripe,10,2014-Q3,2015-Q1,Closeout,20220630 Sunland ES,10366559,Sunland ES-Restroom Upgrade,Access Compliance,6,Kelly Gonez,Northeast,1697301,13451,8350 Hillrose St.,Sunland,91040,Remove restroom partition and add grab bars,2,2014-Q4,2014-Q4,Closeout,20220630 Arroyo Seco Museum Science Magnet,10363880,Arroyo Seco Museum Science Magnet - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1432201,13900,4805 Sycamore Terrace,Los Angeles,90042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",262,2014-Q2,2014-Q3,Closeout,20220630 Castelar ES,10363901,Castelar ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1286301,13283,840 Yale St.,Los Angeles,90012,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",282,2014-Q3,2014-Q4,Closeout,20220630 Northridge Academy HS,10366125,Northridge Academy HS - Fix Failing Concrete Planter Boxes,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1851301,13930,9601 Zelzah Ave.,Northridge,91325,"The concrete planter boxes (10) located throughout the school site are no longer able to sustain the weight of their contents of trees, shrubs and soil, which has created a potential safety hazard. The planter boxes have been secured with metal bands to prevent them from collapsing. The scope of work includes the demolition of the concrete planter boxes (10) and the associated water supply and waste lines; removal of the trees and shrubs contained within the planter boxes, and equipping the school grounds with tables, umbrellas and benches of a permanent nature, in place of the failing concrete planter boxes.",51,2014-Q2,2014-Q3,Closeout,20220630 Anatola ES,10366501,Anatola ES - Demolish/Remove DOH Portable Bldg,Portable Removal,3,Scott Schmerelson,Northwest,1211001,13609,7364 Anatola Ave.,Lake Balboa,91406,"Demolish/Remove Department of Housing (DOH) Portable Building; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",89,2015-Q2,2015-Q4,Closeout,20220630 Manchester ES,10004639,Manchester ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",South,1509601,13305,661 W. 87th St.,Los Angeles,90044,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",38,2014-Q3,2016-Q3,Closeout,20220630 Sylmar Charter HS,10367039,Sylmar HS - Portable Relocation,Portable Removal,6,Kelly Gonez,Northeast,1887801,13856,13050 Borden Ave.,Sylmar,91342,"Relocate one 12' x 40' DSA portable restroom building, disconnect utilities and fire alarm, remove fencing, and resurface asphalt paving",49,2015-Q4,2016-Q3,Closeout,20220630 Superior Charter ES,10367931,Superior Charter ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1700701,13810,9756 Oso Ave.,Chatsworth,91311,Provide and install electronic marquee.,45,2017-Q3,2017-Q3,Closeout,20220630 Wilmington Park EEC,10103103,Wilmington Park EEC - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,7,Tanya Ortiz Franklin,South,1958501,16300,1419 Young St.,Wilmington,90744,Mitigate Lead in Water,6,2014-Q1,2015-Q2,Closeout,20220630 Valley Oaks Center for Enriched Studies,10366929,Sun Valley HS - 2015-16 Prop 39 (North Valley Military Institute),Charter Prop 39,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,"This project is a charter school renovation for North Valley Military Institute for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 15 classrooms for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",164,2015-Q2,2015-Q3,Closeout,20220630 El Dorado ES,10367081,El Dorado ES - SEEDS,SEEDS,6,Kelly Gonez,Northeast,1354101,13792,12749 El Dorado Ave.,Sylmar,91342,"Improve an existing outdoor learning space that is approximately 2,700 square feet by installing decomposed granite, a concrete entrance pad, a hose bib with a timer and an electrical power outlet. The outdoor learning space will be outfitted by the school site (El Dorado ES) and the partner organization (TreePeople) with planter boxes, planting materials and outdoor tables.",34,2016-Q1,2016-Q1,Closeout,20220630 Cohasset ES,10367610,Cohasset ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1313701,13542,15810 Saticoy St.,Lake Balboa,91406,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",46,2016-Q4,2017-Q3,Closeout,20220630 Contreras Learning Complex,10367612,Contreras Learning Complex - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1851701,13932,322 S. Lucas Ave.,Los Angeles,90017,"Modernize parent & family center by providing interior paint and refinishing floors. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",28,2016-Q3,2016-Q4,Closeout,20220630 Haddon EEC,10005038,Haddon EEC - Safety Upgrades and Improvements,Campus Improvement,6,Kelly Gonez,Northeast,1958801,16666,10085 Haddon Ave.,Pacoima,91331,"Upgrade restroom flooring, entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",87,2014-Q3,2015-Q1,Closeout,20220630 Delevan ES,10365698,Delevan ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1339701,13455,4168 W. Ave. 42,Los Angeles,90065,Replace deteriorated playground matting systems to ensure the health and safety of students.,90,2015-Q1,2015-Q2,Closeout,20220630 Camino Nuevo HS,10366534,Camino Nuevo HS - SEEDS,SEEDS,2,Monica Garcia,Central,1857001,13932,1215 W. Miramar St.,Los Angeles,90026,"Design and construct an outdoor learning space that is approximately 2,600 square feet and consists of the installation of a hose bib, painting of concrete surfaces, relocation of concrete benches and installation of art poles. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",5,2014-Q4,2015-Q1,Closeout,20220630 Sunny Brae ES,10366335,Sunny Brae ES - Deteriorated Flooring,Flooring,3,Scott Schmerelson,Northwest,1698601,13737,20620 Arminta St.,Canoga Park,91306,"The deteriorated asbestos-containing floor tiles are in poor condition causing not only a tripping hazard, but a health hazard due to the risk of an asbestos release. The project will replace the deteriorated flooring and abate the asbestos in various rooms located in the main office building, auditorium and classroom buildings.",216,2014-Q2,2014-Q3,Closeout,20220630 Dearborn Charter Academy ES,10003972,Dearborn ES - Shade Shelters & Technology Upgrades,Campus Improvement,3,Scott Schmerelson,Northwest,1337701,13762,9240 Wish Ave.,Northridge,91325,"Purchase and install 400 square foot shade shelter for kindergarten yard; Purchase and install 900 square foot shade shelter for upper grade level yard; Computer Lab purchase and install desks and chairs for 32 stations, 30 PC desktop computers, 1 computer for teacher, 33 data drops for new and existing computers, 1 printer/scanner, and 1 smart board",343,2012-Q3,2014-Q1,Closeout,20220630 Roybal Learning Center,10368840,Roybal Learning Center - 2017-18 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1854401,13875,1200 W. Colton St.,Los Angeles,90026,"This project is a charter school renovation for Los Angeles Academy of Arts and Enterprise for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 17 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",8,2017-Q2,2017-Q3,Closeout,20220630 Raymond ES,10367632,Raymond ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1621901,13469,7511 Raymond Ave.,Los Angeles,90044,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",76,2016-Q3,2017-Q2,Closeout,20220630 Alexandria ES,10367274,Alexandria ES - Security Upgrades,Security System,2,Monica Garcia,Central,1204101,13456,4211 Oakwood Ave.,Los Angeles,90004,Upgrade physical security of the school by purchasing and installing an electric camera door entry system at northern front gate.,6,2016-Q2,2016-Q3,Closeout,20220630 Dolores ES,10367523,Dolores ES - Temporary Ramp,Access Compliance,7,Tanya Ortiz Franklin,South,1345201,13711,22526 Dolores St.,Carson,90745,Provide and Install 1 Temporary Ramp to Kindergarten Classroom D3,15,2016-Q1,2016-Q3,Closeout,20220630 66th St. EEC,10367291,66th St. EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1956101,16681,405 E. 67th St.,Los Angeles,90003,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",103,2016-Q3,2016-Q3,Closeout,20220630 Bridges Span School,10367008,Bridges ES-Temp Ramp,Access Compliance,7,Tanya Ortiz Franklin,South,1686701,14543,1235 Broad Ave.,Wilmington,90744,Temp Ramps,5,2015-Q2,2015-Q2,Closeout,20220630 Le Conte MS,10366904,Le Conte MS - 2015-16 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"This project is a charter school renovation for Citizens of the World Charter School - Hollywood for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 18 classrooms for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",44,2015-Q2,2015-Q3,Closeout,20220630 Angel's Gate Continuation HS,10367905,Angel's Gate Continuation HS - Fencing,Fencing,7,Tanya Ortiz Franklin,South,1885201,13943,3607 S. Gaffey St.,San Pedro,90731,Install new 16' fence around volleyball court.,30,2016-Q4,2017-Q1,Closeout,20220630 Shenandoah EEC,10368002,Shenandoah EEC - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1955901,16725,8861 Beverlywood St.,Los Angeles,90034,Install new security fence with pedestrian gate at front entrance for improved site security.,10,2017-Q1,2017-Q2,Closeout,20220630 Los Angeles HS,10366908,Los Angeles HS - 2015-16 Prop 39 (City Charter HS),Charter Prop 39,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,"This project is a charter school renovation for City Charter HS for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 4 classrooms for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",15,2015-Q3,2015-Q3,Closeout,20220630 Grant ES,10366897,Grant ES - 2015-16 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1426001,13355,1530 N. Wilton Pl.,Los Angeles,90028,"This project is a charter school renovation for Citizens of the World Charter School - Silver Lake for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 12 classrooms for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",62,2015-Q2,2015-Q3,Closeout,20220630 Columbus MS,10367849,Columbus MS - Accessibility Upgrades,Access Compliance,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,Provide and install ADA Hi/Lo drinking fountains and lunch bench. Provide and Install portable wheelchair lift. Remove 3 lavatories from Boys restroom to allow for changing table. Provide and install electrical outlet for changing table and install privacy lock for boys restroom.,64,2016-Q3,2016-Q4,Closeout,20220630 Limerick ES,10367458,Limerick ES - Temp Ramp,Access Compliance,3,Scott Schmerelson,Northwest,1488101,13697,8530 Limerick Ave.,Canoga Park,91306,Temporary Ramp,20,2016-Q1,2016-Q1,Closeout,20220630 Franklin HS,10367097,Franklin HS - 5' Pedestrian Gate,Fencing,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,Provide and install 5' pedestrian gate for new Dual Language program located at rear of campus,7,2015-Q3,2015-Q3,Closeout,20220630 Panorama HS,10366740,Panorama HS - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,"Modernize and upgrade school's existing parent & family center by providing interior paint, new flooring, and security upgrades including new doors and hardware as well as security on windows. Provide whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",62,2015-Q2,2016-Q1,Closeout,20220630 Perez Special Education Center,10367630,Perez Special Education Center - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1195301,13489,4540 Michigan Ave.,Los Angeles,90022,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",44,2016-Q3,2017-Q2,Closeout,20220630 93rd St. ES,10366630,93rd St. ES - Fence for Reading Area,Fencing,7,Tanya Ortiz Franklin,South,1558201,13814,330 E. 93rd St.,Los Angeles,90003,Upgrade the campus by installing a fence to provide a new reading area for students,19,2015-Q1,2015-Q1,Closeout,20220630 Huntington Park-Bell Community Adult School,10366846,Huntington Park-Bell Community Adult School - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1921101,16465,2945 Belgrave Ave.,Huntington Park,90255,Removal of 1 24' x 60' DOH Portable Bldg.,45,2015-Q2,2016-Q1,Closeout,20220630 Normandie EEC,10367347,Normandie EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1954101,16667,4407 S. Raymond Ave.,Los Angeles,90037,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",80,2016-Q2,2016-Q2,Closeout,20220630 Sendak ES,10368181,Sendak ES - Gate Closers and Fencing,Fencing,6,Kelly Gonez,Northeast,1357401,13919,11414 W. Tiara St.,North Hollywood,91601,"Install gate closers at 7 main entrance gates, parent reunion gate at south fence, and fencing around trash bin enclosure.",18,2017-Q1,2017-Q2,Closeout,20220630 Griffin ES,10366385,Griffin ES - Repair Walk Decks,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1430101,13284,2025 Griffin Ave.,Los Angeles,90031,"The concrete membrane of the upper deck walkway and landings has deteriorated, which has created a tripping hazard. The scope of work includes completely removing and replacing the concrete membrane of the upper deck as well as repairing the deteriorated areas of the connected stairwell and landings.",47,2014-Q4,2015-Q1,Closeout,20220630 Millikan Charter MS,10366069,Millikan Charter MS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1823801,13728,5041 Sunnyslope Ave.,Sherman Oaks,91423,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",539,2015-Q1,2015-Q2,Closeout,20220630 Topeka Charter School for Advanced Studies,10368691,Topeka Charter School for Advanced Studies - Kindergarten Upgrades,Access Compliance,3,Scott Schmerelson,Northwest,1720101,13821,9815 Topeka Dr.,Northridge,91324,"Provide and install handrails, new accessible gates, gate hardware, and perimeter fencing for kindergarten area.",46,2017-Q1,2017-Q3,Closeout,20220630 Multnomah ES,10370031,Multnomah ES - Secure Entry System,Security System,2,Monica Garcia,East,1542501,13631,2101 N. Indiana Ave.,Los Angeles,90032,Install new secure entry system,21,2019-Q1,2019-Q2,Closeout,20220630 Westchester Enriched Sciences Magnets,10371348,Westchester Enriched Sciences Magnets - 2020-21 Prop 39 (WISH Community School),Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Community School for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 12 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",186,2020-Q3,2020-Q3,Closeout,20220630 Grape ES,10366317,Grape ES - Ceiling System Improvements,Seismic Modernization,7,Tanya Ortiz Franklin,South,1427401,13495,1940 E. 111th St.,Los Angeles,90059,"Repair 29,000 square feet of suspended ceiling systems in 002DCR classroom building for seismic corrections and to improve structural integrity. Scope of work includes installation of new seismic compression struts, and hanger wire upgrades per code requirements, as well as abatement of asbestos and removing impacted components beyond their remaining service life.","1,333",2022-Q3,2023-Q3,Design,20220630 Politi ES,10372338,Politi ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1238401,13823,2481 W. 11th St.,Los Angeles,90006,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",90,2022-Q3,2022-Q4,Planning,20220630 Bridge ES,10372341,Bridge ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1252101,13297,605 N. Boyle Ave.,Los Angeles,90033,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",91,2022-Q3,2023-Q1,Planning,20220630 Encino Charter ES,10367916,Encino Charter ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,Northwest,1361601,13500,16941 Addison St.,Encino,91316,Provide and install electronic marquee.,41,2017-Q1,2017-Q2,Closeout,20220630 White ES,10365687,White ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1254201,13830,2401 Wilshire Blvd.,Los Angeles,90057,Replace deteriorated playground matting systems to ensure the health and safety of students.,83,2015-Q2,2015-Q2,Closeout,20220630 Kennedy-San Fernando Community Adult School,10366769,Kennedy-San Fernando Community Adult School - Portable Removal,Portable Removal,3,Scott Schmerelson,Northwest,1936501,13264,11254 Gothic Ave.,Granada Hills,91344,"Disconnect, remove and sell 1 Department of Housing (DOH) portable building as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",136,2015-Q3,2016-Q3,Closeout,20220630 Sylmar Charter HS,10372177,Sylmar Charter HS - Major Modernization,Major Modernization,6,Kelly Gonez,Northeast,1887801,13856,13050 Borden Ave.,Sylmar,91342,"Site Due Diligence, Planning and Feasibility Activities.","1,698",-Q,-Q,Planning,20220630 "Lawson Academy of the Arts, Mathematics & Science",10367459,"Lawson Academy of the Arts, Mathematics & Science - Security Upgrades",Security System,1,"Dr. George J. McKenna, III",West,1231201,14563,929 W. 69th St.,Los Angeles,90044,Install Aiphone secure entry system at the main office front door and lobby.,28,2016-Q2,2017-Q2,Closeout,20220630 Bernstein HS,10108778,Bernstein HS - Provide Extension to Fence,Fencing,5,Jackie Goldberg,West,1869601,13953,1309 N. Wilton Pl.,Hollywood,90028,Provide extension to fence.,80,2016-Q3,2017-Q2,Closeout,20220630 Taft Charter HS,10368337,Taft Charter HS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,Northwest,1888001,13787,5461 Winnetka Ave.,Woodland Hills,91364,"Replace deteriorated interior walk-in cooler and exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",293,2019-Q1,2019-Q3,Closeout,20220630 Sterry ES,10368370,Sterry ES - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1693201,13431,1730 Corinth Ave.,Los Angeles,90025,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",232,2019-Q1,2020-Q3,Closeout,20220630 Willenberg Special Education Center,10368912,Willenberg Special Education Center - Remodel Restroom,Access Compliance,7,Tanya Ortiz Franklin,South,1195701,13545,308 Weymouth Ave.,San Pedro,90732,Remodel restroom to provide an accessible adult-sized compartment.,27,2017-Q3,2017-Q3,Closeout,20220630 Dena ES,10367673,Dena ES - 2016-18 Prop 39,Charter Prop 39,2,Monica Garcia,East,1331501,13277,1314 Dacotah St.,Los Angeles,90023,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a charter school renovation for Endeavor College Prep. This growth project included 1 charter office and 12 instructional spaces for charter students in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with an unspecified scope of work and a revised expiration date for the charter school of 6/30/18. The charter operator, Endeavor College Prep did not continue to occupy Dena ES during the 2017-18 academic year. As a result, the scope of work was defined as a vacancy which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",170,2018-Q2,2018-Q3,Closeout,20220630 Stevenson College & Career Preparatory,10367885,Stevenson MS - Accessibility Upgrades,Access Compliance,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,Remove and dispose of 3 concrete stairs at portable classrooms 43 & 44. Provide level landing for metal ramp. Provide and install metal ramp including skirting and galvanized handrails.,82,2016-Q3,2017-Q1,Closeout,20220630 Sierra Vista ES,10369421,Sierra Vista ES - Security Upgrades,Security System,2,Monica Garcia,East,1676701,13380,4342 Alpha St.,Los Angeles,90032,Install new secure entry system.,14,2018-Q1,2018-Q2,Closeout,20220630 107th St. ES,10368368,107th St. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1585701,13857,147 E. 107th St.,Los Angeles,90003,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",203,2019-Q1,2019-Q3,Closeout,20220630 Brooklyn Span School,10372342,Brooklyn ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1256201,13471,4620 Cesar E. Chavez Ave.,Los Angeles,90022,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",81,2022-Q3,2022-Q4,Planning,20220630 Farmdale ES,10372343,Farmdale ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1374001,15166,2660 Ruth Swiggett Dr.,Los Angeles,90032,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",88,2022-Q3,2023-Q1,Planning,20220630 Solis Learning Academy,10372346,Solis Learning Academy - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1775201,14564,319 N. Humphreys Ave.,Los Angeles,90022,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",77,2022-Q3,2022-Q4,Planning,20220630 Sylvan Park ES,10372347,Sylvan Park ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northeast,1702701,13477,6238 Noble Ave.,Van Nuys,91411,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",96,2022-Q3,2023-Q1,Planning,20220630 Fulton College Preparatory School,10367683,Fulton College Preparatory School - 2016-17 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,"This project is a charter school renovation for Lashon Academy for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades K-4. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",39,2016-Q2,2016-Q3,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10370620,"Sun Valley Magnet: Engineering, Arts & Technology - 2019-20 Prop 39",Charter Prop 39,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"This project is a charter school renovation for ISANA Cardinal Charter School for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 2 charter offices, 1 special education room, and 15 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",25,2019-Q2,2019-Q3,Closeout,20220630 Selma ES,10369784,Selma ES - 2018-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1658901,13360,6611 Selma Ave.,Los Angeles,90028,"This project is a charter school renovation for Larchmont Charter School for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 11 instructional spaces for charter student seats in grades 5-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",8,2018-Q2,2018-Q3,Closeout,20220630 Valley Oaks Center for Enriched Studies,10369790,Sun Valley HS - 2018-19 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,"This project is a charter school renovation for North Valley Military Institute for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 2 special education rooms, and 26 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",66,2018-Q2,2018-Q3,Closeout,20220630 Columbus MS,10371129,Columbus MS - Auditorium Renovation,Auditorium Renovation,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,Upgrade projector screen and theater drapes.,40,2020-Q2,2020-Q3,Closeout,20220630 Obama Global Preparation Academy,10371326,Obama Global Preparation Academy - 2020-21 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1686801,193550,1700 W. 46th St.,Los Angeles,90062,"This project is a charter school renovation for LA's Promise Charter MS for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 9 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",264,2020-Q3,2020-Q3,Closeout,20220630 Harvard ES,10372234,Harvard ES - Install Privacy Fence,Fencing,5,Jackie Goldberg,West,1204201,13946,330 N. Harvard Blvd.,Los Angeles,90004,Install new chain link privacy fence. Replace approx. 550 feet of chain link fence with privacy fencing.,54,2022-Q1,2022-Q1,Closeout,20220630 Latona ES,10369108,Latona ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1479501,13374,4312 Berenice Ave.,Los Angeles,90031,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",53,2017-Q4,2018-Q2,Closeout,20220630 Solano ES,10369110,Solano ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1683601,13343,615 Solano Ave.,Los Angeles,90012,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",57,2018-Q1,2018-Q3,Closeout,20220630 Erwin ES,10369113,Erwin ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1363001,13624,13400 Erwin St.,Van Nuys,91401,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",56,2017-Q4,2018-Q3,Closeout,20220630 Buchanan ES,10369126,Buchanan ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1260301,13350,5024 Buchanan St.,Los Angeles,90042,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",51,2018-Q1,2018-Q3,Closeout,20220630 Narbonne HS,10369076,Narbonne HS - Fencing,Fencing,7,Tanya Ortiz Franklin,South,1877901,13407,24300 S. Western Ave.,Harbor City,90710,Extend fence under home bleachers and install fence panels behind and between buildings to prevent student access. Buildings are located west from home bleachers.,26,2017-Q3,2018-Q1,Closeout,20220630 Dodson MS,10368170,Dodson MS - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1811001,13846,28014 Montereina Dr.,Rancho Palos Verdes,90275,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 197 doors/hardware, 68 accessible paths of travel, 96 signs, 17 restrooms, 13 drinking fountains/sinks, 3 assistive listening devices/intercoms/phones, 9 concrete ramps, 3 metal ramps, 8 pieces of accessible furniture, 1 assembly seat, 6 railings, 2 locker room modifications/lockers, 1 parking area, 1 cafeteria counter, 4 new elevators/stage lifts, 1 bus loading zone and a new major storm drain at the existing bus lane.","8,507",2018-Q2,2021-Q4,Closeout,20220630 Belmont HS,10369371,Belmont HS - Roofing & HVAC,Roofing,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"The project replaces approximately 139,000 square feet of deteriorated roofing campus-wide, installs new gutters and downspouts, and replaces the skylights. As part of this roofing project, selected heating, ventilation, and air conditioning (HVAC) units and equipment will be replaced on 8 buildings while the remaining roof-mounted HVAC units and ductwork on 3 buildings will be protected in place.","5,321",2018-Q3,2019-Q4,Closeout,20220630 Fletcher ES,10369128,Fletcher ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",55,2017-Q3,2018-Q2,Closeout,20220630 Ford ES,10369134,Ford ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1391801,13503,1112 S. Ford Blvd.,Los Angeles,90022,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",59,2018-Q1,2018-Q3,Closeout,20220630 Holmes ES,10369135,Holmes ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1456201,13315,5108 Holmes Ave.,Los Angeles,90058,"Modernize Parent & Family Center classroom by providing paint touch-up, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",61,2018-Q1,2018-Q2,Closeout,20220630 South East HS,10369141,South East HS - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1888101,14161,2720 Tweedy Blvd.,South Gate,90280,"Modernize Parent & Family Center classroom by providing paint touch-up, security upgrades (install metal skins and new locking mechanisms on doors), and replacing deteriorated floor/ceiling tiles as needed. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",33,2017-Q4,2018-Q2,Closeout,20220630 Ritter ES,10369364,Ritter ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1630101,13562,11108 Watts Ave.,Los Angeles,90059,Install Aiphone video/buzzer entry system at main entrance.,31,2017-Q4,2018-Q3,Closeout,20220630 West Vernon ES,10368374,West Vernon ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1765401,13330,4312 S. Grand Ave.,Los Angeles,90037,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",276,2019-Q2,2021-Q2,Closeout,20220630 Woodlawn ES,10369423,Woodlawn ES - Electronic Marquees,Electrical/Lighting,5,Jackie Goldberg,East,1790401,13572,6314 Woodlawn Ave.,Bell,90201,Install two electronic marquees; one free-standing and one wall-mounted.,103,2019-Q1,2019-Q2,Closeout,20220630 Eagle Rock HS,10369716,Eagle Rock HS - ADA Improvements,Access Compliance,5,Jackie Goldberg,Central,1861401,13553,1750 Yosemite Dr.,Los Angeles,90041,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 29 doors, 87 door hardware, accessible paths of travel, 202 signs, 11 restrooms, 33 drinking fountains/sinks, 2 assistive listening devices/intercoms/phones, 11 concrete ramps, 17 metal ramps, 9 pieces of accessible furniture, 12 railings, 5 existing elevator modifications, 5 parking areas, 6 cafeteria counters, 13 casework/counters, 4 changing rooms, 2 new elevators/stage lifts, and DSA certification of 4 portable buildings.","11,230",2021-Q3,2023-Q1,Construction,20220630 Pacoima EEC,10005059,Pacoima EEC - Safety Upgrades and Improvements,Campus Improvement,6,Kelly Gonez,Northeast,1954701,16781,11059 Herrick Ave.,Pacoima,91331,"Upgrade entry control system, exterior gates, and playground equipment; provide new stand-alone fire alarm system",197,2015-Q4,2015-Q4,Closeout,20220630 Broadous ES,10366524,Broadous ES - Address Old HVAC Systems,HVAC,6,Kelly Gonez,Northeast,1382901,13768,12561 Filmore St.,Pacoima,91331,"This project will upgrade the existing heating, ventilation and air conditioning system in 8 classrooms in Buildings C and D. The existing systems are over 40 years old and are in poor condition resulting in frequent system failures and unreliable service. The project includes installation of new ductwork, insulation, and abatement of all asbestos containing materials.",898,2015-Q4,2016-Q4,Closeout,20220630 Dymally HS,10371131,Dymally HS - Campus Improvement,Campus Improvement,7,Tanya Ortiz Franklin,South,1766701,14581,8800 S. San Pedro St.,Los Angeles,90003,Install three water bottle filling stations and upgrade sound system in auditorium.,72,2020-Q2,2020-Q3,Closeout,20220630 Verdugo Hills HS,10369536,Verdugo Hills HS - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1891401,13642,10625 Plainview Ave.,Tujunga,91042,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2024-Q1,2024-Q3,Planning,20220630 Charnock ES,10372333,Charnock ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1300201,13676,11133 Charnock Rd.,Los Angeles,90034,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",97,2022-Q3,2022-Q4,Planning,20220630 West Athens ES,10372335,West Athens ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1764401,13317,1110 W. 119th St.,Los Angeles,90044,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and replacing the deteriorated flooring and ceiling tiles. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",103,2022-Q3,2022-Q4,Planning,20220630 Webster MS,10372521,Webster MS - 2022-23 Prop 39 (Magnolia Science Academy #4),Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project is a charter school renovation for Magnolia Science Academy #4 for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 4 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",117,2022-Q3,2022-Q3,Planning,20220630 Rancho Dominguez Preparatory School,10372525,Rancho Dominguez Preparatory School - Synthetic Turf,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1886801,193560,4110 Santa Fe Ave.,Long Beach,90810,"This project is to replace approximately 80,000 square feet of synthetic turf on the football field, including new perimeter drainage, water cannons, and repair of the track.","4,284",2024-Q1,2024-Q3,Planning,20220630 Esperanza ES,10372538,Esperanza ES - Secure Entry System,Security System,2,Monica Garcia,Central,1238301,13824,680 Little St.,Los Angeles,90017,Install new secure entry system at the Main Office.,46,2022-Q2,2022-Q3,Construction,20220630 Langdon ES,10367693,Langdon ES - 2016-17 Prop 39,Charter Prop 39,6,Kelly Gonez,Northwest,1477501,13413,8817 Langdon Ave.,North Hills,91343,"This project is a charter school renovation for Lashon Academy for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office and 4 instructional spaces for charter student seats in grades K-4. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",39,2016-Q2,2016-Q3,Closeout,20220630 Main ES,10366568,Main ES - HVAC & Roofing,HVAC,7,Tanya Ortiz Franklin,Central,1506801,13272,129 E. 53rd St.,Los Angeles,90011,"This project upgrades the heating, ventilation, and air conditioning (HVAC) system and replaces the deteriorated roofing for the Cafeteria, Main/Auditorium, Classroom, South, and East buildings and a bungalow. The existing HVAC equipment is a split system that is over 28 years old and in poor condition resulting in frequent system failures and unreliable service. The new HVAC system includes rooftop units which requires structural upgrades to the roofing. The project also provides interim housing as well as preserves several historical windows by carefully removing them to avoid damage while work is underway and later reinstalling them.","12,535",2017-Q3,2019-Q3,Closeout,20220630 Maywood ES,10371850,Maywood Academy HS - Install Electronic Marquee,Electrical/Lighting,5,Jackie Goldberg,East,1238101,13950,5200 Cudahy Ave.,Maywood,90270,Install new electronic wall-mounted marquee near main entrance.,70,2022-Q4,2023-Q2,Design,20220630 Stanford ES,10372014,Stanford ES - Install Security Monitor System,Security System,5,Jackie Goldberg,East,1690401,13478,2833 Illinois Ave.,South Gate,90280,Install video surveillance (CCTV) system with 4 cameras,57,2021-Q4,2022-Q1,Closeout,20220630 112th St. ES,10372116,112th St. ES - Energy Conservation Lighting,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $460,514. Estimated energy savings is 198,037 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $115,708 which is 25.1% of the ECM costs.",116,2022-Q3,2023-Q1,Planning,20220630 Dacotah EEC,10369317,Dacotah EEC - Restroom Upgrade,Access Compliance,2,Monica Garcia,East,1951201,16745,3142 Lydia Dr.,Los Angeles,90023,The project will provide one restroom that complies with the Americans with Disabilities Act (ADA) and a standalone fire alarm upgrade for the EEC building.,813,2021-Q1,2022-Q2,Closeout,20220630 Fletcher ES,10371869,Fletcher ES - 2021-22 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,"This project is a charter school renovation for ISANA Octavia Academy for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The scope of work for this project included the reconfiguration of rooms back to District systems, this scope of work was not performed.",1,2021-Q2,2021-Q3,Closeout,20220630 Burton ES,10369144,Burton ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1265801,13540,8111 Calhoun Ave.,Panorama City,91402,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",43,2018-Q1,2018-Q3,Closeout,20220630 El Dorado ES,10369147,El Dorado ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1354101,13792,12749 El Dorado Ave.,Sylmar,91342,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",67,2018-Q1,2019-Q1,Closeout,20220630 O'Melveny ES,10369155,O'Melveny ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1572601,13396,728 Woodworth St.,San Fernando,91340,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",49,2018-Q1,2018-Q3,Closeout,20220630 Broadacres ES,10372146,Broadacres ES - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1253001,13837,19424 S. Broadacres Ave.,Carson,90746,"Remove manual-type marquee from front of school. Install electronic free-standing marquee in same location, with new footing. Approx. 100 feet above-ground and 100 feet below-ground conduit required. Double-sided color LED displays.",72,2022-Q3,2022-Q4,Planning,20220630 Rosemont EEC,10369324,Rosemont EEC - Fire Alarm & Restroom Upgrades,Access Compliance,2,Monica Garcia,Central,1955301,16761,430 N. Rosemont Ave.,Los Angeles,90026,The project will upgrade the fire alarm system and provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,636,2022-Q4,2023-Q3,Design,20220630 Erwin ES,10369431,Erwin ES - SEEDS,SEEDS,6,Kelly Gonez,Northeast,1363001,13624,13400 Erwin St.,Van Nuys,91401,"Construct an outdoor learning space of approximately 1,700 square feet consisting of the removal of approximately 750 square feet of asphalt and cement, the installation of new chain link fencing with an access gate and a gate that complies with the Americans with Disabilities Act (ADA), decomposed granite and a cement brush-off area, composite wood headers to create in-ground planting areas, the over excavation and replacement of soil for in-ground planting areas, a new irrigation system with a solar-powered controller, points of connection for raised beds and planter areas, log benches and stools, raised beds, and wood picnic benches. The project will be outfitted by the school site and partners with native and edible plants.",80,2018-Q4,2019-Q4,Closeout,20220630 Heliotrope ES,10105869,Heliotrope ES - Compliance with State & Federal Access Requirements,Fire Alarm System,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),451,2015-Q1,2015-Q4,Closeout,20220630 Millikan Charter MS,10367091,Millikan Charter MS - Plumbing Utilities Upgrades,Plumbing/Irrigation/Drainage,3,Scott Schmerelson,Northeast,1823801,13728,5041 Sunnyslope Ave.,Sherman Oaks,91423,"The project will upgrade the deteriorated domestic water, sewer and building drainage systems. The existing plumbing utilities are over 55 years old and are in poor condition resulting in unreliable service.","8,938",2020-Q4,2021-Q4,Closeout,20220630 Broadway ES,10370903,Broadway ES - Restroom Upgrades,Access Compliance,4,Nick Melvoin,West,1253401,13533,1015 Lincoln Blvd.,Venice,90291,"provide baby devoro toilet,step-n-wash in boys restroom and step stool.",5,2019-Q4,2019-Q4,Closeout,20220630 El Sereno MS,10370713,El Sereno MS - SEEDS,SEEDS,2,Monica Garcia,East,1811801,13412,2839 N. Eastern Ave.,Los Angeles,90032,"Construct an outdoor learning space of approximately 7,950 square feet. Project includes excavation and removal of 135 cubic yards of impacted soil, and new soil import. Remaining funds after soil remediation will be used for prioritized remaining scope, such as the installation of decomposed granite, fencing, irrigation and a gate. The project will be outfitted by EnrichLA with both edible and native plants.",89,2019-Q3,2020-Q3,Closeout,20220630 San Pedro HS - Olguin Campus,10369367,San Pedro HS Olguin Campus - Pool Scoreboard,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1893701,15221,3210 S. Alma St.,San Pedro,90731,Install new electronic scoreboard at swimming pool.,282,2019-Q3,2020-Q1,Closeout,20220630 Meridian EEC,10005050,Meridian EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,Central,1953401,13705,6124 Ruby Pl.,Los Angeles,90016,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, and playground equipment; provide new shade shelter",204,2015-Q1,2015-Q3,Closeout,20220630 Wilshire Park ES,10369808,Wilshire Park ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1261901,13956,4063 Ingraham St.,Los Angeles,90005,Install new secure entry system at main gate.,21,2018-Q4,2019-Q2,Closeout,20220630 Langdon ES,10369527,Langdon ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northwest,1477501,13413,8817 Langdon Ave.,North Hills,91343,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",370,2020-Q3,2021-Q3,Closeout,20220630 Sunrise ES,10369872,Sunrise ES - Secure Entry System,Security System,2,Monica Garcia,East,1698801,13395,2821 E. 7th St.,Los Angeles,90023,Install new secure entry system,37,2018-Q4,2019-Q1,Closeout,20220630 Camellia ES,10367823,Camellia ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1272601,13587,7451 Camellia Ave.,North Hollywood,91605,"Remove/demolish 4 bungalows (24' x 72'), provide temporary fencing, disconnect all utilities and reconnect to the remaining buildings on site, and restore the former building footprints to playground space. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",285,2016-Q4,2017-Q4,Closeout,20220630 Stevenson College & Career Preparatory,10371824,Stevenson MS - Install Secure Entry System,Security System,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,Install new secure entry system for two entrances into the Admin. Bldg. Install one intercom at the north door and one intercom at the south door with two video receivers in the main office.,49,2021-Q2,2021-Q3,Closeout,20220630 Meyler ES,10367281,Meyler ES - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1734201,13730,1123 W. 223rd St.,Torrance,90502,Install new electronic marquee.,42,2018-Q4,2018-Q4,Closeout,20220630 Bernstein HS,10371861,Bernstein HS - 2021-22 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1869601,13953,1309 N. Wilton Pl.,Hollywood,90028,"This project is a charter school renovation for Academic Performance Excellence Academy (APEX) for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 3 special education rooms, and 13 instructional spaces for charter student seats in grades 7-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",6,2021-Q4,2021-Q4,Closeout,20220630 South Park ES,10370804,South Park ES - Exterior Painting,Painting,7,Tanya Ortiz Franklin,South,1686301,13304,8510 Towne Ave.,Los Angeles,90003,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",428,2020-Q4,2021-Q1,Closeout,20220630 Virginia ES,10371755,Virginia ES - Install Kitchenette And Cabinets,Furniture/Fixtures/Equipment,1,"Dr. George J. McKenna, III",West,1757501,13504,2925 Virginia Rd.,Los Angeles,90016,Remove deteriorated kitchenette with stove and cap gas line. Install new kitchenette with sink only and new cabinets.,30,2021-Q1,2021-Q4,Closeout,20220630 Solis Learning Academy,10371337,Solis Learning Academy - 2020-23 Prop 39,Charter Prop 39,2,Monica Garcia,East,1775201,14564,319 N. Humphreys Ave.,Los Angeles,90022,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for USC College Prep - Orange Campus. This project included 1 charter office, 2 special education rooms, and 7 instructional spaces for charter student seats in grades 9-11. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term co-location for Ednovate - Esperanza College Prep with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 7 instructional spaces for charter student seats in grades 9-10 and an undefined scope of work. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 7 instructional spaces for charter student seats in grades 9-10 and an undefined scope of work.",17,2021-Q3,2021-Q3,Closeout,20220630 Henry MS,10369477,Henry MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1817401,13658,17340 San Jose St.,Granada Hills,91344,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",284,2020-Q2,2021-Q2,Closeout,20220630 2nd St. ES,10370564,2nd St. ES - 2019-20 Prop 39,Charter Prop 39,2,Monica Garcia,East,1657501,13326,1942 E. 2nd St.,Los Angeles,90033,"This project is a charter school renovation for Extera Public School for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",17,2019-Q2,2019-Q3,Closeout,20220630 Lorena ES,10371328,Lorena ES - 2020-21 Prop 39,Charter Prop 39,2,Monica Garcia,East,1494501,13351,1015 S. Lorena St.,Los Angeles,90023,"This project is a charter school renovation for Extera Public School #2 for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",12,2020-Q2,2020-Q3,Closeout,20220630 Banneker Career & Transition Center,10367953,Banneker Special Education Center - Renovate Restrooms,Access Compliance,7,Tanya Ortiz Franklin,South,1194101,15142,14024 S. San Pedro St.,Los Angeles,90061,"Renovate restrooms , provide changing room and modify stage.",165,2016-Q4,2017-Q2,Closeout,20220630 Wilson HS,10108868,Wilson HS - HVAC,HVAC,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,"The school's air conditioning system is a central plant system, serving nearly the entire Wilson HS campus, that has deteriorated beyond repair and required the lease of temporary chillers. This project will design and construct the replacement of 2 chillers, related air handlers, and associated equipment in the outdoor chiller yard, multipurpose building, and the administration/classroom building which includes the West and East Wings and Central and East Towers. In addition, the scope includes the demolition and replacement of all corridor ceilings in the Central and East Towers to facilitate asbestos abatement, the provision of temporary air conditioning for classrooms in the Central and East Towers, the replacement of the kitchen exhaust fan, the addition of an Ansul fire suppression system at the stove hood, the installation of 2 fume hood exhaust systems in science labs, new paving in the existing chiller yard and the staging area, and the replacement of ductwork, terminals and dampers to correct duct leaks.","14,483",2017-Q4,2020-Q1,Closeout,20220630 Soto ES,10370680,Soto ES - HVAC,HVAC,2,Monica Garcia,East,1684901,13424,1020 S. Soto St.,Los Angeles,90023,"This project is to provide a new heating, ventilation and air conditioning (HVAC) system in seven classroom bungalows.","9,885",2023-Q3,2024-Q4,Design,20220630 McAuliffe EEC,10367997,McAuliffe EEC - Playground Upgrades,Paving/Greening/Playground Equipment,5,Jackie Goldberg,East,1945901,193555,8914 Hunt Ave.,South Gate,90280,Remove outdated rubber matting and replace with new rubber matting system on the existing playground.,65,2017-Q2,2017-Q3,Closeout,20220630 Blythe ES,10367065,Blythe ES - ADA Improvements,Access Compliance,3,Scott Schmerelson,Northwest,1247001,13758,18730 Blythe St.,Reseda,91335,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 39 doors/hardware, 27 accessible paths of travel, 34 signs, 10 restrooms, 15 drinking fountains/sinks, 9 casework/counters, 1 assistive listening device/intercom/phone, 1 concrete ramp, 3 metal ramps, 2 pieces of accessible furniture, 2 assembly seats, 1 railing, 1 existing elevator modification, 2 parking areas, 1 cafeteria counter, and 1 stage lift.","3,029",2016-Q4,2021-Q3,Closeout,20220630 Mann UCLA Community School,10372120,Mann MS - Energy Conservation Lighting,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1757401,13534,7001 S. St. Andrews Pl.,Los Angeles,90047,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $1,114,696. Estimated energy savings is 530,812 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $297,087 which is 26.6% of the ECM costs.",297,2022-Q3,2023-Q1,Planning,20220630 Huntington Park HS,10368820,Huntington Park HS - 2017-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1870001,13597,6020 Miles Ave.,Huntington Park,90255,"This project is a charter school renovation for Prepa Tec Los Angeles HS for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades 9-10. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",160,2017-Q2,2017-Q3,Closeout,20220630 Los Angeles HS,10367531,Los Angeles HS - Gym Renovation,Gym/Athletic Facilities Renovation,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,"The project addresses the deteriorated bleachers, shot clock, scoreboard, backboards, wall-mounted back pads, and flooring in the gymnasium. The current bleachers are temporary bleachers that were installed over 10 years ago. The scope of work replaces these items with new components as well as improves access to the gymnasium including the addition of a wheelchair lift to comply with the Americans with Disabilities Act (ADA).","3,039",2018-Q1,2019-Q2,Closeout,20220630 Panorama HS,10108402,Room/Locker Room Conversion,Reconfiguration,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,Room/Locker Room Conversion,511,2015-Q4,2016-Q3,Closeout,20220630 Audubon MS,10370569,Audubon MS - 2019-21 Prop 39 (Stella Middle Charter Academy),Charter Prop 39,1,"Dr. George J. McKenna, III",West,1802801,13564,4120 11th Ave.,Los Angeles,90008,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for Stella Middle Charter Academy. This project included 1 charter office, 2 special education rooms, and 20 instructional spaces for charter student seats in grades 5-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved in Board of Education Report No. 313-19/20 for 2020-21 Proposition 39 charter co-locations as a vacating project. Stella Middle Charter Academy will not continue occupancy in the 2020-21 school year. Therefore, this project is amended to include the scope of work necessary to return the site to it previous conditions with all low voltage systems reconnected to District-operated programs.",680,2019-Q2,2019-Q3,Closeout,20220630 Gardena HS,10371138,Gardena HS - Campus Improvement,Campus Improvement,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"Provide new fence with privacy slats, double gates at west end by H building, 3 water bottle filling stations at 3 separate locations, and install motorized projector screen, projector, and sound system in Social Hall.",100,2020-Q1,2020-Q3,Closeout,20220630 Marina Del Rey MS,10371733,Marina Del Rey MS - Exterior Painting,Painting,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.","1,151",2022-Q3,2023-Q2,Planning,20220630 Kingsley ES,10371914,Kingsley ES - Install Wrought Iron Fencing,Fencing,5,Jackie Goldberg,West,1617901,13927,5200 W. Virginia Ave.,Los Angeles,90029,Provide and install approximately 160' of 8' tall wrought iron fence with two pedestrian gates at the front of the school on Virginia Ave.,63,2021-Q2,2021-Q3,Closeout,20220630 Maclay MS,10370601,Maclay MS - 2019-20 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"This project is a charter school renovation for YPI Valley Public Charter HS for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 2 special education rooms, and 12 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",26,2019-Q2,2019-Q3,Closeout,20220630 Webster MS,10368852,Webster MS - 2017-18 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project is a charter school renovation for Citizens of the World - Mar Vista for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office and 5 instructional spaces for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",135,2017-Q2,2017-Q3,Closeout,20220630 Willow ES,10371662,Willow ES - Install Video Surveillance System,Security System,5,Jackie Goldberg,East,1230901,14622,2777 Willow Pl.,South Gate,90280,Install video surveillance (CCTV) system with four cameras placed around Building A.,67,2021-Q1,2021-Q2,Closeout,20220630 Romer MS,10371116,Romer MS - Motorized Gate and Security Upgrades,Security System,6,Kelly Gonez,Northeast,1811601,13894,6501 Laurel Canyon Blvd.,North Hollywood,91606,Provide and install one electric gate and provide entrance key cards for staff.,99,2020-Q1,2020-Q3,Closeout,20220630 Bakewell PC,10371417,Bakewell PC - Landscaping and Irrigation,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",South,1402001,13850,8261 S. Baring Cross St.,Los Angeles,90044,"Install low-water-use garden, irrigation system, and sliced-log walking path between lunch pavilion and play area.",19,2020-Q4,2020-Q4,Closeout,20220630 Kim ES,10370696,Kim ES - Marquee,Electrical/Lighting,5,Jackie Goldberg,Central,1270101,13906,225 S. Oxford Ave.,Los Angeles,90004,"Install a new electronic free-standing marquee. This Local District Central priority project includes a school contribution (work order #28886068), however the budget represents only the bond-funded portion.",27,2019-Q4,2020-Q1,Closeout,20220630 Flournoy ES,10369362,Flournoy ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1578101,13509,1630 E. 111th St.,Los Angeles,90059,Install Aiphone video/buzzer entry system at main entrance.,16,2018-Q1,2018-Q2,Closeout,20220630 Kennedy HS,10367449,Kennedy HS - Roofing,Roofing,3,Scott Schmerelson,Northwest,1872501,13263,11254 Gothic Ave.,Granada Hills,91344,"This project is to upgrade 50,000 square feet of roofing on two buildings and arcades with a Polyvinyl Chloride (PVC) material. The roofs are over 20 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",649,2017-Q1,2017-Q2,Closeout,20220630 Santee Education Complex,10369955,Santee Education Complex - Pool Security Fencing,Fencing,5,Jackie Goldberg,Central,1871601,13945,1921 S. Maple Ave.,Los Angeles,90011,Install security fencing around swimming pool,119,2018-Q4,2019-Q2,Closeout,20220630 Bridges Span School,10371615,Bridges Span School - Install Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1686701,14543,1235 Broad Ave.,Wilmington,90744,Install new secure entry system at door to main office with three video receivers in main office.,24,2020-Q4,2021-Q2,Closeout,20220630 Taft Charter HS,10370622,Taft Charter HS - 2019-20 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1888001,13787,5461 Winnetka Ave.,Woodland Hills,91364,"Ivy Academia is vacating this site. This project was approved in Board of Education Report No. 343-18/19. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",130,2019-Q3,2019-Q3,Closeout,20220630 Gledhill EEC,10367322,Gledhill EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northwest,1957801,16641,16058 Gledhill St.,North Hills,91343,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",128,2016-Q1,2016-Q3,Closeout,20220630 Hooper PC,10370434,Hooper PC - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1457601,13849,1280 E. 52nd St.,Los Angeles,90011,Purchase 75 iPads and 2 storage carts and secure room for storage.,58,2019-Q1,2021-Q2,Closeout,20220630 Alta Loma ES,10366470,Alta Loma ES - Plumbing Utilities Upgrades,Plumbing/Irrigation/Drainage,1,"Dr. George J. McKenna, III",West,1208201,13402,1745 Vineyard Ave.,Los Angeles,90019,"This project replaced the 75-year-old deteriorated underground water and sewer utilities serving the main and west buildings as well as the underground irrigation main line on the east side of the main building. The project also included replacing: domestic water lines, building drain lines, classroom and service sinks, classroom cabinets and countertops, drinking fountains, water heaters, and a warming oven in place of the kitchen stove. The restrooms in the main and west buildings were renovated to meet Americans with Disabilities Act (ADA) accessibility requirements.","1,700",2016-Q4,2018-Q1,Closeout,20220630 Crescent Heights Language Arts/Social Justice Magnet ES,10368328,Crescent Heights Language Arts/Social Justice Magnet ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1328801,13454,1661 S. Crescent Heights Blvd.,Los Angeles,90035,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",154,2017-Q2,2017-Q3,Closeout,20220630 Sylvan Park ES,10370948,Sylvan Park ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northeast,1702701,13477,6238 Noble Ave.,Van Nuys,91411,Install new electronic free-standing marquee,36,2020-Q1,2020-Q1,Closeout,20220630 6th Ave. ES,10371114,6th Ave. ES - Campus Improvement,Campus Improvement,1,"Dr. George J. McKenna, III",West,1678101,13425,3109 Sixth Ave.,Los Angeles,90018,Install motorized rolling gate at two parking lot locations. Install two CCTV cameras.,100,2020-Q1,2021-Q4,Closeout,20220630 Broadous ES,10369921,Broadous ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1382901,13768,12561 Filmore St.,Pacoima,91331,"Remove 2 portable buildings, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving and provide playground striping at the footprint of the buildings.",120,2018-Q4,2019-Q3,Closeout,20220630 Glen Alta Span School,10371916,Glen Alta Span School - Energy Conservation Lighting,Electrical/Lighting,2,Monica Garcia,East,1413701,13292,3410 Sierra St.,Los Angeles,90031,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $354,003. Estimated energy savings is 545,097 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $86,721 which is 24.50% of the ECM costs.",87,2022-Q4,2023-Q1,Planning,20220630 Irving STEAM Magnet MS,10369759,Irving STEAM Magnet MS - 2018-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"This project is a charter school renovation for Celerity Octavia Charter School for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",7,2018-Q2,2018-Q3,Closeout,20220630 Kim Academy,10368734,Kim Academy - Synthetic Turf Field & Track,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1806401,13934,615 S. Shatto Pl.,Los Angeles,90005,"The existing natural turf field and damaged running track have created safety issues due to continual flooding, leading to a chronic pest problem at the site, and tripping hazards. This project will install a new synthetic turf field of approximately 18,000 square feet and new synthetic track of approximately 3,000 square feet. The scope of work includes cleaning field drainage, providing irrigation repairs for cooling, and associated Americans with Disabilities Act (ADA) path of travel and restroom upgrades.","1,197",2018-Q2,2018-Q3,Closeout,20220630 Holmes MS,10370840,Holmes MS - Restroom Upgrades,Access Compliance,3,Scott Schmerelson,Northwest,1818201,13835,9351 Paso Robles Ave.,Northridge,91325,Provide accessible toilet stall in Girls' restroom and in girls' PE locker room.,34,2019-Q4,2019-Q4,Closeout,20220630 Los Angeles Academy MS,10367943,Los Angeles Academy MS - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,Central,1820001,13890,644 E. 56th St.,Los Angeles,90011,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 49 doors/hardware, 13 accessible paths of travel, 138 signs, 31 restrooms, 14 drinking fountains/sinks, 5 assistive listening devices/intercoms/phones, 5 concrete ramps, 7 metal ramps, 28 pieces of accessible furniture, 1 assembly seat, 10 railings, 2 locker room modifications/lockers, 1 nurse's exam room modification, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","3,893",2017-Q3,2019-Q4,Closeout,20220630 Western TECH Magnet School,10366272,Western ES - 2014-15 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1767101,13338,1724 W. 53rd St.,Los Angeles,90062,"This project is a charter school renovation for Garr Academy of Mathematics & Entrepreneurial Studies for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 7 classrooms for 149 charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",151,2014-Q2,2014-Q3,Closeout,20220630 Brooklyn Span School,10369473,Brooklyn Span School - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1256201,13471,4620 Cesar E. Chavez Ave.,Los Angeles,90022,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",259,2020-Q2,2021-Q1,Closeout,20220630 Bertrand ES,10367264,Bertrand ES - Roofing,Roofing,4,Nick Melvoin,Northwest,1243801,13610,7021 Bertrand Ave.,Reseda,91335,"The project will replace approximately 56,300 square feet of deteriorated roofing on buildings and arcades campus-wide with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes replacing damaged wood, removing and reinstalling extensive conduit banks mounted on the rooftops, and painting to match existing areas affected in the roof demolition. The existing roof-mounted heating, ventilation, and air conditioning (HVAC) units and ductwork will be protected in place.",753,2018-Q1,2018-Q3,Closeout,20220630 Monroe HS,10364177,Monroe HS - Industrial Arts Building Replacement,Campus Improvement,6,Kelly Gonez,Northwest,1876801,13704,9229 Haskell Ave.,North Hills,91343,"The existing Industrial Arts building was substantially damaged by fire in November 2012 and would have required extensive work for the building to again be usable and meet current standards. This project will build a replacement facility that includes a robotics laboratory, wood shop, media center, classroom, restrooms, and support spaces. The fire-damaged building will be demolished once the new building is complete and open to the school.","20,187",2017-Q2,2019-Q2,Closeout,20220630 122nd St. ES,10372148,122nd St. ES - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1588701,13868,405 E. 122nd St.,Los Angeles,90061,"Remove manual-type marquee from front of school. Install electronic free-standing marquee in same location, with new footing. Approx. 40 feet below-ground conduit required. Double-sided color LED displays.",70,2022-Q2,2022-Q3,Construction,20220630 Holmes MS,10370771,Holmes MS - Exterior Painting,Painting,3,Scott Schmerelson,Northwest,1818201,13835,9351 Paso Robles Ave.,Northridge,91325,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",660,2020-Q3,2020-Q4,Closeout,20220630 Grand View ES,10368243,Grand View ES - Renovate Computer Lab,Communications/Technology Upgrade,4,Nick Melvoin,West,1424701,13716,3951 Grand View Blvd.,Los Angeles,90066,Renovate computer lab: replace deteriorated furniture and data wiring; install projector and screen; upgrade security,76,2017-Q1,2017-Q2,Closeout,20220630 Rowan ES,10364126,Rowan ES - HVAC,HVAC,2,Monica Garcia,East,1642501,13381,600 S. Rowan Ave.,Los Angeles,90023,"The project will remove and replace a 50-ton chiller, boiler, and fan coil units which provide heating and air conditioning to the main building with 20 classrooms. The existing equipment is 25 years old and frequently breaks down.","4,622",2017-Q2,2018-Q4,Closeout,20220630 Belmont HS,10370518,Belmont HS - Landscape Access Fencing,Fencing,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,Install access gates for landscaping maintenance,8,2019-Q2,2019-Q2,Closeout,20220630 Eagle Rock HS,10367901,Eagle Rock HS - Seismic Retrofit of Practice Gym,Seismic Modernization,5,Jackie Goldberg,Central,1861401,13553,1750 Yosemite Dr.,Los Angeles,90041,"The practice gym on the north side of the campus was built in 1977 with approximately 14,000 square feet and requires upgrades to structural connections at the roof, wall, and foundation to meet current seismic requirements. The scope of work includes seismic retrofits, new wooden flooring and lockers in the practice gym as well as site improvements including cement grouting and repaving the fire access lane. Upgrades to meet the accessibility requirements of the Americans with Disabilities Act (ADA) including restrooms, drinking fountain, new concrete ramp, and path of travel improvements are also included. The project provides interim facilities for school use while the seismic retrofits are underway on the practice gym including the conversion of existing portables to locker rooms and the addition of a temporary portable restroom building.","6,837",2017-Q3,2018-Q2,Closeout,20220630 Victory ES,10370808,Victory ES - Exterior Painting,Painting,6,Kelly Gonez,Northeast,1752101,13442,6315 Radford Ave.,North Hollywood,91606,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",406,2021-Q2,2021-Q4,Closeout,20220630 Waters Employment Preparation Center,10367172,Waters Employment Preparation Center - Restroom Upgrades,Campus Improvement,7,Tanya Ortiz Franklin,South,1168501,13938,10925 S. Central Ave.,Los Angeles,90059,Renovate two sets of restrooms on both floors and perform upgrades to meet the related accessibility requirements of the Americans with Disabilities Act (ADA).,985,2018-Q1,2019-Q1,Closeout,20220630 Roscomare ES,10372086,Roscomare ES - Roofing,Roofing,4,Nick Melvoin,West,1636301,13799,2425 Roscomare Rd.,Los Angeles,90077,"This project is to provide approximately 43,664 square feet of new roofing sitewide, including the installation of new gutters and downspouts and painting of affected areas.",913,2023-Q1,2023-Q2,Planning,20220630 Mount Gleason MS,10366607,Mount Gleason MS - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1824001,13744,10965 Mt. Gleason Ave.,Sunland,91040,"This project removes 3 portable buildings including the disconnection of low voltage and high voltage utilities, reconnection of all utilities to remaining buildings on site, and repair/replacement of asphalt over the former building footprints. During demolition, it was discovered that the 3 portables had served as hubs for low and high voltage vaults mounted on the exterior walls of the buildings. For the school to maintain operations as well as restore the playground to a useful condition, the electrical vaults will be relocated underground, requiring wiring reconnection for some buildings and the replacement of fiber-optic cable in its entirety. The buildings that will be reconnected are Agricultural Unit #5, Homemaking Building, Industrial Arts Building #8, Industrial Arts Building #9, Science Building #11, and Utility Building #7.",782,2015-Q4,2018-Q4,Closeout,20220630 Willenberg Special Education Center,10368229,Willenberg Special Education Center - Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1195701,13545,308 Weymouth Ave.,San Pedro,90732,"Provide and install grab bars; remove and replace elementary toilet with secondary toilet, remove and replace partitions.",21,2017-Q1,2017-Q1,Closeout,20220630 Roscoe ES,10370347,Roscoe ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1635601,13362,10765 Strathern St.,Sun Valley,91352,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",59,2019-Q1,2019-Q2,Closeout,20220630 118th St. ES,10370356,118th St. ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1574001,13321,144 E. 118th St.,Los Angeles,90061,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",56,2019-Q1,2019-Q3,Closeout,20220630 Rosemont EEC,10004288,Rosemont EEC - Shade Shelter,Lunch/Shade Shelter,2,Monica Garcia,Central,1955301,16761,430 N. Rosemont Ave.,Los Angeles,90026,One shade structure will be added to the site to replace shade trees that were removed due to damage to the play area caused by the roots. Includes path of travel improvements to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA).,164,2017-Q2,2018-Q2,Closeout,20220630 Edison MS,10366526,Edison MS - HVAC,HVAC,7,Tanya Ortiz Franklin,South,1811301,13555,6500 Hooper Ave.,Los Angeles,90001,"This project upgrades the heating, ventilation, and air conditioning (HVAC) system in the main administration and classroom building, physical education building, and classroom building #1. The existing system is over 30 years old and beyond economical repair resulting in frequent system failures and unreliable service. The scope of work also includes plumbing and electrical upgrades, asbestos and hazardous material abatement, fire alarm upgrades with modifications to the sprinkler system, and repairing and painting walls and ceilings impacted by the HVAC installation.","13,273",2018-Q2,2022-Q2,Closeout,20220630 Peary MS,10367255,Peary MS - Arcade Roofing,Roofing,7,Tanya Ortiz Franklin,South,1835201,13625,1415 W. Gardena Blvd.,Gardena,90247,"This project upgrades 2,000 square feet of roofing on all the arcades with a Polyvinyl Chloride (PVC) material. The roofs are over 55 years old. The project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",709,2019-Q3,2020-Q4,Closeout,20220630 93rd St. ES,10366713,93rd St. ES - Food Services Upgrade,Food Services Renovation,7,Tanya Ortiz Franklin,South,1558201,13814,330 E. 93rd St.,Los Angeles,90003,"Project will construct a new food services kitchen with scramble area, new larger lunch shelter, new trash enclosure area, relocated/reconfigured parking area, new arcades, repurposed interior space for faculty dining, associated site utilities and upgrades to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA) including path of travel improvements and barrier removal.","9,014",2016-Q2,2017-Q4,Closeout,20220630 Enadia Way Technology Charter,10370698,Enadia Way ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1361001,13656,22944 Enadia Way,West Hills,91307,Install new electronic free-standing marquee,47,2019-Q4,2020-Q1,Closeout,20220630 Burbank ES,10370017,Burbank ES - Accessibility Upgrade,Access Compliance,3,Scott Schmerelson,Northeast,1263001,13678,12215 Albers St.,North Hollywood,91607,Purchase and install two Step-N-Wash stools and adaptive items for students with short stature.,6,2018-Q3,2018-Q4,Closeout,20220630 Maclay MS,10368726,Maclay MS - Wellness Center Expansion,Campus Improvement,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"The project will expand the existing clinic operated by Northeast Valley Health Corporation. The project consists of approximately 6,000 square feet of new construction, related site improvements, the demolition of 2 permanent buildings and removal of 2 existing bungalows, as well as the reconfiguration and modernization of the existing clinic. The project will expand the medical and dental services provided by Northeast Valley Health Corporation and provide new mental health clinic space operated by LAUSD's Student Health and Human Services Department.","11,166",2019-Q2,2021-Q1,Closeout,20220630 Brockton ES,10368333,Brockton ES - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1254801,13432,1309 Armacost Ave.,Los Angeles,90025,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",159,2017-Q2,2017-Q3,Closeout,20220630 2nd St. ES,10371297,2nd St. ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1657501,13326,1942 E. 2nd St.,Los Angeles,90033,"Demolish and remove 1 portable buildings, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/Replace asphalt paving.",180,2020-Q3,2020-Q3,Closeout,20220630 Burbank ES,10371712,Burbank ES - Install Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northeast,1263001,13678,12215 Albers St.,North Hollywood,91607,"Install new electronic free-standing marquee at the front lawn near Albers St., just east of the main walkway.",57,2021-Q2,2022-Q3,Construction,20220630 Bethune MS,10371125,Bethune MS - Auditorium Renovation,Auditorium Renovation,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,"Install new projector, motorized screen, and audio/visual equipment, and repair stage lighting in the auditorium.",92,2020-Q3,2021-Q1,Closeout,20220630 Clay MS,10371742,Clay MS - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1809901,13752,12226 S. Western Ave.,Los Angeles,90047,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",75,2022-Q4,2023-Q2,Planning,20220630 Columbus MS,10370579,Columbus MS - 2019-21 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for Ingenium Charter School. This project included 1 charter office, 2 special education rooms, and 23 instructional spaces for charter student seats in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 19 instructional spaces for charter student seats in grades K-5 and an undefined scope of work.",50,2019-Q2,2019-Q3,Closeout,20220630 Dorsey HS,10366472,Dorsey HS-Removal of 1 DOH Bldg,Portable Removal,1,"Dr. George J. McKenna, III",West,1860001,13643,3537 Farmdale Ave.,Los Angeles,90016,"Removal of 1 Department of Housing (DOH) Portable Building; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",55,2014-Q4,2015-Q2,Closeout,20220630 Vermont ES,10369509,Vermont ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",Central,1747901,13273,1435 W. 27th St.,Los Angeles,90007,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",382,2020-Q3,2021-Q2,Closeout,20220630 Bushnell Way ES,10367084,Bushnell Way ES - Address Failing Slope,Excavation,2,Monica Garcia,Central,1267101,13375,5507 Bushnell Way,Los Angeles,90042,"This project will address the failing slope on the north end of the campus adjacent to the Kindergarten building. In addition to remediating the erosion of the soil, the scope also includes upgrading the curbs, gutters, catch basin, storm drain system, planter wall and 22 feet of chain link fencing.",355,2016-Q3,2016-Q3,Closeout,20220630 Valerio ES,10369160,Valerio ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1738401,15143,15035 Valerio St.,Van Nuys,91405,"Modernize Parent & Family Center classroom by providing security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",48,2017-Q4,2018-Q3,Closeout,20220630 Alta California ES,10369162,Alta California ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northwest,1739801,193552,14859 Rayen St.,Panorama City,91402,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",45,2018-Q1,2018-Q3,Closeout,20220630 Jordan HS,10369174,Jordan HS - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1872101,13494,2265 E. 103rd St.,Los Angeles,90002,"Modernize Parent & Family Center classroom by providing paint touch-up, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",40,2018-Q1,2018-Q4,Closeout,20220630 Franklin HS,10372199,Franklin HS - Provide Computer Lab,Reconfiguration,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,Reconfigure layout of computer lab. Install new receptacles and data drops. Purchase (16) computer tables with wire management. Remove free-standing receptacles and data drops.,111,2021-Q4,2022-Q2,Closeout,20220630 59th St. ES,10372233,59th St. ES - Install Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1379501,13400,5939 Second Ave.,Los Angeles,90043,"Install new electronic, free-standing marquee on front lawn. Double-sided 8 feet x 4 feet color LED display.",51,2022-Q1,2022-Q2,Closeout,20220630 Shirley ES,10371336,Shirley ES - 2020-21 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1671201,13671,19452 Hart St.,Reseda,91335,"This project is a charter school renovation for Citizens of the World - West Valley for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades K-1. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",251,2020-Q2,2020-Q3,Closeout,20220630 Sterry ES,10371557,Sterry ES - Install Motorized Parking Lot Gate,Fencing,4,Nick Melvoin,West,1693201,13431,1730 Corinth Ave.,Los Angeles,90025,Install motorized gate at north parking log near intersection of Iowa Ave. and Sawtelle Blvd.,49,2020-Q4,2021-Q1,Closeout,20220630 Figueroa ES,10370365,Figueroa ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",South,1382201,13502,510 W. 111th St.,Los Angeles,90044,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",58,2019-Q3,2020-Q2,Closeout,20220630 28th St. ES,10364089,28th St. ES - HVAC,HVAC,5,Jackie Goldberg,Central,1728801,13325,2807 Stanford Ave.,Los Angeles,90011,"This project replaces the heating, ventilation, and air conditioning (HVAC) system with a combination of new cooling towers, water source heat pumps, split systems, rooftop package units, and associated utility lines, in the administration and classroom buildings. The scope of work also includes electrical upgrades to support the new HVAC system, new soffits for HVAC units in the classrooms and offices in the administration building, metal roof screens for the rooftop units on the classroom building, and replacement roofing. The fire alarm system will also be upgraded with intumescent fireproofing in the classroom building, fire-rated walls in the administration building corridors, modifications to the existing fire sprinkler system, and support infrastructure for low voltage systems (phones, public address and security systems, and fire alarm panel).","15,221",2018-Q4,2021-Q2,Closeout,20220630 Mayall Academy of Arts & Technology Magnet ES,10370549,Mayall Academy of Arts and Technology Magnet ES - Changing Room,Access Compliance,3,Scott Schmerelson,Northwest,1519801,13700,16701 Mayall St.,North Hills,91343,"Create a changing room from existing boys restroom, Building B. Purchase and install hi-lo changing table.",15,2019-Q2,2019-Q3,Closeout,20220630 Markham MS,10370678,Markham MS - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,"This project is to provide approximately 42,000 square feet of new roofing at 28 buildings, including the installation of new gutters and downspouts and painting of affected areas.","1,118",2023-Q1,2024-Q1,Planning,20220630 Limerick ES,10229927,Limerick ES - Non Air-Conditioned Classroom & Equipment,HVAC,3,Scott Schmerelson,Northwest,1488101,13697,8530 Limerick Ave.,Canoga Park,91306,Non Air-Conditioned Classroom & Equipment,20,2014-Q2,2014-Q4,Closeout,20220630 Menlo ES,10364119,Menlo ES - HVAC,HVAC,1,"Dr. George J. McKenna, III",Central,1524701,13386,4156 Menlo Ave.,Los Angeles,90037,"This project upgrades the heating, ventilation, and air conditioning (HVAC) system in the Cafeteria Building and Buildings A, B, C, D & E that house classrooms, teacher work spaces, libraries, multipurpose room, and computer lab. The scope of work includes new heat pump units in place of the chiller, boilers and fan coil units in Buildings A, B, C & E; rooftop package units will be replaced in Building D; the make-up air/exhaust unit for the kitchen will be replaced and the rooftop package unit for the dining rooms will be replaced in the Cafeteria Building; and air ducts will be cleaned and selectively repaired in Building D and the Cafeteria Building. The project also includes replacement flooring in Building A; painting all classrooms in Buildings A, B, C, D & E; and an electrical upgrade to include new ducts and cables.","7,132",2018-Q3,2020-Q3,Closeout,20220630 4th St. PC,10370425,4th St. PC - Marquee,Electrical/Lighting,2,Monica Garcia,East,1397401,13883,469 Amalia Ave.,Los Angeles,90022,Install new electronic wall-mounted marquee,56,2019-Q3,2019-Q4,Closeout,20220630 Blythe ES,10370289,Blythe ES - Portable Removal,Portable Removal,3,Scott Schmerelson,Northwest,1247001,13758,18730 Blythe St.,Reseda,91335,"Demolish 1 portable building, provide temporary fencing, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",103,2019-Q1,2020-Q1,Closeout,20220630 Reseda ES,10367256,Reseda ES - Drainage Improvements,Plumbing/Irrigation/Drainage,4,Nick Melvoin,Northwest,1623301,13398,7265 Amigo Ave.,Reseda,91335,"The project will address the failing drainage at the lunch pavilion and the kitchen exterior areas. In addition to mitigating the drainage, the scope also includes regrading asphalt paving in the playground area, parking lot 1, and concrete curbs and gutters.","2,867",2017-Q3,2018-Q4,Closeout,20220630 Belvedere MS,10367660,Belvedere MS - 2016-17 Prop 39,Charter Prop 39,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,"This project is a charter school renovation for Collegiate Charter High School of Los Angeles for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades 9-10. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",68,2016-Q2,2016-Q3,Closeout,20220630 Palms MS,10369949,Palms MS - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1834001,13668,10860 Woodbine St.,Los Angeles,90034,Install new secure entry system,25,2019-Q1,2019-Q3,Closeout,20220630 Chandler ES,10367497,Chandler Learning Academy - Roofing,Roofing,3,Scott Schmerelson,Northeast,1295901,13619,14030 Weddington St.,Van Nuys,91401,"The project will replace 19,900 square feet of roofing at seven buildings with a Polyvinyl Chloride (PVC) material. The scope of work also includes the removal of existing roof-mounted air conditioning units on one building and replacing with new. The roofs are over 15 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",289,2017-Q3,2018-Q1,Closeout,20220630 10th St. ES,10370214,10th St. ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1708201,13265,1000 Grattan St.,Los Angeles,90015,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2028-Q1,2028-Q2,Planning,20220630 Budlong ES,10369946,Budlong ES - Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1261601,15162,5940 S. Budlong Ave.,Los Angeles,90044,Install new electronic wall-mounted marquee,51,2019-Q3,2019-Q3,Closeout,20220630 Kentwood ES,10370942,Kentwood ES - Marquee,Electrical/Lighting,4,Nick Melvoin,West,1471201,13589,8401 Emerson Ave.,Los Angeles,90045,Install new electronic free-standing marquee,36,2019-Q4,2020-Q1,Closeout,20220630 Hooper ES,10370772,Hooper ES - Exterior Painting,Painting,5,Jackie Goldberg,Central,1457501,13316,1225 E. 52nd St.,Los Angeles,90011,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",327,2020-Q4,2021-Q1,Closeout,20220630 Liberty ES,10369605,Liberty ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1486301,13599,2728 Liberty Blvd.,South Gate,90280,Purchase 200 Chromebooks and 5 charging carts; install security upgrades as needed,69,2018-Q1,2018-Q2,Closeout,20220630 1st St. ES,10371801,1st St. ES - Sesimic Retrofits & HVAC at East Building,Seismic Modernization,2,Monica Garcia,East,1383601,13267,2820 E. 1st St.,Los Angeles,90033,"This project is to provide seismic retrofits and new heating, ventilation, and air conditioning (HVAC) systems at the East Building with a total area of approximately 10,032 square feet. The scope of work includes ADA upgrades as required.","6,144",2023-Q4,2025-Q2,Design,20220630 Belmont HS,10370301,Belmont HS - Parent & Family Center 2018,Campus Improvement,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new chairs. Provide 20 new Chromebooks with a storage/charging cart and 1 laptop for the Parent Coordinator.",40,2019-Q3,2020-Q1,Closeout,20220630 Irving STEAM Magnet MS,10368738,Irving STEAM Magnet MS - Campus Upgrades,Campus Improvement,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"The project will provide campus-wide upgrades including approximately 35,400 square feet of new vinyl composite tiles (VCT) flooring and new seating in the auditorium.",348,2018-Q3,2019-Q1,Closeout,20220630 Arroyo Seco Museum Science Magnet,10371069,Arroyo Seco Museum Science Magnet - Classroom Remodel,Reconfiguration,2,Monica Garcia,Central,1432201,13900,4805 Sycamore Terrace,Los Angeles,90042,"Convert rooms 10 and 10A into a single classroom. Remove dividing wall, modular cabinets, shelving, and wall furnace. Relocate fire alarm components, electrical outlets, light switches, PA speaker, data drops, and white boards. Patch flooring and patch and paint walls as needed.",82,2020-Q2,2020-Q3,Closeout,20220630 Grant ES,10370160,Grant ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,West,1426001,13355,1530 N. Wilton Pl.,Los Angeles,90028,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2024-Q4,2025-Q1,Planning,20220630 Point Fermin Marine Science Magnet ES,10367760,Point Fermin Marine Science Magnet ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1613701,13376,3333 Kerckhoff Ave.,San Pedro,90731,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 29 doors/hardware, 24 accessible paths of travel, 28 signs, 1 restroom, 8 drinking fountains/sinks, 2 assistive listening devices/intercoms/phones, 6 concrete ramps, 2 pieces of accessible furniture, 1 assembly seat, 8 railings, 1 existing elevator modification, 2 playground components, 2 parking areas, 1 cafeteria counter, 2 casework/counters, and 1 passenger/bus loading zone.","3,883",2018-Q3,2022-Q4,Construction,20220630 Haynes Charter for Enriched Studies,10370556,Haynes Charter for Enriched Studies - Exterior Painting,Painting,3,Scott Schmerelson,Northwest,1447301,13793,6624 Lockhurst Dr.,West Hills,91307,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",347,2020-Q2,2020-Q3,Closeout,20220630 Reseda Charter HS,10363847,Reseda HS - Science Lab Improvements,Campus Improvement,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,"The project provides 3 labs (2 chemistry /1 physics) with safety equipment including emergency shower/eyewash, fume hood, utility shutoff valves and HVAC units sufficient to remove chemical fumes from classrooms and workrooms. The project scope also includes chemical storage cabinets and eyewash in workrooms, fire sprinklers in chemistry labs and workrooms, new trough lab stations, functional repairs to plumbing and cabinetry, and requirements of the Americans with Disabilities Act (ADA) for accessibility including path of travel improvements, restroom and fountain upgrades. The project also completed unfinished scope from the previously-approved science lab renovation projects at the school. During construction, the project addressed unforeseen conditions including abatement of additional asbestos-containing material, repair of damaged concrete ceiling joists, changes to the construction of fire-rated assemblies, complete reconstruction of the existing workroom, repair of existing electrical systems, construction of new wall assemblies for proper installation of new audio/visual systems, and modifications to new HVAC and fire alarm system components.","2,643",2016-Q1,2017-Q3,Closeout,20220630 Rosemont ES,10370195,Rosemont ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1637001,13289,421 N. Rosemont Ave.,Los Angeles,90026,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2027-Q2,2027-Q3,Planning,20220630 Figueroa ES,10370796,Figueroa ES - Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",South,1382201,13502,510 W. 111th St.,Los Angeles,90044,Install new electronic wall-mounted marquee,47,2020-Q1,2020-Q2,Closeout,20220630 Westchester Enriched Sciences Magnets,10372352,Westchester Enriched Sciences Magnets - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",95,2022-Q3,2022-Q4,Planning,20220630 Wright STEAM Magnet MS,10372353,Wright MS - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",92,2022-Q3,2022-Q4,Planning,20220630 Grant ES,10372359,Grant ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,West,1426001,13355,1530 N. Wilton Pl.,Los Angeles,90028,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",92,2022-Q3,2022-Q4,Planning,20220630 Budlong ES,10368052,Budlong ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1261601,15162,5940 S. Budlong Ave.,Los Angeles,90044,"Remove and sell 2 DSA portable buildings, provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to remaining buildings on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",143,2016-Q4,2017-Q4,Closeout,20220630 Canoga Park EEC,10367303,Canoga Park EEC - Technology Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1959201,16297,7355 Vassar Ave.,Canoga Park,91303,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",87,2016-Q2,2016-Q3,Closeout,20220630 Eagle Rock ES,10369911,Eagle Rock ES - Auditorium Lighting,Electrical/Lighting,5,Jackie Goldberg,Central,1350701,13499,2057 Fair Park Ave.,Los Angeles,90041,"Install auditorium stage lighting. This Local District Central priority project includes a school contribution (project #10369912), however the budget represents only the bond‐funded portion.",28,2018-Q3,2018-Q3,Closeout,20220630 Corona ES,10369079,Corona ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1321901,13453,3825 Bell Ave.,Bell,90201,"Removal of 2 bungalows. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprints.",320,2018-Q1,2018-Q4,Closeout,20220630 Taft Charter HS,10003960,"Taft Charter HS - Bleacher, HVAC & Restroom Upgrades in the Gym Building",Gym/Athletic Facilities Renovation,4,Nick Melvoin,Northwest,1888001,13787,5461 Winnetka Ave.,Woodland Hills,91364,"This project renovated the gymnasium building including the replacement of existing bleachers with new motorized retractable bleachers in the main gym; repairs to heating, ventilation, and air conditioning (HVAC) equipment; painting and gym graphics in the main gym and the building entrance and lobby; replacement of doors and door hardware; and the installation of new wood flooring in the main gym, practice gym, and 2 dance rooms. The scope of work also included upgrades to the boys' and girls' restrooms, drinking fountain, parking, and path of travel improvements to meet accessibility requirements of the Americans with Disabilities Act (ADA). The project originally included scope related to the multipurpose building, but the Taft HS - Comprehensive Modernization (project #10368166) includes plans to replace the multipurpose building.","2,736",2015-Q4,2016-Q3,Closeout,20220630 San Fernando HS,10368345,San Fernando HS - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1884301,13670,11133 O'Melveny Ave.,San Fernando,91340,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",204,2018-Q3,2018-Q4,Closeout,20220630 24th St. ES,10367850,24th St. ES - Restroom Upgrades,Access Compliance,1,"Dr. George J. McKenna, III",Central,1730101,13335,2055 W. 24th St.,Los Angeles,90018,Modify Kinder restrooms 19 & 21; including relocating light switch. Install ACU provided folding changing table.,5,2016-Q3,2017-Q1,Closeout,20220630 Shenandoah EEC,10005066,Shenandoah EEC - Safety Upgrades and Improvements,Security System,1,"Dr. George J. McKenna, III",West,1955901,16725,8861 Beverlywood St.,Los Angeles,90034,Upgrade entry control system and exterior gates,83,2014-Q1,2014-Q4,Closeout,20220630 Western TECH Magnet School,10366622,Western ES - Paving,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1767101,13338,1724 W. 53rd St.,Los Angeles,90062,"The 25-year-old asphalt concrete paving on part of the campus is severely deteriorated and in need of replacement. The scope of work includes replacing asphalt concrete pavement in between buildings and in parking lot areas. Although the main playground does not require asphalt replacement, there is an opportunity to install Best Management Practices (BMP) in this area which include storm water capture, treatment and filtration where feasible. In addition, the project includes the associated Americans with Disabilities Act (ADA) path of travel and restroom upgrades and drainage systems required by DSA and the District's Storm Water Technical Manual.","4,517",2017-Q4,2019-Q2,Closeout,20220630 El Sereno ES,10369674,El Sereno ES - Technology Upgrades,Communications/Technology Upgrade,2,Monica Garcia,East,1356201,13387,3838 Rosemead Ave.,Los Angeles,90032,Purchase 120 Chromebooks and three charging carts.,39,2018-Q2,2018-Q2,Closeout,20220630 Wilson HS,10370261,Wilson HS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2024-Q3,2024-Q4,Planning,20220630 Magnolia ES,10370176,Magnolia ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1505501,13302,1626 S. Orchard Ave.,Los Angeles,90006,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2023-Q4,2024-Q2,Planning,20220630 Downtown Magnets HS: Downtown Business,10369540,Downtown Business Magnet - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1873801,13269,1081 W. Temple St.,Los Angeles,90012,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2022-Q3,2023-Q2,Planning,20220630 Nevada ES,10371071,Nevada ES - 3D Printers,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1545901,13783,22120 Chase St.,West Hills,91304,Equip STEAM lab with 3D printers,6,2020-Q1,2020-Q2,Closeout,20220630 Dana MS,10369361,Dana MS - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1810401,15063,1501 S. Cabrillo Ave.,San Pedro,90731,Install 13 new closed-circuit television (CCTV) cameras around campus for video surveillance and connect to the existing security system.,89,2018-Q1,2019-Q1,Closeout,20220630 Western TECH Magnet School,10368209,Western ES - SEEDS,SEEDS,1,"Dr. George J. McKenna, III",West,1767101,13338,1724 W. 53rd St.,Los Angeles,90062,"Design and construct an outdoor learning space of approximately 1,700 square feet consisting of the removal of asphalt, installation of decomposed granite, stamped concrete, a hose bib, irrigation system, seating boulders, planter boxes, art poles and soil. It will be outfitted by the school site and the partner organization (The Kitchen Community) with planting materials.",75,2017-Q1,2017-Q4,Closeout,20220630 Roybal Learning Center,10371122,Roybal Learning Center - Water Bottle Filling Stations,Plumbing/Irrigation/Drainage,2,Monica Garcia,Central,1854401,13875,1200 W. Colton St.,Los Angeles,90026,"Provide and install new water bottle filling stations in the multipurpose, classroom and gym buildings.",25,2020-Q1,2020-Q2,Closeout,20220630 Loma Vista ES,10369223,Loma Vista ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1491801,13586,3629 E. 58th St.,Maywood,90270,Remove 2 portable buildings. Abatement of hazardous materials. Disconnect high and low voltage utilities and repair/replace asphalt in the building footprints.,395,2018-Q2,2019-Q3,Closeout,20220630 Mosk ES,10372181,Mosk ES - Install Changing Room,Access Compliance,4,Nick Melvoin,Northwest,1740201,14302,7335 N. Lubao Ave.,Canoga Park,91306,Provide a changing room near Room #2 Special Ed Classroom.,247,2022-Q3,2022-Q4,Design,20220630 Chatsworth Charter HS,10367249,Chatsworth Charter HS - Paving & Plumbing,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1858301,13870,10027 Lurline Ave.,Chatsworth,91311,"The over 20-year-old asphalt concrete paving on the campus is severely deteriorated and in need of replacement. The paving scope of work includes replacing asphalt concrete pavement at parking lots #1, #2, and #3, walkways around the parking lots, service roads, and trash pickup areas; replacing playground pavement including color coating, athletic equipment, and play courts; providing new planters, landscaping, and synthetic turf; and replacing concrete curbs, gutters, and pavement in quad areas. This project will also remove and replace the entire underground plumbing systems at areas to be repaved. The water, sewer, gas and storm drain underground utility systems are 61 years old, deteriorated and beyond economical repair. The plumbing scope includes replacing the existing storm water infiltration basin with two new basins that have a larger overall capacity and additional drain lines. The project also includes the associated Americans with Disabilities Act (ADA) path of travel upgrades.","10,825",2018-Q2,2020-Q1,Closeout,20220630 San Fernando ES,10367930,San Fernando ES - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1645201,13419,1130 Mott St.,San Fernando,91340,Provide and install electronic marquee.,47,2017-Q4,2017-Q4,Closeout,20220630 Holmes ES,10368183,Holmes ES - Clinic Renovation,Campus Improvement,5,Jackie Goldberg,East,1456201,13315,5108 Holmes Ave.,Los Angeles,90058,"The project consists of interior alterations for the existing clinic to expand medical and mental health services, operated by LAUSD's Student Health and Human Services Department, consisting of 2 exam rooms, waiting room, care team area, nursing station, medical lab, and restrooms. The scope of work includes structural and plumbing upgrades to reconfigure the space for the clinic's expanded services; improvements to the counseling office to meet privacy requirements; replacement of heating, ventilation, and air conditioning (HVAC) including 2 heat pumps, condensing units, exhaust fans and ductwork; electrical upgrades due to the installation of a new fully automatic addressable fire alarm system with fire suppression and sprinklers; new flooring and furnishings throughout the clinic as well as repairs and painting to walls, ceilings, and roofing impacted by improvements; and Americans with Disabilities Act (ADA) upgrades to 2 restrooms, modifications to the outside ramp, addition of an accessible drinking fountain, and new signage.","2,333",2018-Q4,2020-Q1,Closeout,20220630 Lawrence MS,10370037,Lawrence MS - Fencing,Fencing,3,Scott Schmerelson,Northwest,1821701,13695,10100 Variel Ave.,Chatsworth,91311,Install an accessible pedestrian gate with electronic keypad lock at the northeast parking lot.,1,2019-Q2,2019-Q2,Closeout,20220630 Westminster Math & Technology/Environmental Studies Magnet ES,10370230,Westminster Math & Technology/Environmental Studies Magnet ES - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1769901,13483,1010 Abbot Kinney Blvd.,Venice,90291,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2025-Q4,2026-Q1,Planning,20220630 Mar Vista ES,10369965,Mar Vista ES - Garden Benches,Furniture/Fixtures/Equipment,4,Nick Melvoin,West,1519201,13603,3330 Granville Ave.,Los Angeles,90066,"Install 20 radius benches in the reading garden. This Local District West priority project includes a Facilities contribution (project #10369567), however the budget represents only the bond‐funded portion.",19,2018-Q3,2018-Q4,Closeout,20220630 Bernstein HS,10369732,Bernstein HS - 2018-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1869601,13953,1309 N. Wilton Pl.,Hollywood,90028,"This project was approved in Board of Education Report No. 429-17/18 as a 2018-19 Proposition 39 charter co-location for Academic Performance Excellence Academy (APEX) for a single-year term with an expiration date of 6/30/19. This growth project included 1 charter office, 1 special education room, and 17 instructional spaces for charter student seats in grades 7-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. Subsequently to the approval of the project, an alternative agreement was executed. As a result, the scope of work changed from a growth co-location to a ""no change"" project with no additional work required.",2,2018-Q3,2018-Q3,Closeout,20220630 Annandale ES,10370454,Annandale ES - Portable Removal,Portable Removal,5,Jackie Goldberg,Central,1215101,13371,6125 Poppy Peak Dr.,Los Angeles,90042,"Demolish and remove 2 portable buildings. Remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving and provide playground striping at the footprint of the buildings.",297,2019-Q2,2020-Q1,Closeout,20220630 El Oro Way Charter for Enriched Studies,10371509,El Oro ES - Upgrade Computer Lab,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1354501,13802,12230 El Oro Way,Granada Hills,91344,"Purchase 21 desks/tables, 2 Promethean ActivPanels, and 2 laserjet printers. Remove wire mold from existing tables, then salvage tables. Configure power/data connections for new tables.",37,2020-Q4,2022-Q1,Closeout,20220630 Palms ES,10369929,Palms ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1598601,13418,3520 Motor Ave.,Los Angeles,90034,"Demolish 1 bungalow building, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and repair/replace asphalt paving.",185,2018-Q4,2019-Q3,Closeout,20220630 Langdon ES,10370949,Langdon ES - Marquee,Electrical/Lighting,6,Kelly Gonez,Northwest,1477501,13413,8817 Langdon Ave.,North Hills,91343,Install new electronic free-standing marquee,51,2019-Q4,2020-Q4,Closeout,20220630 Halldale ES,10371692,Halldale ES - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1434201,13601,21514 Halldale Ave.,Torrance,90501,"Remove existing marquee, footing, and raised flower bed on the front lawn at Halldale Ave. and 216th St. and replace with a new single-sided electronic marquee standing less than 8' high.",54,2021-Q2,2021-Q4,Closeout,20220630 Girls Academic Leadership Academy: King School for STEM,10370904,Girls Academic Leadership Academy: King School for STEM - Remove Classroom Partitions,Access Compliance,1,"Dr. George J. McKenna, III",West,1608701,13361,1067 West Blvd.,Los Angeles,90019,Remove existing room partitions to provide additional maneuvering room for student in a wheelchair.,44,2019-Q4,2020-Q4,Closeout,20220630 Saticoy ES,10372572,Saticoy ES - Accessibility Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1656501,13363,7850 Ethel Ave.,North Hollywood,91605,Design and construct a sloped walkway at Building F.,117,2022-Q3,2022-Q4,Design,20220630 Huntington ES,10370166,Huntington ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1463001,13312,4435 N. Huntington Dr.,Los Angeles,90032,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2027-Q1,2027-Q2,Planning,20220630 Sherman Oaks Charter ES,10372607,Sherman Oaks Charter ES - Playground Matting & Structure,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northeast,1669901,13517,14755 Greenleaf St.,Sherman Oaks,91403,This project is to replace the playground matting and structure in the main yard and replace the playground matting in the kindergarten yard.,"1,445",2023-Q3,2024-Q1,Planning,20220630 Reseda Charter HS,10368163,Reseda Charter HS - Comprehensive Modernization,Comprehensive Modernization,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,"This project includes the construction of new buildings and site improvements with approximately 14 general and specialty classrooms, instructional support spaces, administration, library, cafeteria/lunch shelter, and performing arts center. Existing school facilities will be upgraded including the modernization and seismic retrofit of the north and south gymnasiums. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of administration building #1, library building #2, homemaking building #14, restroom building #16, industrial arts building #7, cafeteria/lunch shelter building #6, student store building #11, auditorium building #5, classroom buildings #13 & #43, and 25 relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","170,148",2022-Q1,2025-Q3,Construction,20220630 Gardena ES,10370156,Gardena ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1404101,13320,647 W. Gardena Blvd.,Gardena,90247,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2026-Q4,2027-Q1,Planning,20220630 Walnut Park ES,10370167,Walnut Park ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1464001,13825,2642 E. Olive St.,Huntington Park,90255,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2027-Q3,2028-Q1,Planning,20220630 Menlo ES,10371331,Menlo ES - 2020-21 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1524701,13386,4156 Menlo Ave.,Los Angeles,90037,"This project is a charter school renovation for Global Education Academy for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 1 special education room, and 4 instructional spaces for charter student seats in grades 5-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",165,2020-Q3,2020-Q3,Closeout,20220630 Bethune MS,10370573,Bethune MS - 2019-21 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for Animo Florence-Firestone Charter MS. This project included 1 charter office, 1 special education room, and 20 instructional spaces for charter student seats in grades 6-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved in Board of Education Report No. 313-19/20 for 2020-21 Proposition 39 charter co-locations as a vacating project. Animo Florence-Firestone Charter MS will not continue occupancy in the 2020-21 school year. Therefore, this project is amended to include the scope of work necessary to return the site to it previous conditions with all low voltage systems reconnected to District-operated programs.",314,2019-Q2,2019-Q3,Closeout,20220630 Sylmar ES,10370710,Sylmar ES - Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1701401,13604,13291 Phillippi Ave.,Sylmar,91342,Install new electronic free-standing marquee,44,2020-Q1,2020-Q1,Closeout,20220630 Irving STEAM Magnet MS,10367691,Irving MS - 2016-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"This project was initially approved in BOE Report No. 373-15/16 as a 2016-17 Prop. 39 co-location for Celerity Octavia Charter School. This reconfiguration project included 1 charter office, 1 special education room, and 13 instructional spaces for charter students in grades K-8, and reduced the number of spaces previously allocated to Celerity Octavia Charter School during the 2015-16 school year. The scope of work included facilities renovations and reconfigurations, recovery of furniture and equipment, and recovery of technology. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with 1 charter office, 1 special education room, and 11 instructional spaces for charter students in grades K-8 with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",31,2016-Q2,2016-Q3,Closeout,20220630 Budlong ES,10368339,Budlong ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1261601,15162,5940 S. Budlong Ave.,Los Angeles,90044,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",140,2017-Q2,2017-Q3,Closeout,20220630 East Valley HS,10369279,East Valley HS - Science Academy STEM Magnet Relocation,Reconfiguration,6,Kelly Gonez,Northeast,1860701,13951,5525 Vineland Ave.,North Hollywood,91601,"The project provides upgrades and alterations to facilities at East Valley HS for the relocation of the Science Academy STEM Magnet from Millikan MS and its expansion to a span 6-12 school with over 500 students. The scope of work includes converting a dance room into a robotics classroom, consolidating 2 classrooms into 1 maker space classroom, upgrading 3 science classrooms to include additional lab space, reconfiguring administrative and counselor offices, and providing a new marquee, signage, and low voltage infrastructure upgrades. Also included is the installation of video surveillance systems (CCTV), as well as providing specialized fixtures, technology, and equipment in support of the instructional programs. This project will allow the Science Academy STEM Magnet to utilize 21 existing classrooms in the main classroom building including 19 classrooms on the 3rd floor, 2 of which will become the new maker space classroom, and 2 classrooms on the 2nd floor. The magnet school will also occupy the following offices and spaces: 2 offices on the 1st floor (N110 & N111) to be converted to the Principal's Office and another space directly across from these offices, as well as spaces on the 3rd floor including an office suite and waiting area (W301), a storage/textbook room west of N314, and a storage/textbook room east of N310 near the southeast stairway.","1,218",2017-Q4,2018-Q4,Closeout,20220630 Jordan HS,10367405,Jordan HS - HVAC in Competition Gym,HVAC,7,Tanya Ortiz Franklin,South,1872101,13494,2265 E. 103rd St.,Los Angeles,90002,"The project addresses cooling needs in the competition gymnasium building by installing a new heating, ventilation, and air conditioning (HVAC) system. The scope of work also includes the replacement of the ceilings in the locker room, dance room, and ROTC area; extension of partition walls to the underside of roof joists, replacement lighting, and reconfiguration and replacement of low voltage systems to accommodate the ceiling replacement; equipment demolition, asbestos abatement, cleaning and leak test for ducts, structural and electrical power upgrades, and patch and paint as required.","5,687",2019-Q1,2020-Q3,Closeout,20220630 Vermont ES,10370748,Vermont ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",Central,1747901,13273,1435 W. 27th St.,Los Angeles,90007,"Demolish and remove 1 bungalow. Disconnect all ITD components, utilities, and plumbing and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",179,2019-Q3,2021-Q2,Closeout,20220630 Beckford Charter for Enriched Studies,10372586,Beckford Charter for Enriched Studies - Provide Exterior Tables,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1233501,13836,19130 Tulsa St.,Northridge,91326,Purchase (12) exterior tables and umbrellas. M&O to anchor all tables.,44,2022-Q3,2022-Q4,Planning,20220630 Alta Loma ES,10370122,Alta Loma ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1208201,13402,1745 Vineyard Ave.,Los Angeles,90019,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q2,2028-Q3,Planning,20220630 Atwater ES,10370126,Atwater ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1223301,13457,3271 Silver Lake Blvd.,Los Angeles,90039,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2027-Q1,2027-Q3,Planning,20220630 Pio Pico MS,10370174,Pio Pico MS - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1498001,13903,1512 S. Arlington Ave.,Los Angeles,90019,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2025-Q4,2026-Q1,Planning,20220630 Purche ES,10370191,Purche ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1615801,13655,13210 Purche Ave.,Gardena,90249,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q1,2028-Q2,Planning,20220630 Soto ES,10370207,Soto ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1684901,13424,1020 S. Soto St.,Los Angeles,90023,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2028-Q2,2028-Q3,Planning,20220630 Le Conte MS,10367694,Le Conte MS - 2016-17 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"This project is a charter school renovation for Citizens of the World Charter School - Hollywood for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 20 instructional spaces for charter student seats in in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",26,2016-Q2,2016-Q3,Closeout,20220630 Canfield ES,10367443,Canfield ES - HVAC,HVAC,1,"Dr. George J. McKenna, III",West,1274001,13556,9233 Airdrome St.,Los Angeles,90035,"This project upgrades the heating, ventilation, and air conditioning (HVAC) system in the administration & classroom building, the south classroom building, boiler vault, and portable buildings. The HVAC system is over 35 years old and beyond economical repair. The scope of work includes the replacement of 1 multi-zone air handling unit with 9 new rooftop units and 9 new exhaust fans, 1 new makeup unit, 1 new kitchen exhaust fan on the roof, and ductwork in the administration & classroom building; the replacement of 6 wall-mounted air conditioning units and 2 window-type air conditioning units with 7 new wall-mounted air conditioning units and 1 fan coil unit in the south classroom building; and the demolition of circulation pump, concrete pad, expansion tank, floor sink, plumbing piping, electrical controls, and hardware in the boiler vault. The project also includes electrical, plumbing and structural upgrades to support the new HVAC equipment as well as fire safety improvements.","6,608",2018-Q4,2020-Q3,Closeout,20220630 Chatsworth Charter HS,10370577,Chatsworth Charter HS - 2019-20 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northwest,1858301,13870,10027 Lurline Ave.,Chatsworth,91311,"This project is a charter school renovation for Valley International Preparatory HS for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",60,2019-Q4,2020-Q1,Closeout,20220630 Mar Vista ES,10370482,Mar Vista ES - Technology and Security Upgrade,Communications/Technology Upgrade,4,Nick Melvoin,West,1519201,13603,3330 Granville Ave.,Los Angeles,90066,Purchase 60 Chromebooks and 2 charging carts; provide security upgrades as needed.,21,2019-Q2,2019-Q2,Closeout,20220630 Glen Alta Span School,10368887,Glen Alta Span School - Accessibility Upgrades,Access Compliance,2,Monica Garcia,East,1413701,13292,3410 Sierra St.,Los Angeles,90031,Install an outdoor ramp in the play yard and two inclined lifts in the main building.,140,2017-Q2,2017-Q3,Closeout,20220630 Belmont HS,10366555,Belmont HS - Roofing & Plumbing Upgrades in Gym,Gym/Athletic Facilities Renovation,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"This project replaces the cracked 3-inch lightweight concrete deck and waterproofing membrane on the roof of the physical education and gymnasium building that was causing water accumulation above and leaking below into the building. The scope also includes the repair of the boys' shower floor with plumbing repairs and the replacement of valves and drains to address shower leaks, and upgrades to meet the accessibility requirements of the Americans with Disabilities Act (ADA) for the student restrooms, drinking fountain, striping and signage in the parking structure, accessible seating, and path of travel improvements.","2,797",2017-Q2,2018-Q1,Closeout,20220630 Brainard ES,10367753,Brainard ES - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1248601,13834,11407 Brainard Ave.,Lake View Terrace,91342,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 128 doors/hardware, 36 accessible paths of travel, 50 signs, 5 restrooms, 38 drinking fountains/sinks, 15 casework/counters, 1 assistive listening device/intercom/phone, 2 concrete ramps, 1 metal ramp, 3 pieces of assessable furniture, 1 assembly seat, 3 railings, 2 parking areas, and 1 passenger/bus loading zones.","4,555",2017-Q2,2022-Q3,Construction,20220630 Eagle Rock HS,10368223,Eagle Rock HS - Seismic Retrofit & HVAC in Auditorium,Seismic Modernization,5,Jackie Goldberg,Central,1861401,13553,1750 Yosemite Dr.,Los Angeles,90041,"This project addresses cooling needs and seismically retrofits the auditorium building of approximately 16,000 square feet that was constructed in 1927 and strengthened in 1968. The project includes replacing the heating, ventilation, and air conditioning (HVAC) system and upgrading the fire alarm system to interface with the new HVAC system. The HVAC scope also includes the replacement of the air handling unit, supply and return fans, supply and return ductwork with new connections to existing mushroom air return grills, and required registers. The seismic retrofit portion of the project includes a lateral force resisting system that is comprised of concrete shear walls with both rigid (stage and foyer) and flexible (auditorium and stagecraft) roof diaphragms. This scope or work includes the installation of new wall-to-roof anchors, fiber reinforced polymer (FRP) layers to the concrete slab and slab-to-wall connections, FRP wraps and anchors to the building foundations, and additional roof joists and ledge wood members. The seismic retrofit scope also includes soil compaction grouting that provides a more stable foundation for the building by injecting grout under pressure into the soil, from approximately 20' to 40' below the surface, in hundreds of roughly configured columns to strengthen this layer of soil. In addition, this project provides restroom and path of travel upgrades to improve access.","9,290",2018-Q3,2020-Q2,Closeout,20220630 Walnut Park ES,10372245,Walnut Park ES - Install Electronic Marquee,Electrical/Lighting,5,Jackie Goldberg,East,1464001,13825,2642 E. Olive St.,Huntington Park,90255,"Install new electronic, free-standing marquee. Install marquee on lawn at corner of Seville Ave. and Olive St. Trench across parking lot approx. 130 feet. Approx. 130 feet underground and 100 feet above-ground conduit required. Single-sided 8 feet x5 feet color LED display.",73,2022-Q3,2023-Q1,Planning,20220630 Saticoy ES,10372298,Saticoy ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1656501,13363,7850 Ethel Ave.,North Hollywood,91605,Install new secure entry system at the Main Office.,35,2022-Q2,2022-Q3,Construction,20220630 Kim ES,10372445,Kim ES - Secure Entry System,Security System,5,Jackie Goldberg,Central,1270101,13906,225 S. Oxford Ave.,Los Angeles,90004,Install new secure entry system at the Main Office.,43,2022-Q2,2022-Q4,Construction,20220630 118th St. ES,10372596,118th St. ES - Install Security Monitor System,Security System,7,Tanya Ortiz Franklin,South,1574001,13321,144 E. 118th St.,Los Angeles,90061,Install video surveillance (CCTV) system with (5) cameras.,78,2022-Q4,2023-Q1,Planning,20220630 Franklin HS,10366541,Franklin HS-Removal of 4 Bungalows,Portable Removal,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,"Removal of 4 Bungalows; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",449,2015-Q4,2016-Q3,Closeout,20220630 Blythe ES,10368082,Blythe ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1247001,13758,18730 Blythe St.,Reseda,91335,Provide and install electronic marquee.,37,2017-Q4,2018-Q1,Closeout,20220630 Beachy ES,10370129,Beachy ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1232901,13666,9757 Beachy Ave.,Arleta,91331,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2025-Q1,2025-Q3,Planning,20220630 Breed ES,10370132,Breed ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1249301,13281,2226 E. 3rd St.,Los Angeles,90033,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",196,2020-Q3,2021-Q3,Closeout,20220630 Eagle Rock ES,10370143,Eagle Rock ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1350701,13499,2057 Fair Park Ave.,Los Angeles,90041,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2022-Q4,2023-Q3,Planning,20220630 Fletcher ES,10370151,Fletcher ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2025-Q4,2026-Q1,Planning,20220630 Bethune MS,10367661,Bethune MS - 2016-17 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,"This project is a charter school renovation for Animo Charter MS #8 for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grade 6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",152,2016-Q2,2016-Q3,Closeout,20220630 Drew MS,10368719,Drew MS - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1811201,13871,8511 Compton Ave.,Los Angeles,90001,"Removal of 2 portable buildings and 2 bungalows. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprints.",259,2017-Q2,2018-Q3,Closeout,20220630 Wright STEAM Magnet MS,10366935,Wright MS - 2015-16 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Charter ES for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 18 classrooms for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",37,2015-Q2,2015-Q3,Closeout,20220630 Grand View ES,10370042,Grand View ES - Technology Upgrades & Storage,Communications/Technology Upgrade,4,Nick Melvoin,West,1424701,13716,3951 Grand View Blvd.,Los Angeles,90066,Purchase 105 Chromebooks and 3 storage carts.,35,2018-Q4,2018-Q4,Closeout,20220630 Porter Ranch Community School,10370523,Porter Ranch Community School - Playground Upgrades,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1230301,14601,12450 Mason Ave.,Porter Ranch,91326,"The project adds a new playground structure and rubberized play matting to the existing play area's hard courts to provide students with additional outdoor activity with fall protection. This Board District 3 priority project includes a contribution from the Friends of Porter Ranch Community School, however the budget represents only the installation cost.",158,2020-Q1,2021-Q1,Closeout,20220630 Canoga Park HS,10369961,Canoga Park HS - Auditorium Lighting,Electrical/Lighting,3,Scott Schmerelson,Northwest,1857101,13415,6850 Topanga Canyon Blvd.,Canoga Park,91303,Install new LED lighting in auditorium,33,2019-Q2,2019-Q3,Closeout,20220630 San Fernando HS,10366711,San Fernando HS - Paving,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1884301,13670,11133 O'Melveny Ave.,San Fernando,91340,"The 20-year-old asphalt concrete paving on the campus is severely deteriorated and in need of replacement. The scope of work includes replacing asphalt concrete pavement at the bleachers, in between buildings, and in parking lot areas. In addition, the project includes the associated Americans with Disabilities Act (ADA) path of travel upgrades and drainage systems required by DSA and the District's Storm Water Technical Manual.","6,372",2017-Q2,2018-Q4,Closeout,20220630 Jefferson HS,10367692,Jefferson HS - 2016-17 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1871401,13447,1319 E. 41st St.,Los Angeles,90011,"Charter School (Student Empowerment Academy) decided to self-revoke and close operations which led to them vacating the Jefferson HS campus in June 2016. Therefore, project which was budgeted as a reduction of (1) space became a reconfiguration of (13) spaces back to Jefferson HS low voltage systems. This was required immediately for the District instructional programs in preparation for the 2016-17 school year.",33,2016-Q3,2016-Q3,Closeout,20220630 Whitman Continuation HS,10369673,Whitman Continuation HS - Fencing and Secure Entry System,Security System,4,Nick Melvoin,West,1862301,16482,7795 Rosewood Ave.,Los Angeles,90036,Security and safety upgrades: Install chain link fence and pedestrian security gate with secure entry system at front of school.,37,2018-Q2,2018-Q3,Closeout,20220630 Banning HS,10369533,Banning HS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",267,2021-Q2,2022-Q4,Construction,20220630 Bradley Global Awareness Magnet ES,10370836,Bradley Global Awareness Magnet ES - ADA Gate,Access Compliance,1,"Dr. George J. McKenna, III",West,1712301,13516,3875 Dublin Ave.,Los Angeles,90008,"Provide ADA gate and 2-way communication for accessible entrance to main building,",156,2019-Q4,2020-Q1,Closeout,20220630 Corona ES,10368953,Corona ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1321901,13453,3825 Bell Ave.,Bell,90201,Provide 80 Chromebooks and 2 charging carts; secure room #9 for storage.,36,2017-Q3,2017-Q4,Closeout,20220630 Ann ES,10370015,Ann ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1213701,13286,126 E. Bloom St.,Los Angeles,90012,"Demolish 1 portable bungalow, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",412,2019-Q1,2019-Q4,Closeout,20220630 Miles EEC,10372327,Miles EEC - Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,East,1953501,16663,2855 Saturn Ave.,Huntington Park,90255,"Remove two poured-in-place play mattings and concrete curb. Replace approx. 900 sq. feet matting with new tile matting and install new concrete curb flush with grade. Replace approx. 250 sq. ft matting with reading garden area, including furniture.",111,2022-Q3,2023-Q1,Planning,20220630 Brockton ES,10368942,Brockton ES - Playground Upgrades,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1254801,13432,1309 Armacost Ave.,Los Angeles,90025,Install one playground structure and provide Americans with Disabilities Act (ADA) compliant path of travel.,454,2020-Q4,2021-Q3,Closeout,20220630 King Magnets MS,10370248,King Magnets MS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1820801,13531,4201 Fountain Ave.,Los Angeles,90029,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2024-Q1,2024-Q3,Planning,20220630 Valley Academy of Arts and Sciences,10371657,Valley Academy of Arts and Sciences - Install Water Bottler Fillers,Plumbing/Irrigation/Drainage,3,Scott Schmerelson,Northwest,1889801,193562,10445 Balboa Blvd.,Granada Hills,91344,Install 3 water bottle filling stations. Two stations will replace existing bubblers on the north side of the administration building and west of the lunch pavilion. One will be a new station on the north side of the gymnasium building with the installation tapping into restroom plumbing.,62,2022-Q3,2023-Q1,Planning,20220630 Belvedere MS,10368885,Belvedere MS - Portable Removal,Portable Removal,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,"Removal of 2 bungalow buildings. Abatement of hazardous materials, disconnection of low and high voltage utilities and repair/replacement of asphalt at building footprints.",274,2017-Q4,2018-Q3,Closeout,20220630 Washington Preparatory HS,10366825,Washington Preparatory HS - Replace Synthetic Turf Field,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1892801,13560,10860 S. Denker Ave.,Los Angeles,90047,"This project addresses the defective synthetic turf field of approximately 100,000 square feet by removing and replacing the field with one that will perform better for instructional and extracurricular activities.","2,027",2016-Q3,2016-Q4,Closeout,20220630 Le Conte MS,10370940,Le Conte MS - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,Purchase (76) Chromebooks and (2) storage carts; install security upgrades as needed,28,2019-Q4,2020-Q1,Closeout,20220630 Roscomare ES,10371075,Roscomare ES - Technology Upgrade,Communications/Technology Upgrade,4,Nick Melvoin,West,1636301,13799,2425 Roscomare Rd.,Los Angeles,90077,Install 3 new smartboards.,15,2020-Q2,2020-Q2,Closeout,20220630 Vaughn EEC,10005072,Vaughn EEC - Safety Upgrades and Improvements,Campus Improvement,6,Kelly Gonez,Northeast,1957201,16782,11480 Herrick Ave.,Pacoima,91331,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",133,2014-Q3,2015-Q1,Closeout,20220630 Dayton Heights EEC,10367310,Dayton Heights EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1951301,16302,3917 Clinton St.,Los Angeles,90004,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",86,2016-Q2,2016-Q4,Closeout,20220630 Lowman Special Education & Career Transition Center,10366688,Lowman Sp Ed-Install 3 Changing Stations,Access Compliance,6,Kelly Gonez,Northeast,1194801,13544,12827 Saticoy St.,North Hollywood,91605,Install 3 Changing Stations,9,2015-Q1,2015-Q1,Closeout,20220630 Reseda Charter HS,10101009,Reseda Charter HS - Science Classroom Conversion - Industrial Arts 1,Reconfiguration,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,Convert existing Industrial Arts 1 classroom into a chemistry science lab,859,2013-Q4,2014-Q2,Closeout,20220630 Maintenance & Operations: North Region 2,10003836,Maintenance & Operations North Region 2 - Photovoltaic Installation,Photovoltaic Installation,6,Kelly Gonez,Northeast,9142801,13910,8960 Herrick Ave.,Sun Valley,91352,Shade Structure to Generate 158 kW of Solar Energy,"1,706",2013-Q4,2014-Q3,Closeout,20220630 Panorama HS,10366918,Panorama HS - 2015-16 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,"This project is a charter school renovation for Valor Academy Charter HS for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 12 classrooms for charter student seats in grades 9-11. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",51,2015-Q2,2015-Q3,Closeout,20220630 Virgil MS,10367155,Virgil MS - Electronic Camera Door Entry System,Security System,2,Monica Garcia,Central,1846201,13382,152 N. Vermont Ave.,Los Angeles,90004,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,14,2016-Q2,2016-Q3,Closeout,20220630 Rockdale Visual & Performing Arts Magnet ES,10368951,Rockdale Visual & Performing Arts Magnet ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1632901,13379,1303 Yosemite Dr.,Los Angeles,90041,Provide 72 Chromebooks and 2 charging carts and secure the workroom in the main office for storage.,34,2017-Q3,2020-Q1,Closeout,20220630 Hawaiian EEC,10372472,Hawaiian EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,7,Tanya Ortiz Franklin,South,1952201,16284,501 Hawaiian Ave.,Wilmington,90744,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 15,691 ft2. ADA upgrades for this project include (a) resurfacing a portion of the parking area - approximately 6000 ft2 - to provide an ADA compliant path of travel and (b) providing an ADA compliant restroom. Additionally, we will replace deteriorated HVAC units and roofing, and make necessary upgrades to the fire alarm system, as required by current code.","4,354",2023-Q4,2025-Q1,Planning,20220630 Fremont HS,10367855,Fremont HS - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1865001,13475,7676 S. San Pedro St.,Los Angeles,90003,"The project removes the following portable buildings from the campus, including the demolition of 1 building on site: 4 DSA portables, 2 DSA portables (40' x 48'), 2 sanitary buildings (12' x 40'), and 1 storage building (20' x 20'). Disconnect all utilities and reconnect to the remaining buildings on site as well as restore asphalt paving as needed.",349,2016-Q3,2018-Q1,Closeout,20220630 Gates EEC,10005031,Gates EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,East,1958901,16287,2306 Thomas St.,Los Angeles,90031,"Upgrade entry control system, exterior gates, playground equipment, restroom doors, and air conditioning system",301,2015-Q2,2023-Q1,Construction,20220630 Huntington Park ES,10369070,Huntington Park ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1239101,13916,6055 Corona Ave.,Huntington Park,90255,"Purchase 82 Chromebooks, 2 charging carts, and 3 laptops. The scope includes technology and security upgrades to storage room with metal skins and panic hardware.",35,2017-Q3,2018-Q4,Closeout,20220630 6th Ave. ES,10367068,6th Ave. ES - ADA Improvements,Access Compliance,1,"Dr. George J. McKenna, III",West,1678101,13425,3109 Sixth Ave.,Los Angeles,90018,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 90 doors/hardware, 37 accessible paths of travel, 60 signs, 14 restrooms, 23 drinking fountains/sinks, 17 casework/counters, 1 assistive listening device/intercom/phone, 6 concrete ramps, 1 metal ramp, 10 pieces of accessible furniture, 14 railings, 1 locker room modification, 1 parking area, and 2 new elevators/stage lifts.","7,267",2019-Q2,2022-Q4,Construction,20220630 Broadous EEC,10005017,Broadous EEC - Safety Upgrades and Improvements,Campus Improvement,6,Kelly Gonez,Northeast,1958701,15104,11736 Bromont Ave.,Pacoima,91331,"Upgrade entry control system, exterior gates, and playground equipment",91,2014-Q3,2014-Q4,Closeout,20220630 Toluca Lake EEC,10005069,Toluca Lake EEC - Safety Upgrades and Improvements,Campus Improvement,6,Kelly Gonez,Northeast,1956801,16690,4915 Strohm Ave.,North Hollywood,91601,"Upgrade entry control system, exterior gates, and playground equipment",53,2014-Q4,2015-Q2,Closeout,20220630 Vanalden EEC,10005071,Vanalden EEC - Safety Upgrades and Improvements,Campus Improvement,4,Nick Melvoin,Northwest,1954201,16723,6212 Vanalden Ave.,Reseda,91335,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, playground equipment, and exterior paint",118,2014-Q2,2015-Q1,Closeout,20220630 Pinewood EEC,10005062,Pinewood EEC - Safety Upgrades and Improvements,Campus Improvement,6,Kelly Gonez,Northeast,1954901,16705,7051 Valmont St.,Tujunga,91042,"Upgrade entry control system, exterior gates, and playground equipment",40,2014-Q3,2015-Q2,Closeout,20220630 State EEC,10367360,State EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1956301,16704,3210 Broadway,Huntington Park,90255,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",91,2016-Q3,2016-Q3,Closeout,20220630 Gardena HS,10004937,Gardena HS - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"Equip with tables, chairs, children's corner, media cart, computers and signage. Repair flooring and upgrade interior with paint. Install window for supervision between partition wall.",74,2013-Q2,2014-Q1,Closeout,20220630 Cárdenas ES,10367114,Cárdenas ES - Security Upgrades,Fencing,3,Scott Schmerelson,Northeast,1740101,193551,6900 Calhoun Ave.,Van Nuys,91405,Upgrade physical security by installing a new fence and mesh on top of the block wall in front of the school.,16,2015-Q4,2016-Q2,Closeout,20220630 Wilmington Park ES,10366762,Wilmington Park ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1778101,13378,1140 Mahar Ave.,Wilmington,90744,"Renovate and upgrade school's existing parent & family center by providing interior paint, flooring and lighting repairs. Remove deteriorated built-in cabinets and patch up walls. Include security upgrades including new doors and panic hardware as well as security on windows. Provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",80,2015-Q1,2015-Q4,Closeout,20220630 93rd St. ES,10367103,93rd St. ES - Electronic Camera Door Entry System,Security System,7,Tanya Ortiz Franklin,South,1558201,13814,330 E. 93rd St.,Los Angeles,90003,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,18,2015-Q4,2016-Q1,Closeout,20220630 Adams MS,10367104,Adams MS - Electronic Camera Door Entry System,Security System,5,Jackie Goldberg,Central,1800901,13366,151 W. 30th St.,Los Angeles,90007,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,32,2015-Q4,2016-Q2,Closeout,20220630 Bright ES,10367110,Bright ES - Electronic Camera Door Entry System,Security System,1,"Dr. George J. McKenna, III",West,1716401,13306,1771 W. 36th St.,Los Angeles,90018,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,23,2015-Q4,2016-Q1,Closeout,20220630 Hawaiian ES,10104311,Modernization of Main Office with Security,Security System,7,Tanya Ortiz Franklin,South,1446601,13648,540 Hawaiian Ave.,Wilmington,90744,Modernization of Main Office with Security,43,2014-Q2,2016-Q1,Closeout,20220630 Vine EEC,10367367,Vine EEC - Technology Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1957401,14281,6312 Eleanor Ave.,Los Angeles,90038,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",99,2016-Q2,2016-Q4,Closeout,20220630 Revere Charter MS,10103874,Provide Sanitary Building,Portable Upgrade,4,Nick Melvoin,West,1835601,13665,1450 Allenford Ave.,Los Angeles,90049,Provide Sanitary Building,"1,225",2012-Q4,2014-Q2,Closeout,20220630 Newcastle ES,10368319,Newcastle ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,Northwest,1547901,13720,6520 Newcastle Ave.,Reseda,91335,Provide and install electronic marquee.,38,2018-Q1,2018-Q2,Closeout,20220630 Sunland ES,10371513,Sunland ES - Install Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1697301,13451,8350 Hillrose St.,Sunland,91040,Remove the existing marquee at Hillrose St. and Oro Vista Ave. Install a new 2-sided electronic marquee standing less than 8¿ high on the front lawn east of the accessible entrance to the main office.,61,2021-Q2,2022-Q3,Construction,20220630 Mack ES,10372612,Mack ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",Central,1511301,13851,3020 S. Catalina St.,Los Angeles,90007,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Broadous ES,10366864,Broadous ES - Address Antiquated Roofing,Roofing,6,Kelly Gonez,Northeast,1382901,13768,12561 Filmore St.,Pacoima,91331,"This project is to replace the roofing on eleven classroom buildings and arcades. The roofing is approximately 20 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",564,2016-Q1,2016-Q2,Closeout,20220630 Castlebay Charter ES,10366598,Castlebay ES - SEEDS,SEEDS,3,Scott Schmerelson,Northwest,1288101,13892,19010 Castlebay Lane,Porter Ranch,91326,"Design and construct an outdoor learning space of approximately 1,700 square feet consisting of painting pavement areas, the installation of permeable concrete pavers and art poles. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",27,2015-Q1,2015-Q2,Closeout,20220630 Lemay ES,10367195,Lemay ES-Removal of 1 DOH Bldg.,Portable Removal,3,Scott Schmerelson,Northwest,1484901,13684,17520 Vanowen St.,Lake Balboa,91406,"Demolish/Remove Department of Housing (DOH) Portable Building; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",70,2015-Q3,2016-Q3,Closeout,20220630 Dodson MS,10366348,Dodson MS - Laptops,Communications/Technology Upgrade,7,Tanya Ortiz Franklin,South,1811001,13846,28014 Montereina Dr.,Rancho Palos Verdes,90275,Increase school's access to technology by providing laptop computers,36,2014-Q3,2015-Q1,Closeout,20220630 Lorena ES,10367132,Lorena ES - Security Upgrades,Security System,2,Monica Garcia,East,1494501,13351,1015 S. Lorena St.,Los Angeles,90023,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance. Provide security upgrades by installing a chain link fence and gate by the existing playground ramp.,15,2016-Q1,2016-Q2,Closeout,20220630 Politi ES,10367142,Politi ES - Replace Deteriorated Carpet,Flooring,2,Monica Garcia,Central,1238401,13823,2481 W. 11th St.,Los Angeles,90006,"Provide upgrades to the existing offices and classrooms in the main building, by removing deteriorated carpet and installing new vinyl composition tile throughout. ",22,2016-Q1,2016-Q1,Closeout,20220630 Trinity ES,10367152,Trinity ES - Electronic Camera Door Entry System,Security System,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,14,2015-Q4,2016-Q2,Closeout,20220630 Arlington Heights ES,10371115,Arlington Heights ES - Campus Improvement,Campus Improvement,1,"Dr. George J. McKenna, III",West,1219201,15202,1717 Seventh Ave.,Los Angeles,90019,"Provide and install two bottle filling stations, lunch tables and benches.",66,2020-Q1,2020-Q4,Closeout,20220630 7th St. Arts Integration Magnet ES,10369827,7th St. Arts Integration Magnet ES - New Food Services Building,Food Services Renovation,7,Tanya Ortiz Franklin,South,1661601,13550,1570 W. 7th St.,San Pedro,90732,"This project replaces an undersized and outdated food service facility with a new food services building that will provide students with faster access to nutritious, healthy meals. The scope includes the construction of a new food services building of approximately 1,600 square feet, consisting of a food preparation/kitchen area, serving area, and food storage with new furnishings and energy efficient equipment; construction of an arcade and concrete walkway of approximately 1,500 square feet; exterior painting of the existing 5 concrete lunch shelters; and demolition of the existing undersized food service ""hot shack"" shed building. To continue providing meals to students during this project, an interim mobile kitchen (8' x 40' portable building) will be placed at the school along with required utilities, temporary fencing, and a temporary access ramp from the lower playground to the main campus during construction. Site work including a ramp, retaining wall, paving, and utilities as well as any other improvements needed to ensure compliance with local, State and Federal facilities requirements including program accessibility under the Americans with Disabilities Act (ADA) are also incorporated into the project.","9,407",2021-Q2,2023-Q1,Construction,20220630 Coeur d'Alene ES,10366951,Coeur d'Alene ES - SEEDS,SEEDS,4,Nick Melvoin,West,1634201,13578,810 Coeur D'Alene Ave.,Venice,90291,"Design and construct an outdoor learning space that is approximately 2,000 square feet consisting of the removal of asphalt, capping of irrigation, installation of decomposed granite, concrete entrance pads, redwood headers, hose bibs and fencing. The outdoor learning space will be outfitted by the school site (Coeur d'Alene ES) and partner organization (ELOW Landscape and Design Build) with planter boxes and planting materials.",33,2015-Q3,2015-Q3,Closeout,20220630 Fulton College Preparatory School,10367800,Fulton College Preparatory School - Fencing,Fencing,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,Install new fencing and 4 gates with panic hardware near gym area.,21,2016-Q3,2016-Q4,Closeout,20220630 Arminta ES,10367411,Arminta ES - SEEDS,SEEDS,6,Kelly Gonez,Northeast,1220501,13710,11530 Strathern St.,North Hollywood,91605,"Design and construct an outdoor learning space of approximately 1,400 square feet consisting of the installation of art poles, a hose bib, seating boulders and potting soil. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches and signage poles.",18,2016-Q2,2016-Q3,Closeout,20220630 Roosevelt HS,10204032,Renovate Health Office,Campus Improvement,2,Monica Garcia,East,1882901,13523,456 S. Mathews St.,Los Angeles,90033,Renovate Health Office,78,2013-Q1,2015-Q4,Closeout,20220630 Columbus MS,10366827,Columbus MS - Gym Upgrades,Flooring,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,This project will replace the wood floors in the Gymnasium Building and rehabilitate adjacent wall systems. The existing floors are over 55 years old and are in poor condition resulting in a hazardous condition at the site.,344,2015-Q3,2016-Q1,Closeout,20220630 Miller Career & Transition Center,10367090,Miller Career & Transition Center - Roofing,Roofing,3,Scott Schmerelson,Northwest,1191001,15164,8218 Vanalden Ave.,Reseda,91335,"This project is to upgrade 45,000 square feet of roofing on 6 buildings and all of the arcades throughout the campus with a PVC material. The roofs are over 40 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",573,2016-Q2,2016-Q3,Closeout,20220630 Westside Global Awareness Magnet,10367527,Westside Global Awareness Magnet - SEEDS,SEEDS,4,Nick Melvoin,West,1331101,13575,104 Anchorage St.,Marina Del Rey,90291,"Design and construct an outdoor learning space of approximately 500 square feet consisting of 2 ADA gates, chain link fencing, points of connection irrigation, utilities, a concrete path and a hose bib. It will be outfitted with raised beds and planting materials by the school site (Westside Global Awareness Magnet).",29,2016-Q3,2016-Q3,Closeout,20220630 Van Nuys HS,10145711,Van Nuys HS - Provide Security Upgrades by Replacing Stadium Lights on Football Field,Electrical/Lighting,3,Scott Schmerelson,Northeast,1889301,13404,6535 Cedros Ave.,Van Nuys,91411,Provide Security Upgrades by Replacing Stadium Lights on Football Field,"1,096",2014-Q4,2015-Q2,Closeout,20220630 Wilton ES,10368700,Wilton ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1780801,13433,745 S. Wilton Pl.,Los Angeles,90005,Provide and install new secure entry system (Aiphone) at main entrance,23,2017-Q2,2017-Q4,Closeout,20220630 Lillian ES,10105863,Lillian ES - Compliance with State & Federal Access Requirements,Fire Alarm System,5,Jackie Goldberg,East,1487701,13468,5909 Lillian St.,Los Angeles,90001,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),375,2015-Q2,2015-Q4,Closeout,20220630 Manhattan ES,10371977,Manhattan ES - Install Changing Room,Access Compliance,1,"Dr. George J. McKenna, III",West,1511001,13685,1850 W. 96th St.,Los Angeles,90047,Provide a changing room including hi-lo table within the Girls RR in classroom bldg. #1. Purchase and install 1 ea. stainless baby changing table in girls and boys RR in classroom bldg.,87,2021-Q4,2022-Q1,Closeout,20220630 Rio Vista ES,10365649,Rio Vista ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1628801,13441,4243 Satsuma Ave.,North Hollywood,91602,Replace Two DOH Buildings with Two DSA Buildings,928,2014-Q2,2016-Q4,Closeout,20220630 White MS,10370900,White MS - SEEDS,SEEDS,7,Tanya Ortiz Franklin,South,1848701,13708,22102 S. Figueroa St.,Carson,90745,"Construct an outdoor learning space of approximately 3,500 square feet. Project includes the installation of decomposed granite, headers to create new in-ground planting areas, a bioswale, new automated irrigation system, benches, tables and an outdoor chalkboard. The project will be outfitted by the school site and partner organizations with native plants.",100,2021-Q1,2022-Q2,Closeout,20220630 Victoria ES,10366577,Victoria ES - SEEDS,SEEDS,5,Jackie Goldberg,East,1750701,13493,3320 Missouri Ave.,South Gate,90280,"Design and construct an outdoor learning space of approximately 1,300 square feet consisting of painting pavements areas, installation of a hose bib and art poles. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",12,2015-Q1,2015-Q1,Closeout,20220630 Miles ES,10366913,Miles ES - 2015-16 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1531501,13650,6720 Miles Ave.,Huntington Park,90255,"Academia Moderna is vacating this site. This project was approved in Board of Education Report No. 423-14/15 . The scope of work includes relocation of classrooms, remedial construction, and reconnecting of all low voltage systems to the District operated program.",29,2015-Q2,2015-Q2,Closeout,20220630 El Camino Real Charter HS,10364105,El Camino Real HS - Roofing,Roofing,3,Scott Schmerelson,Northwest,1861701,13776,5440 Valley Circle Blvd.,Woodland Hills,91367,The project will remove and replace roofing on the administration building and classroom building. The existing roof is peeling and bubbling which has resulted in many repairs. The existing roof has poor surface area drainage and water ponding issues.,"1,124",2014-Q2,2014-Q4,Closeout,20220630 Porter MS,10367631,Porter MS - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1835401,13807,15960 Kingsbury St.,Granada Hills,91344,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",52,2016-Q3,2017-Q3,Closeout,20220630 Dominguez ES,10369880,Dominguez ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1346601,13310,21250 Santa Fe Ave.,Carson,90810,Install new electronic free-standing marquee,56,2018-Q3,2019-Q3,Closeout,20220630 32nd St./USC Performing Arts Magnet ES,10371594,32nd Street USC Performing Arts Magnet HS - Install Secure Entry System,Security System,1,"Dr. George J. McKenna, III",Central,1713701,13299,822 W. 32nd St.,Los Angeles,90007,Install new secure entry system at door to main office with three video receivers in main office.,30,2020-Q4,2021-Q2,Closeout,20220630 Fleming MS,10370366,Fleming MS - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1812701,13657,25425 Walnut St.,Lomita,90717,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",57,2019-Q1,2019-Q4,Closeout,20220630 South Park ES,10369835,South Park ES - Accessibility Upgrade,Access Compliance,7,Tanya Ortiz Franklin,South,1686301,13304,8510 Towne Ave.,Los Angeles,90003,Purchase and install ramp at parent center.,72,2018-Q2,2018-Q3,Closeout,20220630 Murchison EEC,10369857,Murchison EEC - Nature Explore Classroom,Campus Improvement,2,Monica Garcia,East,1953701,16665,1537 Murchison St.,Los Angeles,90033,"This project will create field-tested, research-based outdoor learning spaces that provide learning opportunities and support children's interaction with the natural world. The outdoor learning spaces are divided into distinct activity areas to provide a wide-ranging mix of educational activities that support children with a variety of needs and learning styles. The activity areas include art, building, music, climbing/balancing, flexing, gathering, gardening, messy materials, wheel toys, etc.","1,837",2022-Q4,2023-Q4,Design,20220630 Van Ness ES,10370789,Van Ness ES - Sod and Irrigation,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1742501,13393,501 N. Van Ness Ave.,Los Angeles,90004,Install new sod and irrigation,56,2019-Q4,2020-Q1,Closeout,20220630 Herrick ES,10370791,Herrick ES - iMacs and Security,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1451501,13726,13350 Herrick Ave.,Sylmar,91342,Purchase (2) iMacs and install security upgrades as needed,13,2019-Q4,2020-Q1,Closeout,20220630 Frost MS,10371515,Frost MS - Upgrade Theater Seating and Replace Curtains,Campus Improvement,3,Scott Schmerelson,Northwest,1813701,13777,12314 Bradford Pl.,Granada Hills,91344,Upgrade deteriorated seating and replace curtains in theater room,74,2021-Q1,2021-Q3,Closeout,20220630 Graham ES,10366575,Graham ES - SEEDS,SEEDS,7,Tanya Ortiz Franklin,South,1421901,13476,8407 S. Fir Ave.,Los Angeles,90001,"Design and construct an outdoor learning space of approximately 1,300 square feet and consisting of asphalt removal, painting pavement areas, the installation of concrete pavers, art poles, and a hose bib. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",22,2015-Q1,2015-Q1,Closeout,20220630 Hamlin Charter Academy ES,10366582,Hamlin ES - SEEDS,SEEDS,3,Scott Schmerelson,Northwest,1434901,13725,22627 Hamlin St.,West Hills,91307,"Design and construct an outdoor learning space of approximately 1,300 square feet consisting of painting pavements areas, the installation of a hose bib with an electric timer, and art poles. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",19,2015-Q1,2015-Q2,Closeout,20220630 Bassett ES,10366863,Bassett ES - Address Antiquated Roofing,Roofing,3,Scott Schmerelson,Northwest,1232301,13813,15756 Bassett St.,Lake Balboa,91406,"This project is to replace the roofing on 27 buildings and two arcades. The roofing is more than 15 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",807,2015-Q4,2016-Q2,Closeout,20220630 Peary MS,10367179,Peary MS - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1835201,13625,1415 W. Gardena Blvd.,Gardena,90247,Remove 1 DSA portable building (24' x 40').,73,2016-Q2,2017-Q4,Closeout,20220630 Griffith-Joyner ES,10366562,Griffith-Joyner ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1584901,13497,1963 E. 103rd St.,Los Angeles,90002,"Remove 3 portable buildings including disconnection of low-volt and high-volt utilities, reconnection of all utilities to remaining buildings on site, and repair/replacement of asphalt over the former building footprints.",122,2016-Q2,2017-Q2,Closeout,20220630 Nevin ES,10369496,Nevin ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1546601,13390,1569 E. 32nd St.,Los Angeles,90011,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",295,2020-Q4,2022-Q3,Construction,20220630 Marina Del Rey MS,10366839,Marina Del Rey MS - Theater Renovation,Auditorium Renovation,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"Provide upgrades and renovations to the deteriorated existing small theater room. Provide flooring, paint, sound and lighting systems as well as replace deteriorated seating.",149,2015-Q2,2016-Q1,Closeout,20220630 Nueva Vista ES,10372410,Nueva Vista ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1237801,13822,4412 Randolph St.,Bell,90201,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Telfair ES,10369050,Telfair ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1706801,13616,10975 Telfair Ave.,Pacoima,91331,"Demolish 2 24' x 76' bungalows and remove 1 24' x 60' portable building. Provide temporary fencing. Disconnect all utilities, including low voltage and power to 2 bungalows and 1 portable. Ensure utilities connections to existing buildings remaining on site. Abate and transport all asbestos, lead and other hazardous materials offsite. Perform Phase 1, 2 and 3 onsite monitoring and repair/replace asphalt paving as needed.",309,2018-Q1,2019-Q1,Closeout,20220630 Windsor Hills Math/Science/Aerospace Magnet ES,10369666,Windsor Hills Magnet - Exterior LED Lighting,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1782201,13757,5215 Overdale Dr.,Los Angeles,90043,Install LED lighting throughout the exterior of the campus.,18,2018-Q2,2018-Q2,Closeout,20220630 Haddon ES,10370099,Haddon ES - Exterior Painting,Painting,6,Kelly Gonez,Northeast,1432901,13527,10115 Haddon Ave.,Pacoima,91331,"Prepare, paint, and refinish the exterior of all buildings and their appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site, at Haddon Elementary School.",580,2020-Q2,2020-Q4,Closeout,20220630 Erwin ES,10368046,Erwin ES - Restroom Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1363001,13624,13400 Erwin St.,Van Nuys,91401,"Remove 3 toilets, replace one with a kindergarten-size toilet; remove 3 stalls to make 1 toilet compartment in the girls' restroom; provide and install folding table. Provide and install an exhaust fan at Classroom 2.",18,2016-Q4,2017-Q1,Closeout,20220630 Le Conte MS,10366718,Le Conte MS - Flooring Upgrades,Flooring,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,Provide flooring upgrades by removing deteriorated carpet and installing new vinyl composition tile throughout the principal's office and conference rooms in the main building,52,2015-Q2,2015-Q3,Closeout,20220630 Welby Way Charter ES,10365762,Welby Way ES - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1763701,13789,23456 Welby Way,West Hills,91307,Replace deteriorated playground matting systems to ensure the health and safety of students.,40,2014-Q4,2015-Q3,Closeout,20220630 Sylmar Charter HS,10368100,Sylmar Charter HS - Security Upgrades,Security System,6,Kelly Gonez,Northeast,1887801,13856,13050 Borden Ave.,Sylmar,91342,"Install 30-35 high definition cameras with integrated security system management and video monitoring system, physical access control, and intrusion detection.",289,2017-Q1,2017-Q3,Closeout,20220630 San Gabriel ES,10369556,San Gabriel ES - Electronic Marquee,Electrical/Lighting,5,Jackie Goldberg,East,1646601,13651,8628 San Gabriel Ave.,South Gate,90280,Install new electronic wall-mounted marquee.,22,2018-Q4,2018-Q4,Closeout,20220630 Narbonne HS,10369175,Narbonne HS - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1877901,13407,24300 S. Western Ave.,Harbor City,90710,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",50,2018-Q1,2018-Q2,Closeout,20220630 Hoover ES,10364111,Hoover ES - HVAC,HVAC,5,Jackie Goldberg,Central,1458901,13298,2726 Francis Ave.,Los Angeles,90005,"The project will remove and replace the existing Airfan multi-zone air handler, which provides heating and cooling for the auditorium and the three-story building with 25 classrooms. The existing unit is more than 40 years old and is in very poor condition resulting in numerous service calls.","2,983",2014-Q4,2016-Q1,Closeout,20220630 Wilton EEC,10367371,Wilton EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,West,1957701,13433,4030 W. Leeward Ave.,Los Angeles,90005,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",51,2016-Q3,2016-Q3,Closeout,20220630 Shenandoah EEC,10367359,Shenandoah EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1955901,16725,8861 Beverlywood St.,Los Angeles,90034,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",88,2016-Q3,2016-Q3,Closeout,20220630 Parks-Huerta EEC,10005061,Parks-Huerta EEC - Safety Upgrades and Improvements,Campus Improvement,1,"Dr. George J. McKenna, III",West,1944701,13879,1020 W. 58th Pl.,Los Angeles,90044,"Upgrade shade shelter, entry control system, and playground equipment",187,2014-Q2,2016-Q3,Closeout,20220630 Pearl Journalism/Communications Magnet HS,10229923,Pearl Journalism/Communications Magnet HS - Non Air-Conditioned Classroom & Equipment,HVAC,3,Scott Schmerelson,Northwest,1855801,15701,6649 Balboa Blvd.,Lake Balboa,91406,Non Air-Conditioned Classroom & Equipment,"1,159",2016-Q3,2017-Q4,Closeout,20220630 Serrania Charter for Enriched Studies,10367797,Serrania ES - Ceiling Mounted Projector,Communications/Technology Upgrade,4,Nick Melvoin,Northwest,1660601,13800,5014 Serrania Ave.,Woodland Hills,91364,Purchase and install ceiling-mounted projector.,15,2016-Q3,2016-Q4,Closeout,20220630 Escutia PC,10367616,Escutia PC - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1322001,13923,6401 Bear Ave.,Bell,90201,Modernize parent & family center by providing interior paint and refinishing floors. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.,25,2016-Q2,2016-Q3,Closeout,20220630 3rd St. ES,10365668,3rd St. ES - Replace Playground Matting,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1711001,13399,201 S. June St.,Los Angeles,90004,Replace deteriorated playground matting systems to ensure the health and safety of students.,35,2014-Q2,2014-Q2,Closeout,20220630 Colfax Charter ES,10365692,Colfax Charter ES - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northeast,1316401,13681,11724 Addison St.,North Hollywood,91607,Replace deteriorated playground matting systems to ensure the health and safety of students.,83,2014-Q2,2014-Q3,Closeout,20220630 Elizabeth Learning Center,10367425,Elizabeth Learning Center - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1354801,13480,4811 Elizabeth St.,Cudahy,90201,Remove 1 portable restroom building. Disconnect utilities and restore the area to original condition.,21,2016-Q1,2016-Q1,Closeout,20220630 Cisneros Learning Academy,10366823,Cisneros Learning Academy - Replace Synthetic Turf Field,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1294001,14583,1018 Mohawk St.,Los Angeles,90026,"This project addresses the defective synthetic turf field of approximately 17,300 square feet by removing and replacing the field with one that will perform better for instructional and extracurricular activities.",291,2015-Q3,2015-Q4,Closeout,20220630 Westchester Enriched Sciences Magnets,10366702,Westchester Enriched Sciences Magnets - Corrections to Girls' Softball Field,Gym/Athletic Facilities Renovation,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,Upgrade girls' softball field by installing new gates and dugouts,18,2015-Q1,2016-Q3,Closeout,20220630 Clinton MS,10367668,Clinton MS - 2016-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1806201,13909,3500 S. Hill St.,Los Angeles,90007,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a charter school renovation for Animo Jackie Robinson Charter HS. This growth project included 1 charter office, 1 special education room, and 20 instructional spaces for charter students in grades 9-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",5,2016-Q3,2016-Q3,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10364129,Sun Valley Magnet - HVAC,HVAC,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"The project will replace the existing 25-year-old heat pump units for a 20-classroom building. The existing units are inefficient, noisy, and require frequent service. Units are now deteriorated beyond economical repair.","1,175",2015-Q2,2018-Q1,Closeout,20220630 Richland ES,10369969,Richland ES - Secure Entry System,Security System,4,Nick Melvoin,West,1626001,13576,11562 Richland Ave.,Los Angeles,90064,Install new secure entry system,23,2018-Q4,2019-Q1,Closeout,20220630 Sylvan Park ES,10369401,Sylvan ES-Install Ramp,Access Compliance,3,Scott Schmerelson,Northeast,1702701,13477,6238 Noble Ave.,Van Nuys,91411,Install a ramp at Room 17.,43,2017-Q4,2018-Q1,Closeout,20220630 Monte Vista EEC,10367344,Monte Vista EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1959001,15741,5509 Ash St.,Los Angeles,90042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",76,2016-Q3,2016-Q3,Closeout,20220630 Nobel Charter MS,10371423,Nobel MS - Video Surveillance (CCTV) System,Security System,3,Scott Schmerelson,Northwest,1827201,13805,9950 Tampa Ave.,Northridge,91324,Install video surveillance (CCTV) system with four cameras.,59,2020-Q2,2021-Q4,Closeout,20220630 Primary Academy for Success School,10372367,Primary Academy PC - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northwest,1477601,13865,9075 Willis Ave.,Panorama City,91402,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",87,2022-Q3,2022-Q4,Planning,20220630 66th St. ES,10372370,66th St. ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1682201,13339,6600 S. San Pedro St.,Los Angeles,90003,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",90,2022-Q3,2022-Q4,Planning,20220630 Markham MS,10372376,Markham MS - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",93,2022-Q3,2022-Q4,Planning,20220630 Wright STEAM Magnet MS,10371397,Wright STEAM Magnet MS - Water Bottle Filling Station for WISH Community School,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,Install water bottle filling station for the WISH Community School co-located on the campus.,12,2020-Q3,2020-Q4,Closeout,20220630 King Magnets MS,10371608,King Magnets MS - Verizon Lab Infrastructure Upgrades,Communications/Technology Upgrade,2,Monica Garcia,Central,1820801,13531,4201 Fountain Ave.,Los Angeles,90029,Infrastructure upgrades in support of Verizon Innovative Learning Lab installation.,15,2020-Q4,2021-Q2,Closeout,20220630 Coldwater Canyon ES,10370314,Coldwater Canyon ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1315101,13663,6850 Coldwater Canyon Ave.,North Hollywood,91605,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",54,2019-Q1,2019-Q4,Closeout,20220630 Foshay Learning Center,10368153,Foshay Learning Center - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",Central,1813201,13474,3751 S. Harvard Blvd.,Los Angeles,90018,"Replace deteriorated walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",148,2017-Q2,2017-Q3,Closeout,20220630 Warner ES,10371927,Warner ES - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1761601,13481,615 Holmby Ave.,Los Angeles,90024,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 1 door/jamb, 1 door hardware, 2 thresholds, 4 accessible paths of travel, 8 restrooms, 13 restroom accessories, 3 drinking fountains, 1 casework/counter, 1 assistive listening device, 1 intercom upgrade, 3 concrete ramps, 2 pieces of accessible furniture, 1 assembly seat upgrade, 9 railings, 3 parking lot upgrades, 1 playground component/matting upgrade, 2 existing elevator upgrades, and 1 permanent stage lift with stage adapt.","4,582",2023-Q4,2025-Q1,Design,20220630 Avalon Gardens ES,10371240,Avalon Gardens ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1224701,13618,13940 S. San Pedro St.,Los Angeles,90061,Remove the existing marquee and footing on San Pedro St. and replace with a new 2-sided electronic marquee standing less than 8' high.,60,2020-Q3,2021-Q1,Closeout,20220630 Crestwood ES,10370950,Crestwood ES - Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1330201,13733,1946 W. Crestwood St.,Rancho Palos Verdes,90275,Provide accessible stall with room for changing equipment in Boys' restroom.,116,2019-Q4,2020-Q3,Closeout,20220630 Normont ES,10366842,Normont ES - Security Grills on 1st Story Windows,Security System,7,Tanya Ortiz Franklin,South,1564401,13652,1001 W. 253rd St.,Harbor City,90710,Upgrade physical security of the campus by providing and installing security grills for all the 1st story windows.,29,2015-Q2,2015-Q3,Closeout,20220630 Fenton Charter ES,10366493,Fenton Charter ES - Demolish/Remove DOH Portable Bldg,Portable Removal,6,Kelly Gonez,Northeast,1374701,13767,11828 Gain St.,Lake View Terrace,91342,"Demolish/Remove Department of Housing (DOH) Portable Building; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",245,2015-Q1,2015-Q3,Closeout,20220630 Wright STEAM Magnet MS,10367724,Wright MS - 2016-17 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Charter ES for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 21 instructional spaces for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",95,2016-Q2,2016-Q3,Closeout,20220630 Kester ES,10369958,Kester ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northeast,1472601,13683,5353 Kester Ave.,Van Nuys,91411,Install new electronic free-standing marquee,38,2018-Q3,2019-Q1,Closeout,20220630 Loreto ES,10369985,Loreto ES - Secure Entry System,Security System,2,Monica Garcia,East,1495901,13301,3408 Arroyo Seco Ave.,Los Angeles,90065,Install new secure entry system,31,2018-Q4,2019-Q1,Closeout,20220630 Maywood ES,10369986,Maywood ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1238101,13950,5200 Cudahy Ave.,Maywood,90270,Install new secure entry system,17,2018-Q4,2018-Q4,Closeout,20220630 Stanford PC,10369988,Stanford PC - Secure Entry System,Security System,5,Jackie Goldberg,East,1690501,13853,3020 Kansas Ave.,South Gate,90280,Install new secure entry system,10,2018-Q4,2018-Q4,Closeout,20220630 Van Nuys HS,10369993,Van Nuys HS - Courtyard Lighting,Electrical/Lighting,3,Scott Schmerelson,Northeast,1889301,13404,6535 Cedros Ave.,Van Nuys,91411,Install security lighting for courtyard,8,2018-Q4,2019-Q1,Closeout,20220630 118th St. ES,10369996,118th St. ES - Door Alarms at Main Building,Security System,7,Tanya Ortiz Franklin,South,1574001,13321,144 E. 118th St.,Los Angeles,90061,Install alarm on emergency doors exiting main building,3,2018-Q4,2018-Q4,Closeout,20220630 Castlebay Charter ES,10371619,Castlebay ES - Replace Parent Center Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1288101,13892,19010 Castlebay Lane,Porter Ranch,91326,"Replace deteriorated parent center furniture including 30 chairs, 11 fold-up tables, 1 desk, 1 filing cabinet, and 1 task chair.",16,2021-Q1,2021-Q3,Closeout,20220630 Wilmington Park EEC,10371697,Wilmington Park EEC - Install Privacy Fence,Fencing,7,Tanya Ortiz Franklin,South,1958501,16300,1419 Young St.,Wilmington,90744,Replace approximately 500 linear feet of chain-link fencing with blue privacy slats on the east perimeter of the campus along Blinn Ave. and the north perimeter of the campus along the alley.,45,2021-Q1,2021-Q3,Closeout,20220630 Owensmouth Continuation HS,10371718,Owensmouth Continuation HS - Purchase Lunch Tables,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1857301,16401,6921 Jordan Ave.,Canoga Park,91303,Purchase 5 exterior lunch tables with fiberglass umbrellas.,13,2022-Q3,2022-Q4,Planning,20220630 Perez Special Education Center,10371775,Perez Special Education Center - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1195301,13489,4540 Michigan Ave.,Los Angeles,90022,"Modify existing accessible restrooms in classrooms 12 & 15 to provide safety, privacy and comfort in changing areas. Purchase and install Rifton support station in each restroom.",65,2021-Q2,2021-Q3,Closeout,20220630 El Sereno EEC,10005027,El Sereno EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,East,1958101,16304,3802 Pueblo Ave.,Los Angeles,90032,"Upgrade fencing, entry control system, exterior gates, playground equipment, and heating and air conditioning system",308,2015-Q3,2016-Q1,Closeout,20220630 Westchester Enriched Sciences Magnets,10369801,Westchester Enriched Sciences Magnets - 2018-19 Prop 39 (Westside Innovative School House (WISH) Charter HS),Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Charter HS for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades 9-10. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",119,2018-Q2,2018-Q3,Closeout,20220630 Solis Learning Academy,10371144,Solis Learning Academy - Multipurpose Room Upgrades,Campus Improvement,2,Monica Garcia,East,1775201,14564,319 N. Humphreys Ave.,Los Angeles,90022,"Provide and install new projector, screen, audio/visual equipment, and water bottle filling stations in the multipurpose room.",75,2020-Q1,2020-Q2,Closeout,20220630 San Pascual STEAM Magnet ES,10370019,San Pascual STEAM Magnet ES - Install Ramp,Access Compliance,2,Monica Garcia,Central,1649301,13440,815 San Pascual Ave.,Los Angeles,90042,Purchase and install TMP ramp at rooms 10 and 11.,89,2018-Q3,2019-Q1,Closeout,20220630 Westport Heights ES,10372003,Westport Heights ES - Install Secure Entry System,Security System,4,Nick Melvoin,West,1771201,13592,6011 W. 79th St.,Los Angeles,90045,Install new secure entry system with intercoms at two doors to main office with two video receivers in main office and one in principal's office.,51,2021-Q3,2021-Q4,Closeout,20220630 Monte Vista ES,10372005,Monte Vista ES - Purchase Classroom Furniture,Furniture/Fixtures/Equipment,2,Monica Garcia,Central,1538401,13270,5423 Monte Vista St.,Los Angeles,90042,"Purchase new kindergarten furniture for students and teacher: tables, chairs, a desk, and storage",26,2021-Q4,2022-Q3,Construction,20220630 West Athens ES,10369351,West Athens ES - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1764401,13317,1110 W. 119th St.,Los Angeles,90044,Install Aiphone video/buzzer entry system at main entrance.,25,2018-Q1,2018-Q2,Closeout,20220630 Glassell Park EEC,10005032,Glassell Park EEC - Safety Upgrades and Improvements,Lunch/Shade Shelter,5,Jackie Goldberg,Central,1945701,16289,3003 N. Carlyle St.,Los Angeles,90065,Provide shade shelter,80,2015-Q1,2015-Q3,Closeout,20220630 Park Western ES,10370711,Park Western ES - Window Security Grills,Security System,7,Tanya Ortiz Franklin,South,1601301,13588,1214 Park Western Pl.,San Pedro,90732,Install window security grills in 17 rooms,103,2022-Q3,2022-Q4,Planning,20220630 Playa Del Rey ES,10369074,Playa Del Rey ES - SEEDS,SEEDS,4,Nick Melvoin,West,1611001,13559,12221 Juniette St.,Culver City,90230,"Construct an outdoor learning space of approximately 1,200 square feet, consisting of the removal of asphalt, over-excavation of soil and import of new soil, the installation of decomposed granite with a concrete brush off pad, a new irrigation system, composite wood headers to create planting areas, wood raised beds for edible plants, wood raised beds for a butterfly garden, a tool shed, work tables, log benches, and stools. It will be outfitted by the school site partner with native and edible plants.",67,2018-Q2,2018-Q4,Closeout,20220630 Micheltorena ES,10363974,Micheltorena ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1528801,13329,1511 Micheltorena St.,Los Angeles,90026,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",481,2015-Q2,2015-Q4,Closeout,20220630 Banneker Career & Transition Center,10370361,Banneker Career & Transition Center - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1194101,15142,14024 S. San Pedro St.,Los Angeles,90061,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",55,2019-Q1,2019-Q3,Closeout,20220630 Angeles Mesa ES,10369183,Angeles Mesa ES - Roofing,Roofing,1,"Dr. George J. McKenna, III",West,1212301,13427,2611 W. 52nd St.,Los Angeles,90043,"This project replaces approximately 31,000 square feet of deteriorated roofing on the main building with new asphalt shingles and approximately 29,000 square feet of deteriorated roofing with new Polyvinyl Chloride (PVC) material and metal flashing installation on 7 buildings. The scope of work also includes the replacement of damaged wood, installation of new gutters and downspouts, and painting to match existing areas affected in the roof demolition. In addition, heating, ventilation, and air conditioning (HVAC) units and duct work will be removed and replaced on 3 buildings.","1,444",2018-Q2,2019-Q1,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10370927,Sun Valley Magnet - Roofing,Roofing,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"This project replaces approximately 108,000 square feet of deteriorated roofing at 11 buildings and includes the installation of new gutters and downspouts and painting of affected areas.","2,327",2023-Q1,2023-Q3,Planning,20220630 Plummer ES,10369482,Plummer ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northwest,1612301,13878,9340 Noble Ave.,North Hills,91343,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",373,2020-Q3,2021-Q3,Closeout,20220630 Van Nuys HS,10365653,Van Nuys HS - Replace Water-Damaged Gym Floor,Gym/Athletic Facilities Renovation,3,Scott Schmerelson,Northeast,1889301,13404,6535 Cedros Ave.,Van Nuys,91411,This project will replace a hardwood floor that was damaged in a flood caused by a broken water line. The project will also include the removal and replacement of deteriorated bleachers and will require a restrooms upgrade to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA).,"1,399",2015-Q3,2016-Q3,Closeout,20220630 University Charter HS,10370806,University Charter HS - Exterior Painting,Painting,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",868,2020-Q3,2021-Q1,Closeout,20220630 Westchester Enriched Sciences Magnets,10371741,Westchester Enriched Sciences Magnets - Exterior Painting,Painting,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.","1,678",2022-Q2,2022-Q4,Construction,20220630 South Gate HS,10371234,South Gate HS - Electrical Upgrades,Electrical/Lighting,5,Jackie Goldberg,East,1887101,13262,3351 Firestone Blvd.,South Gate,90280,Install six dedicated electrical circuits and several receptacles to support 30 computers and new graphic design equipment.,23,2020-Q2,2020-Q4,Closeout,20220630 Fulton College Preparatory School,10370586,Fulton College Preparatory School - 2019-20 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,"This project is a charter school renovation for Lashon Academy for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 2 special education rooms, and 23 instructional spaces for charter student seats in grades K-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",107,2019-Q2,2019-Q3,Closeout,20220630 Cowan ES,10370039,Cowan ES - Technology Upgrades,Communications/Technology Upgrade,4,Nick Melvoin,West,1326001,13622,7615 Cowan Ave.,Los Angeles,90045,Purchase 50 iPads.,28,2018-Q4,2019-Q1,Closeout,20220630 Crenshaw Magnet HS: STEMM,10368801,Crenshaw HS - 2017-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,"This project was approved as a charter school renovation for View Park Preparatory ES for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 included 1 charter office, 1 special education room, and 21 instructional spaces for charter student seats in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. Subsequently to the approval of the project, an alternative agreement was executed for View Park Preparatory MS to share use of the softball field and room 201. As a result, the scope of work changed from a growth co-location to a ""no change"" project with minimal additional work required.",6,2017-Q3,2017-Q3,Closeout,20220630 Dayton Heights ES,10368949,Dayton Heights ES - Technology Upgrades,Communications/Technology Upgrade,2,Monica Garcia,Central,1335601,13352,607 N. Westmoreland Ave.,Los Angeles,90004,Provide 161 Chromebooks and 6 charging carts.,53,2017-Q3,2017-Q4,Closeout,20220630 Pearl Journalism/Communications Magnet HS,10366519,Pearl HS-Electrical Outlets In 2 Restrooms,Access Compliance,3,Scott Schmerelson,Northwest,1855801,15701,6649 Balboa Blvd.,Lake Balboa,91406,Provide & Install Ground-Fault Circuit Interrupter (GFCI) Electrical Outlets in 2 Restrooms for Changing Tables,8,2014-Q4,2015-Q1,Closeout,20220630 Miller Career & Transition Center,10368018,Miller CTC - School Beautification & Safety Improvement,Painting,3,Scott Schmerelson,Northwest,1191001,15164,8218 Vanalden Ave.,Reseda,91335,Paint interior and exterior of all buildings and appurtenant structures.,501,2017-Q3,2018-Q1,Closeout,20220630 Fletcher ES,10370431,Fletcher ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,Purchase 60 iPads and 2 storage carts and secure room for storage.,57,2019-Q1,2019-Q4,Closeout,20220630 King ES,10371103,King ES - Auditorium Upgrades,Auditorium Renovation,1,"Dr. George J. McKenna, III",Central,1653401,13423,3989 S. Hobart Blvd.,Los Angeles,90062,"Replace deteriorated seats, floor, projector screen, curtains, and paint interior walls in auditorium.",94,2020-Q1,2020-Q4,Closeout,20220630 West Valley Occupational Center,10371738,West Valley Occupational Center - Exterior Painting,Painting,4,Nick Melvoin,Northwest,1901001,13659,6200 Winnetka Ave.,Woodland Hills,91367,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",75,2022-Q4,2023-Q2,Planning,20220630 Garvanza Technology & Leadership Magnet ES,10368733,Garvanza Technology & Leadership Magnet ES - Seismic Retrofit of Main Building,Seismic Modernization,2,Monica Garcia,Central,1408201,15329,317 N. Ave. 62,Los Angeles,90042,"The project provides a seismic retrofit of the main building, a 2-story concrete wall and wood frame structure which includes 12 classrooms, with a total area of approximately 33,812 square feet. The building was built in 1923, with an addition built on its north side in 1936, and has lateral force resisting systems comprised of concrete shear walls with flexible roof diaphragms. The scope of work includes strengthening existing beam rafters; installing new cross ties, blocking, and new anchors for diaphragm-to-wall connections; and strengthening existing shear walls to foundation connections by adding Fiber Reinforced Polymer (FRP) anchors or new reinforced Gunite wall strengthening panels. The project also includes Americans with Disabilities Act (ADA) upgrades where required.","7,192",2021-Q4,2024-Q1,Construction,20220630 Belvedere MS,10366006,Belvedere MS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",646,2015-Q1,2015-Q3,Closeout,20220630 South Gate HS,10367003,South Gate HS - Upgrade Old Gym Floors & Wall Systems,Flooring,5,Jackie Goldberg,East,1887101,13262,3351 Firestone Blvd.,South Gate,90280,This project will replace the wood floors in the gymnasium building and rehabilitate adjacent wall systems including replacing windows that leak. The existing floors are over 50 years old and in poor condition resulting in a hazardous condition at the site.,623,2016-Q2,2016-Q4,Closeout,20220630 Burbank Arts Tech Community Magnet MS,10363893,Burbank Arts Tech Community Magnet MS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1806601,13551,6460 N. Figueroa St.,Los Angeles,90042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,309",2014-Q3,2014-Q4,Closeout,20220630 Ritter ES,10364065,Ritter ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1630101,13562,11108 Watts Ave.,Los Angeles,90059,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",673,2015-Q2,2016-Q1,Closeout,20220630 Playa Del Rey ES,10370389,Playa Del Rey ES - Sloped Walkway,Access Compliance,4,Nick Melvoin,West,1611001,13559,12221 Juniette St.,Culver City,90230,Design and construct sloped walkway at school entrance.,58,2019-Q1,2019-Q2,Closeout,20220630 Jones ES,10371102,Jones ES - Library and Multipurpose Room Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1294301,193565,900 E. 33rd St.,Los Angeles,90011,Provide and install projectors and screens in the library and multipurpose room.,68,2020-Q2,2020-Q3,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10371149,Sun Valley Magnet - Fencing and Security Upgrades,Campus Improvement,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"New motorized drive gate, fencing and card reader.",99,2020-Q1,2021-Q1,Closeout,20220630 Markham MS,10371734,Markham MS - Exterior Painting,Painting,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.","1,260",2022-Q3,2023-Q2,Planning,20220630 Purche ES,10371737,Purche ES - Exterior Painting,Painting,7,Tanya Ortiz Franklin,South,1615801,13655,13210 Purche Ave.,Gardena,90249,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",566,2021-Q4,2022-Q2,Closeout,20220630 Manchester ES,10369839,Manchester ES - Accessibility Upgrade,Access Compliance,1,"Dr. George J. McKenna, III",South,1509601,13305,661 W. 87th St.,Los Angeles,90044,Purchase and install metal ramp at room E parent center.,52,2018-Q2,2018-Q3,Closeout,20220630 Sierra Park ES,10370206,Sierra Park ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1675301,13391,3170 Budau Ave.,Los Angeles,90032,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q3,2026-Q4,Planning,20220630 Bradley Global Awareness Magnet ES,10370834,Bradley Global Awareness Magnet ES - Accessibility Upgrades,Access Compliance,1,"Dr. George J. McKenna, III",West,1712301,13516,3875 Dublin Ave.,Los Angeles,90008,Remove and replace cabinet in main office to provide accessible entry to office. Provide accessible restroom in Nurse's office and purchase and install hi-lo changing table. Install electrical outlet.,46,2020-Q3,2020-Q3,Closeout,20220630 Crenshaw Magnet HS: STEMM,10363835,Crenshaw Magnet HS - Seismic Modernization,Seismic Modernization,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,"This project provides seismic improvements to the campus by demolishing the existing lunch pavilion, covered walkways, student store, multipurpose/food service and music buildings and constructing a new lunch pavilion, covered walkways, student store, and performing arts/food service facility to replace the multipurpose/food service and music buildings. The scope of work includes replacing the aging and deteriorating energy management system, 16-year-old central plant chillers, and heating, ventilation, and air conditioning (HVAC) equipment. The project also completes scope associated with the Small Learning Communities (SLC) program including the development of project rooms focused on the educational disciplines of each SLC, restroom and parking upgrades, classroom improvements, and hallway signage; relocates utility lines as necessary; and provides associated path of travel upgrades to ensure compliance with the Americans with Disabilities Act (ADA).","96,561",2017-Q2,2022-Q3,Construction,20220630 Manual Arts Community Adult School,10004305,Diane Watson Career Center,Reconfiguration,1,"Dr. George J. McKenna, III",Central,1930701,13345,4131 S. Vermont Ave.,Los Angeles,90037,"In 2009, the Division of Adult and Career Education purchased a property to house an automotive training program. This project remodeled and reconfigured the building to add a mezzanine level and five classrooms in order to accommodate 120 adult education students. The Diane E. Watson Career Training Center was completed at the end of 2014 and currently operates as a branch of the Los Angeles Technology Center.","11,879",2011-Q4,2014-Q4,Closeout,20220630 Cheremoya ES,10370108,Cheremoya ES - Technology and Security Upgrade,Communications/Technology Upgrade,5,Jackie Goldberg,West,1304101,13410,6017 Franklin Ave.,Los Angeles,90028,Purchase 40 Chromebooks and 1 storage cart. Secure doors to room 8 for storage.,21,2018-Q4,2019-Q3,Closeout,20220630 Carlson Home/Hospital School,10371478,Carlson Home/Hospital School - Upgrade Phone System,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1194401,13441,10952 Whipple St.,North Hollywood,91602,Add 7 digital phones. Pull cabling from office phone switch to various rooms. Relocate data drops using existing and new pathways.,39,2020-Q3,2021-Q1,Closeout,20220630 President ES,10367053,President ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1614801,13765,1465 W. 243rd St.,Harbor City,90710,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 83 doors/hardware, 36 accessible paths of travel, 46 signs, 15 restrooms, 13 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 1 concrete ramp, 14 metal ramps, 6 pieces of accessible furniture, 1 assembly seat, 5 railings, 1 parking area, 1 door modification/auto opener, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","5,792",2016-Q4,2022-Q3,Construction,20220630 Webster MS,10370627,Webster MS - 2019-20 Prop 39 (Citizens of the World - Mar Vista),Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project is a charter school renovation for Citizens of the World - Mar Vista for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",10,2019-Q2,2019-Q3,Closeout,20220630 Aggeler Opportunity HS,10108859,Aggeler Opportunity HS - Library & Multipurpose Room Upgrades,Addition,3,Scott Schmerelson,Northwest,1850701,13644,21050 Plummer St.,Chatsworth,91311,"Project scope includes a new adaptive metal building that includes a library, multipurpose room and restrooms, a new modular restroom building, site upgrades necessary to enable safe and efficient operation of the campus, and upgrades to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA).","2,184",2015-Q3,2016-Q2,Closeout,20220630 South East HS,10371145,South East HS - Auditorium Upgrades,Auditorium Renovation,5,Jackie Goldberg,East,1888101,14161,2720 Tweedy Blvd.,South Gate,90280,"Install new ceiling-mounted projector, motorized projector screen, and LED lighting in the auditorium.",76,2020-Q2,2020-Q4,Closeout,20220630 Apperson ES,10367751,Apperson ES - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1216401,13608,10233 Woodward Ave.,Sunland,91040,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 43 doors/hardware, 13 accessible paths of travel, 42 signs, 7 restrooms, 13 drinking fountains/sinks, 3 assistive listening devices/intercoms/phones, 4 concrete ramps, 2 metal ramps, 8 pieces of accessible furniture, 2 assembly seats, 9 railings, 1 parking area, 1 door modification/auto opener, and 1 passenger/bus loading zone.","1,855",2017-Q2,2019-Q2,Closeout,20220630 Fleming MS,10370242,Fleming MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1812701,13657,25425 Walnut St.,Lomita,90717,"Replace deteriorated interior walk-in cooler and interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, interior walk-in freezer/cooler combination unit, and refrigeration equipment.",182,2025-Q3,2025-Q4,Planning,20220630 Euclid ES,10369031,Euclid ES - Fire Damage Repairs,Campus Improvement,2,Monica Garcia,East,1367101,13319,806 Euclid Ave.,Los Angeles,90023,"The project will provide fire damage repairs in the school kitchen. Major repairs consist of the removal and replacement of walls, framing, doors, ceiling, exhaust fan, plumbing fixtures, water heater, flooring, ductwork for heating, ventilation, and air conditioning (HVAC), electrical systems, low voltage systems, fire alarm, interior casework, and kitchen appliances.",335,2017-Q3,2018-Q1,Closeout,20220630 La Salle ES,10370421,La Salle ES - Laundry Plumbing,Plumbing/Irrigation/Drainage,1,"Dr. George J. McKenna, III",West,1478601,13507,8715 La Salle Ave.,Los Angeles,90047,Provide new plumbing and power to support laundry equipment,31,2019-Q3,2020-Q2,Closeout,20220630 Mulholland MS,10370919,Mulholland MS - Portable Removal,Portable Removal,3,Scott Schmerelson,Northwest,1825901,15184,17120 Vanowen St.,Lake Balboa,91406,"Coordinate with various departments while removing portable buildings such as in obtaining environmental reports from the Facilities Environmental Technical Unit (FETU); requesting that Space Planning remove furniture and equipment, Maintenance & Operations disconnect utilities, and ITD disconnect low voltage connections; and providing new pavement.",250,2019-Q4,2021-Q1,Closeout,20220630 Sherman Oaks Charter ES,10370205,Sherman Oaks Charter ES - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northeast,1669901,13517,14755 Greenleaf St.,Sherman Oaks,91403,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2024-Q3,2024-Q4,Planning,20220630 102nd St. EEC,10369312,102nd St. EEC - Restroom Upgrade,Access Compliance,7,Tanya Ortiz Franklin,South,1954501,16301,1925 E. 102nd St.,Los Angeles,90002,The project will provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,455,2021-Q4,2022-Q3,Construction,20220630 Ramona ES,10370608,Ramona ES - 2019-20 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1617801,13353,1133 N. Mariposa Ave.,Los Angeles,90029,"This project is a charter school renovation for Citizens of the World - Silver Lake for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. However, the charter school opted to vacate the site and will not continue occupancy in the 2019-20 school year.",0,2019-Q4,2019-Q4,Closeout,20220630 Victoria ES,10368435,Victoria ES - New Metal Ramp,Access Compliance,5,Jackie Goldberg,East,1750701,13493,3320 Missouri Ave.,South Gate,90280,Provide and install metal ramp to the parent & family center (rooms 35/36A).,26,2017-Q1,2017-Q1,Closeout,20220630 Fairburn ES,10370558,Fairburn ES - Exterior Painting,Painting,4,Nick Melvoin,West,1372601,13445,1403 Fairburn Ave.,Los Angeles,90024,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",204,2020-Q1,2020-Q2,Closeout,20220630 Manhattan ES,10368829,Manhattan ES - 2017-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1511001,13685,1850 W. 96th St.,Los Angeles,90047,"Apple Academy Charter Public School is vacating this site. This project was approved in Board of Education Report No. 530-16/17. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",7,2017-Q2,2017-Q2,Closeout,20220630 Clay MS,10366222,Clay MS - 2014-15 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1809901,13752,12226 S. Western Ave.,Los Angeles,90047,"This project is a charter school renovation for Alliance College-Ready Academy HS #8 (Health Services Academy HS) for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 18 classrooms for 529 charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",17,2014-Q2,2014-Q2,Closeout,20220630 Nimitz MS,10369388,Nimitz MS - Lunch Tables,Furniture/Fixtures/Equipment,5,Jackie Goldberg,East,1826801,13637,6021 Carmelita Ave.,Huntington Park,90255,"Purchase 156 new lunch tables, benches, and umbrellas with stands.",141,2019-Q2,2019-Q3,Closeout,20220630 Calvert Charter for Enriched Studies,10370322,Calvert Charter for Enriched Studies - Parent & Family Center,Campus Improvement,4,Nick Melvoin,Northwest,1271201,13731,19850 Delano St.,Woodland Hills,91367,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",58,2020-Q2,2020-Q3,Closeout,20220630 North Hollywood HS Zoo Magnet,10370097,North Hollywood HS Zoo Magnet - Exterior Painting,Painting,3,Scott Schmerelson,Northeast,1878603,14241,5336 Crystal Springs Dr.,Los Angeles,90027,"Prepare, paint, and refinish the exterior of all buildings and there appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",225,2019-Q2,2019-Q4,Closeout,20220630 Widney Special Education HS,10370810,Widney Special Education HS - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",Central,1191401,15163,2302 S. Gramercy Pl.,Los Angeles,90018,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",261,2020-Q1,2020-Q3,Closeout,20220630 Playa Vista ES,10367415,Playa Vista ES - Classroom Addition,Addition,4,Nick Melvoin,West,1230601,14565,13150 W. Bluff Creek Dr.,Los Angeles,90045,This project will add 4 classrooms of net capacity to Playa Vista ES in anticipation of continued growth in the Playa Vista community. The library will be converted to 2 kindergarten rooms and the new building will include a new library and 2 general classrooms.,"7,688",2024-Q1,2026-Q1,Design,20220630 Strathern ES,10370279,Strathern ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1695901,13654,7939 St. Clair Ave.,North Hollywood,91605,"Demolish 3 portable buildings, provide temporary fencing, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",160,2019-Q1,2019-Q4,Closeout,20220630 Lankershim ES,10372179,Lankershim ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1478101,13358,5250 Bakman Ave.,North Hollywood,91601,"Demolish and remove 2 portable buildings, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/Replace asphalt paving.",235,2022-Q3,2022-Q4,Planning,20220630 Cochran MS,10372195,Cochran MS - Install Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1824501,13574,4066 Johnnie Cochran Vista,Los Angeles,90019,Install secure entry system at door to main office with two video receivers in main office,37,2021-Q4,2022-Q1,Closeout,20220630 Corona ES,10372243,Corona ES - Install Security Monitor System,Security System,5,Jackie Goldberg,East,1321901,13453,3825 Bell Ave.,Bell,90201,Install video surveillance (CCTV) system with (3) new cameras,45,2022-Q3,2022-Q4,Planning,20220630 Boyle Heights HS: STEM Academy,10369945,Boyle Heights HS: STEM Academy - ADA Access at Hollenbeck MS,Access Compliance,2,Monica Garcia,East,1761501,13408,503 S. Mott St.,Los Angeles,90033,"Add thresholds, switch contents of classroom 177 and 271 to accommodate student in wheelchair and construct cages and outlets for vending machines. Boyle Heights Stem Academy usually operates from Roosevelt HS. They are currently operating at Hollenbeck MS during construction at Roosevelt. The improvements are specific to Boyle Heights' requirements.",22,2018-Q3,2018-Q4,Closeout,20220630 Irving STEAM Magnet MS,10371101,Irving STEAM Magnet MS - Auditorium and Library Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"Provide and install overhead projector, screen and sound system in auditorium. Provide projector, screen and speakers in the library.",108,2020-Q1,2020-Q3,Closeout,20220630 Cortines School of Visual and Performing Arts,10371777,Cortines School of Visual and Performing Arts - Energy Efficiency Lighting,Electrical/Lighting,2,Monica Garcia,Central,1851601,13295,450 N. Grand Ave.,Los Angeles,90012,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $990,507. Estimated energy savings is 582,821 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work.",214,2021-Q2,2021-Q2,Closeout,20220630 Justice Academy Charter ES,10372622,Justice Academy Charter ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1469201,13727,23350 Justice St.,West Hills,91304,Install new secure entry system at the Main Office.,39,2022-Q4,2022-Q3,Planning,20220630 Mariposa-Nabi PC,10372629,Mariposa-Nabi PC - Secure Entry System,Security System,5,Jackie Goldberg,Central,1498301,13948,987 S. Mariposa Ave.,Los Angeles,90006,Install new secure entry system at the Main Office.,38,2022-Q3,2022-Q3,Planning,20220630 Gridley ES,10372632,Gridley ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1429501,13748,1907 Eighth St.,San Fernando,91340,Install new secure entry system at the Main Office.,56,2022-Q3,2022-Q3,Planning,20220630 Commonwealth ES,10367611,Commonwealth ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1319201,13392,215 S. Commonwealth Ave.,Los Angeles,90004,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",33,2017-Q2,2017-Q4,Closeout,20220630 Nevada ES,10370522,Nevada ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1545901,13783,22120 Chase St.,West Hills,91304,"Install new electronic, free-standing marquee",55,2019-Q3,2019-Q4,Closeout,20220630 Plummer ES,10369295,Plummer ES - Install Ramp,Access Compliance,6,Kelly Gonez,Northwest,1612301,13878,9340 Noble Ave.,North Hills,91343,Install a ramp at classroom 1,31,2017-Q4,2017-Q4,Closeout,20220630 Verdugo Hills HS,10364222,Verdugo Hills HS - Fire Alarm System,Fire Alarm System,6,Kelly Gonez,Northeast,1891401,13642,10625 Plainview Ave.,Tujunga,91042,Fire Alarm System,"2,066",2015-Q3,2016-Q4,Closeout,20220630 Vermont ES,10367831,Vermont ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",Central,1747901,13273,1435 W. 27th St.,Los Angeles,90007,"Remove/demolish 2 bungalows, relocate contents of the portable buildings, provide temporary fencing, disconnect all utilities and data systems, reconnect all utilities to remaining buildings on site, and repair asphalt paving over the former building footprints and adjacent areas. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",166,2017-Q1,2018-Q1,Closeout,20220630 Van Nuys HS,10370057,Van Nuys HS - Portable Wheelchair Lift,Access Compliance,3,Scott Schmerelson,Northeast,1889301,13404,6535 Cedros Ave.,Van Nuys,91411,Purchase and install portable wheelchair lift for auditorium.,35,2018-Q4,2018-Q4,Closeout,20220630 Ford ES,10372006,Ford ES - Install Security Monitor System,Security System,2,Monica Garcia,East,1391801,13503,1112 S. Ford Blvd.,Los Angeles,90022,Add 4 cameras to existing video surveillance (CCTV) system,48,2021-Q4,2022-Q1,Closeout,20220630 Hollywood HS,10370103,Hollywood HS - Roofing,Roofing,4,Nick Melvoin,West,1869301,13356,1521 N. Highland Ave.,Los Angeles,90028,"This project is to provide approximately 67,000 square feet of new roofing at seven buildings with new PVC roofing and metal flashing. The scope also includes the replacement of damaged wood, installation of new gutters and downspouts, replacement of skylights, exhaust fan and gravity vents with existing roof mounted HVAC units and ductwork at other buildings to be protected in place. Includes approximately 85,500 square feet of waterproofing on Physical Education deck and Shop/Home Making deck.","3,431",2022-Q2,2023-Q2,Construction,20220630 Bell HS,10372082,Bell HS - Roofing,Roofing,5,Jackie Goldberg,East,1853601,13488,4328 Bell Ave.,Bell,90201,"This project is to provide approximately 212,217 square feet of new roofing sitewide, including the installation of new gutters and downspouts and painting of affected areas.","3,598",2024-Q4,2025-Q2,Planning,20220630 Germain Academy for Academic Achievement,10368012,Germain Academy for Academic Achievement - Restroom Upgrades,Access Compliance,3,Scott Schmerelson,Northwest,1411701,13872,20730 Germain St.,Chatsworth,91311,"Modify kindergarten restroom; provide and install folding changing table, privacy screen and enlarge doorways.",9,2016-Q4,2017-Q1,Closeout,20220630 Cortines School of Visual and Performing Arts,10370652,Cortines School of Visual and Performing Arts - Piping Systems & Other Upgrades,Campus Improvement,2,Monica Garcia,Central,1851601,13295,450 N. Grand Ave.,Los Angeles,90012,"This project is to replace the existing deteriorated underground and above-ground chilled piping systems for heating, ventilation, and air conditioning (HVAC). The scope of work also includes replacing a portion of the slab, subgrade, trench drain, fence and curb at the basketball court.","14,837",2022-Q2,2024-Q4,Construction,20220630 YES Academy at Hyde Park ES,10366318,YES Academy at Hyde Park ES - Ceiling System Improvements,Seismic Modernization,1,"Dr. George J. McKenna, III",West,1465801,13465,3140 Hyde Park Blvd.,Los Angeles,90043,"Repair 4,000 square feet of suspended ceiling systems in 002CAJ classroom building for seismic corrections and to improve structural integrity. Scope of work includes installation of new seismic compression struts, and hanger wire upgrades per code requirements, as well as abatement of asbestos and removing impacted components beyond their remaining service life.",250,2019-Q3,2019-Q4,Closeout,20220630 Gage MS,10369915,Gage MS - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1815101,13598,2880 E. Gage Ave.,Huntington Park,90255,Demolish 3 portable buildings. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite. Repair/replace asphalt paving.,342,2018-Q4,2019-Q4,Closeout,20220630 Fullbright ES,10368089,Fullbright ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,Northwest,1402701,13661,6940 Fullbright Ave.,Canoga Park,91306,Provide and install electronic marquee.,37,2018-Q1,2018-Q1,Closeout,20220630 Westchester Enriched Sciences Magnets,10103297,Westchester Enriched Sciences Magnets - Auditorium Renovation,Auditorium Renovation,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"The project will upgrade the lighting control board, stage rigging, and microphone system in the auditorium.",100,2022-Q4,2023-Q1,Design,20220630 Ambler ES,10371732,Ambler ES - Exterior Painting,Painting,7,Tanya Ortiz Franklin,South,1208901,13833,319 E. Sherman Dr.,Carson,90746,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",533,2021-Q4,2022-Q3,Construction,20220630 Ranchito ES,10371204,Ranchito ES - Install Ramp,Access Compliance,6,Kelly Gonez,Northeast,1619201,13721,7940 Ranchito Ave.,Panorama City,91402,Construct and attach a sloped walkway to an existing concrete ramp to provide ADA access to the school yard.,36,2020-Q2,2020-Q3,Closeout,20220630 Alexander Science Center ES,10372532,Alexander Science Center ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",Central,1511101,13884,3737 S. Figueroa St.,Los Angeles,90007,Install new secure entry system at the Main Office.,30,2022-Q3,2022-Q4,Planning,20220630 Ivanhoe ES,10369409,Ivanhoe ES - Classroom Replacement,Addition,5,Jackie Goldberg,Central,1467101,13357,2828 Herkimer St.,Los Angeles,90039,"This classroom replacement/addition project authorizes preconstruction activities such as planning, due diligence, design through Division of the State Architect (DSA) approval, as well as site and environmental analysis. The school has 11 classrooms located in relocatable buildings with 6 of the classrooms in uncertified portables and 2 of the classrooms in a DOH portable that does not comply with State standards for school buildings. Moreover, neighborhood enrollment has been growing and up to 4 additional classrooms may be required for essential school programs, and the existing food services hot shack is undersized and does not meet County of Los Angeles Health Department standards. Included in the project design are approximately 15 classrooms and support spaces to replace 11 classrooms in relocatable buildings and 4 classrooms to support neighborhood enrollment; a new, minimally-sized, food service facility; infrastructure to support the new facilities including an enhanced information technology network convergence system; upgrades to landscape, hardscape, parking, and playground areas where portables are removed or in other project-related areas; and site work, path of travel, and other required ADA improvements. In addition, limited construction activities may include the removal of 2 classrooms in a DOH portable and the placement of interim housing during preconstruction.","46,996",2022-Q3,2025-Q3,Design,20220630 Coldwater Canyon ES,10367063,Coldwater Canyon ES - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1315101,13663,6850 Coldwater Canyon Ave.,North Hollywood,91605,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 87 doors/hardware, 17 accessible paths of travel, 42 signs, 10 restrooms, 16 drinking fountains/sinks,10 casework/counters, 1 assistive listening device/intercom/phone, 3 metal ramps, 4 pieces of accessible furniture, 1 assembly seating, 2 railings, 2 parking, 1 cafeteria counter, and 1 new elevator/stage lift.","2,987",2016-Q4,2022-Q3,Construction,20220630 Fletcher ES,10371135,Fletcher ES - Campus Improvement,Campus Improvement,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,"Provide and install 10 planter boxes and irrigation along the perimeter fencing on the playground. Provide 48 iPads, 48 Chromebooks, and smart board in the library.",96,2020-Q2,2020-Q3,Closeout,20220630 Fair ES,10371646,Fair ES - Exterior Painting,Painting,6,Kelly Gonez,Northeast,1371201,13600,6501 Fair Ave.,North Hollywood,91606,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",742,2021-Q4,2022-Q2,Closeout,20220630 Miles ES,10368362,Miles ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1531501,13650,6720 Miles Ave.,Huntington Park,90255,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",172,2018-Q2,2019-Q1,Closeout,20220630 Knollwood Preparatory Academy ES,10371219,Knollwood Preparatory Academy ES - Exterior Benches,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1476201,13770,11822 Gerald Ave.,Granada Hills,91344,Install four benches in the reading garden with anchors in new concrete footings.,7,2020-Q4,2021-Q2,Closeout,20220630 Chatsworth Charter HS,10371555,Chatsworth HS - Install Parking Lot Gates,Fencing,3,Scott Schmerelson,Northwest,1858301,13870,10027 Lurline Ave.,Chatsworth,91311,Install three sets of swing arm gates along the services road.,49,2021-Q2,2022-Q3,Construction,20220630 Curtiss MS,10371744,Curtiss MS - Exterior Painting,Painting,7,Tanya Ortiz Franklin,South,1810301,13775,1254 E. Helmick St.,Carson,90746,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",892,2021-Q3,2022-Q1,Closeout,20220630 La Salle ES,10372391,La Salle ES - Parent Center Furniture and Technology,Furniture/Fixtures/Equipment,1,"Dr. George J. McKenna, III",West,1478601,13507,8715 La Salle Ave.,Los Angeles,90047,"Purchase standard parent center furniture/technology package, which includes the following: Furniture: (16) tables, (31) chairs, (5) types of storage; Technology: (21) laptops, storage cart, projector and document camera on cart, printer.",57,2022-Q3,2023-Q1,Planning,20220630 Addams Continuation HS,10372138,Addams Continuation HS - Purchase Lunch Tables and Tech,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1872601,16503,16341 Donmetz St.,Granada Hills,91344,Purchase (11) lunch tables and (1) interactive displays,24,2021-Q4,2022-Q3,Construction,20220630 Sherman Oaks Center for Enriched Studies,10366802,Sherman Oaks Center for Enriched Studies - Comprehensive Modernization,Comprehensive Modernization,4,Nick Melvoin,Northwest,1884201,13692,18605 Erwin St.,Reseda,91335,"This project includes the construction of new buildings and site improvements with 28 general and specialty classrooms, instructional support spaces, gymnasium, lunch shelter, and a playground for elementary students. Existing school facilities will be upgraded including the modernization and seismic retrofit of the auditorium building, and the two administration buildings will be connected and completely reconfigured. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of the physical education building, 7 relocatable buildings with 12 classrooms, lunch shelter, music building, industrial arts building #2, and classroom buildings B & C. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","125,133",2019-Q1,2023-Q2,Construction,20220630 Erwin ES,10371418,Erwin ES - Purchase Classroom Chairs,Furniture/Fixtures/Equipment,6,Kelly Gonez,Northeast,1363001,13624,13400 Erwin St.,Van Nuys,91401,Purchase (420) classroom chairs,50,2020-Q3,2020-Q3,Closeout,20220630 Blythe ES,10372615,Blythe ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1247001,13758,18730 Blythe St.,Reseda,91335,Install new secure entry system at the Main Office.,30,2022-Q3,2022-Q3,Planning,20220630 49th St. ES,10370153,49th St. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,Central,1393201,13348,750 E. 49th St.,Los Angeles,90011,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2026-Q3,2026-Q3,Planning,20220630 Gardner ES,10370157,Gardner ES - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1406801,13354,7450 Hawthorn Ave.,Los Angeles,90046,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q3,2027-Q4,Planning,20220630 Escutia PC,10369979,Escutia PC - Electronic Marquee and Secure Entry System,Electrical/Lighting,5,Jackie Goldberg,East,1322001,13923,6401 Bear Ave.,Bell,90201,Install new electronic wall-mounted marquee and install new secure entry system,79,2019-Q2,2019-Q4,Closeout,20220630 Catskill ES,10371254,Catskill ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1289001,13662,23536 Catskill Ave.,Carson,90745,"Demolish/remove 4 portable buildings, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",493,2020-Q2,2020-Q4,Closeout,20220630 West Hollywood ES,10370228,West Hollywood ES - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1764901,13364,670 N. Hammond St.,West Hollywood,90069,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2026-Q3,2026-Q4,Planning,20220630 Lincoln HS,10370268,Lincoln HS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1872901,13280,3501 N. Broadway,Los Angeles,90031,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2024-Q2,2024-Q4,Planning,20220630 Denker ES,10371666,Denker ES - Secure Entry System & Electronic Marquee,Campus Improvement,7,Tanya Ortiz Franklin,South,1342501,13638,1620 W. 162nd St.,Gardena,90247,"Install a new secure entry system with an intercom at the door to the main office, two monitors in the main office, and one monitor in the principal's office. Install an electronic free-standing marquee on the front lawn east of the walkway to the main entrance.",98,2021-Q2,2021-Q4,Closeout,20220630 Chatsworth Charter HS,10371311,Chatsworth Charter HS - 2020-22 Prop 39 (Valley International Preparatory HS),Charter Prop 39,3,Scott Schmerelson,Northwest,1858301,13870,10027 Lurline Ave.,Chatsworth,91311,"This project was initially approved in BOE Report No. 313-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for Valley International Preparatory HS. The project included 1 charter office, 2 special education rooms, and 10 instructional spaces for charter student seats in grades 9-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved in Board of Education Report No. 317-20/21 for 2021-22 Proposition 39 charter co-locations as a vacating project. Valley International Preparatory HS will not continue occupancy in the 2021-22 school year. Therefore, this project is amended to include the scope of work necessary to return the site to it previous conditions, as appropriate.",22,2020-Q2,2020-Q3,Closeout,20220630 Le Conte MS,10372500,Le Conte MS - 2022-23 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"This project is a charter school renovation for Citizens of the World - Hollywood for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 4 special education rooms, and 20 instructional spaces for charter student seats in grades TK-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",35,2022-Q3,2022-Q3,Planning,20220630 San Pedro HS - Olguin Campus,10367261,San Pedro HS Olguin Campus - Provide Pool Security,Security System,7,Tanya Ortiz Franklin,South,1893701,15221,3210 S. Alma St.,San Pedro,90731,Provide additional security for Olguin HS pool. Provide motion sensors connected to the school police. Provide and install flood lights connected to the motion sensors.,3,2016-Q3,2016-Q4,Closeout,20220630 Griffith-Joyner ES,10371136,Griffith-Joyner ES - Campus Improvement,Campus Improvement,7,Tanya Ortiz Franklin,South,1584901,13497,1963 E. 103rd St.,Los Angeles,90002,Replace old lighting fixtures with LED. Paint auditorium walls. Replace old lunch tables with new expanded metal tables.,88,2020-Q2,2020-Q3,Closeout,20220630 Fulton College Preparatory School,10369260,Fulton College Preparatory School - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,"Remove/sell 3 portable buildings. Remove/relocate furniture and equipment, disconnect low voltage ITD components, restore areas with asphalt paving at building footprints.",96,2018-Q1,2019-Q3,Closeout,20220630 Raymond ES,10371688,Raymond ES - Install Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1621901,13469,7511 Raymond Ave.,Los Angeles,90044,Remove existing marquee and footing on the front lawn on Raymond Ave. and replace with a new 2-sided electronic marquee standing less than 8' high.,58,2021-Q1,2021-Q4,Closeout,20220630 Yorkdale ES,10107448,Yorkdale ES - Compliance with State & Federal Access Requirements,Access Compliance,2,Monica Garcia,Central,1795901,13385,5657 Meridian St.,Los Angeles,90042,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) for Lunch Shelter,450,2015-Q4,2016-Q2,Closeout,20220630 Blythe ES,10103729,Blythe ES - Portable Removal,Portable Removal,3,Scott Schmerelson,Northwest,1247001,13758,18730 Blythe St.,Reseda,91335,Demolish/Remove Portable Building(s),29,2010-Q2,2017-Q1,Closeout,20220630 Hamasaki Medical & Science Magnet ES,10369599,Hamasaki ES - Playground Upgrades,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1627401,13577,4865 E. 1st St.,Los Angeles,90022,Install new playground structure in pre-kindergarten yard,42,2018-Q2,2018-Q4,Closeout,20220630 Camellia ES,10370527,Camellia ES - Intrusion Alarm,Security System,6,Kelly Gonez,Northeast,1272601,13587,7451 Camellia Ave.,North Hollywood,91605,Install intrusion alarm in computer lab,5,2019-Q2,2019-Q4,Closeout,20220630 Compton ES,10105865,Compton ES - Compliance with State & Federal Access Requirements,Fire Alarm System,7,Tanya Ortiz Franklin,South,1320501,13498,1515 E. 104th St.,Los Angeles,90002,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),438,2015-Q3,2016-Q2,Closeout,20220630 Palisades Charter HS,10372564,Palisades Charter HS - HVAC,HVAC,4,Nick Melvoin,West,1879801,13742,15777 Bowdoin St.,Pacific Palisades,90272,"This project will remove and replace campus-wide existing heating-only air handlers with HVAC air handlers or fan coil units and connect them to the central 4-pipe system. It will provide two new chillers to add cooling to the site, a new boiler for the gym, and split heat pump units for smaller spaces that do not currently have air conditioning. Path of Travel accessibility upgrades are not included, since this is a mechanical only project with no significant structural work (almost all units sit on the ground slab).","34,688",2024-Q3,2026-Q4,Planning,20220630 109th St. ES,10370355,109th St. ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1583601,13672,10915 McKinley Ave.,Los Angeles,90059,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",69,2019-Q3,2020-Q3,Closeout,20220630 YES Academy at Hyde Park ES,10372159,YES Academy at Hyde Park ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1465801,13465,3140 Hyde Park Blvd.,Los Angeles,90043,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",481,2022-Q4,2024-Q2,Planning,20220630 Century Park ES,10372235,Century Park ES - Install Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1294501,13675,10935 S. Spinning Ave.,Inglewood,90303,"Install new electronic, free-standing marquee. Remove manual-type marquee near front of school. Install new marquee in same location, with new footing. Approx. 30 feet underground and 100 feet above-ground conduit required. Double-sided 8 feet x 5 feet color LED display.",76,2022-Q3,2022-Q4,Planning,20220630 Erwin ES,10367064,Erwin ES - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1363001,13624,13400 Erwin St.,Van Nuys,91401,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 135 doors/hardware, 88 accessible paths of travel, 76 signs, 10 restrooms, 23 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 3 concrete ramps, 5 metal ramps, 2 pieces of accessible furniture, 1 assembly seat, 12 railings, 1 parking area, and 1 cafeteria counter.","4,609",2016-Q4,2022-Q4,Construction,20220630 Gardena HS,10102925,Gardena HS - Small Learning Community & Fire Alarm Upgrades,Small Learning Community/Academy,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"This project is part of a program to provide campus-wide upgrades that enable schools to operate distinct Small Learning Communities (SLC). The scope of work includes the addition of an exterior canopy to the auditorium building, alterations to 8 classroom buildings and 1 administrative building for academy offices, upgrades to provide visual identities for the individual SLC, outdoor improvements including a new courtyard and general landscaping, as well as restroom and path of travel improvements to meet the accessibility requirements of the Americans with Disabilities Act (ADA). The project also upgrades the fire alarms throughout the campus to a new automatic and addressable system that complies with District safety standards.","10,929",2016-Q3,2020-Q2,Closeout,20220630 Sunland ES,10004579,Sunland ES - Facelift,Facelift,6,Kelly Gonez,Northeast,1697301,13451,8350 Hillrose St.,Sunland,91040,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",106,2012-Q3,2016-Q3,Closeout,20220630 Garvanza Technology & Leadership Magnet ES,10004601,Garvanza ES - Facelift,Facelift,2,Monica Garcia,Central,1408201,15329,317 N. Ave. 62,Los Angeles,90042,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",116,2015-Q1,2016-Q3,Closeout,20220630 Euclid ES,10004614,Euclid ES - Facelift,Facelift,2,Monica Garcia,East,1367101,13319,806 Euclid Ave.,Los Angeles,90023,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",12,2012-Q2,2016-Q3,Closeout,20220630 Eastman ES,10004618,Eastman ES - Facelift,Facelift,2,Monica Garcia,East,1352101,13520,4112 E. Olympic Blvd.,Los Angeles,90023,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",126,2015-Q1,2016-Q3,Closeout,20220630 San Pedro ES,10004624,San Pedro ES - Facelift,Facelift,5,Jackie Goldberg,Central,1650701,13279,1635 S. San Pedro St.,Los Angeles,90015,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",90,2012-Q2,2016-Q3,Closeout,20220630 Nevada ES,10366729,Nevada ES - Shade Shelter for Kindergarten,Lunch/Shade Shelter,3,Scott Schmerelson,Northwest,1545901,13783,22120 Chase St.,West Hills,91304,This project will provide a shade shelter over the existing play structure in the kindergarten yard plus associated accessibility improvements.,111,2016-Q1,2016-Q2,Closeout,20220630 Coliseum ES,10367669,Coliseum ES - 2016-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1317801,13593,4400 Coliseum St.,Los Angeles,90016,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a charter school renovation for City Language Immersion Charter. This growth project included 1 charter office and 5 instructional spaces for charter students in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with an unspecified scope of work and a revised expiration date for the charter school of 6/30/18. The charter operator, City Language Immersion Charter did not continue to occupy Coliseum ES during the 2017-18 academic year. As a result, the scope of work was defined as a vacancy which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",129,2016-Q2,2016-Q3,Closeout,20220630 Kennedy HS,10366774,Kennedy HS - HVAC,HVAC,3,Scott Schmerelson,Northwest,1872501,13263,11254 Gothic Ave.,Granada Hills,91344,"This project will upgrade a 40-year-old heating, ventilation and air conditioning system in the boiler house building which services nearly all of the buildings at the site. The scope includes removing two antiquated boilers that are no longer operational and one that is in poor operating condition. It will include providing two new boilers that meet the current code requirements and replacing associated fixtures.","1,764",2016-Q4,2017-Q3,Closeout,20220630 Dixie Canyon Community Charter ES,10370862,Dixie Canyon ES - Secure Entry System,Security System,3,Scott Schmerelson,Northeast,1343801,13677,4220 Dixie Canyon Ave.,Sherman Oaks,91423,Install new secure entry system,14,2020-Q1,2020-Q1,Closeout,20220630 Weigand ES,10004635,Weigand ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1763401,13611,10401 Weigand Ave.,Los Angeles,90002,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",145,2013-Q1,2016-Q3,Closeout,20220630 Hamasaki Medical & Science Magnet ES,10369106,Hamasaki ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1627401,13577,4865 E. 1st St.,Los Angeles,90022,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",54,2018-Q1,2019-Q1,Closeout,20220630 Harrison ES,10367187,Harrison ES - Removal of 4 Portables,Portable Removal,2,Monica Garcia,East,1443801,13528,3529 City Terrace Dr.,Los Angeles,90063,"Removal of 4 portable buildings including abatement of hazardous materials, disconnect of utilities and data feeds, and asphalt repair",202,2015-Q4,2016-Q2,Closeout,20220630 Burbank Arts Tech Community Magnet MS,10101469,Burbank Arts Tech Community Magnet MS - Modernize Existing Food Service Area,Food Services Renovation,2,Monica Garcia,Central,1806601,13551,6460 N. Figueroa St.,Los Angeles,90042,Modernize Existing Food Service Area,727,2013-Q4,2014-Q2,Closeout,20220630 University Charter HS,10004111,University HS - Facelift,Facelift,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",148,2013-Q3,2017-Q1,Closeout,20220630 Marina Del Rey MS,10004112,Marina Del Rey MS - Facelift,Facelift,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",125,2012-Q2,2016-Q3,Closeout,20220630 Carnegie MS,10004135,Carnegie MS - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1809001,13761,21820 Bonita St.,Carson,90745,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",214,2012-Q2,2016-Q3,Closeout,20220630 Locke Charter HS,10366061,Locke Charter HS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1873301,13889,325 E. 111th St.,Los Angeles,90061,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",740,2015-Q2,2015-Q3,Closeout,20220630 Miramonte EEC,10005052,Miramonte EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1953601,16664,1341 E. 70th St.,Los Angeles,90001,"Upgrade entry control system, exterior gates, and playground equipment",71,2014-Q3,2015-Q1,Closeout,20220630 Gardena EEC,10005030,Gardena EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1916501,16462,1350 W. 177th St.,Gardena,90248,"Upgrade entry control system, plumbing systems in restrooms, and playground equipment",11,2014-Q4,2015-Q1,Closeout,20220630 Holmes EEC,10005041,Holmes EEC - Safety Upgrades and Improvements,Campus Improvement,5,Jackie Goldberg,East,1952401,16292,1810 E. 52nd St.,Los Angeles,90058,"Upgrade entry control system, exterior gates, playground equipment, electrical, and interior paint",118,2014-Q3,2016-Q1,Closeout,20220630 66th St. EEC,10005010,66th St. EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1956101,16681,405 E. 67th St.,Los Angeles,90003,"Upgrade entry control system, exterior gates, and playground equipment",13,2014-Q3,2015-Q1,Closeout,20220630 Lowman Special Education & Career Transition Center,10367771,Lowman Special Education Center - Restroom Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1194801,13544,12827 Saticoy St.,North Hollywood,91605,Remove existing cabinets and provide new tile as needed in the bathroom between classrooms 11 & 12.,14,2016-Q2,2016-Q3,Closeout,20220630 1st St. ES,10368044,1st St. ES - Electrical Outlet,Access Compliance,2,Monica Garcia,East,1383601,13267,2820 E. 1st St.,Los Angeles,90033,Provide and install electrical outlet for changing table.,1,2016-Q4,2016-Q4,Closeout,20220630 Monroe HS,10367413,Monroe HS - SEEDS,SEEDS,6,Kelly Gonez,Northwest,1876801,13704,9229 Haskell Ave.,North Hills,91343,"Design and construct an outdoor learning space of approximately 1,600 square feet consisting of the installation of pavers, art poles, a hose bib, seating boulders and potting soil. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches and signage poles.",30,2016-Q2,2016-Q3,Closeout,20220630 Enadia Way Technology Charter,10363925,Enadia Technology Enriched Charter ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1361001,13656,22944 Enadia Way,West Hills,91307,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",196,2014-Q3,2014-Q4,Closeout,20220630 Chatsworth Charter HS,10366016,Chatsworth Charter HS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1858301,13870,10027 Lurline Ave.,Chatsworth,91311,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",971,2014-Q4,2015-Q2,Closeout,20220630 Hazeltine ES,10004573,Hazeltine ES - Facelift,Facelift,3,Scott Schmerelson,Northeast,1449301,13529,7150 Hazeltine Ave.,Van Nuys,91405,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",90,2012-Q3,2016-Q3,Closeout,20220630 Hyde Park EEC,10367332,Hyde Park EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1952701,16295,6428 Eleventh Ave.,Los Angeles,90043,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",78,2016-Q3,2016-Q3,Closeout,20220630 97th St. EEC,10005013,97th St. EEC - Safety Upgrades and Improvements,Campus Improvement,1,"Dr. George J. McKenna, III",South,1953901,16743,430 W. Colden Ave.,Los Angeles,90003,"Upgrade entry control system, exterior gates, playground equipment, and electrical outlets",78,2014-Q3,2015-Q3,Closeout,20220630 Hawaiian EEC,10005039,Hawaiian EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1952201,16284,501 Hawaiian Ave.,Wilmington,90744,"Upgrade entry control system, exterior gates, and playground equipment",53,2014-Q3,2015-Q1,Closeout,20220630 Trinity ES,10367528,Trinity ES - SEEDS,SEEDS,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,"Design and construct an outdoor learning space of approximately 1,500 square feet consisting of the installation of decomposed granite, stamped concrete, a hose bib, irrigation system, utilities, soil and art poles. It will be outfitted by the school site and the partner organization (The Kitchen Community) with planter boxes, seating boulders, planting materials, trees, and signage poles.",38,2016-Q3,2016-Q4,Closeout,20220630 Hancock Park ES,10105862,Hancock Park ES - Compliance with State & Federal Access Requirements,Fire Alarm System,4,Nick Melvoin,West,1439701,13582,408 S. Fairfax Ave.,Los Angeles,90036,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),411,2015-Q2,2016-Q1,Closeout,20220630 Leichman Career Preparatory & Transition Center,10366540,Leichman Sp ED Ctr-New Ramp/Stage,Access Compliance,4,Nick Melvoin,Northwest,1190801,13887,19034 Gault St.,Reseda,91335,Provide and Install Ramp/Stage in Auditorium,7,2014-Q4,2014-Q4,Closeout,20220630 Compton ES,10365189,Compton ES - Painting,Painting,7,Tanya Ortiz Franklin,South,1320501,13498,1515 E. 104th St.,Los Angeles,90002,Upgrade the school by painting the interior of the campus.,152,2014-Q1,2016-Q4,Closeout,20220630 Euclid ES,10369101,Euclid ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1367101,13319,806 Euclid Ave.,Los Angeles,90023,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",52,2017-Q4,2018-Q2,Closeout,20220630 Woodlake Community Charter ES,10367007,Woodlake Community Charter ES - Bus Drop-Off,Access Compliance,3,Scott Schmerelson,Northwest,1787701,13686,23231 Hatteras St.,Woodland Hills,91367,Bus Drop Off,84,2015-Q2,2015-Q3,Closeout,20220630 Enadia Way Technology Charter,10367121,Enadia Way ES - 40 Laptops & 2 Carts,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1361001,13656,22944 Enadia Way,West Hills,91307,Increase school's access to technology by providing forty new laptop computers with two carts for various classrooms.,68,2015-Q4,2015-Q4,Closeout,20220630 Granada Hills Charter HS,10367122,Granada Community Charter ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1868101,13769,10535 Zelzah Ave.,Granada Hills,91344,Provide upgrades to the campus by installing a new electronic marquee. The marquee was purchased by Granada Community Charter ES for installation at the elementary school.,18,2016-Q1,2016-Q1,Closeout,20220630 Northridge MS,10366738,Northridge MS - Parent & Family Center,Reconfiguration,3,Scott Schmerelson,Northwest,1828301,13740,17960 Chase St.,Northridge,91325,"Convert and renovate former shop building space into a new parent & family center by providing interior paint, flooring and lighting repairs, security upgrades including new doors and panic hardware as well as security on windows. Remove deteriorated built-in cabinets and patch up walls. Provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",79,2015-Q2,2015-Q4,Closeout,20220630 Miles EEC,10005051,Miles EEC - Safety Upgrades and Improvements,Campus Improvement,5,Jackie Goldberg,East,1953501,16663,2855 Saturn Ave.,Huntington Park,90255,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, playground equipment, and interior and exterior paint",193,2014-Q2,2016-Q3,Closeout,20220630 Irving STEAM Magnet MS,10366474,Irving MS-Stage Lift,Access Compliance,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,Stage Lift,33,2014-Q3,2014-Q4,Closeout,20220630 El Camino Real Charter HS,10366819,El Camino Real Charter HS - Synthetic Turf Field,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1861701,13776,5440 Valley Circle Blvd.,Woodland Hills,91367,"This project addresses the defective synthetic turf field of approximately 110,800 square feet by removing and replacing the field with one that will perform better for instructional and extracurricular activities.","1,378",2015-Q3,2015-Q4,Closeout,20220630 Warner ES,10367453,Warner ES - Security Upgrades,Security System,4,Nick Melvoin,West,1761601,13481,615 Holmby Ave.,Los Angeles,90024,"Provide campus security upgrades including new chain link fence and gates, new door locking mechanism, new CCTV system, new camera buzzer system, and new upgraded lighting throughout the campus.",348,2016-Q1,2016-Q4,Closeout,20220630 Granada ES,10367770,Granada Community Charter ES - Accessibility Upgrades,Access Compliance,3,Scott Schmerelson,Northwest,1423301,13561,17170 Tribune St.,Granada Hills,91344,Provide and install metal ramp to Classrooms 24 & 25 including handrails and skirting.Provide and install portable wheelchair lift; modify backstage as required; convert storage room to changing room.,95,2016-Q2,2016-Q3,Closeout,20220630 Darby ES,10366548,Darby Ave Charter - Provide Technology,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1334001,13797,10818 Darby Ave.,Northridge,91326,"Increase school's access to technology by providing 30 laptop computers with carts, 2 document cameras, and 2 projectors",36,2014-Q4,2015-Q1,Closeout,20220630 Lincoln HS: Leadership in Entertainment & Media Arts,10367466,Lincoln HS - Removal/Demo of 8 Bungalows & 1 Sanitary Bldg,Portable Removal,2,Monica Garcia,East,1775301,13280,3501 N. Broadway,Los Angeles,90031,"Remove/demolish 8 portable classroom & 1 sanitary building due to closure of this academy; Disconnect utilities, fire alarm and low voltage; Approved paving project will convert the site of the former academy to parking",240,2016-Q3,2017-Q1,Closeout,20220630 Nueva Vista ES,10365656,Nueva Vista ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1237801,13822,4412 Randolph St.,Bell,90201,Demolish/Remove 2 Portable Buildings,93,2017-Q2,2019-Q1,Closeout,20220630 Loma Vista ES,10369984,Loma Vista ES - Electronic Marquee and Lunch Tables,Campus Improvement,5,Jackie Goldberg,East,1491801,13586,3629 E. 58th St.,Maywood,90270,Install a new electronic wall-mounted marquee and replace 40 deteriorated lunch tables.,95,2019-Q2,2019-Q3,Closeout,20220630 Marquez Charter ES,10366641,Marquez Charter ES - Security Upgrades,Security System,4,Nick Melvoin,West,1516401,13628,16821 Marquez Ave.,Pacific Palisades,90272,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance,13,2015-Q4,2015-Q4,Closeout,20220630 Rogers Continuation HS,10367503,Rogers Continuation HS - HVAC,HVAC,3,Scott Schmerelson,Northeast,1889501,15721,14711 Gilmore St.,Van Nuys,91411,"This project will upgrade the heating, ventilation and air conditioning systems in 4 classroom buildings. The HVAC systems are over 18 years old and beyond economical repair.",191,2016-Q4,2017-Q2,Closeout,20220630 Taft Charter HS,10366269,Taft Charter HS - 2014-15 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1888001,13787,5461 Winnetka Ave.,Woodland Hills,91364,"This project is a charter school renovation for Ivy Academia for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 30 classrooms for 766.03 charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",434,2014-Q2,2014-Q3,Closeout,20220630 Taft Charter HS,10366931,Taft Charter HS - 2015-16 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1888001,13787,5461 Winnetka Ave.,Woodland Hills,91364,"This project is a charter school renovation for Ivy Academia for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 2 charter offices and 30 classrooms for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",147,2015-Q2,2015-Q4,Closeout,20220630 Rancho Dominguez Preparatory School,10367416,Rancho Dominguez Preparatory School - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1886801,193560,4110 Santa Fe Ave.,Long Beach,90810,"Provide and install electrical infrastructure and 10 new cameras in the ""Red"" and ""Green"" buildings.",7,2018-Q2,2018-Q4,Closeout,20220630 Sutter MS,10366606,Sutter MS-Classroom Conversion,Access Compliance,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,"Remove and cap existing gas valve, eye wash station and faucet. Science lab classroom is being converted to a special education classroom.",1,2014-Q4,2014-Q4,Closeout,20220630 Fries ES,10366036,Fries ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1401401,13463,1301 Fries Ave.,Wilmington,90744,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",247,2015-Q2,2015-Q2,Closeout,20220630 Markham MS,10368099,Markham MS - Portable Removal (4),Portable Removal,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,"This project removes 4 portable buildings including the abatement of hazardous materials, disconnection of low voltage and high voltage utilities, and patch/seal of asphalt paving over the former building footprints.",198,2016-Q4,2018-Q2,Closeout,20220630 Rockdale Visual & Performing Arts Magnet ES,10370483,Rockdale Visual & Performing Arts Magnet ES - Secure Entry System,Security System,5,Jackie Goldberg,Central,1632901,13379,1303 Yosemite Dr.,Los Angeles,90041,Install new secure entry system,14,2019-Q3,2019-Q3,Closeout,20220630 Wilmington STEAM Magnet MS,10369532,Wilmington STEAM Magnet MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1849001,13538,1700 Gulf Ave.,Wilmington,90744,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",155,2025-Q1,2025-Q3,Planning,20220630 Columbus MS,10367403,Columbus MS - Roofing,Roofing,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,"This project is to upgrade 18,000 square feet of roofing at two buildings with a Polyvinyl Chloride (PVC) material. The roofs are over 25 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",280,2016-Q3,2016-Q4,Closeout,20220630 Edison MS,10105886,Edison MS - Compliance with State & Federal Access Requirements,Fire Alarm System,7,Tanya Ortiz Franklin,South,1811301,13555,6500 Hooper Ave.,Los Angeles,90001,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),577,2015-Q2,2016-Q2,Closeout,20220630 Walgrove ES,10369875,Walgrove ES - Secure Entry System,Security System,4,Nick Melvoin,West,1760301,13729,1630 Walgrove Ave.,Los Angeles,90066,Install new secure entry system,23,2018-Q3,2019-Q3,Closeout,20220630 Broadacres ES,10370362,Broadacres ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1253001,13837,19424 S. Broadacres Ave.,Carson,90746,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",59,2019-Q1,2019-Q2,Closeout,20220630 Hollenbeck MS,10108819,Hollenbeck MS - Retaining Wall Repairs,Excavation,2,Monica Garcia,East,1817901,13408,2510 E. 6th St.,Los Angeles,90023,"Instability of an on-site slope caused damage to a set of stairs, a concrete walkway and retaining wall. As a result, tripping hazards were created on the walkway and at building entrances. The project will stabilize the slope by removing and replacing a retaining wall, adding a drainage system for proper runoff discharge, and improving landscape and irrigation. The project will also remove and replace the damaged concrete walkway and staircase.",339,2022-Q3,2023-Q1,Design,20220630 Halldale ES,10368103,Halldale ES - Accessibility Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1434201,13601,21514 Halldale Ave.,Torrance,90501,"Convert AV room to changing area; provide and install lavatory, electrical outlet and exhaust fan.",45,2016-Q4,2017-Q2,Closeout,20220630 Belmont HS,10369952,Belmont HS - Two Electronic Marquees,Electrical/Lighting,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,Install two electronic marquees: one wall-mounted and one free-standing,96,2019-Q2,2019-Q4,Closeout,20220630 107th St. ES,10367480,107th St. ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1585701,13857,147 E. 107th St.,Los Angeles,90003,Install Aiphone secure entry system at Main Office entrance.,21,2017-Q1,2018-Q1,Closeout,20220630 Stoner ES,10368947,Stoner ES - Outdoor Learning Area & Reading Garden,Campus Improvement,4,Nick Melvoin,West,1695201,13772,11735 Braddock Dr.,Culver City,90230,"The project provides a new outdoor learning area and reading garden; installs a new irrigation system, new fencing, and provides seating.",89,2017-Q4,2018-Q4,Closeout,20220630 Bell HS,10370334,Bell HS - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1853601,13488,4328 Bell Ave.,Bell,90201,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and interior painting. Provide new chairs. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",35,2019-Q2,2019-Q4,Closeout,20220630 135th St. ES,10369499,135th St. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1587701,13607,801 W. 135th St.,Gardena,90247,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2023-Q2,2024-Q1,Planning,20220630 Irving STEAM Magnet MS,10370595,Irving STEAM Magnet MS - 2019-21 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for ISANA Octavia Academy. This project included 1 charter office, 1 special education room, and 13 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 13 instructional spaces for charter student seats in grades K-8 and an undefined scope of work.",66,2019-Q2,2019-Q3,Closeout,20220630 112th St. ES,10371108,112th St. ES - Campus Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,Install two bottle filling stations. Install motorized screen and projector in auditorium stage. Paint auditorium interior walls.,88,2020-Q1,2020-Q3,Closeout,20220630 Independence ES,10369555,Independence ES - Security Upgrades,Security System,5,Jackie Goldberg,East,1688001,13912,8435 Victoria Ave.,South Gate,90280,Install new secure entry system.,11,2018-Q1,2018-Q3,Closeout,20220630 Gledhill ES,10368965,Gledhill ES - Shade Shelter,Lunch/Shade Shelter,6,Kelly Gonez,Northwest,1413001,13746,16030 Gledhill St.,North Hills,91343,Install a 26' x 50' shade structure in the kindergarten yard and provide Americans with Disabilities Act (ADA) path of travel upgrades including paving and fencing repairs as well as the replacement and addition of 2 gates to improve accessibility.,177,2018-Q3,2019-Q1,Closeout,20220630 Garvanza Technology & Leadership Magnet ES,10367685,Garvanza ES - 2016-17 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1408201,15329,317 N. Ave. 62,Los Angeles,90042,"This project is a charter school renovation for Celerity Troika Charter School for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office and 6 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",104,2016-Q2,2016-Q3,Closeout,20220630 Toluca Lake EEC,10369861,Toluca Lake EEC - Nature Explore Classroom,Campus Improvement,6,Kelly Gonez,Northeast,1956801,16690,4915 Strohm Ave.,North Hollywood,91601,"This project will create field-tested, research-based outdoor learning spaces that provide learning opportunities and support children's interaction with the natural world.  The outdoor learning spaces are divided into distinct activity areas to provide a wide-ranging mix of educational activities that support children with a variety of needs and learning styles.  The activity areas include art, building, music, climbing/balancing, flexing, gathering, gardening, messy materials, wheel toys, etc.","1,406",2021-Q2,2022-Q4,Construction,20220630 Lake Balboa College Preparatory Magnet,10370704,Lake Balboa Magnet HS - Furniture and Technology Purchase,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1739001,15185,6701 Balboa Blvd.,Lake Balboa,91406,"Purchase (48) lab chairs (40) exterior benches, and (2) interactive displays",47,2019-Q3,2020-Q1,Closeout,20220630 White MS,10370883,White MS - Security Upgrades and Phone Line,Security System,7,Tanya Ortiz Franklin,South,1848701,13708,22102 S. Figueroa St.,Carson,90745,Install security upgrades for two rooms and phone line in dean's office,32,2019-Q4,2020-Q2,Closeout,20220630 Roosevelt HS,10369516,Roosevelt HS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1774901,13523,456 S. Mathews St.,Los Angeles,90033,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",391,2021-Q1,2021-Q3,Closeout,20220630 135th St. ES,10367526,135th St. ES - Paving,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1587701,13607,801 W. 135th St.,Gardena,90247,"The over 25-year-old asphalt concrete paving on the campus is severely deteriorated and in need of replacement. The scope of work includes replacing approximately 134,000 square feet of asphalt concrete pavement at the playground, in between buildings, and in parking lot areas. In addition, the project includes the construction of planters and green space, associated Americans with Disabilities Act (ADA) path of travel upgrades, and drainage systems required by DSA and the District's Storm Water Technical Manual.","6,884",2019-Q2,2020-Q2,Closeout,20220630 Jefferson HS,10369539,Jefferson HS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1871401,13447,1319 E. 41st St.,Los Angeles,90011,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",333,2021-Q4,2022-Q3,Construction,20220630 Aldama ES,10363873,Aldama ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1202701,13401,632 N. Ave. 50,Los Angeles,90042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",492,2015-Q2,2015-Q4,Closeout,20220630 Dodson MS,10367553,Dodson MS - New Pavers,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1811001,13846,28014 Montereina Dr.,Rancho Palos Verdes,90275,"This project is to replace approximately 9,500 square feet of deteriorated paver blocks at the school quad. Existing pavers pose a tripping hazard for students and staff. The scope of work also includes the replacement of approximately 230 linear feet of concrete curb.",393,2017-Q2,2017-Q4,Closeout,20220630 Dymally HS,10367677,Dymally HS - 2016-19 Prop 39 (Watts Learning Center Charter MS),Charter Prop 39,7,Tanya Ortiz Franklin,South,1766701,14581,8800 S. San Pedro St.,Los Angeles,90003,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-location as a charter school renovation for Watts Learning Center Charter MS. This project included 1 charter office, 1 special education room, and 17 instructional spaces for charter students in grades 6-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no change"" project with 1 charter office, 1 special education room, and 17 instructional spaces for charter students in grades 6-8. The project was again amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/19.",62,2016-Q2,2016-Q3,Closeout,20220630 109th St. ES,10368361,109th St. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1583601,13672,10915 McKinley Ave.,Los Angeles,90059,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",257,2021-Q3,2022-Q3,Construction,20220630 Harrison ES,10368033,Harrison ES - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1443801,13528,3529 City Terrace Dr.,Los Angeles,90063,Modify kindergarten restroom; provide and install folding changing table and privacy screen.,4,2016-Q4,2017-Q1,Closeout,20220630 Dodson MS,10369523,Dodson MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1811001,13846,28014 Montereina Dr.,Rancho Palos Verdes,90275,"Replace deteriorated interior walk-in cooler and interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, interior walk-in freezer/cooler combination unit, and refrigeration equipment.",182,2022-Q3,2023-Q2,Planning,20220630 Edison MS,10366476,Edison MS - HVAC in Changing Room,Access Compliance,7,Tanya Ortiz Franklin,South,1811301,13555,6500 Hooper Ave.,Los Angeles,90001,Provide & Install Split System Air Conditioning Unit for Changing Room,23,2014-Q4,2015-Q1,Closeout,20220630 66th St. ES,10371080,66th St. ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1682201,13339,6600 S. San Pedro St.,Los Angeles,90003,"Demolish and remove 4 portable buildings, remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",548,2020-Q1,2021-Q2,Closeout,20220630 Pearl Journalism/Communications Magnet HS,10371753,Pearl Journalism/Communications Magnet HS - Roofing,Roofing,3,Scott Schmerelson,Northwest,1855801,15701,6649 Balboa Blvd.,Lake Balboa,91406,"This project will provide approximately 55,708 square feet of new roofing sitewide.","1,077",2023-Q1,2023-Q3,Planning,20220630 Dolores ES,10368109,Dolores ES - Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1345201,13711,22526 Dolores St.,Carson,90745,Remove and replace toilet; remove partition doors; provide and install grab bars.,8,2016-Q4,2017-Q1,Closeout,20220630 Bethune MS,10367495,Bethune MS - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,"This project is to upgrade 55,300 square feet of roofing at four buildings and arcades with a Polyvinyl Chloride (PVC) material. The scope of work also includes the removal of 20,700 square feet of tile roofing on one building and replacing with new. The roofs are over 15 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.","1,045",2016-Q4,2017-Q3,Closeout,20220630 Nightingale MS,10004095,Nightingale MS - Facelift,Facelift,2,Monica Garcia,East,1826401,13584,3311 N. Figueroa St.,Los Angeles,90065,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",188,2012-Q1,2016-Q3,Closeout,20220630 Lanai ES,10370644,Lanai ES - Technology Upgrade,Communications/Technology Upgrade,4,Nick Melvoin,Northwest,1476401,13703,4241 Lanai Rd.,Encino,91436,Purchase (7) iMacs; security upgrades as needed,17,2019-Q3,2019-Q4,Closeout,20220630 Palms MS,10371019,Palms MS - Install Ramp,Access Compliance,1,"Dr. George J. McKenna, III",West,1834001,13668,10860 Woodbine St.,Los Angeles,90034,Install TMP ramp Home EC entrance to main building.,47,2019-Q4,2020-Q1,Closeout,20220630 Broadous EEC,10367300,Broadous EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1958701,15104,11736 Bromont Ave.,Pacoima,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",92,2016-Q2,2016-Q3,Closeout,20220630 Curtiss MS,10366315,Curtiss MS - Ceiling System Improvements,Seismic Modernization,7,Tanya Ortiz Franklin,South,1810301,13775,1254 E. Helmick St.,Carson,90746,"Repair 40,000 square feet of suspended ceiling systems in 002DCR classroom building for seismic corrections and to improve structural integrity. Scope of work includes installation of new seismic compression struts, and hanger wire upgrades per code requirements, as well as abatement of asbestos and removing impacted components beyond their remaining service life.","3,315",2022-Q4,2023-Q4,Design,20220630 Garza PC,10371689,Garza PC - Install Security Gate,Fencing,2,Monica Garcia,East,1342601,13928,2750 E. Hostetter St.,Los Angeles,90023,Install sliding wrought iron security gate at stairway to rooftop,6,2021-Q1,2021-Q2,Closeout,20220630 Lankershim ES,10372293,Lankershim ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1478101,13358,5250 Bakman Ave.,North Hollywood,91601,Install new secure entry system at the Main Office.,33,2022-Q3,2022-Q4,Planning,20220630 Lorne ES,10372294,Lorne ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1497301,13669,17440 Lorne St.,Northridge,91325,Install new secure entry system at the Main Office.,36,2022-Q2,2022-Q3,Construction,20220630 Middleton ES,10372295,Middleton PC - Secure Entry System,Security System,5,Jackie Goldberg,East,1530101,13649,6537 Malabar St.,Huntington Park,90255,Install new secure entry system at the Main Office.,29,2022-Q1,2022-Q3,Construction,20220630 Virgil MS,10372304,Virgil MS - HVAC,HVAC,2,Monica Garcia,Central,1846201,13382,152 N. Vermont Ave.,Los Angeles,90004,"This project is to provide new heating, ventilation, and air conditioning (HVAC) systems campus-wide.","31,117",2024-Q4,2027-Q4,Planning,20220630 Vaughn Next Century Learning Center,10370661,Vaughn Next Century Learning Center Augmentation Grant - New 2-Story Addition,Charter Augmentation Grant,6,Kelly Gonez,Northeast,1745201,13756,13330 Vaughn St.,San Fernando,91340,"An augmentation grant was awarded to construct on the existing District-owned Vaughn campus a permanent two-story structure to accommodate 259 students to support Vaughn's renewed charter petition for its 2nd through 12th grades. The proposed project is comprised of approximately 26,000 square feet to include six learning pods (equivalent to 12 classrooms), health and administrative offices, a media/literacy pod, a IT network room, a teacher work and professional development room , a food service area, and the removal of the current main office with surrounding student assembly area. The charter school anticipates funding the remainder of the project budget from its capital reserve.","9,749",2021-Q4,2023-Q3,Construction,20220630 Holmes ES,10370593,Holmes ES - 2019-20 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1456201,13315,5108 Holmes Ave.,Los Angeles,90058,"Clemente Charter School is vacating this site. This project was approved in Board of Education Report No. 343-18/19. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",23,2019-Q2,2019-Q3,Closeout,20220630 Coldwater Canyon ES,10363909,Coldwater Canyon ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1315101,13663,6850 Coldwater Canyon Ave.,North Hollywood,91605,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",391,2014-Q2,2014-Q3,Closeout,20220630 Rowan ES,10368050,Rowan ES - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1642501,13381,600 S. Rowan Ave.,Los Angeles,90023,Modify kindergarten restrooms for changing room including relocating electrical switches and enlarging doorways. Provide and install folding changing table.,4,2016-Q4,2017-Q2,Closeout,20220630 Cruz EEC,10005016,Cruz EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,Central,1949601,15501,1020 S. Valencia St.,Los Angeles,90015,Upgrade entry control system and playground equipment,47,2014-Q4,2015-Q1,Closeout,20220630 Garvanza Technology & Leadership Magnet ES,10368323,Garvanza Technology & Leadership Magnet ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1408201,15329,317 N. Ave. 62,Los Angeles,90042,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",180,2017-Q2,2018-Q1,Closeout,20220630 Peary MS,10370001,Peary MS - Lunch Tables,Furniture/Fixtures/Equipment,7,Tanya Ortiz Franklin,South,1835201,13625,1415 W. Gardena Blvd.,Gardena,90247,Provide 44 new lunch tables.,57,2018-Q4,2020-Q1,Closeout,20220630 Reseda ES,10367266,Reseda ES - ADA Improvements,Access Compliance,4,Nick Melvoin,Northwest,1623301,13398,7265 Amigo Ave.,Reseda,91335,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 51 doors/hardware, 16 accessible paths of travel, 33 signs, 8 restrooms, 18 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 3 concrete ramps, 2 pieces of accessible furniture, 7 railings, 1 parking area, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","3,023",2017-Q2,2021-Q2,Closeout,20220630 Lowman Special Education & Career Transition Center,10370085,Lowman Special Education & Career Transition Center - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1194801,13544,12827 Saticoy St.,North Hollywood,91605,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 70 doors/hardware, 13 accessible paths of travel, 68 signs, 3 drinking fountains, 17 sinks/sink cabinets, and 8 railings.","2,011",2023-Q3,2024-Q4,Design,20220630 O'Melveny ES,10368357,O'Melveny ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1572601,13396,728 Woodworth St.,San Fernando,91340,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",226,2019-Q1,2019-Q4,Closeout,20220630 Fulton College Preparatory School,10371319,Fulton College Preparatory School - 2020-21 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,"This project is a charter school renovation for Lashon Academy - Valley Campus for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 28 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",114,2020-Q2,2020-Q3,Closeout,20220630 Foshay Learning Center,10372443,Foshay Learning Center - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",Central,1813201,13474,3751 S. Harvard Blvd.,Los Angeles,90018,Install new secure entry system at the Main Office.,35,2022-Q3,2022-Q4,Planning,20220630 75th St. ES,10367750,75th St. ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1663001,13470,142 W. 75th St.,Los Angeles,90003,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 44 doors/hardware, 34 accessible paths of travel, 31 signs, 2 restrooms, 16 drinking fountains/sinks, 8 assistive listening devices/intercoms/phones, 6 concrete ramps, 3 pieces of accessible furniture, 4 railings, 2 playground components, and 1 parking area.","2,774",2017-Q2,2020-Q1,Closeout,20220630 Taft Charter HS,10364130,Taft Charter HS - HVAC,HVAC,4,Nick Melvoin,Northwest,1888001,13787,5461 Winnetka Ave.,Woodland Hills,91364,"The project will replace the deteriorated and aged steam boiler, air handlers, fan coils, chillers, and pumps with 8 packaged rooftop air conditioning units that serve the administration building consisting of classrooms as well as administrative and support areas. The equipment is more than 30 years old, highly inefficient and requires frequent service.","1,525",2016-Q3,2018-Q1,Closeout,20220630 Sunny Brae ES,10367639,Sunny Brae ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1698601,13737,20620 Arminta St.,Canoga Park,91306,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",41,2016-Q3,2017-Q2,Closeout,20220630 Belvedere MS,10366219,Belvedere MS - 2014-15 Prop 39,Charter Prop 39,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,"This project is a charter school renovation for KIPP Sol Academy for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 7 classrooms for 187.68 charter student seats in grades 5-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",137,2014-Q2,2014-Q3,Closeout,20220630 Taft Charter HS,10367715,Taft Charter HS - 2016-18 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1888001,13787,5461 Winnetka Ave.,Woodland Hills,91364,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-location for Ivy Academia. This growth project included 1 charter office, 1 special education room, and 31 instructional spaces for charter students in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with 2 charter offices and 20 instructional spaces for charter students in grades K-8 and with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",2,2016-Q3,2016-Q4,Closeout,20220630 Crescent Heights EEC,10005023,Crescent Heights EEC - Safety Upgrades and Improvements,Campus Improvement,1,"Dr. George J. McKenna, III",West,1959701,16285,1700 S. Alvira St.,Los Angeles,90035,"Upgrade entry control system, exterior gates, and playground equipment",105,2014-Q2,2015-Q3,Closeout,20220630 Belvedere MS,10365214,Belvedere MS - Portable Removal,Portable Removal,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,Demolish/Remove 2 Portable Buildings,201,2014-Q4,2015-Q1,Closeout,20220630 Sutter MS,10366781,Sutter MS- Change Restroom Door Hardware,Access Compliance,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,Remove and replace existing restroom door lock with indicator deadbolt,1,2015-Q1,2015-Q2,Closeout,20220630 Wilton EEC,10005078,Wilton EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,West,1957701,13433,4030 W. Leeward Ave.,Los Angeles,90005,"Upgrade entry control system, exterior gates, and playground equipment",13,2014-Q2,2015-Q4,Closeout,20220630 Laurel EEC,10005044,Laurel EEC - Safety Upgrades and Improvements,Campus Improvement,4,Nick Melvoin,West,1952901,16286,8023 Willoughby Ave.,Los Angeles,90046,"Upgrade entry control system, exterior gates, and playground equipment",9,2014-Q3,2015-Q1,Closeout,20220630 Collins EEC,10005009,52nd St. EEC - Safety Upgrades and Improvements,Campus Improvement,1,"Dr. George J. McKenna, III",West,1951601,16625,901 W. 52nd St.,Los Angeles,90037,"Upgrade entry control system, exterior gates, and playground equipment",44,2014-Q3,2015-Q1,Closeout,20220630 112th St. ES,10108027,112th St. ES - Upgrade Fire Alarm System,Fire Alarm System,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,Upgrade Fire Alarm System,611,2013-Q3,2014-Q1,Closeout,20220630 Los Angeles HS,10367698,Los Angeles HS - 2016-17 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,"City Charter HS is vacating this site. This project was approved in Board of Education Report No. 373-15/16. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",13,2016-Q3,2016-Q3,Closeout,20220630 Chandler ES,10366859,Chandler LC-GFCI Outlet for Changing Table,Access Compliance,3,Scott Schmerelson,Northeast,1295901,13619,14030 Weddington St.,Van Nuys,91401,GFCI Outlet for Changing Table,2,2015-Q2,2015-Q3,Closeout,20220630 Delevan ES,10366466,Delevan ES-Restroom Upgrade,Access Compliance,5,Jackie Goldberg,Central,1339701,13455,4168 W. Ave. 42,Los Angeles,90065,Restroom Upgrade,6,2014-Q3,2014-Q4,Closeout,20220630 Orthopaedic Hospital Medical Magnet HS,10367140,Orthopaedic Hospital Medical Magnet HS - Security Upgrades,Security System,5,Jackie Goldberg,Central,1885301,13908,300 W. 23rd St.,Los Angeles,90007,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,15,2016-Q1,2016-Q3,Closeout,20220630 Gault ES,10003975,Gault ES - Auditorium Renovation,Auditorium Renovation,3,Scott Schmerelson,Northwest,1411001,13682,17000 Gault St.,Lake Balboa,91406,"Renovate auditorium: replace acoustic ceiling tiles, remove and replace existing flooring, replace existing stage curtain, add new stage lift to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA), provide and install stage lighting and sound system, repair electrical outlets, and upgrade existing restrooms.",408,2013-Q2,2014-Q1,Closeout,20220630 Commonwealth ES,10367461,Commonwealth ES - Camera Door Entry System,Security System,2,Monica Garcia,Central,1319201,13392,215 S. Commonwealth Ave.,Los Angeles,90004,Upgrade physical security of school by purchasing and installing an electronic camera door entry system.,47,2016-Q4,2017-Q2,Closeout,20220630 Arlington Heights ES,10004598,Arlington Heights ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1219201,15202,1717 Seventh Ave.,Los Angeles,90019,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",49,2015-Q3,2016-Q3,Closeout,20220630 Point Fermin Marine Science Magnet ES,10004653,Point Fermin Marine Science Magnet - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1613701,13376,3333 Kerckhoff Ave.,San Pedro,90731,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",143,2013-Q3,2015-Q3,Closeout,20220630 White MS,10364342,White MS - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1848701,13708,22102 S. Figueroa St.,Carson,90745,Demolish/Remove Portable Building(s),110,2013-Q2,2014-Q1,Closeout,20220630 Vermont ES,10364005,Vermont ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1747901,13273,1435 W. 27th St.,Los Angeles,90007,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",359,2014-Q3,2014-Q4,Closeout,20220630 Chase ES,10107686,Chase ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,6,Kelly Gonez,Northwest,1301401,13620,14041 Chase St.,Panorama City,91402,Mitigate Lead in Water,138,2014-Q1,2014-Q2,Closeout,20220630 Emelita ES,10371758,Emelita ES - Install Secure Entry System,Security System,4,Nick Melvoin,Northwest,1358901,13713,17931 Hatteras St.,Encino,91316,Install new secure entry system at door to main office with two video receivers in main office and one in principal's office.,32,2021-Q4,2022-Q1,Closeout,20220630 Los Angeles HS,10369544,Los Angeles HS - Roofing & HVAC,Roofing,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,"The project replaces more than 220,000 square feet of deteriorated roofing campus-wide with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes replacing damaged wood, installing new gutters and downspouts, and painting to match existing areas affected in the roof demolition. As part of this roofing project, selected heating, ventilation, and air conditioning (HVAC) units and equipment will be replaced while the remaining roof-mounted HVAC units and ductwork will be protected in place.","3,692",2019-Q1,2020-Q2,Closeout,20220630 Valley View ES,10372190,Valley View ES - HVAC,HVAC,3,Scott Schmerelson,West,1739701,13428,6921 Woodrow Wilson Dr.,Los Angeles,90068,"This project is to provide new heating, ventilation and air conditioning (HVAC) systems at two buildings and three relocatable classroom bungalows. The scope of work includes installing new gas lines, controls, thermostats, piping, diffusers, registers, grilles, and painting of affected areas.","5,476",2024-Q1,2025-Q1,Design,20220630 Melvin ES,10372449,Melvin ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1523301,13719,7700 Melvin Ave.,Reseda,91335,Install new secure entry system at the Main Office.,37,2022-Q3,2022-Q4,Planning,20220630 Verdugo Hills HS,10367094,Verdugo Hills HS - Plumbing Utilities Upgrades,Plumbing/Irrigation/Drainage,6,Kelly Gonez,Northeast,1891401,13642,10625 Plainview Ave.,Tujunga,91042,"This project is to upgrade the deteriorated domestic water, sewer and building drainage systems. The existing plumbing utilities are over 70 years old and are in poor condition resulting in unreliable service. The scope also includes the associated Americans with Disabilities Act (ADA) path of travel upgrades and drainage systems required by the DSA and the District's Storm Water Technical Manual, as well as the rest of the deteriorated asphalt concrete walkways and service roads.","13,821",2019-Q2,2021-Q4,Closeout,20220630 Evergreen Continuation HS,10370049,Evergreen Continuation HS - Public Address System,Electrical/Lighting,6,Kelly Gonez,Northeast,1887601,16584,13101 Dronfield Ave.,Sylmar,91342,Install public address (PA) system,11,2018-Q4,2018-Q4,Closeout,20220630 Florence ES,10370152,Florence ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,East,1389001,13397,7211 Bell Ave.,Los Angeles,90001,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2025-Q4,2026-Q1,Planning,20220630 Cabrillo EEC,10372149,Cabrillo EEC - Install Privacy Fence,Fencing,7,Tanya Ortiz Franklin,South,1950801,16299,741 W. 8th St.,San Pedro,90731,"Replace bottom 4 feet ONLY of existing 8 feet tall chain link fence, with privacy fencing. Replace approx. 250 feet. (2) pedestrian swing gates along path.",33,2022-Q3,2022-Q4,Planning,20220630 De La Torre ES,10371395,De La Torre ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1230101,14104,500 N. Island Ave.,Wilmington,90744,Install new secure entry system at door to main office,22,2020-Q3,2021-Q1,Closeout,20220630 Wilshire Park ES,10364011,Wilshire Park ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1261901,13956,4063 Ingraham St.,Los Angeles,90005,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",703,2015-Q2,2016-Q2,Closeout,20220630 Rise Kohyang MS,10371483,Rise Kohyang MS Augmentation Grant,Charter Augmentation Grant,2,Monica Garcia,Central,1517701,13899,3020 Wilshire Blvd. 2nd Floor,Los Angeles,90010,"This augmentation grant was awarded for the acquisition and construction of a permanent middle school facility to be built on approximately one-acre of land and will provide permanent educational facilities for approximately 450 students in 6th through 8th grades. The proposed 46,000 square foot project will consist of a two-story classroom building with 20 classrooms, a library/media room, administrative offices, storage, lunch area, food service area, a multi-purpose room, an outdoor area for recess, and an underground parking garage. The charter school anticipates funding the remainder of the project budget from State Charter School Facilities Program (CSFP) funding.","32,794",2024-Q1,2025-Q3,Design,20220630 Kentwood ES,10372465,Kentwood ES - Install Pedestrian Gate,Fencing,4,Nick Melvoin,West,1471201,13589,8401 Emerson Ave.,Los Angeles,90045,Install pedestrian gate near the middle of the chain link fence along Dunbarton. Install concrete steps and landings to access gate from sidewalk (fence line sits at a higher elevation than the sidewalk).,44,2022-Q3,2022-Q4,Planning,20220630 Kim Academy,10366051,Kim Academy - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1806401,13934,615 S. Shatto Pl.,Los Angeles,90005,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",278,2015-Q1,2015-Q2,Closeout,20220630 North Hollywood HS Zoo Magnet,10366075,North Hollywood HS Zoo Magnet - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1878603,14241,5336 Crystal Springs Dr.,Los Angeles,90027,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",267,2015-Q1,2015-Q2,Closeout,20220630 Maclay MS,10367699,Maclay MS - 2016-17 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"This project is a charter school renovation for Citizens of the YPI Valley Public Charter HS for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades 9-11. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",80,2016-Q2,2016-Q3,Closeout,20220630 Ascot ES,10370326,Ascot ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1221901,13276,1447 E. 45th St.,Los Angeles,90011,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",51,2019-Q1,2019-Q3,Closeout,20220630 Panorama HS,10371117,Panorama HS - Water Bottle Filling Stations,Plumbing/Irrigation/Drainage,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,Provide and install four bottle filling stations,79,2020-Q1,2020-Q3,Closeout,20220630 Irving STEAM Magnet MS,10372499,Irving STEAM Magnet MS - 2022-23 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"This project is a charter school renovation for ISANA Octavia Academy for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 2 charter offices, 1 special education room, and 12 instructional spaces for charter student seats in grades TK-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",361,2022-Q3,2022-Q3,Planning,20220630 Barrett ES,10004645,Barrett ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",South,1556201,13449,419 W. 98th St.,Los Angeles,90003,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",96,2012-Q4,2017-Q1,Closeout,20220630 President ES,10004654,President ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1614801,13765,1465 W. 243rd St.,Harbor City,90710,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",129,2013-Q1,2016-Q3,Closeout,20220630 95th St. EEC,10005012,95th St. EEC - Safety Upgrades and Improvements,Campus Improvement,1,"Dr. George J. McKenna, III",West,1953801,16684,1027 W. 96th St.,Los Angeles,90044,"Upgrade entry control system, exterior gates, playground equipment, and flooring",35,2014-Q2,2015-Q3,Closeout,20220630 37th St. EEC,10005007,37th St. EEC - Safety Upgrades and Improvements,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1959301,16741,1204 W. 36th Pl.,Los Angeles,90007,"Upgrade entry control system, exterior gates, and playground equipment",83,2014-Q3,2015-Q1,Closeout,20220630 Marvin EEC,10005049,Marvin EEC - Safety Upgrades and Improvements,Campus Improvement,1,"Dr. George J. McKenna, III",West,1958401,16293,2341 S. Curson Ave.,Los Angeles,90016,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, playground equipment, and air conditioning",170,2014-Q1,2015-Q1,Closeout,20220630 South Shores Visual & Performing Arts Magnet ES,10367192,South Shores Visual & Performing Arts Magnet ES - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1687001,13808,2060 W. 35th St.,San Pedro,90732,"This project is to upgrade 18,900 square feet of roofing on five buildings and arcades with a Polyvinyl Chloride (PVC) material. The roofs are over 35 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",358,2016-Q1,2016-Q2,Closeout,20220630 Virgil MS,10368849,Virgil MS - 2017-19 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1846201,13382,152 N. Vermont Ave.,Los Angeles,90004,"This project was initially approved in BOE Report No. 530-16/17 for the 2017-18 Prop 39 co-locations as a charter school renovation for Citizens of the World - Silver Lake. This project included 1 charter office and 12 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/19.",140,2017-Q2,2017-Q3,Closeout,20220630 Manchester ES,10370373,Manchester ES - Broadcast Studio Technology and Security,Communications/Technology Upgrade,1,"Dr. George J. McKenna, III",South,1509601,13305,661 W. 87th St.,Los Angeles,90044,Purchase 7 iMacs and 2 iPad Pros for broadcast studio and secure room for storage.,21,2018-Q4,2019-Q2,Closeout,20220630 Bonita ES,10370880,Bonita ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1247301,13796,21929 Bonita St.,Carson,90745,Install new electronic free-standing marquee,64,2019-Q4,2020-Q3,Closeout,20220630 6th Ave. ES,10371857,6th Ave. ES - 2021-22 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1678101,13425,3109 Sixth Ave.,Los Angeles,90018,"This project is a charter school renovation for Lashon Academy City for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 1 special education room, and 4 instructional spaces for charter student seats in grades TK-4. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",72,2021-Q2,2021-Q3,Closeout,20220630 Maclay MS,10368335,Maclay MS - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"Replace deteriorated interior walk-in cooler and side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",221,2017-Q4,2018-Q4,Closeout,20220630 Dorsey HS,10004086,Dorsey HS - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1860001,13643,3537 Farmdale Ave.,Los Angeles,90016,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",189,2011-Q4,2016-Q3,Closeout,20220630 Valley View ES,10366531,Valley View ES - Address Old Storm Drain System & Erosion,Plumbing/Irrigation/Drainage,3,Scott Schmerelson,West,1739701,13428,6921 Woodrow Wilson Dr.,Los Angeles,90068,This project will replace the deteriorated storm drain system that has caused erosion to the northeast hillside and address the damage to the slope due to the deterioration of the storm drain system.,692,2015-Q3,2016-Q1,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10366647,Sun Valley MS - New Classroom Security Doors,Security System,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,Upgrade physical security of the school by installing new security doors for classrooms and the existing computer lab,36,2015-Q1,2015-Q2,Closeout,20220630 Hobart ES,10371100,Hobart ES - Auditorium Upgrade and Water Bottle Filling Station,Campus Improvement,5,Jackie Goldberg,Central,1454801,13331,980 S. Hobart Blvd.,Los Angeles,90006,"Install new projector, screen, and audio/visual equipment in the auditorium and install a new water bottle filling station.",67,2020-Q2,2020-Q4,Closeout,20220630 2nd St. ES,10371301,2nd St. ES - 2020-22 Prop 39,Charter Prop 39,2,Monica Garcia,East,1657501,13326,1942 E. 2nd St.,Los Angeles,90033,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for Extera Public School. This project included 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades K-8 and an undefined scope of work. However, the co-located charter requested the pick-up of Prop 39-owned furniture. This Prop 39 furniture is to be returned to inventory for future use within the Prop 39 Program. As a result, this project is amended to include the scope of work required to retrieve the furniture.",39,2021-Q3,2021-Q3,Closeout,20220630 Webster MS,10371890,Webster MS - 2021-22 Prop 39 (Magnolia Science Academy #4),Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project is a charter school renovation for Magnolia Science Academy #4 for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 2 special education rooms, and 3 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The scope of work for this project included the reconfiguration of rooms back to District systems, this scope of work was not performed.",1,2021-Q3,2021-Q3,Closeout,20220630 King ES,10372497,King ES - 2022-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1653401,13423,3989 S. Hobart Blvd.,Los Angeles,90062,"This project is a charter school renovation for New Heights Charter School for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 2 charter offices, 2 special education rooms, and 14 instructional spaces for charter student seats in grades 3-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",204,2022-Q3,2022-Q3,Planning,20220630 Carson HS,10366314,Carson HS - Ceiling System Improvements,Seismic Modernization,7,Tanya Ortiz Franklin,South,1857501,13869,22328 S. Main St.,Carson,90745,"Repair 12,000 square feet of suspended ceiling systems in 027DCR classroom building for seismic corrections and to improve structural integrity. Scope of work includes installation of new seismic compression struts, and hanger wire upgrades per code requirements, as well as abatement of asbestos and removing impacted components beyond their remaining service life.",823,2020-Q2,2021-Q3,Closeout,20220630 Magnolia ES,10369770,Magnolia ES - 2018-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1505501,13302,1626 S. Orchard Ave.,Los Angeles,90006,"Equitas Academy Charter School #3 is vacating this site.  This project was approved in Board of Education Report No. 429-17/18.  The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",38,2018-Q3,2018-Q3,Closeout,20220630 Locke EEC,10100410,Locke EEC - Repair & Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1953101,16288,320 E. 111th St.,Los Angeles,90061,Repair & Replace Playground Matting,600,2013-Q3,2014-Q2,Closeout,20220630 Ramona ES,10004605,Ramona ES - Facelift,Facelift,5,Jackie Goldberg,West,1617801,13353,1133 N. Mariposa Ave.,Los Angeles,90029,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",125,2012-Q2,2016-Q3,Closeout,20220630 San Fernando ES,10108400,San Fernando ES - Compliance with State & Federal Access Requirements,Fire Alarm System,6,Kelly Gonez,Northeast,1645201,13419,1130 Mott St.,San Fernando,91340,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),371,2015-Q1,2016-Q1,Closeout,20220630 95th St. ES,10372609,95th St. ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1552101,13349,1109 W. 96th St.,Los Angeles,90044,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Wright STEAM Magnet MS,10368353,Wright STEAM Magnet MS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",134,2017-Q4,2018-Q2,Closeout,20220630 95th St. ES,10369413,95th St. ES - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1552101,13349,1109 W. 96th St.,Los Angeles,90044,Install closed-circuit television (CCTV) cameras in building corridor for video surveillance and connect to the existing security system.,9,2017-Q4,2018-Q2,Closeout,20220630 Calabash Charter Academy,10368191,Calabash Charter Academy - Classroom Replacement,Addition,3,Scott Schmerelson,Northwest,1270401,13743,23055 Eugene St.,Woodland Hills,91364,"The school has 8 classrooms located in 4 portable buildings of which 2 classrooms are located in a Department of Housing (DOH) portable building and 6 classrooms are located in 3 uncertified relocatable buildings. The project includes the removal of 1 DOH portable building, 3 uncertified portable buildings, 1 uncertified portable restroom building, and a book storage building. Also included is the construction of 8 new classrooms including kindergarten classrooms, the construction of a book storage room and support spaces including restrooms, and infrastructure upgrades including utilities that could be required to support the new facilities. The scope also includes the restoration of landscape, hardscape, and playground where portables have been removed and the replacement of approximately 162,000 square feet of deteriorated asphalt concrete paving at the playground and kindergarten yard areas which presents a safety/tripping hazard. Interim facilities such as temporary restrooms will be provided to accommodate the school during construction. Additional site improvements to ensure compliance with the Americans with Disabilities Act (ADA), Division of the State Architect (DSA), environmental mitigations, or any other facilities requirements may be performed.","19,894",2019-Q2,2021-Q2,Closeout,20220630 Napa ES,10370536,Napa ES - Install Ramps,Access Compliance,3,Scott Schmerelson,Northwest,1544601,13701,19010 Napa St.,Northridge,91324,Construct concrete ramp to main office from the playground.,212,2019-Q4,2020-Q2,Closeout,20220630 Nestle Charter ES,10371068,Nestle Charter ES - Secure Entry System,Security System,4,Nick Melvoin,Northwest,1545201,13614,5060 Nestle Ave.,Tarzana,91356,Install new secure entry system.,19,2020-Q4,2020-Q4,Closeout,20220630 El Sereno MS,10370240,El Sereno MS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1811801,13412,2839 N. Eastern Ave.,Los Angeles,90032,"Replace deteriorated interior walk-in cooler, interior walk-in freezer, and interior side-by-side walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, interior walk-in freezer, interior side-by-side walk-in cooler, and refrigeration equipment.",289,2020-Q3,2021-Q1,Closeout,20220630 Rio Vista ES,10004576,Rio Vista ES - Facelift,Facelift,6,Kelly Gonez,Northeast,1628801,13441,4243 Satsuma Ave.,North Hollywood,91602,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",133,2012-Q3,2016-Q3,Closeout,20220630 Saticoy ES,10004581,Saticoy ES - Facelift,Facelift,6,Kelly Gonez,Northeast,1656501,13363,7850 Ethel Ave.,North Hollywood,91605,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",138,2013-Q1,2016-Q3,Closeout,20220630 South Shores Visual & Performing Arts Magnet ES,10004655,South Shores Magnet School for the Visual/Performing Arts - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1687001,13808,2060 W. 35th St.,San Pedro,90732,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",141,2013-Q1,2016-Q3,Closeout,20220630 Bakewell PC,10366000,Bakewell PC - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",South,1402001,13850,8261 S. Baring Cross St.,Los Angeles,90044,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",299,2015-Q1,2015-Q2,Closeout,20220630 Santana Arts Academy,10365127,Santana Arts Academy - Purchase Devices,Communications/Technology Upgrade,6,Kelly Gonez,Northwest,1740401,15165,9301 N. Columbus Ave.,North Hills,91343,Purchase devices and a cart to provide internet and intranet access for students and teachers,57,2014-Q1,2014-Q1,Closeout,20220630 Glen Alta Span School,10370468,Glen Alta Span School - ADA Improvements,Access Compliance,2,Monica Garcia,East,1413701,13292,3410 Sierra St.,Los Angeles,90031,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 70 doors/hardware, 22 accessible paths of travel, 59 signs, 12 restrooms, 1 drinking fountain, 22 sinks/sink cabinets, 3 assistive listening devices/intercoms/phones, 5 concrete ramps, 5 pieces of accessible furniture, 8 railings, 2 locker upgrades, 1 playground component, 1 parking area, 1 stage lift, and 1 passenger/bus loading zone.","5,644",2023-Q2,2024-Q2,Design,20220630 Andasol ES,10370866,Andasol ES - Purchase Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1211701,13839,10126 Encino Ave.,Northridge,91325,Purchase classroom furniture (tables and chairs),57,2019-Q4,2020-Q2,Closeout,20220630 Carver MS,10369814,Carver MS - Marquee,Electrical/Lighting,5,Jackie Goldberg,Central,1809401,13409,4410 McKinley Ave.,Los Angeles,90011,Install new electronic marquee.,30,2018-Q3,2018-Q4,Closeout,20220630 Western TECH Magnet School,10370229,Western TECH Magnet School - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1767101,13338,1724 W. 53rd St.,Los Angeles,90062,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q2,2026-Q3,Planning,20220630 Dorsey HS,10003513,Dorsey HS Redevelopment,Comprehensive Modernization,1,"Dr. George J. McKenna, III",West,1860001,13643,3537 Farmdale Ave.,Los Angeles,90016,"This project redeveloped the Dorsey HS campus by building a new classroom building, comprised of 17 classrooms and administration space for a small learning community, and a new competitive gymnasium with locker rooms. In addition, the project renovated an historic gymnasium to provide modernized areas for practice and athletic training. Portable buildings with 14 classrooms, restrooms and storage were also removed from the campus once the new facilities were completed.","33,325",2011-Q1,2014-Q2,Closeout,20220630 Bradley EEC,10367990,Bradley EEC - Campus Upgrades,Campus Improvement,7,Tanya Ortiz Franklin,South,1988101,13938,10925 S. Central Ave.,Los Angeles,90059,"Provide stainless steel countertops, 3-compartment food preparation sink, and metal shelving to comply with health code and OEHS standards, and remove outdated rubber matting and replace with new rubber matting system on the existing playground.",91,2016-Q4,2017-Q1,Closeout,20220630 Holmes MS,10370882,Holmes MS - SEEDS,SEEDS,3,Scott Schmerelson,Northwest,1818201,13835,9351 Paso Robles Ave.,Northridge,91325,"Construct an outdoor learning space of approximately 3,300 square feet. Includes the installation of decomposed granite, headers to create in-ground planting areas, a new automated irrigation system, trees, raised beds, log benches and stools and an outdoor chalkboard. The project will be outfitted by the school site with native and edible plants..",100,2021-Q2,2022-Q2,Closeout,20220630 66th St. ES,10369505,66th St. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1682201,13339,6600 S. San Pedro St.,Los Angeles,90003,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2024-Q2,2024-Q3,Planning,20220630 Northridge MS,10369525,Northridge MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1828301,13740,17960 Chase St.,Northridge,91325,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2023-Q2,2024-Q1,Planning,20220630 Mount Washington ES,10368315,Mount Washington ES - Garden Benches,Furniture/Fixtures/Equipment,5,Jackie Goldberg,Central,1541101,13324,3981 San Rafael Ave.,Los Angeles,90065,Provide and install new concrete benches in the garden area.,25,2017-Q2,2017-Q2,Closeout,20220630 Gardner ES,10368131,Gardner ES - Portable Removal,Portable Removal,4,Nick Melvoin,West,1406801,13354,7450 Hawthorn Ave.,Los Angeles,90046,"Remove 1 portable building including abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprints.",103,2017-Q2,2017-Q3,Closeout,20220630 Balboa Mental Health Center,10368759,Balboa Mental Health Center - Clinic Expansion,Campus Improvement,3,Scott Schmerelson,Northwest,1165801,15185,6701 Balboa Blvd.,Lake Balboa,91406,"The project provides a new mental health clinic adjacent to the existing LAUSD Mental Health Center, located in 5 bungalows and 1 portable building, on the site of the Birmingham HS/Local District Northwest administrative complex. The scope of work consists of approximately 4,800 square feet of new construction, new furniture and equipment including additional casework and shelving for the mental health clinic, related site improvements including security upgrades, and new temporary and permanent parking lots to provide adequate parking for the mental health clinic as well as a student drop-off area with an accessible path of travel to the adjacent Lake Balboa College Preparatory Magnet. The project also includes the removal of existing bungalows/portable buildings, the relocation of the Board District 3 Field Office next to the Local District Northwest offices, and the relocation of an obstacle course with new equipment for the Police Academy Magnet on the neighboring Mulholland MS campus.","11,308",2019-Q2,2021-Q4,Closeout,20220630 Telfair ES,10368186,Telfair ES - Clinic Renovation,Campus Improvement,6,Kelly Gonez,Northeast,1706801,13616,10975 Telfair Ave.,Pacoima,91331,"The project consists of interior alterations of the existing school-based clinic operated by LAUSD's Student Health and Human Services. The alterations provide the clinic with a more efficient space in order to provide medical, mental health and vision services to students. The scope of work includes structural, electrical, and plumbing upgrades to reconfigure the space for the clinic's services; replacement of heating, ventilation, and air conditioning (HVAC) including 4 condensing units, exhaust fans, and ductwork; installation of a new fire alarm system including modifications to the sprinklers; improvements to the phone, data, and public address systems; asbestos and lead abatement; new flooring and casework/furnishings throughout the clinic as well as repairs and painting to walls, ceilings, and roofing impacted by improvements; landscape and hardscape improvements; and Americans with Disabilities Act (ADA) upgrades to restrooms and new signage.","2,594",2018-Q3,2020-Q1,Closeout,20220630 Catskill ES,10370363,Catskill ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1289001,13662,23536 Catskill Ave.,Carson,90745,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",55,2019-Q1,2019-Q3,Closeout,20220630 Anton EEC,10367989,Anton EEC - Playground Upgrades,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1952101,14382,831 N. Bonnie Beach Pl.,Los Angeles,90063,Replace the outdated rubber matting with a new rubber matting system on the existing playground and provide new age-appropriate playground equipment adjacent to the existing playground structure.,135,2017-Q2,2018-Q2,Closeout,20220630 Monte Vista ES,10365776,Monte Vista ES - Underground Piping Replacement Project,Plumbing/Irrigation/Drainage,2,Monica Garcia,Central,1538401,13270,5423 Monte Vista St.,Los Angeles,90042,"The project will replace the deteriorated and failing underground piping that provides water, gas and sewer services to the school.",284,2014-Q2,2014-Q3,Closeout,20220630 Hooper ES,10369131,Hooper ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1457501,13316,1225 E. 52nd St.,Los Angeles,90011,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",58,2017-Q3,2018-Q2,Closeout,20220630 Independence ES,10369136,Independence ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1688001,13912,8435 Victoria Ave.,South Gate,90280,Provide security upgrades (install metal skins and new locking mechanisms on doors) and a door sign for the Parent & Family Center. Provide 20 new Chromebooks with charging cart as well as 1 laptop and 1 desk for Parent Coordinator.,27,2018-Q1,2018-Q4,Closeout,20220630 Nightingale MS,10369139,Nightingale MS - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1826401,13584,3311 N. Figueroa St.,Los Angeles,90065,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",53,2018-Q2,2018-Q4,Closeout,20220630 Norwood ES,10368835,Norwood ES - 2017-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1569901,13271,2020 Oak St.,Los Angeles,90007,"Global Education Academy is vacating this site. This project was approved in Board of Education Report No. 530-16/17. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",39,2017-Q2,2017-Q3,Closeout,20220630 Chatsworth Park ES,10367912,Chatsworth Park ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1302701,13389,22005 Devonshire St.,Chatsworth,91311,Provide and install electronic marquee.,46,2017-Q3,2017-Q3,Closeout,20220630 Vaughn Next Century Learning Center,10367568,Vaughn Next Century Learning Center Augmentation Grant - New Modular Classroom Buildings,Charter Augmentation Grant,6,Kelly Gonez,Northeast,1745201,13756,13330 Vaughn St.,San Fernando,91340,"An augmentation grant was awarded for new modular classrooms buildings of approximately 20,000 square feet on a portion of the former District elementary campus that is now part of the Vaughn Next Century Learning Center. The project constructs 16 classrooms with approximately 400 permanent seats and includes the demolition of 15 classrooms in portable buildings. The charter school anticipates funding the remainder of the project budget from its capital reserve.","6,182",2016-Q4,2017-Q4,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10370089,Sun Valley Magnet - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 68 doors/hardware, 39 accessible paths of travel, 125 signs, 19 restrooms, 10 drinking fountains, 18 sinks/sink cabinets, 2 assistive listening devices/intercoms/phones, 2 concrete ramps, 8 metal ramps, 1 assembly seat, 9 railings, 1 existing elevator modification, 3 locker room modifications, 1 parking area, 4 casework/counters, 28 door modifications/auto openers, and 1 stage lift.","5,626",2022-Q1,2023-Q4,Construction,20220630 Sharp ES,10371255,Sharp ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1666501,13809,13800 Pierce St.,Arleta,91331,"Demolish and remove 2 portable buildings, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",195,2020-Q2,2020-Q3,Closeout,20220630 Manual Arts HS,10371505,Manual Arts HS - Install Athletics Field Lighting,Electrical/Lighting,1,"Dr. George J. McKenna, III",Central,1874301,13345,4131 S. Vermont Ave.,Los Angeles,90037,This project will install four lighting poles at the track/football field. Poles will be 90 feet and 100 feet tall with a total of 54 LED fixtures. The electrical room will also receive upgrades.,"2,302",2023-Q1,2023-Q3,Design,20220630 Noble ES,10365728,Noble ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1560301,13632,8329 Noble Ave.,North Hills,91343,Replace deteriorated playground matting systems to ensure the health and safety of students.,55,2014-Q2,2014-Q3,Closeout,20220630 Vaughn Next Century Learning Center,10365097,Vaughn Next Century Learning Center Augmentation Grant,Charter Augmentation Grant,6,Kelly Gonez,Northeast,1745201,13756,13330 Vaughn St.,San Fernando,91340,Augmentation grant to construct 3 permanent classrooms including the demolition of 3 unused and undersized Department of Housing portable buildings.,700,2014-Q1,2014-Q4,Closeout,20220630 Cleveland Infant Center,10004277,Cleveland Infant Center - Shade Shelter,Lunch/Shade Shelter,3,Scott Schmerelson,Northwest,1949101,13753,19031 W. Strathern St.,Reseda,91335,Three shade structures were added to the site with one over the larger apparatus as this is a very large site located in a part of town with warmer temperatures. Includes path of travel improvements to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA).,206,2012-Q2,2014-Q3,Closeout,20220630 Sotomayor Arts and Sciences Magnet,10366824,Sotomayor Learning Academy - Replace Synthetic Turf Field,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1857701,193556,2050 N. San Fernando Rd.,Los Angeles,90065,"This project addresses the defective synthetic turf field of approximately 81,900 square feet by removing and replacing the field with one that will perform better for instructional and extracurricular activities.",990,2015-Q3,2015-Q4,Closeout,20220630 Holmes MS,10371998,Holmes MS - Provide Verizon Lab Infrastructure,Reconfiguration,3,Scott Schmerelson,Northwest,1818201,13835,9351 Paso Robles Ave.,Northridge,91325,"Infrastructure upgrades in support of Verizon Innovative Learning Lab installation. Demo existing cabinets, white boards, and tack boards; remove flooring and wall base; remove sink and cap lines. Provide water and drain for new sink; provide data and power; secure doors; paint doors, trim and window frames. Heart of America/Verizon will donate roughly $500K of upgrades. New flooring, paint, lighting, ceiling work, iMacs, iPads, 3D printers, A/V equipment, robots, and furniture. ASU will provide instructional and professional development support.",78,2021-Q3,2022-Q3,Construction,20220630 Garvanza Technology & Leadership Magnet ES,10368810,Garvanza Technology & Leadership Magnet ES - 2017-18 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1408201,15329,317 N. Ave. 62,Los Angeles,90042,"Celerity Troika Charter School is vacating this site. This project was approved in Board of Education Report No. 530-16/17. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",12,2017-Q3,2017-Q3,Closeout,20220630 Marina Del Rey MS,10368151,Marina Del Rey MS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"Replace deteriorated walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new walk-in cooler and refrigeration equipment.",123,2017-Q1,2017-Q2,Closeout,20220630 Parthenia Academy of Arts & Technology,10368737,Parthenia Academy of Arts & Technology - SEEDS,SEEDS,3,Scott Schmerelson,Northwest,1602701,13702,16825 Napa St.,North Hills,91343,"Construct an outdoor learning space of approximately 2,000 square feet consisting of the removal of asphalt, the installation of decomposed granite with a concrete brush off area, two new drains, a protective hand rail, composite wood headers, wood decking, a new irrigation system, benches, log stump stools and an outdoor information board. The project will be outfitted by the school site with native plant materials and a new tree.",56,2018-Q1,2018-Q3,Closeout,20220630 Glenwood ES,10371139,Glenwood ES - Campus Improvement,Campus Improvement,6,Kelly Gonez,Northeast,1419201,13590,8001 Ledge Ave.,Sun Valley,91352,Provide projector and upgrade sound system. Install two water bottle filling stations.,94,2020-Q1,2021-Q1,Closeout,20220630 Hillcrest ES,10364136,Hillcrest ES - Urban Greening,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1452801,13621,4041 Hillcrest Dr.,Los Angeles,90008,"This urban greening project is a collaboration between the District and the LA County Department of Public Works. The project is anticipated to include the following: conversion of existing asphalt into a permeable meadow playfield, the addition of native landscaping, shade trees, a learning garden with raised planter beds, an outdoor classroom with tables and benches, a bioswale, a decomposed granite walking path, minor ADA upgrades to the path of travel and restrooms, and improved site drainage and storm water runoff.",246,2022-Q4,2023-Q2,Design,20220630 CHIME Institute's Schwarzenegger Community School,10370109,CHIME Institute's Schwarzenegger Community School - Technology Upgrade,Communications/Technology Upgrade,4,Nick Melvoin,Northwest,1202001,13844,19722 Collier St.,Woodland Hills,91364,Purchase 21 Chromebooks.,8,2018-Q4,2018-Q4,Closeout,20220630 McBride Special Education Center,10366850,Mcbride Special ED-Restroom Upgrade,Access Compliance,4,Nick Melvoin,West,1195201,15205,3960 Centinela Ave.,Los Angeles,90066,Restroom Upgrade,2,2015-Q2,2015-Q3,Closeout,20220630 Clinton MS,10366636,Clinton MS - Security Upgrades,Security System,5,Jackie Goldberg,Central,1806201,13909,3500 S. Hill St.,Los Angeles,90007,Upgrade physical security of the school by providing and installing security grills on the administration windows and all exterior door glass,80,2015-Q2,2015-Q3,Closeout,20220630 Selma ES,10367710,Selma ES - 2016-17 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1658901,13360,6611 Selma Ave.,Los Angeles,90028,"This project is a charter school renovation for Larchmont Charter School for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office and 12 instructional spaces for charter student seats in grades 4-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",84,2016-Q2,2016-Q3,Closeout,20220630 Bandini ES,10370554,Bandini ES - Install fence,Access Compliance,7,Tanya Ortiz Franklin,South,1228801,13458,425 N. Bandini St.,San Pedro,90731,Install fence and gate around kinder yard.,21,2019-Q2,2019-Q3,Closeout,20220630 Haskell STEAM Magnet ES,10366334,Haskell ES - Deteriorated Roofing Systems,Roofing,3,Scott Schmerelson,Northwest,1445201,13736,15850 Tulsa St.,Granada Hills,91344,"The roofing system on the lunch shelter and 16 classroom buildings is more than 20 years old and consists of multiple layers and patches. The project will replace the roofing systems on these buildings, and includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",465,2014-Q4,2015-Q1,Closeout,20220630 112th St. ES,10366873,112th St. ES - 2015-16 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"This project is a charter school renovation for Resolute Academy for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 7 classrooms for charter student seats in grades 5-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",195,2015-Q2,2015-Q3,Closeout,20220630 Hillcrest ES,10366900,Hillcrest ES - 2015-16 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1452801,13621,4041 Hillcrest Dr.,Los Angeles,90008,"This project is a charter school renovation for City Charter ES for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 10 classrooms for charter student seats in grades K-4. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",63,2015-Q2,2015-Q3,Closeout,20220630 Grape ES,10369821,Grape ES - Parking Lot Gate Openers,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1427401,13495,1940 E. 111th St.,Los Angeles,90059,Upgrade the 111th St. parking lot entrances with new electric gate openers.,48,2019-Q3,2019-Q4,Closeout,20220630 Park ES,10367848,Park ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1600501,13861,8020 Park Ave.,Cudahy,90201,"Remove 1 portable building (48' x 40') and demolish 1 DSA portable building (24' x 60'), provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to remaining buildings on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",131,2016-Q4,2018-Q1,Closeout,20220630 University Pathways Medical Magnet Academy,10369583,University Pathways Medical Magnet Academy - Gompers MS Classrooms,Reconfiguration,7,Tanya Ortiz Franklin,South,1756701,13581,11227 S. San Pedro St.,Los Angeles,90061,"The project provides upgrades and alterations to facilities at Gompers MS to allow for a separate and distinct space for the University Pathways Medical Magnet Academy (UPMMA), a new magnet high school that opened on the campus in 2018. The project has been divided into two phases, the first provides immediate upgrades to support the start of the UPMMA instructional programs, and the second includes long-term improvements that require DSA review and approval. The first phase consists of upgrading three classroom buildings and four portable buildings to include converting existing classrooms into flexible science classrooms and a computer lab, reconfiguring classrooms into administrative space and counselor offices, and installing a pedestrian entrance gate and fencing, public address systems/bells/phones, signage, and a marquee. It also includes repairs and painting to the interior and exterior of the buildings, and providing new furniture, technology, fixtures and equipment. The second phase includes relocating and installing a portable chemistry lab building, adding a modular restroom building, site adapt work for the new buildings, infrastructure and accessibility upgrades, and any other required improvements to ensure compliance with local, State, and Federal facilities requirements.","3,629",2018-Q2,2021-Q1,Closeout,20220630 Harbor City ES,10370881,Harbor City ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1442501,13406,1508 W. 254th St.,Harbor City,90710,Install new electronic free-standing marquee,54,2019-Q4,2020-Q2,Closeout,20220630 Loyola Village Fine & Performing Arts Magnet ES,10364046,Loyola Village ES - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1501401,13602,8821 Villanova Ave.,Los Angeles,90045,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",378,2014-Q1,2014-Q2,Closeout,20220630 Dymally HS,10368804,Dymally HS - 2017-18 Prop 39 (Pathways Community School),Charter Prop 39,7,Tanya Ortiz Franklin,South,1766701,14581,8800 S. San Pedro St.,Los Angeles,90003,"This project is a charter school renovation for Pathways Community School for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 14 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",135,2017-Q2,2017-Q3,Closeout,20220630 Shirley ES,10371886,Shirley ES - 2021-22 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1671201,13671,19452 Hart St.,Reseda,91335,"This project is a charter school renovation for Citizens of the World - West Valley for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 2 special education rooms, and 8 instructional spaces for charter student seats in grades TK-2. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",92,2021-Q2,2021-Q3,Closeout,20220630 Woodlawn ES,10369285,Woodlawn ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1790401,13572,6314 Woodlawn Ave.,Bell,90201,"Removal of 2 portable buildings. Salvage all furniture and equipment from classrooms, abate hazardous materials, disconnect low and high voltage utilities, and repair/replace asphalt at building footprints.",187,2017-Q4,2019-Q1,Closeout,20220630 Kennedy ES,10366535,Kennedy ES - SEEDS,SEEDS,2,Monica Garcia,East,1469601,13886,4010 E. Ramboz Dr.,Los Angeles,90063,"Design and construct an outdoor learning space that is approximately 1,900 square feet and consists of the installation of a hose bib, power outlet, decomposed granite and concrete pavers, art poles and the removal of fencing materials and abandoned utility infrastructure. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",27,2015-Q1,2015-Q2,Closeout,20220630 Maywood ES,10367926,Maywood ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1238101,13950,5200 Cudahy Ave.,Maywood,90270,Purchase 75 Chromebooks and 2 syncing carts; upgrade classroom security features including door hardware and installation of metal skins on doors.,24,2016-Q4,2016-Q4,Closeout,20220630 Eastman ES,10367678,Eastman ES - 2016-17 Prop 39,Charter Prop 39,2,Monica Garcia,East,1352101,13520,4112 E. Olympic Blvd.,Los Angeles,90023,"This project is a charter school renovation for Extera Public School - Eastman for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office and 4 instructional spaces for charter student seats in grades K-4. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",107,2016-Q2,2016-Q3,Closeout,20220630 Buchanan ES,10370134,Buchanan ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1260301,13350,5024 Buchanan St.,Los Angeles,90042,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q3,2029-Q1,Planning,20220630 Carson ES,10370137,Carson ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1283601,13435,161 E. Carson St.,Carson,90745,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2027-Q1,2027-Q2,Planning,20220630 Carthay Environmental Studies Magnet ES,10366635,Carthay Center ES - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1284901,13461,6351 W. Olympic Blvd.,Los Angeles,90048,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance,18,2015-Q1,2015-Q3,Closeout,20220630 Calahan ES,10367908,Calahan Community Charter ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1270601,13747,18722 Knapp St.,Northridge,91324,Provide and install electronic marquee.,44,2018-Q2,2018-Q2,Closeout,20220630 Parthenia Academy of Arts & Technology,10367927,Parthenia ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1602701,13702,16825 Napa St.,North Hills,91343,Provide and install electronic marquee.,37,2017-Q4,2018-Q1,Closeout,20220630 Woodlawn ES,10367937,Woodlawn ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1790401,13572,6314 Woodlawn Ave.,Bell,90201,"Purchase 120 iPads, 3 syncing carts, and sleeves with integrated keypads; upgrade classroom security features including door hardware and installation of metal skins on doors.",102,2016-Q4,2017-Q1,Closeout,20220630 Arlington Heights ES,10369727,Arlington Heights ES - 2018-20 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1219201,15202,1717 Seventh Ave.,Los Angeles,90019,"This project was initially approved in BOE Report No. 429-17/18 for the 2018-19 Prop 39 co-locations as a charter school renovation for Global Education Academy #2. This project included 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 11 spaces allocated to the charter and a scope of work that is not yet defined.",23,2018-Q2,2018-Q2,Closeout,20220630 Aragon ES,10368731,Aragon ES - Seismic Retrofit of Main Building,Seismic Modernization,2,Monica Garcia,Central,1217801,13372,1118 Aragon Ave.,Los Angeles,90065,"The project provides a seismic retrofit of the main building which consists of three structures with a total area of approximately 29,290 square feet. These three structures were built from 1925 to 1938, strengthened in 1965, partially reconstructed in 1988, and have lateral force resisting systems comprised of concrete shear walls with flexible roof diaphragms. The scope of work includes installing new concrete walls and foundations, plywood sheeting, joist connectors, roof diaphragm, and Fiber Reinforced Polymer (FRP) wrap at existing coupling beams for a proper transfer of lateral loads and adequate structural capacity for life safety demand levels. The project also includes Americans with Disabilities Act (ADA) upgrades where required.","10,952",2020-Q1,2022-Q3,Construction,20220630 Belmont HS,10371843,Belmont HS - Energy Conservation Lighting,Electrical/Lighting,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"LADWP will be upgrading existing interior and exterior lights with LED kits or fixtures throughout the campus for increased energy savings. LADPW will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will preform this work with their own funds for an estimated $3,322,896. Estimated energy savings is 592,988 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration task and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $645,034 which is 19.41% of the ECM costs.",645,2021-Q2,2021-Q3,Closeout,20220630 Panorama HS,10372135,Panorama HS - Guardrail Extensions at Exterior Stairways,Campus Improvement,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,This project is to provide enclosures at landings and stairs above the second floor at three stair towers to enhance student safety.,638,2023-Q4,2024-Q3,Design,20220630 93rd St. ES,10366127,93rd St. ES - Fix Parking Lot Asphalt,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1558201,13814,330 E. 93rd St.,Los Angeles,90003,"The asphalt in the parking lot is damaged and in need of resurfacing. The scope of work includes removing and replacing damaged asphalt pavement, and associated path of travel improvements according to the DSA-approved drawings.",247,2014-Q3,2014-Q4,Closeout,20220630 Sunny Brae ES,10367728,Sunny Brae ES - Portable Removal,Portable Removal,3,Scott Schmerelson,Northwest,1698601,13737,20620 Arminta St.,Canoga Park,91306,"Remove/Sell DSA 24 'x 40' Portable Classroom A2132Y; Remove/Sell DSA 48' x 40' Portable Classroom X3234Y; Remove/Sell DSA 24' x 60' Portable Classroom X3612Y; Demolish 1 Bungalow. Disconnect all utilities, including low voltage and power, to 4 portable buildings; reconnect all utilities to existing buildings remaining on site. Abate and transport all asbestos, lead and other hazardous materials offsite. Perform Phase 1 & 2 and Phase 3 onsite monitoring. Restore asphalt paving as needed.",155,2016-Q2,2016-Q3,Closeout,20220630 Playa Del Rey ES,10369967,Playa Del Rey ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,West,1611001,13559,12221 Juniette St.,Culver City,90230,Install new electronic free-standing marquee,34,2019-Q2,2019-Q2,Closeout,20220630 Dena ES,10370059,Dena ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1331501,13277,1314 Dacotah St.,Los Angeles,90023,"Demolish 3 portable buildings, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",583,2019-Q1,2020-Q1,Closeout,20220630 Broad ES,10372428,Broad ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1252701,13774,24815 Broad Ave.,Wilmington,90744,"Demolish and remove 2 portable buildings, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/Replace asphalt paving.",211,2022-Q3,2023-Q2,Planning,20220630 Alta Loma ES,10004595,Alta Loma ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1208201,13402,1745 Vineyard Ave.,Los Angeles,90019,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",80,2012-Q2,2016-Q3,Closeout,20220630 Bright ES,10004643,Bright ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1716401,13306,1771 W. 36th St.,Los Angeles,90018,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",164,2013-Q2,2016-Q3,Closeout,20220630 Main ES,10004625,Main ES - Facelift,Facelift,7,Tanya Ortiz Franklin,Central,1506801,13272,129 E. 53rd St.,Los Angeles,90011,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",18,2012-Q4,2016-Q3,Closeout,20220630 Miramonte ES,10004634,Miramonte ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1532901,13323,1400 E. 68th St.,Los Angeles,90001,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",135,2012-Q2,2016-Q3,Closeout,20220630 San Pedro ES,10367636,San Pedro ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1650701,13279,1635 S. San Pedro St.,Los Angeles,90015,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",46,2016-Q3,2016-Q4,Closeout,20220630 Chapman ES,10363904,Chapman ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1298601,13460,1947 Marine Ave.,Gardena,90249,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",240,2014-Q3,2014-Q3,Closeout,20220630 Columbus ES,10363911,Columbus ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1743201,13568,6700 Columbus Ave.,Van Nuys,91405,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",218,2014-Q3,2014-Q4,Closeout,20220630 Erwin ES,10363926,Erwin ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1363001,13624,13400 Erwin St.,Van Nuys,91401,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",397,2014-Q2,2014-Q3,Closeout,20220630 Saturn ES,10004589,Saturn ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",48,2012-Q2,2016-Q3,Closeout,20220630 Vernon City ES,10004629,Vernon City ES - Facelift,Facelift,5,Jackie Goldberg,East,1749301,13563,2360 E. Vernon Ave.,Los Angeles,90058,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",152,2012-Q2,2016-Q3,Closeout,20220630 Topanga Charter ES,10366775,Topanga Charter ES - Plumbing Upgrades,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1719801,13816,22075 Topanga School Rd.,Topanga,90290,This project is to upgrade the approximately 60-year-old deteriorated underground sanitary sewer and domestic water piping. The clay sewer lines have collapsed in several locations resulting in the closure of four restrooms.,518,2015-Q1,2016-Q1,Closeout,20220630 Camellia ES,10364097,Camellia ES - HVAC,HVAC,6,Kelly Gonez,Northeast,1272601,13587,7451 Camellia Ave.,North Hollywood,91605,The project will remove Marvair wall-mounted HVAC systems and replace them with new package rooftop gas/electric units on buildings 1 through 12. Eighteen classrooms are affected and the existing equipment is more than 25 years old and in poor condition. Maintenance & Operations received more than 40 related service calls within the past 12 months prior to approval of this project.,"1,070",2015-Q4,2017-Q1,Closeout,20220630 Budlong ES,10367664,Budlong ES - 2016-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1261601,15162,5940 S. Budlong Ave.,Los Angeles,90044,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a charter school renovation for Lou Dantzler Preparatory ES. This growth project included 1 charter office, 1 special education room, and 16 instructional spaces for charter students in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",83,2016-Q2,2016-Q3,Closeout,20220630 Roosevelt Infant Center,10367356,Roosevelt Infant Center - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,East,1955601,16583,456 S. Mathews St.,Los Angeles,90033,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",18,2016-Q3,2016-Q3,Closeout,20220630 Norwood ES,10366915,Norwood ES - 2015-17 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1569901,13271,2020 Oak St.,Los Angeles,90007,"This project is a charter school renovation for Global Education Academy for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 7 classrooms for charter student seats in grades K-3. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. This project is amended to include an additional single-year term for Global Education Academy with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 as a ""No Growth"" project includes 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades K-4. The scope for this project is not yet defined.",172,2015-Q2,2015-Q3,Closeout,20220630 Sylmar Charter HS,10368604,Sylmar Charter HS - New Metal Ramp,Access Compliance,6,Kelly Gonez,Northeast,1887801,13856,13050 Borden Ave.,Sylmar,91342,"Provide and install metal ramp, skirting and door hardware.",34,2017-Q1,2017-Q2,Closeout,20220630 Atwater ES,10368677,Atwater ES - Technology Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1223301,13457,3271 Silver Lake Blvd.,Los Angeles,90039,Upgrade technology by purchasing 35 laptops.,36,2017-Q1,2017-Q2,Closeout,20220630 Locke EEC,10367335,Locke EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1953101,16288,320 E. 111th St.,Los Angeles,90061,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",131,2016-Q2,2016-Q3,Closeout,20220630 Alexandria ES,10364343,Alexandria ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1204101,13456,4211 Oakwood Ave.,Los Angeles,90004,Demolish/Remove Portable Building(s),169,2014-Q4,2015-Q1,Closeout,20220630 Eagle Rock ES,10364345,Eagle Rock ES - Portable Removal,Portable Removal,5,Jackie Goldberg,Central,1350701,13499,2057 Fair Park Ave.,Los Angeles,90041,Demolish/Remove Portable Building(s),67,2013-Q4,2014-Q1,Closeout,20220630 University Charter HS,10364362,University Charter HS - Portable Removal,Portable Removal,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,Demolish/Remove Portable Building(s),234,2013-Q2,2015-Q3,Closeout,20220630 Parks-Huerta EEC,10367352,Parks-Huerta EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1944701,13879,1020 W. 58th Pl.,Los Angeles,90044,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",116,2016-Q2,2016-Q3,Closeout,20220630 Cabrillo ES,10366759,Cabrillo ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1268501,13552,732 S. Cabrillo Ave.,San Pedro,90731,"Modernize and upgrade school's existing parent center by providing interior paint, new flooring, and security upgrades including new doors and hardware as well as security on windows. Provide whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",85,2015-Q1,2015-Q4,Closeout,20220630 Newmark Continuation HS,10100966,Newmark Continuation HS - Upgrade Fire Alarm System,Fire Alarm System,2,Monica Garcia,Central,1854501,16282,1575 W. 2nd St.,Los Angeles,90026,Upgrade Fire Alarm System,233,2014-Q3,2015-Q3,Closeout,20220630 Belvedere ES,10370130,Belvedere ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1239701,13373,3724 E. 1st St.,Los Angeles,90063,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2027-Q4,2028-Q1,Planning,20220630 Kennedy ES,10367056,Kennedy ES - ADA Improvements,Access Compliance,2,Monica Garcia,East,1469601,13886,4010 E. Ramboz Dr.,Los Angeles,90063,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 38 doors/hardware, 22 accessible paths of travel, 28 signs, 9 restrooms, 6 drinking fountains/sinks, 3 casework/counters, 5 concrete ramps, 2 pieces of accessible furniture, 2 arcades, 2 railings, 1 playground component, 1 parking area, 1 cafeteria counter, 1 nurse's exam room modification, 1 new elevator, and 1 passenger loading zone.","6,690",2017-Q2,2021-Q3,Closeout,20220630 South Gate MS,10004952,South Gate MS - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1837701,13261,4100 Firestone Blvd.,South Gate,90280,"Equip with tables, chairs, children's corner, media cart, computers, blinds, and signage. Upgrade interior with paint. Provide new AC window unit and replace exterior locks.",79,2013-Q2,2014-Q1,Closeout,20220630 Parthenia Academy of Arts & Technology,10366451,Parthenia Academy of Arts & Technology - HVAC,HVAC,3,Scott Schmerelson,Northwest,1602701,13702,16825 Napa St.,North Hills,91343,"This project will replace the existing heating, ventilation, and air conditioning (HVAC) systems throughout the entire campus. The existing systems are over 25 years old and in poor condition resulting in frequent system failures and unreliable service.","4,324",2016-Q3,2018-Q2,Closeout,20220630 Miles EEC,10372010,Miles EEC - Install Security Monitor System,Security System,5,Jackie Goldberg,East,1953501,16663,2855 Saturn Ave.,Huntington Park,90255,Install video surveillance (CCTV) system with 2 cameras in parking lot area,53,2021-Q4,2022-Q1,Closeout,20220630 Valerio ES,10370794,Valerio ES - Sod And Paving,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1738401,15143,15035 Valerio St.,Van Nuys,91405,Install new sod and paving,45,2020-Q1,2020-Q1,Closeout,20220630 Belmont HS,10372486,Belmont HS - 2022-23 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"This project is a charter school renovation for Los Angeles Academy of Arts and Enterprise for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 12 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",744,2022-Q3,2022-Q3,Planning,20220630 Park Western ES,10370530,Park Western ES - Intrusion Alarm,Security System,7,Tanya Ortiz Franklin,South,1601301,13588,1214 Park Western Pl.,San Pedro,90732,Install new intrusion alarm,24,2019-Q2,2019-Q3,Closeout,20220630 Gulf ES,10368717,Gulf ES - Auditorium Upgrade,Auditorium Renovation,7,Tanya Ortiz Franklin,South,1431501,13464,828 W. L St.,Wilmington,90744,Install new audio/visual equipment in auditorium.,51,2017-Q3,2018-Q2,Closeout,20220630 Arlington Heights ES,10372482,Arlington Heights ES - 2022-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1219201,15202,1717 Seventh Ave.,Los Angeles,90019,"This project is a charter school renovation for Global Education Academy #2 for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 4 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",39,2022-Q3,2022-Q3,Planning,20220630 75th St. ES,10372634,75th St. ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1663001,13470,142 W. 75th St.,Los Angeles,90003,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Fair ES,10370583,Fair ES - 2019-20 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1371201,13600,6501 Fair Ave.,North Hollywood,91606,"This project is a charter school renovation for New Horizons Charter Academy for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",26,2019-Q2,2019-Q3,Closeout,20220630 San Fernando HS,10370864,San Fernando HS - Restroom Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1884301,13670,11133 O'Melveny Ave.,San Fernando,91340,Install Rifton support station in girls restroom in 300 bldg. Purchase and install 5' hi-lo changing table in all gender restroom inside text book room/plant managers office in 300 bldg and install electrical outlets.,21,2019-Q4,2019-Q4,Closeout,20220630 Los Angeles HS,10371640,Los Angeles HS - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.","1,400",2021-Q2,2022-Q1,Closeout,20220630 Gompers MS,10371847,Gompers MS - Temp Ramps,Access Compliance,7,Tanya Ortiz Franklin,South,1816001,13581,234 E. 112th St.,Los Angeles,90061,"Install TMP Ramp at temporary Nurse's office, Room 100 Bldg. AA-31.",88,2021-Q3,2022-Q2,Closeout,20220630 Orchard Academies,10372011,Orchard Academies 2C - Install Secure Entry System,Security System,5,Jackie Goldberg,East,1515301,193567,6411 Orchard Ave.,Bell,90201,Install new secure entry system at door to main office with two video receivers in main office and one in principal's office.,29,2021-Q3,2022-Q1,Closeout,20220630 Monlux ES,10372595,Monlux ES - Install Chain Link Fence,Fencing,6,Kelly Gonez,Northeast,1534201,13591,6051 Bellaire Ave.,North Hollywood,91606,"Remove existing deteriorated chain link fence, approx. 145 feet. Fabricate and install new chain link fence (Approx. 275 feet) + pedestrian gate, and concrete walkway to include new classroom building which will become available to students next year (Bldg. AA-1275).",73,2022-Q3,2023-Q1,Planning,20220630 Burroughs MS,10366806,Burroughs MS - Comprehensive Modernization,Comprehensive Modernization,1,"Dr. George J. McKenna, III",West,1807501,13448,600 S. Mc Cadden Pl.,Los Angeles,90005,"This project includes the construction of new buildings and site improvements with 27 general and specialty classrooms, instructional support spaces, food services, indoor dining, boys' and girls' locker rooms, lunch shelter, play areas, quads, courtyards, and parking. Existing school facilities will be upgraded including the modernization, seismic retrofit, and repair and preservation of portions of the exterior brick for the historic administration/classroom/auditorium building, classroom building, shop building, and gymnasium. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of the food service/lunch shelter/classroom building, girls' locker room building, and 18 classrooms in relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","266,424",2022-Q4,2027-Q2,Design,20220630 Parks Learning Center,10363991,Parks Learning Center - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northwest,1357601,13852,8855 Noble Ave.,North Hills,91343,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",241,2014-Q2,2014-Q3,Closeout,20220630 Independence ES,10372588,Independence ES - Install Privacy Fence,Fencing,5,Jackie Goldberg,East,1688001,13912,8435 Victoria Ave.,South Gate,90280,Install new chain link privacy fence to increase height of concrete wall. Fabricate and install approx. 280 feet of 2 ft tall privacy fencing over existing block wall.,36,2022-Q4,2023-Q1,Planning,20220630 Beachy ES,10371259,Beachy ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1232901,13666,9757 Beachy Ave.,Arleta,91331,"Demolish and remove 5 portable buildings, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite building. Remove all hazardous materials offsite and perform Phase 1, 2 and 3 onsite monitoring. Repair/replace asphalt paving.",214,2020-Q2,2020-Q3,Closeout,20220630 Purche ES,10370859,Purche ES - Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1615801,13655,13210 Purche Ave.,Gardena,90249,Purchase and install 5' hi-lo changing table in girl's restroom in bldg. A8637. Requires electrical outlet.,4,2019-Q4,2019-Q4,Closeout,20220630 Banning HS,10367899,Banning HS - Synthetic Turf Field,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,"The project includes replacing approximately 104,000 square feet of deteriorated synthetic turf field on which the warranty has expired, cleaning of field drainage, and repairing irrigation for cooling. The scope of work also includes soils stabilization with scarifying and cement treatment of 2' of existing soil in the field area and the addition of 2"" of top base; soccer and football goals and other playfield equipment replacement; and upgrades to site utilities, fencing and irrigation boxes.","2,469",2019-Q1,2019-Q2,Closeout,20220630 Romer MS,10369780,Romer MS - 2018-19 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1811601,13894,6501 Laurel Canyon Blvd.,North Hollywood,91606,"This project is a charter school renovation for Celerity Palmati Charter School for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 13 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",29,2018-Q2,2018-Q3,Closeout,20220630 Monlux ES,10369191,Monlux ES - New Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1534201,13591,6051 Bellaire Ave.,North Hollywood,91606,"Remove and replace old marquee with new, electronic marquee.",37,2017-Q4,2018-Q1,Closeout,20220630 Hillside ES,10370307,Hillside ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1453401,13293,120 E. Ave. 35,Los Angeles,90031,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",62,2019-Q2,2019-Q4,Closeout,20220630 Wadsworth ES,10371261,Wadsworth ES - Portable Removal,Portable Removal,5,Jackie Goldberg,Central,1758901,13383,981 E. 41st St.,Los Angeles,90011,"Demolish and remove 2 portables buildings; remove/relocate furniture and equipment; disconnect all ITD components and utilities and reconnect to existing onsite buildings; remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring; and repair/replace asphalt paving.",287,2020-Q3,2021-Q2,Closeout,20220630 Palms MS,10370375,Palms MS - Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1834001,13668,10860 Woodbine St.,Los Angeles,90034,Install new 18' electronic marquee.,114,2020-Q4,2021-Q2,Closeout,20220630 Roosevelt HS,10370311,Roosevelt HS - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1774901,13523,456 S. Mathews St.,Los Angeles,90033,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",61,2019-Q3,2019-Q4,Closeout,20220630 City Terrace ES,10372132,City Terrace ES - Roofing,Roofing,2,Monica Garcia,East,1309601,13490,4350 City Terrace Dr.,Los Angeles,90063,"This project is to provide approximately 25,214 square feet of new roofing at five buildings, including the installation of new gutters and downspouts and painting of affected areas.",535,2023-Q2,2023-Q4,Planning,20220630 Tweedy ES,10366110,Tweedy ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1726001,13955,9724 Pinehurst Ave.,South Gate,90280,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",255,2015-Q2,2015-Q3,Closeout,20220630 Langdon ES,10372292,Langdon ES - Secure Entry System,Security System,6,Kelly Gonez,Northwest,1477501,13413,8817 Langdon Ave.,North Hills,91343,Install new secure entry system at the Main Office.,30,2022-Q3,2022-Q4,Planning,20220630 Hollywood ES,10371826,Hollywood ES - New Basketball Court,Paving/Greening/Playground Equipment,5,Jackie Goldberg,West,1654901,13957,1115 Tamarind Ave.,Los Angeles,90038,"Provide age-appropriate basketball court at south end of main playground. Install two hoop systems (post, backboard, hoop, and net) and paint court lines.",14,2021-Q2,2021-Q3,Closeout,20220630 Van Nuys MS,10372520,Van Nuys MS - 2022-23 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northeast,1843401,13605,5435 Vesper Ave.,Van Nuys,91411,"This project is a charter school renovation for High Tech Los Angeles MS for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office,1 special education room, and 6 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",52,2022-Q3,2022-Q3,Planning,20220630 Pio Pico MS,10371885,Pio Pico MS - 2021-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1498001,13903,1512 S. Arlington Ave.,Los Angeles,90019,"This project was initially approved in BOE Report No. 317-20/21 for the 2021-22 Prop 39 co-locations as a charter school renovation for Magnolia Science Academy #6. The project included 1 charter office, 1 special education room, and 3 instructional spaces for charter student seats in grades 6-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved in Board of Education Report No. 291-21/22 for 2022-23 Proposition 39 charter co-locations as a vacating project. Magnolia Science Academy #6 will not continue occupancy in the 2022-23 school year. Therefore, this project is amended to include the scope of work necessary to return the site to it previous conditions, as appropriate.",234,2021-Q2,2021-Q3,Closeout,20220630 Stevenson College & Career Preparatory,10372513,Stevenson College & Career Preparatory - 2022-23 Prop 39,Charter Prop 39,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"This project is a charter school renovation for Collegiate Charter HS of Los Angeles for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 9 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",139,2022-Q3,2022-Q3,Planning,20220630 Curtiss MS,10372584,Curtis MS - Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1810301,13775,1254 E. Helmick St.,Carson,90746,Remodel faculty restroom to provide space for changing table.,145,2022-Q4,2023-Q1,Planning,20220630 Wright STEAM Magnet MS,10369803,Wright STEAM Magnet MS - 2018-19 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Charter MS for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 23 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",4,2018-Q2,2018-Q3,Closeout,20220630 Murchison ES,10372505,Murchison ES - 2022-23 Prop 39,Charter Prop 39,2,Monica Garcia,East,1543801,13522,1501 Murchison St.,Los Angeles,90033,"This project is a charter school renovation for KIPP Promesa Prep for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades 2-4. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",462,2022-Q3,2022-Q3,Planning,20220630 Roberti EEC,10005063,Roberti EEC - Safety Upgrades and Improvements,Campus Improvement,5,Jackie Goldberg,Central,1949701,15261,1156 E. Vernon Ave.,Los Angeles,90011,"Upgrade security fencing, entry control system, exterior gates, playground equipment, and exterior doors",71,2014-Q2,2015-Q2,Closeout,20220630 Belmont HS,10368794,Belmont HS - 2017-18 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"This project was approved in Board of Education Report No. 530-16/17 as a 2017-18 Proposition 39 charter co-location. The charter operator, Rise Kohyang HS did not occupy Belmont HS during the 2017-18 academic year. As a result, the scope of work changed from a co-location to vacating the site which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",22,2017-Q4,2018-Q1,Closeout,20220630 Webster MS,10369672,Webster MS - Secure Entry System,Security System,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,Install new secure entry system.,18,2018-Q2,2018-Q3,Closeout,20220630 Balboa Gifted/High Ability Magnet ES,10366861,Balboa Gifted/High Ability Magnet ES - Roofing,Roofing,3,Scott Schmerelson,Northwest,1226901,13840,17020 Labrador St.,Northridge,91325,"This project is to replace the roofing on 12 classroom buildings and the arcades. The roofing is more than 20 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",595,2015-Q4,2016-Q4,Closeout,20220630 Le Conte MS,10368822,Le Conte MS - 2017-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"This project is a charter school renovation for Citizens of the World - Hollywood for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office and 20 instructional spaces for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",52,2017-Q3,2017-Q3,Closeout,20220630 Manual Arts HS,10368184,Manual Arts HS - Wellness Center Expansion,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1874301,13345,4131 S. Vermont Ave.,Los Angeles,90037,"The project will expand the existing wellness center, operated by St. John's Well Child & Family Center, to provide additional dental and medical services. The project consists of approximately 3,400 square feet of new construction, related site improvements, removal of existing bungalows, and various reconfigurations and alterations to the approximately 2,200-square-foot existing wellness center.","8,396",2019-Q4,2022-Q3,Construction,20220630 Downtown Magnets HS: Downtown Business,10367447,Downtown Business Magnet - Paving,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1873801,13269,1081 W. Temple St.,Los Angeles,90012,"The over 10-year-old asphalt concrete paving on the campus is severely deteriorated and in need of replacement. The scope of work includes replacing approximately 24,600 square feet of asphalt concrete pavement at the top of the upper deck parking lot. In addition, the project includes the installation of a waterproof membrane and striping to match existing parking stalls, parking area improvements including the designation of spaces for the KLCS-TV station and visitors, new outdoor seating furniture, associated Americans with Disabilities Act (ADA) path of travel upgrades, and drainage systems required by DSA and the District's Storm Water Technical Manual. In order to facilitate school operations during construction, the project provided traffic officers to assist pedestrians and a daily shuttle service from the interim parking lot to the school.","1,606",2017-Q4,2018-Q1,Closeout,20220630 Bethune MS,10368350,Bethune MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",174,2017-Q4,2018-Q3,Closeout,20220630 Locke EEC,10104220,Locke EEC - New Shade Shelters,Lunch/Shade Shelter,7,Tanya Ortiz Franklin,South,1953101,16288,320 E. 111th St.,Los Angeles,90061,New Shade Shelters,330,2013-Q3,2014-Q2,Closeout,20220630 Carson ES,10004656,Carson ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1283601,13435,161 E. Carson St.,Carson,90745,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",138,2012-Q4,2016-Q3,Closeout,20220630 Broad ES,10004657,Broad ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1252701,13774,24815 Broad Ave.,Wilmington,90744,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",62,2013-Q1,2017-Q1,Closeout,20220630 Caroldale Learning Community,10369476,Caroldale Learning Community - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1281501,13843,22424 Caroldale Ave.,Carson,90745,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2025-Q2,2025-Q3,Planning,20220630 Baldwin Hills ES,10104573,Baldwin Hills ES - Repairs for Compliance with State & Federal Access Requirements,Fire Alarm System,1,"Dr. George J. McKenna, III",West,1227401,13595,5421 Rodeo Rd.,Los Angeles,90016,Repairs to Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),394,2015-Q2,2016-Q1,Closeout,20220630 24th St. EEC,10367286,24th St. EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1957001,16624,2101 W. 24th St.,Los Angeles,90018,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",60,2016-Q2,2016-Q3,Closeout,20220630 Eagle Rock ES,10367798,Eagle Rock ES - Fencing,Fencing,5,Jackie Goldberg,Central,1350701,13499,2057 Fair Park Ave.,Los Angeles,90041,Provide and install fence at west lawn.,66,2017-Q1,2018-Q2,Closeout,20220630 Alexandria EEC,10367296,Alexandria EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1950101,16686,4304 Rosewood Ave.,Los Angeles,90004,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",74,2016-Q3,2016-Q3,Closeout,20220630 Dacotah EEC,10367309,Dacotah EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,East,1951201,16745,3142 Lydia Dr.,Los Angeles,90023,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",115,2016-Q3,2016-Q4,Closeout,20220630 Hobart EEC,10367329,Hobart EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1958301,15562,982 S. Serrano Ave.,Los Angeles,90066,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",76,2016-Q3,2016-Q4,Closeout,20220630 Park Western EEC,10367351,Park Western EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1954801,16742,1220 Park Western Pl.,San Pedro,90732,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",83,2016-Q3,2016-Q4,Closeout,20220630 Willenberg Special Education Center,10370811,Willenberg Special Education Center - Exterior Painting,Painting,7,Tanya Ortiz Franklin,South,1195701,13545,308 Weymouth Ave.,San Pedro,90732,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",416,2020-Q2,2020-Q3,Closeout,20220630 Locke Charter HS,10367407,Locke Charter HS - HVAC in Competition Gym,HVAC,7,Tanya Ortiz Franklin,South,1873301,13889,325 E. 111th St.,Los Angeles,90061,"The project addresses cooling needs in the gymnasium building by installing a new heating, ventilation, and air conditioning (HVAC) system. The scope of work also includes structural upgrades to support the new air conditioning units on the roof/mezzanine, electrical and plumbing upgrades for new HVAC equipment connections, patch and repair of roofing in areas around new equipment and ductwork, fire proofing with overspray at ceiling space, replacement of ceilings and light fixtures in selected areas, patch and repair to walls and ceilings impacted by the HVAC replacement/structural work, equipment demolition, asbestos abatement, and cleaning and leak test for ducts. The project also includes replacement of certain HVAC components in the kitchen/multipurpose room building as required by DSA.","8,370",2018-Q4,2022-Q2,Closeout,20220630 Westchester Enriched Sciences Magnets,10366933,Westchester Enriched Sciences Magnets - 2015-18 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project was initially approved in BOE Report No. 423-14/15 for 2015-16 Prop. 39 co-locations as a charter school renovation for Ocean Charter School. This growth project included 1 charter office and 17 instructional spaces for charter students in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a ""no growth"" project with 1 charter office and 17 instructional spaces for charter students in grades K-8. The project was again amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",27,2015-Q2,2015-Q3,Closeout,20220630 Sylvan Park ES,10367813,Sylan Park ES - Restroom Upgrades,Access Compliance,3,Scott Schmerelson,Northeast,1702701,13477,6238 Noble Ave.,Van Nuys,91411,"Modify kindergarten restrooms K1 & K2 including widening doors, relocating light switch, removing and replacing partition, and installing ACU-provided folding changing table.",25,2016-Q3,2016-Q3,Closeout,20220630 Lake Balboa College Preparatory Magnet,10368311,Lake Balboa College Preparatory Magnet - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1739001,15185,6701 Balboa Blvd.,Lake Balboa,91406,Provide and install electronic marquee.,39,2017-Q4,2017-Q4,Closeout,20220630 Cheremoya ES,10367608,Cheremoya ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,West,1304101,13410,6017 Franklin Ave.,Los Angeles,90028,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",46,2016-Q3,2017-Q1,Closeout,20220630 Bushnell Way ES,10363895,Bushnell Way ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1267101,13375,5507 Bushnell Way,Los Angeles,90042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",260,2014-Q2,2014-Q3,Closeout,20220630 Hoover ES,10105878,Hoover ES - Compliance with State & Federal Access Requirements,Fire Alarm System,5,Jackie Goldberg,Central,1458901,13298,2726 Francis Ave.,Los Angeles,90005,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),465,2015-Q1,2015-Q3,Closeout,20220630 Russell ES,10105883,Russell ES - Compliance with State & Federal Access Requirements,Fire Alarm System,7,Tanya Ortiz Franklin,South,1643801,15401,1263 E. Firestone Blvd.,Los Angeles,90001,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),311,2014-Q4,2015-Q1,Closeout,20220630 Compton ES,10369360,Compton ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1320501,13498,1515 E. 104th St.,Los Angeles,90002,Install Aiphone video/buzzer entry system at main entrance.,17,2018-Q1,2018-Q2,Closeout,20220630 Portola Charter MS,10367810,Portola MS - Renovate Attendance Office,Reconfiguration,4,Nick Melvoin,Northwest,1810701,13785,18720 Linnet St.,Tarzana,91356,Renovate Attendance Office; install service window as well as add new phone line drops.,17,2016-Q3,2016-Q4,Closeout,20220630 Academy for Enriched Sciences Magnet ES,10367817,Academy for Enriched Sciences Elementary Magnet - Convert Classroom,Reconfiguration,3,Scott Schmerelson,Northwest,1225001,13615,17551 Miranda St.,Encino,91316,"Upgrade kindergarten classroom; provide new toilets, stall partitions, and sinks.",18,2016-Q3,2016-Q3,Closeout,20220630 Coeur d'Alene ES,10367881,Coeur d'Alene ES - Kiln Electrical and Ventilation,HVAC,4,Nick Melvoin,West,1634201,13578,810 Coeur D'Alene Ave.,Venice,90291,Install electrical infrastructure and ventilation for new kiln.,12,2016-Q3,2016-Q4,Closeout,20220630 7th St. Arts Integration Magnet ES,10364231,Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1661601,13550,1570 W. 7th St.,San Pedro,90732,Security Upgrades,15,2016-Q2,2016-Q2,Closeout,20220630 Alexander Science Center ES,10364236,Alexander Science Center ES - Purchase 10 iPads for students,Communications/Technology Upgrade,1,"Dr. George J. McKenna, III",Central,1511101,13884,3737 S. Figueroa St.,Los Angeles,90007,Purchase 10 iPads for students,4,2015-Q2,2015-Q2,Closeout,20220630 Griffin ES,10365193,Griffin ES - Security Upgrades,Security System,2,Monica Garcia,East,1430101,13284,2025 Griffin Ave.,Los Angeles,90031,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,10,2013-Q4,2015-Q3,Closeout,20220630 Reseda Charter HS,10366260,Reseda HS - 2014-15 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,"This project is a charter school renovation for Magnolia Science Academy #5 for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 for Magnolia Science Academy #7 was revised to Magnolia Science Academy #5 and includes 1 charter office and 9 classrooms for 239.88 charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",93,2014-Q2,2014-Q3,Closeout,20220630 Cleveland EEC,10367306,Cleveland EEC - Technology Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1858801,16481,19031 W. Strathern St.,Reseda,91335,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",56,2016-Q3,2016-Q3,Closeout,20220630 Fair EEC,10367318,Fair EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1958201,16765,11300 Kittridge St.,North Hollywood,91606,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",73,2016-Q3,2016-Q3,Closeout,20220630 Brockton ES,10368943,Brockton ES - Technology & Security Upgrades,Communications/Technology Upgrade,4,Nick Melvoin,West,1254801,13432,1309 Armacost Ave.,Los Angeles,90025,Provide 32 iMac desktop computers and security upgrades as necessary for the computer lab.,52,2017-Q4,2017-Q4,Closeout,20220630 Soto ES,10369203,Soto ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1684901,13424,1020 S. Soto St.,Los Angeles,90023,"Removal of 3 portable buildings. Salvage all furniture and equipment from classrooms, abate hazardous materials, disconnect low and high voltage utilities, and repair/replace asphalt at building footprints.",450,2018-Q1,2020-Q4,Closeout,20220630 Nightingale MS,10369528,Nightingale MS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1826401,13584,3311 N. Figueroa St.,Los Angeles,90065,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",435,2021-Q1,2021-Q4,Closeout,20220630 Ambler ES,10364242,Ambler ES - Portable Classrooms for Enrollment Growth,Portable Upgrade,7,Tanya Ortiz Franklin,South,1208901,13833,319 E. Sherman Dr.,Carson,90746,Provide Additional Classroom Space for Enrollment Growth,326,2017-Q1,2017-Q1,Closeout,20220630 Monte Vista ES,10364251,Monte Vista ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1538401,13270,5423 Monte Vista St.,Los Angeles,90042,Demolish/Remove Portable Building(s),110,2013-Q4,2015-Q1,Closeout,20220630 135th St. ES,10363852,135th St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1587701,13607,801 W. 135th St.,Gardena,90247,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",310,2014-Q4,2015-Q1,Closeout,20220630 98th St. ES,10365993,98th St. ES - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1550701,13547,5431 W. 98th St.,Los Angeles,90045,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",315,2015-Q2,2015-Q3,Closeout,20220630 Los Angeles Center for Enriched Studies,10004102,Los Angeles Center for Enriched Studies - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1874101,13554,5931 W. 18th St.,Los Angeles,90035,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",117,2011-Q4,2016-Q3,Closeout,20220630 Aragon ES,10367906,Aragon ES - Technology Upgrades,Communications/Technology Upgrade,2,Monica Garcia,Central,1217801,13372,1118 Aragon Ave.,Los Angeles,90065,Supplement technology purchased by the school by purchasing 19 iMac desktop computers.,30,2016-Q4,2017-Q1,Closeout,20220630 Sylmar Charter HS,10368094,Sylmar Charter HS - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1887801,13856,13050 Borden Ave.,Sylmar,91342,"Remove and sell 1 DSA portable building, provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to remaining buildings on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",57,2017-Q3,2018-Q1,Closeout,20220630 Crenshaw Magnet HS: STEMM,10366227,Crenshaw HS - 2014-15 Prop 39 (View Park Preparatory MS),Charter Prop 39,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,"This project is a charter school renovation for View Park Preparatory MS for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 13 classrooms for 360 charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",20,2014-Q2,2014-Q3,Closeout,20220630 Wilshire Park ES,10365766,Wilshire Park ES - Replace Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1261901,13956,4063 Ingraham St.,Los Angeles,90005,Replace deteriorated playground matting systems to ensure the health and safety of students.,18,2015-Q1,2015-Q2,Closeout,20220630 Emelita ES,10370318,Emelita ES - Parent & Family Center,Campus Improvement,4,Nick Melvoin,Northwest,1358901,13713,17931 Hatteras St.,Encino,91316,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",58,2019-Q3,2020-Q1,Closeout,20220630 Langdon ES,10369590,Langdon ES - ADA Improvements,Access Compliance,6,Kelly Gonez,Northwest,1477501,13413,8817 Langdon Ave.,North Hills,91343,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 78 doors/hardware, 18 accessible paths of travel, 55 signs, 8 restrooms, 3 drinking fountains, 17 sinks/sink cabinets, 2 assistive listening devices/intercoms/phones, 4 concrete ramps, 5 metal ramps, 16 pieces of accessible furniture, 2 assembly seats, 1 railing, 2 parking areas, 13 casework/counters, 2 cafeteria counters, 2 door modifications/auto openers, 1 nurse's exam room modification, 1 new elevator, 1 stage lift, 2 passenger/bus loading zones, and DSA certification of 1 portable building.","9,341",2019-Q2,2023-Q1,Construction,20220630 Noble ES,10370801,Noble ES - Exterior Painting,Painting,6,Kelly Gonez,Northeast,1560301,13632,8329 Noble Ave.,North Hills,91343,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",494,2020-Q3,2020-Q4,Closeout,20220630 Webster MS,10371891,Webster MS - 2021-22 Prop 39 (Citizens of the World - Mar Vista),Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project is a charter school renovation for Citizens of the World - Mar Vista for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 3 special education rooms, and 8 instructional spaces for charter student seats in grades 1-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",19,2021-Q2,2021-Q3,Closeout,20220630 Pinewood EEC,10369323,Pinewood EEC - Restroom Upgrade,Access Compliance,6,Kelly Gonez,Northeast,1954901,16705,7051 Valmont St.,Tujunga,91042,The project will provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,552,2021-Q2,2021-Q4,Closeout,20220630 Reed MS,10372238,Reed MS - Provide Lunch Tables,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northeast,1835501,13647,4525 Irvine Ave.,North Hollywood,91602,Provide exterior lunch tables. Disassemble and remove (84) wooden benches under lunch shelter. Cut metal brackets and (3) metal posts for each bench. Purchase and anchor (51) picnic-style metal benches.,77,2022-Q2,2022-Q4,Construction,20220630 Phoenix Continuation HS,10371693,Phoenix Continuation HS - Install Secure Entry System,Security System,4,Nick Melvoin,West,1890901,15062,12971 Zanja St.,Los Angeles,90066,Install new secure entry system at main entrance gate with three video receivers in main office. Replace pedestrian rolling gate with swing gate to accommodate new locking mechanism and strike plate.,47,2021-Q1,2021-Q3,Closeout,20220630 Aggeler Opportunity HS,10372459,Aggeler Opportunity HS - Install Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1850701,13644,21050 Plummer St.,Chatsworth,91311,Install secure entry system at main entrance gate. Install (3) receivers in main office. Run approx. 50 feet of conduit and 50 feet of wiremold.,37,2022-Q3,2022-Q4,Planning,20220630 Porter MS,10371365,Porter MS - Library Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1835401,13807,15960 Kingsbury St.,Granada Hills,91344,"Purchase tables, chairs, and couches",46,2020-Q3,2020-Q4,Closeout,20220630 Pearl Journalism/Communications Magnet HS,10370825,Pearl Journalism/Communications Magnet HS - Exterior Painting,Painting,3,Scott Schmerelson,Northwest,1855801,15701,6649 Balboa Blvd.,Lake Balboa,91406,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",209,2020-Q2,2020-Q4,Closeout,20220630 Lankershim ES,10372594,Lankershim ES - Install Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1478101,13358,5250 Bakman Ave.,North Hollywood,91601,"Install new electronic, free-standing marquee. Replace non-functional, deteriorated, free-standing marquee. Existing concrete footing, power, and data will be used. Double-sided 8 feet x4 feet color LED display.",25,2022-Q4,2023-Q1,Planning,20220630 Bethune MS,10004115,Bethune MS - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",244,2011-Q2,2015-Q3,Closeout,20220630 Dacotah EEC,10005024,Dacotah EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,East,1951201,16745,3142 Lydia Dr.,Los Angeles,90023,"Upgrade entry control system, exterior gates, and playground equipment",37,2014-Q3,2014-Q4,Closeout,20220630 Cowan ES,10366889,Cowan ES - 2015-16 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1326001,13622,7615 Cowan Ave.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Charter MS for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 4 classrooms for charter student seats in grades 6-9. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",108,2015-Q2,2016-Q1,Closeout,20220630 Sustainability Initiatives,10371984,Heroes for Zero 21-22 Contest Costs,Other,2,Monica Garcia,Central,1145301,13863,"333 S. Beaudry Ave., 22nd Floor",Los Angeles,90017,Heroes for Zero 21-22 is an education & awareness contest under the LADWP MOU 2021. This budget covers the cost of contest materials and awards ceremony. Projects that are developed at schools as a result of awards will have individual project numbers.,22,2022-Q3,2023-Q1,Planning,20220630 Herrick ES,10371236,Herrick ES - Auditorium A/V Equipment,Electrical/Lighting,6,Kelly Gonez,Northeast,1451501,13726,13350 Herrick Ave.,Sylmar,91342,"Install audio/visual equipment in auditorium. Install ceiling-mounted projector, wall-mounted television with sound bar, and all power/data/audio/video connections needed. Replace deteriorated sound system amplifier components and install new wireless microphones.",25,2020-Q4,2021-Q1,Closeout,20220630 Melrose Math/Science/Technology Magnet ES,10371230,Melrose Math/Science/Technology Magnet ES - Auditorium Curtains,Auditorium Renovation,4,Nick Melvoin,West,1521901,13521,731 N. Detroit St.,Los Angeles,90046,Install motorized stage curtains in auditorium.,30,2021-Q2,2021-Q3,Closeout,20220630 Melvin ES,10370520,Melvin ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1523301,13719,7700 Melvin Ave.,Reseda,91335,"Install a new electronic, free-standing marquee. This Local District Northwest priority project includes a Board District 3 contribution towards approximately half the budget.",53,2019-Q2,2019-Q4,Closeout,20220630 Toluca Lake EEC,10369327,Toluca Lake EEC - Fire Alarm & Restroom Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1956801,16690,4915 Strohm Ave.,North Hollywood,91601,The project will upgrade the fire alarm system and provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,632,2020-Q4,2022-Q2,Closeout,20220630 Kennedy HS,10369963,Kennedy HS - Technology & Security Upgrades,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1872501,13263,11254 Gothic Ave.,Granada Hills,91344,Purchase 2 MacBooks and 6 iMac computers; provide security upgrades as needed.,25,2018-Q4,2019-Q1,Closeout,20220630 Langdon ES,10370351,Langdon ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northwest,1477501,13413,8817 Langdon Ave.,North Hills,91343,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",60,2019-Q2,2019-Q4,Closeout,20220630 Lane ES,10369917,Lane ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1476701,13629,1500 Avenida Cesar Chavez,Monterey Park,91754,"Demolish and remove 1 portable building, remove/relocate furniture and equipment, disconnect all ITD components and utilities, and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving and provide playground striping at the footprint of the building.",185,2018-Q4,2020-Q1,Closeout,20220630 Webster MS,10370803,Webster MS - Exterior Painting,Painting,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.","1,312",2021-Q1,2022-Q2,Closeout,20220630 White MS,10370053,White MS - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1848701,13708,22102 S. Figueroa St.,Carson,90745,Install new secure entry system,29,2019-Q1,2019-Q2,Closeout,20220630 Harbor City ES,10370368,Harbor City ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1442501,13406,1508 W. 254th St.,Harbor City,90710,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",58,2019-Q1,2019-Q4,Closeout,20220630 Primary Academy for Success School,10370441,Primary Academy PC - Secure Entry System,Security System,6,Kelly Gonez,Northwest,1477601,13865,9075 Willis Ave.,Panorama City,91402,Install new secure entry system,21,2019-Q3,2020-Q1,Closeout,20220630 Harte Preparatory MS,10369549,Harte Preparatory MS - Security & Safety Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1817001,13612,9301 S. Hoover St.,Los Angeles,90044,"Provide security and safety upgrades by installing a new wrought iron pedestrian gate with secure entry system at the front of the school, traffic posts to secure the parking area, and pedestrian gates between buildings to control student traffic.",76,2018-Q1,2019-Q2,Closeout,20220630 Esperanza ES,10370714,Esperanza ES - SEEDS,SEEDS,2,Monica Garcia,Central,1238301,13824,680 Little St.,Los Angeles,90017,"Construct an outdoor learning space of approximately 4,700 square feet. Includes the removal of concrete, installation of decomposed granite, composite wood headers to create in-ground planting areas, an irrigation system, trees, log benches and stools to create a classroom gathering space. The project will be outfitted by the school site with native plants. LA Audubon Society will be aiding the school with resources and materials.",95,2019-Q3,2019-Q3,Closeout,20220630 Clifford Math & Technology Magnet ES,10370110,Clifford Math & Technology Magnet ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1311001,13309,2150 Duane St.,Los Angeles,90039,"Purchase 36 Chromebooks, 8 MacBooks, and 1 storage cart. Secure doors to room 4 for storage.",30,2018-Q4,2019-Q3,Closeout,20220630 Utah Span School,10371362,Utah ES - Secure Entry System,Security System,2,Monica Garcia,East,1737001,13328,255 Gabriel Garcia Marquez St.,Los Angeles,90033,Install new secure entry system at door to main office,27,2020-Q3,2021-Q1,Closeout,20220630 Crescent Heights Language Arts/Social Justice Magnet ES,10370865,Crescent Heights Language Arts/Social Justice Magnet - Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1328801,13454,1661 S. Crescent Heights Blvd.,Los Angeles,90035,Install new electronic free-standing marquee,30,2019-Q4,2020-Q1,Closeout,20220630 Garvanza Technology & Leadership Magnet ES,10370330,Garvanza Technology & Leadership Magnet ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1408201,15329,317 N. Ave. 62,Los Angeles,90042,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",64,2019-Q2,2020-Q1,Closeout,20220630 Farmdale ES,10367755,Farmdale ES - ADA Improvements,Access Compliance,2,Monica Garcia,East,1374001,15166,2660 Ruth Swiggett Dr.,Los Angeles,90032,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 96 doors/hardware, 20 accessible paths of travel, 38 signs, 17 restrooms, 30 drinking fountains/sinks, 21 counters, 1 assistive listening device/intercom/phone, 7 concrete ramps, 5 asphalt ramps, 6 metal ramps, 8 pieces of accessible furniture, 5 assembly seat, 2 railings, 5 parking areas, and 1 stage lift.","3,006",2017-Q2,2021-Q1,Closeout,20220630 Westchester Enriched Sciences Magnets,10371893,Westchester Enriched Sciences Magnets - 2021-22 Prop 39 (WISH Academy HS),Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Academy HS for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 3 special education rooms, and 12 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",187,2021-Q2,2021-Q3,Closeout,20220630 Pacoima MS,10367977,Pacoima MS - Seismic Retrofit of Auditorium,Seismic Modernization,6,Kelly Gonez,Northeast,1832101,13750,9919 Laurel Canyon Blvd.,Pacoima,91331,"The auditorium was built in 1955 with 15,100 square feet and will require upgrades to structural connections at the roof, wall, and foundation to meet current seismic requirements.","1,886",2018-Q2,2019-Q1,Closeout,20220630 Brockton ES,10370323,Brockton ES - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1254801,13432,1309 Armacost Ave.,Los Angeles,90025,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",57,2019-Q3,2020-Q1,Closeout,20220630 Hamilton HS,10368159,Hamilton HS - Comprehensive Modernization,Comprehensive Modernization,1,"Dr. George J. McKenna, III",West,1868601,13570,2955 Robertson Blvd.,Los Angeles,90034,"This project includes the construction of new buildings and site improvements with approximately 59 general and specialty classrooms, instructional support spaces, maintenance and operations area, lunch shelter, bleachers, athletic fields, press box and restroom/concessions. Existing school facilities will be upgraded including the modernization and seismic retrofit of the administration/classroom building #3 and auditorium building #2; seismic retrofit of cafeteria building #9; and seismic retrofit and new HVAC system in the small gymnasium building #13 and the large gymnasium building #14. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of lab/classroom building #4, humanities classroom building #6, photography building #7, maintenance and operations building, lunch shelter, bleachers, and 6 relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","271,665",2022-Q4,2028-Q1,Design,20220630 Amestoy ES,10371239,Amestoy ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1209601,13426,1048 W. 149th St.,Gardena,90247,Install new secure entry system at door to main office with three video receivers in main office.,34,2020-Q3,2021-Q1,Closeout,20220630 Fries ES,10371396,Fries ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1401401,13463,1301 Fries Ave.,Wilmington,90744,Install new secure entry system at door to main office,26,2020-Q3,2021-Q1,Closeout,20220630 112th St. ES,10369355,112th St. ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,Install Aiphone video/buzzer entry system at main entrance.,13,2018-Q1,2018-Q2,Closeout,20220630 96th St. ES,10369359,96th St. ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1557501,13496,1471 E. 96th St.,Los Angeles,90002,Install Aiphone video/buzzer entry system at main entrance.,25,2017-Q4,2018-Q2,Closeout,20220630 Bryson ES,10369600,Bryson ES - Security Upgrades,Security System,5,Jackie Goldberg,East,1258901,13558,4470 Missouri Ave.,South Gate,90280,Install new secure entry system,24,2019-Q4,2020-Q1,Closeout,20220630 Dorsey HS,10372161,Dorsey HS - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1860001,13643,3537 Farmdale Ave.,Los Angeles,90016,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.","1,164",2022-Q4,2024-Q2,Planning,20220630 Le Conte MS,10372193,Le Conte MS - Roofing,Roofing,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"This project is to provide approximately 110,857 square feet of new roofing at 13 buildings, including the installation of new gutters and downspouts and painting of affected areas.","2,848",2023-Q1,2023-Q4,Planning,20220630 Huntington Park ES,10372097,Huntington Park ES - Install Electronic Marquee,Electrical/Lighting,5,Jackie Goldberg,East,1239101,13916,6055 Corona Ave.,Huntington Park,90255,Install new electronic wall-mounted marquee near main entrance. Approx. 120 ft of data and power required. PUS confirmed wall is free of asbestos. Project requires structural design. Standard red LED display.,59,2022-Q2,2022-Q2,Closeout,20220630 Anton ES,10372285,Anton ES - Secure Entry System,Security System,2,Monica Garcia,East,1435601,14382,831 N. Bonnie Beach Pl.,Los Angeles,90063,Install new secure entry system at the Main Office.,41,2022-Q2,2022-Q3,Construction,20220630 Plainview Academic Charter Academy,10372300,Plainview Academic Charter Academy - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1609601,13580,10819 Plainview Ave.,Tujunga,91042,Install new secure entry system at the Main Office.,40,2022-Q3,2022-Q4,Planning,20220630 Beethoven ES,10372315,Beethoven ES - Install Wrought Iron Fence,Fencing,4,Nick Melvoin,West,1234201,15206,3711 Beethoven St.,Los Angeles,90066,Install approx. 200' of wrought iron fencing with three pedestrian gates.,51,2022-Q3,2022-Q4,Planning,20220630 Dominguez ES,10372320,Dominguez ES - Purchase Exterior Tables,Furniture/Fixtures/Equipment,7,Tanya Ortiz Franklin,South,1346601,13310,21250 Santa Fe Ave.,Carson,90810,Purchase (20) picnic-style tables with umbrellas. M&O to anchor all tables.,56,2022-Q3,2022-Q4,Planning,20220630 Belmont HS,10100281,Belmont HS - Replace HVAC,HVAC,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,Replace HVAC,"3,016",2016-Q3,2017-Q4,Closeout,20220630 Dena ES,10369480,Dena ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1331501,13277,1314 Dacotah St.,Los Angeles,90023,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",393,2020-Q4,2021-Q3,Closeout,20220630 42nd St. ES,10364346,42nd St. ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1395901,13487,4231 Fourth Ave.,Los Angeles,90008,Demolish/Remove Portable Building(s),174,2014-Q2,2015-Q4,Closeout,20220630 Van Nuys MS,10367505,Van Nuys MS - Roofing,Roofing,3,Scott Schmerelson,Northeast,1843401,13605,5435 Vesper Ave.,Van Nuys,91411,"This project is to upgrade 24,420 square feet of roofing on two buildings and arcades with a Polyvinyl Chloride (PVC) material. The roofs are over 35 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",230,2017-Q2,2017-Q3,Closeout,20220630 South Gate MS,10367002,South Gate MS - Upgrade Old Gym Floors & Wall Systems,Flooring,5,Jackie Goldberg,East,1837701,13261,4100 Firestone Blvd.,South Gate,90280,This project will replace the wood floors in the gymnasium building and rehabilitate adjacent wall systems including replacing windows that leak. The existing floors are over 70 years old and in poor condition resulting in a hazardous condition at the site.,193,2016-Q2,2016-Q3,Closeout,20220630 Van Nuys HS,10370025,Van Nuys HS - Install Ramps to Classrooms 529 & 531,Access Compliance,3,Scott Schmerelson,Northeast,1889301,13404,6535 Cedros Ave.,Van Nuys,91411,Purchase and install TMP ramps at classroom 529 and 531 and include adjacent classrooms if practical.,122,2018-Q4,2019-Q1,Closeout,20220630 Haddon EEC,10369852,Haddon EEC - Nature Explore Classroom,Campus Improvement,6,Kelly Gonez,Northeast,1958801,16666,10085 Haddon Ave.,Pacoima,91331,"This project will create field-tested, research-based outdoor learning spaces that provide learning opportunities and support children's interaction with the natural world.  The outdoor learning spaces are divided into distinct activity areas to provide a wide-ranging mix of educational activities that support children with a variety of needs and learning styles.  The activity areas include art, building, music, climbing/balancing, flexing, gathering, gardening, messy materials, wheel toys, etc.","2,237",2020-Q3,2021-Q4,Closeout,20220630 Budlong ES,10371643,Budlong ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1261601,15162,5940 S. Budlong Ave.,Los Angeles,90044,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",592,2021-Q2,2022-Q2,Closeout,20220630 Laurel Span School,10372000,Laurel Cinematic Arts & Creative Tech Magnet - Install Security System,Security System,4,Nick Melvoin,West,1480801,13359,925 N. Hayworth Ave.,Los Angeles,90046,Install intrusion alarm in Room 11 storage room,12,2021-Q4,2021-Q4,Closeout,20220630 Toluca Lake EEC,10372088,Toluca Lake EEC - Purchase Classroom Furniture,Furniture/Fixtures/Equipment,6,Kelly Gonez,Northeast,1956801,16690,4915 Strohm Ave.,North Hollywood,91601,Purchase (2) new student activity tables and (5) cubby storage units,6,2021-Q4,2022-Q1,Closeout,20220630 Lawrence MS,10366055,Lawrence MS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1821701,13695,10100 Variel Ave.,Chatsworth,91311,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",483,2015-Q1,2015-Q2,Closeout,20220630 Marvin EEC,10367996,Marvin EEC - Door Upgrades,Ceiling/Wall System,1,"Dr. George J. McKenna, III",West,1958401,16293,2341 S. Curson Ave.,Los Angeles,90016,"Replace all exterior doors, which are weathered and damaged beyond economical repair, and paint interior doors.",21,2016-Q4,2017-Q2,Closeout,20220630 Arminta ES,10369142,Arminta ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1220501,13710,11530 Strathern St.,North Hollywood,91605,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",53,2018-Q3,2018-Q4,Closeout,20220630 Fernangeles ES,10369148,Fernangeles ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1375301,13594,12001 Art St.,Sun Valley,91352,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",52,2018-Q3,2018-Q4,Closeout,20220630 Mount Gleason MS,10368983,Mount Gleason MS-Lunch tables/changing room upgrades,Access Compliance,6,Kelly Gonez,Northeast,1824001,13744,10965 Mt. Gleason Ave.,Sunland,91040,"Purchase two accessible lunch tables. Remodel storage room into changing table which includes: provide electrical outlets, provide exhaust fan, widen doorways, provide privacy curtains, provide instant water heater, remove cabinets and finish walls, door and cabinet hardware and remove replace mastic floor.",58,2017-Q2,2017-Q3,Closeout,20220630 North Valley Military Institute,10368317,North Valley Military Institute - Fencing Upgrade,Fencing,6,Kelly Gonez,Northeast,1810601,13842,12105 Allegheny St.,Sun Valley,91352,Provide and install fence for the archery range.,34,2017-Q2,2017-Q3,Closeout,20220630 Monroe HS,10363845,Monroe HS - Science Lab Improvements,Campus Improvement,6,Kelly Gonez,Northwest,1876801,13704,9229 Haskell Ave.,North Hills,91343,"The project provides 2 chemistry labs with safety equipment including emergency shower/eyewash, fume hood, utility shutoff valves and HVAC units sufficient to remove chemical fumes from classrooms and workrooms. The project scope also includes chemical storage cabinets and eyewash in workrooms, fire sprinklers in chemistry labs and workrooms, functional repairs to plumbing and cabinetry, and requirements of the Americans with Disabilities Act (ADA) for accessibility including path of travel improvements, restroom and fountain upgrades. The project will also complete any unfinished scope that was part of the previously-approved science lab renovation project at this school.","2,561",2015-Q4,2016-Q3,Closeout,20220630 Wilshire Crest ES,10370783,Wilshire Crest ES - Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1779501,13524,5241 W. Olympic Blvd.,Los Angeles,90036,Install new electronic free-standing marquee,51,2019-Q4,2019-Q4,Closeout,20220630 Overland ES,10368199,Overland ES - Parking & Playground Improvements,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1590401,13486,10650 Ashby Ave.,Los Angeles,90064,Provide new staff parking lot and reconfigure playground.,406,2018-Q2,2018-Q2,Closeout,20220630 Hillside ES,10368732,Hillside ES - Paving,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1453401,13293,120 E. Ave. 35,Los Angeles,90031,"This project replaces approximately 50,000 square feet of deteriorated asphalt paving in the playground areas and provides a new drainage system for the site. The scope includes new site drainage, planter areas, bioswale, and underground infiltration. The site drainage shall be designed to comply with the LAUSD Storm Water Technical Manual and State Water Board requirements as well as meet the intent of the Los Angeles County Low Impact Development (LID) Manual.","3,089",2020-Q3,2021-Q2,Closeout,20220630 Welby Way Charter ES,10371425,Welby Way ES - Video Surveillance (CCTV) System,Security System,3,Scott Schmerelson,Northwest,1763701,13789,23456 Welby Way,West Hills,91307,Install video surveillance (CCTV) system with two cameras.,33,2021-Q3,2022-Q1,Closeout,20220630 Carnegie MS,10369610,Carnegie MS - HVAC,HVAC,7,Tanya Ortiz Franklin,South,1809001,13761,21820 Bonita St.,Carson,90745,"This project is to replace Heating, Ventilation and Air Conditioning systems at the Administration and Library/Oral Arts Buildings.","3,770",2021-Q4,2023-Q4,Construction,20220630 Westminster Math & Technology/Environmental Studies Magnet ES,10372139,Westminster ES Magnet - Roofing,Roofing,4,Nick Melvoin,West,1769901,13483,1010 Abbot Kinney Blvd.,Venice,90291,"This project is to provide approximately 51,354 square feet of new roofing at seven buildings, including the installation of new gutters and downspouts and painting of affected areas.","1,045",2023-Q2,2024-Q1,Planning,20220630 Los Angeles Academy MS,10370600,Los Angeles Academy MS - 2019-20 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,Central,1820001,13890,644 E. 56th St.,Los Angeles,90011,"Summit Preparatory Charter School is vacating this site. This project was approved in Board of Education Report No. 343-18/19. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",38,2019-Q2,2019-Q3,Closeout,20220630 Baldwin Hills ES,10370297,Baldwin Hills ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1227401,13595,5421 Rodeo Rd.,Los Angeles,90016,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",62,2019-Q1,2019-Q3,Closeout,20220630 Valerio ES,10370222,Valerio ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1738401,15143,15035 Valerio St.,Van Nuys,91405,"Replace deteriorated interior walk-in cooler, interior walk-in freezer, and interior side-by-side walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, interior walk-in freezer, interior side-by-side walk-in cooler, and refrigeration equipment.",221,2025-Q3,2025-Q4,Planning,20220630 Weigand ES,10370226,Weigand ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1763401,13611,10401 Weigand Ave.,Los Angeles,90002,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q1,2026-Q3,Planning,20220630 Roscomare ES,10370095,Roscomare ES - Exterior Painting,Painting,4,Nick Melvoin,West,1636301,13799,2425 Roscomare Rd.,Los Angeles,90077,"Prepare, paint, and refinish the exterior of all buildings and their appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",163,2019-Q3,2019-Q3,Closeout,20220630 State ES,10370778,State ES - ADA Improvements,Access Compliance,5,Jackie Goldberg,East,1691801,13639,3211 Santa Ana St.,South Gate,90280,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 10 doors/jambs, 11 door hardware, 23 thresholds, 19 accessible paths of travel, 55 signs, 13 restrooms, 15 drinking fountains, 13 sinks/sink cabinets, 1 assistive listening device/intercom/phone, 2 concrete ramps, 1 metal ramp, 14 pieces of accessible furniture, 1 assembly seat, 11 railings, 5 existing elevator modifications, 1 parking area, 2 casework/counters, 7 door modifications/auto openers, 1 stage lift, and DSA certification or replacement of 1 portable sanitary building.","6,379",2023-Q1,2024-Q4,Design,20220630 Warner ES,10371785,Warner ES - Install Grab Bar,Access Compliance,4,Nick Melvoin,West,1761601,13481,615 Holmby Ave.,Los Angeles,90024,Install grab bar in Nurse's office.,7,2021-Q2,2021-Q2,Closeout,20220630 Shenandoah EEC,10369322,Shenandoah EEC - Restroom Upgrade,Access Compliance,1,"Dr. George J. McKenna, III",West,1955901,16725,8861 Beverlywood St.,Los Angeles,90034,The project will provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,254,2022-Q3,2023-Q1,Design,20220630 Windsor Hills Math/Science/Aerospace Magnet ES,10369807,Windsor Hills Math/Science/Aerospace Magnet ES - Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1782201,13757,5215 Overdale Dr.,Los Angeles,90043,Install new electronic free-standing marquee.,62,2018-Q4,2018-Q4,Closeout,20220630 Wadsworth EEC,10005074,Wadsworth EEC - Safety Upgrades and Improvements,Campus Improvement,5,Jackie Goldberg,Central,1957501,16764,1047 E. 41st St.,Los Angeles,90011,Upgrade exterior gates and parking lot,8,2014-Q3,2015-Q1,Closeout,20220630 Madison MS,10366663,Madison MS-Remove Non bearing Partition,Access Compliance,6,Kelly Gonez,Northeast,1823001,13627,13000 Hart St.,North Hollywood,91605,Remove Dividing Non-Structural Wall for Special Classroom Conversion,7,2014-Q4,2015-Q1,Closeout,20220630 Fairfax HS,10372001,Fairfax HS - Install Security Monitor System,Security System,4,Nick Melvoin,West,1862101,13473,7850 Melrose Ave.,Los Angeles,90046,Install video surveillance (CCTV) system with 8 cameras,77,2021-Q4,2022-Q2,Closeout,20220630 Crestwood ES,10370378,Crestwood ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1330201,13733,1946 W. Crestwood St.,Rancho Palos Verdes,90275,Install new secure entry system,21,2019-Q2,2019-Q3,Closeout,20220630 Fishburn ES,10370584,Fishburn ES - 2019-20 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1384901,13532,5701 Fishburn Ave.,Maywood,90270,"Clemente Charter School is vacating this site. This project was approved in Board of Education Report No. 343-18/19. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",24,2019-Q2,2019-Q3,Closeout,20220630 Vernon City ES,10368116,Vernon City ES - Lunch Shelter,Lunch/Shade Shelter,5,Jackie Goldberg,East,1749301,13563,2360 E. Vernon Ave.,Los Angeles,90058,Replace the deteriorated and undersized lunch shelter with a new larger lunch shelter that includes new lunch tables and benches for both general and accessible seating.,552,2018-Q2,2020-Q2,Closeout,20220630 Northridge Academy HS,10372122,Northridge Academy HS - Energy Conservation Lighting,Electrical/Lighting,3,Scott Schmerelson,Northwest,1851301,13930,9601 Zelzah Ave.,Northridge,91325,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $1,056,719. Estimated energy savings is 461,834 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $284,911 which is 26.9% of the ECM costs.",285,2021-Q4,2022-Q3,Construction,20220630 49th St. ES,10372204,49th St. ES - Install Privacy Fence,Fencing,7,Tanya Ortiz Franklin,Central,1393201,13348,750 E. 49th St.,Los Angeles,90011,Replace approx. 170 feet of chain link fence with privacy fencing. Install new 20 feet section of privacy fencing with a pedestrian gate,52,2021-Q4,2022-Q1,Closeout,20220630 Lowman Special Education & Career Transition Center,10367623,Lowman Special Education & Career Transition Center - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1194801,13544,12827 Saticoy St.,North Hollywood,91605,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",43,2016-Q3,2017-Q2,Closeout,20220630 Wright STEAM Magnet MS,10368856,Wright MS - 2017-18 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Charter MS for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 2 charter offices and 23 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",80,2017-Q2,2017-Q3,Closeout,20220630 Sylmar Leadership Academy,10370348,Sylmar Leadership Academy - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1740801,14568,14550 Bledsoe St.,Sylmar,91342,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new chairs. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",43,2019-Q1,2019-Q2,Closeout,20220630 Hazeltine ES,10369151,Hazeltine ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northeast,1449301,13529,7150 Hazeltine Ave.,Van Nuys,91405,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",47,2018-Q1,2018-Q3,Closeout,20220630 Noble ES,10369154,Noble ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1560301,13632,8329 Noble Ave.,North Hills,91343,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",80,2018-Q1,2018-Q3,Closeout,20220630 San Fernando ES,10369156,San Fernando ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1645201,13419,1130 Mott St.,San Fernando,91340,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",52,2017-Q4,2018-Q3,Closeout,20220630 Overland ES,10364252,Overland ES - Upgrade Awnings/Paint Existing Bungalows,Campus Improvement,1,"Dr. George J. McKenna, III",West,1590401,13486,10650 Ashby Ave.,Los Angeles,90064,Upgrade Awnings/Paint Existing Bungalows,16,2014-Q1,2015-Q2,Closeout,20220630 Vena ES,10369161,Vena ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1746601,13773,9377 Vena Ave.,Arleta,91331,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",45,2018-Q1,2018-Q3,Closeout,20220630 Chase ES,10369164,Chase ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northwest,1301401,13620,14041 Chase St.,Panorama City,91402,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",58,2017-Q3,2018-Q1,Closeout,20220630 92nd St. ES,10369168,92nd St. ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1554801,13511,9211 Grape St.,Los Angeles,90002,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",48,2017-Q4,2018-Q2,Closeout,20220630 Santana Arts Academy,10367637,Santana Arts Academy - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northwest,1740401,15165,9301 N. Columbus Ave.,North Hills,91343,Modernize parent & family center by providing interior paint and refinishing floors. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.,30,2016-Q3,2016-Q4,Closeout,20220630 Tweedy ES,10367641,Tweedy ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1726001,13955,9724 Pinehurst Ave.,South Gate,90280,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",45,2016-Q3,2017-Q3,Closeout,20220630 Loma Vista ES,10370172,Loma Vista ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1491801,13586,3629 E. 58th St.,Maywood,90270,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2026-Q2,2026-Q3,Planning,20220630 Miller ES,10370183,Miller ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",South,1532101,13780,830 W. 77th St.,Los Angeles,90044,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2025-Q1,2025-Q2,Planning,20220630 186th St. ES,10370188,186th St. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1575301,13303,1581 W. 186th St.,Gardena,90248,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2027-Q3,2027-Q4,Planning,20220630 Raymond ES,10370193,Raymond ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1621901,13469,7511 Raymond Ave.,Los Angeles,90044,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q2,2027-Q3,Planning,20220630 Academy for Enriched Sciences Magnet ES,10367903,Academy for Enriched Sciences Elementary Magnet - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1225001,13615,17551 Miranda St.,Encino,91316,Provide and install electronic marquee.,42,2016-Q4,2017-Q1,Closeout,20220630 75th St. ES,10365223,75th St. ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1663001,13470,142 W. 75th St.,Los Angeles,90003,Demolish/Remove 1 Portable Building,74,2014-Q3,2015-Q2,Closeout,20220630 Banning HS,10368107,Banning HS - Electrical Outlet,Access Compliance,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,"Provide and install electrical outlet in women's restrooms in the main building, east hall.",2,2016-Q4,2016-Q4,Closeout,20220630 Ann ES,10366216,Ann ES - 2014-18 Prop 39,Charter Prop 39,2,Monica Garcia,East,1213701,13286,126 E. Bloom St.,Los Angeles,90012,"This project was initially approved in BOE Report No. 342-13/14 for 2014-15 Prop. 39 co-locations as a charter school renovation for Endeavor College Prep. This growth project included 1 charter office and 7 instructional spaces for 202 charter students in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 423-14/15 for 2015-16 Prop. 39 co-locations as a ""no growth"" project with 1 charter office and 7 instructional spaces for charter students in grades K-8. The project was amended in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a ""no growth"" project. The project was again amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with an unspecified scope of work and a revised expiration date for the charter school of 6/30/18. The charter operator, Endeavor College Prep did not continue to occupy Ann ES during the 2017-18 academic year. As a result, the scope of work was defined as a vacancy which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",27,2018-Q3,2018-Q3,Closeout,20220630 School Police Department,10364239,School Police Department - Portable Removal,Portable Removal,2,Monica Garcia,Central,1134101,13875,125 N. Beaudry Ave.,Los Angeles,90012,Demolish/Remove Portable Building(s) at Maclay Police Substation,56,2014-Q4,2015-Q1,Closeout,20220630 Fulton College Preparatory School,10366895,Fulton College Preparatory School - 2015-16 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,"This project is a charter school renovation for Lashon Academy for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 10 classrooms for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",103,2015-Q2,2015-Q3,Closeout,20220630 Crenshaw Magnet HS: STEMM,10004142,Crenshaw HS - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",115,2014-Q2,2016-Q3,Closeout,20220630 Holmes ES,10368818,Holmes ES - 2017-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1456201,13315,5108 Holmes Ave.,Los Angeles,90058,"This project was initially approved in BOE Report No. 530-16/17 for the 2017-18 Prop 39 co-locations as a charter school renovation for Clemente Charter School. This project included 1 charter office and 9 instructional spaces for charter student seats in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/19.",150,2017-Q2,2017-Q3,Closeout,20220630 Hope Continuation HS,10368679,Hope Continuation HS - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1865201,16441,7840 Towne Ave.,Los Angeles,90003,Purchase and install Aiphone secure entry system to enhance and control the security of the campus.,17,2017-Q2,2017-Q4,Closeout,20220630 Carson HS,10366724,Carson HS - Safety Upgrades to Athletic Fields,Gym/Athletic Facilities Renovation,7,Tanya Ortiz Franklin,South,1857501,13869,22328 S. Main St.,Carson,90745,Provide safety nets and poles at the boys' baseball and girls' softball fields to prevent baseballs/softballs from causing accidents.,719,2022-Q3,2023-Q2,Design,20220630 Hubbard ES,10372633,Hubbard ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1460301,13718,13325 Hubbard St.,Sylmar,91342,Install new secure entry system at the Main Office.,49,2022-Q3,2022-Q3,Planning,20220630 Garza PC,10363899,Garza PC - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1342601,13928,2750 E. Hostetter St.,Los Angeles,90023,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",255,2015-Q2,2015-Q2,Closeout,20220630 Brockton ES,10100283,Brockton ES - Renovate Auditorium,Auditorium Renovation,4,Nick Melvoin,West,1254801,13432,1309 Armacost Ave.,Los Angeles,90025,Renovate Auditorium,257,2013-Q4,2015-Q2,Closeout,20220630 White MS,10367055,White MS - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1848701,13708,22102 S. Figueroa St.,Carson,90745,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 249 doors/hardware, 114 accessible paths of travel, 127 signs, 24 restrooms, 37 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 17 concrete ramps, 4 metal ramps, 34 pieces of accessible furniture, 1 assembly seat, 8 railings, 1 locker room modification/locker, 2 parking areas, 1 cafeteria counter, 2 new elevators/stage lifts, and 1 passenger/bus loading zone.","7,006",2016-Q4,2022-Q4,Construction,20220630 Vista del Valle Dual Language Academy,10370349,Vista del Valle Dual Language Academy - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1740001,193561,12441 Bromont Ave.,San Fernando,91340,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",51,2019-Q1,2019-Q4,Closeout,20220630 Wright STEAM Magnet MS,10371156,Wright STEAM Magnet MS - Library Furniture and Flooring,Library Renovation,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,Provide furniture and flooring in the library.,73,2020-Q3,2020-Q4,Closeout,20220630 Virginia ES,10368381,Virginia ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1757501,13504,2925 Virginia Rd.,Los Angeles,90016,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",166,2018-Q2,2018-Q4,Closeout,20220630 Topeka Charter School for Advanced Studies,10367374,Topeka Charter School for Advanced Studies - Shade Shelters,Lunch/Shade Shelter,3,Scott Schmerelson,Northwest,1720101,13821,9815 Topeka Dr.,Northridge,91324,"The project will install a new shade structure over the existing play equipment in the kindergarten yard and install a new shade structure over the lunch tables used by the children for outdoor meals and play. The scope of work also includes site improvements such as paving, landscaping, and irrigation as well as upgrades to the meet the accessibility requirements of the Americans with Disabilities Act (ADA) with the addition of a gate, sidewalk, and drinking fountain.",354,2017-Q3,2018-Q2,Closeout,20220630 San Fernando HS,10366094,San Fernando HS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1884301,13670,11133 O'Melveny Ave.,San Fernando,91340,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,071",2015-Q2,2015-Q3,Closeout,20220630 Cabrillo ES,10370709,Cabrillo ES - Privacy Fence,Fencing,7,Tanya Ortiz Franklin,South,1268501,13552,732 S. Cabrillo Ave.,San Pedro,90731,Install new fence with privacy slats,24,2019-Q3,2019-Q3,Closeout,20220630 San Miguel ES,10370512,San Miguel ES - Roofing,Roofing,5,Jackie Goldberg,East,1687501,14741,9801 San Miguel Ave.,South Gate,90280,"This project is to provide approximately 26,900 square feet of new roofing at 16 buildings, including new gutters and downspouts, and painting of affected areas",568,2024-Q4,2025-Q2,Planning,20220630 Cantara ES,10369825,Cantara ES - Accessibility Upgrade,Access Compliance,3,Scott Schmerelson,Northwest,1276701,13732,17950 Cantara St.,Reseda,91335,Install metal ramp at one portable building for rooms 16-17 and install door hardware and threshold.,36,2018-Q2,2018-Q3,Closeout,20220630 Weemes ES,10371598,Weemes ES - Install Secure Entry System,Security System,1,"Dr. George J. McKenna, III",Central,1715101,13322,1260 W. 36th Pl.,Los Angeles,90007,Install new secure entry system at door to main office with three video receivers in main office. Install mounting post for intercom/camera.,28,2021-Q1,2021-Q2,Closeout,20220630 Perez Special Education Center,10364123,Perez Special Education Center - HVAC,HVAC,2,Monica Garcia,East,1195301,13489,4540 Michigan Ave.,Los Angeles,90022,"The project will remove and replace a 90-ton chiller, multi-zones, and fan coil units which provide heating and air conditioning for 35 classrooms and a number of offices. The existing equipment is approximately 30 years old, in poor condition, and unreliable.","8,150",2017-Q2,2019-Q2,Closeout,20220630 Lake Balboa College Preparatory Magnet,10370738,Lake Balboa College Preparatory Magnet - Accessibility Upgrade,Access Compliance,3,Scott Schmerelson,Northwest,1739001,15185,6701 Balboa Blvd.,Lake Balboa,91406,Provide accessible changing room and purchase and install Hi-Lo changing table.,40,2019-Q3,2019-Q3,Closeout,20220630 Lomita STEAM Magnet ES,10366696,Lomita STEAM Magnet ES - Upgrade Telecommunications,Communications/Technology Upgrade,7,Tanya Ortiz Franklin,South,1493201,13313,2211 247th St.,Lomita,90717,Upgrade telecommunications infrastructure to support an automatic telephone attendant console,27,2015-Q4,2016-Q1,Closeout,20220630 Carson HS,10367445,Carson HS - HVAC in Competition Gym,HVAC,7,Tanya Ortiz Franklin,South,1857501,13869,22328 S. Main St.,Carson,90745,"The project will address cooling needs in the gymnasium building. The scope of work includes installing a new heating, ventilation, and air conditioning (HVAC) system and upgrading the fire alarm system. The project also includes equipment demolition, asbestos abatement, cleaning and leak test for ducts, structural upgrade, electrical power upgrade, patch and paint if required.","6,229",2019-Q2,2021-Q1,Closeout,20220630 Markham MS,10371249,Markham MS - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,Install new secure entry system at door to main office with three video receivers in main office.,31,2020-Q3,2021-Q1,Closeout,20220630 Van Nuys HS,10371189,Van Nuys HS - Accessibility Upgrades,Access Compliance,3,Scott Schmerelson,Northeast,1889301,13404,6535 Cedros Ave.,Van Nuys,91411,Install an ADA accessible gate and provide Aiphone and camera to allow the main office to open the gate remotely.,143,2020-Q3,2021-Q1,Closeout,20220630 Malabar ES,10372077,Malabar ES - Install Ramp,Access Compliance,2,Monica Garcia,East,1508201,13314,3200 E. Malabar St.,Los Angeles,90063,Install a concrete ramp from the street to the auditorium.,144,2022-Q1,2022-Q3,Construction,20220630 52nd St. ES,10367067,52nd St. ES - ADA Improvements,Access Compliance,1,"Dr. George J. McKenna, III",West,1380801,13307,816 W. 51st St.,Los Angeles,90037,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 89 doors/hardware, 30 accessible paths of travel, 58 signs, 10 restrooms, 13 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 4 concrete ramps, 5 assembly seats, 4 railings, and 1 parking area.","3,288",2017-Q1,2022-Q4,Construction,20220630 Gault ES,10370697,Gault ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1411001,13682,17000 Gault St.,Lake Balboa,91406,"Install a new electronic, free-standing marquee. This Local District Northwest priority project includes a Board District 3 contribution towards approximately half the budget.",43,2019-Q3,2019-Q4,Closeout,20220630 Carthay Environmental Studies Magnet ES,10371064,Carthay Environmental Studies Magnet ES - Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1284901,13461,6351 W. Olympic Blvd.,Los Angeles,90048,"Remove the old marquee and mount a new marquee to the existing concrete slab. The marquee replacement includes boring holes, running conduit and wires from the main building to the new marquee, and painting exposed conduit and providing touch-ups as needed.",54,2020-Q2,2020-Q3,Closeout,20220630 20th St. ES,10372250,20th St. ES - SEEDS,SEEDS,5,Jackie Goldberg,Central,1727401,13333,1353 E. 20th St.,Los Angeles,90011,"Construct an outdoor learning and gathering space of approximately 1,900 square feet. Includes the installation of decomposed granite and cement brush off areas, concrete headers to create in-ground planting areas, new trees, mulch, a new irrigation system, log benches and stools to create a classroom gathering space. The project will be outfitted by the school site with drought tolerant plants.",146,2022-Q3,2023-Q2,Planning,20220630 Hamasaki Medical & Science Magnet ES,10369297,Hamasaki Medical & Science Magnet ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1627401,13577,4865 E. 1st St.,Los Angeles,90022,"Demolition of 1 portable DSA building. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprint.",180,2018-Q1,2021-Q2,Closeout,20220630 Van Ness ES,10366197,Van Ness ES - Laptops & Cart,Communications/Technology Upgrade,4,Nick Melvoin,West,1742501,13393,501 N. Van Ness Ave.,Los Angeles,90004,Increase school's access to technology by providing laptops and media carts,24,2014-Q3,2014-Q3,Closeout,20220630 Gardena HS,10369227,Gardena HS - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"Removal of 4 portable buildings. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprints.",220,2017-Q4,2020-Q3,Closeout,20220630 Danube ES,10371213,Danube ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1333501,13845,11220 Danube Ave.,Granada Hills,91344,Install new secure entry system at door to main office with three video receivers in main office.,15,2021-Q1,2021-Q2,Closeout,20220630 Welby Way Charter ES,10370036,Welby Way Charter ES - Secure Entry at Pedestrian Gates,Security System,3,Scott Schmerelson,Northwest,1763701,13789,23456 Welby Way,West Hills,91307,Install new hardware with key pads on two pedestrian gates near the child care center.,14,2019-Q3,2019-Q4,Closeout,20220630 Vaughn Next Century Learning Center,10366322,Vaughn Next Century Learning Center - Ceiling System Improvements,Seismic Modernization,6,Kelly Gonez,Northeast,1745201,13756,13330 Vaughn St.,San Fernando,91340,"Repair 7,000 square feet of suspended ceiling systems in 003DAN classroom building for seismic corrections and to improve structural integrity. Scope of work includes installation of new seismic compression struts, and hanger wire upgrades per code requirements, as well as abatement of asbestos and removing impacted components beyond their remaining service life.",586,2017-Q4,2018-Q1,Closeout,20220630 Madison ES,10369878,Madison ES - Technology Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1321001,13907,9820 Madison Ave.,South Gate,90280,Purchase 54 iPads and 2 charging carts,23,2018-Q4,2018-Q4,Closeout,20220630 Fairfax HS,10372110,Fairfax HS - Major Modernization,Major Modernization,4,Nick Melvoin,West,1862101,13473,7850 Melrose Ave.,Los Angeles,90046,"Site Due Diligence, Planning and Feasibility Activities.","1,569",-Q,-Q,Planning,20220630 Knollwood Preparatory Academy ES,10004569,Knollwood ES - Facelift,Facelift,3,Scott Schmerelson,Northwest,1476201,13770,11822 Gerald Ave.,Granada Hills,91344,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",144,2012-Q2,2016-Q3,Closeout,20220630 Avalon Gardens ES,10372467,Avalon Gardens ES - Purchase Exterior Tables,Furniture/Fixtures/Equipment,7,Tanya Ortiz Franklin,South,1224701,13618,13940 S. San Pedro St.,Los Angeles,90061,Purchase (10) tables and umbrellas. M&O to anchor all tables.,33,2022-Q3,2022-Q4,Planning,20220630 Soto ES,10367257,Soto ES - Failing Slope,Excavation,2,Monica Garcia,East,1684901,13424,1020 S. Soto St.,Los Angeles,90023,"This project will address the failing slope on the east end of the campus. In addition to remediating the erosion of the soil, the scope also includes constructing French drains, curbs, and gutters.",394,2017-Q2,2017-Q4,Closeout,20220630 Westchester Enriched Sciences Magnets,10369802,Westchester Enriched Sciences Magnets - 2018-19 Prop 39 (Westside Innovative School House (WISH) Charter MS),Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Charter MS for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office and 6 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",244,2018-Q2,2018-Q3,Closeout,20220630 Columbus ES,10372287,Columbus ES - Secure Entry System,Security System,3,Scott Schmerelson,Northeast,1743201,13568,6700 Columbus Ave.,Van Nuys,91405,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Sylmar Charter HS,10372124,Sylmar Charter HS - Energy Conservation Lighting,Electrical/Lighting,6,Kelly Gonez,Northeast,1887801,13856,13050 Borden Ave.,Sylmar,91342,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $2,016,650. Estimated energy savings is 753,594 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $486,497 which is 24.1% of the ECM costs.",487,2021-Q4,2023-Q1,Construction,20220630 Porter MS,10366086,Porter MS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1835401,13807,15960 Kingsbury St.,Granada Hills,91344,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",459,2015-Q1,2015-Q2,Closeout,20220630 Locke EEC,10100411,Locke EEC - New Playground Equipment,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1953101,16288,320 E. 111th St.,Los Angeles,90061,New Playground Equipment,272,2013-Q3,2014-Q2,Closeout,20220630 Wilmington Park EEC,10005077,Wilmington Park EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1958501,16300,1419 Young St.,Wilmington,90744,"Upgrade parking lot gate, entry control system, plumbing systems in restrooms, exterior gates, and playground equipment.",682,2017-Q2,2017-Q3,Closeout,20220630 La Salle ES,10370931,La Salle ES - Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1478601,13507,8715 La Salle Ave.,Los Angeles,90047,Install new electronic free-standing marquee,57,2019-Q4,2020-Q2,Closeout,20220630 San Pedro HS,10368875,San Pedro HS-Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1885001,13377,1001 W. 15th St.,San Pedro,90731,"Removal of 4 Bungalow Classroom Buildings. The disconnection of electrical and plumbing utilities (gas, water and sewer), fire alarm, condensation line as well as bard guard and low voltage disconnection.",451,2017-Q2,2017-Q4,Closeout,20220630 Herrick ES,10367920,Herrick ES - Fencing,Fencing,6,Kelly Gonez,Northeast,1451501,13726,13350 Herrick Ave.,Sylmar,91342,Install new 8' chain link fencing at kindergarten yard.,11,2016-Q4,2016-Q4,Closeout,20220630 Weemes ES,10369507,Weemes ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",Central,1715101,13322,1260 W. 36th Pl.,Los Angeles,90007,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",432,2020-Q4,2021-Q3,Closeout,20220630 59th St. ES,10364091,59th St. ES - Roofing,Roofing,1,"Dr. George J. McKenna, III",West,1379501,13400,5939 Second Ave.,Los Angeles,90043,"The project will replace the roofing on 3 classroom buildings and a storage garage building. The roofing is more than 32 years old and is missing multiple layers of materials that have blown off in heavy winds. Approximately 6,500 square feet of roofing is to be removed and replaced.",52,2013-Q4,2014-Q1,Closeout,20220630 Twain MS,10004944,Twain MS - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1842501,13630,2224 Walgrove Ave.,Los Angeles,90066,"Equip with tables, chairs, children's corner, computers and signage. Renovate flooring. Provide interior paint, and whiteboards. Replace exterior doors and locks.",63,2013-Q4,2014-Q1,Closeout,20220630 Napa ES,10004946,Napa ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1544601,13701,19010 Napa St.,Northridge,91324,"Equip with tables, chairs, children's corner, media cart, signage, and computers. Provide interior paint and new window blinds. Remove partition wall and unused shelving.",66,2013-Q1,2014-Q1,Closeout,20220630 Gulf ES,10369303,Gulf ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1431501,13464,828 W. L St.,Wilmington,90744,"Removal of 2 portable buildings. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprints.",274,2018-Q1,2018-Q2,Closeout,20220630 Vermont ES,10367644,Vermont ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1747901,13273,1435 W. 27th St.,Los Angeles,90007,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",47,2017-Q3,2018-Q3,Closeout,20220630 Vena ES,10367154,Vena ES - Computer Lab Upgrades,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1746601,13773,9377 Vena Ave.,Arleta,91331,"Provide upgrades to the existing computer lab by providing new additional electrical outlets, wiring and Internet drops.",15,2015-Q4,2016-Q2,Closeout,20220630 Sunny Brae ES,10367467,Sunny Brae ES - Temporary Ramp,Access Compliance,3,Scott Schmerelson,Northwest,1698601,13737,20620 Arminta St.,Canoga Park,91306,Provide and install concrete sloped walkway with galvanized handrails to connect the main office arcade to the main entry quad.,15,2016-Q1,2016-Q2,Closeout,20220630 Harbor Community Adult School: Alternative Education & Work Center,10366674,Harbor Community Adult School - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1899520,13730,1123 W. 223rd St.,Torrance,90502,"Disconnect and remove 1 portable as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",55,2015-Q2,2015-Q4,Closeout,20220630 Vermont ES,10367865,Vermont ES - Restroom Upgrades,Access Compliance,1,"Dr. George J. McKenna, III",Central,1747901,13273,1435 W. 27th St.,Los Angeles,90007,"Modify Kinder restroom for changing tables; including enlarging doorways, relocating light switch and installing folding changing table.",13,2016-Q3,2017-Q1,Closeout,20220630 San Pedro HS,10004873,San Pedro HS - Baseball Field Upgrade,Fencing,7,Tanya Ortiz Franklin,South,1885001,13377,1001 W. 15th St.,San Pedro,90731,"This project will create a new 70 foot high barrier along the boundary of the San Pedro HS baseball field, which will ensure compliance with a recent Superior Court decision.",752,2013-Q1,2013-Q3,Closeout,20220630 Stoner ES,10366198,Stoner ES - New Gates for Parking Security,Security System,4,Nick Melvoin,West,1695201,13772,11735 Braddock Dr.,Culver City,90230,Install two sets of new gates and physical barriers to provide school with secure vehicular entrance and exit,13,2015-Q2,2016-Q2,Closeout,20220630 Vanalden ES,10367934,Vanalden ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,Northwest,1741101,13724,19019 Delano St.,Reseda,91335,Provide and install electronic marquee.,42,2017-Q1,2017-Q2,Closeout,20220630 Pacoima EEC,10367350,Pacoima EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1954701,16781,11059 Herrick Ave.,Pacoima,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",105,2016-Q2,2016-Q3,Closeout,20220630 San Fernando EEC,10367358,San Fernando EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1955501,13419,1204 Woodworth St.,San Fernando,91340,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",88,2016-Q2,2016-Q3,Closeout,20220630 Nevin ES,10367807,Nevin ES - Restroom Upgrades,Access Compliance,5,Jackie Goldberg,Central,1546601,13390,1569 E. 32nd St.,Los Angeles,90011,Demolish existing shelves and hooks for changing table. Provide and install folding changing table.,17,2016-Q3,2016-Q3,Closeout,20220630 Napa ES,10370005,Napa ES - SEEDS,SEEDS,3,Scott Schmerelson,Northwest,1544601,13701,19010 Napa St.,Northridge,91324,"Construct an outdoor learning space of approximately 3,492 square feet. Includes the installation of new chain link fencing, decomposed granite and a cement brush off area, composite wood headers to create in-ground planting areas and pathways, an irrigation system, trees and furnishings to create a classroom gathering space. The project will be outfitted by the school site with native and flowering plants to attract hummingbirds and butterflies.",100,2021-Q2,2022-Q1,Closeout,20220630 Le Conte MS,10368946,Le Conte MS - Security Upgrades,Security System,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,Provide and install new Aiphone secure entry system at the main entrance.,15,2017-Q3,2018-Q2,Closeout,20220630 Hamlin Charter Academy ES,10369062,Hamlin Charter Academy ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1434901,13725,22627 Hamlin St.,West Hills,91307,Provide and install new electronic marquee.,42,2018-Q1,2018-Q1,Closeout,20220630 Griffith STEAM Magnet MS,10369526,Griffith STEAM Magnet MS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1816801,13646,4765 E. 4th St.,Los Angeles,90022,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2023-Q3,2024-Q1,Planning,20220630 Van Nuys ES,10367933,Van Nuys ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northeast,1743801,13403,6464 Sylmar Ave.,Van Nuys,91401,Provide and install electronic marquee.,36,2017-Q4,2018-Q2,Closeout,20220630 Danube ES,10363914,Danube ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1333501,13845,11220 Danube Ave.,Granada Hills,91344,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",333,2014-Q3,2014-Q4,Closeout,20220630 Bethune MS,10367426,Bethune MS - Renovate Restroom for Changing Room,Access Compliance,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,Renovate girls' restroom for changing table.,56,2016-Q1,2016-Q2,Closeout,20220630 Bell HS,10369534,Bell HS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1853601,13488,4328 Bell Ave.,Bell,90201,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2024-Q4,2025-Q2,Planning,20220630 Burbank ES,10367381,Burbank ES - Office Renovation & Accessibility Upgrades,Access Compliance,3,Scott Schmerelson,Northeast,1263001,13678,12215 Albers St.,North Hollywood,91607,"Main office renovation for accessibility, path of travel, asphalt and drainage repairs",37,2015-Q4,2016-Q1,Closeout,20220630 Cheremoya ES,10368111,Cheremoya ES - Windows Upgrades,Campus Improvement,5,Jackie Goldberg,West,1304101,13410,6017 Franklin Ave.,Los Angeles,90028,"This project replaces all deteriorated windows at the main building and two bungalow buildings. The scope of work also includes painting as part of the window replacement, restroom renovation, and replacement of school signs, chain link fence, and exterior lights.","1,710",2021-Q1,2022-Q2,Closeout,20220630 Compton ES,10368970,Compton ES - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1320501,13498,1515 E. 104th St.,Los Angeles,90002,Provide and install new wall-mounted electronic marquee.,41,2018-Q4,2019-Q1,Closeout,20220630 Hamilton HS,10370265,Hamilton HS - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1868601,13570,2955 Robertson Blvd.,Los Angeles,90034,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2025-Q1,2025-Q2,Planning,20220630 9th St. ES,10370653,9th St. ES - Synthetic Turf,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1550501,13268,835 Stanford Ave.,Los Angeles,90021,"This project is to replace approximately 5,600 square feet of deteriorated synthetic turf at the playfield, near the stage, and in the play yard.",799,2020-Q2,2020-Q3,Closeout,20220630 Kim ES,10363905,Kim ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1270101,13906,225 S. Oxford Ave.,Los Angeles,90004,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",765,2015-Q1,2016-Q2,Closeout,20220630 Aggeler Opportunity HS,10363871,Aggeler Opportunity HS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1850701,13644,21050 Plummer St.,Chatsworth,91311,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",431,2014-Q4,2015-Q2,Closeout,20220630 San Fernando HS,10369335,San Fernando HS - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1884301,13670,11133 O'Melveny Ave.,San Fernando,91340,"Removal of two 24' x 76' bungalows and 1 portable building. Provide temporary fencing, disconnect all utilities including low voltage and power to 3 buildings, reconnect all utilities to existing buildings remaining on site. Abate and transport all asbestos, lead and other hazardous materials offsite. Perform Phase 1, 2 and 3 onsite monitoring and restore asphalt paving as needed.",393,2018-Q1,2019-Q4,Closeout,20220630 Moneta Continuation HS,10366811,Moneta Continuation HS - Campus Relocation,Reconfiguration,7,Tanya Ortiz Franklin,South,1866601,16461,17951 Budlong Ave.,Gardena,90248,"Moneta Continuation HS was originally located at 1230 W. 177th St. on the northeast corner of the Gardena HS campus and occupied 2 portable buildings for administrative space and 3 classrooms. This project moves the school to a new site on the southeast side of the campus near 182nd St. where it will occupy 4 existing portable buildings and thereby expand to a 6-classroom facility with increased recreational area and necessary administrative facilities. Improvements to the existing portable buildings include new flooring, office configuration, and painting of the entire school. Additionally, the project scope includes the demolition of an existing portable building to enable the creation of additional outdoor play space, installation of a restroom building, fencing, and all necessary upgrades to comply with the Americans with Disabilities Act.","1,088",2016-Q1,2020-Q1,Closeout,20220630 Palisades Charter HS,10367451,Palisades Charter HS - HVAC in Competition Gym,HVAC,4,Nick Melvoin,West,1879801,13742,15777 Bowdoin St.,Pacific Palisades,90272,"The project will address cooling needs in the gymnasium building. The scope of work includes installing a new heating, ventilation, and air conditioning (HVAC) system. The project also includes equipment demolition, asbestos abatement, cleaning and leak test for ducts, structural upgrade, electrical power upgrade, patch and paint if required.","11,417",2021-Q4,2024-Q1,Construction,20220630 74th St. ES,10370104,74th St. ES - Privacy Fencing,Fencing,1,"Dr. George J. McKenna, III",West,1664401,13549,2112 W. 74th St.,Los Angeles,90047,Raise existing fence on Cimarron Ave. to 8' and install new privacy fencing.,17,2019-Q1,2019-Q2,Closeout,20220630 Crescent Heights Language Arts/Social Justice Magnet ES,10370393,Crescent Heights Language Arts/Social Justice Magnet ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1328801,13454,1661 S. Crescent Heights Blvd.,Los Angeles,90035,"Demolish 2 portable buildings, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",440,2019-Q2,2019-Q4,Closeout,20220630 Columbus ES,10370112,Columbus ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northeast,1743201,13568,6700 Columbus Ave.,Van Nuys,91405,Remove existing marquee and install new electronic free-standing marquee,37,2019-Q1,2019-Q2,Closeout,20220630 El Oro Way Charter for Enriched Studies,10107687,El Oro Way Charter for Enriched Studies - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,3,Scott Schmerelson,Northwest,1354501,13802,12230 El Oro Way,Granada Hills,91344,Mitigate Lead in Water,163,2014-Q1,2015-Q2,Closeout,20220630 Wilson HS,10371642,Wilson HS - Exterior Painting,Painting,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.","2,110",2022-Q3,2023-Q3,Planning,20220630 Franklin HS,10371747,Franklin HS - Exterior Painting,Painting,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",75,2022-Q4,2024-Q3,Planning,20220630 Cabrillo EEC,10372469,Cabrillo EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,7,Tanya Ortiz Franklin,South,1950801,16299,741 W. 8th St.,San Pedro,90731,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 7,926 ft2. ADA upgrades for this project include (a) resurfacing a portion of the parking area - approximately 726 ft2 - to provide an ADA compliant path of travel and (b) providing an ADA compliant restroom. Additionally, we will replace deteriorated HVAC units and roofing, add a bottle filler, and make necessary upgrades to the fire alarm system, as required by current code.","3,084",2023-Q4,2025-Q1,Planning,20220630 Sunland ES,10370211,Sunland ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1697301,13451,8350 Hillrose St.,Sunland,91040,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2024-Q4,2025-Q1,Planning,20220630 Eastman ES,10369308,Eastman ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1352101,13520,4112 E. Olympic Blvd.,Los Angeles,90023,"Demolition of 2 bungalows. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprints.",360,2018-Q1,2019-Q3,Closeout,20220630 96th St. ES,10371392,96th St. ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1557501,13496,1471 E. 96th St.,Los Angeles,90002,Install new electronic wall-mounted marquee on south side of auditorium facing 96th St.,46,2020-Q3,2021-Q1,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10372516,"Sun Valley Magnet: Engineering, Arts & Technology - 2022-23 Prop 39",Charter Prop 39,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"This project is a charter school renovation for ISANA Cardinal Academy for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 12 instructional spaces for charter student seats in grades TK-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",39,2022-Q3,2022-Q3,Planning,20220630 Banning HS,10366002,Banning HS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",831,2015-Q2,2015-Q3,Closeout,20220630 Castle Heights ES,10304279,Castle Heights ES - Purchase Laptops,Communications/Technology Upgrade,1,"Dr. George J. McKenna, III",West,1287701,13680,9755 Cattaraugus Ave.,Los Angeles,90034,Purchase Laptops,22,2013-Q4,2014-Q3,Closeout,20220630 Carson HS,10367440,Carson HS - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1857501,13869,22328 S. Main St.,Carson,90745,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 334 doors/hardware, 61 accessible paths of travel, 230 signs, 28 restrooms, 33 drinking fountains, 13 sinks/sink cabinets, 5 assistive listening devices/intercoms/phones, 5 concrete ramps, 17 metal ramps, 29 pieces of accessible furniture, 6 assembly seats, 3 railings, 3 locker room modifications, 2 parking areas, 24 casework/counters, 3 door modifications/auto openers, 1 new elevator, and 1 stage lift. In addition, this project includes critical repairs and safety improvements for Building K to address structural deficiencies that have developed since its construction in 1968. The scope of work for Building K includes replacing the entire roofing system and roofing structural members, replacing the cement plaster soffits and fascia in the corner areas, replacing corroded guardrails and stair rails in certain areas, installing additional structural elements to safeguard the building, and providing additional ADA upgrades beyond the facilities that were previously identified for accessibility enhancement.","14,989",2020-Q3,2024-Q2,Construction,20220630 Northridge EEC,10371817,Northridge EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,3,Scott Schmerelson,Northwest,1828401,16622,18050 Chase St.,Northridge,91325,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 15,134 ft2. ADA upgrades for this project include (a) resurfacing the parking area - approximately 984 ft2 - to provide an ADA compliant path of travel and (b) providing an ADA compliant restroom. Additionally, we will replace deteriorated HVAC units, roofing, and make necessary upgrades to the fire alarm system, as required by current code.","5,061",2023-Q2,2024-Q2,Design,20220630 Hillside ES,10370283,Hillside ES - Exterior Painting,Painting,2,Monica Garcia,East,1453401,13293,120 E. Ave. 35,Los Angeles,90031,"Prepare, paint and refinish the exterior of all buildings and all appurtenances, including, but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",354,2020-Q1,2020-Q3,Closeout,20220630 Multnomah ES,10372175,Multnomah ES - Portable Removal,Access Compliance,2,Monica Garcia,East,1542501,13631,2101 N. Indiana Ave.,Los Angeles,90032,"Removal of 1 bungalow and 3 portable buildings. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/Replace asphalt paving.",550,2022-Q3,2022-Q4,Planning,20220630 107th St. ES,10372214,107th St. ES - Washer and Dryer Utilities,Plumbing/Irrigation/Drainage,7,Tanya Ortiz Franklin,South,1585701,13857,147 E. 107th St.,Los Angeles,90003,"Provide new plumbing and power to support laundry equipment. Install hot/cold water lines, drain, and dedicated electrical circuits. Tap into water lines from adjacent restroom. Washer and dryer being donated to school by Think Watts Foundation",16,2021-Q4,2022-Q1,Closeout,20220630 Shirley ES,10372512,Shirley ES - 2022-23 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1671201,13671,19452 Hart St.,Reseda,91335,"This project is a charter school renovation for Citizens of the World - West Valley for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades TK-3. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",75,2022-Q3,2022-Q3,Planning,20220630 Pacoima MS,10366082,Pacoima MS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1832101,13750,9919 Laurel Canyon Blvd.,Pacoima,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",692,2015-Q2,2015-Q2,Closeout,20220630 Irving STEAM Magnet MS,10366047,Irving MS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",555,2015-Q2,2015-Q3,Closeout,20220630 Ramona Opportunity HS,10371211,Ramona Opportunity HS - Secure Entry System,Security System,2,Monica Garcia,East,1880701,13422,231 S. Alma Ave.,Los Angeles,90063,Install new secure entry system at main office. Install pedestal mounted intercom near main door and three video receivers in main office.,35,2020-Q3,2020-Q4,Closeout,20220630 74th St. ES,10372166,74th St. ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1664401,13549,2112 W. 74th St.,Los Angeles,90047,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",505,2022-Q2,2024-Q1,Construction,20220630 Sharp ES,10372574,Sharp ES - Install Ramp,Access Compliance,6,Kelly Gonez,Northeast,1666501,13809,13800 Pierce St.,Arleta,91331,Add TMP ramp to one of the 4th grade classrooms.,124,2022-Q3,2022-Q4,Planning,20220630 Los Angeles Center for Enriched Studies,10366709,Los Angeles Center for Enriched Studies - HVAC,HVAC,1,"Dr. George J. McKenna, III",West,1874101,13554,5931 W. 18th St.,Los Angeles,90035,"The existing heating, ventilation and air conditioning system in the mechanical room servicing the pool area does not have adequate ventilation which is causing corrosion to all the systems in the mechanical room. This project will upgrade the HVAC dehumidification unit in the pool area and the mechanical room as well as affected pool equipment, plumbing and wall systems.","2,098",2016-Q3,2017-Q1,Closeout,20220630 Panorama City ES,10368889,Panorama City ES - Auditorium Acoustics Improvement,Ceiling/Wall System,6,Kelly Gonez,Northwest,1560401,13874,8600 Kester Ave.,Panorama City,91402,The project will improve acoustics in the auditorium/multipurpose room by installing sound mitigating and bass trapping materials on walls and ceiling to prevent reverberation.,80,2018-Q2,2018-Q3,Closeout,20220630 Stagg ES,10370353,Stagg ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1689001,13722,7839 Amestoy Ave.,Lake Balboa,91406,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",42,2019-Q3,2019-Q4,Closeout,20220630 Broad ES,10371244,Broad ES - Fencing,Fencing,7,Tanya Ortiz Franklin,South,1252701,13774,24815 Broad Ave.,Wilmington,90744,Replace approximately 220' of chain link fence with 8' tall chain link privacy fence along the west and south sides of the kindergarten play yard. Install approximately 140' of new chain link privacy fence with double pedestrian gates at the south end of the kindergarten building.,23,2020-Q3,2020-Q3,Closeout,20220630 Cabrillo ES,10372534,Cabrillo ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1268501,13552,732 S. Cabrillo Ave.,San Pedro,90731,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Harrison ES,10372613,Harrison ES - Secure Entry System,Security System,2,Monica Garcia,East,1443801,13528,3529 City Terrace Dr.,Los Angeles,90063,Install new secure entry system at the Main Office.,58,2022-Q3,2022-Q3,Planning,20220630 Wilson HS,10369334,Wilson HS - Portable Removal,Portable Removal,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,"Removal of 5 portable buildings. Salvage all furniture and equipment from classrooms, abate hazardous materials, disconnect low and high voltage utilities, and repair/replace asphalt in the building footprints.",224,2018-Q1,2018-Q3,Closeout,20220630 Holmes MS,10370873,Holmes MS - Purchase Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1818201,13835,9351 Paso Robles Ave.,Northridge,91325,Purchase classroom furniture (tables and chairs),92,2019-Q4,2020-Q2,Closeout,20220630 Franklin HS,10369608,Franklin HS - Chiller,HVAC,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,Replace a failed 210-ton chiller serving the Main Building.,488,2016-Q4,2018-Q3,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10371340,"Sun Valley Magnet: Engineering, Arts & Technology - 2020-22 Prop 39",Charter Prop 39,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for ISANA Cardinal Academy. This project included 1 charter office, 1 special education room, and 14 instructional spaces for charter student seats in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 14 instructional spaces for charter student seats in grades K-5 and an undefined scope of work.",24,2021-Q3,2021-Q3,Closeout,20220630 Eastman ES,10371314,Eastman ES - 2020-22 Prop 39,Charter Prop 39,2,Monica Garcia,East,1352101,13520,4112 E. Olympic Blvd.,Los Angeles,90023,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for Extera Public School #2. This project included 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades K-5 and an undefined scope of work. However, the co-located charter requested the pick-up of Prop 39-owned furniture. This Prop 39 furniture is to be returned to inventory for future use within the Prop 39 Program. As a result, this project is amended to include the scope of work required to retrieve the furniture.",11,2021-Q3,2021-Q3,Closeout,20220630 Obama Global Preparation Academy,10372506,Obama Global Preparation Academy - 2022-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1686801,193550,1700 W. 46th St.,Los Angeles,90062,"This project is a charter school renovation for Russell Westbrook, Why Not? MS for a single-year term with an expiration date of 6/30/23. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 9 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",107,2022-Q3,2022-Q3,Planning,20220630 Marianna ES,10372541,Marianna ES - Secure Entry System,Security System,2,Monica Garcia,East,1513701,13479,4215 E. Gleason St.,Los Angeles,90063,Install new secure entry system at the Main Office.,60,2022-Q2,2022-Q3,Construction,20220630 Gardena ES,10363935,Gardena ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1404101,13320,647 W. Gardena Blvd.,Gardena,90247,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",298,2014-Q3,2014-Q4,Closeout,20220630 Eshelman ES,10371247,Eshelman ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1364001,13501,25902 Eshelman Ave.,Lomita,90717,Remove the existing marquee and footing at Eshelman Ave. and 259th Pl. and replace with a new 2-sided electronic marquee standing less than 8' high.,57,2020-Q2,2020-Q4,Closeout,20220630 Miramonte ES,10370967,Miramonte ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1532901,13323,1400 E. 68th St.,Los Angeles,90001,"Demolish and remove 4 portable buildings, remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/Replace asphalt paving.",201,2020-Q1,2020-Q2,Closeout,20220630 Canoga Park ES,10371420,Canoga Park ES - Video Surveillance (CCTV) System,Security System,3,Scott Schmerelson,Northwest,1275301,13416,7438 Topanga Canyon Blvd.,Canoga Park,91303,Install video surveillance (CCTV) system with one camera.,32,2020-Q2,2021-Q3,Closeout,20220630 Chavez ES,10370305,Chavez ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1764001,13947,5243 Oakland St.,Los Angeles,90032,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",58,2019-Q2,2020-Q1,Closeout,20220630 Van Nuys HS,10371373,Van Nuys HS - Water Bottle Filling Station,Plumbing/Irrigation/Drainage,3,Scott Schmerelson,Northeast,1889301,13404,6535 Cedros Ave.,Van Nuys,91411,Install water bottle filling station in main building,14,2021-Q1,2021-Q2,Closeout,20220630 Sylmar Charter HS,10367452,Sylmar Charter HS - HVAC in Competition Gym,HVAC,6,Kelly Gonez,Northeast,1887801,13856,13050 Borden Ave.,Sylmar,91342,"The project addresses cooling needs in the competition gym building with the installation of a new heating, ventilation, and air conditioning (HVAC) system including 12 new rooftop air conditioning units, 6 new roof-mounted exhaust fans, and replacement of the rooftop perimeter ductwork enclosure/air distribution system around the gym exterior. The scope of work also includes removal and asbestos abatement for the existing supply and return air handling units, structural reinforcement of the building roof, expansion of the electrical room to accommodate the larger electrical equipment serving the new HVAC system, and replacement of the ceilings in rooms with HVAC work including reinstalling light fixtures and adjusting the fire sprinkler layout based on the new ceilings.","6,292",2018-Q3,2019-Q3,Closeout,20220630 Muir MS,10368051,Muir MS - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1825501,13436,5929 S. Vermont Ave.,Los Angeles,90044,"Remove/demolish 5 bungalows, provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to remaining buildings on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",559,2016-Q4,2018-Q2,Closeout,20220630 Cowan ES,10367671,Cowan ES - 2016-17 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1326001,13622,7615 Cowan Ave.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Charter MS for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 4 instructional spaces for charter student seats in grades 7-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",43,2016-Q2,2016-Q3,Closeout,20220630 Kentwood EEC,10370736,Kentwood EEC - Reopening with Outdoor Classroom,Campus Improvement,4,Nick Melvoin,West,1952801,13589,8376 Dunbarton Ave.,Los Angeles,90045,"The Kentwood EEC site, closed in 2012, is located adjacent to Kentwood ES. The site includes one single-story building with approximately 4,480 square feet. This project will provide upgrades to both the interior and exterior of the classroom building, including a new HVAC unit, flooring, and IT upgrades, as well as upgrades to the existing fire alarm and public address systems, and paint. New furniture will be provided to the center. Additionally, the project will provide Americans with Disabilities Act (ADA) upgrades as necessary, including path of travel access to the main entrance and staff restroom upgrades for ADA compliance. A new outdoor classroom to provide opportunities for a hands-on, nature-based learning experience is included with the project.","5,333",2022-Q3,2023-Q3,Design,20220630 Franklin HS,10363933,Franklin HS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",908,2014-Q3,2015-Q1,Closeout,20220630 Glenwood ES,10366566,Glenwood ES - Antiquated Fire Alarm System,Fire Alarm System,6,Kelly Gonez,Northeast,1419201,13590,8001 Ledge Ave.,Sun Valley,91352,"This project will upgrade the antiquated fire alarm system to comply with the 2013 California Building Code. This project will remove existing panels, wiring and raceways. The upgrades will include a mechanism that will report fire alarm activations to a central monitoring system.",670,2016-Q3,2017-Q1,Closeout,20220630 Romer MS,10370611,Romer MS - 2019-20 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1811601,13894,6501 Laurel Canyon Blvd.,North Hollywood,91606,"This project is a charter school renovation for ISANA Palmati Charter School for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 14 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",9,2019-Q2,2019-Q3,Closeout,20220630 Van Nuys MS,10370624,Van Nuys MS - 2019-20 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northeast,1843401,13605,5435 Vesper Ave.,Van Nuys,91411,"This project is a charter school renovation for High Tech Los Angeles MS for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office,1 special education room, and 7 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",40,2019-Q2,2019-Q3,Closeout,20220630 CHIME Institute's Schwarzenegger Community School,10003532,CHIME Institute Augmentation Grant,Charter Augmentation Grant,4,Nick Melvoin,Northwest,1202001,13844,19722 Collier St.,Woodland Hills,91364,"The project is comprised of 2 two-story buildings consisting of 16 new classrooms, a library/media center, and administrative offices. The project also includes an expansion of the existing parking lot and field area. The project provides the additional classrooms necessary to support the full K-8 program for CHIME Institute's Schwarzenegger Community School in permanent facilities and allows for the removal of temporary housing.","3,682",2010-Q1,2015-Q3,Closeout,20220630 Florence ES,10372147,Florence ES - Add Cameras To Security Monitor System,Security System,7,Tanya Ortiz Franklin,East,1389001,13397,7211 Bell Ave.,Los Angeles,90001,Add (4) cameras to existing video surveillance (CCTV) system,25,2022-Q1,2022-Q1,Closeout,20220630 Dahlia Heights ES,10368927,Dahlia Heights ES - Classroom Replacement,Addition,5,Jackie Goldberg,Central,1332901,13308,5063 Floristan Ave.,Los Angeles,90041,"This project replaces 5 classrooms located in 3 relocatable buildings of which 2 of the classrooms are in a DOH portable that does not comply with State standards for school buildings. Included in the project are the design and construction of 4 general classrooms, 1 kindergarten classroom, 1 resource specialist program room, and support spaces; infrastructure to support the new facilities; removal of portables once the classroom replacement project is complete and upgrades to landscape, hardscape, and playground areas where portables are removed; and site work, path of travel, and other required ADA improvements. In addition, the project may include the placement of interim housing during construction.","16,949",2021-Q2,2023-Q4,Construction,20220630 Wilmington Park ES,10371767,Wilmington Park ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1778101,13378,1140 Mahar Ave.,Wilmington,90744,"The Wilmington Park Elementary School site spans 4.63 acres and is comprised of a traditional K-5 elementary school program and a state preschool program. The building area is approximately 89,553 square feet and includes five multi-story permanent buildings, and one relocatable sanitary building. The buildings were constructed between 1925 and 2008. As of the 2020-2021 E-CAR, the school served 585 students and currently 90 have been identified as having a disability. The site has been assigned a Category Two accessibility level. In order to meet the criteria for Category Two, various upgrades to six buildings are required, including approximately: three new concrete ramps, upgrades to 14 restrooms including 33 restroom accessories, two new wheelchair lifts, one new assistive listening device, one new door/jamb, 24 new door hardware, five drinking fountain upgrades, five furniture accessibility upgrades, one intercom, 41 accessible path of travel upgrades, three existing elevator upgrades, 15 new railings, nine new signs, two new sinks/cabinets, 10 new thresholds, and any other required improvements or mitigations to ensure compliance with local, state and/or federal facilities requirements.","5,269",2023-Q3,2024-Q4,Design,20220630 Aspire Tate Academy,10366108,Tate ES Aspire Tate Academy - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1225401,14602,123 W. 59th St.,Los Angeles,90003,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",256,2015-Q2,2015-Q3,Closeout,20220630 Webster MS,10372125,Webster MS - Energy Conservation Lighting,Electrical/Lighting,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $981,421. Estimated energy savings is 505,523 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $265,099 which is 27% of the ECM costs.",265,2022-Q3,2023-Q1,Planning,20220630 Bellingham ES,10372220,Bellingham ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1357701,13925,6728 Bellingham Ave.,North Hollywood,91606,Install new secure entry system at the Main Office,51,2022-Q1,2022-Q3,Construction,20220630 Vernon City ES,10372231,Vernon City ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1749301,13563,2360 E. Vernon Ave.,Los Angeles,90058,Install new secure entry system at the Main Office,33,2022-Q3,2023-Q1,Planning,20220630 Burbank Arts Tech Community Magnet MS,10370477,Burbank Arts Tech Community Magnet MS - Secure Entry System,Security System,2,Monica Garcia,Central,1806601,13551,6460 N. Figueroa St.,Los Angeles,90042,Install new secure entry system,23,2019-Q3,2019-Q4,Closeout,20220630 118th St. ES,10364013,118th St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1574001,13321,144 E. 118th St.,Los Angeles,90061,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",973,2015-Q2,2016-Q1,Closeout,20220630 Germain Academy for Academic Achievement,10371603,Germain ES - Install Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1411701,13872,20730 Germain St.,Chatsworth,91311,Install secure entry system.,19,2021-Q2,2021-Q4,Closeout,20220630 Sutter MS,10371887,Sutter MS - 2021-22 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,"This project is a charter school renovation for Ingenium Charter School for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 2 special education rooms, and 8 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The scope of work for this project included the reconfiguration of rooms back to District systems, this scope of work was not performed.",0,2021-Q2,2021-Q2,Closeout,20220630 Lorena ES,10372393,Lorena ES - Upgrade Secure Entry System,Security System,2,Monica Garcia,East,1494501,13351,1015 S. Lorena St.,Los Angeles,90023,Upgrade secure entry system. Install new receivers in principal and SAA offices; 1 each. Install a total of approx. 100 feet of new wire mold for power/data.,17,2022-Q1,2022-Q3,Construction,20220630 Irving STEAM Magnet MS,10372111,Irving STEAM Magnet MS - Major Modernization,Major Modernization,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"Site Due Diligence, Planning and Feasibility Activities.","1,563",-Q,-Q,Planning,20220630 Eagle Rock HS,10367976,Eagle Rock HS - Upgrades to Fire Alarm System,Fire Alarm System,5,Jackie Goldberg,Central,1861401,13553,1750 Yosemite Dr.,Los Angeles,90041,"This project is replace an antiquated fire alarm system with a new automatic and addressable system. The project will also include removal of existing panels, wiring, and raceways and patching and painting of walls.","4,557",2023-Q2,2024-Q2,Design,20220630 Bonita ES,10372439,Bonita ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1247301,13796,21929 Bonita St.,Carson,90745,Install new secure entry system at the Main Office.,35,2022-Q2,2022-Q4,Construction,20220630 Liberty ES,10372589,Liberty ES - Install Electronic Marquee,Electrical/Lighting,5,Jackie Goldberg,East,1486301,13599,2728 Liberty Blvd.,South Gate,90280,"Install new electronic, free-standing marquee. Remove existing wall-mounted, magnetic-tile marquee. Patch and paint wall where marquee was removed. Install new concrete pedestal-mounted marquee on front lawn. Approx. 30 feet underground conduit required. Double-sided 8 ft x5 ft color LED display.",77,2022-Q4,2023-Q1,Planning,20220630 Garcetti Learning Academy,10370445,Garcetti Learning Academy - Technology & Security Upgrades,Communications/Technology Upgrade,1,"Dr. George J. McKenna, III",South,1679501,13318,612 W. 68th St.,Los Angeles,90044,Purchase 40 Chromebooks and 1 storage cart; secure storage room.,21,2019-Q1,2019-Q2,Closeout,20220630 Dymally HS,10370550,Dymally HS - Changing Room,Access Compliance,7,Tanya Ortiz Franklin,South,1766701,14581,8800 S. San Pedro St.,Los Angeles,90003,Convert Boys restroom near classroom 2-160 to a changing room by removing partitions and adding an outlet.,17,2019-Q2,2019-Q2,Closeout,20220630 Griffin ES,10371707,Griffin ES - Seismic Retrofits at Main Building,Seismic Modernization,2,Monica Garcia,East,1430101,13284,2025 Griffin Ave.,Los Angeles,90031,"This project is to provide seismic retrofits at the Main Building with a total area of approximately 19,710 square feet. The scope of work includes ADA upgrades as required.","6,053",2023-Q4,2025-Q3,Design,20220630 Sutter MS,10367948,Sutter MS - ADA Improvements,Access Compliance,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 72 doors/hardware, 36 accessible paths of travel, 60 signs, 11 restrooms, 8 drinking fountains/sinks, 6 assistive listening devices/intercoms/phones, 2 concrete ramps, 15 pieces of accessible furniture, 8 assembly seats, 8 railings, 4 casework/counters, and 2 dressing room modifications.","3,784",2017-Q4,2022-Q4,Construction,20220630 3rd St. ES,10304280,3rd St. ES - Purchase Laptops,Communications/Technology Upgrade,4,Nick Melvoin,West,1711001,13399,201 S. June St.,Los Angeles,90004,Purchase Laptops,24,2013-Q2,2014-Q2,Closeout,20220630 Beachy ES,10108860,Beachy ES - Arcade Replacement,Roofing,6,Kelly Gonez,Northeast,1232901,13666,9757 Beachy Ave.,Arleta,91331,"Built in the 1950s, the wooden arcade frame has deteriorated due to water and termite damage. In addition, the arcade has been used to support fire alarm, safety and technology conduits, although it was not designed to support this additional weight and does not meet current seismic requirements. This project includes the design and construction of a new steel arcade that can support the existing conduits as well as the installation of seismic joints to provide movement during an earthquake for all conduits and locations where the arcade abuts the buildings. The scope of work also includes demolition of the wooden arcade, rewiring or replacement of electrical components in the conduits above the arcade, replacement of the lunch pavilion, and replacement of the majority of the concrete walkways under the new arcade. The project also provides associated Americans with Disabilities Act (ADA) upgrades to the school.","7,196",2015-Q4,2018-Q3,Closeout,20220630 Belvedere MS,10368158,Belvedere MS - Comprehensive Modernization,Comprehensive Modernization,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,"This project includes the construction of new buildings and site improvements with approximately 47 general and specialty classrooms, instructional support spaces, administration, gymnasium, library, maintenance and operations area, food services and lunch shelter, central courtyard, play areas, and parking. Existing school facilities will be upgraded including the modernization and seismic retrofit of the auditorium (portion of building #1). The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of main building #1 (auditorium portion to remain), classroom/library building #2, storage unit, math building #7, physical education building #11, home economics building #12 including the cafeteria, lunch shelters, utility building, shop building #15, classroom building #1 (building #20), academic building #21, agriculture building, and one relocatable building. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","178,568",2021-Q3,2024-Q4,Construction,20220630 Hamasaki Medical & Science Magnet ES,10370453,Hamasaki Medical & Science Magnet ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1627401,13577,4865 E. 1st St.,Los Angeles,90022,"Demolish 2 bungalows A-639 and A0697R. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving. This portable removal project is for the Garfield Community Adult School on the Hamasaki Medical & Science Magnet ES campus.",260,2019-Q2,2021-Q2,Closeout,20220630 Roosevelt HS,10371477,Roosevelt HS - Purchase Cafeteria Furniture,Furniture/Fixtures/Equipment,2,Monica Garcia,East,1774901,13523,456 S. Mathews St.,Los Angeles,90033,"Purchase cafeteria furniture including 39 tables, 190 chairs, and 5 soft benches.",95,2020-Q4,2021-Q1,Closeout,20220630 Sutter MS,10370706,Sutter MS - Verizon Innovative Learning Lab,Reconfiguration,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,Facilities upgrades in support of Verizon Innovative Learning Lab installation,85,2019-Q3,2020-Q2,Closeout,20220630 Victoria ES,10368957,Victoria ES - Technology Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1750701,13493,3320 Missouri Ave.,South Gate,90280,Furnish computer lab with 32 iMac desktop computers,51,2017-Q3,2017-Q4,Closeout,20220630 Locke EEC,10005046,Locke EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1953101,16288,320 E. 111th St.,Los Angeles,90061,"Upgrade perimeter fencing, exterior lighting system, entry control system, exterior gate; resurface and restripe parking lot.",588,2017-Q1,2017-Q3,Closeout,20220630 Riverside Charter ES,10371849,Riverside ES - Install Auditorium AV Equipment,Electrical/Lighting,3,Scott Schmerelson,Northeast,1631501,13645,13061 Riverside Dr.,Sherman Oaks,91423,Install new sound system and ceiling-mounted projector,48,2022-Q3,2023-Q1,Planning,20220630 Bell HS,10372307,Bell HS - Weight Room Concrete,Gym/Athletic Facilities Renovation,5,Jackie Goldberg,East,1853601,13488,4328 Bell Ave.,Bell,90201,This project is to provide replacement of the concrete slab and metal deck at the Weight Room in the Gymnasium.,873,2023-Q1,2023-Q3,Design,20220630 Sotomayor Arts and Sciences Magnet,10371609,Sotomayor Arts and Sciences Magnet - Softball Backstop,Fencing,5,Jackie Goldberg,Central,1857701,193556,2050 N. San Fernando Rd.,Los Angeles,90065,Provide backstop for softball practice field and recondition landscape for infield with bases.,49,2021-Q2,2021-Q2,Closeout,20220630 Lokrantz Special Education Center,10371621,Lokrantz Special Education Center - Purchase Interactive Displays,Communications/Technology Upgrade,4,Nick Melvoin,Northwest,1194701,13795,19451 Wyandotte St.,Reseda,91335,Purchase 9 interactive displays with mobile stands.,47,2021-Q1,2021-Q1,Closeout,20220630 Valerio ES,10369330,Valerio ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1738401,15143,15035 Valerio St.,Van Nuys,91405,"Remove/demolish 3 DOH portable buildings. Remove/relocate furniture and equipment, disconnect low voltage ITD components and utilities, restore areas with asphalt paving in the building footprints.",156,2018-Q1,2019-Q3,Closeout,20220630 Glassell Park STEAM Magnet ES,10368772,Glassell Park STEAM Magnet ES - Seismic Retrofit of Main Building,Seismic Modernization,5,Jackie Goldberg,Central,1412301,13384,2211 W. Ave. 30,Los Angeles,90065,"The project provides a seismic retrofit of the main building, a 2-story concrete wall and wood frame structure which includes 10 classrooms, with a total area of approximately 32,270 square feet. The scope of work includes strengthening existing concrete wall piers by wrapping Fiber Reinforced Polymer (FRP) strips; installing new cross ties, blocking, and new anchors for diaphragm-to-wall connections and hold-down epoxy anchors to foundations; sistering new joists; and strengthening the existing diaphragm by providing a new diaphragm below existing joists on the first and second floors. The project also includes Americans with Disabilities Act (ADA) upgrades where required.","8,040",2020-Q3,2022-Q2,Closeout,20220630 Ochoa Learning Center,10366078,Ochoa Learning Center - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1237201,14062,5027 Live Oak St.,Cudahy,90201,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",416,2015-Q2,2015-Q3,Closeout,20220630 Morningside ES,10372361,Morningside ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1539701,13414,576 N. Maclay Ave.,San Fernando,91340,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",97,2022-Q3,2022-Q4,Planning,20220630 Mount Gleason MS,10372362,Mount Gleason MS - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1824001,13744,10965 Mt. Gleason Ave.,Sunland,91040,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",99,2022-Q3,2022-Q4,Planning,20220630 Garfield HS,10372218,Garfield HS - Synthetic Football Field and Track Upgrade,Gym/Athletic Facilities Renovation,2,Monica Garcia,East,1867901,13512,5101 E. 6th St.,Los Angeles,90022,"New synthetic turf football field with synthetic competition track. Field improvements to include additional bleachers, new goal posts, new scoreboard, soccer goals, stadium AV upgrade, a landscape refresh, and new fencing around the track.","8,535",2024-Q2,2025-Q1,Planning,20220630 24th St. ES,10364014,24th St. ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1730101,13335,2055 W. 24th St.,Los Angeles,90018,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",611,2014-Q1,2014-Q3,Closeout,20220630 Narbonne HS,10100831,Narbonne HS - Chemistry Lab,Portable Upgrade,7,Tanya Ortiz Franklin,South,1877901,13407,24300 S. Western Ave.,Harbor City,90710,Provide Chemistry Lab,"1,151",2015-Q3,2016-Q3,Closeout,20220630 Amanecer PC,10365995,Amanecer PC - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1642601,13924,832 S. Eastman Ave.,Los Angeles,90023,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",269,2015-Q2,2015-Q3,Closeout,20220630 Berendo MS,10366484,Berendo MS - Retaining Wall Repairs,Excavation,5,Jackie Goldberg,Central,1805701,13274,1157 S. Berendo St.,Los Angeles,90006,"A section of the retaining wall and chain link fence on the playground along 11th St. that was failing due to storm water runoff penetration and subsequent corrosion was temporarily fixed and in need of further repairs. Berendo MS and Monsenor Oscar Romero Charter School currently share the campus through a Proposition 39 co-location with new permanent buildings planned. This project to replace the damaged portion of the retaining wall was expanded to approximately 130 linear feet to include the existing wall between Berendo MS and the charter school that had begun to lean and also required repairs. Through coordination between the District and the charter school operator, the retaining wall was replaced under the construction contract for the Monsenor Oscar Romero Charter School Augmentation Grant project (#10004854). In addition, a new concrete sidewalk north of the retaining wall was installed to repair the deteriorated and damaged curb and gutter along 11th St. and Berendo St. that could have posed a tripping hazard.",506,2017-Q1,2017-Q3,Closeout,20220630 Toluca Lake EEC,10104325,Toluca Lake EEC - New Shade Shelters Including Compliance with State & Federal Access Requirements,Lunch/Shade Shelter,6,Kelly Gonez,Northeast,1956801,16690,4915 Strohm Ave.,North Hollywood,91601,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) for New Shade Shelters,74,2015-Q4,2016-Q3,Closeout,20220630 Serrania Charter for Enriched Studies,10366615,Serrania ES - SEEDS,SEEDS,4,Nick Melvoin,Northwest,1660601,13800,5014 Serrania Ave.,Woodland Hills,91364,"Design and construct an outdoor learning space of approximately 1,400 square feet consisting of painting pavement areas, removing old surface paint, and installing art poles. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders and signage poles.",11,2015-Q1,2015-Q2,Closeout,20220630 Bridges Span School,10367082,Bridges Span School - SEEDS,SEEDS,7,Tanya Ortiz Franklin,South,1686701,14543,1235 Broad Ave.,Wilmington,90744,"Design and construct an outdoor learning space of approximately 1,500 square feet consisting of the installation of pavers, art poles, a hose bib, tree wells and painting of pavement. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders and signage poles.",20,2015-Q4,2016-Q1,Closeout,20220630 Latona ES,10004619,Latona ES - Facelift,Facelift,2,Monica Garcia,East,1479501,13374,4312 Berenice Ave.,Los Angeles,90031,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",93,2013-Q1,2016-Q3,Closeout,20220630 Walgrove ES,10004588,Walgrove ES - Facelift,Facelift,4,Nick Melvoin,West,1760301,13729,1630 Walgrove Ave.,Los Angeles,90066,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",47,2012-Q3,2016-Q3,Closeout,20220630 Saturn ES,10368098,Saturn ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,"Remove and sell 2 portable buildings, provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to remaining buildings on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",54,2016-Q4,2018-Q1,Closeout,20220630 Hooper ES,10368372,Hooper ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1457501,13316,1225 E. 52nd St.,Los Angeles,90011,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",287,2020-Q3,2021-Q1,Closeout,20220630 Columbus MS,10366224,Columbus MS - 2014-15 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,"This project is a charter school renovation for Ingenium Charter School for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 17 classrooms for 398.05 charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",105,2014-Q2,2014-Q3,Closeout,20220630 Grant ES,10366237,Grant ES - 2014-15 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1426001,13355,1530 N. Wilton Pl.,Los Angeles,90028,"This project is a charter school renovation for Citizens of the World Charter School - Silver Lake for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 14 classrooms for 375.82 charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",114,2014-Q2,2014-Q3,Closeout,20220630 Westminster EEC,10367369,Westminster EEC - Technology Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1957601,16724,1010 Main St.,Venice,90291,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",121,2016-Q2,2016-Q4,Closeout,20220630 Hillside ES,10363954,Hillside ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1453401,13293,120 E. Ave. 35,Los Angeles,90031,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",398,2014-Q2,2014-Q3,Closeout,20220630 Malabar ES,10363969,Malabar ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1508201,13314,3200 E. Malabar St.,Los Angeles,90063,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",594,2015-Q4,2016-Q1,Closeout,20220630 Rockdale Visual & Performing Arts Magnet ES,10363990,Rockdale ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1632901,13379,1303 Yosemite Dr.,Los Angeles,90041,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",225,2014-Q4,2014-Q4,Closeout,20220630 Norwood ES,10105876,Norwood ES - Compliance with State & Federal Access Requirements,Fire Alarm System,5,Jackie Goldberg,Central,1569901,13271,2020 Oak St.,Los Angeles,90007,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),315,2015-Q2,2016-Q3,Closeout,20220630 Lorne ES,10367924,Lorne ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1497301,13669,17440 Lorne St.,Northridge,91325,Provide and install electronic marquee.,38,2017-Q3,2017-Q4,Closeout,20220630 75th St. ES,10370201,75th St. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1663001,13470,142 W. 75th St.,Los Angeles,90003,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2026-Q3,2026-Q4,Planning,20220630 Trinity ES,10370216,Trinity ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2026-Q4,2027-Q1,Planning,20220630 Bryson ES,10364020,Bryson ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1258901,13558,4470 Missouri Ave.,South Gate,90280,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",619,2014-Q2,2015-Q1,Closeout,20220630 Maple PC,10364051,Maple PC - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1722001,13952,3601 S. Maple Ave.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",244,2014-Q1,2014-Q2,Closeout,20220630 Norwood ES,10364058,Norwood ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1569901,13271,2020 Oak St.,Los Angeles,90007,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",473,2014-Q1,2014-Q2,Closeout,20220630 Miller Career & Transition Center,10367490,Miller Career & Transition Center - Renovate Restroom,Access Compliance,3,Scott Schmerelson,Northwest,1191001,15164,8218 Vanalden Ave.,Reseda,91335,Remove and replace restroom partitions and compartment doors for boys' and girls' restroom,28,2016-Q1,2016-Q2,Closeout,20220630 Fair ES,10369746,Fair ES - 2018-19 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1371201,13600,6501 Fair Ave.,North Hollywood,91606,"This project is a charter school renovation for New Horizons Charter Academy for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 11 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",45,2018-Q2,2018-Q3,Closeout,20220630 Kittridge ES,10372224,Kittridge ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1476001,13696,13619 Kittridge St.,Van Nuys,91401,Install new secure entry system at the Main Office,38,2022-Q1,2022-Q4,Construction,20220630 Telfair ES,10372452,Telfair ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1706801,13616,10975 Telfair Ave.,Pacoima,91331,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Grant ES,10372582,Grant ES - Install Changing Table,Access Compliance,5,Jackie Goldberg,West,1426001,13355,1530 N. Wilton Pl.,Los Angeles,90028,Provide changing area in boys' restroom in main building.,41,2022-Q3,2022-Q4,Design,20220630 93rd St. ES,10364092,93rd St. ES - HVAC,HVAC,7,Tanya Ortiz Franklin,South,1558201,13814,330 E. 93rd St.,Los Angeles,90003,"The project will replace all heating, cooling and ventilation systems throughout the site. The system provides heating and cooling to 24 classrooms and administrative offices. The existing boilers and air handler units are more than 50 years old and are in poor condition resulting in unreliable service. Maintenance & Operations has received more than 45 service calls within the past 12 months.","4,125",2014-Q3,2016-Q1,Closeout,20220630 Buchanan ES,10369552,Buchanan ES - Playground Upgrades in Main Yard,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1260301,13350,5024 Buchanan St.,Los Angeles,90042,Install new playground structure and matting at main play yard; provide Americans with Disabilities Act (ADA) compliant path of travel.,272,2019-Q4,2022-Q3,Construction,20220630 Griffith STEAM Magnet MS,10367181,Griffith STEAM Magnet MS - ADA Improvements,Access Compliance,2,Monica Garcia,East,1816801,13646,4765 E. 4th St.,Los Angeles,90022,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 162 doors/hardware, 30 accessible paths of travel, 117 signs, 17 restrooms, 13 drinking fountains/sinks, 2 assistive listening devices/intercoms/phones, 8 concrete ramps, 3 metal ramps, 19 pieces of accessible furniture, 6 railings, 3 door modifications/auto openers, and 1 passenger/bus loading zone.","5,784",2017-Q4,2021-Q3,Closeout,20220630 112th St. ES,10371635,112th St. ES - Exterior Painting,Painting,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",550,2021-Q2,2021-Q3,Closeout,20220630 "Lawson Academy of the Arts, Mathematics & Science",10367622,"Lawson Academy of the Arts, Mathematics & Science - Parent & Family Center",Campus Improvement,1,"Dr. George J. McKenna, III",West,1231201,14563,929 W. 69th St.,Los Angeles,90044,Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.,11,2016-Q2,2016-Q4,Closeout,20220630 Willenberg Special Education Center,10371815,Willenberg Special Education Center - Restroom Barrier Removal,Access Compliance,7,Tanya Ortiz Franklin,South,1195701,13545,308 Weymouth Ave.,San Pedro,90732,Remodel room 45 and 63 restroom for single use accessible restroom. Raise lavatory to accessible height for room 62 restroom.,186,2021-Q3,2022-Q2,Closeout,20220630 Pio Pico MS,10004097,Pio Pico MS - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1498001,13903,1512 S. Arlington Ave.,Los Angeles,90019,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",149,2012-Q2,2016-Q3,Closeout,20220630 Peary MS,10004124,Peary MS - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1835201,13625,1415 W. Gardena Blvd.,Gardena,90247,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",247,2011-Q3,2015-Q3,Closeout,20220630 Hope ES,10366045,Hope ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1692001,13944,7560 State St.,Huntington Park,90255,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",417,2015-Q1,2015-Q3,Closeout,20220630 Wilson HS,10367949,Wilson HS - ADA Improvements,Access Compliance,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 136 doors/hardware, 65 accessible paths of travel, 165 signs, 20 restrooms, 26 drinking fountains/sinks, 1 assistive listening devices/intercoms/phones, 2 concrete ramps, 25 pieces of accessible furniture, 14 railings, 1 existing elevator modifications, 87 locker room modifications/lockers, 2 parking areas, 12 casework/counters, and 1 new elevators/stage lifts.","6,696",2017-Q4,2022-Q4,Construction,20220630 Washington Preparatory HS,10370420,Washington Preparatory HS - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1892801,13560,10860 S. Denker Ave.,Los Angeles,90047,Install new secure entry system,17,2019-Q2,2019-Q3,Closeout,20220630 Buchanan ES,10370674,Buchanan ES - Install Concrete Ramp,Access Compliance,2,Monica Garcia,Central,1260301,13350,5024 Buchanan St.,Los Angeles,90042,Provide concrete accessible ramp to main building.,141,2019-Q3,2019-Q4,Closeout,20220630 Glassell Park EEC,10370433,Glassell Park EEC - Marquee,Electrical/Lighting,5,Jackie Goldberg,Central,1945701,16289,3003 N. Carlyle St.,Los Angeles,90065,Install new electronic wall-mounted marquee,54,2019-Q3,2019-Q4,Closeout,20220630 Glenfeliz ES,10370712,Glenfeliz ES - SEEDS,SEEDS,5,Jackie Goldberg,Central,1416401,13526,3955 Glenfeliz Blvd.,Los Angeles,90039,"Construct an outdoor learning space of approximately 6,700 square feet. Includes the installation of decomposed granite, composite wood headers to create in-ground planting areas and pathways, an irrigation system, asphalt striping, trees, as well as log benches and stools to create a classroom gathering space. The project will be outfitted by EnrichLA with native and edible plants.",86,2019-Q3,2019-Q3,Closeout,20220630 Belmont HS,10371901,Belmont HS - Photovoltaic Installation (Sika Solar Pilot Project),Photovoltaic Installation,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"The proposed Sika Pilot Project (""Project"") consist of installation of a 77.4 kW non-penetrating solar photovoltaic (PV) system on the roof of the administration building at Belmont High School. The site was selected since it has an existing Sika Sarnafil Polyvinyl Chloride (PVC) roof that is compatible with the proposed PV attachment system and has the capability of accepting additional load. The new non-penetrating PV system technology does not require any roof membrane penetrations, eliminating potential leakage points and reducing maintenance. Instead, the solar PV mount is welded to the roof membrane using a welding flange and standard hot-air welding equipment. Other non-penetrating PV system attachment technologies will void the roof membrane warranty if installed.",407,2023-Q4,2024-Q1,Planning,20220630 Marlton Special Education School,10370470,Marlton Special Education School - ADA Improvements,Access Compliance,1,"Dr. George J. McKenna, III",West,1194901,13860,4000 Santo Tomas Dr.,Los Angeles,90008,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 94 doors/hardware, 27 accessible paths of travel, 93 signs, 14 restrooms, 9 drinking fountains, 24 sinks/sink cabinets, 8 assistive listening devices/intercoms/phones, 4 concrete ramps, 4 pieces of accessible furniture, 1 assembly seat, 10 railings, 2 locker room modifications with 3 locker upgrades, 1 playground component, 1 parking area, 2 casework/counters, 3 door modifications/auto openers, 1 path of travel, 1 covered walkway and 1 new elevator/stage lift.","9,480",2022-Q4,2024-Q3,Design,20220630 Lorena ES,10371877,Lorena ES - 2021-22 Prop 39,Charter Prop 39,2,Monica Garcia,East,1494501,13351,1015 S. Lorena St.,Los Angeles,90023,"This project is a charter school renovation for Extera Public School #2 for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades TK-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",8,2021-Q3,2021-Q4,Closeout,20220630 Mulholland MS,10371735,Mulholland MS - Exterior Painting,Painting,3,Scott Schmerelson,Northwest,1825901,15184,17120 Vanowen St.,Lake Balboa,91406,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",988,2022-Q3,2023-Q2,Planning,20220630 Bravo Medical Magnet HS,10004103,Bravo Medical Magnet HS - Facelift,Facelift,2,Monica Garcia,East,1875401,13336,1200 N. Cornwell St.,Los Angeles,90033,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",98,2012-Q2,2016-Q3,Closeout,20220630 Lawrence MS,10370929,Lawrence MS - Classroom Replacement,Addition,3,Scott Schmerelson,Northwest,1821701,13695,10100 Variel Ave.,Chatsworth,91311,"This project removes and replaces one Department of Housing relocatable building that does not comply with State standards and provides associated improvements for site restoration. The project includes the construction and installation of one DSA-certifiable relocatable building with 1,920 square feet that will be reconfigured, upgraded and furnished to provide offices, exam rooms and support spaces for the Student Health and Human Services clinic program serving students on campus. Site upgrades as required to support the new facility and clinic program, such as parking lot improvements, fencing, controlled entry, and relocation of a storage container are also included. Improvements or mitigations to ensure compliance with local, State and/or Federal facilities requirements will be addressed.","2,800",2024-Q2,2024-Q4,Design,20220630 Van Nuys MS,10371884,Van Nuys MS - 2021-22 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northeast,1843401,13605,5435 Vesper Ave.,Van Nuys,91411,"This project is a charter school renovation for High Tech Los Angeles MS for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office,1 special education room, and 8 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",138,2021-Q2,2021-Q4,Closeout,20220630 Sunrise ES,10370474,Sunrise ES - Security Upgrade in Multipurpose Room,Security System,2,Monica Garcia,East,1698801,13395,2821 E. 7th St.,Los Angeles,90023,Install intrusion alarm and public address (PA) system in multipurpose building.,17,2019-Q2,2019-Q2,Closeout,20220630 Moneta Continuation HS,10371250,Moneta Continuation HS - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1866601,16461,17951 Budlong Ave.,Gardena,90248,Install new secure entry system at main gate to campus with three video receivers in main office.,32,2020-Q3,2021-Q1,Closeout,20220630 Marshall HS,10370086,Marshall HS - ADA Improvements,Access Compliance,2,Monica Garcia,Central,1875001,13571,3939 Tracy St.,Los Angeles,90027,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 101 doors/hardware, 48 accessible paths of travel, 146 signs, 26 restrooms, 11 drinking fountains, 3 sinks/sink cabinets, 3 assistive listening devices/intercoms/phones, 3 concrete ramps, 4 assembly seats, 11 railings, 4 existing elevator modifications, 2 locker room modifications, 6 casework/counters, 34 door modifications/auto openers, 1 new elevator, 1 stage lift, and 2 passenger/bus loading zones.","10,445",2020-Q4,2022-Q4,Construction,20220630 Jefferson HS,10366298,Pilot School - Nava College Preparatory HS at Jefferson HS,Reconfiguration,5,Jackie Goldberg,Central,1871401,13447,1319 E. 41st St.,Los Angeles,90011,Reconfigure and upgrade 13 classrooms and 1 administrative office at Jefferson HS to create separate and distinct facilities space that enables the successful operation of Nava College Preparatory HS.,407,2014-Q2,2015-Q1,Closeout,20220630 Rosemont ES,10372311,Rosemont ES - Install Chain Link Fence,Fencing,2,Monica Garcia,Central,1637001,13289,421 N. Rosemont Ave.,Los Angeles,90026,Install new chain link fence. Approx. 30' of fencing with one gate.,12,2022-Q3,2022-Q4,Planning,20220630 Hillcrest ES,10370383,Hillcrest ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1452801,13621,4041 Hillcrest Dr.,Los Angeles,90008,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",436,2020-Q2,2020-Q3,Closeout,20220630 Grant HS,10366801,Grant HS - Comprehensive Modernization,Comprehensive Modernization,6,Kelly Gonez,Northeast,1868301,13674,13000 Oxnard St.,Van Nuys,91401,"This project includes the construction of new buildings and site improvements with 31 general and specialty classrooms, instructional support spaces, administration, library, and maintenance and operations area. Existing school facilities will be upgraded including the modernization, seismic retrofit, and new HVAC system in classroom buildings 100 & 200 and Grant Hall (multipurpose building); and the modernization and seismic retrofit of the gymnasium building. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of buildings 2, 3, 4, 23, 27, 29, and 30; auxiliary structures for agricultural/horticultural studies; and 27 classrooms in relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved. In addition, improvements to private Hatteras St. will be made, the cost of which is shared with Valley College.","186,260",2020-Q3,2024-Q4,Construction,20220630 Irving STEAM Magnet MS,10371799,Irving STEAM Magnet MS - Seismic Retrofits at Auditorium,Seismic Modernization,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"This project is to provide seismic retrofits at the Auditorium Building with a total area of approximately 15,107 square feet. The scope of work includes ADA upgrades as required.","2,149",2024-Q3,2026-Q1,Design,20220630 4th St. ES,10367963,4th St. ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1397301,13482,420 Amalia Ave.,Los Angeles,90022,"Remove/demolish 1 bungalow including abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprint.",320,2017-Q2,2019-Q1,Closeout,20220630 Cienega ES,10371766,Cienega ES - ADA Improvements,Access Compliance,1,"Dr. George J. McKenna, III",West,1306801,13429,2611 S. Orange Dr.,Los Angeles,90016,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 4 door hardware, 7 thresholds, 12 accessible paths of travel, 4 signs, 8 restrooms, 34 restroom accessories, 1 drinking fountain, 1 assistive listening device/intercom/phone, 2 pieces of accessible furniture, 1 assembly seat, 5 railings, 1 parking area, and 1 new elevator/stage lift.","3,750",2023-Q2,2024-Q4,Design,20220630 San Fernando EEC,10370947,San Fernando EEC - Privacy Fence,Fencing,6,Kelly Gonez,Northeast,1955501,13419,1204 Woodworth St.,San Fernando,91340,Install new privacy fence,13,2020-Q1,2020-Q2,Closeout,20220630 South Shores Visual & Performing Arts Magnet ES,10366349,South Shores Magnet School for the Visual/Performing Arts - New Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1687001,13808,2060 W. 35th St.,San Pedro,90732,Provide upgrades to the campus by removing existing marquee and providing a new electronic marquee,39,2015-Q2,2015-Q3,Closeout,20220630 Whitman Continuation HS,10371510,Whitman Continuation HS - Install Water Bottle Filling Station,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1862301,16482,7795 Rosewood Ave.,Los Angeles,90036,Install water bottle filling station outside of main building.,10,2021-Q1,2021-Q2,Closeout,20220630 Kentwood ES,10371606,Kentwood ES - Install Secure Entry System,Security System,4,Nick Melvoin,West,1471201,13589,8401 Emerson Ave.,Los Angeles,90045,Install new secure entry system at main entrance gate with three video receivers in main office. Modify pedestrian gate to accommodate new locking mechanism and strike plate.,51,2021-Q1,2021-Q3,Closeout,20220630 Plummer ES,10371716,Plummer ES - Install Play Structure And Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northwest,1612301,13878,9340 Noble Ave.,North Hills,91343,"Install play structure and matting to cover approximately 1,400 square feet. Provide path of travel upgrades from the faculty parking lot to the new play structure and replace the existing gate with a new gate that complies with the Americans with Disabilities Act (ADA).",584,2022-Q4,2023-Q2,Design,20220630 Narbonne HS,10363846,Narbonne HS - Science Lab Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1877901,13407,24300 S. Western Ave.,Harbor City,90710,"The project provides 4 chemistry labs with safety equipment including emergency shower/eyewash, fume hood, utility shutoff valves and HVAC units sufficient to remove chemical fumes from classrooms and workrooms. The project scope also includes chemical storage cabinets and eyewash in workrooms, fire sprinklers in chemistry labs and workrooms, functional repairs to plumbing and cabinetry, replacement of acid waste piping, and requirements of the Americans with Disabilities Act (ADA) for accessibility including path of travel improvements, restroom and fountain upgrades. The project also completed unfinished scope from the previously-approved science lab renovation project at the school as well as provided interim housing due to increased enrollment. During construction, the project addressed unforeseen conditions including the relocation of various classroom infrastructure, the incorporation of a sound enhancement system in 3 science labs, additional plumbing requirements for the sanitary sewer line, changes to the fire sprinkler system, and the replacement of all flooring with vinyl composition tile.","5,247",2016-Q2,2017-Q4,Closeout,20220630 Emerson Community Charter MS,10371825,Emerson MS - Install Auditorium AV Equipment,Electrical/Lighting,4,Nick Melvoin,West,1812301,13641,1650 Selby Ave.,Los Angeles,90024,"Remove deteriorated sound system, projector, and projector screen and install new sound system, projector, projector screen, and peripheral equipment.",81,2021-Q2,2021-Q4,Closeout,20220630 Lankershim ES,10366340,Lankershim ES - New Sound & Visual System,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1478101,13358,5250 Bakman Ave.,North Hollywood,91601,Provide upgrades to the auditorium and library by installing a new sound and visual system,48,2014-Q3,2015-Q1,Closeout,20220630 Santee Education Complex,10366097,Santee Education Complex - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1871601,13945,1921 S. Maple Ave.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",951,2015-Q1,2015-Q3,Closeout,20220630 Virginia ES,10364190,Virginia ES - Provide iPads,Communications/Technology Upgrade,1,"Dr. George J. McKenna, III",West,1757501,13504,2925 Virginia Rd.,Los Angeles,90016,Provide iPads,9,2014-Q2,2014-Q2,Closeout,20220630 Sherman Oaks Charter ES,10368206,Sherman Oaks Charter ES - SEEDS,SEEDS,3,Scott Schmerelson,Northeast,1669901,13517,14755 Greenleaf St.,Sherman Oaks,91403,"Design and construct an outdoor learning space of approximately 6,500 square feet consisting of the installation of concrete, decomposed granite, irrigation system, bioswale and boulders. It will be outfitted by the school site and the partner organizations (Sherman Oaks/EnrichLA) with raised beds, drip irrigation and planting materials.",88,2017-Q1,2018-Q2,Closeout,20220630 West Vernon ES,10364134,West Vernon ES - HVAC,HVAC,5,Jackie Goldberg,Central,1765401,13330,4312 S. Grand Ave.,Los Angeles,90037,"The project will replace the deteriorated and aged air handlers, fan coils, and wall-mounted heat pumps that serve classrooms, administrative and support areas. The equipment is more than 30 years old, highly inefficient, requires frequent service, and has deteriorated beyond economical repair.","5,208",2017-Q1,2019-Q1,Closeout,20220630 South Gate MS,10372013,South Gate MS - Purchase Classroom Furniture,Furniture/Fixtures/Equipment,5,Jackie Goldberg,East,1837701,13261,4100 Firestone Blvd.,South Gate,90280,Purchase new tables and desks for art classroom,55,2021-Q3,2021-Q4,Closeout,20220630 Westminster EEC,10372093,Westminster EEC - Purchase Classroom Furniture,Furniture/Fixtures/Equipment,4,Nick Melvoin,West,1957601,16724,1010 Main St.,Venice,90291,"Purchase new student activity tables, chairs, and cubby storage units",6,2021-Q4,2021-Q4,Closeout,20220630 Harmony ES,10372242,Harmony ES - Install Security Monitor System,Security System,5,Jackie Goldberg,Central,1468101,13535,899 E. 42nd Pl.,Los Angeles,90011,"Install new video surveillance (CCTV) system with (3) new cameras. Connect (8) existing cameras to new system. Discard existing deteriorated/outdated system server. New cameras to cover cafeteria parking lot, main entrance gate, and pedestrian gate on 42nd St.",63,2022-Q4,2023-Q1,Planning,20220630 Barrett ES,10372389,Barrett ES - Install Privacy Fence,Fencing,1,"Dr. George J. McKenna, III",South,1556201,13449,419 W. 98th St.,Los Angeles,90003,"Remove existing chain link fencing. Install approx. 225 feet of blue privacy fencing, to match existing in other areas.",23,2022-Q3,2023-Q1,Planning,20220630 San Jose ES,10363994,San Jose ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northwest,1647901,13691,14928 Clymer St.,Mission Hills,91345,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",331,2014-Q3,2014-Q4,Closeout,20220630 King Magnets MS,10004157,King MS - Facelift,Facelift,2,Monica Garcia,Central,1820801,13531,4201 Fountain Ave.,Los Angeles,90029,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",156,2012-Q2,2016-Q3,Closeout,20220630 Hollenbeck MS,10366043,Hollenbeck MS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1817901,13408,2510 E. 6th St.,Los Angeles,90023,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",552,2015-Q1,2015-Q2,Closeout,20220630 Euclid ES,10367806,Euclid ES - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1367101,13319,806 Euclid Ave.,Los Angeles,90023,"Remove and replace urinal, toilet, and lavatory fixtures for appropriate height.",6,2016-Q3,2016-Q3,Closeout,20220630 Ranchito ES,10367929,Ranchito ES - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1619201,13721,7940 Ranchito Ave.,Panorama City,91402,Provide and install electronic marquee.,41,2016-Q3,2017-Q1,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10369530,Sun Valley Magnet - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2023-Q4,2024-Q1,Planning,20220630 Banning HS,10004136,Banning HS - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",222,2011-Q4,2016-Q3,Closeout,20220630 Gardena HS,10004138,Gardena HS - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",215,2012-Q1,2017-Q1,Closeout,20220630 Gage MS,10004158,Gage MS - Facelift,Facelift,5,Jackie Goldberg,East,1815101,13598,2880 E. Gage Ave.,Huntington Park,90255,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",251,2011-Q3,2016-Q3,Closeout,20220630 Shirley ES,10004843,Shirley ES - Lunch Shelter,Lunch/Shade Shelter,4,Nick Melvoin,Northwest,1671201,13671,19452 Hart St.,Reseda,91335,Upgrade existing lunch shelter ceiling panels to ensure student safety.,59,2012-Q3,2014-Q1,Closeout,20220630 De La Torre ES,10369172,De La Torre ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1230101,14104,500 N. Island Ave.,Wilmington,90744,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",39,2018-Q1,2018-Q2,Closeout,20220630 Mann MS,10367701,Mann MS - 2016-17 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1823601,13534,7001 S. St. Andrews Pl.,Los Angeles,90047,"This project is a charter school renovation for Westchester Secondary Charter School for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",91,2016-Q2,2016-Q3,Closeout,20220630 Panorama HS,10367706,Panorama HS - 2016-17 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,"This project is a charter school renovation for Valor Academy Charter HS for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 15 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",24,2016-Q2,2016-Q3,Closeout,20220630 Hooper EEC,10367331,Hooper EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1952501,16294,1224 E. 52nd St.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",96,2016-Q3,2016-Q4,Closeout,20220630 Barton Hill ES,10370127,Barton Hill ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1231501,13340,423 N. Pacific Ave.,San Pedro,90731,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q3,2028-Q3,Planning,20220630 92nd St. ES,10365671,92nd St. ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1554801,13511,9211 Grape St.,Los Angeles,90002,Replace deteriorated playground matting systems to ensure the health and safety of students.,70,2014-Q1,2014-Q1,Closeout,20220630 State ES,10105902,State ES - Compliance with State & Federal Access Requirements,Fire Alarm System,5,Jackie Goldberg,East,1691801,13639,3211 Santa Ana St.,South Gate,90280,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),151,2014-Q4,2015-Q2,Closeout,20220630 Clifford Math & Technology Magnet ES,10365690,Clifford ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1311001,13309,2150 Duane St.,Los Angeles,90039,Replace deteriorated playground matting systems to ensure the health and safety of students.,27,2014-Q3,2014-Q3,Closeout,20220630 Lull Special Education Center,10364047,Lull Special Education Center - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1195901,13615,17551 Miranda St.,Encino,91316,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",435,2013-Q4,2014-Q2,Closeout,20220630 Vine ES,10370225,Vine ES - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1753401,13342,955 N. Vine St.,Los Angeles,90038,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2025-Q3,2026-Q1,Planning,20220630 Harte Preparatory MS,10370245,Harte Preparatory MS - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1817001,13612,9301 S. Hoover St.,Los Angeles,90044,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2024-Q3,2024-Q4,Planning,20220630 Marina Del Rey MS,10367702,Marina Del Rey MS - 2016-19 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-location for Goethe International Charter School. This project included 1 charter office, 1 special education room, and 19 instructional spaces for charter students in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no change"" project with 1 charter office, 1 special education room, and 19 instructional spaces for charter students in grades K-5. The project was again amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/19.",118,2016-Q2,2016-Q3,Closeout,20220630 Wilshire Crest ES,10366624,Wilshire Crest ES - Plumbing Utilities Upgrades,Plumbing/Irrigation/Drainage,1,"Dr. George J. McKenna, III",West,1779501,13524,5241 W. Olympic Blvd.,Los Angeles,90036,"This project replaces the deteriorated domestic water, sewer and drain lines. The scope of work also includes replacing classroom and service sinks and cabinets, renovating the faculty and office restrooms, upgrading the sump pump system located in the basement mechanical room, upgrading the fire alarm system, and repairing areas impacted by the plumbing upgrades with patch and paint. Also included are upgrades to meet the accessibility requirements of the Americans with Disabilities Act (ADA) with restroom and path of travel improvements.","2,516",2017-Q4,2019-Q1,Closeout,20220630 Westport Heights ES,10365764,Westport Heights ES - Replace Playground Matting,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1771201,13592,6011 W. 79th St.,Los Angeles,90045,Replace deteriorated playground matting systems to ensure the health and safety of students.,57,2015-Q2,2015-Q3,Closeout,20220630 Canterbury ES,10365099,Canterbury ES - Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1278101,13541,13670 Montague St.,Arleta,91331,Provide upgrades to the campus by providing a new electronic marquee,42,2014-Q1,2014-Q3,Closeout,20220630 Carson HS,10367591,Carson HS - Metal Ramp,Access Compliance,7,Tanya Ortiz Franklin,South,1857501,13869,22328 S. Main St.,Carson,90745,provide and install 1 metal Ramp with common landing and skirting connecting classrooms X5 & X6,30,2016-Q2,2016-Q3,Closeout,20220630 Emerson Community Adult School,10366699,Emerson Community Adult School - Portable Removal,Portable Removal,4,Nick Melvoin,West,1138901,13714,8810 Emerson Ave.,Los Angeles,90045,"Disconnect and remove 1 Department of Housing (DOH) portable building as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",59,2015-Q1,2016-Q1,Closeout,20220630 Venice Community Adult School,10366950,Venice Community Adult School - Portable Removal,Portable Removal,4,Nick Melvoin,West,1946201,13513,13000 Venice Blvd.,Los Angeles,90066,Removal of 1 24' x 36' DOH portable building,108,2016-Q1,2016-Q3,Closeout,20220630 Farmdale ES,10365701,Farmdale ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1374001,15166,2660 Ruth Swiggett Dr.,Los Angeles,90032,Replace deteriorated playground matting systems to ensure the health and safety of students.,18,2013-Q4,2014-Q1,Closeout,20220630 Germain Academy for Academic Achievement,10365702,Germain ES - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1411701,13872,20730 Germain St.,Chatsworth,91311,Replace deteriorated playground matting systems to ensure the health and safety of students.,83,2014-Q2,2014-Q2,Closeout,20220630 Glassell Park STEAM Magnet ES,10365703,Glassell Park ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1412301,13384,2211 W. Ave. 30,Los Angeles,90065,Replace deteriorated playground matting systems to ensure the health and safety of students.,43,2014-Q4,2014-Q4,Closeout,20220630 Carson ES,10108814,Carson ES - Purchase & Install Wrought Iron Fence at the Front of the School,Fencing,7,Tanya Ortiz Franklin,South,1283601,13435,161 E. Carson St.,Carson,90745,Purchase & Install Wrought Iron Fence at the Front of the School,13,2013-Q4,2014-Q4,Closeout,20220630 Shirley ES,10372419,Shirley ES - Campus Improvements,Campus Improvement,4,Nick Melvoin,Northwest,1671201,13671,19452 Hart St.,Reseda,91335,"Install one water bottle filler at existing drinking fountain and install a new audio/visual system and lighting in the auditorium. Installation will include new raceways, electrical receptacles and hardware to support new components.",88,2022-Q3,2022-Q4,Planning,20220630 Revere Charter MS,10369715,Revere Charter MS - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1835601,13665,1450 Allenford Ave.,Los Angeles,90049,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 102 doors, 112 door hardware, 102 thresholds, accessible paths of travel, 104 signs, 17 restrooms, 24 drinking fountains/sinks, 5 assistive listening devices/intercoms/phones, 8 concrete ramps with handrails, 2 AC ramps with handrails, 2 metal ramps, 1 piece of accessible furniture, 9 assembly seats, 1 railing, 5 locker room modifications/lockers, 2 parking areas, 2 cafeteria counter, 10 casework/counters, 1 nurse's exam room modification, 2 changing rooms, and 2 stage lifts.","8,828",2021-Q3,2023-Q1,Construction,20220630 Los Angeles Center for Enriched Studies,10370932,Los Angeles Center for Enriched Studies - Security Upgrade,Security System,1,"Dr. George J. McKenna, III",West,1874101,13554,5931 W. 18th St.,Los Angeles,90035,Install new secure entry system,36,2019-Q4,2020-Q1,Closeout,20220630 2nd St. ES,10370555,2nd St. ES - Exterior Painting,Painting,2,Monica Garcia,East,1657501,13326,1942 E. 2nd St.,Los Angeles,90033,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",329,2020-Q2,2020-Q2,Closeout,20220630 Valley View ES,10371658,Valley View ES - Purchase Lunch Tables,Furniture/Fixtures/Equipment,3,Scott Schmerelson,West,1739701,13428,6921 Woodrow Wilson Dr.,Los Angeles,90068,Purchase 4 benches and 14 exterior lunch tables to upgrade current fiberglass tables to metal mesh tables.,25,2021-Q1,2021-Q3,Closeout,20220630 Eastman ES,10372490,Eastman ES - 2022-23 Prop 39,Charter Prop 39,2,Monica Garcia,East,1352101,13520,4112 E. Olympic Blvd.,Los Angeles,90023,"This project is a charter school renovation for Extera Public School #2 for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 6 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",60,2022-Q3,2022-Q3,Planning,20220630 Purche ES,10372553,Purche ES - Install Parking Lot Fence,Fencing,7,Tanya Ortiz Franklin,South,1615801,13655,13210 Purche Ave.,Gardena,90249,Install chain link fence at parking lot. Install approx. 200 feet of 8 ft tall chain link fence with two roll gates.,51,2022-Q3,2022-Q4,Planning,20220630 Andasol ES,10367373,Andasol ES - Playground Upgrades,Campus Improvement,3,Scott Schmerelson,Northwest,1211701,13839,10126 Encino Ave.,Northridge,91325,"The project replaces the deteriorated and obsolete play equipment in the kindergarten yard with a new play structure, playground matting, and paving. The installation of a new 30' x 40' shade structure over the new playground equipment will protect children while at play and upgrades to meet the accessibility requirements of the Americans with Disabilities Act (ADA) including path of travel, ramp, fencing with gate, and drinking fountain will improve program access.",448,2017-Q3,2018-Q2,Closeout,20220630 Locke EEC,10372599,Locke EEC - Install Security Monitor System,Security System,7,Tanya Ortiz Franklin,South,1953101,16288,320 E. 111th St.,Los Angeles,90061,Install video surveillance (CCTV) system with (5) cameras.,76,2022-Q4,2023-Q1,Planning,20220630 Wadsworth EEC,10369328,Wadsworth EEC - Restroom Upgrade,Access Compliance,5,Jackie Goldberg,Central,1957501,16764,1047 E. 41st St.,Los Angeles,90011,The project will provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,340,2022-Q3,2023-Q2,Design,20220630 Lewis Continuation HS,10370484,Lewis Continuation HS - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1863801,16543,12508 Wicks St.,Sun Valley,91352,Install new secure entry system,29,2019-Q2,2019-Q3,Closeout,20220630 San Fernando MS,10365638,San Fernando MS - Seismic Retrofit & HVAC in Girls' Gym,Seismic Modernization,6,Kelly Gonez,Northeast,1835801,13420,130 N. Brand Blvd.,San Fernando,91340,"This project seismically retrofits the girls' gymnasium by providing additional anchoring and reinforcements to wall and roof structures, which significantly reduces the seismic vulnerability of the building, particularly the roof systems. In addition, the existing heating, ventilation, and air conditioning (HVAC) systems in the gymnasium and adjacent utility building will be replaced. The HVAC scope of work includes replacing approximately 5,500 square feet of ceiling along with light fixtures, sprinkler heads, and low voltage fixtures; replacing approximately 4,500 square feet of roofing; and adding steel frame supports.","6,217",2017-Q1,2019-Q2,Closeout,20220630 Fairfax HS,10100297,Fairfax HS - HVAC,HVAC,4,Nick Melvoin,West,1862101,13473,7850 Melrose Ave.,Los Angeles,90046,"Replace heating, ventilation, and air conditioning (HVAC).","14,144",2017-Q1,2019-Q3,Closeout,20220630 24th St. EEC,10372602,24th St. EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1957001,16624,2101 W. 24th St.,Los Angeles,90018,"This project will provide an outdoor classroom, with at least 10 learning stations, by dividing the existing playground into distinct activity areas covering 6,075 square feet. The scope of work includes Americans with Disabilities Act accessibility upgrades, and any other required improvements or mitigations to ensure compliance with local, state, and/or federal facilities requirements. Campus upgrades include new heating, ventilation, and air-conditioning units, new roofing, fire alarm upgrades, a new shade fabric for the existing shade structure, a new water bottle filling station, and new playground matting.","3,153",2024-Q3,2025-Q4,Planning,20220630 Gardena EEC,10004998,Gardena EEC - Nature Explore Classroom,Campus Improvement,7,Tanya Ortiz Franklin,South,1916501,16462,1350 W. 177th St.,Gardena,90248,"Design and construct new nature explore classroom including required fire alarm, restroom, parking lot, drinking fountain and pedestrian gate accessibility upgrades.","1,174",2017-Q1,2017-Q3,Closeout,20220630 Palisades Charter HS,10369375,Palisades Charter HS - Plumbing Upgrades,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1879801,13742,15777 Bowdoin St.,Pacific Palisades,90272,"This project replaces the underground hot water pipes serving the entire campus and installs new hot water boilers at 8 classroom buildings. The pipes were originally installed in the 1960s and had repeatedly failed, resulting in flooding throughout the campus. Temporary repairs were provided until a long-term solution could be implemented to address the deteriorated water pipes.","6,755",2020-Q4,2023-Q1,Construction,20220630 Van Deene ES,10371668,Van Deene ES - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1741901,13788,826 W. Javelin St.,Torrance,90502,"Provide and install a new 2-sided electronic marquee standing less than 8' high and measuring 5' x 8'. The new marquee will be installed in front of the school along Javelin St., at the northwest exterior of the main building, including construction of new footing and trenching to install new underground pathways for power and data.",56,2021-Q2,2021-Q4,Closeout,20220630 Shenandoah ES,10368165,Shenandoah ES - Comprehensive Modernization,Comprehensive Modernization,1,"Dr. George J. McKenna, III",West,1667101,13491,2450 Shenandoah St.,Los Angeles,90034,"This project includes the construction of new buildings and site improvements with approximately 19 general and specialty classrooms, instructional support spaces, lunch shelter, covered walkways, playgrounds, and parking. Existing school facilities will be upgraded including the modernization and seismic retrofit of classroom/auditorium building #200; and the reconfiguration of the classrooms, library, and instructional support areas in administration/library/classroom building #100. The project also includes the demolition of the lunch pavilion, shade structure, and 21 relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","68,920",2021-Q3,2024-Q1,Construction,20220630 Hubbard ES,10369152,Hubbard ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1460301,13718,13325 Hubbard St.,Sylmar,91342,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",47,2017-Q4,2018-Q3,Closeout,20220630 153rd St. ES,10371765,153rd St. ES - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1582201,13812,1605 W. 153rd St.,Gardena,90247,"Install new electronic wall-mounted marquee on the multipurpose room building. The existing non-electronic, free-standing marquee will remain on campus.",53,2021-Q4,2022-Q1,Closeout,20220630 Stanford PC,10370377,Stanford PC - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1690501,13853,3020 Kansas Ave.,South Gate,90280,Purchase 70 iPads and 2 charging carts and secure room for storage.,44,2018-Q4,2019-Q2,Closeout,20220630 Annalee ES,10371614,Annalee ES - Install Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1214601,13760,19410 S. Annalee Ave.,Carson,90746,Install new secure entry system at door to main office with three video receivers in main office.,21,2021-Q1,2021-Q2,Closeout,20220630 Adams MS,10365994,Adams MS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1800901,13366,151 W. 30th St.,Los Angeles,90007,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",428,2015-Q1,2015-Q2,Closeout,20220630 Vine EEC,10372560,Vine EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,4,Nick Melvoin,West,1957401,14281,6312 Eleanor Ave.,Los Angeles,90038,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 22,030 sq.ft. ADA upgrades for this project include resurfacing the parking area - approximately 6,300 sq. ft. - to provide an ADA compliant path of travel and POT upgrades to gates, door hardware, handrails, and signage, as well as adjustments to existing restrooms. Additionally, we will replace deteriorated HVAC units and roofing, and make necessary upgrades to the fire alarm system, as required by current code.","5,028",2024-Q2,2025-Q3,Planning,20220630 Wilton ES,10372524,Wilton ES - 2022-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1780801,13433,745 S. Wilton Pl.,Los Angeles,90005,"This project is a charter school renovation for Magnolia Science Academy #6 for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 4 charter offices, 1 special education room, and 4 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",551,2022-Q3,2022-Q3,Planning,20220630 Laurel EEC,10370481,Laurel EEC - Landscaping and Irrigation,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1952901,16286,8023 Willoughby Ave.,Los Angeles,90046,Install new landscaping and irrigation,10,2019-Q2,2019-Q2,Closeout,20220630 Nimitz MS,10371923,Nimitz MS - ADA Improvements,Access Compliance,5,Jackie Goldberg,East,1826801,13637,6021 Carmelita Ave.,Huntington Park,90255,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 3 doors/jambs, 7 door hardware, 4 thresholds, 20 accessible paths of travel, 4 signs, 8 restrooms,22 restroom accessories, 9 drinking fountains, 1 sink/sink cabinet, 4 casework/counters, 1 assistive listening device/intercom/phone, 3 concrete ramps, 6 pieces of accessible furniture, 1 assembly seat upgrade, 3 railings, 4 locker room upgrades, 2 locker upgrades and 2 existing elevator upgrades.","5,358",2023-Q3,2025-Q1,Design,20220630 Moore Math/Science/Technology Academy,10372638,Moore Math/Science/Technology Academy - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1231301,14603,1321 E. 61st St.,Los Angeles,90001,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Gardner ES,10370427,Gardner ES - Garden Irrigation,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1406801,13354,7450 Hawthorn Ave.,Los Angeles,90046,Install irrigation at two new garden areas,18,2020-Q1,2020-Q4,Closeout,20220630 Topanga Charter ES,10370943,Topanga Charter ES -Technology Upgrade,Communications/Technology Upgrade,4,Nick Melvoin,West,1719801,13816,22075 Topanga School Rd.,Topanga,90290,Purchase 30 iPads and 1 storage cart.,19,2020-Q1,2020-Q2,Closeout,20220630 Barton Hill ES,10365680,Barton Hill ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1231501,13340,423 N. Pacific Ave.,San Pedro,90731,Replace deteriorated playground matting systems to ensure the health and safety of students.,72,2013-Q4,2014-Q1,Closeout,20220630 Burton ES,10365684,Burton ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1265801,13540,8111 Calhoun Ave.,Panorama City,91402,Replace deteriorated playground matting systems to ensure the health and safety of students.,84,2014-Q3,2014-Q4,Closeout,20220630 Hollywood HS,10004113,Hollywood HS - Facelift,Facelift,4,Nick Melvoin,West,1869301,13356,1521 N. Highland Ave.,Los Angeles,90028,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",229,2012-Q1,2016-Q3,Closeout,20220630 Stonehurst STEAM Magnet ES,10372450,Stonehurst STEAM Magnet ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1694501,13653,9851 Stonehurst Ave.,Sun Valley,91352,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Paseo del Rey Natural Science Magnet ES,10372508,Paseo del Rey Natural Science Magnet ES - 2022-23 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1605201,13784,7751 Paseo Del Rey,Playa Del Rey,90293,"This project is a charter school renovation for Westside Innovative School House (WISH) Community School for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades TK-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",400,2022-Q3,2022-Q3,Planning,20220630 Playa Del Rey ES,10370379,Playa Del Rey ES - Exterior Painting,Painting,4,Nick Melvoin,West,1611001,13559,12221 Juniette St.,Culver City,90230,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",231,2020-Q1,2020-Q2,Closeout,20220630 Graham EEC,10103647,Graham EEC - New Shade Shelters,Lunch/Shade Shelter,7,Tanya Ortiz Franklin,South,1951801,16291,8332 S. Elm St.,Los Angeles,90001,New Shade Shelters,226,2014-Q2,2014-Q4,Closeout,20220630 Gault ES,10370676,Gault ES - Roofing,Roofing,3,Scott Schmerelson,Northwest,1411001,13682,17000 Gault St.,Lake Balboa,91406,"This project is to provide approximately 56,000 square feet of new roofing at 18 buildings, including the installation of new gutters and downspouts and painting of affected areas.","1,096",2021-Q4,2022-Q3,Construction,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10368846,Sun Valley MS - 2017-18 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"This project is a charter school renovation for Celerity Cardinal Charter School for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 14 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",21,2017-Q3,2017-Q3,Closeout,20220630 Audubon MS,10369728,Audubon MS - 2018-19 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1802801,13564,4120 11th Ave.,Los Angeles,90008,"This project is a charter school renovation for Crenshaw Arts/Tech Charter HS (CATCH) for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades 9-12. The scope of work includes furniture and equipment for the conversion of a general classroom to a special education classroom.",8,2018-Q3,2018-Q3,Closeout,20220630 Johnson STEM Academy,10370044,Johnson STEM Academy - Technology Upgrade,Communications/Technology Upgrade,4,Nick Melvoin,West,1524001,13606,8701 Park Hill Dr.,Los Angeles,90045,Purchase 114 Chromebooks and 1 storage cart.,34,2018-Q4,2019-Q1,Closeout,20220630 Gridley ES,10370409,Gridley ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1429501,13748,1907 Eighth St.,San Fernando,91340,"Demolish 1 portable building, provide testing and lab for PCBs, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",195,2019-Q1,2020-Q1,Closeout,20220630 O'Melveny ES,10369885,O'Melveny ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1572601,13396,728 Woodworth St.,San Fernando,91340,"Demolish and remove 1 portable buildings, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/Replace asphalt paving.",86,2018-Q2,2018-Q4,Closeout,20220630 Rio Vista ES,10371913,Rio Vista ES - Provide Robotics Lab,Campus Improvement,6,Kelly Gonez,Northeast,1628801,13441,4243 Satsuma Ave.,North Hollywood,91602,"Convert room 9 into a Robotics Lab. Modify doors to provide better security. Provide necessary power for charging. Re-arrange white/tack boards. Provide and install flat screen TV. Purchase 20 Dash Bots, 20 Cue Builder kits, 13 Bee Bots, 2 LED Light Recording Rings, 1 Desk Microphone, 3 Charging Carts, and a sound system with 2 wireless lavalier microphones.",67,2021-Q2,2022-Q3,Construction,20220630 Haskell STEAM Magnet ES,10369668,Haskell STEAM Magnet ES - Auditorium Upgrade,Electrical/Lighting,3,Scott Schmerelson,Northwest,1445201,13736,15850 Tulsa St.,Granada Hills,91344,Install projector and audio equipment in auditorium.,43,2018-Q2,2018-Q3,Closeout,20220630 Van Gogh Charter ES,10371691,Van Gogh ES - Install Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1742201,13862,17160 Van Gogh St.,Granada Hills,91344,Install new secure entry system at entrance to main office with three receivers in the main office.,38,2022-Q1,2022-Q3,Construction,20220630 Crenshaw Magnet HS: STEMM,10371745,Crenshaw Magnet HS: STEMM - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.","1,075",2022-Q3,2023-Q3,Planning,20220630 Woodlawn ES,10367260,Woodlawn ES - Ceiling & Stairs Upgrades,Campus Improvement,5,Jackie Goldberg,East,1790401,13572,6314 Woodlawn Ave.,Bell,90201,"This project will address the deteriorated roof soffit ceilings and cracked second floor walkways of the North Building. The scope of work includes replacing the steel stairs, removing exterior stucco walls on the first and second floors, and providing path of travel upgrades to meet the accessibility requirements of the Americans with Disabilities Act (ADA) with a new concrete ramp and pedestrian gate.",349,2018-Q1,2018-Q3,Closeout,20220630 Liberty ES,10370598,Liberty ES - 2019-20 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1486301,13599,2728 Liberty Blvd.,South Gate,90280,"KIPP Corazon Academy is vacating this site. This project was approved in Board of Education Report No. 343-18/19. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",22,2019-Q2,2019-Q3,Closeout,20220630 153rd St. ES,10372369,153rd St. ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1582201,13812,1605 W. 153rd St.,Gardena,90247,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",95,2022-Q2,2022-Q3,Construction,20220630 96th St. ES,10372371,96th St. ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1557501,13496,1471 E. 96th St.,Los Angeles,90002,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",92,2022-Q3,2022-Q4,Planning,20220630 Le Conte MS,10366056,Le Conte MS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",603,2015-Q2,2015-Q3,Closeout,20220630 Albion ES,10369726,Albion ES - 2018-20 Prop 39,Charter Prop 39,2,Monica Garcia,East,1201401,13296,322 S. Ave. 18,Los Angeles,90031,"This project was initially approved in BOE Report No. 429-17/18 for the 2018-19 Prop 39 co-locations as a charter school renovation for Los Feliz Charter School for the Arts. This project included 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades K-1. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""No Change"" project with 7 spaces allocated to the charter and an undefined scope of work. However, the charter school opted to vacate the site and will not continue occupancy in the 2019-20 school year. As a result, this project is amended to include the scope of work required to restore the LAUSD campus to its former condition. The required reconfiguration may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",162,2018-Q2,2018-Q3,Closeout,20220630 Castle Heights ES,10371208,Castle Heights ES - Video Surveillance (CCTV) System,Security System,1,"Dr. George J. McKenna, III",West,1287701,13680,9755 Cattaraugus Ave.,Los Angeles,90034,Install video surveillance (CCTV) system with four cameras placed around the campus,86,2020-Q2,2020-Q4,Closeout,20220630 North Hollywood HS,10366799,North Hollywood HS - Comprehensive Modernization,Comprehensive Modernization,3,Scott Schmerelson,Northeast,1878601,13557,5231 Colfax Ave.,North Hollywood,91601,"This project includes the construction of new buildings and site improvements with 56 general and specialty classrooms, instructional support spaces, gymnasium, performing arts center, maintenance and operations area, basketball courts, tennis courts, and baseball and softball fields. Existing school facilities will be upgraded including the modernization and seismic retrofit of Kennedy Hall (classroom and administration building), Frasher Hall (classroom building), and the Library/Media Center. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of 23 relocatable buildings and 12 permanent buildings including: Randolph Hall (social arts and classroom building), auditorium, shop and mechanics building, shop building, auto shop building, gymnasium, physical education building (girls' locker room), instrumental music classroom building, student store, concession building (candy store and restrooms), and two storage buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","294,940",2021-Q1,2026-Q1,Construction,20220630 White ES,10372611,White ES - Secure Entry System,Security System,2,Monica Garcia,Central,1254201,13830,2401 Wilshire Blvd.,Los Angeles,90057,"board report #346-21/22, dated 6/14/2022",39,2022-Q3,2022-Q3,Planning,20220630 Kenter Canyon Charter ES,10367378,Kenter Canyon Charter ES-P&I Accessible Parking,Access Compliance,4,Nick Melvoin,West,1469901,13626,645 N. Kenter Ave.,Los Angeles,90049,Provide and Install Accessible Parking,114,2016-Q1,2016-Q1,Closeout,20220630 Russell ES,10370002,Russell ES - Secure Entry System and Computer Lab,Campus Improvement,7,Tanya Ortiz Franklin,South,1643801,15401,1263 E. Firestone Blvd.,Los Angeles,90001,Install new secure entry system and convert classroom to computer lab,58,2018-Q4,2019-Q1,Closeout,20220630 Lawrence MS,10371421,Lawrence MS - Video Surveillance (CCTV) System,Security System,3,Scott Schmerelson,Northwest,1821701,13695,10100 Variel Ave.,Chatsworth,91311,Install video surveillance (CCTV) system with four cameras.,59,2020-Q2,2022-Q3,Construction,20220630 Lillian ES,10370339,Lillian ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1487701,13468,5909 Lillian St.,Los Angeles,90001,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",59,2019-Q2,2020-Q1,Closeout,20220630 Magnolia ES,10368828,Magnolia ES - 2017-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1505501,13302,1626 S. Orchard Ave.,Los Angeles,90006,"This project is a charter school renovation for Equitas Academy Charter School # 3 for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",207,2017-Q2,2017-Q3,Closeout,20220630 Liggett ES,10368779,Liggett ES - Auditorium Upgrade,Communications/Technology Upgrade,6,Kelly Gonez,Northwest,1487001,13804,9373 Moonbeam Ave.,Panorama City,91402,The project provides a ceiling-mounted projector and speakers. The scope of work includes fixed power and media connections to the projector as well as the installation of a sound rack on stage which includes a CD/DVD player and computer and MIC connections.,33,2017-Q2,2017-Q2,Closeout,20220630 Arleta HS,10365998,Arleta HS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1860901,13920,14200 Van Nuys Blvd.,Arleta,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",770,2015-Q2,2016-Q1,Closeout,20220630 Lokrantz Special Education Center,10372254,Lokrantz Special Education Center - ADA Improvements,Access Compliance,4,Nick Melvoin,Northwest,1194701,13795,19451 Wyandotte St.,Reseda,91335,"The site has been assigned a Category Two accessibility level. In order to meet the criteria for Category Two, various upgrades to four buildings are required, including: corrections, installation, or replacement of two new assistive listening devices, three casework counter upgrades, one new concrete ramp, 14 new doors/jambs, 83 new door hardware, two parking lot upgrades, one playground component/matting upgrade, 27 accessible path of travel upgrades, 12 restroom upgrades, 56 new signs, nine new sinks/cabinets, eight new thresholds and one onsite passenger loading zone, and any other required improvements or mitigations to ensure compliance with local, state and/or federal facilities requirements.","5,206",2024-Q1,2025-Q3,Design,20220630 Hobart EEC,10372559,Hobart EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,5,Jackie Goldberg,Central,1958301,15562,982 S. Serrano Ave.,Los Angeles,90066,"This project will provide an outdoor classroom, with at least 10 learning stations, by dividing the existing playground into distinct activity areas covering 11,100 sq.ft. It will also provide new heating, ventilation, and air-conditioning (HVAC) units, new playground matting, and necessary upgrades to the fire alarm system. ADA upgrades will include an accessible path of travel and restroom and drinking water station upgrades.","3,933",2024-Q2,2025-Q3,Planning,20220630 Russell ES,10370007,Russell ES - Video Surveillance (CCTV) Upgrades,Security System,7,Tanya Ortiz Franklin,South,1643801,15401,1263 E. Firestone Blvd.,Los Angeles,90001,Upgrade video surveillance (CCTV) system by installing additional cameras throughout campus,114,2018-Q4,2019-Q3,Closeout,20220630 Roscoe ES,10372593,Roscoe ES - Install Privacy Fence,Fencing,6,Kelly Gonez,Northeast,1635601,13362,10765 Strathern St.,Sun Valley,91352,Remove existing chain link fencing. Install approx. 340 feet of privacy fencing.,31,2022-Q4,2023-Q2,Planning,20220630 Canoga Park ES,10370317,Canoga Park ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1275301,13416,7438 Topanga Canyon Blvd.,Canoga Park,91303,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",58,2020-Q1,2020-Q2,Closeout,20220630 Solano ES,10363999,Solano ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1683601,13343,615 Solano Ave.,Los Angeles,90012,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",289,2015-Q2,2016-Q1,Closeout,20220630 Legacy HS Complex,10372009,Legacy Visual and Performing Arts HS - Install Privacy Fence,Fencing,5,Jackie Goldberg,East,1892101,14621,5225 Tweedy Blvd.,South Gate,90280,"Replace existing chain link fence with new privacy chain link fence on the east side of the campus, along the football field; approximately 500'",91,2022-Q3,2022-Q4,Planning,20220630 Emelita ES,10369812,Emelita ES - Marquee Installation,Electrical/Lighting,4,Nick Melvoin,Northwest,1358901,13713,17931 Hatteras St.,Encino,91316,Install new electronic marquee (installation cost only). This Local District Northwest priority project includes a Board District 3 contribution towards approximately half the budget.,18,2018-Q2,2018-Q3,Closeout,20220630 Short ES,10368906,Short ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,West,1674001,13679,12814 Maxella Ave.,Los Angeles,90066,Provide and install new electronic marquee.,52,2018-Q1,2018-Q2,Closeout,20220630 Malabar ES,10369077,Malabar ES - SEEDS,SEEDS,2,Monica Garcia,East,1508201,13314,3200 E. Malabar St.,Los Angeles,90063,"Construct an outdoor learning space of approximately 4,100 square feet, consisting of the removal of asphalt, the installation of decomposed granite with concrete ""brush off"" areas, a new irrigation system, composite wood headers, new fencing, boulders, stepping stones, mulch, benches, and log stump stools. It will be outfitted by the school site partner with native plants.",72,2017-Q3,2018-Q4,Closeout,20220630 Bernstein HS,10371367,Bernstein HS - Water Bottle Filling Stations,Plumbing/Irrigation/Drainage,5,Jackie Goldberg,West,1869601,13953,1309 N. Wilton Pl.,Hollywood,90028,Install (4) water bottle filling stations in main building,29,2020-Q2,2020-Q3,Closeout,20220630 Fletcher ES,10370004,Fletcher ES - SEEDS,SEEDS,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,"Construct an outdoor learning space of approximately 3,152 square feet. Includes the installation of new chain link fencing and ADA gates, installation of decomposed granite and cement brush off areas, composite wood headers to create in-ground planting areas, an irrigation system, raised beds and furnishings to create a classroom gathering space. The project will be outfitted by the school site with edible plants as well as native and flowering plants to attract hummingbirds and butterflies. LA River HS will be aiding the school with resources and materials.",86,2019-Q1,2019-Q2,Closeout,20220630 Grand View ES,10370371,Grand View ES - Exterior Painting,Painting,4,Nick Melvoin,West,1424701,13716,3951 Grand View Blvd.,Los Angeles,90066,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",569,2020-Q1,2020-Q3,Closeout,20220630 Union ES,10366748,Union ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1735601,13294,150 S. Burlington Ave.,Los Angeles,90057,"Modernize and renovate school's existing parent & family center by providing interior paint and security upgrades including new doors and hardware as well as security on windows. Repair flooring, provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",107,2015-Q3,2015-Q4,Closeout,20220630 Compton ES,10366758,Compton ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1320501,13498,1515 E. 104th St.,Los Angeles,90002,"Renovate and upgrade school's existing parent & family center by providing interior paint, flooring and lighting repairs, and security upgrades including new doors and panic hardware as well as security on windows. Remove deteriorated built-in cabinets and patch up walls. Provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",124,2015-Q1,2015-Q4,Closeout,20220630 Solano ES,10366767,Solano ES-Removal of 2 Portable & 1 Sanitary Bldg.,Portable Removal,2,Monica Garcia,East,1683601,13343,615 Solano Ave.,Los Angeles,90012,"Removal of 2 DSA Portable Buildings and 1 Sanitary Portable Building Measuring 12' x 40'; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",10,2015-Q3,2015-Q4,Closeout,20220630 95th St. ES,10370768,95th St. ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1552101,13349,1109 W. 96th St.,Los Angeles,90044,"Demolish and remove 2 portable buildings, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",325,2019-Q4,2021-Q2,Closeout,20220630 Fulton College Preparatory School,10371137,Fulton College Preparatory School - Campus Improvement,Campus Improvement,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,Provide and install new fencing with the installation of motorized gate and card reader.,79,2020-Q2,2021-Q1,Closeout,20220630 28th St. EEC,10005005,28th St. EEC - Safety Upgrades and Improvements,Campus Improvement,5,Jackie Goldberg,Central,1959501,13325,747 E. 28th St.,Los Angeles,90011,"Upgrade entry control system, plumbing system in restrooms, exterior gates, playground equipment and fire alarm system",384,2015-Q2,2016-Q1,Closeout,20220630 Van Nuys ES,10365117,Van Nuys ES - Purchase Devices,Communications/Technology Upgrade,3,Scott Schmerelson,Northeast,1743801,13403,6464 Sylmar Ave.,Van Nuys,91401,Purchase devices and a cart to provide internet and intranet access for students and teachers.,27,2014-Q1,2014-Q1,Closeout,20220630 Anatola ES,10365105,Anatola ES - Devices & Desktop Computers,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1211001,13609,7364 Anatola Ave.,Lake Balboa,91406,Purchase devices and desktop computers to provide internet and intranet access for students and teachers.,28,2014-Q1,2014-Q1,Closeout,20220630 La Salle ES,10367387,La Salle ES - Replace Steel Stairs,Campus Improvement,1,"Dr. George J. McKenna, III",West,1478601,13507,8715 La Salle Ave.,Los Angeles,90047,"This project replaces the corroded and deteriorated exterior steel stairs with new galvanized steel stairs at Building #2. The scope of work also includes replacing the wall supporting the stair structure due to termite damage, asbestos abatement, repairing damaged plaster, patch and paint, and path of travel upgrades to meet accessibility requirements of the Americans with Disabilities Act (ADA).",550,2017-Q2,2018-Q1,Closeout,20220630 Carson ES,10371245,Carson ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1283601,13435,161 E. Carson St.,Carson,90745,Remove the existing marquee and footing on Carson St. and replace with a new 2-sided electronic marquee standing less than 8' high.,61,2020-Q4,2021-Q1,Closeout,20220630 City Terrace ES,10372096,City Terrace ES - Install Security Gate,Fencing,2,Monica Garcia,East,1309601,13490,4350 City Terrace Dr.,Los Angeles,90063,Fabricate and install a new wrought iron pedestrian gate. Install gate near entrance to direct visitors to main office; cut-off direct access to classrooms.,25,2022-Q3,2022-Q4,Planning,20220630 Ranchito ES,10367962,Ranchito ES - Concrete Ramp,Access Compliance,6,Kelly Gonez,Northeast,1619201,13721,7940 Ranchito Ave.,Panorama City,91402,Provide and install concrete ramp and handrails at rear exterior door of Nurse's Office,86,2016-Q4,2016-Q4,Closeout,20220630 Marshall HS,10364118,Marshall HS - Repair Roof Auto Shop Building,Roofing,2,Monica Garcia,Central,1875001,13571,3939 Tracy St.,Los Angeles,90027,"The project, which includes design and construction, will replace the structural beams in the auto shop building. A glue-laminated beam has split along its length over a cantilevered carport area, which has created a hazardous situation. Maintenance & Operations has provided temporary shoring of this beam, but this has severely compromised the auto shop program access to critical equipment. It has been determined that the beams supporting the roof were not adequately designed originally. The design correction is expected to include removal and replacement of the damaged glue-laminated beams and installation of five additional beams, plus the addition of necessary structural elements, fire/life safety improvements, and upgrades to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA).",487,2015-Q4,2016-Q1,Closeout,20220630 Sutter MS,10369793,Sutter MS - 2018-19 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,"This project is a charter school renovation for Ingenium Charter MS for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office,1 special education room, and 10 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",25,2018-Q2,2018-Q3,Closeout,20220630 66th St. ES,10364341,66th St. ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1682201,13339,6600 S. San Pedro St.,Los Angeles,90003,Demolish/Remove Portable Building(s),63,2014-Q4,2015-Q1,Closeout,20220630 Cowan ES,10368207,Cowan ES - SEEDS,SEEDS,4,Nick Melvoin,West,1326001,13622,7615 Cowan Ave.,Los Angeles,90045,"Design and construct an outdoor learning space of approximately 1,500 square feet consisting of the installation of a hose bib, irrigation system, seating boulders, planter boxes, art poles, a storage unit and soil. It will be outfitted by the school site and the partner organization (The Kitchen Community) with planting materials.",56,2017-Q1,2017-Q2,Closeout,20220630 Belmont HS,10370515,Belmont HS - Synthetic Turf,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"This project replaces approximately 66,000 square feet of deteriorated synthetic turf at the football field. The scope of work includes the installation of new perforated pipe on the perimeter of the football field, additional drain system below the turf surface, repairs to the synthetic track, as well as replacement of irrigation heads and nozzles in the landscaping area and extra sprinkler heads in the tree removal area.","1,948",2019-Q4,2020-Q2,Closeout,20220630 Reseda Charter HS,10367633,Reseda Charter HS - Parent & Family Center,Campus Improvement,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",45,2016-Q4,2017-Q2,Closeout,20220630 Griffith-Joyner ES,10363930,Griffith-Joyner ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1584901,13497,1963 E. 103rd St.,Los Angeles,90002,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",598,2015-Q1,2015-Q2,Closeout,20220630 Hollywood ES,10363955,Hollywood PC - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,West,1654901,13957,1115 Tamarind Ave.,Los Angeles,90038,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",160,2014-Q2,2014-Q3,Closeout,20220630 Hughes ES,10363958,Hughes ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1237501,13939,4242 Clara St.,Cudahy,90201,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",337,2014-Q3,2014-Q4,Closeout,20220630 Holmes EEC,10100483,Holmes EEC - Paint Building Exterior,Painting,5,Jackie Goldberg,East,1952401,16292,1810 E. 52nd St.,Los Angeles,90058,Paint Building Exterior,36,2014-Q1,2015-Q2,Closeout,20220630 Camino Nuevo ES #3: Castellanos ES,10366012,Camino Nuevo ES #3 Castellanos ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1215701,193548,1723 Cordova St.,Los Angeles,90007,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",200,2014-Q4,2015-Q2,Closeout,20220630 Bonita ES,10370131,Bonita ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1247301,13796,21929 Bonita St.,Carson,90745,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q3,2028-Q4,Planning,20220630 Evergreen ES,10370146,Evergreen ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1369901,13569,2730 Ganahl St.,Los Angeles,90033,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2026-Q2,2026-Q3,Planning,20220630 Grand View ES,10370159,Grand View ES - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1424701,13716,3951 Grand View Blvd.,Los Angeles,90066,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2022-Q3,2023-Q1,Planning,20220630 Los Feliz STEMM Magnet ES,10370175,Los Feliz STEMM Magnet ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1498601,13344,1740 N. New Hampshire Ave.,Los Angeles,90027,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q3,2027-Q4,Planning,20220630 West Vernon ES,10102798,West Vernon ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,5,Jackie Goldberg,Central,1765401,13330,4312 S. Grand Ave.,Los Angeles,90037,Mitigate Lead in Water,136,2012-Q1,2015-Q3,Closeout,20220630 Huntington Park ES,10366757,Huntington Park ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1239101,13916,6055 Corona Ave.,Huntington Park,90255,"Upgrade the existing parent & family center by providing interior paint and security upgrades including new doors and panic hardware. Equip the room with new classroom furniture, laptop computers and signage.",65,2015-Q1,2015-Q3,Closeout,20220630 Windsor Hills Math/Science/Aerospace Magnet ES,10367739,Windsor Hills Math/Science/Aerospace Magnet - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1782201,13757,5215 Overdale Dr.,Los Angeles,90043,Provide and install a camera buzzer system. Provide and install Aiphone secure entrance system to enhance and control the security of the campus.,11,2016-Q3,2017-Q1,Closeout,20220630 Widney Special Education HS,10363840,Widney Special Education HS - Seismic Modernization,Seismic Modernization,1,"Dr. George J. McKenna, III",Central,1191401,15163,2302 S. Gramercy Pl.,Los Angeles,90018,"The project will seismically retrofit the lunch pavilion building to meet current DSA structural codes and requirements. The project will also provide ""light"" modernizations and repairs (i.e. patch paint and minor repairs as necessary) to the lunch pavilion, and any associated upgrades to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA) including path of travel improvements.","2,480",2017-Q3,2018-Q3,Closeout,20220630 Albion ES,10365673,Albion ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1201401,13296,322 S. Ave. 18,Los Angeles,90031,Replace deteriorated playground matting systems to ensure the health and safety of students.,50,2014-Q2,2014-Q2,Closeout,20220630 West Adams Preparatory HS,10367268,West Adams Preparatory HS - Marquee Wall Installation,Electrical/Lighting,5,Jackie Goldberg,Central,1874801,13949,1500 W. Washington Blvd.,Los Angeles,90006,Provide and install new wall-mounted electronic marquee at front of school.,60,2016-Q4,2017-Q2,Closeout,20220630 Saturn ES,10105894,Saturn ES - Compliance with State & Federal Access Requirements,Fire Alarm System,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),512,2015-Q2,2016-Q1,Closeout,20220630 Saturn ES,10368045,Saturn ES - Restroom Upgrades,Access Compliance,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,Modify kindergarten Jack & Jill restrooms for changing room including relocating electrical switches and enlarging doorways. Provide and install folding changing table.,2,2016-Q4,2017-Q1,Closeout,20220630 University Charter HS,10366213,University Charter HS - Portable Removal,Portable Removal,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,Demolish/Remove 4 Portable Buildings,83,2015-Q1,2015-Q4,Closeout,20220630 Wadsworth EEC,10368006,Wadsworth EEC - New Cabinets in Kitchen,Ceiling/Wall System,5,Jackie Goldberg,Central,1957501,16764,1047 E. 41st St.,Los Angeles,90011,"Replace all built-in upper and lower wood cabinets, countertops and sinks with a new cabinet storage system in the kitchen as the current system is beyond economical repair.",51,2018-Q3,2019-Q2,Closeout,20220630 Lockhurst Charter ES,10004561,Lockhurst ES - Facelift,Facelift,3,Scott Schmerelson,Northwest,1488701,13794,6170 Lockhurst Dr.,Woodland Hills,91367,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",73,2013-Q2,2016-Q3,Closeout,20220630 92nd St. ES,10369358,92nd St. ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1554801,13511,9211 Grape St.,Los Angeles,90002,Install Aiphone video/buzzer entry system at main entrance.,25,2018-Q1,2018-Q3,Closeout,20220630 Harmony ES,10367598,Harmony ES - Restroom Upgrades,Access Compliance,5,Jackie Goldberg,Central,1468101,13535,899 E. 42nd Pl.,Los Angeles,90011,Add exhaust fan for restroom between classrooms 125 & 133. Remove and cap toilet in restroom near classroom 121. Provide and install electrical outlet for changing table.,23,2016-Q2,2016-Q3,Closeout,20220630 Mount Gleason MS,10368387,Mount Gleason MS - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1824001,13744,10965 Mt. Gleason Ave.,Sunland,91040,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",237,2018-Q3,2019-Q1,Closeout,20220630 Trinity ES,10366553,Trinity ES-Removal of 2 Portables,Portable Removal,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,"Removal of 2 Portables; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",374,2015-Q3,2016-Q1,Closeout,20220630 Sterry ES,10368722,Sterry ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,West,1693201,13431,1730 Corinth Ave.,Los Angeles,90025,Remove deteriorated marquee. Provide and install new electronic marquee.,21,2017-Q3,2017-Q3,Closeout,20220630 Santee Education Complex,10368187,Santee Education Complex - Wellness Center Expansion,Campus Improvement,5,Jackie Goldberg,Central,1871601,13945,1921 S. Maple Ave.,Los Angeles,90011,"The project includes the interior alterations of the existing space and related site improvements to expand medical and mental health services currently provided by Eisner Pediatric and Family Medical Center. The scope of work includes structural, electrical, and plumbing upgrades to reconfigure the space for the clinic's expanded services; installation of 2 new skylights; replacement of heating, ventilation, and air conditioning (HVAC) including exhaust fans, ductwork, grilles, diffusers and thermostats; installation of a new fire alarm system with new sprinklers; improvements to the phone, data, and security systems; asbestos and lead abatement; new flooring, cabinets/countertops, and lighting fixtures throughout the clinic; repairs and painting to walls, ceilings, and roofing impacted by improvements; exterior site improvements including garden landscape and irrigation, concrete paving, and fencing; and Americans with Disabilities Act (ADA) upgrades to restrooms, new ramp and signage.","3,093",2018-Q3,2019-Q4,Closeout,20220630 Miller ES,10366710,Miller ES - Deteriorated Asphalt Concrete Paving,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",South,1532101,13780,830 W. 77th St.,Los Angeles,90044,"Project is to replace 56,300 square feet of deteriorated roofing with new PVC roofing and metal flashing installation at 19 buildings and arcades, replace damaged wood in kind, and paint to match existing areas affected in the roof demolition. The existing roof-mounted HVAC units and ductwork will be protected in place","3,151",2017-Q1,2018-Q1,Closeout,20220630 Purche ES,10371209,Purche ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1615801,13655,13210 Purche Ave.,Gardena,90249,Install new secure entry system at main office with two intercoms and three video receivers. One intercom is for the public entrance and one intercom is for the door leading to the campus for use by students.,23,2020-Q3,2021-Q2,Closeout,20220630 Stevenson College & Career Preparatory,10372417,Stevenson College & Career Preparatory - Install Audio/Video Equipment - Prop 39 Colocation Grant,Electrical/Lighting,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,Install audio/visual system and lighting in the auditorium. Installation will include new raceways and hardware to support new components.,100,2022-Q3,2022-Q4,Planning,20220630 Camellia ES,10363897,Camellia ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1272601,13587,7451 Camellia Ave.,North Hollywood,91605,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",531,2014-Q4,2015-Q2,Closeout,20220630 Dayton Heights EEC,10005025,Dayton Heights EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,Central,1951301,16302,3917 Clinton St.,Los Angeles,90004,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",67,2014-Q1,2015-Q4,Closeout,20220630 Rosemont EEC,10005064,Rosemont EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,Central,1955301,16761,430 N. Rosemont Ave.,Los Angeles,90026,"Upgrade entry control system, exterior gates, and playground equipment",18,2014-Q3,2015-Q4,Closeout,20220630 South Gate MS,10367525,South Gate MS - Phased Portable Removal,Portable Removal,5,Jackie Goldberg,East,1837701,13261,4100 Firestone Blvd.,South Gate,90280,"This project is part of the International Studies Learning Center Addition which will enable the International Studies Learning Center to operate on one site at the Legacy HS Complex campus as well as reduce the District's reliance on relocatable buildings at South Gate MS and align middle school enrollment in the South Gate area. This portion of the project will gradually remove at least 14 classrooms in relocatable buildings from the South Gate MS campus as enrollment is realigned with Southeast MS and the International Studies Learning Center through the establishment of a middle school zone of choice. Once the portable classroom buildings are removed, associated site improvements will also be completed.","4,000",2022-Q4,2023-Q4,Design,20220630 Elizabeth Learning Center,10363844,Elizabeth Learning Center - Science Lab Improvements,Campus Improvement,5,Jackie Goldberg,East,1354801,13480,4811 Elizabeth St.,Cudahy,90201,"The project provides 2 chemistry labs with safety equipment including emergency shower/eyewash, fume hood, utility shutoff valves and HVAC units sufficient to remove chemical fumes from classrooms and workrooms. The project scope also includes chemical storage cabinets and eyewash in workrooms, fire sprinklers in chemistry labs and workrooms, functional repairs to plumbing and cabinetry, and requirements of the Americans with Disabilities Act (ADA) for accessibility including path of travel improvements, restroom and fountain upgrades. The project will also complete any unfinished scope that was part of the previously-approved science lab renovation project at this school.","2,812",2016-Q4,2018-Q1,Closeout,20220630 Playa Del Rey ES,10371604,Playa Del Rey ES - Install Parking Lot Fence,Fencing,4,Nick Melvoin,West,1611001,13559,12221 Juniette St.,Culver City,90230,Install approximately 300' of chain-link fencing and 2 swing gates around south parking lot.,30,2021-Q1,2021-Q1,Closeout,20220630 Wright STEAM Magnet MS,10371351,Wright STEAM Magnet MS - 2020-22 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for WISH Community School. This project included 1 charter office, 2 special education rooms, and 19 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 20 instructional spaces for charter student seats in grades K-8 and an undefined scope of work.",5,2021-Q3,2021-Q3,Closeout,20220630 Lorena ES,10372501,Lorena ES - 2022-23 Prop 39,Charter Prop 39,2,Monica Garcia,East,1494501,13351,1015 S. Lorena St.,Los Angeles,90023,"This project is a charter school renovation for Extera Public School #2 for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 6 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",61,2022-Q3,2022-Q3,Planning,20220630 Burbank ES,10366725,Burbank ES - Shade for Play Structures,Lunch/Shade Shelter,3,Scott Schmerelson,Northeast,1263001,13678,12215 Albers St.,North Hollywood,91607,This project will provide shade shelters over the two existing play structures in the kindergarten yard and main playground plus associated accessibility improvements.,231,2016-Q1,2016-Q3,Closeout,20220630 Eagle Rock HS,10366025,Eagle Rock HS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1861401,13553,1750 Yosemite Dr.,Los Angeles,90041,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",700,2015-Q2,2015-Q3,Closeout,20220630 Bethune MS,10370081,Bethune MS - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 106 doors/hardware, 19 accessible paths of travel, 113 signs, 20 restrooms, 14 drinking fountains, 17 sinks/sink cabinets, 3 assistive listening devices/intercoms/phones, 4 concrete ramps, 1 metal ramp, 2 assembly seats, 19 railings, 6 locker room modifications, 1 parking area, 6 casework/counters, 19 door modifications/auto openers, and 2 new stage lifts.","8,599",2021-Q2,2023-Q3,Construction,20220630 Chase EEC,10368870,Chase EEC - Shade Shelter,Lunch/Shade Shelter,6,Kelly Gonez,Northwest,1946001,16744,8635 N. Colbath Ave.,Panorama City,91402,The project will install 1 shade structure and provide path of travel improvements that comply with the Americans with Disabilities Act (ADA).,548,2020-Q3,2022-Q3,Construction,20220630 Cheremoya ES,10368944,Cheremoya ES - Shade Shelter,Lunch/Shade Shelter,5,Jackie Goldberg,West,1304101,13410,6017 Franklin Ave.,Los Angeles,90028,"Install one shade structure, matting, and provide Americans with Disabilities Act (ADA) compliant path of travel.",200,2020-Q3,2021-Q2,Closeout,20220630 Ride ES (SMART Academy),10370125,Ride ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1230801,14584,1041 E. 46th St.,Los Angeles,90011,"Replace deteriorated interior walk-in freezer and interior side-by-side walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior side-by-side walk-in cooler, and refrigeration equipment.",153,2028-Q3,2028-Q4,Planning,20220630 Obama ES,10004358,Valley Region ES #13 - Photovoltaic Installation,Photovoltaic Installation,6,Kelly Gonez,Northeast,1230201,14567,8150 Cedros Ave.,Panorama City,91402,Shade Structure to Generate 215 kW of Solar Energy,844,2015-Q1,2015-Q3,Closeout,20220630 Westside Global Awareness Magnet,10369973,Westside Global Awareness Magnet - Secure Entry System,Security System,4,Nick Melvoin,West,1331101,13575,104 Anchorage St.,Marina Del Rey,90291,Install new secure entry system,23,2019-Q1,2019-Q2,Closeout,20220630 Palisades Charter HS,10366083,Palisades Charter HS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1879801,13742,15777 Bowdoin St.,Pacific Palisades,90272,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",888,2015-Q2,2015-Q3,Closeout,20220630 Northridge MS,10372123,Northridge MS - Energy Conservation Lighting,Electrical/Lighting,3,Scott Schmerelson,Northwest,1828301,13740,17960 Chase St.,Northridge,91325,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $1,123,710. Estimated energy savings is 611,159 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $290,979 which is 25.9% of the ECM costs.",291,2022-Q3,2023-Q1,Planning,20220630 Limerick ES,10372409,Limerick ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1488101,13697,8530 Limerick Ave.,Canoga Park,91306,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Marina Del Rey MS,10364116,Marina Del Rey MS - HVAC,HVAC,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,The project will replace the existing boilers and heating and ventilation units which provide heating for the gymnasium and locker rooms. The existing equipment is 25 years old and in very poor condition resulting in numerous related service calls.,"3,381",2016-Q4,2018-Q1,Closeout,20220630 Chatsworth Charter HS,10363842,Chatsworth Charter HS - Science Lab Improvements,Campus Improvement,3,Scott Schmerelson,Northwest,1858301,13870,10027 Lurline Ave.,Chatsworth,91311,"The project provides 2 chemistry labs with safety equipment including emergency shower/eyewash, fume hood, utility shutoff valves and HVAC units sufficient to remove chemical fumes from classrooms and workrooms. The project scope also includes chemical storage cabinets and eyewash in workrooms, fire sprinklers in chemistry labs and workrooms, kitchen hood with fire suppression, functional repairs to plumbing and cabinetry, and requirements of the Americans with Disabilities Act (ADA) for accessibility including path of travel improvements, restroom and fountain upgrades. The project will also complete any unfinished scope that was part of the previously-approved science lab renovation project at this school.","2,982",2016-Q3,2017-Q4,Closeout,20220630 London Continuation HS,10372237,London Continuation HS - Purchase Interactive Displays,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1868501,15441,12924 Oxnard St.,Van Nuys,91401,Purchase (5) 75 inches Clear Touch interactive displays w/ mobile stands. Install electrical receptacle in room 802.,26,2022-Q1,2022-Q1,Closeout,20220630 Riverside Charter ES,10372267,Riverside Charter ES - Changing Table,Access Compliance,3,Scott Schmerelson,Northeast,1631501,13645,13061 Riverside Dr.,Sherman Oaks,91423,Purchase and Install one electric outlet and hi-lo changing table.,18,2022-Q1,2022-Q2,Closeout,20220630 Dymally HS,10371316,Dymally HS - 2020-21 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1766701,14581,8800 S. San Pedro St.,Los Angeles,90003,"This project is a charter school renovation for Watts Learning Center Charter MS for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 17 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, and communication/safety purchases and upgrades.",15,2020-Q2,2020-Q3,Closeout,20220630 Irving STEAM Magnet MS,10370773,Irving STEAM Magnet MS - Exterior Painting,Painting,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",800,2021-Q2,2021-Q4,Closeout,20220630 Wilson HS,10365222,Wilson HS - Portable Removal,Portable Removal,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,Demolish/Remove 1 Portable Building,24,2014-Q3,2015-Q2,Closeout,20220630 Drew MS,10204036,Drew MS - Refinish Gym Floor,Flooring,7,Tanya Ortiz Franklin,South,1811201,13871,8511 Compton Ave.,Los Angeles,90001,Refinish Gym Floor,30,2013-Q3,2014-Q2,Closeout,20220630 Los Angeles HS,10366907,Los Angeles HS - 2015-16 Prop 39 (Math and Science College Preparatory),Charter Prop 39,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,"Math and Science College Preparatory is vacating this site. This project was approved in Board of Education Report No. 423-14/15 . The scope of work includes relocation of classrooms, remedial construction, and reconnecting of all low voltage systems to the District operated program.",8,2015-Q2,2015-Q2,Closeout,20220630 Normandie ES,10366505,Normandie ES - Demolish/Remove DOH Portable Bldg,Portable Removal,1,"Dr. George J. McKenna, III",Central,1563001,13300,4505 S. Raymond Ave.,Los Angeles,90037,"Demolish/Remove Department of Housing (DOH) Portable Building; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",75,2015-Q2,2017-Q1,Closeout,20220630 153rd St. ES,10369819,153rd St. ES - Main Office Counter,Reconfiguration,7,Tanya Ortiz Franklin,South,1582201,13812,1605 W. 153rd St.,Gardena,90247,Fabricate and install a new counter with 2 swing doors in the main office.,4,2018-Q2,2018-Q4,Closeout,20220630 West Adams Preparatory HS,10367979,West Adams Preparatory HS - Synthetic Turf Field,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1874801,13949,1500 W. Washington Blvd.,Los Angeles,90006,"The project includes replacing approximately 103,000 square feet of deteriorated synthetic turf field, cleaning of field drainage, and repairing irrigation for cooling. The warranty for the synthetic turf field has expired.","2,699",2019-Q2,2020-Q1,Closeout,20220630 Elysian Heights ES,10368950,Elysian Heights ES - Security Upgrades,Security System,5,Jackie Goldberg,Central,1357501,13411,1562 Baxter St.,Los Angeles,90026,Provide and install new Aiphone secure entry system at the main entrance. Install monitors in the main office and principal's office.,13,2018-Q2,2018-Q2,Closeout,20220630 Olympic PC,10365730,Olympic PC - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1239201,13921,950 S. Albany St.,Los Angeles,90015,Replace deteriorated playground matting systems to ensure the health and safety of students.,19,2014-Q4,2015-Q1,Closeout,20220630 Woodcrest ES,10369057,Woodcrest ES - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1786301,13369,1151 W. 109th St.,Los Angeles,90044,Provide and install new Aiphone secure entry system at the main entrance.,17,2017-Q3,2018-Q2,Closeout,20220630 Arroyo Seco Museum Science Magnet,10369059,Arroyo Seco Museum Science Magnet - Security Upgrades,Security System,2,Monica Garcia,Central,1432201,13900,4805 Sycamore Terrace,Los Angeles,90042,"Provide security upgrades by installing a parking gate card reader at the staff parking lot, a secure buzzer entry system at the new entry gate, a window at the main office, and security lighting campus-wide.",121,2017-Q3,2019-Q2,Closeout,20220630 Harte Preparatory MS,10369258,Harte Preparatory MS - Security Upgrades,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1817001,13612,9301 S. Hoover St.,Los Angeles,90044,Install electric gate motor and card reader in the staff parking lot on 92nd St.,45,2019-Q2,2019-Q4,Closeout,20220630 Murchison ES,10367860,Murchison ES - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1543801,13522,1501 Murchison St.,Los Angeles,90033,Provide and install electrical outlet for changing table and signage for changing room.,2,2016-Q3,2016-Q4,Closeout,20220630 Miller Career & Transition Center,10367601,Miller Career & Transition Center - Restroom Upgrades,Access Compliance,3,Scott Schmerelson,Northwest,1191001,15164,8218 Vanalden Ave.,Reseda,91335,Remove and replace restroom partitions and compartment doors for boys' and girls' restrooms at the main building.,31,2016-Q2,2016-Q2,Closeout,20220630 Overland ES,10365731,Overland ES - Replace Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1590401,13486,10650 Ashby Ave.,Los Angeles,90064,Replace deteriorated playground matting systems to ensure the health and safety of students.,52,2014-Q2,2014-Q3,Closeout,20220630 Plummer ES,10365735,Plummer ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northwest,1612301,13878,9340 Noble Ave.,North Hills,91343,Replace deteriorated playground matting systems to ensure the health and safety of students.,39,2014-Q2,2014-Q4,Closeout,20220630 Curtiss MS,10366892,Curtiss MS - 2015-18 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1810301,13775,1254 E. Helmick St.,Carson,90746,"This project was initially approved in BOE Report No. 423-14/15 for 2015-16 Prop. 39 co-locations as a charter school renovation for Magnolia Science Academy #3. This reconfiguration project included 1 charter office and 15 instructional spaces for charter students in grades 6-12, and reduced the number of spaces previously allocated to Magnolia Science Academy #3 during the 2014-15 school year. The scope of work included facilities renovations and reconfigurations, recovery of furniture and equipment, and recovery of technology. The project was amended in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a ""no growth"" project with 1 charter office, 1 special education room, and 14 instructional spaces for charter students in grades 6-12. The project was again amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",6,2014-Q3,2014-Q3,Closeout,20220630 Murchison EEC,10367345,Murchison EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,East,1953701,16665,1537 Murchison St.,Los Angeles,90033,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",52,2016-Q2,2016-Q3,Closeout,20220630 Vladovic Harbor Teacher Preparation Academy,10367465,Harbor Teacher Preparation Academy - Technology Upgrades,Communications/Technology Upgrade,7,Tanya Ortiz Franklin,South,1851801,14589,1111 Figueroa Pl.,Wilmington,90744,Increase school's access to technology by providing 1 cart and 30 MacBook Air devices for various classrooms,50,2016-Q1,2016-Q1,Closeout,20220630 Downtown Magnets HS: Downtown Business,10364103,Downtown Magnets HS Downtown Business Magnet - Emergency Lighting System,Electrical/Lighting,2,Monica Garcia,Central,1873801,13269,1081 W. Temple St.,Los Angeles,90012,The project will repair/replace five non-functioning emergency power inverters with storage batteries that are at the end of their life cycle. This life safety system services the emergency lighting and exit signs for the first and second floor of the school building in the event of power failure.,118,2014-Q2,2014-Q3,Closeout,20220630 Van Ness ES,10368054,Van Ness ES - Portable Removal,Portable Removal,4,Nick Melvoin,West,1742501,13393,501 N. Van Ness Ave.,Los Angeles,90004,"Remove 2 bungalows including abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprints.",341,2016-Q4,2018-Q3,Closeout,20220630 Gompers MS,10368671,Gompers MS - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1816001,13581,234 E. 112th St.,Los Angeles,90061,"Remove and sell 2 portable buildings (36' x 40' identified as A-1947 & A-1948), remove/demolish 2 bungalows (28' x 64' identified as AA-1849 & AA-1850), demolish shade structure adjacent to portable buildings, provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to remaining buildings on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",289,2017-Q1,2018-Q2,Closeout,20220630 Banning HS,10102899,Banning HS - Non Air-Conditioned Spaces - Phase 1B,HVAC,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,Non Air-Conditioned Spaces - Phase 1B,615,2013-Q2,2014-Q1,Closeout,20220630 Nava College Preparatory Academy,10369023,Nava College Preparatory Academy-Install Grab Bars,Access Compliance,5,Jackie Goldberg,Central,1761401,13447,1319 E. 41st St.,Los Angeles,90011,Install grab bars in restroom across the hall from Classroom 155.,5,2017-Q3,2017-Q3,Closeout,20220630 Webster MS,10367645,Webster MS - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",57,2016-Q3,2016-Q4,Closeout,20220630 Balboa Gifted/High Ability Magnet ES,10367907,Balboa Gifted/High Ability Magnet ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1226901,13840,17020 Labrador St.,Northridge,91325,Provide and install electronic marquee.,39,2017-Q1,2017-Q2,Closeout,20220630 South East HS,10369786,South East HS - 2018-22 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1888101,14161,2720 Tweedy Blvd.,South Gate,90280,"This project was initially approved in BOE Report No. 429-17/18 for the 2018-19 Prop 39 co-locations as a charter school renovation for Valiente College Preparatory Charter School. This project included 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades 4-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 8 spaces allocated to the charter and an undefined scope of work. The project was then approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades 4-8 and an undefined scope of work. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades 4-8 and an undefined scope of work.",161,2021-Q3,2021-Q3,Closeout,20220630 Primary Academy for Success School,10365737,Primary Academy PC - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northwest,1477601,13865,9075 Willis Ave.,Panorama City,91402,Replace deteriorated playground matting systems to ensure the health and safety of students.,23,2014-Q2,2014-Q2,Closeout,20220630 Stanford PC,10365748,Stanford PC - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,East,1690501,13853,3020 Kansas Ave.,South Gate,90280,Replace deteriorated playground matting systems to ensure the health and safety of students.,24,2014-Q2,2014-Q3,Closeout,20220630 Monlux ES,10363976,Monlux ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1534201,13591,6051 Bellaire Ave.,North Hollywood,91606,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",365,2014-Q2,2014-Q3,Closeout,20220630 Emelita ES,10004562,Emelita ES - Facelift,Facelift,4,Nick Melvoin,Northwest,1358901,13713,17931 Hatteras St.,Encino,91316,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",131,2013-Q1,2016-Q3,Closeout,20220630 Normont ES,10371251,Normont ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1564401,13652,1001 W. 253rd St.,Harbor City,90710,Install a new 2-sided electronic marquee standing less than 8' high on the grass lawn near Broadwell Ave. and 253rd St.,62,2021-Q1,2021-Q2,Closeout,20220630 Van Nuys MS,10371153,Van Nuys MS - Auditorium Upgrades,Auditorium Renovation,3,Scott Schmerelson,Northeast,1843401,13605,5435 Vesper Ave.,Van Nuys,91411,"Provide and install new audio/visual equipment, projector system, and door buzzer in the auditorium.",75,2020-Q1,2020-Q4,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10366927,Sun Valley MS - 2015-16 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"This project is a charter school renovation for Celerity Cardinal Charter School for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 13 classrooms for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",2,2015-Q3,2016-Q3,Closeout,20220630 Gage MS,10369689,Gage MS - Restroom Upgrade,Access Compliance,5,Jackie Goldberg,East,1815101,13598,2880 E. Gage Ave.,Huntington Park,90255,Modify toilet compartment to improve accessibility and purchase and install a vertical changing station (Rifton support station).,31,2018-Q2,2018-Q3,Closeout,20220630 Santa Monica Community Charter ES,10371607,Santa Monica Community Charter ES - Install Water Bottle Filling Stations,Plumbing/Irrigation/Drainage,5,Jackie Goldberg,West,1654801,13347,1022 N. Van Ness Ave.,Los Angeles,90038,Install 4 water bottle filling stations in different areas around the main building.,14,2021-Q1,2021-Q2,Closeout,20220630 Winnetka ES,10371225,Winnetka ES - Pedestrian Gates,Fencing,3,Scott Schmerelson,Northwest,1783601,13515,8240 Winnetka Ave.,Canoga Park,91306,"Fabricate and install two ADA compliant, wrought iron pedestrian gates at the main entrance. One gate will replace an existing fence panel on the south end of the administration building next to the administration office door.",20,2021-Q3,2022-Q1,Closeout,20220630 South Gate MS,10104987,South Gate MS - Provide New Arcade Between Administration Building & Cafeteria/Serving Line Building/Lunch Shelter,Roofing,5,Jackie Goldberg,East,1837701,13261,4100 Firestone Blvd.,South Gate,90280,Provide New Arcade Between Administration Building & Cafeteria/Serving Line Building/Lunch Shelter,"1,056",2007-Q3,2020-Q3,Closeout,20220630 Harrison ES,10363948,Harrison ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1443801,13528,3529 City Terrace Dr.,Los Angeles,90063,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",299,2014-Q4,2014-Q4,Closeout,20220630 15th St. ES,10370358,15th St. ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1376701,13337,1527 S. Mesa St.,San Pedro,90731,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",59,2019-Q1,2019-Q2,Closeout,20220630 Narbonne HS,10371797,Narbonne HS - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1877901,13407,24300 S. Western Ave.,Harbor City,90710,"This project is to provide approximately 368,287 square feet of new roofing sitewide, including the installation of new gutters and downspouts, skylights, and painting of affected areas.","6,275",2023-Q2,2023-Q4,Planning,20220630 Academy for Enriched Sciences Magnet ES,10372531,Academy for Enriched Sciences Elementary Magnet - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1225001,13615,17551 Miranda St.,Encino,91316,Install new secure entry system at the Main Office.,38,2022-Q3,2022-Q4,Planning,20220630 Wisdom ES,10372639,Wisdom ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1687201,193554,1125 E. 74th St.,Los Angeles,90001,Install new secure entry system at the Main Office.,33,2022-Q3,2022-Q4,Planning,20220630 Lincoln HS,10368161,Lincoln HS - Comprehensive Modernization,Comprehensive Modernization,2,Monica Garcia,East,1872901,13280,3501 N. Broadway,Los Angeles,90031,"This project includes the construction of new buildings and site improvements with approximately 9 general and specialty classrooms, instructional support spaces, maintenance and operations area, and an elevator/stair tower to the bridge. Existing school facilities will be upgraded including the modernization and seismic retrofit of the administration, auditorium, and home economics buildings; and seismic retrofit and new HVAC system in the gymnasium. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of the shop building, music building #1, and 8 relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","274,527",2023-Q3,2027-Q4,Design,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10368988,Sun Valley MS - Purchase Ramps,Access Compliance,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,Purchase 2 Manufactured ramps from TMP Services and M&O to install.,110,2017-Q3,2017-Q3,Closeout,20220630 Playa Del Rey ES,10370519,Playa Del Rey ES - Library Projector,Communications/Technology Upgrade,4,Nick Melvoin,West,1611001,13559,12221 Juniette St.,Culver City,90230,Install ceiling-mounted projector and screen in library,11,2019-Q2,2019-Q3,Closeout,20220630 Glassell Park STEAM Magnet ES,10368367,Glassell Park ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1412301,13384,2211 W. Ave. 30,Los Angeles,90065,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",169,2017-Q3,2018-Q1,Closeout,20220630 Carson-Gore Academy of Environmental Studies,10369947,Carson-Gore Academy of Environmental Studies - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1293901,193547,3200 W. Washington Blvd.,Los Angeles,90018,Install new secure entry system,22,2018-Q3,2019-Q2,Closeout,20220630 Grand View ES,10372137,Grand View ES - Roofing,Roofing,4,Nick Melvoin,West,1424701,13716,3951 Grand View Blvd.,Los Angeles,90066,"This project is to provide approximately 67,124 square feet of new roofing at 21 buildings, including the installation of new gutters and downspouts and painting of affected areas.","1,488",2023-Q2,2024-Q1,Planning,20220630 Richland ES,10372545,Richland ES - Install Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,West,1626001,13576,11562 Richland Ave.,Los Angeles,90064,"Install new electronic, free-standing marquee. Remove manual-type marquee near front of school. Install new marquee in same location on existing footing. Planning to use existing conduit, which currently provides power only. New double-sided, color, LED display. Provide new plants/shrubs around footing.",47,2022-Q3,2023-Q1,Planning,20220630 Rodia Continuation HS,10371558,Rodia Continuation HS - Install Video Surveillance System,Security System,5,Jackie Goldberg,East,1872301,16061,2701 Sequoia Dr.,South Gate,90280,Install video surveillance (CCTV) system with three cameras. Install two cameras on the classroom building and one on the administration building.,47,2020-Q4,2021-Q3,Closeout,20220630 93rd St. ES,10371238,93rd St. ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1558201,13814,330 E. 93rd St.,Los Angeles,90003,Remove the existing wall-mounted marquee and replace with a new 2-sided electronic marquee standing less than 8' high on the front lawn on 93rd St.,56,2020-Q3,2020-Q4,Closeout,20220630 Lake PC,10365713,Lake PC - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1239301,13954,135 N. Lake St.,Los Angeles,90026,Replace deteriorated playground matting systems to ensure the health and safety of students.,31,2014-Q3,2014-Q4,Closeout,20220630 Westminster Math & Technology/Environmental Studies Magnet ES,10371928,Westminster Math & Technology/Environmental Studies Magnet ES - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1769901,13483,1010 Abbot Kinney Blvd.,Venice,90291,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 7 doors/jamb, 7 door hardware, 8 thresholds, 15 accessible paths of travel, 4 signs, 10 restrooms, 11 restroom accessories, 2 drinking fountains, 3 casework/counters, 2 assistive listening devices, 1 phone upgrade, 1 concrete ramp,1 TMP ramp, 8 pieces of accessible furniture, 9 railings, 1 parking lot upgrade, 1 automatic door opener, 1 playground component/matting upgrade, 1 permanent stage lift, and 1 new elevator.","9,292",2023-Q4,2025-Q2,Design,20220630 Venice HS,10204019,Venice HS - Small Learning Community Upgrades,Small Learning Community/Academy,4,Nick Melvoin,West,1890701,13513,13000 Venice Blvd.,Los Angeles,90066,The project scope has been divided into 2 portions based on DSA review and approval. The non-DSA portion of the project provides all new finishes and signage at 4 classrooms. The DSA portion of the project consists of student and staff restroom modernization on the ground floor of the Administration and East Classroom buildings. Also included in the DSA project is abatement of the crawl space under the East Classroom Building as well as path of travel improvements to meet the accessibility requirements of the Americans with Disabilities Act (ADA).,"3,430",2018-Q1,2019-Q3,Closeout,20220630 Taft Charter HS,10369794,Taft Charter HS - 2018-19 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1888001,13787,5461 Winnetka Ave.,Woodland Hills,91364,"This project was approved in Board of Education Report No. 429-17/18 as a 2018-19 Proposition 39 charter co-location for Ivy Academia for a single-year term with an expiration date of 6/30/19. This growth/reconfiguration project included 1 charter office,1 special education room, and 22 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. Subsequently to the approval of the project, an alternative agreement was executed. As a result, the scope of work changed from a growth/reconfiguration to a ""no change"" project with no additional work required.",6,2018-Q2,2018-Q3,Closeout,20220630 Marshall HS,10369554,Marshall HS - Fencing,Fencing,2,Monica Garcia,Central,1875001,13571,3939 Tracy St.,Los Angeles,90027,Install wrought iron pedestrian gate and fencing at southeast corner of the campus.,28,2018-Q3,2019-Q3,Closeout,20220630 Chandler ES,10366626,Chandler LC-Restroom Upgrade,Access Compliance,3,Scott Schmerelson,Northeast,1295901,13619,14030 Weddington St.,Van Nuys,91401,Provide & Install Ground-Fault Circuit Interrupter (GFCI) Electrical Outlet for Changing Table; Remove and Cap 3 Lavatories,9,2014-Q4,2015-Q1,Closeout,20220630 Point Fermin Marine Science Magnet ES,10102740,Point Fermin Marine Science Magnet ES - Non Air-Conditioned Classrooms & MDF Room,HVAC,7,Tanya Ortiz Franklin,South,1613701,13376,3333 Kerckhoff Ave.,San Pedro,90731,Non Air-Conditioned Classrooms & MDF Room,"1,158",2013-Q2,2014-Q2,Closeout,20220630 Fullbright ES,10366196,Fulbright ES - Laptops & Cart,Communications/Technology Upgrade,4,Nick Melvoin,Northwest,1402701,13661,6940 Fullbright Ave.,Canoga Park,91306,Increase school's access to technology by providing laptops and media carts,34,2014-Q3,2014-Q3,Closeout,20220630 Solano ES,10103832,Solano ES - Food Services Modernization,Food Services Renovation,2,Monica Garcia,East,1683601,13343,615 Solano Ave.,Los Angeles,90012,"This project will restore the multipurpose room to its intended use for food service functions and assemblies by constructing a new building. The project includes a new 10,000 square foot building with five classrooms, administration offices, and restrooms, as well as an adjacent kindergarten yard with play equipment. The project also includes the reconfiguration of existing space to support the multipurpose room's current uses, the removal of 3 portable buildings, and the vacation of Solano Ave. between the main campus and the location of the portable buildings. This will enable the District to redevelop the vacated portion of Solano Ave., along with the area currently housing the portable buildings, into playfields and a new parking lot.","15,358",2013-Q4,2015-Q3,Closeout,20220630 Foshay Learning Center,10369432,Foshay Learning Center - Install Ramp,Access Compliance,1,"Dr. George J. McKenna, III",Central,1813201,13474,3751 S. Harvard Blvd.,Los Angeles,90018,Install a ramp at first grade classroom.,38,2017-Q4,2018-Q1,Closeout,20220630 Vaughn EEC,10369862,Vaughn EEC - Nature Explore Classroom,Campus Improvement,6,Kelly Gonez,Northeast,1957201,16782,11480 Herrick Ave.,Pacoima,91331,"This project will create field-tested, research-based outdoor learning spaces that provide learning opportunities and support children's interaction with the natural world. The outdoor learning spaces are divided into distinct activity areas to provide a wide-ranging mix of educational activities that support children with a variety of needs and learning styles. The activity areas include art, building, music, climbing/balancing, flexing, gathering, gardening, messy materials, wheel toys, etc.","2,791",2020-Q3,2022-Q1,Closeout,20220630 Webster MS,10371155,Webster MS - Security Upgrades,Security System,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"Provide three secure entry systems, one for each school on the campus.",86,2020-Q1,2021-Q1,Closeout,20220630 Palms MS,10372085,Palms MS - Roofing,Roofing,1,"Dr. George J. McKenna, III",West,1834001,13668,10860 Woodbine St.,Los Angeles,90034,"This project is to provide approximately 156,947 square feet of new roofing sitewide, including the installation of new gutters and downspouts and painting of affected areas.","2,105",2023-Q1,2023-Q3,Planning,20220630 Isaacs Avalon Continuation HS,10371561,Isaacs Avalon Continuation HS - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1853101,16281,1425 N. Avalon Blvd.,Wilmington,90744,Install new secure entry system at main entrance gate with three video receivers in main office. Fabricate new pedestrian gate to accommodate new locking mechanism and strike plate.,29,2020-Q4,2021-Q2,Closeout,20220630 Sunrise ES,10370779,Sunrise ES - ADA Improvements,Access Compliance,2,Monica Garcia,East,1698801,13395,2821 E. 7th St.,Los Angeles,90023,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 1 door/jamb, 22 door hardware, 5 thresholds, 34 accessible paths of travel, 48 signs, 10 restrooms, 2 drinking fountains, 15 sinks/sink cabinets, 2 assistive listening devices/intercoms/phones, 4 concrete ramps, 5 metal ramps, 2 pieces of accessible furniture, 1 assembly seat, 15 railings, 3 parking areas, 2 casework/counters, and1 stage lift.","5,044",2022-Q3,2023-Q3,Design,20220630 Marina Del Rey MS,10371880,Marina Del Rey MS - 2021-23 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"This project was initially approved in BOE Report No. 317-20/21 for the 2021-21 Prop 39 co-locations as a charter school renovation for Goethe International Charter School. This project included 1 charter office, 2 special education rooms, and 15 instructional spaces for charter student seats in grades TK-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The scope of work for this project included the reconfigurations of rooms back to District systems, this scope of work was not performed. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 15 instructional spaces for charter student seats in grades TK-8 and an undefined scope of work.",0,2021-Q3,2021-Q3,Closeout,20220630 Webster MS,10365989,Webster MS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",482,2014-Q2,2014-Q3,Closeout,20220630 White Point ES,10105904,White Point ES - Compliance with State & Federal Access Requirements,Fire Alarm System,7,Tanya Ortiz Franklin,South,1776701,13617,1410 Silvius Ave.,San Pedro,90731,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),654,2014-Q1,2017-Q3,Closeout,20220630 Pio Pico MS,10369776,Pio Pico MS - 2018-19 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1498001,13903,1512 S. Arlington Ave.,Los Angeles,90019,"This project was approved in Board of Education Report No. 429-17/18 as a 2018-19 Prop. 39 charter co-location. The charter operator, Global Education Academy MS, did not occupy Pio Pico MS during the 2018-19 academic year. As a result, the scope of work changed from a co-location to vacating the site which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District-operated program.",4,2018-Q2,2018-Q2,Closeout,20220630 Alexandria EEC,10369316,Alexandria EEC - Restroom Upgrade,Access Compliance,2,Monica Garcia,Central,1950101,16686,4304 Rosewood Ave.,Los Angeles,90004,"This project upgrades an existing restroom and provides accessible drinking fountains, parking and path of travel upgrades, to comply with current Americans with Disabilities Act (ADA) standards.",570,2020-Q3,2021-Q4,Closeout,20220630 112th St. ES,10371299,112th St. ES - 2020-21 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"This project is a charter school renovation for Resolute Academy Charter for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 11 instructional spaces for charter student seats in grades 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",24,2020-Q2,2020-Q3,Closeout,20220630 Capistrano ES,10372089,Capistrano ES - Purchase Classroom Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1280201,13759,8118 Capistrano Ave.,West Hills,91304,Purchase (90) new 2nd/3rd grade chairs and (120) 4th/5th grade chairs,32,2021-Q4,2021-Q4,Closeout,20220630 Lane ES,10372225,Lane ES - Secure Entry System,Security System,2,Monica Garcia,East,1476701,13629,1500 Avenida Cesar Chavez,Monterey Park,91754,Install new secure entry system at the Main Office,54,2021-Q4,2022-Q3,Construction,20220630 Audubon MS,10363834,Audubon MS - Seismic Modernization,Seismic Modernization,1,"Dr. George J. McKenna, III",West,1802801,13564,4120 11th Ave.,Los Angeles,90008,"The project will seismically retrofit the lunch pavilion, a non-ductile concrete frame structure, built in 1972. In conjunction with DSA, staff has categorized the lunch pavilion as a ""Category 2"", ""Priority 1B"" structure. These building types are not expected to perform as well in future earthquakes and therefore require seismic corrections and upgrades. The scope of work also includes upgrades to meet the accessibility requirements of the Americans with Disabilities Act (ADA) with restroom and path of travel improvements.","4,567",2018-Q1,2019-Q4,Closeout,20220630 Hobart ES,10366178,Hobart ES - Replace Roofing & HVAC,Roofing,5,Jackie Goldberg,Central,1454801,13331,980 S. Hobart Blvd.,Los Angeles,90006,"The roofing systems and roof-mounted HVAC ducts on 4 of the school's buildings have deteriorated, causing persistent leaking. The leaking and subsequent damage to one of the buildings required the classrooms to be relocated to an alternate building. The built-up type roof systems on these buildings are more than 40 years old and have never been replaced. The project scope, schedule, and budget assume the deteriorated roof systems and HVAC roof-mounted ductwork are removed and replaced.",343,2014-Q1,2015-Q1,Closeout,20220630 Loyola Village Fine & Performing Arts Magnet ES,10364115,Loyola Village ES - HVAC,HVAC,4,Nick Melvoin,West,1501401,13602,8821 Villanova Ave.,Los Angeles,90045,"The project replaces heating, ventilation, and air conditioning (HVAC) equipment that is more than 25 years old and in very poor condition resulting in unreliable service. The scope of work includes the replacement of existing heat pumps with new BARD heat pump units in buildings D, E, F, G & H (comprised of 12 classrooms), building N (comprised of 4 offices & 1 art/display room), the administration building A (comprised of 4 office/ancillary rooms, 1 teachers' work room & the library), and a faculty dining room in the multipurpose building. The project also replaces the HVAC system serving the assembly hall/dining room in the multipurpose building with 3 gas/electric rooftop package units and includes structural upgrades and rooftop mechanical screen work, hazardous material abatement, and upgrades to meet the accessibility requirements of the Americans with Disabilities Act (ADA).","2,390",2016-Q4,2017-Q4,Closeout,20220630 Irving STEAM Magnet MS,10366512,Irving STEAM Magnet MS - ADA Improvements,Access Compliance,5,Jackie Goldberg,Central,1818901,13583,3010 Estara Ave.,Los Angeles,90065,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 121 doors/hardware, 41 accessible paths of travel, 179 signs, 29 restrooms, 35 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 11 concrete ramps, 5 metal ramps, 13 pieces of accessible furniture, 1 assembly seat, 5 railings, 3 existing elevator modifications, 5 locker room modifications/lockers, 3 parking areas, 2 cafeteria counters, 31 door modifications/auto openers, 2 dressing room modifications, 1 changing room, 3 new elevators/stage lifts, and 5 passenger/bus loading zones.","9,124",2019-Q3,2021-Q1,Closeout,20220630 Dana MS,10108861,Dana MS - Slope & Drainage Repairs,Plumbing/Irrigation/Drainage,7,Tanya Ortiz Franklin,South,1810401,15063,1501 S. Cabrillo Ave.,San Pedro,90731,"A portion of the school is built on a terraced slope. The shotcrete on the middle and upper slope has filled with water and failed in some locations, due to poor surface drainage control and thin, poorly constructed shotcrete. In order to mitigate the distressed condition, improvement of the surface drainage is critical. The scope of the proposed project includes the design and installation of appropriate drainage, repair of asphalt, and restoration of irrigation and landscaping. Significant Americans with Disabilities Act (ADA) ramps will be required.","1,940",2015-Q4,2018-Q1,Closeout,20220630 Annalee ES,10368967,Annalee ES - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1214601,13760,19410 S. Annalee Ave.,Carson,90746,Install new electronic marquee.,55,2019-Q1,2019-Q2,Closeout,20220630 Lee Medical & Health Science Magnet ES,10371488,Lee Medical & Health Science Magnet ES - Playground Solar Reflective Asphalt Coating,Painting,2,Monica Garcia,Central,1230701,15207,3600 Council St.,Los Angeles,90004,"Clean and prepare existing asphalt throughout site then apply solar reflective coating on playground, seal coat on non-playground areas, and new striping throughout.",304,2021-Q1,2021-Q2,Closeout,20220630 Huntington ES,10370308,Huntington ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1463001,13312,4435 N. Huntington Dr.,Los Angeles,90032,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",37,2019-Q2,2019-Q4,Closeout,20220630 Lowman Special Education & Career Transition Center,10367925,Lowman Special Education & Career Transition Center - Shade Shelters,Lunch/Shade Shelter,6,Kelly Gonez,Northeast,1194801,13544,12827 Saticoy St.,North Hollywood,91605,"The project provides and installs 2 shade shelters as well as meets accessibility requirements of the Americans with Disabilities Act (ADA) with upgrades to the parking lot, new concrete ramp, new gates, and fire lane access renovation.",293,2018-Q1,2019-Q1,Closeout,20220630 Hillcrest ES,10369754,Hillcrest ES - 2018-20 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1452801,13621,4041 Hillcrest Dr.,Los Angeles,90008,"This project was initially approved in BOE Report No. 429-17/18 for the 2018-19 Prop 39 co-locations as a charter school renovation for Stella Elementary Charter Academy. This project included 1 charter office, 1 special education room, and 4 instructional spaces for charter student seats in grade K. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""No Change"" project with 6 spaces allocated to the charter and an undefined scope of work. However, the charter school opted to vacate the site and will not continue occupancy in the 2019-20 school year. As a result, this project is amended to include the scope of work required to restore the LAUSD campus to its former condition. The required reconfiguration may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",128,2019-Q3,2019-Q3,Closeout,20220630 Cantara ES,10367910,Cantara ES - Lunch Shelter,Lunch/Shade Shelter,3,Scott Schmerelson,Northwest,1276701,13732,17950 Cantara St.,Reseda,91335,Provide and install lunch shelter.,344,2020-Q3,2021-Q3,Closeout,20220630 El Oro Way Charter for Enriched Studies,10372310,El Oro Way Charter for Enriched Studies - Purchase Exterior Benches,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1354501,13802,12230 El Oro Way,Granada Hills,91344,Purchase (33) exterior benches. M&O to anchor all benches around campus.,38,2022-Q3,2022-Q4,Planning,20220630 McBride Special Education Center,10366168,McBride Special Education Center - Compliance with State & Federal Access Requirements,Access Compliance,4,Nick Melvoin,West,1195201,15205,3960 Centinela Ave.,Los Angeles,90066,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Replacement Kindergarten Toilets & Lavatories,33,2014-Q2,2014-Q2,Closeout,20220630 Mayberry ES,10363972,Mayberry ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1520501,13484,2414 Mayberry St.,Los Angeles,90026,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",213,2014-Q3,2014-Q4,Closeout,20220630 Gault ES,10229924,Gault ES - Non Air-Conditioned Classroom & Equipment,HVAC,3,Scott Schmerelson,Northwest,1411001,13682,17000 Gault St.,Lake Balboa,91406,Non Air-Conditioned Classroom & Equipment,31,2013-Q4,2014-Q1,Closeout,20220630 Taper ES,10365752,Taper ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1703501,13539,1824 Taper Ave.,San Pedro,90731,Replace deteriorated playground matting systems to ensure the health and safety of students.,103,2013-Q4,2014-Q1,Closeout,20220630 Telfair ES,10365753,Telfair ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1706801,13616,10975 Telfair Ave.,Pacoima,91331,Replace deteriorated playground matting systems to ensure the health and safety of students.,38,2013-Q4,2014-Q2,Closeout,20220630 Toland Way ES,10365754,Toland Way ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1717801,13566,4545 Toland Way,Los Angeles,90041,Replace deteriorated playground matting systems to ensure the health and safety of students.,41,2014-Q3,2014-Q3,Closeout,20220630 10th St. ES,10368167,10th St. ES - ADA Improvements,Access Compliance,2,Monica Garcia,Central,1708201,13265,1000 Grattan St.,Los Angeles,90015,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 49 doors/hardware, 22 accessible paths of travel, 68 signs, 11 restrooms, 15 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 3 concrete ramps, 11 pieces of accessible furniture, 30 railings, 2 door modifications/auto openers, and 1 passenger/bus loading zone.","2,900",2018-Q1,2020-Q1,Closeout,20220630 El Sereno MS,10367968,El Sereno MS - Portable Removal,Portable Removal,2,Monica Garcia,East,1811801,13412,2839 N. Eastern Ave.,Los Angeles,90032,"Remove/demolish 2 bungalows (24' x 72'), provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to remaining buildings on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",514,2016-Q4,2018-Q4,Closeout,20220630 Humphreys ES,10372408,Humphreys ES - Secure Entry System,Security System,2,Monica Garcia,East,1461601,13437,500 S. Humphreys Ave.,Los Angeles,90022,Install new secure entry system at the Main Office.,52,2022-Q3,2022-Q4,Planning,20220630 Wilbur Charter for Enriched Academics,10372414,Wilbur Charter for Enriched Academics - Secure Entry System,Security System,4,Nick Melvoin,Northwest,1777401,13811,5213 Crebs Ave.,Tarzana,91356,Install new secure entry system at the Main Office.,38,2022-Q3,2022-Q4,Planning,20220630 West Hollywood ES,10368676,West Hollywood ES - HVAC,HVAC,4,Nick Melvoin,West,1764901,13364,670 N. Hammond St.,West Hollywood,90069,"The project will replace the antiquated and deteriorated heating, ventilation, and air conditioning (HVAC) systems throughout the site. The project scope involves one 15-Ton split system, 13 floor-mounted heat pumps, 7 wall-mounted heat pumps, 2 window-mounted HVAC units, and 2 roof-mounted exhaust hoods.","6,601",2019-Q2,2021-Q2,Closeout,20220630 Beachy ES,10370344,Beachy ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1232901,13666,9757 Beachy Ave.,Arleta,91331,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",61,2019-Q1,2019-Q2,Closeout,20220630 King Magnets MS,10368112,King MS Film & Media Magnet - Gym Flooring,Flooring,2,Monica Garcia,Central,1820801,13531,4201 Fountain Ave.,Los Angeles,90029,"This project replaces approximately 8,000 square feet of deteriorated wooden floors in the Main Gymnasium. The scope of work also includes repainting the school logo, game lines, letterings, walls, and basketball backboards as required.",234,2018-Q3,2018-Q4,Closeout,20220630 Beckford Charter for Enriched Studies,10366128,Beckford Charter for Enriched Studies - New Swing Gate,Security System,3,Scott Schmerelson,Northwest,1233501,13836,19130 Tulsa St.,Northridge,91326,Upgrade the north parking lot entrance by providing a new swing gate,7,2014-Q1,2014-Q2,Closeout,20220630 Limerick ES,10366130,Limerick ES - Laptops & Media Carts,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1488101,13697,8530 Limerick Ave.,Canoga Park,91306,Increase school's access to technology by providing laptops and media carts,31,2014-Q3,2014-Q3,Closeout,20220630 Granada ES,10366133,Granada ES - Desktop Computers,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1423301,13561,17170 Tribune St.,Granada Hills,91344,Increase school's access to technology by providing new desktop computers,89,2014-Q3,2014-Q3,Closeout,20220630 Encino Charter ES,10366135,Encino ES - Upgrade Parking Lot Lighting,Electrical/Lighting,4,Nick Melvoin,Northwest,1361601,13500,16941 Addison St.,Encino,91316,Upgrade exterior lighting in the parking lot and kindergarten play yard to improve school safety and security,6,2014-Q1,2014-Q2,Closeout,20220630 Buchanan ES,10366138,Buchanan ES - Install Lunch Shelter/Playground Lighting,Electrical/Lighting,2,Monica Garcia,Central,1260301,13350,5024 Buchanan St.,Los Angeles,90042,Upgrade campus lighting system by installing lighting around the lunch shelter and south playground,30,2014-Q2,2016-Q4,Closeout,20220630 Selma ES,10366141,Selma ES - Electronic Camera Door Entry,Security System,5,Jackie Goldberg,West,1658901,13360,6611 Selma Ave.,Los Angeles,90028,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance,10,2014-Q4,2016-Q2,Closeout,20220630 Riordan PC,10371694,Riordan PC - Install Secure Entry System,Security System,2,Monica Garcia,Central,1538501,13858,5531 Monte Vista St.,Los Angeles,90042,Install new secure entry system at entrance to main office with two receivers in the main office.,39,2021-Q1,2021-Q2,Closeout,20220630 Saturn ES,10371708,Saturn ES - HVAC,HVAC,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,"This project is to provide a new heating, ventilation, and air conditioning (HVAC) system in the Main, Assembly, Classroom, and Kindergarten Buildings, and six portable buildings.","6,081",2023-Q1,2024-Q3,Design,20220630 Rosewood Urban Planning & Design Magnet ES,10369501,Rosewood Urban Planning & Design Magnet ES - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1638401,13579,503 N. Croft Ave.,Los Angeles,90048,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2022-Q1,2022-Q3,Construction,20220630 Lexington PC,10370435,Lexington PC - Technology & Security Upgrades,Communications/Technology Upgrade,2,Monica Garcia,Central,1517001,13847,4564 W. Lexington Ave.,Los Angeles,90029,"Purchase 40 iPads, 40 Chromebooks, and 2 charging carts, and secure room for storage.",52,2019-Q1,2019-Q4,Closeout,20220630 Woodlake Community Charter ES,10365768,Woodlake ES - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1787701,13686,23231 Hatteras St.,Woodland Hills,91367,Replace deteriorated playground matting systems to ensure the health and safety of students.,152,2014-Q2,2014-Q2,Closeout,20220630 Westminster Math & Technology/Environmental Studies Magnet ES,10102651,Westminster Math & Technology/Environmental Studies Magnet ES - Non Air-Conditioned Classrooms & MDF Room,HVAC,4,Nick Melvoin,West,1769901,13483,1010 Abbot Kinney Blvd.,Venice,90291,Non Air-Conditioned Classrooms & MDF Room,64,2015-Q1,2017-Q1,Closeout,20220630 Normandie ES,10363980,Normandie ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1563001,13300,4505 S. Raymond Ave.,Los Angeles,90037,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",431,2014-Q3,2014-Q4,Closeout,20220630 Los Angeles Academy MS,10229926,Los Angeles Academy MS - Non Air-Conditioned Classroom & Equipment,HVAC,7,Tanya Ortiz Franklin,Central,1820001,13890,644 E. 56th St.,Los Angeles,90011,Non Air-Conditioned Classroom & Equipment,313,2015-Q1,2017-Q1,Closeout,20220630 Haynes Charter for Enriched Studies,10366342,Haynes ES - New Sound & Visual System,Auditorium Renovation,3,Scott Schmerelson,Northwest,1447301,13793,6624 Lockhurst Dr.,West Hills,91307,Provide upgrades to the auditorium by installing a new sound and visual system,41,2014-Q3,2015-Q1,Closeout,20220630 Annandale ES,10366212,Annandale ES - Compliance with State & Federal Access Requirements,Access Compliance,5,Jackie Goldberg,Central,1215101,13371,6125 Poppy Peak Dr.,Los Angeles,90042,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Upgrades to Restroom and Curb Ramps,2,2014-Q2,2014-Q3,Closeout,20220630 Yorkdale ES,10365769,Yorkdale ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1795901,13385,5657 Meridian St.,Los Angeles,90042,Replace deteriorated playground matting systems to ensure the health and safety of students.,43,2014-Q4,2014-Q4,Closeout,20220630 Panorama City ES,10367141,Panorama City ES - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northwest,1560401,13874,8600 Kester Ave.,Panorama City,91402,Provide upgrades to the campus by installing a new electronic marquee. The marquee was purchased by the school. ,18,2016-Q2,2016-Q2,Closeout,20220630 Sheridan ES,10367146,Sheridan ES - Replace Deteriorated Carpet,Flooring,2,Monica Garcia,East,1668501,13290,416 N. Cornwell St.,Los Angeles,90033,"Provide upgrades to the main office and seventeen classrooms in the main building, by removing deteriorated carpet and installing new vinyl composition tile throughout. ",117,2016-Q1,2016-Q3,Closeout,20220630 Mack ES,10366063,Mack ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1511301,13851,3020 S. Catalina St.,Los Angeles,90007,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",220,2015-Q1,2015-Q1,Closeout,20220630 Westminster EEC,10005076,Westminster EEC - Safety Upgrades and Improvements,Campus Improvement,4,Nick Melvoin,West,1957601,16724,1010 Main St.,Venice,90291,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",51,2014-Q1,2015-Q3,Closeout,20220630 Coeur d'Alene ES,10366854,Coeur d'Alene ES - Office Reconfiguration,Reconfiguration,4,Nick Melvoin,West,1634201,13578,810 Coeur D'Alene Ave.,Venice,90291,Provide upgrades to the main building by converting the existing storage room into the new Assistant Principal's office. Install a new HVAC window unit.,9,2015-Q2,2015-Q4,Closeout,20220630 Lockhurst Charter ES,10366341,Lockhurst ES - New Sound & Visual System,Auditorium Renovation,3,Scott Schmerelson,Northwest,1488701,13794,6170 Lockhurst Dr.,Woodland Hills,91367,Provide upgrades to the auditorium by installing a new sound and visual system,18,2014-Q3,2015-Q1,Closeout,20220630 Carnegie MS,10369521,Carnegie MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1809001,13761,21820 Bonita St.,Carson,90745,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",268,2019-Q1,2020-Q1,Closeout,20220630 San Gabriel ES,10370197,San Gabriel ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1646601,13651,8628 San Gabriel Ave.,South Gate,90280,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2026-Q3,2026-Q4,Planning,20220630 Taper ES,10370213,Taper ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1703501,13539,1824 Taper Ave.,San Pedro,90731,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q4,2028-Q1,Planning,20220630 232nd Pl. ES,10370219,232nd Pl. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1732901,13709,23240 Archibald Ave.,Carson,90745,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q1,2027-Q2,Planning,20220630 Hooper ES,10367127,Hooper ES - Security Upgrades & New Flooring,Campus Improvement,5,Jackie Goldberg,Central,1457501,13316,1225 E. 52nd St.,Los Angeles,90011,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance. Provide upgrades to the main building by removing deteriorated carpet and installing new vinyl composition tile throughout the main office and classrooms.,20,2016-Q1,2016-Q2,Closeout,20220630 Compton ES,10004637,Compton ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1320501,13498,1515 E. 104th St.,Los Angeles,90002,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",170,2012-Q4,2016-Q3,Closeout,20220630 Dyer ES,10004582,Dyer ES - Facelift,Facelift,6,Kelly Gonez,Northeast,1349301,13712,14500 Dyer St.,Sylmar,91342,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",140,2013-Q2,2016-Q3,Closeout,20220630 Liberty ES,10363966,Liberty ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1486301,13599,2728 Liberty Blvd.,South Gate,90280,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",335,2014-Q3,2014-Q4,Closeout,20220630 Camellia ES,10367792,Camellia ES - Ceiling Mounted Projector,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1272601,13587,7451 Camellia Ave.,North Hollywood,91605,"Provide and install a ceiling-mounted projector in the auditorium. In addition, connect the new projector to the existing sound system.",12,2016-Q3,2016-Q3,Closeout,20220630 Norwood ES,10367435,Norwood ES - Portable Removal,Portable Removal,5,Jackie Goldberg,Central,1569901,13271,2020 Oak St.,Los Angeles,90007,"Remove and demolish 3 bungalows (28' x 60') including disconnection of utilities, reconnection of electrical and plumbing utilities as well as fire alarm systems to remaining buildings on site, and repair/replacement of asphalt over the former building footprints.",521,2016-Q3,2017-Q2,Closeout,20220630 Calvert Charter for Enriched Studies,10368939,Calvert ES - Wall-Fold Tables In MPR,Furniture/Fixtures/Equipment,4,Nick Melvoin,Northwest,1271201,13731,19850 Delano St.,Woodland Hills,91367,Provide and install new wall-fold tables in multi-purpose room/auditorium. Install (2) double-sets along north wall and (2) single-sets along south wall. Remove light fixtures on north and south walls to facilitate installation of tables. Remove and replace chair rail and baseboard in affected areas. Touch up wall paint in affected areas.,29,2017-Q3,2017-Q4,Closeout,20220630 Virgil MS,10369531,Virgil MS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1846201,13382,152 N. Vermont Ave.,Los Angeles,90004,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2023-Q3,2023-Q4,Planning,20220630 Monsenor Oscar Romero Charter School,10004854,Monsenor Oscar Romero Charter School Augmentation Grant,Charter Augmentation Grant,2,Monica Garcia,Central,1819601,13274,1157 S. Berendo St.,Los Angeles,90006,"Monsenor Oscar Romero Charter School currently occupies space at Berendo MS under the annual Proposition 39 co-location process. This project provides permanent educational facilities for approximately 400 students in grades 6-8 to be located on 1.10 acres at the northeastern corner of the Berendo MS campus. The project was developed by YPI Charter Schools, the governing nonprofit organization and operator of the charter school, and has been awarded an augmentation grant in support of this long-term solution. The new facilities include a 2-story building of approximately 37,000 square feet with 16 classrooms including science and computer labs, an administration building, a multipurpose building, a lunch shelter, a small outdoor courtyard, and an underground parking structure with approximately 40 parking spaces. The location determined to best facilitate the long-term operations of both schools requires the removal of a bungalow, restroom building, surface parking lot, and an outdoor basketball court. The project also includes the demolition of 6 bungalow buildings that are currently occupied by the charter school. Additional upgrades to support the shared use of the campus will be completed by the Berendo MS - Facilities Improvement project (#10366649).","16,195",2016-Q4,2018-Q4,Closeout,20220630 Colfax Charter ES,10369897,Colfax Charter ES - Library Flooring,Flooring,3,Scott Schmerelson,Northeast,1316401,13681,11724 Addison St.,North Hollywood,91607,"Replace existing flooring in the library with carpet tile. This Board District 3 priority project includes a school contribution (project #10369895), however the budget represents only the bond‐funded portion.",10,2018-Q4,2018-Q4,Closeout,20220630 Twain MS,10368354,Twain MS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1842501,13630,2224 Walgrove Ave.,Los Angeles,90066,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",140,2017-Q4,2018-Q2,Closeout,20220630 Broadous ES,10368347,Broadous ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1382901,13768,12561 Filmore St.,Pacoima,91331,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2018-Q2,2018-Q4,Closeout,20220630 116th St. ES,10369571,116th St. ES - Classroom and Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1586301,13723,11610 Stanford Ave.,Los Angeles,90059,"District South will open a new program for students with multiple disabilities at 116th St. ES. The classroom will have to be made accessible, have a changing room added, and restrooms need appropriate upgrades. This includes a changing room within Room #2 and the addition of accessible door hardware. Renovation of Boys' and Girls' restrooms on main floor, and ADA accessibility on the Main Building. Purchase and install lunch tables and a hi-lo changing table.",343,2018-Q2,2018-Q3,Closeout,20220630 75th St. EEC,10369313,75th St. EEC - Restroom Upgrade,Access Compliance,7,Tanya Ortiz Franklin,South,1955801,16683,242 W. 75th St.,Los Angeles,90003,"This project upgrades an existing restroom and provides accessible drinking fountains, parking and path of travel upgrades, to comply with current Americans with Disabilities Act (ADA) standards.",317,2020-Q2,2021-Q2,Closeout,20220630 Audubon MS,10371119,Audubon MS - Motorized Gate,Security System,1,"Dr. George J. McKenna, III",West,1802801,13564,4120 11th Ave.,Los Angeles,90008,Provide motorized drive gate.,77,2020-Q1,2021-Q1,Closeout,20220630 Lorena ES,10371106,Lorena ES - Auditorium Upgrades,Auditorium Renovation,2,Monica Garcia,East,1494501,13351,1015 S. Lorena St.,Los Angeles,90023,"Install new projector, screen, audio/visual equipment, and LED lighting in the auditorium.",74,2020-Q1,2020-Q3,Closeout,20220630 Boys Academic Leadership Academy,10367959,Boys Academic Leadership Academy - Reconfiguration,Reconfiguration,1,"Dr. George J. McKenna, III",West,1756901,13560,1511 W. 110th St.,Los Angeles,90047,"This upgrade project for Boys Academic Leadership Academy (BALA) reconfigures and upgrades a standalone 26-classroom building and an adjacent portable classroom building at Washington Preparatory HS to allow for a separate space for the operation of the new BALA school. The project includes converting 4 classrooms to a parent center, administrative and counselor offices; adding a ramp, gate, and security system to the main entrance and privacy screens to the perimeter fence; improving program accessibility with a new concrete walkway and transition ramp in the parking area and the addition of an assistive listening system; removing a portable building to enlarge the courtyard and installing a concrete platform in the quad area; installing lunch benches, paving and landscape; replacing deteriorated partitions and fixtures in restrooms; providing signage and telecommunication infrastructure upgrades; and equipping the facilities with necessary instructional technology including computers for teachers, 2 laptop carts, and approximately 50 laptops for students.","1,528",2018-Q2,2018-Q3,Closeout,20220630 Lokrantz Special Education Center,10364042,Lokrantz Special Education Center - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,Northwest,1194701,13795,19451 Wyandotte St.,Reseda,91335,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",672,2013-Q4,2014-Q2,Closeout,20220630 Bancroft MS,10369060,Bancroft MS - SEEDS,SEEDS,4,Nick Melvoin,West,1803801,13565,929 N. Las Palmas Ave.,Los Angeles,90038,"Construct an outdoor learning space of approximately 2,400 square feet, consisting of the removal of asphalt, the installation of decomposed granite and a ""brush off"" concrete pad, a new irrigation system with hose bibs, composite wood headers to create planting areas, asphalt repair, a gate that complies with the Americans with Disabilities Act (ADA), raised beds, a tool shed, work tables, and picnic tables. It will be outfitted by the school site partner with native and edible plants.",102,2018-Q1,2018-Q4,Closeout,20220630 99th St. ES,10370566,99th St. ES - 2019-20 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1553401,13508,9900 S. Wadsworth Ave.,Los Angeles,90002,"KIPP Ignite Academy is vacating this site. This project was approved in Board of Education Report No. 343-18/19. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",65,2019-Q2,2019-Q3,Closeout,20220630 Locke EEC,10369853,Locke EEC - Nature Explore Classroom,Campus Improvement,7,Tanya Ortiz Franklin,South,1953101,16288,320 E. 111th St.,Los Angeles,90061,"This project will create field-tested, research-based outdoor learning spaces that provide learning opportunities and support children's interaction with the natural world. The outdoor learning spaces are divided into distinct activity areas to provide a wide-ranging mix of educational activities that support children with a variety of needs and learning styles. The activity areas include art, building, music, climbing/balancing, flexing, gathering, gardening, messy materials, wheel toys, etc.","2,761",2022-Q4,2023-Q3,Design,20220630 Dorris ES,10372095,Dorris ES - Install Parking Lot Fence,Fencing,5,Jackie Goldberg,Central,1347901,13510,2225 Dorris Pl.,Los Angeles,90031,"Secure parking lot with chain link fence. Install approx. 150' of new fencing, (2) 20' rolling gates, and (1) 5' rolling pedestrian gate at arcade.",46,2021-Q4,2022-Q1,Closeout,20220630 Gridley ES,10372134,Gridley ES - HVAC,HVAC,6,Kelly Gonez,Northeast,1429501,13748,1907 Eighth St.,San Fernando,91340,"This project is to provide a new heating, ventilation and air conditioning (HVAC) system at five permanent buildings, 21 relocatable buildings, and one sanitary building. The scope of work also includes installing new ductwork, controls, thermostats, piping, diffusers, registers, grilles, and painting of affected areas.","15,470",2024-Q1,2026-Q1,Planning,20220630 Towne ES,10372321,Towne ES - Purchase Exterior Tables,Furniture/Fixtures/Equipment,7,Tanya Ortiz Franklin,South,1720501,13755,18924 Towne Ave.,Carson,90746,Purchase (6) picnic-style tables with umbrellas. M&O to anchor all tables.,22,2022-Q3,2022-Q4,Planning,20220630 Foshay Learning Center,10372331,Foshay Learning Center - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1813201,13474,3751 S. Harvard Blvd.,Los Angeles,90018,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor and ceiling tiles; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",95,2022-Q3,2022-Q4,Planning,20220630 Fairfax HS,10104661,Fairfax HS - Health Careers Academy,Small Learning Community/Academy,4,Nick Melvoin,West,1862101,13473,7850 Melrose Ave.,Los Angeles,90046,Health Careers Academy,664,2015-Q2,2015-Q3,Closeout,20220630 Calahan ES,10372348,Calahan ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1270601,13747,18722 Knapp St.,Northridge,91324,"Modernize Parent & Family Center classroom by: installing new window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",90,2022-Q3,2022-Q4,Planning,20220630 Lake Balboa College Preparatory Magnet,10372350,Lake Balboa College Preparatory Magnet K-12 - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1739001,15185,6701 Balboa Blvd.,Lake Balboa,91406,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",96,2022-Q3,2022-Q4,Planning,20220630 Hooper PC,10372355,Hooper PC - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1457601,13849,1280 E. 52nd St.,Los Angeles,90011,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",90,2022-Q3,2022-Q4,Planning,20220630 Lizarraga ES,10372356,Lizarraga ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1468001,13897,401 E. 40th Pl.,Los Angeles,90011,"Modernize Parent & Family Center classroom by: installing a new projector screen and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",91,2022-Q3,2022-Q4,Planning,20220630 Toland Way ES,10372357,Toland Way ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1717801,13566,4545 Toland Way,Los Angeles,90041,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",91,2022-Q3,2022-Q4,Planning,20220630 Carson ES,10100815,Carson ES - Provide Secure Entrance,Security System,7,Tanya Ortiz Franklin,South,1283601,13435,161 E. Carson St.,Carson,90745,Provide Secure Entrance,52,2014-Q1,2014-Q1,Closeout,20220630 Contreras Learning Complex,10366021,Contreras Learning Complex - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1851701,13932,322 S. Lucas Ave.,Los Angeles,90017,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",504,2014-Q4,2015-Q1,Closeout,20220630 Park ES,10366085,Park ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1600501,13861,8020 Park Ave.,Cudahy,90201,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",257,2015-Q1,2015-Q2,Closeout,20220630 Reseda Charter HS,10366362,Reseda Charter HS - Compliance with State & Federal Access Requirements,Access Compliance,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Upgrades to Restroom,5,2014-Q3,2014-Q3,Closeout,20220630 Yorkdale ES,10364012,Yorkdale ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1795901,13385,5657 Meridian St.,Los Angeles,90042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",224,2014-Q3,2014-Q4,Closeout,20220630 Westchester Enriched Sciences Magnets,10229932,Westchester Enriched Sciences Magnets - Non Air-Conditioned Classroom & Equipment,HVAC,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,Non Air-Conditioned Classroom & Equipment,25,2013-Q3,2014-Q1,Closeout,20220630 Wilmington Park ES,10348916,Wilmington Park ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1778101,13378,1140 Mahar Ave.,Wilmington,90744,Demolish/Remove Portable Building(s),228,2013-Q2,2014-Q1,Closeout,20220630 Clifford Math & Technology Magnet ES,10307255,Clifford Math & Technology Magnet ES - Electronic Entry & Monitoring System,Security System,5,Jackie Goldberg,Central,1311001,13309,2150 Duane St.,Los Angeles,90039,Electronic Entry & Monitoring System,29,2013-Q2,2014-Q2,Closeout,20220630 West Athens ES,10108090,West Athens ES - Provide Upgrades to Irrigation System,Plumbing/Irrigation/Drainage,1,"Dr. George J. McKenna, III",West,1764401,13317,1110 W. 119th St.,Los Angeles,90044,Provide Upgrades to Irrigation System,4,2014-Q2,2014-Q2,Closeout,20220630 Washington Preparatory HS,10107449,Washington Preparatory HS - Compliance with State & Federal Access Requirements,Access Compliance,1,"Dr. George J. McKenna, III",West,1892801,13560,10860 S. Denker Ave.,Los Angeles,90047,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) for Lunch Shelter,320,2014-Q4,2015-Q1,Closeout,20220630 Brooklyn EEC,10005018,Brooklyn EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,East,1957901,16305,329 N. Arizona Ave.,Los Angeles,90022,Upgrade exterior gates and playground equipment,41,2014-Q2,2014-Q3,Closeout,20220630 Alexandria EEC,10005015,Alexandria EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,Central,1950101,16686,4304 Rosewood Ave.,Los Angeles,90004,"Upgrade entry control system, exterior gates, and playground equipment",35,2014-Q2,2015-Q3,Closeout,20220630 Johnston Community Day School,10366610,Johnston Community Day School - SEEDS,SEEDS,7,Tanya Ortiz Franklin,South,1858901,13854,2210 Taper Ave.,San Pedro,90731,"Design and construct an outdoor learning space of approximately 1,900 square feet consisting of patch and repair existing asphalt, painting pavement areas and the installation of art poles. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",20,2015-Q1,2015-Q2,Closeout,20220630 Denker ES,10366572,Denker ES - SEEDS,SEEDS,7,Tanya Ortiz Franklin,South,1342501,13638,1620 W. 162nd St.,Gardena,90247,"Design and construct an outdoor learning space of approximately 1,300 square feet consisting of asphalt removal, painting pavement areas, the installation of concrete pavers, art poles, and a hose bib. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",15,2014-Q4,2015-Q1,Closeout,20220630 Lizarraga ES,10367131,Lizarraga ES - Electronic Camera Door Entry System,Security System,5,Jackie Goldberg,Central,1468001,13897,401 E. 40th Pl.,Los Angeles,90011,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,17,2016-Q1,2016-Q2,Closeout,20220630 Nevada ES,10367137,Nevada ES - Auditorium Upgrades,Auditorium Renovation,3,Scott Schmerelson,Northwest,1545901,13783,22120 Chase St.,West Hills,91304,"Modernize and provide upgrades to the existing auditorium by installing a new upgraded sound system with a new projector. Provide electrical upgrades, new ceiling lighting and stage lighting, and replace the existing seats.",86,2016-Q1,2016-Q4,Closeout,20220630 Brainard ES,10367422,Brainard ES- ADA Repairs,Access Compliance,6,Kelly Gonez,Northeast,1248601,13834,11407 Brainard Ave.,Lake View Terrace,91342,Remove and cap toilet at Kinder Restroom; Remove toilet partition (K2); Provide and install compliant doors with occupancy locks at restroom entrances; provide and install thresholds for kinder classrooms and library; provide and install occupancy lock at upper level faculty restroom.,30,2015-Q4,2016-Q1,Closeout,20220630 Pomelo Community Charter ES,10105890,Pomelo Community Charter ES - Compliance with State & Federal Access Requirements,Fire Alarm System,3,Scott Schmerelson,Northwest,1614001,13764,7633 March Ave.,West Hills,91304,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),595,2014-Q4,2015-Q2,Closeout,20220630 Eshelman ES,10367584,Eshelman ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1364001,13501,25902 Eshelman Ave.,Lomita,90717,"Removal of 1 24' x 60' DOH Portable Bldg. Disconnect utilities, remove bungalow and restore the area. Reconnect electrical, plumbing and fire alarm system to remaining bldgs if necessary.",65,2016-Q2,2016-Q3,Closeout,20220630 10th St. ES,10105875,10th St. ES - Compliance with State & Federal Access Requirements,Fire Alarm System,2,Monica Garcia,Central,1708201,13265,1000 Grattan St.,Los Angeles,90015,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),550,2015-Q1,2015-Q3,Closeout,20220630 Aurora ES,10365999,Aurora ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,Central,1468501,13918,1050 E. 52nd Pl.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",211,2015-Q2,2015-Q3,Closeout,20220630 Miramonte EEC,10367343,Miramonte EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1953601,16664,1341 E. 70th St.,Los Angeles,90001,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",83,2016-Q2,2016-Q4,Closeout,20220630 McKinley ES,10369271,McKinley ES - Security Surveillance Upgrades,Security System,7,Tanya Ortiz Franklin,South,1665801,13506,7812 McKinley Ave.,Los Angeles,90001,Install an 8-camera closed-circuit television (CCTV) system for video surveillance.,71,2017-Q4,2018-Q3,Closeout,20220630 Stanford PC,10369422,Stanford PC - Electronic Marquee,Electrical/Lighting,5,Jackie Goldberg,East,1690501,13853,3020 Kansas Ave.,South Gate,90280,Install new wall-mounted electronic marquee.,25,2018-Q1,2018-Q2,Closeout,20220630 Polytechnic HS,10367535,Polytechnic HS - New Metal Ramp,Access Compliance,6,Kelly Gonez,Northeast,1863601,13734,12431 Roscoe Blvd.,Sun Valley,91352,Provide and install portable metal ramp to Classroom 300 at College center,39,2016-Q2,2016-Q2,Closeout,20220630 Telfair ES,10368964,Telfair ES - Security Upgrades for Computer Lab,Security System,6,Kelly Gonez,Northeast,1706801,13616,10975 Telfair Ave.,Pacoima,91331,Install new intrusion alarm system in computer lab.,12,2017-Q4,2018-Q1,Closeout,20220630 Van Ness ES,10365757,Van Ness ES - Replace Playground Matting,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1742501,13393,501 N. Van Ness Ave.,Los Angeles,90004,Replace deteriorated playground matting systems to ensure the health and safety of students.,53,2014-Q4,2014-Q4,Closeout,20220630 Arlington Heights ES,10368701,Arlington Heights ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1219201,15202,1717 Seventh Ave.,Los Angeles,90019,Provide and install new secure entry system (Aiphone) at main entrance,24,2017-Q2,2017-Q4,Closeout,20220630 Baldwin Hills ES,10368793,Baldwin Hills ES - 2017-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1227401,13595,5421 Rodeo Rd.,Los Angeles,90016,"This project is a charter school renovation for New Los Angeles Charter ES for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades K-2. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",29,2017-Q2,2017-Q3,Closeout,20220630 Belvedere MS,10368795,Belvedere MS - 2017-18 Prop 39,Charter Prop 39,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,"This project is a charter school renovation for Collegiate Charter HS of Los Angeles for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades 9-11. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",15,2017-Q2,2017-Q3,Closeout,20220630 Manchester ES,10367241,Manchester ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",South,1509601,13305,661 W. 87th St.,Los Angeles,90044,"Remove 3 DSA portable buildings and demolish 2 bungalows, disconnect all utilities and data systems, reconnect all utilities to remaining buildings on site, repair asphalt paving over the former building footprints, and remove all construction-related debris.",129,2015-Q4,2017-Q3,Closeout,20220630 Rio Vista ES,10369959,Rio Vista ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1628801,13441,4243 Satsuma Ave.,North Hollywood,91602,Install new secure entry system,14,2018-Q3,2018-Q4,Closeout,20220630 Roosevelt HS,10366772,Roosevelt HS- Remove/Sale 1 Portable Classroom Bldg,Portable Removal,2,Monica Garcia,East,1882901,13523,456 S. Mathews St.,Los Angeles,90033,"Removal/Sale of 1 Department of Housing (DOH) Portable Building; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",78,2015-Q4,2016-Q1,Closeout,20220630 Apperson ES,10368958,Apperson ES - Fencing,Fencing,6,Kelly Gonez,Northeast,1216401,13608,10233 Woodward Ave.,Sunland,91040,Install new fence at kindergarten yard.,18,2018-Q1,2018-Q2,Closeout,20220630 Mount Washington ES,10366840,Mount Washington ES - Security Upgrades,Security System,5,Jackie Goldberg,Central,1541101,13324,3981 San Rafael Ave.,Los Angeles,90065,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,14,2015-Q3,2015-Q4,Closeout,20220630 Colfax Charter ES,10372549,Colfax Charter ES - Install Privacy Fence,Fencing,3,Scott Schmerelson,Northeast,1316401,13681,11724 Addison St.,North Hollywood,91607,Install new chain link privacy fence. Remove existing chain link fencing. Install approx. 500 feet of privacy fencing at two sections of the campus. Straighten and paint some posts.,39,2022-Q3,2022-Q4,Planning,20220630 Clifford Math & Technology Magnet ES,10365642,Clifford ES - Upgrade 2 Portable Buildings,Portable Upgrade,5,Jackie Goldberg,Central,1311001,13309,2150 Duane St.,Los Angeles,90039,"Upgrade two portable buildings by providing sound proofing to windows, installing door seals and placing sound baffles on A/C units.",11,2014-Q2,2016-Q2,Closeout,20220630 122nd St. ES,10370357,122nd St. ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1588701,13868,405 E. 122nd St.,Los Angeles,90061,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",58,2019-Q1,2019-Q3,Closeout,20220630 Pacoima MS,10370345,Pacoima MS - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1832101,13750,9919 Laurel Canyon Blvd.,Pacoima,91331,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",58,2019-Q3,2019-Q4,Closeout,20220630 Corona ES,10372183,Corona ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1321901,13453,3825 Bell Ave.,Bell,90201,"Remove 2 portable buildings, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/Replace asphalt paving.",373,2022-Q3,2023-Q1,Planning,20220630 Del Amo ES,10372637,Del Amo ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1338401,13623,21228 Water St.,Carson,90745,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Noble ES,10105872,Noble ES - Compliance with State & Federal Access Requirements,Fire Alarm System,6,Kelly Gonez,Northeast,1560301,13632,8329 Noble Ave.,North Hills,91343,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),551,2014-Q4,2015-Q3,Closeout,20220630 Burbank Arts Tech Community Magnet MS,10368771,Burbank Arts Tech Community Magnet MS - Seismic Retrofit of Home Economics Building,Seismic Modernization,2,Monica Garcia,Central,1806601,13551,6460 N. Figueroa St.,Los Angeles,90042,"The project provides a seismic retrofit of the Home Economics building, an L-shaped structure, with a total area of approximately 10,700 square feet. The project includes strengthening existing concrete walls by wrapping Fiber Reinforced Polymer (FRP) strips and installing new cross ties, blockings and new anchors for roof truss-to-wall connections. The scope of work may also include strengthening the foundation and existing roof truss top and bottom cords. The project also includes Americans with Disabilities Act (ADA) upgrades as required.","2,325",2019-Q2,2020-Q1,Closeout,20220630 Dolores EEC,10367311,Dolores EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1951401,16762,22309 Catskill Ave.,Carson,90745,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",46,2016-Q2,2016-Q3,Closeout,20220630 Cabrillo EEC,10367302,Cabrillo EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1950801,16299,741 W. 8th St.,San Pedro,90731,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",83,2016-Q2,2016-Q4,Closeout,20220630 Raymond ES,10368039,Raymond ES - Restroom Upgrades,Access Compliance,1,"Dr. George J. McKenna, III",West,1621901,13469,7511 Raymond Ave.,Los Angeles,90044,Modify kindergarten restroom; provide and install folding changing table.,3,2016-Q4,2017-Q1,Closeout,20220630 Colfax Charter ES,10367116,Colfax Charter ES - Safety Upgrades,Security System,3,Scott Schmerelson,Northeast,1316401,13681,11724 Addison St.,North Hollywood,91607,Provide safety upgrades to the north parking lot by installing two swing gates for entering and exiting the lot.,14,2015-Q4,2016-Q1,Closeout,20220630 Van Deene ES,10366777,Van Deene ES - SEEDS,SEEDS,7,Tanya Ortiz Franklin,South,1741901,13788,826 W. Javelin St.,Torrance,90502,"Design and construct an outdoor learning space of approximately 1,200 square feet consisting of painting pavement areas, removal of fencing, and the installation of a hose bib and art poles. The outdoor learning space will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders and signage poles.",20,2015-Q3,2015-Q3,Closeout,20220630 Banning HS,10368749,Banning HS - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,Provide and install wall-mounted electronic marquee on Oral Arts building (024CAT) next to main entrance.,41,2018-Q1,2018-Q3,Closeout,20220630 Farmdale ES,10369869,Farmdale ES - Secure Entry System,Security System,2,Monica Garcia,East,1374001,15166,2660 Ruth Swiggett Dr.,Los Angeles,90032,Install new secure entry system,25,2018-Q3,2018-Q3,Closeout,20220630 Van Gogh Charter ES,10368201,Van Gogh Charter ES - Swing Gates,Fencing,3,Scott Schmerelson,Northwest,1742201,13862,17160 Van Gogh St.,Granada Hills,91344,Provide and install two swing gates.,16,2017-Q2,2017-Q3,Closeout,20220630 Evergreen ES,10369866,Evergreen ES - Secure Entry System,Security System,2,Monica Garcia,East,1369901,13569,2730 Ganahl St.,Los Angeles,90033,Install new secure entry system,22,2018-Q3,2019-Q1,Closeout,20220630 74th St. ES,10369597,74th St. ES - New Marquee Installation,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1664401,13549,2112 W. 74th St.,Los Angeles,90047,"This project is for the installation of a new wall-mounted marquee. The design, including Division of the State Architect (DSA) approval, will be completed by project #10369017.",9,2018-Q2,2018-Q3,Closeout,20220630 East Valley HS,10366026,East Valley HS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1860701,13951,5525 Vineland Ave.,North Hollywood,91601,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",520,2015-Q1,2015-Q3,Closeout,20220630 Holmes ES,10366481,Holmes MS - Electronic Camera Main Door Entry,Security System,5,Jackie Goldberg,East,1456201,13315,5108 Holmes Ave.,Los Angeles,90058,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance,20,2014-Q4,2015-Q4,Closeout,20220630 Rosewood Urban Planning & Design Magnet ES,10366092,Rosewood ES - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1638401,13579,503 N. Croft Ave.,Los Angeles,90048,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",213,2015-Q1,2015-Q2,Closeout,20220630 Gompers MS,10370244,Gompers MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1816001,13581,234 E. 112th St.,Los Angeles,90061,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2026-Q2,2025-Q4,Planning,20220630 Jones ES,10368821,Jones ES - 2017-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1294301,193565,900 E. 33rd St.,Los Angeles,90011,"This project is a charter school renovation for Synergy Charter Academy for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office and 13 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",36,2017-Q2,2017-Q2,Closeout,20220630 Selma ES,10368841,Selma ES - 2017-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1658901,13360,6611 Selma Ave.,Los Angeles,90028,"This project is a charter school renovation for Larchmont Charter School for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades 4-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",19,2017-Q2,2017-Q3,Closeout,20220630 Eagle Rock ES,10367099,Eagle Rock ES - New Waiting Area,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1350701,13499,2057 Fair Park Ave.,Los Angeles,90041,Provide and install a concrete waiting area at the front of the school near the multipurpose room building.,9,2015-Q3,2015-Q4,Closeout,20220630 Grant HS,10367380,Grant HS - Renovate 3 Changing Table Locations,Access Compliance,6,Kelly Gonez,Northeast,1868301,13674,13000 Oxnard St.,Van Nuys,91401,Renovate 3 Changing Table Locations,28,2015-Q4,2016-Q2,Closeout,20220630 Cabrillo ES,10368376,Cabrillo ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1268501,13552,732 S. Cabrillo Ave.,San Pedro,90731,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",296,2019-Q2,2022-Q1,Closeout,20220630 Sutter MS,10367714,Sutter MS - 2016-17 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,"This project is a charter school renovation for Ingenium Charter MS for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",148,2016-Q2,2016-Q3,Closeout,20220630 Webster MS,10369798,Webster MS - 2018-19 Prop 39 (Magnolia Science Academy #4),Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project is a charter school renovation for Magnolia Science Academy #4 for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office,1 special education room, and 7 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",2,2018-Q2,2018-Q3,Closeout,20220630 Monterey Continuation HS,10369871,Monterey Continuation HS - Secure Entry System,Security System,2,Monica Garcia,East,1867701,16463,466 S. Fraser Ave.,Los Angeles,90022,Install new secure entry system,31,2018-Q3,2018-Q4,Closeout,20220630 Gulf ES,10368971,Gulf ES - Prep Workroom For Laundry Equipment,Communications/Technology Upgrade,7,Tanya Ortiz Franklin,South,1431501,13464,828 W. L St.,Wilmington,90744,"Provide new plumbing, gas line, and power in teacher's workroom to support laundry equipment",13,2017-Q2,2017-Q3,Closeout,20220630 San Pedro HS - Olguin Campus,10004373,South Region HS #15 - Photovoltaic Installation,Photovoltaic Installation,7,Tanya Ortiz Franklin,South,1893701,15221,3210 S. Alma St.,San Pedro,90731,Rooftop Panels/Shade Structure to Generate 729 kW of Solar Energy,"4,900",2012-Q2,2014-Q3,Closeout,20220630 Sylmar Charter HS,10366741,Sylmar Charter HS - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1887801,13856,13050 Borden Ave.,Sylmar,91342,"Convert and renovate two classroom spaces into a new parent & family center by providing interior paint, flooring and lighting repairs, and security upgrades including new doors and panic hardware as well as security on windows. Remove deteriorated built-in cabinets and fume hood, patch up walls and ceiling. Provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",80,2015-Q2,2016-Q1,Closeout,20220630 Gage MS,10370758,Gage MS - Exterior Painting,Painting,5,Jackie Goldberg,East,1815101,13598,2880 E. Gage Ave.,Huntington Park,90255,"Prepare, paint, and refinish the masonry/stucco of Multi-Purpose Bldg, Arcade B, Lunch Pavilion, Arcade 10, and their appurtenances, walls, retaining walls, block walls, and enclosures. Prepare, prime, paint and refinish all exterior painted surfaces including but not limited to all arcades, doors and trim, sash and trim, fascia, classroom access ramps, window A/C units, electrical boxes, and all other painted surfaces unless otherwise stated.",91,2020-Q1,2020-Q2,Closeout,20220630 Dena ES,10370306,Dena ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1331501,13277,1314 Dacotah St.,Los Angeles,90023,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",60,2019-Q3,2020-Q3,Closeout,20220630 Gledhill EEC,10005033,Gledhill EEC - Safety Upgrades and Improvements,Campus Improvement,6,Kelly Gonez,Northwest,1957801,16641,16058 Gledhill St.,North Hills,91343,"Upgrade fencing, entry control system, exterior gates, playground equipment, and electrical upgrades",72,2014-Q3,2015-Q1,Closeout,20220630 Northridge EEC,10005058,Northridge EEC - Safety Upgrades and Improvements,Campus Improvement,3,Scott Schmerelson,Northwest,1828401,16622,18050 Chase St.,Northridge,91325,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, playground equipment, and protective fencing around air conditioning system",183,2014-Q3,2015-Q1,Closeout,20220630 Canoga Park EEC,10005020,Canoga Park EEC - Safety Upgrades and Improvements,Campus Improvement,3,Scott Schmerelson,Northwest,1959201,16297,7355 Vassar Ave.,Canoga Park,91303,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",61,2014-Q1,2014-Q3,Closeout,20220630 Normont ES,10372296,Normont ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1564401,13652,1001 W. 253rd St.,Harbor City,90710,Install new secure entry system at the Main Office.,32,2022-Q1,2022-Q3,Construction,20220630 74th St. ES,10372309,74th St. ES - Purchase Parent Center Furniture And Technology,Furniture/Fixtures/Equipment,1,"Dr. George J. McKenna, III",West,1664401,13549,2112 W. 74th St.,Los Angeles,90047,"Standard parent center furniture/technology package which includes the following: Furniture: (16) tables, (31) chairs, (5) types of storage; Technology: (21) laptops, storage cart, projector and document camera on cart, printer.",57,2022-Q1,2022-Q3,Construction,20220630 Clay MS,10369738,Clay MS - 2018-19 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1809901,13752,12226 S. Western Ave.,Los Angeles,90047,"Animo South LA Charter HS is vacating this site. This project was approved in Board of Education Report No. 429-17/18. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",8,2018-Q2,2018-Q2,Closeout,20220630 Walgrove ES,10369971,Walgrove ES - Computer Lab,Communications/Technology Upgrade,4,Nick Melvoin,West,1760301,13729,1630 Walgrove Ave.,Los Angeles,90066,Provide new computer lab,57,2018-Q3,2019-Q3,Closeout,20220630 93rd St. ES,10370359,93rd St. ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1558201,13814,330 E. 93rd St.,Los Angeles,90003,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",55,2019-Q2,2019-Q4,Closeout,20220630 Napa ES,10368147,Napa ES - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1544601,13701,19010 Napa St.,Northridge,91324,"Replace deteriorated walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new walk-in freezer/cooler combination unit and refrigeration equipment.",131,2017-Q1,2017-Q2,Closeout,20220630 135th St. ES,10372079,135th St. ES - Energy Conservation Lighting,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1587701,13607,801 W. 135th St.,Gardena,90247,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $369,237. Estimated energy savings is 148,091 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $93,848 which is 25.4% of the ECM costs.",94,2022-Q3,2023-Q3,Planning,20220630 Albion ES,10370679,Albion ES - HVAC,HVAC,2,Monica Garcia,East,1201401,13296,322 S. Ave. 18,Los Angeles,90031,"This project is to provide a new heating, ventilation and air conditioning (HVAC) system in the Main Building, Auditorium, Unit 2 and 3 classroom buildings, and classroom bungalow.","6,588",2022-Q1,2023-Q4,Construction,20220630 Reseda Charter HS,10366558,Reseda HS - ADA Improvements,Access Compliance,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,"Install new ramps and handrails, improve accessibility in restroom, install new ADA compliant drinking fountains, convert and modernize an existing room to a new ADA compliant changing room, improve accessibility to counters in the food service and student store areas, and install new accessible lockers.","1,320",2014-Q4,2016-Q1,Closeout,20220630 Panorama HS,10368836,Panorama HS - 2017-18 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,"This project is a charter school renovation for Valor Academy Charter HS for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 16 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",11,2017-Q2,2017-Q3,Closeout,20220630 Rivera Learning Complex: Green Design STEAM Academy,10368979,Rivera Learning Complex - Restroom Upgrade,Access Compliance,7,Tanya Ortiz Franklin,South,1771901,193559,6100 S. Central Ave.,Los Angeles,90001,Purchase and install special lavatory sink.,6,2017-Q2,2017-Q3,Closeout,20220630 Santee Education Complex,10368977,Santee Education Complex - Security Upgrades,Security System,5,Jackie Goldberg,Central,1871601,13945,1921 S. Maple Ave.,Los Angeles,90011,"This project will fund a portion of the installation of a closed-circuit television (CCTV) system with 91 cameras for video surveillance throughout the campus. In addition to the bond funds allocated to this project budget, the school has contributed $300,000 for this security upgrade (project #10368975).",59,2018-Q1,2018-Q2,Closeout,20220630 Hale Charter Academy MS,10371357,Hale Charter Academy MS - Main Electrical Switchgear,Electrical/Lighting,3,Scott Schmerelson,Northwest,1816901,13873,23830 Califa St.,Woodland Hills,91367,The main electrical switchgear serves various buildings campus-wide with antiquated oil-filled circuit breakers. The breakers were designed decades ago and are leaking oil. This project is to replace the existing main electrical switchgear by installing new load interrupting switches.,"1,137",2022-Q3,2023-Q1,Design,20220630 Crescent Heights EEC,10371809,Crescent Heights EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,1,"Dr. George J. McKenna, III",West,1959701,16285,1700 S. Alvira St.,Los Angeles,90035,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 12,960 sqft. ADA upgrades for this project include (a) resurfacing the parking area - approximately 6,300 sqft - to provide an ADA compliant path of travel and (b) providing an ADA compliant restroom. Additionally, we will replace deteriorated HVAC units, roofing, approximately 990 ft2 of play matting, and make necessary upgrades to the fire alarm system, as required by current code.","4,221",2023-Q2,2024-Q3,Design,20220630 Budlong ES,10370463,Budlong ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1261601,15162,5940 S. Budlong Ave.,Los Angeles,90044,"Demolish 5 portable buildings, construct permanent interior fencing, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",473,2019-Q2,2019-Q4,Closeout,20220630 Independence Continuation HS,10372431,Independence Continuation HS - Install Ramp,Access Compliance,3,Scott Schmerelson,Northwest,1855901,15186,6501 Balboa Blvd.,Lake Balboa,91406,Provide TMP ramp access to main office.,117,2022-Q3,2022-Q4,Design,20220630 Ochoa Learning Center,10372358,Ochoa Learning Center - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1237201,14062,5027 Live Oak St.,Cudahy,90201,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing the deteriorated flooring; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",99,2022-Q3,2022-Q4,Planning,20220630 Bushnell Way ES,10369064,Bushnell Way ES - SEEDS,SEEDS,2,Monica Garcia,Central,1267101,13375,5507 Bushnell Way,Los Angeles,90042,"Construct an outdoor learning space of approximately 2,000 square feet, consisting of the removal of asphalt, the installation of decomposed granite and stamped concrete, 4 tree wells with new trees and bubblers, an irrigation system, picnic tables, raised beds and benches. It will be outfitted by the school site partner with edible plants.",59,2018-Q1,2018-Q4,Closeout,20220630 Wilmington Park ES,10371252,Wilmington Park ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1778101,13378,1140 Mahar Ave.,Wilmington,90744,Install a new 2-sided electronic marquee standing less than 8' high on the grass lawn near the main entrance on Mahar Ave.,53,2020-Q3,2021-Q1,Closeout,20220630 Marina Del Rey MS,10371104,Marina Del Rey MS - Auditorium Upgrades,Auditorium Renovation,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,Install new audio/visual equipment and lighting in the auditorium.,98,2020-Q3,2020-Q4,Closeout,20220630 Roybal-Allard ES,10371079,Roybal-Allard ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1688401,14582,3232 Saturn Ave.,Huntington Park,90255,Install new secure entry system,31,2020-Q3,2020-Q3,Closeout,20220630 Westminster Math & Technology/Environmental Studies Magnet ES,10372094,Westminster ES Magnet - Install Privacy Fence,Fencing,4,Nick Melvoin,West,1769901,13483,1010 Abbot Kinney Blvd.,Venice,90291,Replace approx. 500¿ of chain link fence on Main St. with privacy fencing,61,2021-Q4,2022-Q1,Closeout,20220630 Fernangeles ES,10004585,Fernangeles ES - Facelift,Facelift,6,Kelly Gonez,Northeast,1375301,13594,12001 Art St.,Sun Valley,91352,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",49,2014-Q1,2016-Q3,Closeout,20220630 Eagle Rock ES,10004599,Eagle Rock ES - Facelift,Facelift,5,Jackie Goldberg,Central,1350701,13499,2057 Fair Park Ave.,Los Angeles,90041,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",141,2012-Q4,2016-Q3,Closeout,20220630 Elysian Heights ES,10004609,Elysian Heights ES - Facelift,Facelift,5,Jackie Goldberg,Central,1357501,13411,1562 Baxter St.,Los Angeles,90026,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",144,2014-Q1,2016-Q3,Closeout,20220630 Holmes ES,10107488,Holmes ES - Upgrade Elevator Controller for Use with Fire Alarm System and Compliance with State & Federal Access Requirements,Fire Alarm System,5,Jackie Goldberg,East,1456201,13315,5108 Holmes Ave.,Los Angeles,90058,Upgrade Elevator Controller for Use with Fire Alarm System and to Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),162,2013-Q3,2014-Q1,Closeout,20220630 Garfield HS,10368146,Garfield HS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1867901,13512,5101 E. 6th St.,Los Angeles,90022,"Replace deteriorated walk-in freezer and 2 walk-in coolers by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new walk-in freezer, walk-in cooler, and refrigeration equipment including a large freezer. The new walk-in cooler will be installed inside the cafeteria with the entry door widened to 3'. The new walk-in freezer will be installed outside the cafeteria with 1 entry door, eliminating 1 entry door closest to the cafeteria and 1 walk-in cooler, and the new refrigeration equipment will be installed next to this exterior freezer unit. Fencing and gates will be installed around the exterior freezer and refrigeration equipment to provide service access.",195,2017-Q1,2017-Q2,Closeout,20220630 Canyon Charter ES,10365188,Canyon Charter ES - Security Upgrades,Security System,4,Nick Melvoin,West,1279501,13346,421 Entrada Dr.,Santa Monica,90402,"Upgrade physical security of the campus by providing new gates at the kindergarten yard, multipurpose room, and rear entrance to the campus.",14,2015-Q1,2015-Q4,Closeout,20220630 White MS,10366831,White MS-ADA repairs,Access Compliance,7,Tanya Ortiz Franklin,South,1848701,13708,22102 S. Figueroa St.,Carson,90745,ADA Repairs,13,2015-Q2,2015-Q2,Closeout,20220630 Wilton ES,10106108,Wilton ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,1,"Dr. George J. McKenna, III",West,1780801,13433,745 S. Wilton Pl.,Los Angeles,90005,Mitigate Lead in Water,130,2013-Q3,2014-Q3,Closeout,20220630 Blythe ES,10364018,Blythe ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1247001,13758,18730 Blythe St.,Reseda,91335,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",446,2013-Q4,2014-Q2,Closeout,20220630 Burroughs MS,10364021,Burroughs MS - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1807501,13448,600 S. Mc Cadden Pl.,Los Angeles,90005,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",834,2014-Q2,2014-Q3,Closeout,20220630 Huntington Park ES,10363959,Huntington Park ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1239101,13916,6055 Corona Ave.,Huntington Park,90255,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",363,2015-Q2,2015-Q3,Closeout,20220630 Brooklyn Span School,10363890,Brooklyn ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1256201,13471,4620 Cesar E. Chavez Ave.,Los Angeles,90022,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",270,2014-Q4,2015-Q1,Closeout,20220630 Annandale ES,10367017,Annandale ES - Restroom Upgrades,Access Compliance,5,Jackie Goldberg,Central,1215101,13371,6125 Poppy Peak Dr.,Los Angeles,90042,Renovate boys' and girls' restrooms in auditorium.,28,2015-Q2,2015-Q3,Closeout,20220630 Virgil MS,10364133,Virgil MS - Emergency Lighting System,Electrical/Lighting,2,Monica Garcia,Central,1846201,13382,152 N. Vermont Ave.,Los Angeles,90004,The emergency power inverter located in the auditorium basement is not functioning and needs to be completely replaced to restore the functionality of this life safety system during a site power failure. This system provides for emergency lighting and exit signs to illuminate the path of egress from the building. This emergency system is not in compliance with the California Health Code and poses a health and safety risk in the event of an emergency evacuation.,83,2014-Q2,2014-Q3,Closeout,20220630 Maywood Center for Enriched Studies,10001317,South Region HS #8,New School,5,Jackie Goldberg,East,1891701,15421,5800 King Ave.,Maywood,90270,"The District acquired land to build a new high school. The campus will consist of three small schools that include classrooms, science labs, student dining, and administrative offices. Shared facilities among the three small schools will include performing arts classrooms, a multipurpose room, a gymnasium, support services, food services, playfields, and a parking structure.","157,483",2014-Q4,2017-Q4,Closeout,20220630 Yorkdale ES,10368857,Yorkdale ES - 2017-18 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1795901,13385,5657 Meridian St.,Los Angeles,90042,"This project is a charter school renovation for Celerity Rolas Charter School for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",246,2017-Q2,2017-Q3,Closeout,20220630 State ES,10102475,State ES - Replace Deteriorating Water Line in Main Building,Plumbing/Irrigation/Drainage,5,Jackie Goldberg,East,1691801,13639,3211 Santa Ana St.,South Gate,90280,Replace deteriorating water line in main building.,117,2014-Q4,2015-Q4,Closeout,20220630 Haddon ES,10369470,Haddon ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1432901,13527,10115 Haddon Ave.,Pacoima,91331,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2023-Q1,2023-Q4,Planning,20220630 Murchison EEC,10005054,Murchison EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,East,1953701,16665,1537 Murchison St.,Los Angeles,90033,"Upgrade security fence, entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",94,2014-Q1,2015-Q2,Closeout,20220630 Sendak ES,10366099,Sendak ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1357401,13919,11414 W. Tiara St.,North Hollywood,91601,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",227,2015-Q1,2015-Q1,Closeout,20220630 Twain MS,10368601,Twain MS - New Metal Ramp,Access Compliance,4,Nick Melvoin,West,1842501,13630,2224 Walgrove Ave.,Los Angeles,90066,"Provide and install metal ramp, skirting and door hardware.",55,2017-Q1,2017-Q3,Closeout,20220630 112th St. ES,10367648,112th St. ES - 2016-17 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"This project is a charter school renovation for Resolute Academy for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades 5-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",36,2016-Q2,2016-Q3,Closeout,20220630 Le Conte MS,10370775,Le Conte MS - Exterior Painting,Painting,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",812,2020-Q3,2021-Q2,Closeout,20220630 Strathern ES,10004580,Strathern ES - Facelift,Facelift,6,Kelly Gonez,Northeast,1695901,13654,7939 St. Clair Ave.,North Hollywood,91605,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",136,2013-Q2,2016-Q3,Closeout,20220630 Albion ES,10371798,Albion ES - Seismic Retrofits at Auditorium,Seismic Modernization,2,Monica Garcia,East,1201401,13296,322 S. Ave. 18,Los Angeles,90031,"This project is to provide seismic retrofits at the Auditorium, Classroom 1, and Classroom 2 Buildings with a total area of approximately 36,445 square feet. The scope of work includes American with Disabilities Act (ADA) upgrades as required.","8,894",2023-Q3,2025-Q3,Design,20220630 Garfield HS,10370028,Garfield HS - Electronic Marquee,Electrical/Lighting,2,Monica Garcia,East,1867901,13512,5101 E. 6th St.,Los Angeles,90022,Install new 18' electronic free-standing marquee.,70,2019-Q1,2019-Q3,Closeout,20220630 Coliseum ES,10367841,Coliseum ES - Fire Damage Repairs to Kindergarten Building,Campus Improvement,1,"Dr. George J. McKenna, III",West,1317801,13593,4400 Coliseum St.,Los Angeles,90016,"The repairs consist of the removal and replacement of framing, roofing, ceiling tile, lighting, electrical systems, casework, and HVAC units, as well as site work required by the Americans with Disabilities Act including the restrooms that are an integral part of the kindergarten classrooms.",856,2017-Q1,2018-Q4,Closeout,20220630 Plasencia ES,10370141,Plasencia ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1324701,13287,1321 Cortez St.,Los Angeles,90026,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2028-Q1,2028-Q2,Planning,20220630 Newmark Continuation HS,10367581,Newmark Continuation HS - HVAC,HVAC,2,Monica Garcia,Central,1854501,16282,1575 W. 2nd St.,Los Angeles,90026,"This project will upgrade the heating, ventilation, and air conditioning (HVAC) system in the classroom and administration/classroom buildings. The HVAC system includes 3 rooftop-mounted units that are over 15 years old and beyond economical repair.",330,2020-Q4,2022-Q3,Construction,20220630 Tulsa ES,10370524,Tulsa ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1724701,13693,10900 Hayvenhurst Ave.,Granada Hills,91344,Install new secure entry system,30,2019-Q3,2019-Q4,Closeout,20220630 Berendo MS,10366649,Berendo MS - Facilities Improvement,Campus Improvement,5,Jackie Goldberg,Central,1805701,13274,1157 S. Berendo St.,Los Angeles,90006,"Berendo MS and Monsenor Oscar Romero Charter School share the campus through a Proposition 39 co-location. Over the long-term, new permanent buildings are being funded and constructed under the Monsenor Oscar Romero Charter School Augmentation Grant project (#10004854), which provides new classroom, administrative and food service facilities on part of the Berendo MS campus. The charter school will need to continue to use the physical education facilities at Berendo MS, however the existing gymnasium is undersized and inadequate. This project will provide a new gymnasium of approximately 20,000 square feet that includes basketball courts, locker rooms, a fitness room, and support spaces for students from both schools. In addition, the new charter school facilities require the removal of a bungalow and restroom building that are utilized by Healthy Start, a program that provides services in academics, youth development, family support, basic needs, and physical and mental health care. This project relocates the Healthy Start clinic to renovated space in the Administrative Building with approximately 2,100 square feet for a waiting area, counseling and exam rooms, restrooms, and an administrative area as well as a new ramp and restroom upgrades to improve accessibility. The facilities improvements include the conversion of asphalt under 6 bungalow buildings to be demolished after the charter school moves into their new facilities into playfields, landscaped areas, and learning gardens that will provide all students with an enhanced learning environment. This project also formalizes the street vacation of Dewey Ave. between 11th St. and 12th St. which has historically been part of the Berendo MS campus.","29,295",2018-Q4,2020-Q1,Closeout,20220630 24th St. EEC,10369310,24th St. EEC - Fire Alarm & Restroom Upgrades,Access Compliance,1,"Dr. George J. McKenna, III",Central,1957001,16624,2101 W. 24th St.,Los Angeles,90018,The project will upgrade the fire alarm system and provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,666,2022-Q2,2022-Q4,Construction,20220630 Bradley Global Awareness Magnet ES,10371124,Bradley Global Awareness Magnet ES - Campus Improvement,Campus Improvement,1,"Dr. George J. McKenna, III",West,1712301,13516,3875 Dublin Ave.,Los Angeles,90008,"Install new fence and gate, new outdoor basketball court, and lunch tables.",75,2020-Q2,2020-Q4,Closeout,20220630 Mountain View ES,10371366,Mountain View ES - K-yard Fence,Fencing,6,Kelly Gonez,Northeast,1540401,13706,6410 Olcott St.,Tujunga,91042,Install new fence to expand kindergarten yard,43,2020-Q3,2020-Q4,Closeout,20220630 Warner ES,10370047,Warner ES - Secure Entry System,Security System,4,Nick Melvoin,West,1761601,13481,615 Holmby Ave.,Los Angeles,90024,Install new secure entry system. This Board District 4 priority project includes a Local District West contribution towards approximately half the budget.,37,2019-Q1,2019-Q2,Closeout,20220630 Fair ES,10368326,Fair ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1371201,13600,6501 Fair Ave.,North Hollywood,91606,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",122,2017-Q4,2018-Q1,Closeout,20220630 Montague Charter Academy,10366070,Montague Charter Academy - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1537001,13739,13000 Montague St.,Pacoima,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",388,2015-Q2,2015-Q2,Closeout,20220630 North Hollywood HS,10366074,North Hollywood HS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1878601,13557,5231 Colfax Ave.,North Hollywood,91601,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",874,2015-Q1,2015-Q2,Closeout,20220630 Apperson ES,10004583,Apperson ES - Facelift,Facelift,6,Kelly Gonez,Northeast,1216401,13608,10233 Woodward Ave.,Sunland,91040,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",144,2012-Q3,2014-Q2,Closeout,20220630 Wadsworth ES,10004623,Wadsworth ES - Facelift,Facelift,5,Jackie Goldberg,Central,1758901,13383,981 E. 41st St.,Los Angeles,90011,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",146,2012-Q2,2016-Q3,Closeout,20220630 Hubbard ES,10366167,Hubbard ES - Compliance with State & Federal Access Requirements,Access Compliance,6,Kelly Gonez,Northeast,1460301,13718,13325 Hubbard St.,Sylmar,91342,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Installation of Electrical Outlet,2,2014-Q2,2014-Q2,Closeout,20220630 Reseda Charter HS,10367224,Reseda HS - Dance Floor System at North Gym,Flooring,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,Provide and Install new dance floor system in Dance Room at North Gym.,39,2016-Q1,2016-Q1,Closeout,20220630 Southeast MS,10366849,Southeast MS-ADA Repairs,Access Compliance,5,Jackie Goldberg,East,1815301,16081,2560 Tweedy Blvd.,South Gate,90280,ADA Repairs,15,2015-Q2,2015-Q3,Closeout,20220630 Lull Special Education Center,10366343,Lull Special Education Center - Restroom & Technology Upgrades,Campus Improvement,3,Scott Schmerelson,Northwest,1195901,13615,17551 Miranda St.,Encino,91316,Upgrade restroom facilities for new student population. Provide electrical and data upgrades to 6 classrooms and install 6 smartboards.,13,2015-Q2,2015-Q3,Closeout,20220630 Van Gogh Charter ES,10366195,Van Gogh ES - Laptops & Desktop Computers,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1742201,13862,17160 Van Gogh St.,Granada Hills,91344,Increase schools access to technology by providing laptop and desktop computers,41,2014-Q3,2014-Q3,Closeout,20220630 Bernstein HS,10366008,Bernstein HS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,West,1869601,13953,1309 N. Wilton Pl.,Hollywood,90028,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",572,2014-Q2,2014-Q4,Closeout,20220630 Noble ES,10363979,Noble ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1560301,13632,8329 Noble Ave.,North Hills,91343,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",392,2014-Q1,2014-Q3,Closeout,20220630 Shenandoah ES,10366716,Shenandoah ES - Install Electronic Camera Entry System,Security System,1,"Dr. George J. McKenna, III",West,1667101,13491,2450 Shenandoah St.,Los Angeles,90034,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance,11,2015-Q1,2015-Q3,Closeout,20220630 San Fernando HS,10366837,San Fernando HS - Wrought Iron Fencing,Fencing,6,Kelly Gonez,Northeast,1884301,13670,11133 O'Melveny Ave.,San Fernando,91340,"Upgrade physical security of the school by installing 330' of wrought iron fencing along the private block wall to secure the campus and adjacent private property. Install 130' of chain link fence, roll gate and pedestrian gate by the track and football field.",115,2015-Q3,2015-Q3,Closeout,20220630 Rivera Learning Complex,10366843,Rivera Learning Complex - Paint Buildings,Painting,7,Tanya Ortiz Franklin,South,1886701,193559,6100 S. Central Ave.,Los Angeles,90001,"Upgrade the quad area of the school by painting buildings B, C, D and E.",42,2015-Q2,2015-Q3,Closeout,20220630 Cochran MS,10364025,Cochran MS - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1824501,13574,4066 Johnnie Cochran Vista,Los Angeles,90019,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",405,2014-Q1,2014-Q2,Closeout,20220630 Middleton ES,10364054,Middleton ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1530101,13649,6537 Malabar St.,Huntington Park,90255,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",676,2014-Q4,2014-Q2,Closeout,20220630 Ramona Opportunity HS,10004947,Ramona Opportunity HS - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1880701,13422,231 S. Alma Ave.,Los Angeles,90063,"Provide tables, chairs, children's corner, media cart, computers and signage. Remove existing built-in cabinets and bookcases. Upgrade interior with paint and replace exterior locks.",56,2013-Q4,2014-Q1,Closeout,20220630 Panorama HS,10366084,Panorama HS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",572,2015-Q2,2015-Q3,Closeout,20220630 Lockwood ES,10105887,Lockwood ES - Compliance with State & Federal Access Requirements,Fire Alarm System,2,Monica Garcia,Central,1489001,13311,4345 Lockwood Ave.,Los Angeles,90029,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),361,2015-Q1,2015-Q3,Closeout,20220630 Noble EEC,10005055,Noble EEC - Safety Upgrades and Improvements,Campus Improvement,6,Kelly Gonez,Northeast,1954001,16668,8315 Noble Ave.,North Hills,91343,"Upgrade security fence with pedestrian gate, entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",93,2014-Q1,2015-Q2,Closeout,20220630 Dymally HS,10366232,Dymally HS - 2014-15 Prop 39 (Pathways Community School),Charter Prop 39,7,Tanya Ortiz Franklin,South,1892301,14581,8800 S. San Pedro St.,Los Angeles,90003,"This project is a charter school renovation for Pathways Community School for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 for Frederick Douglass Academy HS was revised when the charter school did not accept the original offer and an alternative charter school, Pathways Community School, accepted the co-location to include 1 charter office and 5 classrooms for 141.33 charter student seats in grade 9. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",85,2014-Q2,2014-Q3,Closeout,20220630 Maple PC,10366579,Maple PC - SEEDS,SEEDS,5,Jackie Goldberg,Central,1722001,13952,3601 S. Maple Ave.,Los Angeles,90011,"Design and construct an outdoor learning space of approximately 500 square feet consisting of painting concrete surfaces, the installation of a hose bib and art poles. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",20,2015-Q1,2015-Q3,Closeout,20220630 Sheridan ES,10369503,Sheridan ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1668501,13290,416 N. Cornwell St.,Los Angeles,90033,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2023-Q3,2024-Q1,Planning,20220630 Revere Charter MS,10370254,Revere Charter MS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1835601,13665,1450 Allenford Ave.,Los Angeles,90049,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2026-Q2,2026-Q4,Planning,20220630 Manual Arts HS,10370269,Manual Arts HS - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",Central,1874301,13345,4131 S. Vermont Ave.,Los Angeles,90037,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q2,2028-Q4,Planning,20220630 Rowan ES,10370162,Rowan ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1642501,13381,600 S. Rowan Ave.,Los Angeles,90023,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",153,2022-Q1,2023-Q1,Construction,20220630 Marvin ES,10370179,Marvin ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1517801,13573,2411 Marvin Ave.,Los Angeles,90016,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2026-Q3,2027-Q1,Planning,20220630 Kester ES,10107685,Kester ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,3,Scott Schmerelson,Northeast,1472601,13683,5353 Kester Ave.,Van Nuys,91411,Mitigate Lead in Water,146,2014-Q1,2015-Q1,Closeout,20220630 Mikes EEC,10367341,Mikes EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",South,1959101,16682,7720 S. Vermont Ave.,Los Angeles,90044,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",87,2016-Q3,2016-Q4,Closeout,20220630 Wadsworth ES,10369511,Wadsworth ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1758901,13383,981 E. 41st St.,Los Angeles,90011,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",155,2022-Q4,2023-Q3,Planning,20220630 Park Western EEC,10005060,Park Western EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1954801,16742,1220 Park Western Pl.,San Pedro,90732,"Upgrade entry control system, exterior gates, and playground equipment",46,2014-Q3,2014-Q4,Closeout,20220630 112th St. EEC,10005004,112th St. EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1954601,16623,1319 E. 112th St.,Los Angeles,90059,"Upgrade entry control system, exterior gates, and playground equipment",57,2014-Q3,2015-Q1,Closeout,20220630 Dolores EEC,10005026,Dolores EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1951401,16762,22309 Catskill Ave.,Carson,90745,Upgrade entry control system and playground equipment,41,2014-Q2,2015-Q3,Closeout,20220630 Normont EEC,10005057,Normont EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1954301,16706,25028 Petroleum Ave.,Harbor City,90710,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",63,2014-Q2,2016-Q1,Closeout,20220630 Cabrillo EEC,10005019,Cabrillo EEC - Safety Upgrades and Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1950801,16299,741 W. 8th St.,San Pedro,90731,"Upgrade entry control system, exterior gates, and playground equipment",34,2014-Q3,2015-Q3,Closeout,20220630 City Terrace ES,10363906,City Terrace ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1309601,13490,4350 City Terrace Dr.,Los Angeles,90063,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",392,2015-Q2,2015-Q3,Closeout,20220630 San Pedro HS,10366095,San Pedro HS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1885001,13377,1001 W. 15th St.,San Pedro,90731,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,142",2015-Q2,2015-Q3,Closeout,20220630 Muir MS,10100672,Muir MS - Upgrade Fire Alarm System,Fire Alarm System,1,"Dr. George J. McKenna, III",West,1825501,13436,5929 S. Vermont Ave.,Los Angeles,90044,Upgrade Fire Alarm System,"1,798",2013-Q3,2016-Q2,Closeout,20220630 El Sereno MS,10101056,El Sereno MS - Repair/Replace Grandstands,Gym/Athletic Facilities Renovation,2,Monica Garcia,East,1811801,13412,2839 N. Eastern Ave.,Los Angeles,90032,Repair/Replace Grandstands,"1,124",2016-Q3,2017-Q2,Closeout,20220630 South Gate MS,10367829,South Gate MS - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1837701,13261,4100 Firestone Blvd.,South Gate,90280,"Demolish 4 bungalows, provide temporary fencing, disconnect all utilities and data systems, reconnect all utilities to remaining buildings on site, repair asphalt paving over the former building footprints, and remove all construction-related debris.",388,2016-Q3,2017-Q3,Closeout,20220630 Chandler ES,10367427,Chandler ES - GFCI Outlet for Changing Table,Access Compliance,3,Scott Schmerelson,Northeast,1295901,13619,14030 Weddington St.,Van Nuys,91401,"Provide and install electrical outlet for changing table. provide and install 3 compliant thresholds for Nurse's office, & Classroom 1 & 17. Provide and install 2 accessible lunch tables.",14,2016-Q1,2016-Q1,Closeout,20220630 Sunny Brae ES,10367149,Sunny Brae ES - 36 Computers for Lab,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1698601,13737,20620 Arminta St.,Canoga Park,91306,Increase school's access to technology by providing thirty six new desktop computers for computer lab.,41,2015-Q4,2016-Q1,Closeout,20220630 Lemay ES,10003980,Lemay ES - Campus Improvements,Campus Improvement,3,Scott Schmerelson,Northwest,1484901,13684,17520 Vanowen St.,Lake Balboa,91406,"Remove and replace 64 single benches with backs for the entire campus, provide 8 new lunch tables with benches; Remove old carpet and replace with tile (VCT) flooring in 6 classrooms; Remove existing wall-mounted AC units inside classrooms 4,5, 6, 7 and 8 and provide new AC ducts, additional framing for AC units, and install 2 roof-mounted AC units",569,2013-Q2,2014-Q1,Closeout,20220630 Cheremoya ES,10367562,Cheremoya ES - SEEDS,SEEDS,5,Jackie Goldberg,West,1304101,13410,6017 Franklin Ave.,Los Angeles,90028,"Design and construct an approximately 4,000 square feet kindergarten outdoor learning space consisting of the installation of an irrigation system, tricycle path and concrete bench seating. The project will be outfitted by the school site and partner organizations (EnrichLA and Cheremoya Foundation) and is planned to include synthetic turf, planting materials and boulders.",54,2016-Q3,2016-Q3,Closeout,20220630 Hollenbeck MS,10368359,Hollenbeck MS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1817901,13408,2510 E. 6th St.,Los Angeles,90023,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",249,2018-Q2,2020-Q1,Closeout,20220630 153rd St. ES,10364087,153rd St. ES - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1582201,13812,1605 W. 153rd St.,Gardena,90247,"The project will replace the roofing on 8 classroom buildings. The existing roofs are more than 33 years old, consist of built-up layers of roofing materials, have poor surface area drainage and water ponding issues, and are deteriorated beyond economical repair. Maintenance & Operations has received more than 13 related service calls.",174,2014-Q3,2014-Q3,Closeout,20220630 North Valley Occupational Center,10366770,North Valley Occupational Center - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1932901,13888,11450 Sharp Ave.,Mission Hills,91345,"Disconnect, remove and sell 3 Department of Housing (DOH) portable buildings as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",103,2015-Q3,2016-Q3,Closeout,20220630 Porter MS,10105895,Porter MS - Compliance with State & Federal Access Requirements,Fire Alarm System,3,Scott Schmerelson,Northwest,1835401,13807,15960 Kingsbury St.,Granada Hills,91344,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),307,2015-Q1,2015-Q2,Closeout,20220630 Markham MS,10104489,Markham MS - Upgrade Fire Alarm System,Fire Alarm System,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,Upgrade Fire Alarm System,"1,257",2012-Q4,2014-Q3,Closeout,20220630 Belvedere MS,10369731,Belvedere MS - 2018-19 Prop 39,Charter Prop 39,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,"This project is a charter school renovation for Collegiate Charter HS of Los Angeles for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",35,2018-Q2,2018-Q3,Closeout,20220630 Hobart ES,10369487,Hobart ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1454801,13331,980 S. Hobart Blvd.,Los Angeles,90006,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",208,2019-Q1,2019-Q3,Closeout,20220630 Muir MS,10369545,Muir MS - Roofing & HVAC,Roofing,1,"Dr. George J. McKenna, III",West,1825501,13436,5929 S. Vermont Ave.,Los Angeles,90044,"The project will replace approximately 140,000 square feet of deteriorated roofing campus-wide with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes replacing damaged wood, replacing skylights, installing new gutters and downspouts, and painting to match existing areas affected in the roof demolition. As part of this roofing project, selected heating, ventilation, and air conditioning (HVAC) units and equipment will be replaced while the remaining roof-mounted HVAC units and ductwork will be protected in place.","3,719",2023-Q3,2024-Q3,Planning,20220630 Trinity ES,10102143,Trinity ES - Replace HVAC,HVAC,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,Replace HVAC,243,2013-Q4,2016-Q1,Closeout,20220630 Denker ES,10367189,Denker ES - Removal of 1 Portable,Portable Removal,7,Tanya Ortiz Franklin,South,1342501,13638,1620 W. 162nd St.,Gardena,90247,Removal of one 24' x 60' DOH Portable Building,69,2015-Q4,2016-Q2,Closeout,20220630 Gulf ES,10367282,Gulf ES - Technology Upgrades,Communications/Technology Upgrade,7,Tanya Ortiz Franklin,South,1431501,13464,828 W. L St.,Wilmington,90744,Increase school's access to technology by providing 4 Chromebook carts and 120 Chromebooks for various classrooms,41,2015-Q4,2015-Q4,Closeout,20220630 Saturn ES,10371067,Saturn ES - Auditorium Upgrades,Auditorium Renovation,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,Install new audio/visual equipment in the auditorium.,49,2020-Q1,2020-Q2,Closeout,20220630 McBride Special Education Center,10366619,McBride Special Education Center - Arcade Repairs,Roofing,4,Nick Melvoin,West,1195201,15205,3960 Centinela Ave.,Los Angeles,90066,"This project will replace the failing 60-year-old Glue-Lam beams on the arcade. In addition to dry rot due to age, the beams have been damaged due to impacts by school buses as they maneuver on the campus. This constant wear and tear has impacted the structural integrity of the arcade structure.",803,2022-Q3,2023-Q2,Design,20220630 Community Magnet Charter ES,10372192,Community Magnet Charter ES - Roofing,Roofing,4,Nick Melvoin,West,1274101,13687,11301 Bellagio Rd.,Los Angeles,90049,"his project is to provide approximately 53,814 square feet of new roofing at 17 buildings, including the installation of new gutters and downspouts and painting of affected areas.","1,259",2023-Q1,2023-Q4,Planning,20220630 Chandler ES,10370475,Chandler ES - New Fold-Up Tables/Benches,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northeast,1295901,13619,14030 Weddington St.,Van Nuys,91401,Install additional fold-up tables/benches in the multipurpose room for student dining and school events.,16,2020-Q2,2020-Q3,Closeout,20220630 Carver MS,10371556,Carver MS - Install Video Surveillance System,Security System,5,Jackie Goldberg,Central,1809401,13409,4410 McKinley Ave.,Los Angeles,90011,Install video surveillance (CCTV) system with three cameras. Install two cameras on the physical education building and one on the auditorium/classroom building; cameras will not be attached to the administration building due to its historic nature.,47,2020-Q4,2021-Q4,Closeout,20220630 Mendez HS,10366068,Mendez HS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1861101,14521,1200 Plaza Del Sol,Los Angeles,90033,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",392,2015-Q1,2015-Q2,Closeout,20220630 San Fernando HS,10204038,San Fernando HS - Provide Laptops,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1884301,13670,11133 O'Melveny Ave.,San Fernando,91340,Provide Laptops,57,2014-Q1,2014-Q2,Closeout,20220630 Granada Hills Charter HS,10366829,Granada Hills Charter HS - Plumbing Utilities Upgrades,Plumbing/Irrigation/Drainage,3,Scott Schmerelson,Northwest,1868101,13769,10535 Zelzah Ave.,Granada Hills,91344,"This project is to upgrade the deteriorated domestic water, sewer and fire sprinkler systems. The existing plumbing utilities are over 50 years old and are in poor condition resulting in unreliable service.","14,194",2019-Q2,2021-Q4,Closeout,20220630 Olympic PC,10370423,Olympic PC - Secure Entry System,Security System,2,Monica Garcia,Central,1239201,13921,950 S. Albany St.,Los Angeles,90015,Install new secure entry system,19,2019-Q2,2019-Q3,Closeout,20220630 Laurel Span School,10367275,Laurel Span School - Shade Shelter,Lunch/Shade Shelter,4,Nick Melvoin,West,1480801,13359,925 N. Hayworth Ave.,Los Angeles,90046,Install new shade shelter,171,2016-Q4,2017-Q1,Closeout,20220630 University Pathways Public Service Academy,10369581,University Pathways Public Service Academy - Drew MS Classrooms,Reconfiguration,7,Tanya Ortiz Franklin,South,1756601,13871,1415 E. Firestone Blvd.,Los Angeles,90001,"The project provides upgrades and alterations to facilities at Drew MS to allow for a separate and distinct space for the University Pathways Public Service Academy (UPPSA), a new high school that opened on the campus in 2018. The project has been divided into two phases, the first provides immediate upgrades to support the start of the UPPSA instructional programs, and the second includes long-term improvements that require DSA review and approval. The first phase consists of upgrading two classroom buildings and two portable buildings to include converting existing classrooms into flexible science classrooms and a makerspace, reconfiguring classrooms into administrative space and counselor offices, and installing two pedestrian entrance gates, public address systems/bells/phones, signage, and a marquee. It also includes the temporary rental of a portable sanitary building and its utility connections, repairs and painting to the interior and exterior of the buildings, and providing new furniture, technology, fixtures and equipment. The second phase includes relocating and installing a portable chemistry lab building, adding a modular restroom building, site adapt work for the new buildings, infrastructure and accessibility upgrades, and any other required improvements to ensure compliance with local, State, and Federal facilities requirements.","4,603",2018-Q2,2020-Q4,Closeout,20220630 Sylmar ES,10372098,Sylmar ES - Install Exterior Lighting,Electrical/Lighting,6,Kelly Gonez,Northeast,1701401,13604,13291 Phillippi Ave.,Sylmar,91342,Install (10) new wall-pack lighting fixtures to provide security lighting in dim areas around campus. Approx. 250 ft of conduit needed.,33,2022-Q1,2022-Q2,Closeout,20220630 Vinedale College Preparatory Academy,10368177,Vinedale College Preparatory Academy - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1754801,13430,10150 La Tuna Canyon Rd.,Sun Valley,91352,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 64 doors/hardware, 58 accessible paths of travel, 46 signs, 7 restrooms, 20 drinking fountains/sinks, 2 assistive listening devices/intercoms/phones, 3 concrete ramps, 4 pieces of accessible furniture, 4 railings, 1 playground component, 3 parking areas, 10 casework/counters, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","3,993",2018-Q1,2022-Q2,Closeout,20220630 Queen Anne ES,10364062,Queen Anne ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1616401,13567,1212 Queen Anne Pl.,Los Angeles,90019,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",427,2014-Q1,2014-Q3,Closeout,20220630 Grand View ES,10366518,Grand View ES - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1424701,13716,3951 Grand View Blvd.,Los Angeles,90066,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 167 doors/hardware, 37 accessible paths of travel, 150 signs, 25 restrooms, 57 drinking fountains/sinks, 3 assistive listening devices/intercoms/phones, 11 concrete ramps, 3 metal ramps, 6 pieces of accessible furniture, 13 assembly seats, 4 railings, 3 playground components, 7 parking areas, 3 nurse's exam room modifications, 2 dressing room modifications, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","6,387",2019-Q2,2020-Q4,Closeout,20220630 San Pedro ES,10364069,San Pedro ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1650701,13279,1635 S. San Pedro St.,Los Angeles,90015,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",506,2014-Q1,2014-Q2,Closeout,20220630 Taper ES,10204034,Taper ES - Update Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1703501,13539,1824 Taper Ave.,San Pedro,90731,Update Marquee,28,2013-Q1,2014-Q2,Closeout,20220630 Metropolitan Continuation HS,10363973,Metropolitan Continuation HS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1875701,13285,727 S. Wilson St.,Los Angeles,90021,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",116,2014-Q2,2014-Q3,Closeout,20220630 Bellevue PC,10366003,Bellevue PC - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1237901,13841,610 N. Micheltorena St.,Los Angeles,90026,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",167,2015-Q2,2015-Q3,Closeout,20220630 Camino Nuevo Academy #4: Cisneros Learning Academy,10366013,Camino Nuevo Academy #4 Cisneros Learning Academy - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1225101,14583,1018 Mohawk St.,Los Angeles,90026,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",245,2015-Q2,2015-Q3,Closeout,20220630 Fernangeles ES,10363928,Fernangeles ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1375301,13594,12001 Art St.,Sun Valley,91352,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",414,2014-Q2,2014-Q4,Closeout,20220630 Hubbard ES,10105903,Hubbard ES - Compliance with State & Federal Access Requirements,Fire Alarm System,6,Kelly Gonez,Northeast,1460301,13718,13325 Hubbard St.,Sylmar,91342,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),247,2014-Q4,2015-Q1,Closeout,20220630 Webster MS,10370257,Webster MS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2024-Q4,2025-Q4,Planning,20220630 122nd St. ES,10365665,122nd St. ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1588701,13868,405 E. 122nd St.,Los Angeles,90061,Replace deteriorated playground matting systems to ensure the health and safety of students.,139,2013-Q4,2014-Q1,Closeout,20220630 Mountain View ES,10364056,Mountain View ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1540401,13706,6410 Olcott St.,Tujunga,91042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",556,2013-Q3,2014-Q2,Closeout,20220630 Winnetka ES,10367160,Winnetka ES - 4 Interactive LCD Projectors,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1783601,13515,8240 Winnetka Ave.,Canoga Park,91306,Increase school's access to technology by providing 4 interactive LCD projectors with wall mounts for smart board use in various kindergarten classrooms.,16,2015-Q4,2016-Q1,Closeout,20220630 Hubbard ES,10367482,Hubbard ES - Security Upgrades,Security System,6,Kelly Gonez,Northeast,1460301,13718,13325 Hubbard St.,Sylmar,91342,Install intrusion alarm in Hubbard Hall.,26,2016-Q2,2016-Q3,Closeout,20220630 Valley Oaks Center for Enriched Studies,10366928,Sun Valley HS - 2015-16 Prop 39 (Triumph Charter HS),Charter Prop 39,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,"Triumph Charter HS is vacating this site. This project was approved in Board of Education Report No. 423-14/15 . The scope of work includes relocation of classrooms, remedial construction, and reconnecting of all low voltage systems to the District operated program.",5,2015-Q3,2016-Q1,Closeout,20220630 La Salle ES,10367424,La Salle ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1478601,13507,8715 La Salle Ave.,Los Angeles,90047,"Remove and sell three 24' x 60' & two 36' x 40' DSA portable buildings. Disconnect utilities and reconnect electrical, plumbing and fire alarm systems to the remaining buildings as well as restore the area to original condition.",145,2016-Q1,2016-Q3,Closeout,20220630 Fishburn ES,10364032,Fishburn ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1384901,13532,5701 Fishburn Ave.,Maywood,90270,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",503,2013-Q4,2014-Q2,Closeout,20220630 Cantara ES,10368091,Cantara ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1276701,13732,17950 Cantara St.,Reseda,91335,Provide and install electronic marquee.,33,2017-Q4,2018-Q1,Closeout,20220630 San Fernando MS,10368274,San Fernando MS - Metal Ramp,Access Compliance,6,Kelly Gonez,Northeast,1835801,13420,130 N. Brand Blvd.,San Fernando,91340,Provide and install metal ramp connecting classroom B9 & B10.,60,2017-Q1,2017-Q2,Closeout,20220630 Barrett ES,10369348,Barrett ES - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",South,1556201,13449,419 W. 98th St.,Los Angeles,90003,Install Aiphone video/buzzer entry system at main entrance.,28,2018-Q1,2018-Q3,Closeout,20220630 Ochoa Learning Center,10367864,Ochoa Learning Center - Changing Area Modifications,Access Compliance,5,Jackie Goldberg,East,1237201,14062,5027 Live Oak St.,Cudahy,90201,Provide changing tables for rooms 2 & 4.,3,2016-Q3,2016-Q4,Closeout,20220630 Ranchito ES,10367866,Ranchito ES - Accessibility Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1619201,13721,7940 Ranchito Ave.,Panorama City,91402,Provide and install portable wheelchair lift. Enlarge door and reception counter for wheelchair access. Provide and install electrical outlet for changing table.,18,2016-Q3,2016-Q4,Closeout,20220630 Stevenson College & Career Preparatory,10367711,Stevenson MS - 2016-17 Prop 39,Charter Prop 39,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"This project is a charter school renovation for Animo Ellen Ochoa Charter MS for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 15 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",475,2016-Q2,2016-Q3,Closeout,20220630 Lockwood ES,10367696,Lockwood ES - 2016-19 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1489001,13311,4345 Lockwood Ave.,Los Angeles,90029,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-location for Citizens of the World Charter School - Silver Lake. This project included 1 charter office and 6 instructional spaces for charter students in grades K-7. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no change"" project with 1 charter office and 6 instructional spaces for charter students in grades K-8 The project was again amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/19.",198,2016-Q2,2016-Q3,Closeout,20220630 Balboa Mental Health Center,10369231,Balboa Mental Health Center - Portable Removal,Portable Removal,3,Scott Schmerelson,Northwest,1165801,15185,6701 Balboa Blvd.,Lake Balboa,91406,"Remove/sell 1 DOH portable building and demolish 2 bungalow buildings. Disconnect low voltage ITD components, disconnect utilities, remove furniture and equipment, and restore areas with asphalt paving.",250,2018-Q1,2018-Q3,Closeout,20220630 3rd St. ES,10367765,3rd St. ES - Restroom Upgrades,Access Compliance,4,Nick Melvoin,West,1711001,13399,201 S. June St.,Los Angeles,90004,Enlarge girls' restroom accessible stall. Provide and install electrical outlet for changing table. Provide and install threshold at classroom 5.,10,2016-Q2,2016-Q3,Closeout,20220630 Tweedy ES,10368204,Tweedy ES - Technology and Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1726001,13955,9724 Pinehurst Ave.,South Gate,90280,Purchase 70 Chromebooks and 3 black & white printers; upgrade security features including door hardware and installation of metal skins on doors.,25,2017-Q1,2017-Q1,Closeout,20220630 Dearborn Charter Academy ES,10368085,Dearborn Charter Academy ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1337701,13762,9240 Wish Ave.,Northridge,91325,Provide and install electronic marquee.,46,2017-Q4,2017-Q4,Closeout,20220630 118th St. ES,10369356,118th St. ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1574001,13321,144 E. 118th St.,Los Angeles,90061,Install Aiphone video/buzzer entry system at main entrance.,19,2018-Q1,2018-Q3,Closeout,20220630 Roscomare ES,10366583,Roscomare ES - Safety Upgrades,HVAC,4,Nick Melvoin,West,1636301,13799,2425 Roscomare Rd.,Los Angeles,90077,Provide safety upgrades by installing an HVAC unit system in the main server room to prevent data systems from overheating and shutting down.,26,2015-Q1,2016-Q1,Closeout,20220630 Oxnard ES,10369990,Oxnard ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1591801,13636,10912 Oxnard St.,North Hollywood,91606,Install new secure entry system,16,2018-Q4,2019-Q1,Closeout,20220630 Roscoe ES,10369991,Roscoe ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1635601,13362,10765 Strathern St.,Sun Valley,91352,Install new secure entry system,12,2018-Q4,2018-Q4,Closeout,20220630 Eagle Tree Continuation HS,10369999,Eagle Tree Continuation HS - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1857801,13869,22628 S. Main St.,Carson,90745,Install new secure entry system,22,2018-Q4,2018-Q4,Closeout,20220630 Bushnell Way ES,10367015,Bushnell Way ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1267101,13375,5507 Bushnell Way,Los Angeles,90042,Removal of 1 DOH portable building including disconnection/reconnection as needed.,33,2015-Q2,2016-Q2,Closeout,20220630 66th St. EEC,10005001,66th St. EEC - Nature Explore Classroom,Campus Improvement,7,Tanya Ortiz Franklin,South,1956101,16681,405 E. 67th St.,Los Angeles,90003,"This project designs and constructs a new nature explore classroom, an outdoor education program for early education students to develop fine and large motor skills while learning about the environment, and includes required fire alarm and restroom accessibility upgrades. The existing ""U"" shaped play yard can accommodate 10 nature explore learning stations throughout the site. Additional screening along fences and expanded buffer zones between the play area and the neighborhood streets will also be provided for increased safety and security.","2,025",2018-Q1,2019-Q1,Closeout,20220630 Drew MS,10368189,Drew MS - New School-Based Clinic,Campus Improvement,7,Tanya Ortiz Franklin,South,1811201,13871,8511 Compton Ave.,Los Angeles,90001,"The project will provide a new school-based clinic on a portion of the campus. The project consists of approximately 4,500 square feet of new construction and related site improvements. The new clinic will be operated by LAUSD's Student Health and Human Services Department to provide medical and mental health services for students.","8,122",2019-Q4,2021-Q4,Closeout,20220630 Hubbard ES,10367541,Hubbard ES - Shade Shelters,Lunch/Shade Shelter,6,Kelly Gonez,Northeast,1460301,13718,13325 Hubbard St.,Sylmar,91342,Install two shade shelters.,195,2017-Q4,2018-Q1,Closeout,20220630 Gardena ES,10367198,Gardena ES - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1404101,13320,647 W. Gardena Blvd.,Gardena,90247,"Replace approximately 40,900 square feet of deteriorated roofing with new Polyvinyl Chloride (PVC) roofing and metal flashing installation at 12 buildings and arcades, replace damaged wood in kind, and paint to match existing areas affected in the roof demolition. The existing roof-mounted HVAC units and ductwork will be protected in place.",547,2016-Q1,2016-Q4,Closeout,20220630 Carver MS,10366014,Carver MS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1809401,13409,4410 McKinley Ave.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",557,2015-Q2,2015-Q3,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10367712,Sun Valley MS - 2016-17 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"This project is a charter school renovation for Celerity Cardinal Charter School for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office and 13 instructional spaces for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",10,2016-Q3,2016-Q4,Closeout,20220630 Harmony ES,10369815,Harmony ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1468101,13535,899 E. 42nd Pl.,Los Angeles,90011,Purchase 70 iPads with 2 charging carts and 160 Chromebooks with 4 charging carts; provide security upgrades as needed.,93,2018-Q2,2018-Q2,Closeout,20220630 Haynes Charter for Enriched Studies,10369962,Haynes Charter for Enriched Studies - Auditorium Upgrades,Auditorium Renovation,3,Scott Schmerelson,Northwest,1447301,13793,6624 Lockhurst Dr.,West Hills,91307,"Install new audio system, curtains, and stage lighting in auditorium",83,2019-Q1,2019-Q3,Closeout,20220630 32nd St./USC Performing Arts Magnet ES,10004159,32nd St./USC Performing Arts Magnet - Facelift,Facelift,1,"Dr. George J. McKenna, III",Central,1713701,13299,822 W. 32nd St.,Los Angeles,90007,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",221,2012-Q1,2016-Q3,Closeout,20220630 Lincoln HS,10366060,Lincoln HS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1872901,13280,3501 N. Broadway,Los Angeles,90031,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",803,2015-Q1,2015-Q2,Closeout,20220630 Berendo MS,10366007,Berendo MS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1805701,13274,1157 S. Berendo St.,Los Angeles,90006,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",494,2015-Q1,2015-Q2,Closeout,20220630 Holmes MS,10366044,Holmes MS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1818201,13835,9351 Paso Robles Ave.,Northridge,91325,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",518,2014-Q4,2015-Q1,Closeout,20220630 Pio Pico MS,10366544,Pio Pico MS-Stage Lift,Access Compliance,1,"Dr. George J. McKenna, III",West,1498001,13903,1512 S. Arlington Ave.,Los Angeles,90019,Provide Portable Lift for Stage,23,2014-Q4,2014-Q4,Closeout,20220630 Beethoven ES,10366628,Beethoven ES-Temp Ramp,Access Compliance,4,Nick Melvoin,West,1234201,15206,3711 Beethoven St.,Los Angeles,90066,Provide & Install Temporary Ramp to Classroom,47,2015-Q2,2015-Q3,Closeout,20220630 Madison MS,10366784,Madison MS-Provide and Install outdoor bathroom,Access Compliance,6,Kelly Gonez,Northeast,1823001,13627,13000 Hart St.,North Hollywood,91605,Provide & Install Portable Platform for Use of Outdoor Portable Wheelchair Lift,16,2015-Q1,2015-Q2,Closeout,20220630 Los Angeles HS,10004104,Los Angeles HS - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",187,2012-Q2,2016-Q3,Closeout,20220630 Cahuenga ES,10366010,Cahuenga ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1269901,13341,220 S. Hobart Blvd.,Los Angeles,90004,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",249,2015-Q1,2015-Q1,Closeout,20220630 Vena ES,10366336,Vena ES - Upgrade & Expand Library,Library Renovation,6,Kelly Gonez,Northeast,1746601,13773,9377 Vena Ave.,Arleta,91331,"Augment and upgrade the existing undersized library to a new larger library with support of Heart of America. Project provides a new pass-through at shared wall, relocates electrical raceways, conduits, and switches. Accept donations of labor and materials to replace flooring, provide new paint, install new cabinetry, tackable surfaces, and shelving. Accept donation of iPads and other computer equipment valued in excess of $25,000 to be acknowledged consistent with Bulletin No. C-66.",79,2014-Q3,2014-Q4,Closeout,20220630 Reed MS,10366088,Reed MS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1835501,13647,4525 Irvine Ave.,North Hollywood,91602,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",499,2014-Q4,2015-Q1,Closeout,20220630 South East HS,10366101,South East HS - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1888101,14161,2720 Tweedy Blvd.,South Gate,90280,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",890,2015-Q2,2015-Q4,Closeout,20220630 Washington PC,10367156,Washington PC - Electronic Camera Door Entry System,Security System,1,"Dr. George J. McKenna, III",South,1763001,13917,860 W. 112th St.,Los Angeles,90044,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,21,2016-Q1,2016-Q2,Closeout,20220630 Winnetka ES,10367159,Winnetka ES - New Interactive Whiteboards for Kindergarten,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1783601,13515,8240 Winnetka Ave.,Canoga Park,91306,Provide electrical upgrades and data upgrades to four kindergarten classrooms to install and use new interactive whiteboards.,19,2016-Q1,2016-Q1,Closeout,20220630 Aldama ES,10367105,Aldama ES - Electronic Camera Door Entry System,Security System,2,Monica Garcia,Central,1202701,13401,632 N. Ave. 50,Los Angeles,90042,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,12,2015-Q3,2016-Q2,Closeout,20220630 Burbank ES,10367112,Burbank ES - 30 Computers & Projector,Communications/Technology Upgrade,3,Scott Schmerelson,Northeast,1263001,13678,12215 Albers St.,North Hollywood,91607,Increase school's access to technology by providing thirty new desktop computers for various classrooms.,34,2015-Q3,2015-Q4,Closeout,20220630 Drew MS,10367120,Drew MS - New Fencing ,Fencing,7,Tanya Ortiz Franklin,South,1811201,13871,8511 Compton Ave.,Los Angeles,90001,"Upgrade physical security and safety of the campus by installing new fencing and wrought iron fencing on the 1st and 2nd floors of Classroom Buildings One, Two, and the Gymnasium. ",28,2015-Q4,2016-Q1,Closeout,20220630 El Sereno MS,10366847,El Sereno MS-ADA Repairs,Access Compliance,2,Monica Garcia,East,1811801,13412,2839 N. Eastern Ave.,Los Angeles,90032,ADA Repairs,15,2015-Q2,2015-Q3,Closeout,20220630 Twain MS,10366838,Twain MS - Provide New Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,West,1842501,13630,2224 Walgrove Ave.,Los Angeles,90066,Provide upgrades to the campus by providing and replacing outdated marquee with a new electronic marquee.,26,2015-Q2,2015-Q4,Closeout,20220630 Maintenance & Operations: Central Region 3,10003835,Maintenance & Operations Central Region 3 - Photovoltaic Installation,Photovoltaic Installation,2,Monica Garcia,Central,9139301,13913,1240 Naomi Ave.,Los Angeles,90021,Rooftop Panels/Shade Structure to Generate 439 kW of Solar Energy,"3,746",2013-Q4,2015-Q1,Closeout,20220630 Vista MS,10367718,Vista MS - 2016-17 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1811701,13896,15040 Roscoe Blvd.,Panorama City,91402,"This project is a charter school renovation for Girls Athletic Leadership School for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 4 instructional spaces for charter student seats in grade 6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",197,2016-Q2,2016-Q3,Closeout,20220630 Colfax Charter ES,10363910,Colfax Charter ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1316401,13681,11724 Addison St.,North Hollywood,91607,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",311,2014-Q3,2014-Q4,Closeout,20220630 Commonwealth ES,10363912,Commonwealth ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1319201,13392,215 S. Commonwealth Ave.,Los Angeles,90004,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",528,2014-Q2,2015-Q3,Closeout,20220630 Markham MS,10104940,"Markham MS - A/C in Administration, Music, Library & Shop Buildings",HVAC,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,"A/C in Administration, Music, Library & Shop Buildings","2,985",2012-Q4,2014-Q3,Closeout,20220630 Albion ES,10363872,Albion ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1201401,13296,322 S. Ave. 18,Los Angeles,90031,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",380,2015-Q1,2015-Q2,Closeout,20220630 Bright ES,10363889,Bright ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1716401,13306,1771 W. 36th St.,Los Angeles,90018,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",320,2014-Q2,2014-Q4,Closeout,20220630 Euclid ES,10363927,Euclid ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1367101,13319,806 Euclid Ave.,Los Angeles,90023,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",415,2014-Q3,2015-Q1,Closeout,20220630 Hart ES,10369472,Hart ES - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1444501,13749,21040 Hart St.,Canoga Park,91303,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2023-Q4,2024-Q1,Planning,20220630 Ford ES,10369483,Ford ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1391801,13503,1112 S. Ford Blvd.,Los Angeles,90022,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2022-Q4,2023-Q3,Planning,20220630 Van Gogh Charter ES,10368088,Van Gogh Charter ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1742201,13862,17160 Van Gogh St.,Granada Hills,91344,Provide and install electronic marquee.,41,2017-Q4,2018-Q1,Closeout,20220630 Estrella EEC,10367992,Estrella EEC - Campus Upgrades,Campus Improvement,7,Tanya Ortiz Franklin,Central,1944101,193549,120 E. 57th St.,Los Angeles,90011,"Replace the obsolete entry control system with a new secure entry control system to improve site security, and remove outdated rubber matting and replace with new rubber matting system on the existing playground.",34,2017-Q3,2017-Q3,Closeout,20220630 Manual Arts HS,10369093,Manual Arts HS - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1874301,13345,4131 S. Vermont Ave.,Los Angeles,90037,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",58,2017-Q4,2019-Q1,Closeout,20220630 Kim Academy,10369099,Kim Academy - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1806401,13934,615 S. Shatto Pl.,Los Angeles,90005,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",50,2017-Q3,2018-Q2,Closeout,20220630 Burbank ES,10369112,Burbank ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northeast,1263001,13678,12215 Albers St.,North Hollywood,91607,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",58,2017-Q4,2018-Q3,Closeout,20220630 Le Conte MS,10369123,Le Conte MS - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",57,2017-Q4,2018-Q4,Closeout,20220630 Stoner ES,10369124,Stoner ES - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1695201,13772,11735 Braddock Dr.,Culver City,90230,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",58,2017-Q4,2018-Q4,Closeout,20220630 Aragon ES,10369125,Aragon ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1217801,13372,1118 Aragon Ave.,Los Angeles,90065,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",53,2018-Q2,2018-Q4,Closeout,20220630 Bassett ES,10370128,Bassett ES - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1232301,13813,15756 Bassett St.,Lake Balboa,91406,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2024-Q4,2025-Q2,Planning,20220630 Broad ES,10370133,Broad ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1252701,13774,24815 Broad Ave.,Wilmington,90744,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q3,2029-Q1,Planning,20220630 Carson HS,10364023,Carson HS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1857501,13869,22328 S. Main St.,Carson,90745,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,080",2014-Q1,2014-Q3,Closeout,20220630 Victoria ES,10364079,Victoria ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1750701,13493,3320 Missouri Ave.,South Gate,90280,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",432,2013-Q4,2014-Q2,Closeout,20220630 Canoga Park HS,10367199,Canoga Park HS - Replace Gymnasium Roofing,Roofing,3,Scott Schmerelson,Northwest,1857101,13415,6850 Topanga Canyon Blvd.,Canoga Park,91303,"Replace approximately 35,000 square feet of deteriorated cap sheet build-up roofing with new PVC roofing and metal flashing installation at gymnasium building. The scope of work also includes the replacement of damaged wood in kind and paint to match existing areas affected in the roof demolition.",485,2016-Q1,2016-Q3,Closeout,20220630 Kester ES,10004826,Kester ES - Technology Upgrades & Computer Lab,Communications/Technology Upgrade,3,Scott Schmerelson,Northeast,1472601,13683,5353 Kester Ave.,Van Nuys,91411,"Purchase, configure and install 17 computers, 1 projector and required technology accessories. Convert classroom into computer lab, include infrastructure upgrades, and purchase and install furniture.",71,2012-Q3,2015-Q3,Closeout,20220630 Crenshaw Magnet HS: STEMM,10366890,Crenshaw HS - 2015-16 Prop 39 (View Park Preparatory MS),Charter Prop 39,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,"This project is a charter school renovation for View Park Preparatory MS for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 12 classrooms for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",22,2015-Q2,2015-Q2,Closeout,20220630 Glenfeliz EEC,10367323,Glenfeliz EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1951701,16661,3745 Dover Pl.,Los Angeles,90039,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",78,2016-Q3,2016-Q3,Closeout,20220630 Stanford PC,10366103,Stanford PC - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1690501,13853,3020 Kansas Ave.,South Gate,90280,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",154,2015-Q2,2015-Q2,Closeout,20220630 59th St. ES,10004590,59th St. ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1379501,13400,5939 Second Ave.,Los Angeles,90043,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",113,2012-Q2,2016-Q3,Closeout,20220630 93rd St. ES,10004636,93rd St. ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1558201,13814,330 E. 93rd St.,Los Angeles,90003,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",150,2012-Q4,2015-Q3,Closeout,20220630 95th St. ES,10004650,95th St. ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",West,1552101,13349,1109 W. 96th St.,Los Angeles,90044,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",109,2013-Q2,2016-Q3,Closeout,20220630 Hobart ES,10004597,Hobart ES - Facelift,Facelift,5,Jackie Goldberg,Central,1454801,13331,980 S. Hobart Blvd.,Los Angeles,90006,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",112,2014-Q1,2016-Q3,Closeout,20220630 Langdon ES,10004567,Langdon ES - Facelift,Facelift,6,Kelly Gonez,Northwest,1477501,13413,8817 Langdon Ave.,North Hills,91343,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",108,2013-Q1,2016-Q3,Closeout,20220630 Calvert Charter for Enriched Studies,10366011,Calvert Charter for Enriched Studies - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,Northwest,1271201,13731,19850 Delano St.,Woodland Hills,91367,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",236,2014-Q4,2015-Q1,Closeout,20220630 Bradley EEC,10367299,Bradley EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1988101,13938,10925 S. Central Ave.,Los Angeles,90059,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",68,2016-Q2,2016-Q2,Closeout,20220630 Chatsworth Charter HS,10369537,Chatsworth Charter HS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1858301,13870,10027 Lurline Ave.,Chatsworth,91311,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",177,2019-Q1,2020-Q1,Closeout,20220630 Emelita ES,10363924,Emelita Academy Charter ES - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,Northwest,1358901,13713,17931 Hatteras St.,Encino,91316,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",307,2014-Q3,2015-Q1,Closeout,20220630 Southeast MS,10367489,Southeast MS - Renovate Restroom,Access Compliance,5,Jackie Goldberg,East,1815301,16081,2560 Tweedy Blvd.,South Gate,90280,"Remove interior partition wall dividing existing changing room and faculty restroom; relocate existing toilet and grab bars to changing room; remove lavatory, soap and hand dryer from restroom; relocate sanitary napkin dispenser and provide and install new electrical outlet.",31,2016-Q1,2016-Q2,Closeout,20220630 24th St. ES,10365198,24th St. ES - Campus Improvements,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1730101,13335,2055 W. 24th St.,Los Angeles,90018,"Upgrade the school by making improvements to the irrigation system, and purchasing and installing a new electronic marquee and new marker boards throughout the school.",84,2013-Q4,2014-Q3,Closeout,20220630 Hollenbeck MS,10004100,Hollenbeck MS - Facelift,Facelift,2,Monica Garcia,East,1817901,13408,2510 E. 6th St.,Los Angeles,90023,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",174,2012-Q2,2016-Q3,Closeout,20220630 Gardner ES,10363937,Gardner ES - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1406801,13354,7450 Hawthorn Ave.,Los Angeles,90046,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",259,2014-Q2,2014-Q3,Closeout,20220630 Sylvan Park EEC,10005068,Sylvan Park EEC - Safety Upgrades and Improvements,Campus Improvement,3,Scott Schmerelson,Northeast,1956501,16691,15011 Delano St.,Van Nuys,91411,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",98,2014-Q1,2015-Q2,Closeout,20220630 Fleming MS,10104906,Fleming MS - HVAC Correction,HVAC,7,Tanya Ortiz Franklin,South,1812701,13657,25425 Walnut St.,Lomita,90717,HVAC Correction,"3,239",2013-Q1,2014-Q2,Closeout,20220630 186th St. ES,10363856,186th St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1575301,13303,1581 W. 186th St.,Gardena,90248,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",403,2014-Q4,2015-Q1,Closeout,20220630 Sunrise ES,10364071,Sunrise ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1698801,13395,2821 E. 7th St.,Los Angeles,90023,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",523,2013-Q4,2014-Q2,Closeout,20220630 University Charter HS,10366720,University HS - Install New Lighting in Parking Lots,Electrical/Lighting,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,"Upgrade physical security of the school by installing new lighting at the north and south end of the student parking lot, and along steps and pathway to the middle parking lot",10,2015-Q2,2015-Q2,Closeout,20220630 Dearborn Charter Academy ES,10367117,Dearborn Charter Academy ES - Kindergarten Play Structure,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1337701,13762,9240 Wish Ave.,Northridge,91325,Upgrade the campus by providing and installing a new large play structure with matting in the kindergarten yard.,197,2017-Q2,2018-Q1,Closeout,20220630 Rosemont ES,10367400,Rosemont ES - Install Secure Entrance,Security System,2,Monica Garcia,Central,1637001,13289,421 N. Rosemont Ave.,Los Angeles,90026,Upgrade the physical security of the school by purchasing and installing an electronic camera door entry system,16,2016-Q1,2017-Q1,Closeout,20220630 Nimitz MS,10368346,Nimitz MS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1826801,13637,6021 Carmelita Ave.,Huntington Park,90255,"Replace deteriorated interior walk-in cooler and exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",298,2018-Q1,2019-Q1,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10369228,Sun Valley Magnet - Basketball & Volleyball Courts,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"This project replaces deteriorated asphalt and installs new basketball and volleyball courts. The scope of work includes replacing asphalt paving for new basketball and volleyball courts, installing colored solar coating, painting game lines and court logos, and installing exterior glass basketball backboards and posts.",169,2017-Q4,2018-Q2,Closeout,20220630 Glenwood ES,10363943,Glenwood ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1419201,13590,8001 Ledge Ave.,Sun Valley,91352,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",303,2014-Q2,2014-Q3,Closeout,20220630 Harvard ES,10363949,Harvard ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,West,1204201,13946,330 N. Harvard Blvd.,Los Angeles,90004,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",218,2014-Q2,2014-Q4,Closeout,20220630 Liechty MS,10366943,Liechty MS - Replace Synthetic Turf Field,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1805801,13898,650 S. Union Ave.,Los Angeles,90017,"This project addresses the deteriorated synthetic turf field of approximately 122,000 square feet by removing and replacing the field with one that will perform better for instructional and extracurricular activities.","1,628",2015-Q4,2016-Q1,Closeout,20220630 Glassell Park STEAM Magnet ES,10366653,Glassell Park ES-Removal of 2 Portables,Portable Removal,5,Jackie Goldberg,Central,1412301,13384,2211 W. Ave. 30,Los Angeles,90065,"Removal of 2 Portables; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",204,2015-Q2,2016-Q1,Closeout,20220630 Los Angeles ES,10369036,Los Angeles ES - Install Drinking Fountain,Access Compliance,5,Jackie Goldberg,Central,1498201,13826,1211 S. Hobart Blvd.,Los Angeles,90006,Install hi-lo drinking fountain near outdoor dining area.,29,2017-Q3,2018-Q1,Closeout,20220630 Carpenter Community Charter ES,10367444,Carpenter Community Charter ES - Fire Alarm System Upgrade,Fire Alarm System,3,Scott Schmerelson,Northeast,1282201,13518,3909 Carpenter Ave.,Studio City,91604,"The project will replace an antiquated fire alarm system with a new automatic and addressable system; remove existing panels, wiring, and raceways; and patch and paint walls.",832,2017-Q2,2018-Q2,Closeout,20220630 Flournoy ES,10368377,Flournoy ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1578101,13509,1630 E. 111th St.,Los Angeles,90059,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2023-Q4,2024-Q2,Planning,20220630 Weemes ES,10364010,Weemes ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",Central,1715101,13322,1260 W. 36th Pl.,Los Angeles,90007,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",402,2014-Q2,2014-Q4,Closeout,20220630 Hazeltine ES,10363951,Hazeltine ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1449301,13529,7150 Hazeltine Ave.,Van Nuys,91405,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",360,2014-Q2,2014-Q3,Closeout,20220630 Van Nuys HS,10369495,Van Nuys HS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northeast,1889301,13404,6535 Cedros Ave.,Van Nuys,91411,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",153,2019-Q1,2019-Q2,Closeout,20220630 107th St. ES,10367197,107th St. ES - Replace Roofing,Roofing,7,Tanya Ortiz Franklin,South,1585701,13857,147 E. 107th St.,Los Angeles,90003,"Replace approximately 12,500 square feet of deteriorated roofing with new PVC roofing and metal flashing installation at 5 buildings, replace damaged wood in kind, and paint to match existing areas affected in the roof demolition. The scope of work also includes approximately 58,600 square feet of roof recoating for several buildings. The existing roof-mounted HVAC units and ductwork will be protected in place.",388,2016-Q1,2016-Q2,Closeout,20220630 Columbus MS,10366739,Columbus MS - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,"Convert and renovate old shop building space into a new parent & family center by providing interior paint, flooring and lighting repairs. Remove deteriorated built-in cabinets and fume hood, patch up walls and ceiling, and provide security upgrades including new doors and panic hardware as well as security on windows. Provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",118,2015-Q2,2015-Q4,Closeout,20220630 Sylmar Charter HS,10363849,Sylmar Charter HS - Science Lab Improvements,Campus Improvement,6,Kelly Gonez,Northeast,1887801,13856,13050 Borden Ave.,Sylmar,91342,"The project provides 4 chemistry labs with safety equipment including emergency shower/eyewash, fume hood, utility shutoff valves and HVAC units sufficient to remove chemical fumes from classrooms and workrooms. The project scope also includes roofing replacement, chemical storage cabinets and eyewash in workrooms, fire sprinklers in chemistry labs and workrooms, new trough lab stations, functional repairs to plumbing and cabinetry, and requirements of the Americans with Disabilities Act (ADA) for accessibility including path of travel improvements, restroom and fountain upgrades. The project also completed unfinished scope from the previously-approved science lab renovation project at the school as well as addressed unforeseen conditions during construction including the redesign and replacement of various classroom infrastructure, additional asbestos abatement, and the path of travel from the teachers' parking lot to the science labs.","5,386",2016-Q3,2017-Q4,Closeout,20220630 Reseda ES,10368739,Reseda ES - Auditorium Projector,Furniture/Fixtures/Equipment,4,Nick Melvoin,Northwest,1623301,13398,7265 Amigo Ave.,Reseda,91335,Provide and install ceiling mounted projector in auditorium to improve safety of presentations,13,2017-Q1,2017-Q3,Closeout,20220630 Middleton ES,10369201,Middleton ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1530101,13649,6537 Malabar St.,Huntington Park,90255,"Removal of 1 portable building. Salvage all furniture and equipment from classrooms, abate hazardous materials, disconnect low and high voltage utilities, and repair/replace asphalt at building footprint.",134,2017-Q4,2019-Q1,Closeout,20220630 Mid-City's Prescott School of Enriched Sciences,10365190,Mid-City's Prescott School of Enriched Sciences - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1350001,13911,3150 W. Adams Blvd.,Los Angeles,90018,Upgrade physical security of the campus by providing new motorized gates and a camera door entry system at the faculty parking lot.,69,2014-Q1,2016-Q4,Closeout,20220630 Manchester ES,10365720,Manchester ES - Replace Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",South,1509601,13305,661 W. 87th St.,Los Angeles,90044,Replace deteriorated playground matting systems to ensure the health and safety of students.,84,2014-Q1,2014-Q1,Closeout,20220630 McBride Special Education Center,10365723,McBride Special Education Center - Replace Playground Matting,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1195201,15205,3960 Centinela Ave.,Los Angeles,90066,Replace deteriorated playground matting systems to ensure the health and safety of students.,39,2014-Q3,2014-Q3,Closeout,20220630 Monte Vista ES,10365725,Monte Vista ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1538401,13270,5423 Monte Vista St.,Los Angeles,90042,Replace deteriorated playground matting systems to ensure the health and safety of students.,41,2014-Q3,2014-Q4,Closeout,20220630 Kenter Canyon Charter ES,10370861,Kenter Canyon Charter ES - Roofing,Roofing,4,Nick Melvoin,West,1469901,13626,645 N. Kenter Ave.,Los Angeles,90049,"This project is to provide approximately 45,000 square feet of new roofing at 16 buildings, including the installation of new gutters and downspouts and painting of affected areas.",902,2022-Q4,2023-Q2,Planning,20220630 Huerta ES,10367417,Huerta ES - Security Upgrades,Security System,5,Jackie Goldberg,Central,1294401,193564,260 E. 31st St.,Los Angeles,90011,Provide and install new camera/electronic door lock for school security.,21,2016-Q4,2017-Q2,Closeout,20220630 Cruz EEC,10367308,Cruz EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1949601,15501,1020 S. Valencia St.,Los Angeles,90015,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",100,2016-Q2,2016-Q3,Closeout,20220630 El Sereno EEC,10367313,El Sereno EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,East,1958101,16304,3802 Pueblo Ave.,Los Angeles,90032,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",84,2016-Q2,2016-Q3,Closeout,20220630 Belmont HS,10366879,Belmont HS - 2015-16 Prop 39 (Camino Nuevo Charter Academy Harvard Campus),Charter Prop 39,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"This project is a charter school renovation for Camino Nuevo Charter Academy for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 19 classrooms for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",36,2015-Q3,2015-Q4,Closeout,20220630 36th St. EEC,10005006,36th St. EEC - Safety Upgrades and Improvements,Campus Improvement,1,"Dr. George J. McKenna, III",West,1956601,16722,3556 S. St. Andrews Pl.,Los Angeles,90018,"Upgrade entry control system, plumbing system in restrooms, exterior gates, and playground equipment",40,2014-Q3,2015-Q1,Closeout,20220630 Normandie EEC,10005056,Normandie EEC - Safety Upgrades and Improvements,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1954101,16667,4407 S. Raymond Ave.,Los Angeles,90037,"Upgrade windows systems, entry control system, exterior gates, and playground equipment",47,2014-Q3,2016-Q1,Closeout,20220630 Vine EEC,10005073,Vine EEC - Safety Upgrades and Improvements,Campus Improvement,4,Nick Melvoin,West,1957401,14281,6312 Eleanor Ave.,Los Angeles,90038,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",48,2014-Q1,2015-Q4,Closeout,20220630 15th St. ES,10366483,15th St. ES - New Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1376701,13337,1527 S. Mesa St.,San Pedro,90731,Provide upgrades to the campus by removing existing marquee and providing a new electronic marquee,28,2016-Q1,2016-Q1,Closeout,20220630 Holmes MS,10367088,Holmes MS - Address Antiquated Roofing,Roofing,3,Scott Schmerelson,Northwest,1818201,13835,9351 Paso Robles Ave.,Northridge,91325,"This project is to upgrade 75,000 square feet of roofing on 5 buildings and all of the arcades throughout the campus with a PVC material. The roofs are over 25 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",910,2016-Q1,2016-Q2,Closeout,20220630 Elysian Heights ES,10367277,Elysian Heights ES - Renovate Computer Lab,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1357501,13411,1562 Baxter St.,Los Angeles,90026,Renovate computer lab by upgrading electrical in support of new technology and providing new desks that are appropriate and safe for computers and cabling,50,2015-Q4,2016-Q2,Closeout,20220630 75th St. ES,10367196,75th St. ES - Replace Roofing,Roofing,7,Tanya Ortiz Franklin,South,1663001,13470,142 W. 75th St.,Los Angeles,90003,"Replace approximately 3,200 square feet of deteriorated roofing with new PVC roofing and metal flashing installation at lunch shelter and arcades, replace damaged wood in kind, and paint to match existing areas affected in the roof demolition. The scope of work also includes approximately 65,500 square feet of roof recoating for 7 buildings. The existing roof-mounted HVAC units and ductwork will be protected in place.",278,2016-Q1,2016-Q2,Closeout,20220630 Aragon ES,10365997,Aragon ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1217801,13372,1118 Aragon Ave.,Los Angeles,90065,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",276,2015-Q2,2015-Q2,Closeout,20220630 Fair ES,10366743,Fair ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1371201,13600,6501 Fair Ave.,North Hollywood,91606,"Modernize and upgrade school's existing parent & family center by providing interior paint, new flooring, and security upgrades including new doors and hardware as well as security on windows. Provide whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",76,2015-Q2,2015-Q4,Closeout,20220630 San Jose ES,10367863,San Jose ES - Changing Areas Modifications,Access Compliance,6,Kelly Gonez,Northwest,1647901,13691,14928 Clymer St.,Mission Hills,91345,Provide and install privacy screens for changing tables.,1,2016-Q3,2016-Q4,Closeout,20220630 Fries ES,10366536,Fries ES - SEEDS,SEEDS,7,Tanya Ortiz Franklin,South,1401401,13463,1301 Fries Ave.,Wilmington,90744,"Design and construct an outdoor learning space that is approximately 1,800 square feet and consists of asphalt removal, painting of pavement areas, removal of fencing, and the installation of concrete pavers, art poles and hose bib. It will be outfitted by the partner organization (Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",24,2014-Q4,2015-Q1,Closeout,20220630 Chase ES,10365100,Chase ES - Marquee,Electrical/Lighting,6,Kelly Gonez,Northwest,1301401,13620,14041 Chase St.,Panorama City,91402,Provide upgrades to the campus by providing a new electronic marquee,36,2014-Q2,2015-Q3,Closeout,20220630 Marlton Special Education School,10370119,Marlton Special Education School - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1194901,13860,4000 Santo Tomas Dr.,Los Angeles,90008,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2026-Q1,2026-Q2,Planning,20220630 4th St. ES,10370154,4th St. ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1397301,13482,420 Amalia Ave.,Los Angeles,90022,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2026-Q4,2027-Q2,Planning,20220630 San Antonio ES,10370168,San Antonio ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1464101,13827,6222 State St.,Huntington Park,90255,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q1,2028-Q2,Planning,20220630 Manchester ES,10370178,Manchester ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",South,1509601,13305,661 W. 87th St.,Los Angeles,90044,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2025-Q4,2026-Q2,Planning,20220630 West Hollywood Community Day School,10364082,West Hollywood Community Day School - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1873001,13901,1049 N. Fairfax Ave.,West Hollywood,90046,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",188,2014-Q1,2014-Q2,Closeout,20220630 Trinity ES,10364003,Trinity ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",304,2014-Q3,2014-Q4,Closeout,20220630 Morningside ES,10370184,Morningside ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1539701,13414,576 N. Maclay Ave.,San Fernando,91340,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2025-Q1,2025-Q3,Planning,20220630 Griffith-Joyner ES,10370189,Griffith-Joyner ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1584901,13497,1963 E. 103rd St.,Los Angeles,90002,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2025-Q4,2026-Q2,Planning,20220630 San Miguel ES,10370208,San Miguel ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1687501,14741,9801 San Miguel Ave.,South Gate,90280,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2028-Q2,2028-Q3,Planning,20220630 Harding ES,10370236,Harding ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1443101,13819,13060 Harding St.,Sylmar,91342,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",153,2028-Q3,2029-Q1,Planning,20220630 Gage MS,10370243,Gage MS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1815101,13598,2880 E. Gage Ave.,Huntington Park,90255,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2026-Q3,2026-Q4,Planning,20220630 Erwin ES,10370262,Erwin ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1363001,13624,13400 Erwin St.,Van Nuys,91401,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",153,2028-Q4,2029-Q1,Planning,20220630 42nd St. ES,10369095,42nd St. ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1395901,13487,4231 Fourth Ave.,Los Angeles,90008,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",48,2018-Q1,2018-Q3,Closeout,20220630 West Adams Preparatory HS,10369100,West Adams Preparatory HS - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1874801,13949,1500 W. Washington Blvd.,Los Angeles,90006,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",43,2018-Q1,2019-Q1,Closeout,20220630 Garza PC,10369103,Garza PC - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1342601,13928,2750 E. Hostetter St.,Los Angeles,90023,"Modernize Parent & Family Center classroom by providing paint touch-up, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",38,2018-Q1,2018-Q3,Closeout,20220630 Gates ES,10369104,Gates ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1409601,13291,3333 Manitou Ave.,Los Angeles,90031,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",49,2018-Q1,2018-Q4,Closeout,20220630 Annandale ES,10367826,Annandale ES - Portable Removal,Portable Removal,5,Jackie Goldberg,Central,1215101,13371,6125 Poppy Peak Dr.,Los Angeles,90042,"Remove 2 portable buildings including sampling and abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprints.",110,2016-Q3,2017-Q4,Closeout,20220630 Lomita STEAM Magnet ES,10370369,Lomita STEAM Magnet ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1493201,13313,2211 247th St.,Lomita,90717,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",49,2019-Q1,2019-Q4,Closeout,20220630 Muir MS,10370605,Muir MS - 2019-20 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1825501,13436,5929 S. Vermont Ave.,Los Angeles,90044,"This project was approved in Board of Education Report No. 343-18/19 as a 2019-20 Prop. 39 charter co-location. However, the charter school opted not to occupy Muir MS during the 2019-20 school year. As a result, this project is amended to include the scope of work required to restore the LAUSD campus to its former condition. The required reconfiguration may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",19,2019-Q3,2019-Q3,Closeout,20220630 Pinewood ES,10370259,Pinewood ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1606801,13613,10111 Silverton Ave.,Tujunga,91042,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",153,2028-Q4,2029-Q2,Planning,20220630 Denker ES,10369173,Denker ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1342501,13638,1620 W. 162nd St.,Gardena,90247,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",48,2018-Q3,2018-Q4,Closeout,20220630 Parmelee ES,10369176,Parmelee ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1602101,13815,1338 E. 76th Pl.,Los Angeles,90001,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",49,2018-Q1,2018-Q3,Closeout,20220630 Van Deene ES,10369177,Van Deene ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1741901,13788,826 W. Javelin St.,Torrance,90502,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",51,2018-Q1,2018-Q2,Closeout,20220630 Lanai ES,10368941,Lanai ES - Secure Entry System (Aiphone),Security System,4,Nick Melvoin,Northwest,1476401,13703,4241 Lanai Rd.,Encino,91436,Provide and install new secure entry system (Aiphone) at main entrance and exterior door to staff lounge. Install (1) main station and (2) sub-stations at locations TBD.,16,2017-Q3,2017-Q4,Closeout,20220630 Sheridan ES,10368129,Sheridan ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1668501,13290,416 N. Cornwell St.,Los Angeles,90033,"Remove 2 portable buildings including abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprints.",101,2017-Q2,2018-Q2,Closeout,20220630 Bancroft MS,10370232,Bancroft MS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1803801,13565,929 N. Las Palmas Ave.,Los Angeles,90038,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q3,2026-Q4,Planning,20220630 Northridge MS,10368086,Northridge MS - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1828301,13740,17960 Chase St.,Northridge,91325,Provide and install electronic marquee.,44,2017-Q4,2018-Q1,Closeout,20220630 Korenstein ES,10368705,Korenstein ES - Changing Area Modifications,Access Compliance,6,Kelly Gonez,Northeast,1739901,193546,7650 Ben Ave.,North Hollywood,91605,Provide and install toddler changing table with privacy screens.,2,2017-Q2,2017-Q2,Closeout,20220630 Loyola Village Fine & Performing Arts Magnet ES,10104479,Provide Shade Structure,Lunch/Shade Shelter,4,Nick Melvoin,West,1501401,13602,8821 Villanova Ave.,Los Angeles,90045,Provide Shade Structure,351,2006-Q1,2016-Q2,Closeout,20220630 Ochoa Learning Center,10369604,Ochoa Learning Center - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1237201,14062,5027 Live Oak St.,Cudahy,90201,Purchase 240 Chromebooks and 6 charging carts; install security upgrades as needed,96,2018-Q2,2018-Q3,Closeout,20220630 University Charter HS,10370274,University Charter HS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2027-Q4,2028-Q2,Planning,20220630 Sunland ES,10367947,Sunland ES - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1697301,13451,8350 Hillrose St.,Sunland,91040,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 75 doors/hardware, 29 accessible paths of travel, 49 signs, 18 restrooms, 37 drinking fountains/sinks, 2 assistive listening devices/intercoms/phones, 7 concrete ramps, 3 metal ramps, 10 pieces of accessible furniture, 1 assembly seat, 11 railings, 2 door modifications/auto openers, 2 new elevators/stage lifts, 1 passenger/bus loading zone, and DSA certification of 2 portable buildings.","7,656",2017-Q3,2021-Q3,Closeout,20220630 Los Angeles Academy MS,10369995,Los Angeles Academy MS - Secure Entry System,Security System,7,Tanya Ortiz Franklin,Central,1820001,13890,644 E. 56th St.,Los Angeles,90011,Install new secure entry system,28,2019-Q2,2019-Q3,Closeout,20220630 Hamasaki Medical & Science Magnet ES,10364109,Hamasaki ES - HVAC,HVAC,2,Monica Garcia,East,1627401,13577,4865 E. 1st St.,Los Angeles,90022,"The project will remove all existing heating, ventilation, and air conditioning (HVAC) systems in the main building serving 20 classrooms and replace them with more energy efficient fan coil units. The existing equipment is more than 50 years old and in very poor condition resulting in unreliable service.","4,669",2017-Q1,2018-Q3,Closeout,20220630 Webster MS,10367259,Webster MS - Paving,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"The over 20-year-old asphalt concrete paving on the campus is severely deteriorated and in need of replacement. The scope of work includes replacing asphalt concrete pavement in between buildings, in the parking lot and bicycle areas, and the playground which will include solar reflective coating. In addition, the project includes installing storm water planters, vegetated swales and a rainwater garden, a riparian woodland habitat with additional trees and shrubs, replacing turf with subterranean infiltration, removing contaminated soil, and the associated Americans with Disabilities Act (ADA) restroom, drinking fountain and path of travel upgrades and drainage systems required by DSA and the District's Storm Water Technical Manual.","11,949",2018-Q3,2020-Q2,Closeout,20220630 Western TECH Magnet School,10367723,Western ES - 2016-17 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1767101,13338,1724 W. 53rd St.,Los Angeles,90062,"GARR Academy of Mathematics and Entrepreneurial Studies is vacating this site. This project was approved in Board of Education Report No. 373-15/16. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",15,2016-Q2,2016-Q3,Closeout,20220630 Vintage Math/Science/Technology Magnet ES,10369192,Vintage Math/Science/Technology Magnet ES - Parking GatesVintage Math/Science/Technology Magnet ES - Parking Gates,Fencing,3,Scott Schmerelson,Northwest,1756201,13694,15848 Stare St.,North Hills,91343,Provide and install two sets of swing gates at the west parking lot.,28,2017-Q4,2018-Q2,Closeout,20220630 University Charter HS,10105209,University Charter HS - A/C - Phase III,HVAC,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,A/C - Phase III,"6,926",2012-Q4,2014-Q3,Closeout,20220630 Taft Charter HS,10370662,Taft Chater HS - Wheelchair Lift,Access Compliance,4,Nick Melvoin,Northwest,1888001,13787,5461 Winnetka Ave.,Woodland Hills,91364,Install a wheelchair lift with battery backup in the auditorium and install outlet if necessary.,10,2019-Q2,2019-Q3,Closeout,20220630 San Fernando MS,10369354,San Fernando MS - TV Installations,Electrical/Lighting,6,Kelly Gonez,Northeast,1835801,13420,130 N. Brand Blvd.,San Fernando,91340,Install 2 televisions provided by the school. The first television will be installed in the main office using existing data and electrical outlets. The second television will be installed in room M4 and requires new data and electrical outlets to be provided.,13,2018-Q1,2019-Q3,Closeout,20220630 Angeles Mesa ES,10368301,Angeles Mesa ES - Campus Upgrades,Campus Improvement,1,"Dr. George J. McKenna, III",West,1212301,13427,2611 W. 52nd St.,Los Angeles,90043,"The project will install new flooring and window systems campus-wide, new wood trim, fascia boards, and doors.","1,006",2021-Q1,2021-Q4,Closeout,20220630 Kennedy HS,10369494,Kennedy HS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1872501,13263,11254 Gothic Ave.,Granada Hills,91344,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",280,2020-Q2,2021-Q2,Closeout,20220630 Crescent Heights EEC,10367307,Crescent Heights EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1959701,16285,1700 S. Alvira St.,Los Angeles,90035,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",83,2016-Q2,2016-Q3,Closeout,20220630 Virginia ES,10368309,Virginia ES - Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1757501,13504,2925 Virginia Rd.,Los Angeles,90016,Provide and install electronic marquee.,48,2018-Q2,2018-Q2,Closeout,20220630 Ritter ES,10367145,Ritter ES - Security Lighting in Courtyard,Campus Improvement,7,Tanya Ortiz Franklin,South,1630101,13562,11108 Watts Ave.,Los Angeles,90059,Provide security and safety upgrades by installing new security lighting in the entrance courtyard for safety. Install one HVAC mini split system in the MDF room to keep data system from overheating and shutting down.,26,2015-Q4,2016-Q3,Closeout,20220630 Fernangeles ES,10369512,Fernangeles ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1375301,13594,12001 Art St.,Sun Valley,91352,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",208,2020-Q1,2020-Q4,Closeout,20220630 Hillcrest ES,10369307,Hillcrest ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1452801,13621,4041 Hillcrest Dr.,Los Angeles,90008,"Remove 3 portable DSA buildings. Abatement of hazardous materials. Disconnect low and high voltage utilities, disconnect plumbing to buildings, and repair/replace asphalt at building footprints. Relocate 1 5' x 6' shed from the north side of the DSA portable buildings to a new location at Castle Heights ES against the lot fence.",379,2018-Q1,2020-Q2,Closeout,20220630 Gault ES,10369117,Gault ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1411001,13682,17000 Gault St.,Lake Balboa,91406,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",43,2018-Q1,2018-Q3,Closeout,20220630 Tarzana ES,10369122,Tarzana ES - Parent & Family Center,Campus Improvement,4,Nick Melvoin,Northwest,1704101,13585,5726 Topeka Dr.,Tarzana,91356,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",50,2017-Q4,2018-Q1,Closeout,20220630 Legacy HS Complex,10369137,Legacy HS Complex - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1892101,14621,5225 Tweedy Blvd.,South Gate,90280,"Modernize Parent & Family Center classroom by providing paint touch-up, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",21,2017-Q3,2018-Q2,Closeout,20220630 Glassell Park EEC,10367321,Glassell Park EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1945701,16289,3003 N. Carlyle St.,Los Angeles,90065,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",75,2016-Q2,2016-Q3,Closeout,20220630 Emerson Community Charter MS,10004192,Emerson Community Charter MS Redevelopment,Comprehensive Modernization,4,Nick Melvoin,West,1812301,13641,1650 Selby Ave.,Los Angeles,90024,"This project consists of a new gymnasium, music classroom, dance classroom, upgrades to existing science classrooms, reconfigured staff parking and student drop-off areas, and a synthetic turf field and play space. The project will enhance facilities for science, performing arts and physical education programs.","21,071",2013-Q4,2015-Q4,Closeout,20220630 153rd St. ES,10102187,153rd St. ES - Paving,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1582201,13812,1605 W. 153rd St.,Gardena,90247,Asphalt Paving Repair & Resealing,51,2018-Q1,2018-Q2,Closeout,20220630 Riverside Charter ES,10369081,Riverside Charter ES - Fencing,Fencing,3,Scott Schmerelson,Northeast,1631501,13645,13061 Riverside Dr.,Sherman Oaks,91423,"Install fencing with gates on the east side of campus by J-bldg. restrooms and a pedestrian gate on an existing fence on the north side of campus, west of the service gate.",20,2017-Q4,2018-Q1,Closeout,20220630 Murchison ES,10370105,Murchison ES - Security Upgrade,Security System,2,Monica Garcia,East,1543801,13522,1501 Murchison St.,Los Angeles,90033,Install new secure entry system at main gate,38,2019-Q1,2019-Q2,Closeout,20220630 Monroe HS,10370798,Monroe HS - Exterior Painting,Painting,6,Kelly Gonez,Northwest,1876801,13704,9229 Haskell Ave.,North Hills,91343,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.","1,043",2020-Q4,2021-Q3,Closeout,20220630 Stoner ES,10369970,Stoner ES - Secure Entry System,Security System,4,Nick Melvoin,West,1695201,13772,11735 Braddock Dr.,Culver City,90230,Install new secure entry system,27,2019-Q2,2019-Q2,Closeout,20220630 Aldama ES,10368127,Aldama ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1202701,13401,632 N. Ave. 50,Los Angeles,90042,"Remove 1 bungalow including abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprint.",238,2017-Q2,2019-Q4,Closeout,20220630 Marvin ES,10371205,Marvin ES - Paving,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1517801,13573,2411 Marvin Ave.,Los Angeles,90016,"This project is to provide approximately 100,000 square feet of new asphalt paving at the main playground, kindergarten playground and parking area, including the replacement of concrete sidewalks, curbs, and gutters. The scope of work also includes greening areas, a reading garden, along with path of travel and accessibility upgrades.","10,142",2024-Q1,2025-Q2,Design,20220630 Canoga Park HS,10105071,"Canoga Park HS - Facilities Upgrades - Academy Offices, Outdoor Spaces, Visual Identity",Small Learning Community/Academy,3,Scott Schmerelson,Northwest,1857101,13415,6850 Topanga Canyon Blvd.,Canoga Park,91303,"Facilities Upgrades - Academy Offices, Outdoor Spaces, Visual Identity","2,609",2015-Q2,2015-Q4,Closeout,20220630 Marina Del Rey MS,10370602,Marina Del Rey MS - 2019-20 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"This project is a charter school renovation for Goethe International Charter School for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 21 instructional spaces for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",54,2019-Q2,2019-Q3,Closeout,20220630 Short ES,10368741,Short ES - Provide Computer Lab,Communications/Technology Upgrade,4,Nick Melvoin,West,1674001,13679,12814 Maxella Ave.,Los Angeles,90066,"Provide a computer lab; upgrade electrical system in support of new technology, provide new desks that are appropriate and safe for computers and cabling; purchase 18 laptops, provide ceiling-mounted projector and screen, provide security upgrades for computer lab.",84,2017-Q2,2017-Q3,Closeout,20220630 Miller Career & Transition Center,10004058,Miller Career & Transition Center - Facelift,Facelift,3,Scott Schmerelson,Northwest,1191001,15164,8218 Vanalden Ave.,Reseda,91335,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",220,2012-Q1,2016-Q3,Closeout,20220630 Marshall HS,10004156,Marshall HS - Facelift,Facelift,2,Monica Garcia,Central,1875001,13571,3939 Tracy St.,Los Angeles,90027,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",157,2012-Q1,2016-Q3,Closeout,20220630 Woodcrest ES,10369518,Woodcrest ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1786301,13369,1151 W. 109th St.,Los Angeles,90044,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",155,2026-Q1,2026-Q2,Planning,20220630 Canoga Park ES,10369352,Canoga Park ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1275301,13416,7438 Topanga Canyon Blvd.,Canoga Park,91303,Install one-sided electronic marquee on the corner of Topanga Canyon Blvd. & Valerio St.,21,2018-Q2,2018-Q2,Closeout,20220630 Chatsworth Park ES,10367372,Chatsworth Park ES - Lunch Area Improvement,Campus Improvement,3,Scott Schmerelson,Northwest,1302701,13389,22005 Devonshire St.,Chatsworth,91311,"This project is to install new wind-barrier fencing around 2 existing lunch shelters, provide new lunch tables and new playground benches in the lunch shelter area, and install additional wall-mounted folding tables in the adjacent auditorium.",76,2016-Q1,2017-Q1,Closeout,20220630 Fairburn ES,10370040,Fairburn ES - Technology Upgrades,Communications/Technology Upgrade,4,Nick Melvoin,West,1372601,13445,1403 Fairburn Ave.,Los Angeles,90024,Purchase 30 iPads and 1 storage cart.,17,2018-Q4,2019-Q1,Closeout,20220630 Curtiss MS,10371312,Curtiss MS - 2020-21 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1810301,13775,1254 E. Helmick St.,Carson,90746,"This project is a charter school renovation for Magnolia Science Academy #3 for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 3 special education rooms, and 14 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",40,2020-Q2,2020-Q2,Closeout,20220630 Lane ES,10367059,Lane ES - ADA Improvements,Access Compliance,2,Monica Garcia,East,1476701,13629,1500 Avenida Cesar Chavez,Monterey Park,91754,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 75 doors/hardware, 19 accessible paths of travel, 44 signs, 14 restrooms, 27 drinking fountains/sinks, 19 casework/counters, 1 assistive listening device/intercom/phone, 11 concrete ramps, 5 asphalt ramps, 8 metal ramps, 9 pieces of accessible furniture, 1 railing, 2 parking areas, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","4,002",2016-Q4,2022-Q3,Construction,20220630 Florence ES,10371613,Florence ES - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,East,1389001,13397,7211 Bell Ave.,Los Angeles,90001,Install new electronic free-standing marquee at the corner of Florence Ave. and Bell Ave.,46,2021-Q1,2021-Q3,Closeout,20220630 Calahan ES,10372535,Calahan ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1270601,13747,18722 Knapp St.,Northridge,91324,Install new secure entry system at the Main Office.,38,2022-Q3,2022-Q4,Planning,20220630 Westminster Math & Technology/Environmental Studies Magnet ES,10366623,Westminster Math & Technology/Environmental Studies Magnet ES - Paving,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1769901,13483,1010 Abbot Kinney Blvd.,Venice,90291,"The 20-year-old asphalt concrete paving on the campus is severely damaged and in need of replacement. The scope of work includes replacement of deteriorated asphalt concrete pavement as needed, redesigning the outdoor athletic areas to meet current requirements, and replacement or repair of outdoor apparatus and fencing as necessary. Also included are the associated path of travel upgrades and drainage systems required by the Division of State Architect (DSA) and the District's Storm Water Technical Manual.","5,293",2017-Q1,2018-Q1,Closeout,20220630 Pacific ES,10372507,Pacific ES - 2022-23 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1464201,13936,2660 E. 57th St.,Huntington Park,90255,"This project is a charter school renovation for KIPP Pueblo Unido for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 9 instructional spaces for charter student seats in grades K-2 and 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",209,2022-Q3,2022-Q3,Planning,20220630 Dearborn Charter Academy ES,10370476,Dearborn Charter Academy ES - Parking Gates,Fencing,3,Scott Schmerelson,Northwest,1337701,13762,9240 Wish Ave.,Northridge,91325,Install parking lot gates,46,2021-Q3,2021-Q4,Closeout,20220630 Westchester Enriched Sciences Magnets,10371894,Westchester Enriched Sciences Magnets - 2021-23 Prop 39 (WISH Community School),Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project was initially approved in BOE Report No. 317-20/21 for the 2021-22 Prop 39 co-locations as a charter school renovation for Westside Innovative School House (WISH) Community School. This project included 1 charter office, 3 special education rooms, and 11 instructional spaces for charter student seats in grades TK-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades TK-8 and an undefined scope of work.",32,2021-Q2,2021-Q3,Closeout,20220630 Canyon Charter ES,10369343,Canyon Charter ES - Classroom Replacement,Addition,4,Nick Melvoin,West,1279501,13346,421 Entrada Dr.,Santa Monica,90402,"The school has 7 classrooms located in 4 relocatable buildings with 2 of the classrooms in a DOH portable that does not comply with State standards for school buildings. Additionally, 2 existing kindergarten classrooms in a permanent building are separated from the main campus by a parking lot. Included in the project design are approximately 9 classrooms (3 kindergarten and 6 general classrooms) and support spaces; infrastructure to support the new facilities including an enhanced information technology network convergence system; upgrades to landscape, hardscape, parking, and playground areas where portables are removed or in other project-related areas; and site work, path of travel, and other required ADA improvements.","40,054",2022-Q3,2025-Q2,Design,20220630 Lowman Special Education & Career Transition Center,10368980,Lowman Special Education & Career Transition Center - Restroom Upgrades,Access Compliance,6,Kelly Gonez,Northeast,1194801,13544,12827 Saticoy St.,North Hollywood,91605,"The programs offered at Lowman Special Education Center have recently expanded to include a Career Transition Center which requires outdoor lunch tables and accessible restrooms for the older students. There are seven locations with non-compliant restrooms that need immediate upgrades including three in the main building and four in the development building. The scope for this project includes upgrades to the existing restrooms to provide additional accessible restroom stalls, age-appropriate fixtures, side changing tables, Rifton support stations, and exhaust fans.","1,886",2018-Q1,2019-Q1,Closeout,20220630 Cabrillo ES,10372464,Cabrillo ES - Install Privacy Fence,Fencing,7,Tanya Ortiz Franklin,South,1268501,13552,732 S. Cabrillo Ave.,San Pedro,90731,Replace existing chain link fencing with approx. 350¿ of new chain link privacy fencing.,33,2022-Q3,2022-Q4,Planning,20220630 King-Drew Medicine & Science Magnet HS,10364039,King-Drew Medicine & Science Magnet HS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1872701,14561,1656 E. 118th St.,Los Angeles,90059,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",719,2014-Q1,2014-Q3,Closeout,20220630 Marvin ES,10368881,Marvin ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1517801,13573,2411 Marvin Ave.,Los Angeles,90016,Removal of 6 portable buildings. Disconnection of low and high voltage utilities and repair/replacement of asphalt at building footprints.,107,2017-Q3,2018-Q2,Closeout,20220630 42nd St. ES,10369723,42nd St. ES - 2018-20 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1395901,13487,4231 Fourth Ave.,Los Angeles,90008,"This project was initially approved in BOE Report No. 429-17/18 for the 2018-19 Prop 39 co-locations as a charter school renovation for Celerity Nascent Charter School. This project included 1 charter office, 1 special education room, and 16 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 18 spaces allocated to ISANA Nascent Academy and a scope of work that is not yet defined.",38,2018-Q2,2018-Q3,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10369992,Sun Valley Magnet - Flooring,Flooring,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,Install hardwood dance floor,42,2019-Q3,2019-Q3,Closeout,20220630 Downtown Magnets HS: Downtown Business,10108863,Downtown Business Magnet - HVAC,HVAC,2,Monica Garcia,Central,1873801,13269,1081 W. Temple St.,Los Angeles,90012,"The existing chiller and boilers were last replaced in 1980, are beyond their functional life, and require regular repair. The outdated pneumatic controls system has multiple air lines that leak routinely. Some of the leaks are inaccessible and cannot be repaired, causing air compressors to run continuously and break down, leading to a possible system failure. The scope of the project includes the design, purchase and installation of one 300-ton chiller, the replacement of two 15-year-old heating boilers, and associated air handler, controls, and equipment.","7,606",2017-Q1,2018-Q1,Closeout,20220630 Hollywood HS,10369441,Hollywood HS - Swimming Pool Repairs,Gym/Athletic Facilities Renovation,4,Nick Melvoin,West,1869301,13356,1521 N. Highland Ave.,Los Angeles,90028,This project is to repair the antiquated swimming pool which has developed leaks in the piping system and has pump equipment which is outdated and difficult to maintain.,781,2019-Q1,2020-Q1,Closeout,20220630 Toland Way ES,10365130,Toland Way ES - Laptops,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1717801,13566,4545 Toland Way,Los Angeles,90041,Purchase laptop computers to provide internet and intranet access for students and teachers,38,2014-Q3,2014-Q3,Closeout,20220630 Albion ES,10365183,Albion ES - Security Upgrades,Security System,2,Monica Garcia,East,1201401,13296,322 S. Ave. 18,Los Angeles,90031,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance,20,2013-Q4,2016-Q4,Closeout,20220630 Huntington Park HS,10370266,Huntington Park HS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1870001,13597,6020 Miles Ave.,Huntington Park,90255,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2024-Q2,2024-Q4,Planning,20220630 Park Western ES,10367544,Park Western ES - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1601301,13588,1214 Park Western Pl.,San Pedro,90732,Provide and install electronic marquee.,34,2016-Q4,2017-Q3,Closeout,20220630 Belvedere ES,10369868,Belvedere ES - Privacy Fencing,Fencing,2,Monica Garcia,East,1239701,13373,3724 E. 1st St.,Los Angeles,90063,Install privacy fencing on south side of campus,8,2018-Q3,2018-Q3,Closeout,20220630 Cisneros Learning Academy,10004352,Central Region ES #14 - Photovoltaic Installation,Photovoltaic Installation,2,Monica Garcia,Central,1294001,14583,1018 Mohawk St.,Los Angeles,90026,Rooftop Panels to Generate 93 kW of Solar Energy,463,2014-Q2,2015-Q2,Closeout,20220630 Pacoima MS,10368330,Pacoima MS - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1832101,13750,9919 Laurel Canyon Blvd.,Pacoima,91331,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",176,2018-Q2,2018-Q4,Closeout,20220630 Malabar ES,10370177,Malabar ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1508201,13314,3200 E. Malabar St.,Los Angeles,90063,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2024-Q4,2025-Q1,Planning,20220630 Liggett ES,10363967,Liggett ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northwest,1487001,13804,9373 Moonbeam Ave.,Panorama City,91402,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",397,2014-Q2,2014-Q3,Closeout,20220630 Oxnard ES,10363981,Oxnard ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1591801,13636,10912 Oxnard St.,North Hollywood,91606,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",461,2015-Q2,2015-Q4,Closeout,20220630 Union ES,10368176,Union ES - ADA Improvements,Access Compliance,2,Monica Garcia,Central,1735601,13294,150 S. Burlington Ave.,Los Angeles,90057,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 56 doors/hardware, 34 accessible paths of travel, 65 signs, 18 restrooms, 25 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 5 concrete ramps, 4 pieces of accessible furniture, 7 railings, 4 existing elevator modifications, 1 parking area, and 2 passenger/bus loading zones.","3,604",2018-Q1,2019-Q4,Closeout,20220630 Cleveland Charter HS,10368673,Cleveland Charter HS - Gym Renovation,Gym/Athletic Facilities Renovation,3,Scott Schmerelson,Northwest,1859001,13753,8140 Vanalden Ave.,Reseda,91335,"This project replaced approximately 10,915 square feet of flooring in the gym building. The school was constructed in 1959 and the condition of the gym floors, bleachers, and wall tiles had become safety concerns. The wood floors were deteriorated; the support system had failed creating dead spots, board separation, and sags in the floors; the manually telescoping bleachers had broken wood planks and steel supports that bind when extending or retracting the bleachers; and some of the acoustical wall tiles were missing, damaged, or falling onto the floor below. This project replaced the wood floors with a new system that is compliant with District specifications, replaced acoustical wall tiles as needed, and painted the interior of 2 gyms and the dance room. In addition, the bleachers were temporarily repaired to avoid future damage to the new floors and will be replaced as part of the Cleveland Charter HS - Comprehensive Modernization project (#10366805).",732,2017-Q2,2017-Q4,Closeout,20220630 Beckford Charter for Enriched Studies,10369068,Beckford Charter for Enriched Studies - Parking Gates,Fencing,3,Scott Schmerelson,Northwest,1233501,13836,19130 Tulsa St.,Northridge,91326,Provide and install parking lot swing gates at the 2 Beckford Ave. driveways.,19,2017-Q4,2018-Q2,Closeout,20220630 Victory ES,10367258,Victory ES - Paving,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1752101,13442,6315 Radford Ave.,North Hollywood,91606,"The over 20-year-old asphalt concrete paving on the campus is severely deteriorated and in need of replacement. The scope of work includes replacing asphalt concrete pavement at the playground, in between buildings, and in the kindergarten yard areas. This also includes the replacement of playground equipment, handball courts, planters and landscaping, and the addition of cool coat paving on the playground. In addition, the project includes upgrades to the drainage systems as required by DSA and the District's Storm Water Technical Manual and upgrades to meet the accessibility requirements of the Americans with Disabilities Act (ADA) including path of travel, multiple ramps, improvements to the underground parking structure, and the renovation of several restrooms.","5,411",2018-Q1,2019-Q1,Closeout,20220630 Twain MS,10370645,Twain MS - Gym Upgrades,Gym/Athletic Facilities Renovation,4,Nick Melvoin,West,1842501,13630,2224 Walgrove Ave.,Los Angeles,90066,Install basketball backboards and volleyball net posts in gym,69,2020-Q4,2021-Q3,Closeout,20220630 Pomelo Community Charter ES,10107688,Pomelo Community Charter ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,3,Scott Schmerelson,Northwest,1614001,13764,7633 March Ave.,West Hills,91304,Mitigate Lead in Water,135,2014-Q1,2014-Q2,Closeout,20220630 Noble ES,10107689,Noble ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,6,Kelly Gonez,Northeast,1560301,13632,8329 Noble Ave.,North Hills,91343,Mitigate Lead in Water,81,2013-Q2,2015-Q1,Closeout,20220630 95th St. ES,10366564,95th St. ES - Antiquated Cooling Tower,HVAC,1,"Dr. George J. McKenna, III",West,1552101,13349,1109 W. 96th St.,Los Angeles,90044,"This project will upgrade the existing antiquated cooling tower, pumps, chemical feeders, piping and tower pads. The existing system is over 25 years old and is in poor condition resulting in frequent system failures and unreliable service.",358,2015-Q3,2016-Q4,Closeout,20220630 Wright STEAM Magnet MS,10367414,Wright STEAM Magnet MS - Flexible Learning Science Labs,Reconfiguration,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,This project will upgrade up to 5 existing classrooms to create flexible learning/science laboratories with new furniture and equipment. The new flexible learning/science space will support 3 educational programs on the campus as part of the Playa Vista area enrollment growth plan.,"4,052",2019-Q3,2021-Q1,Closeout,20220630 Belmont HS,10367658,Belmont HS - 2016-17 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"This project is a charter school renovation for Rise Kohyang HS for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 4 instructional spaces for charter student seats in grade 9. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",99,2016-Q2,2016-Q3,Closeout,20220630 122nd St. ES,10369357,122nd St. ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1588701,13868,405 E. 122nd St.,Los Angeles,90061,Install Aiphone video/buzzer entry system at main entrance.,25,2017-Q4,2018-Q3,Closeout,20220630 Glenwood ES,10369485,Glenwood ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1419201,13590,8001 Ledge Ave.,Sun Valley,91352,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2024-Q4,2025-Q1,Planning,20220630 Lincoln HS,10367746,Lincoln HS - Deteriorated Metal Bridge,Campus Improvement,2,Monica Garcia,East,1872901,13280,3501 N. Broadway,Los Angeles,90031,This project is to replace deteriorated and corroded metal decks of two pedestrian bridges located near the gymnasium building. The bridges are over 40 years old and pose a potential safety concern. The existing structural steel framing will remain in place.,378,2017-Q3,2018-Q1,Closeout,20220630 Escalante EEC,10367314,Escalante EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1945801,193566,7221 S. Atlantic Ave.,Cudahy,90201,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",39,2016-Q2,2016-Q3,Closeout,20220630 Ramona Infant Center,10367354,Ramona Infant Center - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,East,1955101,13422,231 S. Alma Ave.,Los Angeles,90063,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",28,2016-Q3,2016-Q3,Closeout,20220630 Markham MS,10369881,Markham MS - Library Flooring and Windows,Library Renovation,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,Install new flooring and windows in library,25,2018-Q3,2018-Q4,Closeout,20220630 Columbus MS,10369515,Columbus MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",216,2018-Q4,2019-Q2,Closeout,20220630 South Gate MS,10370255,South Gate MS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1837701,13261,4100 Firestone Blvd.,South Gate,90280,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2025-Q4,2026-Q1,Planning,20220630 Columbus MS,10367670,Columbus MS - 2016-17 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,"This project is a charter school renovation for Ingenium Charter School for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 21 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",62,2016-Q2,2016-Q3,Closeout,20220630 Grant ES,10367687,Grant ES - 2016-17 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1426001,13355,1530 N. Wilton Pl.,Los Angeles,90028,"This project is a charter school renovation for Citizens of the World Charter School - Silver Lake for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 15 instructional spaces for charter student seats in grades K-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",57,2016-Q2,2016-Q3,Closeout,20220630 Markham MS,10368378,Markham MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",155,2023-Q2,2024-Q1,Planning,20220630 Toland Way ES,10368952,Toland Way ES - Security Upgrades,Security System,5,Jackie Goldberg,Central,1717801,13566,4545 Toland Way,Los Angeles,90041,Provide and install new Aiphone secure entry system at the main entrance.,16,2017-Q3,2018-Q1,Closeout,20220630 Brentwood Science Magnet ES,10366633,Brentwood Science Magnet - Security Upgrades,Security System,4,Nick Melvoin,West,1250701,13394,740 Gretna Green Way,Los Angeles,90049,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance,11,2015-Q3,2015-Q4,Closeout,20220630 186th St. ES,10364162,186th St. ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1575301,13303,1581 W. 186th St.,Gardena,90248,Demolish/Remove Portable Building(s),181,2014-Q1,2014-Q3,Closeout,20220630 Grant HS,10366380,Grant HS - Replace Inverters For Stadium Lighting,Electrical/Lighting,6,Kelly Gonez,Northeast,1868301,13674,13000 Oxnard St.,Van Nuys,91401,Replacement of Power Inverters for Stadium Lighting,155,2015-Q1,2015-Q2,Closeout,20220630 Fishburn ES,10366894,Fishburn ES - 2015-16 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1384901,13532,5701 Fishburn Ave.,Maywood,90270,"This project is a charter school renovation for Clemente Charter School for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 9 classrooms for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",46,2015-Q2,2015-Q3,Closeout,20220630 Bradley Global Awareness Magnet ES,10364019,Bradley Global Awareness Magnet - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1712301,13516,3875 Dublin Ave.,Los Angeles,90008,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",472,2013-Q4,2014-Q2,Closeout,20220630 Clinton MS,10366223,Clinton MS - 2014-15 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1806201,13909,3500 S. Hill St.,Los Angeles,90007,"This project is a charter school renovation for Animo Jackie Robinson Charter HS for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 20 classrooms for 600 charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",20,2014-Q2,2014-Q3,Closeout,20220630 Belvedere MS,10366881,Belvedere MS - 2015-16 Prop 39,Charter Prop 39,2,Monica Garcia,East,1804701,13466,312 N. Record Ave.,Los Angeles,90063,"This project is a charter school renovation for Collegiate Charter High School of Los Angeles for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 was revised to include 1 charter office and 5 classrooms for charter student seats in grade 9. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",16,2015-Q3,2015-Q3,Closeout,20220630 Community Magnet Charter ES,10366601,Community Elementary Magnet Charter School - SEEDS,SEEDS,4,Nick Melvoin,West,1274101,13687,11301 Bellagio Rd.,Los Angeles,90049,"Design and construct an outdoor learning space of approximately 1,900 square feet consisting of slurry coat existing asphalt, painting pavement areas, the installation of art poles and a hose bib. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",13,2015-Q1,2015-Q2,Closeout,20220630 Van Ness ES,10367018,Van Ness ES - Public Address System Upgrade,Communications/Technology Upgrade,4,Nick Melvoin,West,1742501,13393,501 N. Van Ness Ave.,Los Angeles,90004,Upgrade the school's campus by expanding the capacity of the public address (PA) system to cover additional classrooms and hallways as well as support integration with Blend Special Education ES.,40,2015-Q3,2015-Q3,Closeout,20220630 Laurel Span School,10366547,Laurel ES - Security Upgrades,Fencing,4,Nick Melvoin,West,1480801,13359,925 N. Hayworth Ave.,Los Angeles,90046,Provide security upgrades to the campus by providing and installing privacy fences along the campus.,47,2014-Q4,2015-Q1,Closeout,20220630 Griffin ES,10369105,Griffin ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1430101,13284,2025 Griffin Ave.,Los Angeles,90031,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",50,2018-Q2,2018-Q4,Closeout,20220630 Lankershim ES,10369114,Lankershim ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1478101,13358,5250 Bakman Ave.,North Hollywood,91601,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",44,2018-Q1,2018-Q3,Closeout,20220630 Monlux ES,10369115,Monlux ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1534201,13591,6051 Bellaire Ave.,North Hollywood,91606,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",52,2018-Q1,2018-Q3,Closeout,20220630 156th St. ES,10368192,156th St. ES - Classroom Replacement,Addition,7,Tanya Ortiz Franklin,South,1580801,13673,2100 W. 156th St.,Gardena,90249,"The school has 8 classrooms located in 4 portable buildings of which 2 classrooms are located in a Department of Housing (DOH) portable building and 6 classrooms are located in 3 uncertified relocatable buildings. The project includes the removal of 1 DOH portable building and 3 uncertified portable buildings, the construction of 8 new classrooms and support spaces, infrastructure upgrades including utilities that could be required to support the new facilities, a new fire alarm system for the entire campus, as well as restoration of landscape, hardscape, and playground where portables have been removed. Additional site improvements to ensure compliance with the Americans with Disabilities Act (ADA), Division of the State Architect (DSA), environmental mitigations, or any other facilities requirements may be performed.","18,860",2018-Q4,2020-Q2,Closeout,20220630 Corona ES,10366865,Corona ES - HVAC & Roofing,HVAC,5,Jackie Goldberg,East,1321901,13453,3825 Bell Ave.,Bell,90201,"This project upgrades the heating, ventilation, and air conditioning (HVAC) system and replaces roofing for 6 buildings on campus: main administration building, classroom buildings #1 and #2, kindergarten building, cafeteria building and lunch pavilion, and primary unit building. The HVAC system is over 20 years old and in poor condition resulting in unreliable service. The scope of work also includes plumbing and electrical upgrades with new lighting fixtures, asbestos and hazardous material abatement, fire alarm upgrades with modifications to the sprinkler system, as well as repairing and painting walls and ceilings impacted by the HVAC installation.","13,060",2018-Q2,2020-Q2,Closeout,20220630 Albion ES,10367057,Albion ES - ADA Improvements,Access Compliance,2,Monica Garcia,East,1201401,13296,322 S. Ave. 18,Los Angeles,90031,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 40 doors/hardware, 37 accessible paths of travel, 62 signs, 11 restrooms, 11 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 4 concrete ramps, 6 pieces of accessible furniture, 1 assembly seat, 8 railings, 5 playground components, 2 parking areas, 1 door modification/auto opener, and 1 new elevator/stage lift.","4,888",2016-Q4,2022-Q2,Closeout,20220630 Wadsworth EEC,10372325,Wadsworth EEC - Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1957501,16764,1047 E. 41st St.,Los Angeles,90011,"Remove two poured-in-place mattings and replace them with new tile mattings. Approx. 2,369 total sq. ft.",198,2022-Q3,2022-Q4,Planning,20220630 Lockhurst Charter ES,10371220,Lockhurst Charter ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1488701,13794,6170 Lockhurst Dr.,Woodland Hills,91367,Remove the existing marquee and footing at Lockhurst Dr. and Sylvan St. and replace with a new 2-sided electronic marquee standing less than 8' high.,48,2020-Q3,2021-Q1,Closeout,20220630 92nd St. ES,10368155,92nd St. ES - Comprehensive Modernization,Comprehensive Modernization,7,Tanya Ortiz Franklin,South,1554801,13511,9211 Grape St.,Los Angeles,90002,"This project includes the construction of new buildings and site improvements with approximately 17 general and specialty classrooms, instructional support spaces, storage space, lunch shelter, covered walkways, playground, and parking lot. Existing school facilities will be upgraded including the modernization and seismic retrofit of the historic assembly hall/classroom building (west building), and HVAC upgrades to the administration building and kindergarten building #2. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of kindergarten building #1, classroom building D, one storage building, boiler house, lunch shelter, five relocatable classroom buildings and one relocatable restroom building. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","76,718",2021-Q3,2025-Q1,Construction,20220630 Grant ES,10371260,Grant ES - Portable Removal,Portable Removal,5,Jackie Goldberg,West,1426001,13355,1530 N. Wilton Pl.,Los Angeles,90028,"Demolish/remove 7 portables buildings, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite building. Remove all hazardous materials offsite and perform Phase 1, 2 and 3 onsite monitoring. Repair/replace asphalt paving.",658,2020-Q2,2021-Q1,Closeout,20220630 Chapman ES,10371664,Chapman ES - Install Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1298601,13460,1947 Marine Ave.,Gardena,90249,Install new secure entry system at door to main office with three video receivers in main office.,27,2021-Q1,2021-Q2,Closeout,20220630 San Antonio ES,10371371,San Antonio ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1464101,13827,6222 State St.,Huntington Park,90255,Install new secure entry system at door to main office,23,2020-Q3,2020-Q4,Closeout,20220630 Westchester Enriched Sciences Magnets,10369373,Westchester Enriched Sciences Magnets - Roofing,Roofing,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"The project will replace approximately 326,417 square feet of deteriorated roofing campus-wide and install new gutters and downspouts on 18 buildings.","3,712",2023-Q2,2023-Q4,Planning,20220630 Marshall HS,10370270,Marshall HS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1875001,13571,3939 Tracy St.,Los Angeles,90027,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2026-Q1,2026-Q3,Planning,20220630 O'Melveny ES,10368962,O'Melveny ES - Playground Upgrades,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1572601,13396,728 Woodworth St.,San Fernando,91340,Install new playground structure and matting as well as provide Americans with Disabilities Act (ADA) path of travel upgrades including paving repairs and the replacement of 3 gates to improve accessibility.,369,2019-Q1,2020-Q4,Closeout,20220630 Woodcrest ES,10369291,Woodcrest ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1786301,13369,1151 W. 109th St.,Los Angeles,90044,"Remove/demolish 2 bungalows. Provide temporary fencing. Disconnect all utilities, including low voltage and power to 2 bungalows; reconnect all utilities to existing buildings remaining on site, and provide trenching and new permanent fencing. Abate and transport all asbestos, lead and other hazardous materials offsite. Perform Phase I, II and III onsite monitoring and restore asphalt paving (and court markings) as needed.",287,2018-Q1,2019-Q1,Closeout,20220630 32nd St./USC Performing Arts Magnet ES,10372107,32nd St./USC Performing Arts Magnet ES - Major Modernization,Major Modernization,1,"Dr. George J. McKenna, III",Central,1713701,13299,822 W. 32nd St.,Los Angeles,90007,"Site Due Diligence, Planning and Feasibility Activities.","1,327",-Q,-Q,Planning,20220630 Mount Gleason MS,10372399,Mount Gleason MS - Install Secure Entry System and Pedestrian Gate,Security System,6,Kelly Gonez,Northeast,1824001,13744,10965 Mt. Gleason Ave.,Sunland,91040,"Install new pedestrian gate and secure entry system at front of school, along Mount Gleason Ave. Remove wrought iron fence panel and replace with new gate. Remove section of interior planter and pour concrete for new walkway. Reconfigure affected irrigation. Run approx. 80ft of underground conduit for power and data.",91,2022-Q3,2022-Q4,Planning,20220630 Jones ES,10369760,Jones ES - 2018-23 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1294301,193565,900 E. 33rd St.,Los Angeles,90011,"This project was initially approved in BOE Report No. 429-17/18 for the 2018-19 Prop 39 co-locations as a charter school renovation for Synergy Charter Academy. This project included 1 charter office, 1 special education room, and 13 instructional spaces for charter student seats in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. Subsequently to the approval of the project, an alternative agreement was executed. As a result, the scope of work changed from a growth co-location to a ""no change"" project. The project was amended for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 17 spaces allocated to the charter and an undefined scope of work. The project was then approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 13 instructional spaces for charter student seats in grades K-5 and an undefined scope of work. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 13 instructional spaces for charter student seats in grades K-5 and an undefined scope of work. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 13 instructional spaces for charter student seats in grades TK-5 and an undefined scope of work.",9,2021-Q3,2021-Q3,Closeout,20220630 King ES,10370292,King ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1653401,13423,3989 S. Hobart Blvd.,Los Angeles,90062,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",64,2019-Q4,2020-Q4,Closeout,20220630 Welby Way Charter ES,10370705,Welby Way Charter ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1763701,13789,23456 Welby Way,West Hills,91307,"Install a new electronic, free-standing marquee. This Local District Northwest priority project includes a Board District 3 contribution towards approximately half the budget.",53,2019-Q4,2021-Q1,Closeout,20220630 Cleveland EEC,10372558,Cleveland EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,3,Scott Schmerelson,Northwest,1858801,16481,19031 W. Strathern St.,Reseda,91335,"This project will provide an outdoor classroom, with at least 10 learning stations, by dividing the existing playground into distinct activity areas covering 20,350 sq. ft. It will also provide new heating, ventilation, and air-conditioning (HVAC) units, new roofing, new playground matting, and necessary upgrades to the fire alarm system. ADA upgrades will include an accessible path of travel and restroom and drinking water station upgrades.","4,863",2024-Q2,2025-Q4,Planning,20220630 Anatola ES,10371743,Anatola ES - Exterior Painting,Painting,3,Scott Schmerelson,Northwest,1211001,13609,7364 Anatola Ave.,Lake Balboa,91406,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",430,2022-Q1,2022-Q3,Construction,20220630 Johnston Community Day School,10371853,Johnston CDS - Install Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1858901,13854,2210 Taper Ave.,San Pedro,90731,"Install approx. 100' chain link fence with pedestrian gate to direct traffic to main office. Then, install secure entry system at gate with three video receivers in the the main office.",55,2021-Q2,2022-Q2,Closeout,20220630 Marianna ES,10371361,Marianna ES - Lunch Tables,Furniture/Fixtures/Equipment,2,Monica Garcia,East,1513701,13479,4215 E. Gleason St.,Los Angeles,90063,Purchase 13 exterior lunch tables.,20,2020-Q2,2020-Q2,Closeout,20220630 Polytechnic HS,10366804,Polytechnic HS - Comprehensive Modernization,Comprehensive Modernization,6,Kelly Gonez,Northeast,1863601,13734,12431 Roscoe Blvd.,Sun Valley,91352,"This project includes the construction of new buildings and site improvements with 37 general and specialty classrooms, instructional support spaces, gymnasium, auditorium and performing arts, food service and lunch shelter, administration, library, maintenance and operations area, and basketball and tennis courts. Existing school facilities will be upgraded including roofing repairs and replacement for classroom buildings #3-7, #9, #13, and #18-23. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of the auditorium, music building, administration building, library/study hall building, transformer, cafeteria/lunch shelter, student store/concessions building, two gymnasiums, utility building, math/science building, classroom buildings A & N, 6 sanitary buildings, and 16 classrooms in relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","194,247",2020-Q3,2024-Q2,Construction,20220630 Saturn ES,10103591,Saturn ES - Community Park Greening,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,"In an effort to complement greening efforts by the Los Angeles Conservation Corps at the school, this project will remove asphalt and impacted soil, provide grading, and add a bioswale, boulders for seating, a gathering space with decomposed granite path, plants, and trees as well as provide irrigation to specific areas of the playground.","1,092",2020-Q3,2020-Q4,Closeout,20220630 San Gabriel ES,10369287,San Gabriel ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1646601,13651,8628 San Gabriel Ave.,South Gate,90280,"Removal of 2 portable buildings. Salvage all furniture and equipment from classrooms, abate hazardous materials, disconnect low and high voltage utilities, and repair/replace asphalt at building footprints.",318,2017-Q4,2019-Q3,Closeout,20220630 Avalon Gardens ES,10364016,Avalon Gardens ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1224701,13618,13940 S. San Pedro St.,Los Angeles,90061,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",650,2015-Q2,2016-Q1,Closeout,20220630 Sterry ES,10369546,Sterry ES - Roofing & HVAC,Roofing,4,Nick Melvoin,West,1693201,13431,1730 Corinth Ave.,Los Angeles,90025,"The project replaces approximately 55,000 square feet of deteriorated roofing campus-wide with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes replacing damaged wood, replacing skylights, installing new gutters and downspouts, and painting to match existing areas affected in the roof demolition. As part of this roofing project, selected heating, ventilation, and air conditioning (HVAC) units and equipment will be replaced while the remaining roof-mounted HVAC units and ductwork will be protected in place.",976,2018-Q4,2019-Q4,Closeout,20220630 99th St. ES,10372597,99th St. ES - Install Security Monitor System,Security System,7,Tanya Ortiz Franklin,South,1553401,13508,9900 S. Wadsworth Ave.,Los Angeles,90002,Install video surveillance (CCTV) system with (8) cameras.,120,2022-Q4,2023-Q1,Planning,20220630 Short ES,10370826,Short ES - Exterior Painting,Painting,4,Nick Melvoin,West,1674001,13679,12814 Maxella Ave.,Los Angeles,90066,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",243,2020-Q2,2020-Q3,Closeout,20220630 Beethoven ES,10370875,Beethoven ES - Chromebooks,Communications/Technology Upgrade,4,Nick Melvoin,West,1234201,15206,3711 Beethoven St.,Los Angeles,90066,Purchase (57) Chromebooks and (2) storage carts,20,2019-Q4,2019-Q4,Closeout,20220630 Limerick ES,10368907,Limerick ES - Ramp Installation,Access Compliance,3,Scott Schmerelson,Northwest,1488101,13697,8530 Limerick Ave.,Canoga Park,91306,Provide and install new metal ramp.,67,2017-Q2,2017-Q3,Closeout,20220630 Olive Vista MS,10369944,Olive Vista MS-Install Outlet,Access Compliance,6,Kelly Gonez,Northeast,1830601,13707,14600 Tyler St.,Sylmar,91342,Install electrical outlet for changing table in boys' restroom near room 13.,2,2018-Q3,2018-Q3,Closeout,20220630 Hawaiian EEC,10371667,Hawaiian EEC - Install Privacy Fence,Fencing,7,Tanya Ortiz Franklin,South,1952201,16284,501 Hawaiian Ave.,Wilmington,90744,Replace approximately 300 linear feet of chain-link fencing with blue privacy slats on the south perimeter of the campus along E St. and the northeast perimeter of the campus along Hawaiian Ave.,24,2021-Q1,2021-Q3,Closeout,20220630 Independence ES,10367758,Independence ES - ADA Improvements,Access Compliance,5,Jackie Goldberg,East,1688001,13912,8435 Victoria Ave.,South Gate,90280,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 15 doors/hardware, 19 accessible paths of travel, 46 signs, 8 restrooms, 19 drinking fountains/sinks, 6 concrete ramps, 2 asphalt ramps, 9 pieces of accessible furniture, 1 parking area, 2 cafeteria counters, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","2,072",2017-Q2,2019-Q3,Closeout,20220630 Vintage Math/Science/Technology Magnet ES,10370936,Vintage Math/Science/Technology Magnet ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1756201,13694,15848 Stare St.,North Hills,91343,Install new secure entry system.,21,2020-Q3,2021-Q1,Closeout,20220630 Huntington ES,10369277,Huntington ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1463001,13312,4435 N. Huntington Dr.,Los Angeles,90032,"Remove/demolish 2 bungalow buildings. Remove/relocate furniture and equipment, disconnect low voltage ITD components, restore areas with asphalt paving at building footprints.",328,2018-Q1,2019-Q3,Closeout,20220630 South Gate HS,10372608,South Gate HS - Roofing,Roofing,5,Jackie Goldberg,East,1887101,13262,3351 Firestone Blvd.,South Gate,90280,"This project is to provide approximately 75,193 square feet of new roofing at 28 buildings, including the installation of new gutters and downspouts and painting of affected areas.","1,931",2023-Q3,2024-Q1,Planning,20220630 Van Nuys HS,10370807,Van Nuys HS - Exterior Painting,Painting,3,Scott Schmerelson,Northeast,1889301,13404,6535 Cedros Ave.,Van Nuys,91411,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.","1,045",2020-Q2,2020-Q4,Closeout,20220630 Cortines School of Visual and Performing Arts,10367985,Cortines School of Visual and Performing Arts - HVAC,HVAC,2,Monica Garcia,Central,1851601,13295,450 N. Grand Ave.,Los Angeles,90012,This project is to remove and replace the chiller unit and central plant control system. The chiller unit and control system have failed and are beyond the warranty coverage period.,274,2017-Q1,2017-Q4,Closeout,20220630 Lillian ES,10369197,Lillian ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1487701,13468,5909 Lillian St.,Los Angeles,90001,"Removal of 1 portable and 1 sanitary building. Salvage all furniture and equipment from classrooms, abate hazardous materials, disconnect low and high voltage utilities, and repair/replace asphalt at building footprints.",106,2017-Q4,2018-Q3,Closeout,20220630 Bright ES,10370298,Bright ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1716401,13306,1771 W. 36th St.,Los Angeles,90018,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",57,2019-Q4,2020-Q3,Closeout,20220630 Baldwin Hills ES,10372610,Baldwin Hills ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1227401,13595,5421 Rodeo Rd.,Los Angeles,90016,Install new secure entry system at the Main Office.,38,2022-Q3,2022-Q3,Planning,20220630 Welby Way Charter ES,10372624,Welby Way Charter ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1763701,13789,23456 Welby Way,West Hills,91307,Install new secure entry system at the Main Office.,39,2022-Q4,2022-Q3,Planning,20220630 Berendo MS,10372396,Berendo MS - Install Security Monitor System,Security System,5,Jackie Goldberg,Central,1805701,13274,1157 S. Berendo St.,Los Angeles,90006,Install new CCTV system with (8) cameras,119,2022-Q3,2022-Q4,Planning,20220630 75th St. EEC,10367292,75th St. EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1955801,16683,242 W. 75th St.,Los Angeles,90003,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",98,2016-Q3,2016-Q4,Closeout,20220630 Romer MS,10368839,Romer MS - 2017-18 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1811601,13894,6501 Laurel Canyon Blvd.,North Hollywood,91606,"This project is a charter school renovation for Celerity Palmati Charter School for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 19 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",43,2017-Q2,2017-Q2,Closeout,20220630 Barton Hill ES,10368968,Barton Hill ES - Technology & Security Upgrades,Communications/Technology Upgrade,7,Tanya Ortiz Franklin,South,1231501,13340,423 N. Pacific Ave.,San Pedro,90731,Provide 60 Chromebooks and 2 charging carts; provide security upgrades as necessary.,30,2017-Q2,2017-Q4,Closeout,20220630 Stevenson College & Career Preparatory,10369452,Stevenson College & Career Preparatory - Restroom Upgrade,Access Compliance,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,Provide and install Rifton support station. Enclose the station in a private compartment within the boys' restroom.,15,2018-Q1,2018-Q1,Closeout,20220630 Stevenson College & Career Preparatory,10369788,Stevenson College & Career Preparatory - 2018-19 Prop 39 (KIPP Academy of Innovation),Charter Prop 39,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"This project is a charter school renovation for KIPP Academy of Innovation for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office,1 special education room, and 4 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",74,2018-Q2,2018-Q3,Closeout,20220630 Clover ES,10369948,Clover ES - Flooring,Flooring,1,"Dr. George J. McKenna, III",West,1312301,13688,11020 Clover Ave.,Los Angeles,90034,Install new floor in teachers' dining room and serving area,7,2018-Q4,2018-Q4,Closeout,20220630 Danube ES,10368047,Danube ES - Metal Ramp,Access Compliance,3,Scott Schmerelson,Northwest,1333501,13845,11220 Danube Ave.,Granada Hills,91344,Provide and install metal ramp to classroom 20,50,2016-Q4,2016-Q4,Closeout,20220630 Hamilton HS,10369598,Hamilton HS - Auditorium Upgrades,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1868601,13570,2955 Robertson Blvd.,Los Angeles,90034,Upgrade auditorium lighting and audio system,69,2018-Q2,2018-Q3,Closeout,20220630 Sylvan Park EEC,10367361,Sylvan Park EEC - Technology Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1956501,16691,15011 Delano St.,Van Nuys,91411,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",83,2016-Q3,2016-Q3,Closeout,20220630 El Dorado ES,10369425,El Dorado ES - Auditorium Upgrade,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1354101,13792,12749 El Dorado Ave.,Sylmar,91342,Install audio/visual equipment in auditorium.,42,2018-Q1,2018-Q2,Closeout,20220630 Hamilton HS,10366312,Hamilton HS - Gym Floor & Bleacher Repair,Gym/Athletic Facilities Renovation,1,"Dr. George J. McKenna, III",West,1868601,13570,2955 Robertson Blvd.,Los Angeles,90034,"Repair wood floor and collapsible bleachers in large gym, repair wood floor in small gym, and repair deteriorated wall systems like ceiling tiles, wall tiles, paint, repiping and drinking fountains as needed.","1,934",2016-Q3,2017-Q1,Closeout,20220630 Addams Continuation HS,10370695,Addams Continuation HS - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1872601,16503,16341 Donmetz St.,Granada Hills,91344,Install new secure entry system at main gate,33,2019-Q3,2019-Q4,Closeout,20220630 Jordan HS,10003963,Jordan HS Redevelopment,Comprehensive Modernization,7,Tanya Ortiz Franklin,South,1872101,13494,2265 E. 103rd St.,Los Angeles,90002,"This project reconfigures the existing campus to accommodate three academies, each comprised of approximately 500 seats, and removes and/or replaces substandard and inefficient educational facilities. This project also modernizes or replaces core facilities including, but not limited to, school administration, athletics, arts programs, career technical opportunities, and related facilities to support the school's operational restructuring.","99,131",2013-Q2,2016-Q2,Closeout,20220630 Frost MS,10367087,Frost MS - Paving,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1813701,13777,12314 Bradford Pl.,Granada Hills,91344,"The over 40-year-old asphalt concrete paving on the campus is severely damaged and in need of replacement. The scope of work includes replacing deteriorated asphalt concrete pavement, redesigning the outdoor athletic areas to meet current requirements, and replacing outdoor apparatus, landscaping and fencing as needed. In addition, the project includes associated Americans with Disabilities Act (ADA) path of travel upgrades and drainage systems required by DSA and the District's Storm Water Technical Manual.","5,216",2017-Q2,2018-Q4,Closeout,20220630 Palms MS,10368325,Palms MS - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1834001,13668,10860 Woodbine St.,Los Angeles,90034,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",148,2017-Q3,2017-Q4,Closeout,20220630 Chavez ES,10369416,Chavez ES - Security Upgrades,Security System,2,Monica Garcia,East,1764001,13947,5243 Oakland St.,Los Angeles,90032,Install new secure entry system.,18,2018-Q1,2018-Q2,Closeout,20220630 Cohasset ES,10368023,Cohasset ES - School Beautification & Safety Improvement,Painting,3,Scott Schmerelson,Northwest,1313701,13542,15810 Saticoy St.,Lake Balboa,91406,Paint interior and exterior of all buildings and appurtenant structures.,589,2017-Q2,2018-Q1,Closeout,20220630 Yorkdale ES,10369804,Yorkdale ES - 2018-19 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1795901,13385,5657 Meridian St.,Los Angeles,90042,"This project was approved in Board of Education Report No. 429-17/18 as a 2018-19 Prop. 39 charter co-location. The charter operator, Celerity Rolas Charter School, did not occupy Yorkdale ES during the 2018-19 academic year. As a result, the scope of work changed from a co-location to vacating the site which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District-operated program.",70,2018-Q2,2018-Q3,Closeout,20220630 Roybal Learning Center,10369417,Roybal Learning Center - Safety Upgrades to Baseball Field,Gym/Athletic Facilities Renovation,2,Monica Garcia,Central,1854401,13875,1200 W. Colton St.,Los Angeles,90026,Provide new 40' tall fencing and safety netting behind baseball field backstop.,45,2022-Q3,2022-Q4,Design,20220630 Markham MS,10370009,Markham MS - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,"Demolish 2 portable buildings, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",124,2018-Q4,2019-Q2,Closeout,20220630 El Sereno MS,10369066,El Sereno MS - Security Upgrades,Security System,2,Monica Garcia,East,1811801,13412,2839 N. Eastern Ave.,Los Angeles,90032,Install new secure entry system.,32,2018-Q1,2018-Q2,Closeout,20220630 Roscoe ES,10369025,Roscoe ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1635601,13362,10765 Strathern St.,Sun Valley,91352,"Remove/sell 2 portable buildings. Obtain environmental reports, disconnect high and low voltage utilities, and repair/replace asphalt in the building footprints.",137,2017-Q4,2018-Q4,Closeout,20220630 52nd St. ES,10370295,52nd St. ES - Parent & Family Center 2018,Campus Improvement,1,"Dr. George J. McKenna, III",West,1380801,13307,816 W. 51st St.,Los Angeles,90037,"Modernize parent & family center as needed by installing new window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new chairs. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",54,2019-Q3,2020-Q3,Closeout,20220630 Gulf ES,10368351,Gulf ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1431501,13464,828 W. L St.,Wilmington,90744,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",194,2018-Q3,2019-Q1,Closeout,20220630 Marina Del Rey MS,10366912,Marina Del Rey MS - 2015-16 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"This project is a charter school renovation for Goethe International Charter School for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 16 classrooms for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",11,2015-Q2,2015-Q3,Closeout,20220630 Northridge EEC,10367999,Northridge EEC - Flooring,Flooring,3,Scott Schmerelson,Northwest,1828401,16622,18050 Chase St.,Northridge,91325,"Replace Vinyl Composite Tile (VCT) and glue down carpets with new flooring system throughout entire center, and replace unsanitary restroom flooring in children's bungalow restrooms with new sheet vinyl flooring system.",95,2018-Q3,2019-Q1,Closeout,20220630 Lane ES,10364041,Lane ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1476701,13629,1500 Avenida Cesar Chavez,Monterey Park,91754,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",493,2013-Q3,2014-Q2,Closeout,20220630 Peary MS,10364059,Peary MS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1835201,13625,1415 W. Gardena Blvd.,Gardena,90247,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",883,2014-Q1,2014-Q2,Closeout,20220630 Rio Vista ES,10364064,Rio Vista ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1628801,13441,4243 Satsuma Ave.,North Hollywood,91602,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",396,2014-Q3,2015-Q1,Closeout,20220630 Saturn ES,10369950,Saturn ES - Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,Install new electronic free-standing marquee,59,2019-Q1,2019-Q2,Closeout,20220630 1st St. ES,10369928,1st St ES-Install Outlet,Access Compliance,2,Monica Garcia,East,1383601,13267,2820 E. 1st St.,Los Angeles,90033,Install electrical outlet in dedicated faculty restroom for changing table.,1,2018-Q3,2018-Q3,Closeout,20220630 Cowan ES,10369741,Cowan ES - 2018-19 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1326001,13622,7615 Cowan Ave.,Los Angeles,90045,"Westside Innovative School House (WISH) Charter MS is vacating this site. This project was approved in Board of Education Report No. 429-17/18. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",119,2018-Q3,2018-Q3,Closeout,20220630 Bushnell Way ES,10369296,Bushnell Way ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1267101,13375,5507 Bushnell Way,Los Angeles,90042,"Demolition of 2 bungalows. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprints.",493,2018-Q1,2019-Q4,Closeout,20220630 Roscoe ES,10370194,Roscoe ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1635601,13362,10765 Strathern St.,Sun Valley,91352,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2024-Q2,2024-Q3,Planning,20220630 Fletcher ES,10367681,Fletcher ES - 2016-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a charter school renovation for Celerity Octavia Charter School. This project included 1 charter office and 8 instructional spaces for charter students in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no change"" project with 1 charter office and 8 instructional spaces for charter students in grades K-5. The project was again amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with 1 charter office and 6 instructional spaces for charter students in grades K-5 and a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/19.",169,2016-Q2,2016-Q3,Closeout,20220630 Gates ES,10369484,Gates ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1409601,13291,3333 Manitou Ave.,Los Angeles,90031,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2022-Q4,2023-Q3,Planning,20220630 112th St. ES,10369500,112th St. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2024-Q1,2024-Q2,Planning,20220630 Gratts EEC,10005037,Gratts EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,Central,1944301,13931,1415 W. 5th St.,Los Angeles,90017,Upgrade entry control system and exterior gates; provide new shade shelter,174,2014-Q3,2015-Q3,Closeout,20220630 Napa ES,10369670,Napa ES - Parking Gates,Fencing,3,Scott Schmerelson,Northwest,1544601,13701,19010 Napa St.,Northridge,91324,Install parking lot security gates.,19,2018-Q2,2018-Q4,Closeout,20220630 Osceola ES,10369989,Osceola ES - Auditorium Upgrade,Auditorium Renovation,6,Kelly Gonez,Northeast,1589401,13751,14940 Osceola St.,Sylmar,91342,Install audio/visual equipment in auditorium,48,2018-Q4,2019-Q2,Closeout,20220630 Apperson ES,10370343,Apperson ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1216401,13608,10233 Woodward Ave.,Sunland,91040,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",57,2019-Q1,2019-Q3,Closeout,20220630 Hesby Oaks Leadership Charter,10368313,Hesby Oaks Leadership Charter - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,Northwest,1452101,13717,15530 Hesby St.,Encino,91436,Provide and install electronic marquee.,54,2018-Q1,2018-Q2,Closeout,20220630 Nestle Charter ES,10365639,Nestle ES - Exterior Lighting,Electrical/Lighting,4,Nick Melvoin,Northwest,1545201,13614,5060 Nestle Ave.,Tarzana,91356,Upgrade campus by providing new exterior lighting in the parking lot and k-yard.,10,2013-Q4,2014-Q2,Closeout,20220630 Le Conte MS,10370249,Le Conte MS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2023-Q4,2024-Q1,Planning,20220630 Eagle Rock HS,10370260,Eagle Rock HS - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1861401,13553,1750 Yosemite Dr.,Los Angeles,90041,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2024-Q4,2025-Q2,Planning,20220630 Noble ES,10368149,Noble ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1560301,13632,8329 Noble Ave.,North Hills,91343,"Replace deteriorated walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new walk-in freezer/cooler combination unit and refrigeration equipment.",122,2017-Q1,2017-Q2,Closeout,20220630 Edison MS,10366516,Edison MS - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1811301,13555,6500 Hooper Ave.,Los Angeles,90001,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 162 doors/hardware, 58 accessible paths of travel, 90 signs, 9 restrooms, 21 drinking fountains/sinks, 2 assistive listening devices/intercoms/phones, 4 concrete ramps, 21 pieces of accessible furniture, 1 assembly seat, 10 railings, 2 existing elevator modifications, 139 locker room modifications/lockers, 3 cafeteria counters, 1 changing room, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","7,121",2014-Q4,2022-Q3,Closeout,20220630 Avalon Gardens ES,10365647,Avalon Gardens ES - Compliance with State & Federal Access Requirements,Access Compliance,7,Tanya Ortiz Franklin,South,1224701,13618,13940 S. San Pedro St.,Los Angeles,90061,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Upgrades to Faculty & Student Restrooms and Drinking Fountains,139,2014-Q1,2014-Q2,Closeout,20220630 Dodson MS,10004132,Dodson MS - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1811001,13846,28014 Montereina Dr.,Rancho Palos Verdes,90275,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",15,2012-Q4,2016-Q3,Closeout,20220630 Garcetti Learning Academy,10004640,68th St. ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",South,1679501,13318,612 W. 68th St.,Los Angeles,90044,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",167,2012-Q2,2014-Q2,Closeout,20220630 Virginia ES,10366752,Virginia ES - Parent & Family Center,Reconfiguration,1,"Dr. George J. McKenna, III",West,1757501,13504,2925 Virginia Rd.,Los Angeles,90016,"Relocate and convert room into a new parent & family center by providing interior paint, flooring and lighting repairs, and security upgrades including new doors and panic hardware as well as security on windows. Repair sink and patch up walls. Provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",65,2015-Q3,2016-Q1,Closeout,20220630 Lincoln HS,10108865,Lincoln HS - Slope Repair/Access Compliance,Excavation,2,Monica Garcia,East,1872901,13280,3501 N. Broadway,Los Angeles,90031,Slope Repair/Access Compliance,823,2014-Q2,2014-Q3,Closeout,20220630 University Charter HS,10101902,"University Charter HS - Facilities Upgrades - Academy Offices, Outdoor Spaces, Visual Identity",Small Learning Community/Academy,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,"Facilities Upgrades - Academy Offices, Outdoor Spaces, Visual Identity","1,996",2013-Q2,2014-Q2,Closeout,20220630 Palisades Charter HS Math/Science/Technology Magnet,10004094,Palisades Charter HS Math/Science/Technology Magnet - Facelift,Facelift,4,Nick Melvoin,West,1879802,13742,15777 Bowdoin St.,Pacific Palisades,90272,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",230,2012-Q1,2016-Q3,Closeout,20220630 Normandie ES,10004641,Normandie ES - Facelift,Facelift,1,"Dr. George J. McKenna, III",Central,1563001,13300,4505 S. Raymond Ave.,Los Angeles,90037,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",138,2015-Q1,2016-Q3,Closeout,20220630 Dayton Heights ES,10366750,Dayton Heights ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1335601,13352,607 N. Westmoreland Ave.,Los Angeles,90004,"Upgrade the school's existing parent & family center by providing exterior paint, lighting and floor tile repairs, and security upgrades including new doors and panic hardware. Equip the room with new classroom furniture, laptop computers and signage.",75,2015-Q3,2016-Q1,Closeout,20220630 Plainview Academic Charter Academy,10363985,Plainview Academic Charter Academy - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1609601,13580,10819 Plainview Ave.,Tujunga,91042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",329,2014-Q2,2014-Q3,Closeout,20220630 Melvin ES,10367626,Melvin ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1523301,13719,7700 Melvin Ave.,Reseda,91335,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",53,2016-Q3,2017-Q2,Closeout,20220630 24th St. ES,10367643,24th St. ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1730101,13335,2055 W. 24th St.,Los Angeles,90018,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",56,2016-Q3,2017-Q3,Closeout,20220630 Maywood ES,10365721,Maywood ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,East,1238101,13950,5200 Cudahy Ave.,Maywood,90270,Replace deteriorated playground matting systems to ensure the health and safety of students.,10,2014-Q1,2014-Q1,Closeout,20220630 Annandale ES,10367010,Annandale ES- Portable Wheelchair Lift,Access Compliance,5,Jackie Goldberg,Central,1215101,13371,6125 Poppy Peak Dr.,Los Angeles,90042,Provide Portable lift for stage,23,2015-Q2,2015-Q3,Closeout,20220630 Taper ES,10367524,Taper ES - Exhaust Fan & Louvered Door,Access Compliance,7,Tanya Ortiz Franklin,South,1703501,13539,1824 Taper Ave.,San Pedro,90731,Provide and Install exhaust fan & louvered door in changing room.,0,2016-Q1,2016-Q2,Closeout,20220630 Woodland Hills Academy,10366273,Woodland Hills Academy - 2014-15 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1834401,13806,20800 Burbank Blvd.,Woodland Hills,91367,"Charter HS of the Arts - Multimedia and Performing (CHAMPS) is vacating this site. This project was approved in Board of Education Report No. 342-13/14. The scope of work includes relocation of classrooms, cleaning, miscellaneous repairs, remedial construction and reconnecting of all low voltage systems to the District operated program.",3,2014-Q3,2014-Q4,Closeout,20220630 Angeles Mesa ES,10367967,Angeles Mesa ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1212301,13427,2611 W. 52nd St.,Los Angeles,90043,"Remove 2 DSA portable buildings (24' x 60'), provide temporary fencing, disconnect all utilities including low voltage and power, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",55,2016-Q3,2016-Q4,Closeout,20220630 Palisades Charter HS,10368042,Palisades Charter HS - Portable Wheelchair Lift,Access Compliance,4,Nick Melvoin,West,1879801,13742,15777 Bowdoin St.,Pacific Palisades,90272,Provide and install portable wheelchair lift for stage.,31,2016-Q4,2016-Q4,Closeout,20220630 Kingsley ES,10365711,Kingsley ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,West,1617901,13927,5200 W. Virginia Ave.,Los Angeles,90029,Replace deteriorated playground matting systems to ensure the health and safety of students.,24,2015-Q1,2015-Q1,Closeout,20220630 Ascot ES,10365677,Ascot ES - Replace Playground Matting,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1221901,13276,1447 E. 45th St.,Los Angeles,90011,Replace deteriorated playground matting systems to ensure the health and safety of students.,113,2014-Q3,2014-Q4,Closeout,20220630 McKinley ES,10365722,McKinley ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1665801,13506,7812 McKinley Ave.,Los Angeles,90001,Replace deteriorated playground matting systems to ensure the health and safety of students.,78,2014-Q1,2014-Q1,Closeout,20220630 232nd Pl. ES,10365666,232nd Pl. ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1732901,13709,23240 Archibald Ave.,Carson,90745,Replace deteriorated playground matting systems to ensure the health and safety of students.,51,2014-Q2,2014-Q2,Closeout,20220630 Canoga Park ES,10229922,Canoga Park ES - Non Air-Conditioned Classroom & Equipment,HVAC,3,Scott Schmerelson,Northwest,1275301,13416,7438 Topanga Canyon Blvd.,Canoga Park,91303,Non Air-Conditioned Classroom & Equipment,31,2014-Q4,2015-Q1,Closeout,20220630 Gridley ES,10367124,Gridley ES - Auditorium Upgrades,Auditorium Renovation,6,Kelly Gonez,Northeast,1429501,13748,1907 Eighth St.,San Fernando,91340,Provide electrical upgrades to the auditorium by providing new audio/visual equipment and installing a new upgraded sound system with a new projector.,33,2015-Q4,2016-Q1,Closeout,20220630 2nd St. ES,10364090,2nd St. ES - Roofing,Roofing,2,Monica Garcia,East,1657501,13326,1942 E. 2nd St.,Los Angeles,90033,"The project will replace the roofing on 3 classroom buildings and the lunch shelter, which are more than 40 years old. The existing roofs have poor surface area drainage and water ponding issues. Multiple patchwork repairs prolonged the life of the roofs, but they are now deteriorated beyond economical repair. Within the last few years, Maintenance & Operations has received repetitive requests for service repair calls.",164,2014-Q1,2014-Q2,Closeout,20220630 Lincoln HS,10366299,Pilot School - Academy of Environmental and Social Policy HS at Lincoln HS,Reconfiguration,2,Monica Garcia,East,1872901,13280,3501 N. Broadway,Los Angeles,90031,"Reconfigure and upgrade 16 classrooms, 3 administrative offices, and 2 counseling offices at Lincoln HS to create separate and distinct facilities space that enables the successful operation of Academy of Environmental and Social Policy (ESP) HS.",249,2014-Q2,2014-Q3,Closeout,20220630 Evergreen EEC,10369849,Evergreen EEC - Nature Explore Classroom,Campus Improvement,2,Monica Garcia,East,1958601,16763,1027 N. Evergreen Ave.,Los Angeles,90033,"This project will create field-tested, research-based outdoor learning spaces that provide learning opportunities and support children's interaction with the natural world. The outdoor learning spaces are divided into distinct activity areas to provide a wide-ranging mix of educational activities that support children with a variety of needs and learning styles. The activity areas include art, building, music, climbing/balancing, flexing, gathering, gardening, messy materials, wheel toys, etc.","2,233",2022-Q4,2023-Q3,Design,20220630 Miles ES,10369138,Miles ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1531501,13650,6720 Miles Ave.,Huntington Park,90255,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",58,2018-Q1,2018-Q2,Closeout,20220630 Columbus ES,10369145,Columbus ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northeast,1743201,13568,6700 Columbus Ave.,Van Nuys,91405,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",51,2018-Q1,2018-Q3,Closeout,20220630 Sunland ES,10369158,Sunland ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1697301,13451,8350 Hillrose St.,Sunland,91040,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",54,2018-Q1,2018-Q3,Closeout,20220630 West Vernon ES,10369165,West Vernon ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1765401,13330,4312 S. Grand Ave.,Los Angeles,90037,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",53,2018-Q2,2018-Q4,Closeout,20220630 Annalee ES,10369169,Annalee ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1214601,13760,19410 S. Annalee Ave.,Carson,90746,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",50,2018-Q1,2018-Q4,Closeout,20220630 Van Nuys ES,10107684,Van Nuys ES - Mitigate Lead in Water,Plumbing/Irrigation/Drainage,3,Scott Schmerelson,Northeast,1743801,13403,6464 Sylmar Ave.,Van Nuys,91401,Mitigate Lead in Water,51,2014-Q1,2015-Q1,Closeout,20220630 Buchanan ES,10368093,Buchanan ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1260301,13350,5024 Buchanan St.,Los Angeles,90042,"Remove/demolish 2 bungalows, provide temporary fencing, disconnect all utilities including low voltage and power, reconnect all utilities to remaining buildings on site, and restore asphalt paving as needed. Abate and transport all asbestos, lead and other hazardous materials offsite and perform phase 1, 2 & 3 onsite monitoring.",320,2016-Q4,2020-Q1,Closeout,20220630 Rowan ES,10369405,Rowan ES - Relocate Computer Equipment,Access Compliance,2,Monica Garcia,East,1642501,13381,600 S. Rowan Ave.,Los Angeles,90023,Move contents of computer classroom with no ramp to room 65 with a Ramp.,3,2017-Q4,2017-Q4,Closeout,20220630 Stevenson College & Career Preparatory,10108867,Stevenson College & Career Preparatory - A/C System Replacement in 2 Buildings,HVAC,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,A/C System Replacement in 2 Buildings,"1,530",2014-Q3,2015-Q2,Closeout,20220630 Banning HS,10369171,Banning HS - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,"Modernize Parent & Family Center classroom by providing interior paint, security upgrades (install metal skins and new locking mechanisms on doors), replacing deteriorated floor/ceiling tiles as needed, and installing white boards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage. Provide directional signage along the path of travel leading to room. Provide 20 new Chromebooks with charging cart and 1 laptop for Parent Coordinator.",55,2018-Q1,2018-Q2,Closeout,20220630 4th St. EEC,10005008,4th St. EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,East,1944001,16342,421 S. Hillview Ave.,Los Angeles,90022,Upgrade entry control system and provide shade shelters,149,2014-Q4,2015-Q1,Closeout,20220630 Los Angeles HS,10368386,Los Angeles HS - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,"Replace deteriorated interior walk-in cooler and exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",267,2018-Q4,2019-Q4,Closeout,20220630 Cienega ES,10368703,Cienega ES - Replace Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1306801,13429,2611 S. Orange Dr.,Los Angeles,90016,Remove deteriorated marquee. Provide and install new electronic marquee.,22,2017-Q3,2017-Q3,Closeout,20220630 Hollywood HS,10368360,Hollywood HS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1869301,13356,1521 N. Highland Ave.,Los Angeles,90028,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",167,2018-Q2,2019-Q1,Closeout,20220630 Fries ES,10367086,Fries ES - Paving,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1401401,13463,1301 Fries Ave.,Wilmington,90744,"The over 30-year-old asphalt concrete paving on the campus is severely damaged and in need of replacement. The scope of work includes replacing deteriorated asphalt concrete pavement, adding solar reflective coating, redesigning the outdoor play areas to meet current requirements with new playground equipment and matting as well as hard courts, relocating the marquee sign and its footings, and providing landscaping and irrigation improvements. In addition, the project includes associated Americans with Disabilities Act (ADA) restroom, drinking fountain, and path of travel upgrades and drainage systems required by DSA and the District's Storm Water Technical Manual.","3,692",2018-Q2,2019-Q2,Closeout,20220630 Grape ES,10369363,Grape ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,South,1427401,13495,1940 E. 111th St.,Los Angeles,90059,Install Aiphone video/buzzer entry system at main entrance.,25,2018-Q1,2018-Q2,Closeout,20220630 Fishburn ES,10368807,Fishburn ES - 2017-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1384901,13532,5701 Fishburn Ave.,Maywood,90270,"This project was initially approved in BOE Report No. 530-16/17 for the 2017-18 Prop 39 co-locations as a charter school renovation for Clemente Charter School. This project included 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/19.",13,2017-Q2,2017-Q3,Closeout,20220630 Maclay MS,10369326,Maclay MS - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"Remove/demolish 2 portable buildings. Remove/relocate furniture and equipment, disconnect low voltage ITD components and utilities, restore areas with asphalt paving in the building footprints.",32,2018-Q1,2018-Q2,Closeout,20220630 Avalon Gardens ES,10366377,Avalon Gardens ES - Compliance with State & Federal Access Requirements,Access Compliance,7,Tanya Ortiz Franklin,South,1224701,13618,13940 S. San Pedro St.,Los Angeles,90061,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Temporary Ramp,22,2014-Q3,2015-Q1,Closeout,20220630 San Pedro HS,10366808,San Pedro HS - Comprehensive Modernization,Comprehensive Modernization,7,Tanya Ortiz Franklin,South,1885001,13377,1001 W. 15th St.,San Pedro,90731,"This project includes the construction of new buildings and site improvements with 14 general and specialty classrooms, instructional support spaces, administration, food service, campus drop-off/main entrance, band/visual arts, lunch shelter, tennis courts, and central plant with associated infrastructure. Existing school facilities will be upgraded including the modernization and seismic retrofit of the administration building, classroom building #1, and home economics building; seismic retrofit of the old gymnasium building; and the modernization of the science/classroom building with a new elevator, minor interior modifications, and improvements to the exterior façade. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of the shop building, industrial arts building, central plant, food service building, and 16 relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","244,765",2021-Q2,2027-Q4,Construction,20220630 Anatola ES,10371763,Anatola ES - Install Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1211001,13609,7364 Anatola Ave.,Lake Balboa,91406,Install new secure entry system at door to main office with two video receivers in main office and one in principal's office.,33,2021-Q4,2022-Q3,Construction,20220630 Sutter MS,10370621,Sutter MS - 2019-21 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1840601,13537,7330 Winnetka Ave.,Canoga Park,91306,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for Ingenium Charter MS. This project included 1 charter office, 2 special education rooms, and 10 instructional spaces for charter student seats in grades 6-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 10 instructional spaces for charter student seats in grades 6-8 and an undefined scope of work.",28,2019-Q2,2019-Q3,Closeout,20220630 Park Western EEC,10100507,Park Western EEC - Cabinet & Countertop Improvements,Ceiling/Wall System,7,Tanya Ortiz Franklin,South,1954801,16742,1220 Park Western Pl.,San Pedro,90732,Repair or replace built-in cabinets or countertops.,19,2020-Q4,2021-Q1,Closeout,20220630 Granada ES,10370699,Granada ES - Wall-Fold Tables,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1423301,13561,17170 Tribune St.,Granada Hills,91344,Install wall-fold tables,24,2020-Q1,2020-Q3,Closeout,20220630 59th St. ES,10372163,59th St. ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1379501,13400,5939 Second Ave.,Los Angeles,90043,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",415,2022-Q2,2022-Q4,Construction,20220630 Short ES,10372301,Short ES - Secure Entry System,Security System,4,Nick Melvoin,West,1674001,13679,12814 Maxella Ave.,Los Angeles,90066,Install new secure entry system at the Main Office.,35,2022-Q2,2022-Q4,Construction,20220630 Twain MS,10372466,Twain MS - Install Gym Scoreboards,Electrical/Lighting,4,Nick Melvoin,West,1842501,13630,2224 Walgrove Ave.,Los Angeles,90066,Install scoreboards in gym. Install one scoreboard and shot clock at each end of basketball court/gym (2 each total). Wall-mounted with wireless transmitters/controls.,60,2022-Q3,2023-Q1,Planning,20220630 Fairburn ES,10371416,Fairburn ES - Install Ramp,Access Compliance,4,Nick Melvoin,West,1372601,13445,1403 Fairburn Ave.,Los Angeles,90024,Install TMP ramp at sanitary building and provide accessible stall in girls restroom. Additional ADA barrier removals.,128,2020-Q3,2020-Q4,Closeout,20220630 Bancroft MS,10366862,Bancroft MS - HVAC,HVAC,4,Nick Melvoin,West,1803801,13565,929 N. Las Palmas Ave.,Los Angeles,90038,"This project upgrades the heating, ventilation, and air conditioning (HVAC) system in the north classroom building, administration & classroom building, auditorium building, and the lunch shelter. The HVAC systems are over 25 years old and in poor condition resulting in unreliable service. The scope of work includes replacing HVAC equipment including new rooftop heat pump units, condensing units and fan coils, multi-zone air handling units, chiller, and cooling tower; modifying ductwork and cleaning air distribution systems; and providing structural, electrical and plumbing upgrades to support the new HVAC equipment. The project also includes asbestos and hazardous material abatement, fire alarm upgrades with modifications to the sprinkler system and replacement of the kitchen hood fire suppression system, and repair and painting for walls, ceilings and roofing impacted by the HVAC installation.","8,909",2018-Q4,2020-Q3,Closeout,20220630 State EEC,10369325,State EEC - Campus Upgrade,Campus Improvement,5,Jackie Goldberg,East,1956301,16704,3210 Broadway,Huntington Park,90255,"The project will provide 1 restroom that complies with the Americans with Disabilities Act (ADA), renovate an existing conference room to convert into the Principal's office including electrical upgrades for power and data, and will provide a new 7-stall faculty parking lot, with ADA upgrades as necessary including path of travel access to the main entrance. Additionally, the project will provide new wrought-iron decorative fencing.","1,478",2022-Q4,2023-Q4,Design,20220630 Valley Oaks Center for Enriched Studies,10371338,Sun Valley HS - 2020-22 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for North Valley Military Institute. This project included 1 charter office, 8 special education rooms, and 23 instructional spaces for charter student seats in grades 6-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 8 special education rooms, and 23 instructional spaces for charter student seats in grades 6-12 and an undefined scope of work. However, Valley Oaks Center for Enriched Studies requested a (40ft) storage container. As a result, this project is amended to include the scope of work required to provide this container.",54,2021-Q3,2021-Q3,Closeout,20220630 Politi ES,10372543,Politi ES - Secure Entry System,Security System,2,Monica Garcia,Central,1238401,13823,2481 W. 11th St.,Los Angeles,90006,Install new secure entry system at the Main Office.,42,2023-Q2,2023-Q3,Planning,20220630 Edison MS,10371618,Edison MS - Provide Verizon Lab Infrastructure,Communications/Technology Upgrade,7,Tanya Ortiz Franklin,South,1811301,13555,6500 Hooper Ave.,Los Angeles,90001,Infrastructure upgrades in support of Verizon Innovative Learning Lab installation,15,2020-Q4,2021-Q1,Closeout,20220630 Belmont HS,10364017,Newmark Continuation HS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",170,2014-Q4,2015-Q3,Closeout,20220630 Allesandro ES,10365640,Allesandro ES - Electronic Camera Entry System,Security System,5,Jackie Goldberg,Central,1206801,13367,2210 Riverside Dr.,Los Angeles,90039,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,19,2014-Q1,2014-Q2,Closeout,20220630 Fries ES,10004659,Fries ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1401401,13463,1301 Fries Ave.,Wilmington,90744,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",139,2012-Q4,2016-Q3,Closeout,20220630 Romer MS,10371335,Romer MS - 2020-23 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1811601,13894,6501 Laurel Canyon Blvd.,North Hollywood,91606,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for ISANA Palmati Academy. This project included 1 charter office, 1 special education room, and 11 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 11 instructional spaces for charter student seats in grades K-8 and an undefined scope of work. However, a request from Local District Northeast was received after budgeting to install additional chain-link fencing and gates between the parking lot and the campus in order to improve campus security from intruders and improve safety of pedestrians entering vehicular traffic area.. As a result, this project was amended to include this added scope of work. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 11 instructional spaces for charter student seats in grades TK-8 and an undefined scope of work.",62,2021-Q3,2021-Q3,Closeout,20220630 Calabash Charter Academy,10371226,Calabash Charter Academy - Technology Upgrade,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1270401,13743,23055 Eugene St.,Woodland Hills,91364,"This project provides technology upgrades to four of the new classrooms being constructed as part of the classroom replacement (project #10368191) on the campus. The scope of work includes the installation of a total of four interactive whiteboards in rooms 14, 15, 16, and 17. Each of these classrooms will have one Promethean 75"" V7 Titanium ActivPanel installed.",21,2020-Q3,2020-Q3,Closeout,20220630 Maintenance & Operations: North Region 2,10364186,Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,9142801,13910,8960 Herrick Ave.,Sun Valley,91352,Demolish/Remove Portable Building(s),75,2013-Q2,2014-Q2,Closeout,20220630 Manhattan ES,10367521,Manhattan ES - Renovate Kinder Restroom with Lift,Access Compliance,1,"Dr. George J. McKenna, III",West,1511001,13685,1850 W. 96th St.,Los Angeles,90047,Renovate kindergarten restrooms between classrooms 1 & 2 for changing table; Provide & install portable wheelchair lift in the auditorium,63,2016-Q1,2016-Q2,Closeout,20220630 San Fernando MS,10366629,San Fernando MS-Repair Ramp,Access Compliance,6,Kelly Gonez,Northeast,1835801,13420,130 N. Brand Blvd.,San Fernando,91340,Repair Existing Wood Ramp,13,2014-Q4,2015-Q1,Closeout,20220630 Sylmar ES,10364263,Sylmar ES - Portable Classrooms for Enrollment Growth,Portable Upgrade,6,Kelly Gonez,Northeast,1701401,13604,13291 Phillippi Ave.,Sylmar,91342,Provide Additional Classroom Space for Enrollment Growth,110,2017-Q1,2017-Q1,Closeout,20220630 Narbonne HS,10004161,Narbonne HS - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1877901,13407,24300 S. Western Ave.,Harbor City,90710,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",193,2012-Q1,2016-Q3,Closeout,20220630 El Camino Real Charter HS,10364031,El Camino Real Charter HS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1861701,13776,5440 Valley Circle Blvd.,Woodland Hills,91367,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,027",2014-Q1,2014-Q3,Closeout,20220630 Emerson Community Charter MS,10366029,Emerson Community Charter MS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1812301,13641,1650 Selby Ave.,Los Angeles,90024,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",360,2015-Q2,2015-Q3,Closeout,20220630 Reseda Charter HS,10366089,Reseda HS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",951,2015-Q1,2015-Q2,Closeout,20220630 Maclay MS,10366909,Maclay MS - 2015-16 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"This project is a charter school renovation for YPI Valley Public Charter HS for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 5 classrooms for charter student seats in grade 8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",206,2015-Q2,2016-Q2,Closeout,20220630 Bushnell Way ES,10368152,Bushnell Way ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1267101,13375,5507 Bushnell Way,Los Angeles,90042,"Replace deteriorated walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new walk-in freezer, walk-in cooler, refrigeration equipment, and refrigeration lines.",148,2017-Q1,2017-Q3,Closeout,20220630 Sendak ES,10369426,Sendak ES - Fencing,Fencing,6,Kelly Gonez,Northeast,1357401,13919,11414 W. Tiara St.,North Hollywood,91601,Replace chain link fence with privacy fence at west side of campus.,29,2018-Q2,2018-Q3,Closeout,20220630 Collins EEC,10367315,52nd St. EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1951601,16625,901 W. 52nd St.,Los Angeles,90037,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",73,2016-Q2,2016-Q4,Closeout,20220630 Evergreen EEC,10005028,Evergreen EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,East,1958601,16763,1027 N. Evergreen Ave.,Los Angeles,90033,"Upgrade entry control system, plumbing systems in restrooms, exterior gates, and playground equipment",89,2014-Q1,2015-Q2,Closeout,20220630 Hooper EEC,10005042,Hooper EEC - Safety Upgrades and Improvements,Campus Improvement,5,Jackie Goldberg,Central,1952501,16294,1224 E. 52nd St.,Los Angeles,90011,"Upgrade entry control system, plumbing systems in restroom, exterior gates, and playground equipment",35,2014-Q1,2015-Q3,Closeout,20220630 Allesandro ES,10363875,Allesandro ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1206801,13367,2210 Riverside Dr.,Los Angeles,90039,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",234,2014-Q2,2014-Q4,Closeout,20220630 Hoover ES,10363957,Hoover ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1458901,13298,2726 Francis Ave.,Los Angeles,90005,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",619,2015-Q1,2015-Q2,Closeout,20220630 Dodson MS,10364028,Dodson MS - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1811001,13846,28014 Montereina Dr.,Rancho Palos Verdes,90275,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",693,2014-Q1,2014-Q3,Closeout,20220630 Amestoy ES,10364093,Amestoy ES - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1209601,13426,1048 W. 149th St.,Gardena,90247,"The project will replace the roofing on 7 classroom buildings, multipurpose room, lunch shelter, and 3 restrooms. The roofing is more than 36 years old and consists of multiple layers of patches, poor surface area drainage and water ponding issues.",562,2014-Q4,2015-Q1,Closeout,20220630 92nd St. ES,10363867,92nd St. ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1554801,13511,9211 Grape St.,Los Angeles,90002,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",552,2015-Q3,2015-Q4,Closeout,20220630 Olive Vista MS,10366563,Olive Vista MS-Removal/Relocation of 5 Portables,Portable Removal,6,Kelly Gonez,Northeast,1830601,13707,14600 Tyler St.,Sylmar,91342,"Removal/Relocation of 5 Portables; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",149,2015-Q3,2016-Q1,Closeout,20220630 Apperson ES,10363878,Apperson ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1216401,13608,10233 Woodward Ave.,Sunland,91040,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",313,2014-Q4,2014-Q4,Closeout,20220630 Bassett ES,10363883,Bassett ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1232301,13813,15756 Bassett St.,Lake Balboa,91406,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",373,2014-Q1,2014-Q3,Closeout,20220630 Eagle Rock HS,10367404,Eagle Rock HS - Seismic Retrofit & HVAC in Main Gym,Seismic Modernization,5,Jackie Goldberg,Central,1861401,13553,1750 Yosemite Dr.,Los Angeles,90041,"This project addresses cooling needs and seismically retrofits the south main gym of approximately 24,000 square feet that was built in 1957. The project includes installing a new heating, ventilation, and air conditioning (HVAC) system and upgrading the fire alarm system to interface with the new HVAC system. The HVAC scope also includes equipment demolition, asbestos abatement, cleaning and leak test for ducts, structural and electrical power upgrades, and wall and ceiling repairs and painting. The seismic retrofit portion of the project includes constructing shear walls, wall anchorage connections, and cross-ties for transferring lateral loads and creating adequate structural capacity for life safety demand levels, and framing and retrofitting the roof diaphragm. The seismic retrofit scope also includes soil compaction grouting that provides a more stable foundation for the building by injecting grout under pressure into the soil, from approximately 20' to 40' below the surface, in hundreds of roughly configured columns to strengthen this layer of soil. In addition, this project replaces 2 sets of telescoping bleachers and the flooring throughout the building as well as provides restroom, drinking fountain, and path of travel upgrades to improve access.","14,648",2018-Q3,2020-Q4,Closeout,20220630 Wilmington Park ES,10372546,Wilmington Park ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1778101,13378,1140 Mahar Ave.,Wilmington,90744,Install new secure entry system at the Main Office.,33,2025-Q2,2025-Q3,Planning,20220630 Audubon MS,10371304,Audubon MS - 2020-22 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1802801,13564,4120 11th Ave.,Los Angeles,90008,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for Crenshaw Arts/Tech Charter HS (CATCH). This project included 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades 9-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 9 instructional spaces for charter student seats in grades 9-12 and an undefined scope of work.",9,2021-Q3,2021-Q3,Closeout,20220630 Danube ES,10371212,Danube ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1333501,13845,11220 Danube Ave.,Granada Hills,91344,Remove the existing marquee and footing at Danube Ave. and McKeever St. and replace with a new 2-sided electronic marquee standing less than 8' high.,58,2021-Q1,2021-Q3,Closeout,20220630 Peary MS,10372510,Peary MS - 2022-23 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1835201,13625,1415 W. Gardena Blvd.,Gardena,90247,"This project is a charter school renovation for KIPP Generations Academy for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 6 instructional spaces for charter student seats in grades 5-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",511,2022-Q3,2022-Q3,Planning,20220630 Olive Vista MS,10370048,Olive Vista MS - Metal Shop Improvements,Electrical/Lighting,6,Kelly Gonez,Northeast,1830601,13707,14600 Tyler St.,Sylmar,91342,Upgrade electrical outlets in metal shop and install new machinery provided by Career Technical Education (CTE) grant,34,2018-Q4,2019-Q1,Closeout,20220630 Bell HS,10372240,Bell HS - Install Security Monitor System,Security System,5,Jackie Goldberg,East,1853601,13488,4328 Bell Ave.,Bell,90201,Install new video surveillance (CCTV) system with (4) new cameras. Connect (67) existing cameras to new system. Discard existing deteriorated/outdated system server.,114,2022-Q2,2022-Q3,Construction,20220630 Holmes EEC,10371811,Holmes EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,5,Jackie Goldberg,East,1952401,16292,1810 E. 52nd St.,Los Angeles,90058,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 5,868 sqft. Additionally, we will replace deteriorated HVAC units and make necessary upgrades to the fire alarm system, as required by current code.","2,265",2023-Q2,2024-Q2,Design,20220630 Toluca Lake ES,10372230,Toluca Lake ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1719201,13634,4840 Cahuenga Blvd.,North Hollywood,91601,Install new secure entry system at the Main Office,29,2022-Q2,2022-Q3,Construction,20220630 Nobel Charter MS,10372239,Nobel Charter MS - Purchase Classroom Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1827201,13805,9950 Tampa Ave.,Northridge,91324,"Purchase (38) student desks, (300) student chairs, and (20) teacher chairs. (358) items total.",68,2022-Q1,2022-Q2,Closeout,20220630 Taft Charter HS,10368166,Taft Charter HS - Comprehensive Modernization,Comprehensive Modernization,4,Nick Melvoin,Northwest,1888001,13787,5461 Winnetka Ave.,Woodland Hills,91364,"This project includes the construction of new buildings and site improvements with administrative and support spaces, softball field, and an artificial turf field and synthetic track with scoreboard, new home stand bleachers, rrestrooms, ticket booth, and concession stand. Existing school facilities will be upgraded including the modernization and seismic retrofit of the administration building, multipurpose room/food service/lunch shelter/student store building, and industrial arts building #1; and three new elevators with bridges will be added to provide programmatic access to the 2-story classroom buildings A-G. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of sanitary buildings #1 & #2 (buildings #8 & #14), industrial arts building #2 (building #9), storage unit buildings #11 & 13, parent center buildings #12 & #16, ticket booth #1 (building #39), concession #1 (building #41), and 12 relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","160,045",2021-Q4,2026-Q4,Construction,20220630 Hobart ES,10370592,Hobart ES - 2019-23 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1454801,13331,980 S. Hobart Blvd.,Los Angeles,90006,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for Vista Horizon Global Academy. This project included 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was then approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades K-5 and an undefined scope of work. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades TK-5 and an undefined scope of work. However, the co-located charter requested the pick-up of Prop 39-owned furniture which became obsolete due the purchase of their own furniture. This Prop 39 furniture was returned to inventory for future use within the Prop 39 Program. As a result, this project was amended to included the scope of work required to retrieve the furniture. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades TK-5 and an undefined scope of work.",107,2021-Q3,2021-Q3,Closeout,20220630 Miles ES,10366698,Miles ES-Removal of 4 DOH Bldgs.,Portable Removal,5,Jackie Goldberg,East,1531501,13650,6720 Miles Ave.,Huntington Park,90255,"Removal of 4 Department of Housing (DOH) Portable Buildings; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",149,2015-Q1,2016-Q1,Closeout,20220630 Lorena ES,10366906,Lorena ES - 2015-16 Prop 39,Charter Prop 39,2,Monica Garcia,East,1494501,13351,1015 S. Lorena St.,Los Angeles,90023,"This project is a charter school renovation for Extera Public School - Lorena for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 12 classrooms for charter student seats in grades K-3. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",39,2015-Q2,2015-Q3,Closeout,20220630 Taft Charter HS,10364073,Taft Charter HS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,Northwest,1888001,13787,5461 Winnetka Ave.,Woodland Hills,91364,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.","1,401",2013-Q4,2014-Q2,Closeout,20220630 Glen Alta Span School,10363941,Glen Alta ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1413701,13292,3410 Sierra St.,Los Angeles,90031,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",361,2015-Q2,2015-Q3,Closeout,20220630 Gridley ES,10363945,Gridley ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1429501,13748,1907 Eighth St.,San Fernando,91340,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",348,2014-Q2,2014-Q3,Closeout,20220630 Lanterman Special Education HS,10363964,Lanterman Special Education HS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1191901,13905,2328 St. James Pl.,Los Angeles,90007,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",271,2014-Q3,2014-Q4,Closeout,20220630 Newcastle ES,10363978,Newcastle ES - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,Northwest,1547901,13720,6520 Newcastle Ave.,Reseda,91335,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",286,2014-Q2,2014-Q3,Closeout,20220630 San Antonio ES,10363993,San Antonio ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1464101,13827,6222 State St.,Huntington Park,90255,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",293,2014-Q3,2014-Q4,Closeout,20220630 Washington PC,10364009,Washington PC - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",South,1763001,13917,860 W. 112th St.,Los Angeles,90044,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",168,2014-Q2,2014-Q3,Closeout,20220630 Maclay MS,10366064,Maclay MS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",430,2015-Q1,2015-Q2,Closeout,20220630 Northridge MS,10366077,Northridge MS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1828301,13740,17960 Chase St.,Northridge,91325,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",415,2015-Q1,2015-Q2,Closeout,20220630 Portola Charter MS,10366087,Portola MS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,Northwest,1810701,13785,18720 Linnet St.,Tarzana,91356,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",504,2015-Q1,2015-Q2,Closeout,20220630 Earhart Continuation HS,10369957,Earhart Continuation HS - Secure Entry System,Security System,3,Scott Schmerelson,Northeast,1878801,16525,5355 Colfax Ave.,North Hollywood,91601,Install new secure entry system,31,2018-Q4,2019-Q1,Closeout,20220630 Sierra Vista ES,10107446,Sierra Vista ES - Compliance with State & Federal Access Requirements,Access Compliance,2,Monica Garcia,East,1676701,13380,4342 Alpha St.,Los Angeles,90032,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) for Lunch Shelter,202,2016-Q4,2017-Q1,Closeout,20220630 Sylmar Charter HS,10368384,Sylmar Charter HS - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1887801,13856,13050 Borden Ave.,Sylmar,91342,"Replace deteriorated interior walk-in cooler and exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",247,2018-Q3,2019-Q1,Closeout,20220630 Heliotrope ES,10103871,Provide Sanitary Building,Portable Upgrade,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,Provide Sanitary Building,691,2013-Q3,2014-Q1,Closeout,20220630 Valley Oaks Center for Enriched Studies,10364197,Sun Valley HS - Provide Outdoor Learning Center,Campus Improvement,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,"On March 3, 2013, a fire damaged a classroom building with 5,496 square feet. This project will demolish the fire-damaged classroom building, repair a portion of the attached arcade, and provide an outdoor educational learning center and courtyard with trees, shrubbery, and ground cover in its place. The scope will include required Americans with Disabilities Act (ADA) path of travel improvements from the parking lot to the main building, installation of a new concrete masonry security fence, and galvanized access gate.","1,704",2015-Q4,2017-Q1,Closeout,20220630 Bancroft MS,10370480,Bancroft MS - Technology and Security Upgrade,Communications/Technology Upgrade,4,Nick Melvoin,West,1803801,13565,929 N. Las Palmas Ave.,Los Angeles,90038,Purchase 57 Chromebooks and 2 charging carts; provide security upgrades as needed.,32,2019-Q2,2019-Q3,Closeout,20220630 Walgrove ES,10366993,Walgrove ES - SEEDS,SEEDS,4,Nick Melvoin,West,1760301,13729,1630 Walgrove Ave.,Los Angeles,90066,"Improve an existing outdoor learning space that is approximately 3,000 square feet by installing decomposed granite, a concrete entrance pad, an irrigation system and fencing. The outdoor learning space will be outfitted by the school site and partner organization (EnrichLA) with planter boxes and planting materials.",56,2015-Q3,2016-Q2,Closeout,20220630 Fulton College Preparatory School,10369747,Fulton College Preparatory School - 2018-19 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,"This project is a charter school renovation for Lashon Academy for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 18 instructional spaces for charter student seats in grades K-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",144,2018-Q2,2018-Q3,Closeout,20220630 Miles ES,10370604,Miles ES - 2019-20 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1531501,13650,6720 Miles Ave.,Huntington Park,90255,"KIPP Comienza Community Prep is vacating this site. This project was approved in Board of Education Report No. 343-18/19. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",28,2019-Q2,2019-Q3,Closeout,20220630 Ambler ES,10367654,Ambler ES - 2016-17 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1208901,13833,319 E. Sherman Dr.,Carson,90746,"This project is a charter school renovation for Community Preparatory Academy for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office and 6 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",11,2016-Q2,2016-Q3,Closeout,20220630 Manhattan ES,10102207,Manhattan ES - Paving,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1511001,13685,1850 W. 96th St.,Los Angeles,90047,Asphalt Paving Repair & Resealing,31,2018-Q2,2018-Q3,Closeout,20220630 Paseo del Rey Natural Science Magnet ES,10364122,Paseo del Rey Natural Science Magnet ES - HVAC,HVAC,4,Nick Melvoin,West,1605201,13784,7751 Paseo Del Rey,Playa Del Rey,90293,"The project will remove and replace the existing boilers, heating and ventilation units which provide heating and cooling for the main building and classrooms. The existing equipment is more than 36 years old and is severely deteriorated resulting in unreliable service.","9,614",2018-Q2,2020-Q2,Closeout,20220630 Lockhurst Charter ES,10366166,Lockhurst Charter ES - Compliance with State & Federal Access Requirements,Access Compliance,3,Scott Schmerelson,Northwest,1488701,13794,6170 Lockhurst Dr.,Woodland Hills,91367,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Restroom Renovation,8,2014-Q3,2014-Q3,Closeout,20220630 Stoner ES,10366926,Stoner ES - 2015-18 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1695201,13772,11735 Braddock Dr.,Culver City,90230,"This project was initially approved in BOE Report No. 423-14/15 for 2015-16 Prop. 39 co-locations as a charter school renovation for ICEF Vista Academy ES. This new project included 1 charter office and 8 instructional spaces for charter students in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a ""no growth"" project with 1 charter office, 1 special education room, and 8 instructional spaces for charter students in grades K-5. The project was again amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",137,2015-Q2,2015-Q3,Closeout,20220630 Maple PC,10369954,Maple PC - Secure Entry System,Security System,5,Jackie Goldberg,Central,1722001,13952,3601 S. Maple Ave.,Los Angeles,90011,Install new secure entry system,5,2018-Q4,2019-Q2,Closeout,20220630 Huntington Park ES,10369983,Huntington Park ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1239101,13916,6055 Corona Ave.,Huntington Park,90255,Install new secure entry system,22,2018-Q4,2019-Q1,Closeout,20220630 Downtown Magnets HS: Downtown Business,10367119,Downtown Business Magnet - Fencing,Fencing,2,Monica Garcia,Central,1873801,13269,1081 W. Temple St.,Los Angeles,90012,"Provide physical security upgrades to the campus by installing new fence panels, fencing and gates around the perimeter as the site is currently open to the public.",101,2017-Q3,2019-Q3,Closeout,20220630 El Dorado ES,10364248,El Dorado ES - Portable Removal,Portable Removal,6,Kelly Gonez,Northeast,1354101,13792,12749 El Dorado Ave.,Sylmar,91342,Demolish/Remove Portable Building(s),26,2013-Q3,2014-Q1,Closeout,20220630 Madison MS,10368310,Madison MS - Gym Lockers,Lockers,6,Kelly Gonez,Northeast,1823001,13627,13000 Hart St.,North Hollywood,91605,Provide and install gym lockers.,26,2017-Q3,2017-Q4,Closeout,20220630 Burbank Arts Tech Community Magnet MS,10367665,Burbank MS - 2016-18 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1806601,13551,6460 N. Figueroa St.,Los Angeles,90042,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a charter school renovation for Celerity Troika Charter School. This reconfiguration project included 1 charter office, 1 special education room, and 9 instructional spaces for charter students in grades K-8, and reduced the number of spaces previously allocated to Celerity Troika Charter School during the 2015-16 school year. The scope of work included facilities renovations and reconfigurations, recovery of furniture and equipment, and recovery of technology. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with 1 charter office, 1 special education room, and 11 instructional spaces for charter students in grades K-8 and with an unspecified scope of work and a revised expiration date for the charter school of 6/30/18. The charter operator, Celerity Troika Charter School did not continue to occupy Burbank MS during the 2017-18 academic year. As a result, the scope of work was defined as a vacancy which may include the relocation of classrooms, cleaning, recovery of furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",151,2016-Q2,2016-Q3,Closeout,20220630 Fremont HS,10003962,Fremont HS Redevelopment,Comprehensive Modernization,7,Tanya Ortiz Franklin,South,1865001,13475,7676 S. San Pedro St.,Los Angeles,90003,This project redevelops the Fremont HS campus through a major reconfiguration and modernization project. This project will provide upgraded classrooms and core facilities throughout the school including the main administrative and classroom building as well as food service facilities.,"86,193",2013-Q3,2016-Q2,Closeout,20220630 Pio Pico MS,10366830,Pio Pico MS - HVAC & Fire Alarm System,HVAC,1,"Dr. George J. McKenna, III",West,1498001,13903,1512 S. Arlington Ave.,Los Angeles,90019,"This project will upgrade the heating, ventilation, and air conditioning (HVAC) systems for the classroom/multipurpose and library buildings. The HVAC systems are over 25 years old and in poor condition resulting in unreliable service. The project also includes campus-wide fire alarm system upgrades.","5,016",2018-Q1,2019-Q1,Closeout,20220630 Marina Del Rey MS,10367134,Marina Del Rey MS - Wrought Iron Fencing,Campus Improvement,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"Provide physical security upgrades to the service road and lunch areas by installing new wrought iron fencing and gates, include replacement of all new concrete.",73,2015-Q4,2016-Q4,Closeout,20220630 Plainview Academic Charter Academy,10371512,Plainview Academic Charter Academy - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1609601,13580,10819 Plainview Ave.,Tujunga,91042,Remove large eucalyptus tree near sidewalk at south end of the parking lot on Plainview Ave. Install a new 2-sided electronic marquee standing less than 8' high at the former tree location.,72,2021-Q3,2022-Q3,Construction,20220630 Griffin ES,10369300,Griffin ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1430101,13284,2025 Griffin Ave.,Los Angeles,90031,"Removal of 2 portable buildings. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprints.",184,2017-Q4,2019-Q1,Closeout,20220630 Annandale ES,10367013,Annandale ES - ADA Improvements,Access Compliance,5,Jackie Goldberg,Central,1215101,13371,6125 Poppy Peak Dr.,Los Angeles,90042,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 43 doors/hardware, 31 accessible paths of travel, 27 signs, 4 restrooms, 8 drinking fountains/sinks, 2 casework/counters, 2 assistive listening devices/intercoms/phones, 3 concrete ramps, 1 metal ramp, 5 pieces of accessible furniture, 1 arcade, 4 railings, 3 playground components, and 2 parking areas.","3,475",2016-Q4,2020-Q1,Closeout,20220630 Graham ES,10364106,Graham ES - HVAC,HVAC,7,Tanya Ortiz Franklin,South,1421901,13476,8407 S. Fir Ave.,Los Angeles,90001,"The project will remove and replace the existing Trane chiller, boiler, water-source heat pumps and air handlers, which provide heating and air conditioning for 20 or more classrooms and offices. The equipment is 26 years old and in poor condition resulting in repeated service calls.","7,600",2017-Q1,2018-Q4,Closeout,20220630 San Fernando EEC,10372471,San Fernando EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,6,Kelly Gonez,Northeast,1955501,13419,1204 Woodworth St.,San Fernando,91340,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 6,300 ft2. ADA upgrades for this project include (a) resurfacing a portion of the parking area - approximately 1,400 ft2 - to provide an ADA compliant path of travel and (b) providing an ADA compliant restroom. Additionally, we will replace deteriorated HVAC units and roofing, and make necessary upgrades to the fire alarm system, and other ADA upgrades as required by current code.","2,974",2023-Q4,2025-Q1,Planning,20220630 Latona ES,10365194,Latona ES - Security Upgrades,Security System,2,Monica Garcia,East,1479501,13374,4312 Berenice Ave.,Los Angeles,90031,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,20,2014-Q1,2014-Q3,Closeout,20220630 Beachy ES,10363884,Beachy ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1232901,13666,9757 Beachy Ave.,Arleta,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",400,2014-Q2,2014-Q3,Closeout,20220630 Florence ES,10370354,Florence ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,East,1389001,13397,7211 Bell Ave.,Los Angeles,90001,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",51,2019-Q2,2019-Q4,Closeout,20220630 Northridge MS,10371715,Northridge MS - Install Intrusion Alarm In Technology Lab,Security System,3,Scott Schmerelson,Northwest,1828301,13740,17960 Chase St.,Northridge,91325,"Scope will provide 4 motion sensors and 2 sirens each, in rooms 190 and 191, and will tie the system into the existing intrusion alarm system.",24,2021-Q2,2021-Q2,Closeout,20220630 Stevenson College & Career Preparatory,10371339,Stevenson College & Career Preparatory - 2020-22 Prop 39,Charter Prop 39,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for Collegiate Charter HS of Los Angeles. This project included 1 charter office, 2 special education rooms, and 10 instructional spaces for charter student seats in grades 9-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 8 instructional spaces for charter student seats in grades 9-12 and an undefined scope of work. However, the co-located charter requested the replacement of damaged furniture. As a result, this project is amended to include the scope of work required for the replacement of furniture.",153,2021-Q3,2021-Q3,Closeout,20220630 Nevada ES,10371710,Nevada ES - Install Parking Lot Swing Gates,Fencing,3,Scott Schmerelson,Northwest,1545901,13783,22120 Chase St.,West Hills,91304,Install swing gates at the two driveways of the Northeast parking lot at Chase St. and Hanna Ave.,32,2021-Q2,2021-Q3,Closeout,20220630 Heliotrope ES,10372145,Heliotrope ES - Purchase Furniture,Furniture/Fixtures/Equipment,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,"Purchase a variety of teacher/student desks, chairs, and storage for (4) classrooms. (240) items total",49,2021-Q4,2022-Q2,Closeout,20220630 Roybal Learning Center,10366814,Roybal LC-ADA Repairs,Access Compliance,2,Monica Garcia,Central,1854401,13875,1200 W. Colton St.,Los Angeles,90026,ADA Repairs,21,2015-Q2,2015-Q3,Closeout,20220630 Topanga Charter ES,10371480,Topanga Charter ES - Install Secure Entry System,Security System,4,Nick Melvoin,West,1719801,13816,22075 Topanga School Rd.,Topanga,90290,Install new secure entry system at door to main office with video receivers in main office. Quantity and location of video receivers to be determined by principal.,48,2020-Q4,2021-Q1,Closeout,20220630 Nimitz MS,10370733,Nimitz MS - Accessibility Upgrade,Access Compliance,5,Jackie Goldberg,East,1826801,13637,6021 Carmelita Ave.,Huntington Park,90255,Provide wheelchair access in girls restroom bldg. 0050CR.,42,2019-Q3,2019-Q3,Closeout,20220630 Valley Oaks Center for Enriched Studies,10371147,Sun Valley HS - Motorized Gate,Security System,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,New motorized drive gate.,99,2020-Q1,2020-Q4,Closeout,20220630 Coeur d'Alene ES,10371659,Coeur d'Alene ES - Install Water Bottler Fillers,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1634201,13578,810 Coeur D'Alene Ave.,Venice,90291,Install 2 water bottle filling stations.,22,2021-Q1,2021-Q2,Closeout,20220630 Woodlake Community Charter ES,10372394,Woodlake Community Charter ES - Purchase STEAM Lab Furniture and Technology,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1787701,13686,23231 Hatteras St.,Woodland Hills,91367,"Purchase tables, chairs, and storage for science class; 57 items total. Purchase video projector and document camera with mobile cart and projector screen",42,2022-Q3,2022-Q4,Planning,20220630 Panorama HS,10370607,Panorama HS - 2019-20 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,"This project is a charter school renovation for Girls Athletic Leadership School for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 2 special education rooms, and 11 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",33,2019-Q2,2019-Q3,Closeout,20220630 Glenfeliz ES,10370526,Glenfeliz ES - Secure Entry System,Security System,5,Jackie Goldberg,Central,1416401,13526,3955 Glenfeliz Blvd.,Los Angeles,90039,Install new secure entry system,14,2019-Q3,2019-Q4,Closeout,20220630 Frost MS,10366037,Frost MS - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1813701,13777,12314 Bradford Pl.,Granada Hills,91344,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",519,2014-Q4,2015-Q1,Closeout,20220630 54th St. ES,10369708,54th St. ES - ADA Improvements,Access Compliance,1,"Dr. George J. McKenna, III",West,1378101,13548,5501 S. Eileen Ave.,Los Angeles,90043,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 25 doors, 25 door hardware, 25 thresholds, accessible paths of travel, 56 signs, nine restrooms, nine drinking fountains/sinks, two assistive listening devices/intercoms/phones, 11 pieces of accessible furniture, seven assembly seats, two railings, four casework/counters, and one new stage lift.","3,350",2021-Q4,2022-Q4,Construction,20220630 Sunrise ES,10369305,Sunrise ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1698801,13395,2821 E. 7th St.,Los Angeles,90023,"Removal of 1 portable building. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprint.",125,2017-Q4,2019-Q3,Closeout,20220630 Arlington Heights ES,10371858,Arlington Heights ES - 2021-22 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1219201,15202,1717 Seventh Ave.,Los Angeles,90019,"This project is a charter school renovation for Global Education Academy #2 for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",83,2021-Q3,2021-Q3,Closeout,20220630 Taper ES,10367052,Taper ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1703501,13539,1824 Taper Ave.,San Pedro,90731,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 137 doors/hardware, 34 accessible paths of travel, 47 signs, 19 restrooms, 27 drinking fountains/sinks, 17 casework/counters, 1 assistive listening device/intercom/phone, 6 concrete ramps, 34 pieces of accessible furniture, 2 assembly seats, 12 arcades, 1 railing, and 1 new elevator.","7,848",2016-Q4,2022-Q3,Construction,20220630 Lake Balboa College Preparatory Magnet,10372537,Lake Balboa College Preparatory Magnet - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1739001,15185,6701 Balboa Blvd.,Lake Balboa,91406,Install new secure entry system at the Main Office.,46,2022-Q3,2022-Q4,Planning,20220630 Lawrence MS,10004057,Lawrence MS - Facelift,Facelift,3,Scott Schmerelson,Northwest,1821701,13695,10100 Variel Ave.,Chatsworth,91311,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",253,2011-Q4,2016-Q3,Closeout,20220630 Tarzana ES,10370386,Tarzana ES - Exterior Painting,Painting,4,Nick Melvoin,Northwest,1704101,13585,5726 Topeka Dr.,Tarzana,91356,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",266,2019-Q4,2020-Q2,Closeout,20220630 Northridge MS,10366557,Northridge MS - ADA Improvements,Access Compliance,3,Scott Schmerelson,Northwest,1828301,13740,17960 Chase St.,Northridge,91325,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 284 doors/hardware, 114 accessible paths of travel, 206 signs, 14 restrooms, 30 drinking fountains/sinks, 3 assistive listening devices/intercoms/phones, 9 concrete ramps, 2 metal ramps, 10 pieces of accessible furniture, 2 assembly seats, 26 railings, 11 locker room modifications/lockers, 5 cafeteria counters, 1 changing room, 3 new elevators/stage lifts, and 1 passenger/bus loading zone.","6,337",2014-Q4,2022-Q4,Closeout,20220630 Langdon ES,10369349,Langdon ES - New Ramp,Access Compliance,6,Kelly Gonez,Northwest,1477501,13413,8817 Langdon Ave.,North Hills,91343,Install ramp at building AA337.,82,2017-Q4,2018-Q1,Closeout,20220630 Brentwood Science Magnet ES,10371253,Brentwood Science Magnet ES - Portable Removal,Portable Removal,4,Nick Melvoin,West,1250701,13394,740 Gretna Green Way,Los Angeles,90049,"Demolish and remove 5 portable buildings and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",509,2020-Q2,2020-Q4,Closeout,20220630 Sylmar Charter HS,10371947,Sylmar Charter HS - Changing Room,Access Compliance,6,Kelly Gonez,Northeast,1887801,13856,13050 Borden Ave.,Sylmar,91342,Install TMP Ramp at classroom.,129,2021-Q3,2021-Q4,Closeout,20220630 Heliotrope ES,10364036,Heliotrope ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1450701,13530,5911 Woodlawn Ave.,Maywood,90270,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",491,2013-Q4,2014-Q2,Closeout,20220630 Lowman Special Education & Career Transition Center,10366561,Lowman Sp Ed-Removal of 2 Portables,Portable Removal,6,Kelly Gonez,Northeast,1194801,13544,12827 Saticoy St.,North Hollywood,91605,"Removal of 2 Portables; Disconnect and remove portables as well as restore site to original condition. Reconnect electrical, plumbing, and fire alarm systems to remaining buildings.",70,2014-Q4,2015-Q1,Closeout,20220630 75th St. EEC,10371807,75th St. EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,7,Tanya Ortiz Franklin,South,1955801,16683,242 W. 75th St.,Los Angeles,90003,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 12,600 sqft. ADA upgrades for this project include (a) resurfacing the parking area - approximately 592 sqft - to provide an ADA compliant path of travel and (b) providing an ADA compliant restroom. Additionally, we will replace deteriorated HVAC units and make necessary upgrades to the fire alarm system, as required by current code.","3,149",2023-Q2,2024-Q2,Design,20220630 Cantara ES,10371374,Cantara ES - Auditorium Upgrades,Electrical/Lighting,3,Scott Schmerelson,Northwest,1276701,13732,17950 Cantara St.,Reseda,91335,Install new stage lighting and sound system in auditorium,61,2020-Q4,2021-Q2,Closeout,20220630 Topeka Charter School for Advanced Studies,10370934,Topeka ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1720101,13821,9815 Topeka Dr.,Northridge,91324,Install new electronic free-standing marquee,51,2020-Q1,2020-Q1,Closeout,20220630 Short ES,10372143,Short ES - Install Privacy Fence,Fencing,4,Nick Melvoin,West,1674001,13679,12814 Maxella Ave.,Los Angeles,90066,Replace approx. 700 feet of chain link fence with privacy fencing. (2) rolling gates and (2) pedestrian swing gates along path.,61,2021-Q4,2022-Q1,Closeout,20220630 La Salle ES,10372170,La Salle ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1478601,13507,8715 La Salle Ave.,Los Angeles,90047,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",519,2022-Q2,2022-Q4,Construction,20220630 66th St. ES,10372187,66th St ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1682201,13339,6600 S. San Pedro St.,Los Angeles,90003,Install new secure entry system at the Main Building with three video receivers.,30,2022-Q1,2022-Q3,Construction,20220630 Westchester Enriched Sciences Magnets,10369800,Westchester Enriched Sciences Magnets - 2018-21 Prop 39 (Ocean Charter School),Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project was initially approved in BOE Report No. 429-17/18 for 2018-19 Prop 39 co-locations as a charter school renovation for Ocean Charter School. This project included 1 charter office, 1 special education room, and 19 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. Subsequent to the approval of the project, an alternative agreement was executed. As a result, the scope of work changed from a growth co-location to a ""no change"" project. The project was next approved for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 18 spaces allocated to the charter and an undefined scope of work. The project was then approved in Board of Education Report No. 313-19/20 for 2020-21 Proposition 39 charter co-locations as a vacating project. Ocean Charter School will not continue occupancy in the 2020-21 school year. Therefore, this project is amended to include the scope of work necessary to return the site to its previous conditions with all low voltage systems reconnected to District-operated programs.",14,2020-Q2,2021-Q1,Closeout,20220630 Burbank Arts Tech Community Magnet MS,10107786,Burbank Arts Tech Community Magnet MS - Replace Deteriorating Irrigation Controllers,Plumbing/Irrigation/Drainage,2,Monica Garcia,Central,1806601,13551,6460 N. Figueroa St.,Los Angeles,90042,Replace Deteriorating Irrigation Controllers,58,2014-Q1,2014-Q1,Closeout,20220630 Parthenia Academy of Arts & Technology,10363984,Parthenia ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1602701,13702,16825 Napa St.,North Hills,91343,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",337,2014-Q3,2014-Q4,Closeout,20220630 San Fernando MS,10004064,San Fernando MS - Facelift,Facelift,6,Kelly Gonez,Northeast,1835801,13420,130 N. Brand Blvd.,San Fernando,91340,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",192,2012-Q2,2016-Q3,Closeout,20220630 Eagle Rock HS,10004093,Eagle Rock HS - Facelift,Facelift,5,Jackie Goldberg,Central,1861401,13553,1750 Yosemite Dr.,Los Angeles,90041,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",103,2012-Q2,2016-Q3,Closeout,20220630 95th St. ES,10372168,95th St. ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1552101,13349,1109 W. 96th St.,Los Angeles,90044,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",575,2022-Q4,2024-Q2,Planning,20220630 Haddon ES,10372223,Haddon ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1432901,13527,10115 Haddon Ave.,Pacoima,91331,Install new secure entry system at the Main Office,41,2022-Q1,2022-Q3,Construction,20220630 Dixie Canyon Community Charter ES,10369346,Dixie Canyon Community Charter ES - Classroom Replacement,Addition,3,Scott Schmerelson,Northeast,1343801,13677,4220 Dixie Canyon Ave.,Sherman Oaks,91423,"Construction of 16 classrooms and support spaces that will be designed, constructed, and furnished/equipped to meet current code requirements and Los Angeles Unified design standards. Removal of 13 classrooms located in relocatable buildings. Installation of interim housing to support the school site during construction.Infrastructure upgrades as required to support the new facilities, including an enhanced Information Technology network convergence system. All supporting path-of-travel, landscaping, hardscape and infrastructure improvements as required.","59,241",2022-Q2,2026-Q2,Construction,20220630 Amestoy ES,10369411,Amestoy ES - Classroom Replacement,Addition,7,Tanya Ortiz Franklin,South,1209601,13426,1048 W. 149th St.,Gardena,90247,"The school has 32 classrooms located in relocatable buildings with 24 of the classrooms in DSA-certified portables, 2 of the classrooms in uncertified portables, and 6 of the classrooms in DOH portables that do not comply with State standards for school buildings. This project includes the construction of a new 12-classroom building and support spaces to replace 14 classrooms in relocatable buildings and will be furnished/equipped to current code requirements and District design standards. Also included in the project are two phases of interim housing to support the school site during construction of the new permanent building and infrastructure upgrades as required to support the new facilities such as an enhanced Information Technology network convergence system and a new campus-wide fire alarm system. Upgrades to landscape, hardscape, parking, and playground areas as appropriate will be made to support the removal of relocatable buildings and construction of new facilities. In addition, construction activities include site work and compliance with the Americans with Disabilities Act (ADA), Division of State Architect (DSA), California Environmental Quality Act (CEQA), Department of Toxic Substances Control (DTSC), and any other improvements or mitigations to meet Local, State and/or Federal facilities requirements.","44,035",2021-Q4,2024-Q4,Construction,20220630 Dorsey HS,10367940,Dorsey HS - ADA Improvements,Access Compliance,1,"Dr. George J. McKenna, III",West,1860001,13643,3537 Farmdale Ave.,Los Angeles,90016,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 74 doors/hardware, 69 accessible paths of travel, 70 signs, 13 restrooms, 17 drinking fountains/sinks, 4 assistive listening devices/intercoms/phones, 2 concrete ramps, 4 metal ramps, 15 pieces of accessible furniture, 2 assembly seats, 1 arcade, 7 locker room modifications/lockers, and 1 new elevator/stage lift.","5,767",2017-Q4,2022-Q4,Construction,20220630 Franklin HS,10370329,Franklin HS - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",60,2019-Q2,2020-Q1,Closeout,20220630 Vanalden ES,10372551,Vanalden ES - Purchase Parent Center Furniture,Furniture/Fixtures/Equipment,4,Nick Melvoin,Northwest,1741101,13724,19019 Delano St.,Reseda,91335,"Purchase standard parent center furniture package: (16) tables, (31) chairs, (5) types of storage.",28,2022-Q3,2022-Q4,Planning,20220630 Bernstein HS,10366882,Bernstein HS - 2015-18 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1869601,13953,1309 N. Wilton Pl.,Hollywood,90028,"This project was initially approved in BOE Report No. 423-14/15 for 2015-16 Prop. 39 co-locations as a charter school renovation for Academic Performance Excellence Academy (APEX). This growth project included 2 charter offices and 15 instructional spaces for charter students in grades 7-12. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-locations as a ""no growth"" project with 1 charter offices and 15 instructional spaces for charter students in grades 7-12. The project was again amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",7,2015-Q2,2015-Q3,Closeout,20220630 Buchanan ES,10369553,Buchanan ES - Playground Upgrades in Kindergarten Yard,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1260301,13350,5024 Buchanan St.,Los Angeles,90042,Install new playground structure and matting at kindergarten yard; provide Americans with Disabilities Act (ADA) compliant path of travel.,230,2018-Q3,2019-Q3,Closeout,20220630 Perez Special Education Center,10370120,Perez Special Education Center - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1195301,13489,4540 Michigan Ave.,Los Angeles,90022,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q3,2027-Q4,Planning,20220630 Saturn ES,10370135,Saturn ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1264401,13525,5360 Saturn St.,Los Angeles,90019,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2029-Q1,2029-Q3,Planning,20220630 Denker ES,10370142,Denker ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1342501,13638,1620 W. 162nd St.,Gardena,90247,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q4,2028-Q2,Planning,20220630 54th St. ES,10370148,54th St. ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1378101,13548,5501 S. Eileen Ave.,Los Angeles,90043,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2026-Q1,2026-Q2,Planning,20220630 Holmes ES,10370164,Holmes ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1456201,13315,5108 Holmes Ave.,Los Angeles,90058,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2027-Q3,2028-Q1,Planning,20220630 Hamasaki Medical & Science Magnet ES,10369870,Hamasaki ES - Secure Entry System,Security System,2,Monica Garcia,East,1627401,13577,4865 E. 1st St.,Los Angeles,90022,Install new secure entry system,23,2018-Q3,2019-Q1,Closeout,20220630 Calvert Charter for Enriched Studies,10368308,Calvert Charter for Enriched Studies - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,Northwest,1271201,13731,19850 Delano St.,Woodland Hills,91367,Provide and install electronic marquee.,33,2018-Q1,2018-Q2,Closeout,20220630 Mann MS,10368830,Mann MS - 2017-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1823601,13534,7001 S. St. Andrews Pl.,Los Angeles,90047,"Westchester Secondary Charter School is vacating this site. This project was approved in Board of Education Report No. 530-16/17. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",35,2017-Q3,2017-Q3,Closeout,20220630 Cohasset ES,10367496,Cohasset ES - Roofing,Roofing,3,Scott Schmerelson,Northwest,1313701,13542,15810 Saticoy St.,Lake Balboa,91406,"This project is to upgrade 67,200 square feet of roofing at eighteen buildings with a Polyvinyl Chloride (PVC) material. The roofs are over 15 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",654,2017-Q2,2017-Q4,Closeout,20220630 McAuliffe EEC,10367339,McAuliffe EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1945901,193555,8914 Hunt Ave.,South Gate,90280,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",89,2016-Q2,2016-Q2,Closeout,20220630 Gates EEC,10367320,Gates EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,East,1958901,16287,2306 Thomas St.,Los Angeles,90031,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",83,2016-Q2,2016-Q3,Closeout,20220630 Albion EEC,10106722,Albion EEC - Resurface Playground,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1950001,16685,348 S. Ave. 18,Los Angeles,90031,Resurface Playground,52,2012-Q2,2014-Q4,Closeout,20220630 Beachy ES,10145710,Beachy ES - Provide LED School Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1232901,13666,9757 Beachy Ave.,Arleta,91331,Provide LED School Marquee,42,2013-Q1,2014-Q1,Closeout,20220630 Ride ES (SMART Academy),10370877,Ride ES (SMART Academy) - Secure Entry System,Security System,5,Jackie Goldberg,Central,1230801,14584,1041 E. 46th St.,Los Angeles,90011,Install new secure entry system,20,2019-Q4,2019-Q4,Closeout,20220630 Tulsa ES,10370380,Tulsa ES - Exterior Painting,Painting,3,Scott Schmerelson,Northwest,1724701,13693,10900 Hayvenhurst Ave.,Granada Hills,91344,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",406,2020-Q1,2020-Q3,Closeout,20220630 Topeka Charter School for Advanced Studies,10370872,Topeka Charter School for Advanced Studies - Furniture & Innovation Lab,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1720101,13821,9815 Topeka Dr.,Northridge,91324,Purchase classroom furniture (tables and chairs) and create a new innovation lab/makerspace.,70,2019-Q4,2020-Q2,Closeout,20220630 Carson HS,10363841,Carson HS - Science Lab Improvements,Campus Improvement,7,Tanya Ortiz Franklin,South,1857501,13869,22328 S. Main St.,Carson,90745,"The project provides 3 chemistry labs with safety equipment including emergency shower/eyewash, fume hood, utility shutoff valves and HVAC units sufficient to remove chemical fumes from classrooms and workrooms. The project scope also includes chemical storage cabinets and eyewash in workrooms, a new exit door in 1 workroom, fire sprinklers in chemistry labs and workrooms, functional repairs to plumbing and cabinetry, and requirements of the Americans with Disabilities Act (ADA) for accessibility including path of travel improvements, restroom and fountain upgrades. The project will also complete any unfinished scope that was part of the previously-approved science lab renovation project at this school.","4,019",2017-Q2,2018-Q3,Closeout,20220630 Castlebay Charter ES,10371757,Castlebay ES - Install Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1288101,13892,19010 Castlebay Lane,Porter Ranch,91326,Install new secure entry system at door to main office with two video receivers in main office and one in principal's office.,31,2021-Q4,2022-Q3,Construction,20220630 Romer MS,10366091,Romer MS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1811601,13894,6501 Laurel Canyon Blvd.,North Hollywood,91606,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",520,2015-Q2,2015-Q3,Closeout,20220630 Santa Monica Community Charter ES,10366096,Santa Monica Community Charter ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,West,1654801,13347,1022 N. Van Ness Ave.,Los Angeles,90038,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",402,2015-Q2,2015-Q3,Closeout,20220630 Venice HS,10366113,Venice HS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1890701,13513,13000 Venice Blvd.,Los Angeles,90066,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",986,2015-Q2,2015-Q3,Closeout,20220630 1st St. ES,10363857,1st St. ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1383601,13267,2820 E. 1st St.,Los Angeles,90033,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",298,2014-Q3,2014-Q4,Closeout,20220630 20th St. ES,10363858,20th St. ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1727401,13333,1353 E. 20th St.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",305,2014-Q4,2014-Q4,Closeout,20220630 2nd St. ES,10363860,2nd St. ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1657501,13326,1942 E. 2nd St.,Los Angeles,90033,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",300,2014-Q4,2014-Q4,Closeout,20220630 Fair EEC,10005029,Fair EEC - Safety Upgrades and Improvements,Campus Improvement,6,Kelly Gonez,Northeast,1958201,16765,11300 Kittridge St.,North Hollywood,91606,"Upgrade entry control system, exterior gates, and playground equipment",69,2014-Q3,2015-Q2,Closeout,20220630 Sheridan ES,10004616,Sheridan ES - Facelift,Facelift,2,Monica Garcia,East,1668501,13290,416 N. Cornwell St.,Los Angeles,90033,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",3,2016-Q2,2016-Q3,Closeout,20220630 Stagg ES,10004566,Stagg ES - Facelift,Facelift,3,Scott Schmerelson,Northwest,1689001,13722,7839 Amestoy Ave.,Lake Balboa,91406,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",138,2012-Q4,2016-Q3,Closeout,20220630 Stoner ES,10004592,Stoner ES - Facelift,Facelift,4,Nick Melvoin,West,1695201,13772,11735 Braddock Dr.,Culver City,90230,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",20,2012-Q4,2016-Q3,Closeout,20220630 San Gabriel ES,10364337,San Gabriel ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1646601,13651,8628 San Gabriel Ave.,South Gate,90280,Demolish/Remove Portable Building(s),57,2013-Q4,2014-Q4,Closeout,20220630 Fairfax HS,10364339,Fairfax HS - Portable Removal,Portable Removal,4,Nick Melvoin,West,1862101,13473,7850 Melrose Ave.,Los Angeles,90046,Demolish/Remove Portable Building(s),103,2014-Q1,2014-Q4,Closeout,20220630 Esperanza ES,10364349,Esperanza ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1238301,13824,680 Little St.,Los Angeles,90017,Demolish/Remove Portable Building(s),45,2014-Q1,2014-Q4,Closeout,20220630 Broadacres ES,10364352,Broadacres ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1253001,13837,19424 S. Broadacres Ave.,Carson,90746,Demolish/Remove Portable Building(s),71,2014-Q3,2015-Q1,Closeout,20220630 Garcetti Learning Academy,10364358,Garcetti Learning Academy - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",South,1679501,13318,612 W. 68th St.,Los Angeles,90044,Demolish/Remove Portable Building(s),104,2014-Q3,2014-Q4,Closeout,20220630 Marlton Special Education School,10100671,Marlton Special Education School - Upgrade Fire Alarm System,Fire Alarm System,1,"Dr. George J. McKenna, III",West,1194901,13860,4000 Santo Tomas Dr.,Los Angeles,90008,Upgrade Fire Alarm System,"2,253",2013-Q4,2015-Q1,Closeout,20220630 Marina EEC,10367337,Marina EEC - Technology Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1953301,16283,4908 Westlawn Ave.,Los Angeles,90066,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",80,2016-Q3,2016-Q4,Closeout,20220630 Vaughn EEC,10367366,Vaughn EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1957201,16782,11480 Herrick Ave.,Pacoima,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",83,2016-Q3,2016-Q4,Closeout,20220630 Los Angeles HS,10004941,Los Angeles HS - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,"Equip with tables, chairs, children's corner, media cart, computers, signage. Repair air conditioning and upgrade interior with paint.",88,2013-Q2,2014-Q1,Closeout,20220630 Marina Del Rey MS,10004943,Marina Del Rey MS - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"Upgrade flooring and interior with paint. Equip with tables, chairs, children's corner, signage, computers and a media cart. Reconfigure computer wiring. Repair existing cabinet hardware. Replace exterior doors.",72,2013-Q4,2014-Q1,Closeout,20220630 Shirley ES,10004951,Shirley ES - Parent & Family Center,Campus Improvement,4,Nick Melvoin,Northwest,1671201,13671,19452 Hart St.,Reseda,91335,"Equip with tables, chairs, children's corner, media cart, computers and signage. Upgrade flooring, and replace doors and locks.",36,2013-Q1,2014-Q1,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10004953,Sun Valley MS - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"Equip with tables, chairs, children's corner, media cart, computers signage, and whiteboards. Upgrade interior with paint.",62,2013-Q2,2014-Q1,Closeout,20220630 YES Academy at Hyde Park ES,10004955,YES Academy at Hyde Park ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1465801,13465,3140 Hyde Park Blvd.,Los Angeles,90043,"Equip with tables, chairs, children's corner, media cart, computers window blinds and signage. Replace doors and locks.",80,2013-Q4,2014-Q1,Closeout,20220630 Shenandoah ES,10364356,Shenandoah ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1667101,13491,2450 Shenandoah St.,Los Angeles,90034,Demolish/Remove Portable Building(s),84,2014-Q3,2015-Q2,Closeout,20220630 Holmes ES,10367921,Holmes ES - Technology & Security Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,East,1456201,13315,5108 Holmes Ave.,Los Angeles,90058,Purchase 36 Chromebooks and charging cart; upgrade classroom security features including door hardware and installation of metal skins on doors.,11,2016-Q3,2016-Q4,Closeout,20220630 Langdon ES,10367923,Langdon ES - Fencing,Fencing,6,Kelly Gonez,Northwest,1477501,13413,8817 Langdon Ave.,North Hills,91343,Install new chain link fence with privacy slats at the pre-kindergarten yard.,19,2016-Q4,2017-Q2,Closeout,20220630 Wilbur Charter for Enriched Academics,10367936,Wilbur Charter for Enriched Academics - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,Northwest,1777401,13811,5213 Crebs Ave.,Tarzana,91356,Provide and install electronic marquee.,42,2016-Q4,2017-Q1,Closeout,20220630 Stanford ES,10365212,Stanford ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1690401,13478,2833 Illinois Ave.,South Gate,90280,Demolish/Remove 1 Portable Building,428,2013-Q4,2014-Q2,Closeout,20220630 North Valley Occupational Center,10100739,North Valley Occupational Center - Upgrade Fire Alarm System,Fire Alarm System,6,Kelly Gonez,Northeast,1932901,13888,11450 Sharp Ave.,Mission Hills,91345,Upgrade Fire Alarm System,"1,193",2012-Q4,2014-Q1,Closeout,20220630 Grant EEC,10101586,Grant EEC - Modernization,Campus Improvement,5,Jackie Goldberg,West,1951901,16688,1559 N. St. Andrews Pl.,Los Angeles,90028,Modernization,172,2012-Q3,2014-Q2,Closeout,20220630 Reseda Charter HS,10366613,Reseda HS - SEEDS,SEEDS,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,"Design and construct an outdoor learning space of approximately 1,500 square feet consisting of the installation of decomposed granite, a hose bib and art poles. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders and signage poles.",15,2015-Q1,2015-Q2,Closeout,20220630 Bonita ES,10366591,Bonita ES - SEEDS,SEEDS,7,Tanya Ortiz Franklin,South,1247301,13796,21929 Bonita St.,Carson,90745,"Design and construct an outdoor learning space of approximately 1,700 square feet consisting of painting pavements areas, the installation of a hose bib and art poles. It will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders, and signage poles.",18,2015-Q1,2015-Q1,Closeout,20220630 La Salle ES,10367028,La Salle ES - School Security Enhancement,Security System,1,"Dr. George J. McKenna, III",West,1478601,13507,8715 La Salle Ave.,Los Angeles,90047,"Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance, include monitoring stations at five locations.",27,2015-Q3,2015-Q4,Closeout,20220630 San Fernando MS,10366832,San Fernando MS - Plumbing Utilities Upgrades,Plumbing/Irrigation/Drainage,6,Kelly Gonez,Northeast,1835801,13420,130 N. Brand Blvd.,San Fernando,91340,"The project will upgrade the deteriorated domestic water, sewer and fire sprinkler systems. The existing plumbing utilities are over 50 years old and are in poor condition resulting in unreliable service.","10,244",2019-Q3,2021-Q1,Closeout,20220630 Castro MS,10369550,Castro MS - Electronic Marquee,Electrical/Lighting,2,Monica Garcia,Central,1804501,14201,1575 W. 2nd St.,Los Angeles,90026,Install new electronic free-standing marquee.,60,2018-Q2,2018-Q3,Closeout,20220630 Ramona ES,10367852,Ramona ES - Install Ramp,Access Compliance,5,Jackie Goldberg,West,1617801,13353,1133 N. Mariposa Ave.,Los Angeles,90029,Install concrete ramp ay auditorium.,204,2016-Q4,2017-Q1,Closeout,20220630 Belvedere ES,10366137,Belvedere ES - Circuitry to New Exit Signs,Electrical/Lighting,2,Monica Garcia,East,1239701,13373,3724 E. 1st St.,Los Angeles,90063,Provide electrical and safety upgrades by installing circuitry and cabling to power new exit signs throughout the main building that comply with fire code,38,2014-Q3,2014-Q4,Closeout,20220630 3rd St. ES,10366140,3rd St. ES - New Parking Lot Chain Link Fence,Security System,4,Nick Melvoin,West,1711001,13399,201 S. June St.,Los Angeles,90004,Provide security upgrades by providing a new chain link fence and access control system in school parking lot,8,2014-Q2,2016-Q3,Closeout,20220630 Union ES,10369508,Union ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,Central,1735601,13294,150 S. Burlington Ave.,Los Angeles,90057,"Replace deteriorated side-by-side interior walk-in coolers and exterior walk-in freezer by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in coolers, exterior walk-in freezer, refrigeration equipment, and refrigeration lines.",221,2023-Q3,2023-Q4,Planning,20220630 61st St. ES,10105879,61st St. ES - Compliance with State & Federal Access Requirements,Fire Alarm System,1,"Dr. George J. McKenna, III",West,1680801,13370,6020 S. Figueroa St.,Los Angeles,90003,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),431,2015-Q2,2016-Q2,Closeout,20220630 74th St. ES,10100177,Provide Lunch Shelter,Lunch/Shade Shelter,1,"Dr. George J. McKenna, III",West,1664401,13549,2112 W. 74th St.,Los Angeles,90047,Provide Lunch Shelter,759,2016-Q2,2017-Q1,Closeout,20220630 Holmes EEC,10367330,Holmes EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,East,1952401,16292,1810 E. 52nd St.,Los Angeles,90058,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",83,2016-Q2,2016-Q2,Closeout,20220630 Canterbury ES,10370006,Canterbury ES - SEEDS,SEEDS,6,Kelly Gonez,Northeast,1278101,13541,13670 Montague St.,Arleta,91331,"Construct an outdoor learning space of approximately 2,393 square feet. Includes the installation of decomposed granite and a cement brush off area, composite wood headers to create in-ground planting areas and pathways, an irrigation system, native trees, log benches and stools to create a classroom gathering space. The project will be outfitted by the school site and partner organization with native and flowering plants to attract hummingbirds and butterflies.",100,2019-Q2,2019-Q4,Closeout,20220630 Dena ES,10363917,Dena ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1331501,13277,1314 Dacotah St.,Los Angeles,90023,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",340,2014-Q4,2015-Q1,Closeout,20220630 Walnut Park ES,10368049,Walnut Park ES - Restroom Upgrades,Access Compliance,5,Jackie Goldberg,East,1464001,13825,2642 E. Olive St.,Huntington Park,90255,"Modify kindergarten Jack & Jill restroom; enlarge doorway, provide and install folding changing table, and replace 1 standard toilet with kindergarten size.",5,2016-Q4,2017-Q1,Closeout,20220630 Ascot ES,10369072,Ascot ES - Security Upgrades,Security System,5,Jackie Goldberg,Central,1221901,13276,1447 E. 45th St.,Los Angeles,90011,Install new secure entry system.,20,2018-Q1,2018-Q2,Closeout,20220630 Estrella ES,10367917,Estrella ES - Security Upgrades,Security System,7,Tanya Ortiz Franklin,Central,1294201,193549,120 E. 57th St.,Los Angeles,90011,Provide and install Aiphone secure entry system to enhance and control the security of the campus.,15,2016-Q4,2017-Q1,Closeout,20220630 Cowan ES,10103887,Cowan ES - Renovate Auditorium,Auditorium Renovation,4,Nick Melvoin,West,1326001,13622,7615 Cowan Ave.,Los Angeles,90045,Renovate Auditorium,233,2009-Q3,2015-Q1,Closeout,20220630 Walnut Park ES,10369204,Walnut Park ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1464001,13825,2642 E. Olive St.,Huntington Park,90255,"Removal of 3 portable buildings. Salvage all furniture and equipment from classrooms, abate hazardous materials, disconnect low and high voltage utilities, and repair/replace asphalt at building footprints.",450,2018-Q1,2020-Q2,Closeout,20220630 Malabar ES,10369067,Malabar ES - Outdoor Amphitheater,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1508201,13314,3200 E. Malabar St.,Los Angeles,90063,"This project creates an outdoor amphitheater near the new SEEDS garden. The scope of work includes removing asphalt and the top layer of soil and replacing it with fresh top soil, building a slope for the new grass amphitheater, and covering all of the new soil with sod. The project also includes a new irrigation system for the turf and the installation of new colored asphalt for the amphitheater stage.",173,2017-Q4,2018-Q4,Closeout,20220630 Sepulveda MS,10369520,Sepulveda MS - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northwest,1836301,13786,15330 Plummer St.,North Hills,91343,"Replace deteriorated interior walk-in cooler and exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",436,2020-Q3,2021-Q3,Closeout,20220630 Chatsworth Park ES,10368083,Chatsworth Park ES - Playground Upgrades,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1302701,13389,22005 Devonshire St.,Chatsworth,91311,Install new playground equipment.,207,2018-Q2,2018-Q3,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10370114,Sun Valley Magnet - Faculty Restroom,Reconfiguration,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,Reconfigure staff restroom in J-building and move entrance out of student restroom,33,2018-Q4,2019-Q1,Closeout,20220630 Wonderland ES,10365648,Wonderland ES - Portable Removal,Portable Removal,4,Nick Melvoin,West,1784901,13485,8510 Wonderland Ave.,Los Angeles,90046,Demolish/Remove 1 Portable Building,4,2017-Q1,2017-Q1,Closeout,20220630 Roscoe ES,10365741,Roscoe ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1635601,13362,10765 Strathern St.,Sun Valley,91352,Replace deteriorated playground matting systems to ensure the health and safety of students.,39,2014-Q4,2015-Q1,Closeout,20220630 Lincoln HS,10370069,Lincoln HS - Portable Wheelchair Lift,Access Compliance,2,Monica Garcia,East,1872901,13280,3501 N. Broadway,Los Angeles,90031,Purchase and install portable wheelchair lift in auditorium.,34,2018-Q4,2018-Q4,Closeout,20220630 Wilshire Park ES,10368215,Wilshire Park ES - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1261901,13956,4063 Ingraham St.,Los Angeles,90005,Purchase and install electronic controls to existing rolling gates at staff parking lot.,44,2017-Q2,2018-Q1,Closeout,20220630 Audubon MS,10102956,Audubon MS - Upgrade Recreational Facilities,Campus Improvement,1,"Dr. George J. McKenna, III",West,1802801,13564,4120 11th Ave.,Los Angeles,90008,"The project will install a new public address system, track and court re-striping, new gymnasium telescoping bleachers, dance studio upgrades, and a new kitchen hood fire suppression system. Additionally, this project will include accessibility provisions and barrier removal at the path of travel including a new ramp, handrails, signage, drinking fountain, paving, striping, and restroom upgrades.","1,926",2016-Q4,2019-Q4,Closeout,20220630 Dodson MS,10369381,Dodson MS - Utility Lines for Laundry in Girls' Gym,Gym/Athletic Facilities Renovation,7,Tanya Ortiz Franklin,South,1811001,13846,28014 Montereina Dr.,Rancho Palos Verdes,90275,"Provide new plumbing, gas line, and power in girls' gym to support laundry equipment.",28,2018-Q2,2019-Q1,Closeout,20220630 San Fernando ES,10365744,San Fernando ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1645201,13419,1130 Mott St.,San Fernando,91340,Replace deteriorated playground matting systems to ensure the health and safety of students.,4,2014-Q3,2014-Q3,Closeout,20220630 Richland ES,10366989,Richland ES - SEEDS,SEEDS,4,Nick Melvoin,West,1626001,13576,11562 Richland Ave.,Los Angeles,90064,"Design and construct an outdoor learning space of approximately 1,200 square feet consisting of the installation of concrete, a hose bib and art poles. The outdoor learning space will be outfitted by the partner organization (The Kitchen Community) with planter boxes, planting materials, benches, seating boulders and signage poles.",35,2015-Q3,2015-Q4,Closeout,20220630 Hubbard ES,10367410,Hubbard ES - SEEDS,SEEDS,6,Kelly Gonez,Northeast,1460301,13718,13325 Hubbard St.,Sylmar,91342,"Design and construct an outdoor learning space of approximately 1,000 square feet consisting of the installation of concrete, planting areas, new irrigation, and benches. It will be outfitted with planting materials by the school community (Hubbard ES).",31,2016-Q1,2016-Q2,Closeout,20220630 Rowan ES,10368251,Rowan ES - Auditorium Wheelchair Lifts,Access Compliance,2,Monica Garcia,East,1642501,13381,600 S. Rowan Ave.,Los Angeles,90023,Provide and install portable wheelchair lift in Auditorium; Provide and install lift at main entrance (interior).,57,2017-Q1,2017-Q2,Closeout,20220630 Westchester Enriched Sciences Magnets,10366271,Westchester Enriched Sciences Magnets - 2014-15 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"This project is a charter school renovation for Ocean Charter School for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 16 classrooms for 390.82 charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",121,2014-Q2,2014-Q3,Closeout,20220630 Lincoln HS,10364113,Lincoln HS - Plumbing,Plumbing/Irrigation/Drainage,2,Monica Garcia,East,1872901,13280,3501 N. Broadway,Los Angeles,90031,"The project will remove and replace the deteriorating domestic water lines and building drain lines within the plumbing system. The plumbing system connects to the Cafeteria, Home Economics building and restrooms serving 12 classrooms. The plumbing system is more than 75 years old and is seriously deteriorated which has resulted in several compromises to the piping system with high potentials for service interruptions. Abatement of asbestos containing materials from the plumbing system is required.","1,119",2014-Q3,2015-Q1,Closeout,20220630 112th St. ES,10365663,112th St. ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,Replace deteriorated playground matting systems to ensure the health and safety of students.,74,2013-Q4,2014-Q1,Closeout,20220630 Castelar EEC,10005021,Castelar EEC - Safety Upgrades and Improvements,Campus Improvement,2,Monica Garcia,Central,1951001,13283,840 Yale St.,Los Angeles,90012,Upgrade entry control system and playground equipment,93,2014-Q3,2015-Q1,Closeout,20220630 Belvedere ES,10365681,Belvedere ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1239701,13373,3724 E. 1st St.,Los Angeles,90063,Replace deteriorated playground matting systems to ensure the health and safety of students.,50,2014-Q3,2014-Q3,Closeout,20220630 6th Ave. ES,10367599,6th Ave. ES - Accessibility Upgrades,Access Compliance,1,"Dr. George J. McKenna, III",West,1678101,13425,3109 Sixth Ave.,Los Angeles,90018,"Provide and install wheelchair lift and sloped walkway to auditorium. Modify kindergarten restrooms for changing rooms including enlarging doors, relocating light switch, and installing ACU-provided folding changing table.",59,2016-Q2,2016-Q3,Closeout,20220630 Burbank Arts Tech Community Magnet MS,10370559,Burbank Arts Tech Community Magnet MS - Exterior Painting,Painting,2,Monica Garcia,Central,1806601,13551,6460 N. Figueroa St.,Los Angeles,90042,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",849,2020-Q3,2020-Q4,Closeout,20220630 Audubon MS,10368324,Audubon MS - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1802801,13564,4120 11th Ave.,Los Angeles,90008,"Replace deteriorated interior walk-in cooler and interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, interior walk-in freezer/cooler combination unit, and refrigeration equipment.",159,2017-Q2,2017-Q4,Closeout,20220630 Haddon EEC,10367327,Haddon EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1958801,16666,10085 Haddon Ave.,Pacoima,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",112,2016-Q3,2016-Q3,Closeout,20220630 Telfair EEC,10367362,Telfair EEC - Technology Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1958001,15442,10915 Telfair Ave.,Pacoima,91331,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",79,2016-Q3,2016-Q3,Closeout,20220630 Cienega ES,10369479,Cienega ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1306801,13429,2611 S. Orange Dr.,Los Angeles,90016,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",223,2019-Q3,2020-Q1,Closeout,20220630 Carson HS,10366634,Carson HS - Update Gym Sound System,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1857501,13869,22328 S. Main St.,Carson,90745,Provide electrical power and circuitry to improve and upgrade the outdated sound system in the gym,15,2015-Q2,2015-Q2,Closeout,20220630 2nd St. ES,10365667,2nd St. ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,East,1657501,13326,1942 E. 2nd St.,Los Angeles,90033,Replace deteriorated playground matting systems to ensure the health and safety of students.,61,2014-Q3,2014-Q3,Closeout,20220630 Selma ES,10366645,Selma ES - 24 Laptops,Communications/Technology Upgrade,5,Jackie Goldberg,West,1658901,13360,6611 Selma Ave.,Los Angeles,90028,Increase school's access to technology by providing 24 laptop computers,22,2015-Q1,2015-Q1,Closeout,20220630 Burton ES,10105898,Burton ES - Compliance with State & Federal Access Requirements,Fire Alarm System,6,Kelly Gonez,Northeast,1265801,13540,8111 Calhoun Ave.,Panorama City,91402,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),417,2014-Q4,2015-Q3,Closeout,20220630 Belmont HS,10366880,Belmont HS - 2015-16 Prop 39 (Alliance College-Ready Academy HS #16),Charter Prop 39,2,Monica Garcia,Central,1854301,14201,1575 W. 2nd St.,Los Angeles,90026,"This project is a charter school renovation for Alliance College-Ready Academy HS #16 for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 11 classrooms for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",1,2015-Q4,2016-Q2,Closeout,20220630 Parks Learning Center,10369720,Parks Learning Center - Lunch Shelter Upgrade,Lunch/Shade Shelter,6,Kelly Gonez,Northwest,1357601,13852,8855 Noble Ave.,North Hills,91343,"This project expands the undersized lunch shelter by approximately 1,200 square feet to better accommodate students and reduce the number of lunch service periods. The scope of work includes installation of a new shade structure next to the existing lunch shelter; new lunch tables; site infrastructure including a new floor drain and connection of all drains to existing lines; installation of reinforced asphalt concrete paving; accessibility upgrades; and any other improvements to ensure compliance with local, State, and Federal facilities requirements.",751,2022-Q1,2022-Q4,Construction,20220630 Lockwood ES,10370599,Lockwood ES - 2019-20 Prop 39,Charter Prop 39,2,Monica Garcia,Central,1489001,13311,4345 Lockwood Ave.,Los Angeles,90029,"This project is a charter school renovation for Citizens of the World - Silver Lake for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 4 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. However, the charter school opted to vacate the site and will not continue occupancy in the 2019-20 school year.",17,2019-Q4,2019-Q4,Closeout,20220630 Elizabeth Learning Center,10369977,Elizabeth Learning Center - Electronic Marquee and Secure Entry System,Electrical/Lighting,5,Jackie Goldberg,East,1354801,13480,4811 Elizabeth St.,Cudahy,90201,Install new electronic wall-mounted marquee and install new secure entry system,74,2019-Q1,2019-Q4,Closeout,20220630 Roybal Learning Center,10371948,Roybal Learning Center - Water Conservation Pilot (Rain Systems),Energy/Water Efficiency,2,Monica Garcia,Central,1854401,13875,1200 W. Colton St.,Los Angeles,90026,"Evaluate water conservation potential and water cost savings of implanting a cross-link polymer soil conditioner, known as hydrogels, into existing turf at three (3) LAUSD school campuses. Determine the effectiveness of Rain Systems' patented process of injection of hydrogels into existing turf in order to reduce water consumption for turf irrigation.",15,2022-Q3,2023-Q1,Planning,20220630 Windsor Hills Math/Science/Aerospace Magnet ES,10366210,Windsor Hills Math/Science/Aerospace Magnet ES - Portable Removal,Portable Removal,1,"Dr. George J. McKenna, III",West,1782201,13757,5215 Overdale Dr.,Los Angeles,90043,Demolish/Remove 2 Portable Buildings & 1 Bungalow,142,2014-Q4,2015-Q1,Closeout,20220630 Carthay Environmental Studies Magnet ES,10372253,Carthay Environmental Studies Magnet ES - ADA Improvements,Access Compliance,1,"Dr. George J. McKenna, III",West,1284901,13461,6351 W. Olympic Blvd.,Los Angeles,90048,"The site has been assigned a Category Two accessibility level. In order to meet the criteria for Category Two, various upgrades to three buildings are required, including: corrections, installation or replacement of two new assistive listening devices, four new concrete ramps, four new doors/jambs, 31 new door hardware, 16 drinking fountain upgrades, nine furniture accessibility upgrades, two new intercoms, two playground component/matting upgrades, 29 accessible path of travel upgrades, three new railings, eight restroom upgrades, 26 new signs, one new wheelchair lift, four new thresholds, two new TMP ramps and one new elevator with covered bridge, and any other required improvements or mitigations to ensure compliance with local, state and/or federal facilities requirements.","11,081",2024-Q1,2025-Q3,Design,20220630 Victory ES,10372302,Victory ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1752101,13442,6315 Radford Ave.,North Hollywood,91606,Install new secure entry system at the Main Office,33,2022-Q3,2022-Q4,Planning,20220630 Eagle Rock HS,10372397,Eagle Rock HS - Install Secure Entry System,Security System,5,Jackie Goldberg,Central,1861401,13553,1750 Yosemite Dr.,Los Angeles,90041,"Install secure entry system at door to main office with three video receivers, two receivers in main office and one in principal's office.",40,2022-Q1,2022-Q3,Construction,20220630 10th St. ES,10366707,10th St. ES - HVAC,HVAC,2,Monica Garcia,Central,1708201,13265,1000 Grattan St.,Los Angeles,90015,"This project will upgrade the existing heating, ventilation, and air conditioning (HVAC) system in 3 buildings. The existing systems are over 30 years old and in poor condition resulting in unreliable service.","5,952",2017-Q2,2018-Q3,Closeout,20220630 61st St. ES,10371599,61st St. ES - Install Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1680801,13370,6020 S. Figueroa St.,Los Angeles,90003,Install new secure entry system at main entrance gate with three video receivers in main office,30,2021-Q1,2021-Q3,Closeout,20220630 Sendak ES,10370440,Sendak ES - Playground Upgrades,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1357401,13919,11414 W. Tiara St.,North Hollywood,91601,"The project adds a new playground structure and rubberized play matting to the existing play area's hard courts to provide students with additional outdoor activity with fall protection. This Local District Northeast priority project includes a Board District 6 contribution towards approximately half the budget as well as a school contribution (project #10370451), however the budget represents only the bond-funded portion.",545,2021-Q1,2022-Q1,Closeout,20220630 Lemay EEC,10372462,Lemay EEC - Purchase Classroom Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1953001,16662,17553 Lemay St.,Lake Balboa,91406,"Purchase classroom furniture: tables, chairs, storage, and rugs (31 items).",19,2022-Q3,2022-Q4,Planning,20220630 Walgrove ES,10371511,Walgrove ES - Provide Sensory Classroom,Campus Improvement,4,Nick Melvoin,West,1760301,13729,1630 Walgrove Ave.,Los Angeles,90066,"Remove wall heating unit, patch and repair ceiling and walls as needed, install new window blinds, remove existing furniture, and purchase sensory furniture.",53,2021-Q1,2021-Q4,Closeout,20220630 Sharp ES,10105901,Sharp ES - Compliance with State & Federal Access Requirements,Fire Alarm System,6,Kelly Gonez,Northeast,1666501,13809,13800 Pierce St.,Arleta,91331,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),244,2014-Q4,2015-Q2,Closeout,20220630 Hawaiian EEC,10367328,Hawaiian EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1952201,16284,501 Hawaiian Ave.,Wilmington,90744,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",84,2016-Q2,2016-Q3,Closeout,20220630 Roberti EEC,10367355,Roberti EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1949701,15261,1156 E. Vernon Ave.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",80,2016-Q2,2016-Q2,Closeout,20220630 Obama Global Preparation Academy,10370293,Obama Global Preparation Academy - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1686801,193550,1700 W. 46th St.,Los Angeles,90062,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, and security upgrades on all doors (metal skins and new locking mechanisms). Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",45,2019-Q4,2020-Q3,Closeout,20220630 Dorris ES,10363918,Dorris ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1347901,13510,2225 Dorris Pl.,Los Angeles,90031,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",652,2015-Q2,2016-Q2,Closeout,20220630 Utah Span School,10370839,Utah Span School - Visual Strobe Lights,Access Compliance,2,Monica Garcia,East,1737001,13328,255 Gabriel Garcia Marquez St.,Los Angeles,90033,Provide visual fire alarm strobes in 6 classrooms for deaf and hard of hearing program.,85,2020-Q3,2020-Q3,Closeout,20220630 Vista MS,10371193,Vista MS - Visual Strobes,Access Compliance,6,Kelly Gonez,Northeast,1811701,13896,15040 Roscoe Blvd.,Panorama City,91402,Provide visual fire alarm strobe in 6 classrooms for deaf and hard of hearing program.,149,2020-Q3,2020-Q4,Closeout,20220630 Byrd MS (Relocated to New HS Site in 2008),10365633,Byrd MS - HVAC,HVAC,6,Kelly Gonez,Northeast,1860801,13895,8501 Arleta Ave.,Sun Valley,91352,"This project replaces the non-traditional heating, ventilation, and air conditioning (HVAC) system originally installed at East Valley Area New HS #1A, the new location of Byrd MS since 2008, with a traditional model.","33,727",2017-Q3,2020-Q2,Closeout,20220630 Sharp ES,10368689,Sharp ES - Electrical Outlet,Access Compliance,6,Kelly Gonez,Northeast,1666501,13809,13800 Pierce St.,Arleta,91331,Provide and install standard 110 GFCI outlet for changing tables.,3,2017-Q2,2017-Q2,Closeout,20220630 Stanford ES,10370209,Stanford ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,East,1690401,13478,2833 Illinois Ave.,South Gate,90280,"Replace deteriorated interior walk-in cooler, interior walk-in freezer, and interior side-by-side walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, interior walk-in freezer, interior side-by-side walk-in cooler, and refrigeration equipment.",221,2025-Q1,2025-Q2,Planning,20220630 Cheviot Hills Continuation HS,10369415,Cheviot Hills Continuation HS - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1868801,16464,9200 Cattaraugus Ave.,Los Angeles,90034,Fabricate wrought iron pedestrian gate for main entrance and install new secure entry system.,36,2018-Q1,2018-Q3,Closeout,20220630 Ride ES (SMART Academy),10371559,Ride ES (SMART Academy) - Install Video Surveillance System,Security System,5,Jackie Goldberg,Central,1230801,14584,1041 E. 46th St.,Los Angeles,90011,Install video surveillance (CCTV) system with three cameras. Install two cameras on the administration building and one on arcade #2.,46,2021-Q1,2021-Q3,Closeout,20220630 Bethune MS,10369427,Bethune MS - Parking Fencing & Gates,Fencing,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,Install fence and gates at parking lot.,77,2018-Q2,2020-Q2,Closeout,20220630 Dena ES,10371070,Dena ES - Secure Entry System,Security System,2,Monica Garcia,East,1331501,13277,1314 Dacotah St.,Los Angeles,90023,Install new secure entry system,26,2020-Q3,2020-Q4,Closeout,20220630 74th St. ES,10367574,74th St. ES - Structural Repairs,Ceiling/Wall System,1,"Dr. George J. McKenna, III",West,1664401,13549,2112 W. 74th St.,Los Angeles,90047,This project is to replace the existing deteriorated expansion joints and other structural components in the Main Building.,"7,014",2020-Q2,2021-Q3,Closeout,20220630 Haskell STEAM Magnet ES,10370319,Haskell STEAM Magnet ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1445201,13736,15850 Tulsa St.,Granada Hills,91344,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",54,2019-Q2,2019-Q4,Closeout,20220630 Sherman Oaks Center for Enriched Studies,10203999,Sherman Oaks Center for Enriched Studies - Conversion of Classroom to Chemistry Lab,Reconfiguration,4,Nick Melvoin,Northwest,1884201,13692,18605 Erwin St.,Reseda,91335,Conversion of Classroom to Chemistry Lab,"2,228",2014-Q4,2016-Q3,Closeout,20220630 Carson HS,10369707,Carson HS - Roofing & HVAC,Roofing,7,Tanya Ortiz Franklin,South,1857501,13869,22328 S. Main St.,Carson,90745,"This project provides approximately 155,000 square feet of new roofing at 32 buildings campus-wide, including new heating, ventilation, and air conditioning (HVAC) units and equipment, skylight windows, gutters and downspouts.","3,388",2023-Q1,2024-Q1,Planning,20220630 Lawrence MS,10368341,Lawrence MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1821701,13695,10100 Variel Ave.,Chatsworth,91311,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",139,2017-Q3,2018-Q1,Closeout,20220630 Catskill ES,10370443,Catskill ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1289001,13662,23536 Catskill Ave.,Carson,90745,Install new secure entry system,27,2019-Q2,2019-Q3,Closeout,20220630 Towne ES,10004658,Towne ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1720501,13755,18924 Towne Ave.,Carson,90746,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",90,2014-Q1,2016-Q3,Closeout,20220630 Palms ES,10365732,Palms ES - Replace Playground Matting,Paving/Greening/Playground Equipment,1,"Dr. George J. McKenna, III",West,1598601,13418,3520 Motor Ave.,Los Angeles,90034,Replace deteriorated playground matting systems to ensure the health and safety of students.,38,2015-Q1,2015-Q1,Closeout,20220630 Herrick ES,10365707,Herrick ES - Replace Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1451501,13726,13350 Herrick Ave.,Sylmar,91342,Replace deteriorated playground matting systems to ensure the health and safety of students.,20,2015-Q2,2015-Q2,Closeout,20220630 Stonehurst STEAM Magnet ES,10364070,Stonehurst ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1694501,13653,9851 Stonehurst Ave.,Sun Valley,91352,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",383,2014-Q3,2014-Q4,Closeout,20220630 Toland Way ES,10364074,Toland Way ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1717801,13566,4545 Toland Way,Los Angeles,90041,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",377,2014-Q1,2014-Q2,Closeout,20220630 Garden Grove ES,10003974,Garden Grove ES - HVAC Upgrade & New Restrooms,Campus Improvement,4,Nick Melvoin,Northwest,1405501,13715,18141 Valerio St.,Reseda,91335,Remove existing HVAC units and replace with rooftop HVAC unit in auditorium; Provide new modular sanitary building including student and faculty restrooms,"1,081",2014-Q2,2015-Q2,Closeout,20220630 Lull Special Education Center,10367024,Lull Special Education Center - Multipurpose Room Upgrades,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1195901,13615,17551 Miranda St.,Encino,91316,Provide upgrades to the existing multipurpose room by installing new fold-up tables that can be stored in wall pockets.,29,2015-Q3,2015-Q3,Closeout,20220630 Evergreen ES,10105864,Evergreen ES - Compliance with State & Federal Access Requirements,Fire Alarm System,2,Monica Garcia,East,1369901,13569,2730 Ganahl St.,Los Angeles,90033,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),493,2015-Q1,2015-Q3,Closeout,20220630 Colfax Charter ES,10366189,Colfax Charter ES - Laptops & Desktop Computers,Communications/Technology Upgrade,3,Scott Schmerelson,Northeast,1316401,13681,11724 Addison St.,North Hollywood,91607,Increase schools access to technology by providing laptop and desktop computers,67,2014-Q3,2014-Q3,Closeout,20220630 Hawaiian ES,10368972,Hawaiian ES - Prep Parent Center For Laundry Equipment,Reconfiguration,7,Tanya Ortiz Franklin,South,1446601,13648,540 Hawaiian Ave.,Wilmington,90744,"Provide new plumbing, gas line, and power in Parent Center to support laundry equipment",13,2017-Q2,2017-Q3,Closeout,20220630 El Camino Real Charter HS,10366998,El Camino Real Charter HS - Gym Upgrades,Flooring,3,Scott Schmerelson,Northwest,1861701,13776,5440 Valley Circle Blvd.,Woodland Hills,91367,This project will replace the wood floors in the Gymnasium Building and rehabilitate adjacent wall systems. The existing floors are over 45 years old and are in poor condition resulting in a hazardous condition at the site.,581,2015-Q3,2016-Q1,Closeout,20220630 Beckford Charter for Enriched Studies,10366631,Beckford Ave - 26 Laptops,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1233501,13836,19130 Tulsa St.,Northridge,91326,Increase school's access to technology by providing 26 laptop computers,29,2015-Q1,2015-Q2,Closeout,20220630 232nd Pl. ES,10367727,232nd Pl. ES - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1732901,13709,23240 Archibald Ave.,Carson,90745,Replace existing marquee with electronic marquee.,22,2017-Q3,2018-Q2,Closeout,20220630 Grape ES,10105882,Grape ES - Compliance with State & Federal Access Requirements,Fire Alarm System,7,Tanya Ortiz Franklin,South,1427401,13495,1940 E. 111th St.,Los Angeles,90059,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),327,2014-Q4,2015-Q2,Closeout,20220630 Washington Preparatory HS,10368334,Washington Preparatory HS - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1892801,13560,10860 S. Denker Ave.,Los Angeles,90047,"Replace deteriorated interior walk-in cooler and interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, interior walk-in freezer/cooler combination unit, and refrigeration equipment.",193,2017-Q2,2018-Q1,Closeout,20220630 Amanecer PC,10367606,Amanecer PC - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1642601,13924,832 S. Eastman Ave.,Los Angeles,90023,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",38,2016-Q3,2017-Q2,Closeout,20220630 Arminta EEC,10004995,Arminta EEC - Nature Explore Classroom,Campus Improvement,6,Kelly Gonez,Northeast,1950301,16687,7911 Goll Ave.,North Hollywood,91605,"Design and construct new nature explore classroom including required fire alarm, restroom, parking lot, drinking fountain and pedestrian gate accessibility upgrades.","1,246",2016-Q3,2017-Q1,Closeout,20220630 Utah Span School,10370221,Utah Span School - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1737001,13328,255 Gabriel Garcia Marquez St.,Los Angeles,90033,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2027-Q1,2027-Q2,Planning,20220630 Nightingale MS,10105870,Nightingale MS - Compliance with State & Federal Access Requirements,Fire Alarm System,2,Monica Garcia,East,1826401,13584,3311 N. Figueroa St.,Los Angeles,90065,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),442,2015-Q2,2015-Q4,Closeout,20220630 Los Angeles Academy MS,10370247,Los Angeles Academy MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,Central,1820001,13890,644 E. 56th St.,Los Angeles,90011,"Replace deteriorated interior walk-in cooler and interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, interior walk-in freezer/cooler combination unit, and refrigeration equipment.",182,2027-Q4,2028-Q1,Planning,20220630 Ambler ES,10368787,Ambler ES - 2017-18 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1208901,13833,319 E. Sherman Dr.,Carson,90746,"This project was approved in Board of Education Report No. 530-16/17 as a 2017-18 Proposition 39 charter co-location. The charter operator, Community Preparatory Academy did not occupy Ambler ES during the 2017-18 academic year. As a result, the scope of work changed from a co-location to vacating the site which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District operated program.",12,2017-Q3,2017-Q3,Closeout,20220630 Kennedy ES,10370169,Kennedy ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1469601,13886,4010 E. Ramboz Dr.,Los Angeles,90063,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2025-Q3,2025-Q4,Planning,20220630 Lorena ES,10370173,Lorena ES - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1494501,13351,1015 S. Lorena St.,Los Angeles,90023,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q1,2028-Q2,Planning,20220630 Micheltorena ES,10370181,Micheltorena ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1528801,13329,1511 Micheltorena St.,Los Angeles,90026,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2024-Q1,2024-Q3,Planning,20220630 Strathern ES,10369475,Strathern ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1695901,13654,7939 St. Clair Ave.,North Hollywood,91605,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",215,2019-Q4,2021-Q1,Closeout,20220630 Normandie ES,10369498,Normandie ES - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",Central,1563001,13300,4505 S. Raymond Ave.,Los Angeles,90037,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",390,2020-Q3,2021-Q3,Closeout,20220630 6th Ave. ES,10370781,6th Ave. ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1678101,13425,3109 Sixth Ave.,Los Angeles,90018,Install new secure entry system,31,2019-Q4,2020-Q1,Closeout,20220630 Angeles Mesa ES,10104369,Angeles Mesa ES - Repairs for Compliance with State & Federal Access Requirements,Fire Alarm System,1,"Dr. George J. McKenna, III",West,1212301,13427,2611 W. 52nd St.,Los Angeles,90043,Repairs to Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),619,2015-Q4,2016-Q2,Closeout,20220630 Glenwood ES,10368175,Glenwood ES - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1419201,13590,8001 Ledge Ave.,Sun Valley,91352,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 60 doors/hardware, 38 accessible paths of travel, 71 signs, 11 restrooms, 27 drinking fountains/sinks, 2 assistive listening devices/intercoms/phones, 5 concrete ramps, 7 pieces of accessible furniture, 6 railings, 1 cafeteria counter, 2 door modifications/auto openers, and 2 passenger/bus loading zones.","4,526",2018-Q1,2021-Q1,Closeout,20220630 Vaughn EEC,10368005,Vaughn EEC - Campus Upgrades,Campus Improvement,6,Kelly Gonez,Northeast,1957201,16782,11480 Herrick Ave.,Pacoima,91331,"Fence in small lawn area in front of the school to prevent loitering and vandalism, replace Vinyl Composite Tile (VCT) flooring and glue down carpets with new flooring system throughout the entire center, replace unsanitary linoleum floor with new quarry tile floor system in the kitchen, and replace all built-in wood cabinets throughout the center which are beyond economical repair.",176,2017-Q3,2019-Q1,Closeout,20220630 Reseda Charter HS,10369779,Reseda Charter HS - 2018-19 Prop 39,Charter Prop 39,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,"This project is a charter school renovation for Magnolia Science Academy #5 for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades 6-11. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",80,2018-Q2,2018-Q3,Closeout,20220630 Glenwood ES,10369749,Glenwood ES - 2018-19 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1419201,13590,8001 Ledge Ave.,Sun Valley,91352,"This project is a charter school renovation for Celerity Palmati Charter School for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office and 6 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",163,2018-Q2,2018-Q3,Closeout,20220630 Norwood ES,10370187,Norwood ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1569901,13271,2020 Oak St.,Los Angeles,90007,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2027-Q3,2028-Q1,Planning,20220630 Ramona ES,10370192,Ramona ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,West,1617801,13353,1133 N. Mariposa Ave.,Los Angeles,90029,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2025-Q2,2025-Q4,Planning,20220630 Dymally HS,10367676,Dymally HS - 2016-17 Prop 39 (Pathways Community School),Charter Prop 39,7,Tanya Ortiz Franklin,South,1766701,14581,8800 S. San Pedro St.,Los Angeles,90003,"This project is a charter school renovation for Pathways Community School for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades 9-11. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",13,2016-Q2,2016-Q3,Closeout,20220630 Castle Heights ES,10369806,Castle Heights ES - Exterior Lighting,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1287701,13680,9755 Cattaraugus Ave.,Los Angeles,90034,Install new exterior lighting on bungalows in play area.,14,2018-Q3,2018-Q4,Closeout,20220630 Westport Heights ES,10369972,Westport Heights ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,West,1771201,13592,6011 W. 79th St.,Los Angeles,90045,Install new electronic free-standing marquee,47,2019-Q1,2019-Q2,Closeout,20220630 Lassen ES,10370382,Lassen ES - Exterior Painting,Painting,6,Kelly Gonez,Northwest,1479001,13803,15017 Superior St.,North Hills,91343,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",456,2019-Q4,2020-Q1,Closeout,20220630 Garza PC,10371360,Garza PC - Secure Entry System,Security System,2,Monica Garcia,East,1342601,13928,2750 E. Hostetter St.,Los Angeles,90023,Install new secure entry system at door to main office,24,2020-Q3,2020-Q4,Closeout,20220630 West Athens ES,10372455,West Athens ES - Purchase Exterior Tables,Furniture/Fixtures/Equipment,1,"Dr. George J. McKenna, III",West,1764401,13317,1110 W. 119th St.,Los Angeles,90044,Purchase (37) lunch tables. Replacing existing furniture,34,2022-Q3,2022-Q4,Planning,20220630 Wright STEAM Magnet MS,10372526,Wright STEAM Magnet MS - 2022-23 Prop 39,Charter Prop 39,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,"This project is a charter school renovation for Westside Innovative School House (WISH) Community School for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 22 instructional spaces for charter student seats in grades TK-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",139,2022-Q3,2022-Q3,Planning,20220630 20th St. ES,10370217,20th St. ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1727401,13333,1353 E. 20th St.,Los Angeles,90011,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2028-Q2,2028-Q3,Planning,20220630 Van Deene ES,10370223,Van Deene ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1741901,13788,826 W. Javelin St.,Torrance,90502,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q2,2027-Q3,Planning,20220630 La Salle ES,10367942,La Salle ES - ADA Improvements,Access Compliance,1,"Dr. George J. McKenna, III",West,1478601,13507,8715 La Salle Ave.,Los Angeles,90047,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 78 doors/hardware, 3 accessible paths of travel, 58 signs, 11 restrooms, 26 drinking fountains/sinks, 2 concrete ramps, 3 pieces of accessible furniture, 1 assembly seat, 2 new elevators/stage lifts, and 1 passenger/bus loading zone.","3,394",2017-Q4,2022-Q3,Construction,20220630 Trinity ES,10370623,Trinity ES - 2019-21 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for Gabriella Charter School #2. This project included 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades K-4. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 10 instructional spaces for charter student seats in grades K-4 and an undefined scope of work. Subsequently to the approval of the project, an alternative agreement was executed. As a result, the scope of work changed from a ""no change"" co-location to a ""growth"" by two instructional spaces co-location. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The revised allocations of space for the 2020-21 school year is 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades K-4.",127,2020-Q2,2020-Q3,Closeout,20220630 Marina EEC,10004999,Marina EEC - Nature Explore Classroom,Campus Improvement,4,Nick Melvoin,West,1953301,16283,4908 Westlawn Ave.,Los Angeles,90066,"Design and construct new nature explore classroom including required fire alarm upgrades, restroom upgrades to improve accessibility, upgrades to playground and staff areas, and path of travel improvements including new entry access gates and paving.","2,042",2018-Q2,2019-Q3,Closeout,20220630 Marquez Charter ES,10371074,Marquez Charter ES - Water Bottle Filling Station,Plumbing/Irrigation/Drainage,4,Nick Melvoin,West,1516401,13628,16821 Marquez Ave.,Pacific Palisades,90272,Remove existing drinking water fountain at the restroom bungalow on the north end of campus and replace with new single bubbler fountain and bottle filler.,12,2020-Q1,2020-Q2,Closeout,20220630 Coughlin ES,10369215,Coughlin ES - Storm Water Pump & Street Improvements,Plumbing/Irrigation/Drainage,6,Kelly Gonez,Northeast,1501601,13915,11035 Borden Ave.,Pacoima,91331,"This project is to provide flooding mitigation on the playground at the front of the school. The project consists of street improvements to replace the existing sidewalk, curb and gutter, and paving part of the existing roadway; and a sump pump replacement of the existing water pump and associated piping, new catch basin at an increased depth, and connections to utilities. In addition, the project includes stringent survey requirements along Borden Ave. and intends to expedite completion as Coughlin ES and the adjacent Maclay MS are located in a high traffic area.","1,256",2020-Q2,2020-Q3,Closeout,20220630 Victoria ES,10372209,Victoria ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1750701,13493,3320 Missouri Ave.,South Gate,90280,"Demolish and remove 1 DOH portable buildings, provide temporary fencing, and remove/relocate furniture and equipment. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/Replace asphalt paving.",325,2022-Q3,2022-Q4,Planning,20220630 Pacific ES,10372416,Pacific ES - Campus Improvements,Campus Improvement,5,Jackie Goldberg,East,1464201,13936,2660 E. 57th St.,Huntington Park,90255,"Install (4) water bottle fillers around campus. One will be a new install, where no drinking fountain exists, and three installations will be modifications to existing drinking fountains. Also, install a new audio system in the multipurpose room. Installation will include new pathways and electrical receptacles.",79,2022-Q2,2022-Q4,Construction,20220630 Breed ES,10371310,Breed ES - 2020-21 Prop 39,Charter Prop 39,2,Monica Garcia,East,1249301,13281,2226 E. 3rd St.,Los Angeles,90033,"This project is a charter school renovation for Extera Public School for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 9 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",13,2020-Q2,2020-Q3,Closeout,20220630 28th St. ES,10363859,28th St. ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1728801,13325,2807 Stanford Ave.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",365,2014-Q3,2014-Q4,Closeout,20220630 Wilbur Charter for Enriched Academics,10370939,Wilbur ES - Technology & Security Upgrades,Communications/Technology Upgrade,4,Nick Melvoin,Northwest,1777401,13811,5213 Crebs Ave.,Tarzana,91356,Purchase (72) Chromebooks and (2) storage carts; security upgrades as needed,31,2019-Q4,2020-Q1,Closeout,20220630 West Valley Occupational Center,10370928,West Valley Occupational Center - Fire Alarm System,Fire Alarm System,4,Nick Melvoin,Northwest,1901001,13659,6200 Winnetka Ave.,Woodland Hills,91367,This project upgrades the fire alarm system in the 3-story Business Education Building to a fully automatic and addressable fire alarm and voice evacuation system.,"2,297",2022-Q3,2023-Q3,Design,20220630 Bradley Global Awareness Magnet ES,10372158,Bradley Global Awareness Magnet ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1712301,13516,3875 Dublin Ave.,Los Angeles,90008,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",415,2022-Q2,2022-Q3,Construction,20220630 Noble ES,10372226,Noble ES - Secure Entry System,Security System,6,Kelly Gonez,Northeast,1560301,13632,8329 Noble Ave.,North Hills,91343,Install new secure entry system at the Main Office,37,2022-Q2,2022-Q3,Construction,20220630 Trinity ES,10371888,Trinity ES - 2021-22 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,"This project is a charter school renovation for Gabriella Charter School #2 for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades TK-6. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",35,2021-Q2,2021-Q3,Closeout,20220630 Fernangeles ES,10370793,Fernangeles ES - Chromebooks,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1375301,13594,12001 Art St.,Sun Valley,91352,Purchase (35) Chromebooks and (1) storage cart,13,2019-Q4,2019-Q4,Closeout,20220630 Charnock ES,10370782,Charnock ES - Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1300201,13676,11133 Charnock Rd.,Los Angeles,90034,Install new electronic free-standing marquee,46,2019-Q4,2020-Q1,Closeout,20220630 Camellia ES,10367781,Camellia ES - Painting,Painting,6,Kelly Gonez,Northeast,1272601,13587,7451 Camellia Ave.,North Hollywood,91605,"Paint entire site, interior and exterior.",426,2016-Q4,2018-Q1,Closeout,20220630 Kindergarten Learning Academy,10370596,Kindergarten Learning Academy - 2019-23 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northeast,1743901,13864,6555 Sylmar Ave.,Van Nuys,91401,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for Ararat Charter School. This project included 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades K-5. Although this growth project allocated a special education room, the configuration of this space was not necessary because it was already configured to the Ararat Charter School's systems as they are the sole occupant on this site. Therefore, minimal funds were spent on this growth project. The project was then approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades K-5 and an undefined scope of work. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades TK-5 and an undefined scope of work. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades TK-5 and an undefined scope of work.",0,2021-Q3,2021-Q3,Closeout,20220630 Young Continuation HS,10372160,Young Continuation HS - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1859801,13766,3051 W. 52nd St.,Los Angeles,90043,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",271,2022-Q4,2024-Q2,Planning,20220630 Dixie Canyon Community Charter ES,10370786,Dixie Canyon Community Charter ES - Technology & Security Upgrades,Communications/Technology Upgrade,3,Scott Schmerelson,Northeast,1343801,13677,4220 Dixie Canyon Ave.,Sherman Oaks,91423,Purchase 36 Chromebooks and 3 storage carts; secure room as needed.,24,2019-Q3,2020-Q1,Closeout,20220630 Selma ES,10371143,Selma ES - Fencing and Gates,Campus Improvement,5,Jackie Goldberg,West,1658901,13360,6611 Selma Ave.,Los Angeles,90028,"Provide and install gate, privacy fencing, and Aiphone system.",82,2020-Q1,2020-Q3,Closeout,20220630 Limerick ES,10366735,Limerick ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1488101,13697,8530 Limerick Ave.,Canoga Park,91306,"Modernize and upgrade school's existing parent & family center by providing interior paint, exterior lighting, and security upgrades including new doors and hardware as well as security on windows. Provide flooring repairs, whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",69,2015-Q2,2015-Q4,Closeout,20220630 Markham MS,10366941,Markham MS-Ramp to outdoor Stage & Temp Stage Lift,Access Compliance,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,Ramp to Outdoor Stage and Temp Stage Lift (rental),9,2015-Q2,2015-Q2,Closeout,20220630 Fulton College Preparatory School,10366742,Fulton College Preparatory School - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,"Upgrade the school's existing parent & family center by providing interior paint and lighting repairs. Provide security upgrades including new secure doors and panic hardware. Equip the room with new classroom furniture, laptop computers and signage.",49,2015-Q2,2015-Q4,Closeout,20220630 Sepulveda MS,10371925,Sepulveda MS - ADA Improvements,Access Compliance,6,Kelly Gonez,Northwest,1836301,13786,15330 Plummer St.,North Hills,91343,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 49 doors/jambs, 5 door hardware, 44 thresholds, 20 accessible paths of travel, 11 signs,14 restrooms, 32 restroom accessories, 18 drinking fountains, 14 sinks/sink cabinet, 9 casework/counters, 3 assistive listening devices, 3 phone upgrades, 18 concrete ramps, 3 TMP ramps, 8 pieces of accessible furniture, 19 railings, 1 locker room upgrade, 2 locker upgrades, 1 parking lot upgrade, 2 automatic door openers, and 2 new wheelchair lifts.","11,301",2023-Q3,2025-Q2,Design,20220630 Parmelee ES,10372403,Parmelee ES - Install Wrought Iron Fence,Fencing,7,Tanya Ortiz Franklin,South,1602101,13815,1338 E. 76th Pl.,Los Angeles,90001,Install approx. 120ft of new wrought iron fencing with two pedestrian gates at front of school,54,2022-Q3,2023-Q1,Planning,20220630 Montague Charter Academy,10372566,Montague Charter Academy - Playground Matting,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1537001,13739,13000 Montague St.,Pacoima,91331,This project is to upgrade the deteriorated playground matting and equipment in the kindergarten yard. It includes new paving under the matting.,409,2022-Q3,2022-Q4,Planning,20220630 Baldwin Hills ES,10371306,Baldwin Hills ES - 2020-23 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1227401,13595,5421 Rodeo Rd.,Los Angeles,90016,"This project was initially approved in BOE Report No. 319-19/20 for the 2020-21 Prop 39 co-locations as a charter school renovation for New Los Angeles Charter ES. This project included 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades K-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades TK-5 and an undefined scope of work. However, the co-located charter requested the replacement of furniture. As a result, this project was amended to include the scope of work required for the replacement of furniture. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades TK-5 and an undefined scope of work.",14,2021-Q3,2021-Q3,Closeout,20220630 Euclid ES,10371507,Euclid ES - Install Secure Entry System,Security System,2,Monica Garcia,East,1367101,13319,806 Euclid Ave.,Los Angeles,90023,Install new secure entry system at main gate to campus with two video receivers in main office. Build wrought iron gate to accommodate new system.,39,2021-Q1,2021-Q2,Closeout,20220630 San Pascual STEAM Magnet ES,10371370,San Pascual ES - Secure Entry System,Security System,2,Monica Garcia,Central,1649301,13440,815 San Pascual Ave.,Los Angeles,90042,Install new secure entry system at door to main office,37,2020-Q3,2020-Q4,Closeout,20220630 Charnock ES,10370908,Charnock ES - Security Upgrade,Campus Improvement,1,"Dr. George J. McKenna, III",West,1300201,13676,11133 Charnock Rd.,Los Angeles,90034,Install new secure entry system at main office,27,2019-Q4,2020-Q1,Closeout,20220630 Normont EEC,10369859,Normont EEC - Nature Explore Classroom,Campus Improvement,7,Tanya Ortiz Franklin,South,1954301,16706,25028 Petroleum Ave.,Harbor City,90710,"This project will create field-tested, research-based outdoor learning spaces that provide learning opportunities and support children's interaction with the natural world. The outdoor learning spaces are divided into distinct activity areas to provide a wide-ranging mix of educational activities that support children with a variety of needs and learning styles. The activity areas include art, building, music, climbing/balancing, flexing, gathering, gardening, messy materials, wheel toys, etc.","1,391",2022-Q3,2023-Q3,Design,20220630 Hope ES,10372291,Hope ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1692001,13944,7560 State St.,Huntington Park,90255,Install new secure entry system at the Main Office.,31,2022-Q1,2022-Q2,Closeout,20220630 Jefferson HS,10366809,Jefferson HS - Comprehensive Modernization,Comprehensive Modernization,5,Jackie Goldberg,Central,1871401,13447,1319 E. 41st St.,Los Angeles,90011,"This project includes the construction of new buildings and site improvements with 31 general and specialty classrooms, instructional support spaces, gymnasium with practice and competitive spaces, lunch pavilion, an expanded space to relocate the wellness clinic, maintenance and operations area, concessions, baseball/softball field, tennis and basketball courts, and lighting at the football field. Existing school facilities will be upgraded including the modernization and seismic retrofit of the administrative building and main classroom building; and the seismic retrofit of the cafeteria building. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of the music building, home economics building, two gymnasium buildings, metal shop building, mechanical arts building, power house (utility building), industrial arts building, lunch shelter/service building, and 30 classrooms located in relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","259,443",2022-Q3,2027-Q1,Design,20220630 Bridge ES,10369033,Bridge ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1252101,13297,605 N. Boyle Ave.,Los Angeles,90033,"Removal of 1 DSA Portable Building. Abatement of hazardous materials, disconnect of low and high voltage utilities, and repair/replace asphalt at building footprint.",89,2017-Q4,2019-Q1,Closeout,20220630 Farmdale ES,10371063,Farmdale ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1374001,15166,2660 Ruth Swiggett Dr.,Los Angeles,90032,"Demolish and remove 2 bungalows, provide temporary fencing, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving. Install new permanent fencing to contain the existing parking lot and relocate PA speakers and security lamps.",431,2020-Q2,2020-Q4,Closeout,20220630 Florence ES,10372100,Florence ES - Install Privacy Fence,Fencing,7,Tanya Ortiz Franklin,East,1389001,13397,7211 Bell Ave.,Los Angeles,90001,Replace two sections of chain link fence with privacy fencing; approx. 700 ft. Cost estimate includes the replacement of gates along the fence line.,81,2022-Q3,2023-Q1,Planning,20220630 Le Conte MS,10371324,Le Conte MS - 2020-21 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1822601,13438,1316 N. Bronson Ave.,Hollywood,90028,"This project is a charter school renovation for Citizens of the World - Hollywood for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 2 special education rooms, and 22 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",16,2020-Q3,2020-Q3,Closeout,20220630 Valley Oaks Center for Enriched Studies,10370619,Sun Valley HS - 2019-20 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,"This project is a charter school renovation for North Valley Military Institute for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office,6 special education rooms, and 22 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",34,2019-Q3,2019-Q3,Closeout,20220630 Clinton MS,10371126,Clinton MS - Instructional Seating Upgrade,Furniture/Fixtures/Equipment,5,Jackie Goldberg,Central,1806201,13909,3500 S. Hill St.,Los Angeles,90007,Remove and replace deteriorated seating at large group instruction room.,64,2020-Q4,2021-Q1,Closeout,20220630 1st St. ES,10369956,1st St. ES - Secure Entry System and Fencing,Security System,2,Monica Garcia,East,1383601,13267,2820 E. 1st St.,Los Angeles,90033,Install wrought iron fence and a secure entry system at the front of the school to improve security and safety.,109,2018-Q4,2019-Q3,Closeout,20220630 Riley HS,10367582,Riley HS - HVAC,HVAC,7,Tanya Ortiz Franklin,South,1191701,13778,1524 E. 103rd St.,Los Angeles,90002,"This project will upgrade the heating, ventilation, and air conditioning (HVAC) systems in the Classroom, Nursing, Library, and Administration buildings. The HVAC systems are over 15 years old and beyond economical repair.","4,438",2023-Q2,2025-Q2,Design,20220630 Marianna ES,10372102,Marianna ES - SEEDS,SEEDS,2,Monica Garcia,East,1513701,13479,4215 E. Gleason St.,Los Angeles,90063,"Construct an outdoor learning and gathering space of approximately 1,600 square feet. Includes the installation of decomposed granite and cement brush off areas, composite wood headers to create in-ground planting areas, new trees, a new irrigation system, log benches and stools to create a classroom gathering space and picnic tables to create an outdoor dining garden. The project will be outfitted by the school site with native and flowering plants to attract hummingbirds and butterflies.",100,2021-Q4,2022-Q3,Construction,20220630 Primary Academy for Success School,10363986,Primary Academy PC - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northwest,1477601,13865,9075 Willis Ave.,Panorama City,91402,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",242,2014-Q2,2014-Q3,Closeout,20220630 Sheridan ES,10363997,Sheridan ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1668501,13290,416 N. Cornwell St.,Los Angeles,90033,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",408,2014-Q2,2014-Q3,Closeout,20220630 Sylvan Park ES,10364002,Sylvan Park ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1702701,13477,6238 Noble Ave.,Van Nuys,91411,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",387,2014-Q2,2014-Q3,Closeout,20220630 LaMotte ES,10371595,LaMotte ES - Install Secure Entry System,Security System,1,"Dr. George J. McKenna, III",Central,1231101,14566,4410 Orchard Ave.,Los Angeles,90037,Install new secure entry system at door to main office with three video receivers in main office.,28,2021-Q1,2021-Q2,Closeout,20220630 Hooper ES,10367530,Hooper ES - Paving,Paving/Greening/Playground Equipment,5,Jackie Goldberg,Central,1457501,13316,1225 E. 52nd St.,Los Angeles,90011,"The over 30-year-old asphalt concrete paving on the campus is severely deteriorated and in need of replacement. The scope of work includes replacing more than 100,000 square feet of asphalt concrete pavement, with the thickness designated in the geotechnical recommendations, at the playground and in between buildings. In addition, the project includes solar reflective coating, landscaping and irrigation improvements to approximately 15,000 square feet, outdoor site furnishings such as benches/seat walls and playground equipment, associated Americans with Disabilities Act (ADA) path of travel upgrades, and drainage systems required by DSA and the District's Storm Water Technical Manual.","3,664",2018-Q2,2019-Q3,Closeout,20220630 West Valley Occupational Center,10371837,West Valley Occupational Center - Ozone Cooling Tower,Energy/Water Efficiency,4,Nick Melvoin,Northwest,1901001,13659,6200 Winnetka Ave.,Woodland Hills,91367,"This 2021 LADWP MOU Pilot project project is a continuation under the previous 2015-2020 LADWP MOU. Pilot is to evaluate the feasibility of replacing traditional chemical systems with an ozone treatment system. The Ozone Cooling Tower Pilot program will evaluate water consumption, associated cost savings achieved by ozone treatment of the cooling tower water and by the installation of water monitoring devices at the West Valley Occupational Center. The pilot shall include, but is not limited to, installing the ozone generation system for testing, monitoring, and maintaining the equipment, and training District personnel on system operation. LAUSD will be responsible for and all non-Energy Conservation Measures (non-ECMs), as identified in the MOU.",58,2022-Q4,2023-Q2,Planning,20220630 Venice HS,10369434,Venice HS - Auditorium Repairs,Auditorium Renovation,4,Nick Melvoin,West,1890701,13513,13000 Venice Blvd.,Los Angeles,90066,"The crown molding attached to the walls and ceiling of the auditorium has deteriorated and become a safety hazard and a seismic upgrade to the ceiling is required. This project includes the repair, replacement, and preservation of crown molding elements; creation of an expansion joint between the ceiling plane and crown molding; installation of a modern anchorage system to anchor both old and new crown molding sections to the walls; repainting of the auditorium interior; new fabric-wrapped acoustical ceiling tiles; and new fabric-wrapped acoustical panels on the rear wall are being added. The seismic upgrade to the ceiling will include new re-attachment details for the entire perimeter, and installation of a new grid of compression struts with diagonal splay wires & new connections. The repairs will be performed as recommended by a Historical Restoration Architect to preserve the historically significant features of the auditorium.","5,007",2021-Q3,2022-Q3,Construction,20220630 112th St. ES,10371855,112th St. ES - 2021-23 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"This project was initially approved in BOE Report No. 317-20/21 for the 2021-22 Prop 39 co-locations as a charter school renovation for Resolute Academy Charter. This project included 1 charter office, 2 special education rooms, and 10 instructional spaces for charter student seats in grades 5-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 10 instructional spaces for charter student seats in grades 5-8 and an undefined scope of work.",50,2021-Q2,2021-Q2,Closeout,20220630 Bethune MS,10101048,Bethune MS - Upgrade Fire Alarm System,Fire Alarm System,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,Upgrade Fire Alarm System,"2,215",2010-Q2,2015-Q3,Closeout,20220630 Menlo ES,10372415,Menlo ES - Install New Fencing,Fencing,1,"Dr. George J. McKenna, III",Central,1524701,13386,4156 Menlo Ave.,Los Angeles,90037,"Install approximately 135 linear feet of wrought iron fence along 42nd St. It includes fabrication and galvanization of panels. Also, the installation of a double pedestrian gate and a service gate. Install approximately 70 linear feet of chain linked fence with 8 feet of height. It includes two spots: one location from Building B to Building C; second location from Building C to Building E. Also, it comprises a pedestrian gate at each location.",99,2022-Q3,2022-Q4,Planning,20220630 Selma ES,10370614,Selma ES - 2019-23 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1658901,13360,6611 Selma Ave.,Los Angeles,90028,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for Larchmont Charter School. This project included 1 charter office, 3 special education rooms, and 16 instructional spaces for charter student seats in grades 5-7. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was then approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 3 special education rooms, and 16 instructional spaces for charter student seats in grades 5-7 and an undefined scope of work. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 3 special education rooms, and 16 instructional spaces for charter student seats in grades 5-7 and an undefined scope of work. The project was next approved as a charter school renovation for Larchmont Charter School for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 3 charter office, 3 special education rooms, and 19 instructional spaces for charter student seats in grades K and 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",953,2021-Q3,2021-Q3,Closeout,20220630 Griffith STEAM Magnet MS,10366040,Griffith MS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1816801,13646,4765 E. 4th St.,Los Angeles,90022,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",492,2015-Q1,2015-Q2,Closeout,20220630 Kahlo Continuation HS,10366048,Kahlo Continuation HS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1877701,13945,1924 S. Los Angeles St.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",39,2015-Q1,2015-Q3,Closeout,20220630 Nightingale MS,10365216,Nightingale MS - Portable Removal,Portable Removal,2,Monica Garcia,East,1826401,13584,3311 N. Figueroa St.,Los Angeles,90065,Demolish/Remove 2 Portable Buildings,199,2014-Q4,2015-Q4,Closeout,20220630 Hancock Park ES,10102660,Hancock Park ES - Non Air-Conditioned Classrooms & MDF Room,HVAC,4,Nick Melvoin,West,1439701,13582,408 S. Fairfax Ave.,Los Angeles,90036,Non Air-Conditioned Classrooms & MDF Room,15,2012-Q2,2014-Q2,Closeout,20220630 Academy for Enriched Sciences Magnet ES,10368171,Academy for Enriched Sciences Magnet ES - ADA Improvements,Access Compliance,3,Scott Schmerelson,Northwest,1225001,13615,17551 Miranda St.,Encino,91316,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 25 doors/hardware, 25 accessible paths of travel, 38 signs, 18 restrooms, 20 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 5 concrete ramps, 1 piece of accessible furniture, 5 railings, and 1 parking area.","2,633",2018-Q1,2019-Q4,Closeout,20220630 Gulf ES,10367500,Gulf ES - Concrete Canopy,Roofing,7,Tanya Ortiz Franklin,South,1431501,13464,828 W. L St.,Wilmington,90744,The over 50-year-old concrete canopy covering a stairwell on the campus is severely deteriorated and in need of replacement. The scope of work includes demolition of the current canopy and replacement with a new canopy.,"1,105",2019-Q3,2020-Q3,Closeout,20220630 Garcetti Learning Academy,10368169,Garcetti Learning Academy - ADA Improvements,Access Compliance,1,"Dr. George J. McKenna, III",South,1679501,13318,612 W. 68th St.,Los Angeles,90044,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 62 doors/hardware, 9 accessible paths of travel, 68 signs, 12 restrooms, 15 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 2 metal ramps, 3 pieces of accessible furniture, 1 assembly seat, 6 railings, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","3,804",2018-Q1,2022-Q2,Closeout,20220630 South East HS,10366646,South East HS - Upgrade Baseball Field,Paving/Greening/Playground Equipment,5,Jackie Goldberg,East,1888101,14161,2720 Tweedy Blvd.,South Gate,90280,Upgrade the school baseball field by replacing the existing decomposed granite material under the batting cage with new concrete,20,2016-Q3,2017-Q1,Closeout,20220630 Breed ES,10370574,Breed ES - 2019-20 Prop 39,Charter Prop 39,2,Monica Garcia,East,1249301,13281,2226 E. 3rd St.,Los Angeles,90033,"This project is a charter school renovation for Extera Public School for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",16,2019-Q2,2019-Q3,Closeout,20220630 Carpenter Community Charter ES,10370233,Carpenter Community Charter ES - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northeast,1282201,13518,3909 Carpenter Ave.,Studio City,91604,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",153,2025-Q2,2025-Q3,Planning,20220630 Emerson Community Charter MS,10370241,Emerson Community Charter MS - Walk-In Freezer Modernization,Food Services Renovation,4,Nick Melvoin,West,1812301,13641,1650 Selby Ave.,Los Angeles,90024,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2025-Q2,2025-Q4,Planning,20220630 Muir MS,10370252,Muir MS - Walk-In Freezer Modernization,Food Services Renovation,1,"Dr. George J. McKenna, III",West,1825501,13436,5929 S. Vermont Ave.,Los Angeles,90044,"Replace deteriorated interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler and refrigeration equipment.",120,2027-Q4,2028-Q1,Planning,20220630 King-Drew Medicine & Science Magnet HS,10370267,King-Drew Medicine & Science Magnet HS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1872701,14561,1656 E. 118th St.,Los Angeles,90059,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q2,2027-Q3,Planning,20220630 Bravo Medical Magnet HS,10370271,Bravo Medical Magnet HS - Walk-In Freezer Modernization,Food Services Renovation,2,Monica Garcia,East,1875401,13336,1200 N. Cornwell St.,Los Angeles,90033,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",149,2027-Q1,2027-Q3,Planning,20220630 Van Ness ES,10367955,Van Ness ES - Security Upgrades,Security System,4,Nick Melvoin,West,1742501,13393,501 N. Van Ness Ave.,Los Angeles,90004,Provide and install Aiphone secure entry system to enhance and control the security of the campus.,27,2016-Q3,2017-Q2,Closeout,20220630 Vista MS,10366114,Vista MS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1811701,13896,15040 Roscoe Blvd.,Panorama City,91402,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",427,2014-Q4,2015-Q1,Closeout,20220630 Franklin HS,10367578,Franklin HS - Seismic Retrofit of Physical Education Building,Seismic Modernization,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,"This project is to construct wall anchorage connections and cross-ties for transferring lateral loads. The Physical Education Building was built in the 1960s and covers approximately 21,700 square feet. The lateral force resisting system is comprised of concrete shear walls with a flexible roof diaphragm. In addition, the project provides a new practice field, fire dampers and volume dampers required for improved safety, light fixtures and electrical improvements for energy efficiency, as well as associated Americans with Disabilities Act (ADA) upgrades to restrooms, showers, visitor's team area, gym office, and path of travel.","6,873",2018-Q3,2019-Q4,Closeout,20220630 Stoney Point Continuation HS,10371224,Stoney Point Continuation HS - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1858501,16422,10010 De Soto Ave.,Chatsworth,91311,Remove existing chain link fence and fabricate and install ADA compliant wrought iron gate for main entrance. Install secure entry system at main gate with two video receivers in main office.,49,2021-Q2,2021-Q4,Closeout,20220630 Valley Oaks Center for Enriched Studies,10367713,Sun Valley HS - 2016-17 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,"This project is a charter school renovation for North Valley Military Institute for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 21 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",58,2016-Q2,2016-Q3,Closeout,20220630 Hazeltine ES,10369513,Hazeltine ES - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northeast,1449301,13529,7150 Hazeltine Ave.,Van Nuys,91405,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2022-Q3,2023-Q2,Planning,20220630 Solano ES,10370033,Solano ES - Secure Entry System,Security System,2,Monica Garcia,East,1683601,13343,615 Solano Ave.,Los Angeles,90012,Install new secure entry system,19,2019-Q2,2019-Q3,Closeout,20220630 Marvin ES,10370027,Marvin ES - Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1517801,13573,2411 Marvin Ave.,Los Angeles,90016,Install new electronic wall-mounted marquee,25,2019-Q1,2019-Q2,Closeout,20220630 University Charter HS,10364075,University HS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",985,2014-Q1,2014-Q3,Closeout,20220630 Wright STEAM Magnet MS,10364084,Wright MS - IT Network Upgrade,IT Network Upgrade,4,Nick Melvoin,West,1849301,13738,6550 W. 80th St.,Los Angeles,90045,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",739,2014-Q1,2014-Q2,Closeout,20220630 South Gate MS,10366482,South Gate MS - Electrical Power / Circuitry Upgrades in Computer Lab,Electrical/Lighting,5,Jackie Goldberg,East,1837701,13261,4100 Firestone Blvd.,South Gate,90280,Provide electrical power and circuitry upgrades to the existing computer lab,11,2014-Q4,2016-Q1,Closeout,20220630 Broadous ES,10367061,Broadous ES - ADA Improvements,Access Compliance,6,Kelly Gonez,Northeast,1382901,13768,12561 Filmore St.,Pacoima,91331,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 113 doors/hardware, 38 accessible paths of travel, 53 signs, 16 restrooms, 24 drinking fountains/sinks, 2 assistive listening devices/intercoms/phones, 8 concrete ramps, 11 metal ramps, 9 pieces of accessible furniture, 1 assembly seat, 2 parking areas, 1 cafeteria counter, 1 nurse's exam room modification, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","4,785",2016-Q3,2022-Q4,Construction,20220630 Fair ES,10371134,Fair ES - Campus Improvement,Campus Improvement,6,Kelly Gonez,Northeast,1371201,13600,6501 Fair Ave.,North Hollywood,91606,"Provide and install chain link fence at existing gates, replace 20 lunch tables, and purchase 6 round tables with umbrellas.",87,2020-Q1,2020-Q3,Closeout,20220630 Annandale ES,10372004,Annandale ES - Purchase Classroom Furniture,Furniture/Fixtures/Equipment,5,Jackie Goldberg,Central,1215101,13371,6125 Poppy Peak Dr.,Los Angeles,90042,"Purchase new furniture for special education classrooms: tables, chairs, stools, bean bags, and floor mats",61,2021-Q4,2021-Q4,Closeout,20220630 Purche ES,10371207,Purche ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1615801,13655,13210 Purche Ave.,Gardena,90249,Remove the existing marquee and footing at Purche Ave. and 132nd St. and replace with a new 2-sided electronic marquee standing less than 8' high.,55,2020-Q4,2021-Q2,Closeout,20220630 Valley Oaks Center for Enriched Studies,10372519,Valley Oaks Center for Enriched Studies - 2022-23 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1789501,13842,9171 Telfair Ave.,Sun Valley,91352,"This project is a charter school renovation for North Valley Military Institute for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 5 special education rooms, and 21 instructional spaces for charter student seats in grades 6-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",118,2022-Q3,2022-Q3,Planning,20220630 Calabash Charter Academy,10372616,Calabash Charter Academy - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1270401,13743,23055 Eugene St.,Woodland Hills,91364,Install new secure entry system at the Main Office.,36,2022-Q3,2022-Q3,Planning,20220630 El Sereno MS,10371596,El Sereno MS - Provide Verizon Lab Infrastructure,Communications/Technology Upgrade,2,Monica Garcia,East,1811801,13412,2839 N. Eastern Ave.,Los Angeles,90032,Infrastructure upgrades in support of Verizon Innovative Learning Lab installation.,20,2020-Q4,2021-Q2,Closeout,20220630 Eastman ES,10371133,Eastman ES - Auditorium Renovation,Auditorium Renovation,2,Monica Garcia,East,1352101,13520,4112 E. Olympic Blvd.,Los Angeles,90023,"Provide and install new audio, visual and lighting equipment in auditorium.",84,2020-Q3,2020-Q4,Closeout,20220630 Parmelee ES,10372413,Parmelee ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1602101,13815,1338 E. 76th Pl.,Los Angeles,90001,Install new secure entry system at the Main Office.,32,2022-Q2,2022-Q4,Construction,20220630 102nd St. EEC,10372018,102nd St. EEC - Install Privacy Fence,Fencing,7,Tanya Ortiz Franklin,South,1954501,16301,1925 E. 102nd St.,Los Angeles,90002,Replace existing chain link fence with new privacy chain link fence around perimeter of school; approximately 600'. Approximately 300' is 8' tall fencing and 300' is 4' tall fencing.,42,2022-Q1,2022-Q1,Closeout,20220630 Owensmouth Continuation HS,10371717,Owensmouth Continuation HS - Install Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1857301,16401,6921 Jordan Ave.,Canoga Park,91303,Install new secure entry system at main entrance gate with three video receivers in the main office.,38,2022-Q3,2023-Q1,Planning,20220630 Marshall HS,10366065,Marshall HS - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1875001,13571,3939 Tracy St.,Los Angeles,90027,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",755,2015-Q2,2015-Q3,Closeout,20220630 Miller ES,10370294,Miller ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",South,1532101,13780,830 W. 77th St.,Los Angeles,90044,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",59,2019-Q3,2020-Q2,Closeout,20220630 Coeur d'Alene ES,10372136,Coeur d'Alene ES - Roofing,Roofing,4,Nick Melvoin,West,1634201,13578,810 Coeur D'Alene Ave.,Venice,90291,"This project is to provide approximately 44,638 square feet of new roofing at 16 buildings, including the installation of new gutters and downspouts and painting of affected areas.","1,063",2023-Q2,2023-Q4,Planning,20220630 Parks Learning Center,10371376,Parks Learning Center - Marquee,Electrical/Lighting,6,Kelly Gonez,Northwest,1357601,13852,8855 Noble Ave.,North Hills,91343,Install new electronic free-standing marquee near main entrance,60,2022-Q1,2022-Q3,Construction,20220630 Miles ES,10372186,Miles ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1531501,13650,6720 Miles Ave.,Huntington Park,90255,Install new secure entry system at the Main Office with three video receivers.,29,2022-Q1,2022-Q3,Construction,20220630 Stevenson College & Career Preparatory,10365217,Stevenson College & Career Preparatory - Portable Removal,Portable Removal,2,Monica Garcia,East,1838701,13450,725 S. Indiana St.,Los Angeles,90023,"Demolish/Remove DOH Girls Locker Room Building, DOH Boys Locker Room Building and DOH Healthy Start Clinic.",508,2015-Q4,2017-Q4,Closeout,20220630 Magnolia ES,10364049,Magnolia ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1505501,13302,1626 S. Orchard Ave.,Los Angeles,90006,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",838,2014-Q2,2015-Q1,Closeout,20220630 Crestwood ES,10364102,Crestwood ES - Roofing,Roofing,7,Tanya Ortiz Franklin,South,1330201,13733,1946 W. Crestwood St.,Rancho Palos Verdes,90275,"The project will replace 58,000 square feet of roofing on 13 classroom buildings, multipurpose room/lunch shelter and 10,000 square feet of connecting arcades. The roofing is more than 38 years old and consists of multiple layers and patches. Existing roofing materials have blown off in heavy winds.",539,2014-Q4,2015-Q1,Closeout,20220630 Hughes MS,10372119,Hughes MS - Energy Conservation Lighting,Electrical/Lighting,3,Scott Schmerelson,Northwest,1818501,13763,5607 Capistrano Ave.,Woodland Hills,91367,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $1,059,151. Estimated energy savings is 368,818 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $277,422 which is 26.2% of the ECM costs.",277,2022-Q3,2022-Q3,Planning,20220630 Orchard Academies,10372140,Orchard Academies 2C - Purchase Furniture,Furniture/Fixtures/Equipment,5,Jackie Goldberg,East,1515301,193567,6411 Orchard Ave.,Bell,90201,Purchase tables and stools for science class. (67) items total,41,2021-Q4,2022-Q2,Closeout,20220630 Cheremoya ES,10370561,Cheremoya ES - Exterior Painting,Painting,5,Jackie Goldberg,West,1304101,13410,6017 Franklin Ave.,Los Angeles,90028,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",242,2020-Q2,2020-Q3,Closeout,20220630 Manhattan ES,10365636,Manhattan ES - Play Area Gates,Security System,1,"Dr. George J. McKenna, III",West,1511001,13685,1850 W. 96th St.,Los Angeles,90047,Upgrade physical security of the campus by providing new gates to separate the play area and the existing parking lot.,8,2014-Q1,2014-Q1,Closeout,20220630 Mar Vista ES,10370469,Mar Vista ES - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1519201,13603,3330 Granville Ave.,Los Angeles,90066,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 96 doors/hardware, 24 accessible paths of travel, 56 signs, 9 restrooms, 6 drinking fountains, 1 sink/sink cabinet, 1 assistive listening device/intercom/phone, 4 concrete ramps, 5 pieces of accessible furniture, 1 assembly seat, 13 railings, 1 cafeteria counter, and 1 stage lift.","3,508",2021-Q4,2023-Q1,Construction,20220630 Hart ES,10371759,Hart ES - Install Gates and Promethean Activpanels,Campus Improvement,3,Scott Schmerelson,Northwest,1444501,13749,21040 Hart St.,Canoga Park,91303,Install two pedestrian gates with panic hardware at the north faculty parking lot. Install wall-mounted Promethean ActivPanels in each of 4 classrooms. One installation will also require the installation of a power outlet.,49,2021-Q2,2021-Q4,Closeout,20220630 Knollwood Preparatory Academy ES,10371221,Knollwood Preparatory Academy ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1476201,13770,11822 Gerald Ave.,Granada Hills,91344,Remove the existing marquee and footing near the main entrance on Gerald Ave. and replace with a new 2-sided electronic marquee standing less than 8' high.,55,2020-Q3,2021-Q2,Closeout,20220630 San Pedro Community Adult School EEC,10370737,San Pedro Community Adult School EEC - Reopening with Outdoor Classroom,Campus Improvement,7,Tanya Ortiz Franklin,South,1988501,13434,950 W. Santa Cruz St.,San Pedro,90731,"The San Pedro Community Adult School EEC site, closed in 2012, is located on the Harbor Community Adult School campus. The site includes two single-story buildings with approximately 6,160 square feet. This project will provide upgrades to both the interior and exterior of the classroom buildings including flooring, principal's office, and IT upgrades, as well as separating and upgrading the existing fire alarm and public address systems from the host site, Harbor Community Adult School, and paint. New furniture will be provided to the center. Additionally, the project will provide Americans with Disabilities Act (ADA) upgrades as necessary, including path of travel access to the main entrance and staff restroom upgrades for ADA compliance. A new outdoor classroom to provide opportunities for a hands-on, nature-based learning experience is included with the project.","4,695",2022-Q2,2022-Q4,Construction,20220630 Chatsworth Charter HS,10365271,Chatsworth HS - Barrier Removal,Access Compliance,3,Scott Schmerelson,Northwest,1858301,13870,10027 Lurline Ave.,Chatsworth,91311,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),212,2014-Q1,2014-Q3,Closeout,20220630 Western TECH Magnet School,10366934,Western ES - 2015-16 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1767101,13338,1724 W. 53rd St.,Los Angeles,90062,"This project is a charter school renovation for Garr Academy of Mathematics & Entrepreneurial Studies for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 9 classrooms for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",52,2015-Q2,2015-Q3,Closeout,20220630 University Charter HS,10372194,University Charter HS - Install Wrought Iron Fence,Fencing,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,Remove 4' high chain link fence between gym and YMCA and replace with 8' high wrought iron fence with pedestrian gate. New fence will be approx. 120' long.,48,2022-Q3,2023-Q1,Planning,20220630 Venice HS,10366807,Venice HS - Comprehensive Modernization,Comprehensive Modernization,4,Nick Melvoin,West,1890701,13513,13000 Venice Blvd.,Los Angeles,90066,"This project includes the construction of new buildings and site improvements with 27 general and specialty classrooms, instructional support spaces, and gymnasium with practice and competitive spaces. Existing school facilities will be upgraded including the conversion of the football stadium to a competition level with new bleachers and resurfacing of the grass field and track; new bleachers, outfield fencing/netting, scoreboards, dugouts, batting cages, sports lighting and backstop for the baseball field; and the softball field will be relocated and built new with sports lighting. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of the shop buildings, practice and competitive gymnasiums, utility building, and 14 classrooms in relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","156,907",2018-Q4,2022-Q3,Construction,20220630 Fair ES,10371762,Fair ES - Provide Computer Lab,Campus Improvement,6,Kelly Gonez,Northeast,1371201,13600,6501 Fair Ave.,North Hollywood,91606,"This project converts Room 1 to a computer lab by clearing existing furniture and built-in bookcase, touching up paint, patching walls, and repairing flooring. The project includes creating 36 student stations and 1 teacher station with the installation of raceways and new electrical/data wiring as well as the purchase of tables and chairs, but does not include computers/technology.",117,2021-Q2,2021-Q4,Closeout,20220630 Barton Hill ES,10371665,Barton Hill ES - Install Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1231501,13340,423 N. Pacific Ave.,San Pedro,90731,"Install an electronic, free-standing, and single-sided marquee on the corner of Pacific Ave. and Ofarrell St.",62,2021-Q3,2021-Q4,Closeout,20220630 Venice HS,10372390,Venice HS - Install Wrought Iron Fences,Fencing,4,Nick Melvoin,West,1890701,13513,13000 Venice Blvd.,Los Angeles,90066,"Install new 8 foot tall wrought iron fences at three sections at the front of campus, along Venice Blvd. Each fence will have pedestrian swing gates. School funds will cover scope to demo concrete columns in Section 1.",137,2022-Q3,2022-Q4,Planning,20220630 Erwin ES,10372491,Erwin ES - 2022-23 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1363001,13624,13400 Erwin St.,Van Nuys,91401,"This project is a charter school renovation for Ararat Charter School for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades TK-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",57,2022-Q3,2022-Q3,Planning,20220630 Valley Oaks Center for Enriched Studies,10366745,Sun Valley HS - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1809301,13842,9171 Telfair Ave.,Sun Valley,91352,"Modernize and upgrade school's existing parent & family center by providing interior paint, new flooring, and security upgrades including new doors and hardware as well as security on windows. Provide whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",69,2015-Q2,2015-Q4,Closeout,20220630 10th St. ES,10366746,10th St. ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1708201,13265,1000 Grattan St.,Los Angeles,90015,"Modernize school's existing parent & family center by providing interior paint and security upgrades including new doors and hardware as well as security on windows. Repair flooring, provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",67,2015-Q3,2015-Q4,Closeout,20220630 Alta Loma ES,10366751,Alta Loma ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1208201,13402,1745 Vineyard Ave.,Los Angeles,90019,"Modernize and upgrade school's existing parent & family center by providing interior paint, lighting repairs, new flooring, and security upgrades including new doors and hardware as well as security on windows. Provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",74,2015-Q3,2015-Q4,Closeout,20220630 Lowman Special Education & Career Transition Center,10366765,Lowman Sp Ed-Renovate 2 Changing Table Locations,Access Compliance,6,Kelly Gonez,Northeast,1194801,13544,12827 Saticoy St.,North Hollywood,91605,Renovate 2 Changing Table Locations,17,2015-Q1,2015-Q2,Closeout,20220630 Wadsworth EEC,10367368,Wadsworth EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1957501,16764,1047 E. 41st St.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",88,2016-Q3,2016-Q3,Closeout,20220630 Hobart ES,10364037,Hobart ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1454801,13331,980 S. Hobart Blvd.,Los Angeles,90006,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",489,2014-Q1,2014-Q2,Closeout,20220630 Nevada ES,10370471,Nevada ES - ADA Improvements,Access Compliance,3,Scott Schmerelson,Northwest,1545901,13783,22120 Chase St.,West Hills,91304,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 52 doors/hardware, 15 accessible paths of travel, 46 signs, 7 restrooms, 6 drinking fountains, 16 sinks/sink cabinets, 1 assistive listening device/intercom/phone, 2 concrete ramps, 4 pieces of accessible furniture, 6 assembly seats, 2 railings, 4 casework/counters, 1 door modification/auto opener, and 1 stage lift.","3,564",2021-Q4,2022-Q4,Construction,20220630 Virginia ES,10364081,Virginia ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1757501,13504,2925 Virginia Rd.,Los Angeles,90016,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",440,2013-Q4,2014-Q2,Closeout,20220630 Farmdale ES,10367951,Farmdale ES - Changing Area Modifications,Access Compliance,2,Monica Garcia,East,1374001,15166,2660 Ruth Swiggett Dr.,Los Angeles,90032,Provide and install folding changing tables and privacy screens for classrooms 3 & 31.,10,2016-Q3,2017-Q2,Closeout,20220630 24th St. EEC,10367988,24th St. EEC - Campus Upgrades,Campus Improvement,1,"Dr. George J. McKenna, III",Central,1957001,16624,2101 W. 24th St.,Los Angeles,90018,"Remove outdated rubber matting and replace with new rubber matting system on the existing playground, and replace the obsolete entry control system with a new secure entry control system to improve site security.",29,2017-Q3,2017-Q3,Closeout,20220630 Grant EEC,10367995,Grant EEC - Playground Upgrades,Paving/Greening/Playground Equipment,5,Jackie Goldberg,West,1951901,16688,1559 N. St. Andrews Pl.,Los Angeles,90028,Remove outdated rubber matting and replace with new rubber matting system on the existing playground.,18,2017-Q3,2017-Q3,Closeout,20220630 Roberti EEC,10368001,Roberti EEC - Campus Upgrades,Campus Improvement,5,Jackie Goldberg,Central,1949701,15261,1156 E. Vernon Ave.,Los Angeles,90011,"Refinish or replace existing wood floors in 4 large classrooms with new hardwood flooring system and provide 2 large area rugs in each classroom, reconstruct existing large sand play area to more age-appropriate size, replace play area with a combination of paving and synthetic turf, and provide 2 sandboxes with sand and covers.",76,2018-Q3,2019-Q1,Closeout,20220630 Sylvan Park EEC,10368003,Sylvan Park EEC - Campus Upgrades,Campus Improvement,3,Scott Schmerelson,Northeast,1956501,16691,15011 Delano St.,Van Nuys,91411,"Replace unsanitary restroom flooring in children's bungalow restrooms with new sheet vinyl flooring system, and install perimeter fence around exterior grass area.",60,2018-Q4,2018-Q4,Closeout,20220630 Franklin HS,10370510,Franklin HS - Flooring,Flooring,2,Monica Garcia,Central,1864301,13405,820 N. Ave. 54,Los Angeles,90042,"This project is to replace approximately 178,000 square feet of deteriorated flooring.","1,265",2022-Q4,2024-Q4,Planning,20220630 Hooper ES,10369601,Hooper ES - Technology Upgrades,Communications/Technology Upgrade,5,Jackie Goldberg,Central,1457501,13316,1225 E. 52nd St.,Los Angeles,90011,Purchase 120 Chromebooks and 4 charging carts,41,2018-Q2,2018-Q2,Closeout,20220630 Bethune MS,10367815,Bethune MS - Install Concrete Ramps,Access Compliance,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,Construct concrete ramps at auditorium and parking lot and provide accessible parking.,118,2016-Q3,2016-Q4,Closeout,20220630 Telfair ES,10368674,Telfair ES - Security Upgrades for Multipurpose Room,Security System,6,Kelly Gonez,Northeast,1706801,13616,10975 Telfair Ave.,Pacoima,91331,Install intrusion alarm in the multipurpose room.,20,2017-Q1,2017-Q2,Closeout,20220630 Budlong ES,10369736,Budlong ES - 2018-19 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1261601,15162,5940 S. Budlong Ave.,Los Angeles,90044,"This project was approved in Board of Education Report No. 429-17/18 as a 2018-19 Prop. 39 charter co-location. The charter operator, Lou Dantzler Preparatory ES, did not occupy Budlong ES during the 2018-19 academic year. As a result, the scope of work changed from a co-location to vacating the site which may include the relocation of classrooms, cleaning, retrieving furniture and equipment, miscellaneous repairs, remedial construction, and reconnecting all low voltage systems to the District-operated program.",29,2018-Q2,2018-Q3,Closeout,20220630 Trinity ES,10369795,Trinity ES - 2018-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1721901,13332,3736 Trinity St.,Los Angeles,90011,"This project is a charter school renovation for Gabriella Charter School #2 for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades K-3. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",62,2018-Q2,2018-Q3,Closeout,20220630 "Sun Valley Magnet: Engineering, Arts & Technology",10369791,Sun Valley Magnet - 2018-19 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1839601,13546,7330 Bakman Ave.,Sun Valley,91352,"This project is a charter school renovation for Celerity Cardinal Charter School for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 16 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",22,2018-Q2,2018-Q3,Closeout,20220630 Grant ES,10368812,Grant ES - 2017-20 Prop 39,Charter Prop 39,5,Jackie Goldberg,West,1426001,13355,1530 N. Wilton Pl.,Los Angeles,90028,"This project was initially approved in BOE Report No. 530-16/17 for the 2017-18 Prop 39 co-locations as a charter school renovation for Citizens of the World - Silver Lake. This project included 1 charter office and 13 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades K-8. The project was again amended for a single-year term with an expiration date of 6/30/20 in BOE Report No. 343-18/19 for 2019-20 Prop. 39 co-locations as a ""no change"" project with 14 spaces allocated to the charter and a scope of work that is not yet defined. However, the charter school opted to vacate the site and will not continue occupancy in the 2019-20 school year.",16,2019-Q4,2019-Q4,Closeout,20220630 Holmes MS,10003978,Holmes MS - Auditorium & Gym Renovation,Campus Improvement,3,Scott Schmerelson,Northwest,1818201,13835,9351 Paso Robles Ave.,Northridge,91325,"Auditorium Upgrade lighting system, purchase and install sound system for music & orchestra programs, and refinish stage area; Provide and install new AC system in the main gymnasium",934,2014-Q2,2015-Q1,Closeout,20220630 Widney Special Education HS,10368774,Widney Special Education HS - Roofing & HVAC,Roofing,1,"Dr. George J. McKenna, III",Central,1191401,15163,2302 S. Gramercy Pl.,Los Angeles,90018,"The project will replace approximately 123,365 square feet of deteriorated roofing with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes installing 2 new heating, ventilation, and air conditioning (HVAC) units and 8 skylights, replacing damaged wood, installing new gutters and downspouts, and painting to match existing areas affected in the roof demolition.","2,631",2018-Q1,2019-Q1,Closeout,20220630 Normont EEC,10367998,Normont EEC - Flooring,Flooring,7,Tanya Ortiz Franklin,South,1954301,16706,25028 Petroleum Ave.,Harbor City,90710,Replace unsanitary restroom flooring in children's bungalow restrooms with new sheet vinyl flooring system.,12,2017-Q1,2017-Q4,Closeout,20220630 Normandie EEC,10100486,Normandie EEC - Paint Building Exterior,Painting,1,"Dr. George J. McKenna, III",Central,1954101,16667,4407 S. Raymond Ave.,Los Angeles,90037,Paint Building Exterior,49,2014-Q3,2015-Q1,Closeout,20220630 Atwater ES,10363881,Atwater ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1223301,13457,3271 Silver Lake Blvd.,Los Angeles,90039,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",413,2015-Q2,2015-Q4,Closeout,20220630 Buchanan ES,10363891,Buchanan ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1260301,13350,5024 Buchanan St.,Los Angeles,90042,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",457,2015-Q2,2016-Q1,Closeout,20220630 Carson ES,10363900,Carson ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1283601,13435,161 E. Carson St.,Carson,90745,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",362,2014-Q3,2014-Q4,Closeout,20220630 Lockhurst Charter ES,10372621,Lockhurst Charter ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1488701,13794,6170 Lockhurst Dr.,Woodland Hills,91367,Install new secure entry system at the Main Office.,42,2022-Q4,2022-Q3,Planning,20220630 Sheridan ES,10372509,Sheridan ES - 2022-23 Prop 39,Charter Prop 39,2,Monica Garcia,East,1668501,13290,416 N. Cornwell St.,Los Angeles,90033,"This project is a charter school renovation for KIPP Promesa Prep for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 6 instructional spaces for charter student seats in grades 2-4. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",476,2022-Q3,2022-Q3,Planning,20220630 Broadway ES,10368755,Broadway ES - Install Ramp,Access Compliance,4,Nick Melvoin,West,1253401,13533,1015 Lincoln Blvd.,Venice,90291,Install new ramp and regrade the pathway. Install remote door release and intercom units at the gate. Install handrail and signage.,150,2017-Q3,2020-Q3,Closeout,20220630 Castelar ES,10368072,Castelar ES - Seismic Retrofit of Underground Parking,Seismic Modernization,2,Monica Garcia,Central,1286301,13283,840 Yale St.,Los Angeles,90012,"The underground parking structure concrete beams have deteriorated and require seismic upgrades. The scope of work is to strengthen the structural framing of the underground parking and replace the corroded metal ledger to avoid failure. Scope also includes replacing the entire playground area of approximately 53,000 square feet with cool coated asphalt (about half of which is above the garage), regrading, adding storm drainage, and fixing utility lines, and replacing playground equipment.","2,719",2019-Q3,2020-Q3,Closeout,20220630 Chapman ES,10372151,Chapman ES - Install Wrought Iron Gate,Fencing,7,Tanya Ortiz Franklin,South,1298601,13460,1947 Marine Ave.,Gardena,90249,Remove existing wrought iron gate near auditorium entrance. Re-install gate closer to sidewalk and add fence panels to secure hallway. To eliminate open access to hallway near auditorium.,23,2022-Q1,2022-Q4,Construction,20220630 Porter MS,10371719,Porter MS - Install Pedestrian Gate,Fencing,3,Scott Schmerelson,Northwest,1835401,13807,15960 Kingsbury St.,Granada Hills,91344,Replace perimeter chain-link fence panel with a pedestrian gate on the east side of the campus near room 65,12,2021-Q1,2021-Q2,Closeout,20220630 Woodlake Community Charter ES,10370937,Woodlake Community Charter ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1787701,13686,23231 Hatteras St.,Woodland Hills,91367,Install new electronic free-standing marquee.,49,2020-Q3,2021-Q2,Closeout,20220630 Santa Monica Community Charter ES,10366949,Santa Monica Community Charter-Removal of 3 Bldgs.,Portable Removal,5,Jackie Goldberg,West,1654801,13347,1022 N. Van Ness Ave.,Los Angeles,90038,"Mandated DOH Removal of 3 Bldgs. Abatement of hazardous materials, Disconnection of all utilities, disconnection of all data feeds and repair/replace asphalt.",29,2015-Q1,2015-Q4,Closeout,20220630 Beethoven ES,10367515,Beethoven ES - Security Upgrades,Security System,4,Nick Melvoin,West,1234201,15206,3711 Beethoven St.,Los Angeles,90066,Install secure entrance system including new gate and camera/buzzer system.,26,2016-Q1,2016-Q4,Closeout,20220630 Grand View ES,10367549,Grand View ES - New Portable Wheelchair Lift,Access Compliance,4,Nick Melvoin,West,1424701,13716,3951 Grand View Blvd.,Los Angeles,90066,Provide and install portable wheelchair lift at auditorium.,22,2016-Q2,2016-Q2,Closeout,20220630 Dayton Heights ES,10367603,Dayton Heights ES - Restroom Upgrades,Access Compliance,2,Monica Garcia,Central,1335601,13352,607 N. Westmoreland Ave.,Los Angeles,90004,"Modify kindergarten restrooms K2 & K4 including widening doors, relocating light switch, removing and replacing partition, and installing ACU-provided folding changing table.",8,2016-Q2,2016-Q3,Closeout,20220630 Roscomare ES,10367737,Roscomare ES - Security Upgrades,Security System,4,Nick Melvoin,West,1636301,13799,2425 Roscomare Rd.,Los Angeles,90077,Provide and install Aiphone secure entry system to enhance and control the security of the campus.,13,2016-Q2,2016-Q4,Closeout,20220630 Cabrillo ES,10363896,Cabrillo ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1268501,13552,732 S. Cabrillo Ave.,San Pedro,90731,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",246,2014-Q4,2015-Q1,Closeout,20220630 Cantara ES,10363898,Cantara ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northwest,1276701,13732,17950 Cantara St.,Reseda,91335,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",330,2014-Q2,2014-Q3,Closeout,20220630 Breed ES,10371863,Breed ES - 2021-22 Prop 39,Charter Prop 39,2,Monica Garcia,East,1249301,13281,2226 E. 3rd St.,Los Angeles,90033,"This project is a charter school renovation for Extera Public School for a single-year term with an expiration date of 6/30/22. The 2021-22 Prop. 39 co-location approved in Board of Education Report No. 317-20/21 includes 1 charter office, 2 special education rooms, and 8 instructional spaces for charter student seats in grades TK-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The scope of work for this project included the reconfigurations of rooms back to District systems, this scope of work was not performed.",1,2021-Q2,2021-Q3,Closeout,20220630 Ascot ES,10368157,Ascot ES - Comprehensive Modernization,Comprehensive Modernization,5,Jackie Goldberg,Central,1221901,13276,1447 E. 45th St.,Los Angeles,90011,"This project includes the construction of new buildings and site improvements with approximately 25 general and specialty classrooms, instructional support spaces, administration, library, textbook room, multipurpose room, maintenance and operations area, food services and lunch shelter, kindergarten and elementary school playgrounds, and parking. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of administration/library/classroom building #1, multipurpose room/classroom building #2, food service building #3, lunch shelters #13 & #15, storage building #7, and 12 relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","95,375",2021-Q3,2024-Q4,Construction,20220630 Crenshaw Magnet HS: STEMM,10370654,Crenshaw Magnet HS - Roofing,Roofing,1,"Dr. George J. McKenna, III",West,1859601,13766,5010 Eleventh Ave.,Los Angeles,90043,"This project provides approximately 126,000 square feet of new roofing at four buildings including the installation of new gutters and downspouts and painting of affected areas.","2,428",2025-Q1,2026-Q1,Planning,20220630 Aggeler Opportunity HS,10371636,Aggeler Opportunity HS - Exterior Painting,Painting,3,Scott Schmerelson,Northwest,1850701,13644,21050 Plummer St.,Chatsworth,91311,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",295,2021-Q2,2021-Q4,Closeout,20220630 Mountain View ES,10372363,Mountain View ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1540401,13706,6410 Olcott St.,Tujunga,91042,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, window blinds, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",90,2022-Q3,2022-Q4,Planning,20220630 Brainard ES,10367209,Brainard ES- Portable Wheelchair Lift,Access Compliance,6,Kelly Gonez,Northeast,1248601,13834,11407 Brainard Ave.,Lake View Terrace,91342,"Provide and install portable wheelchair lift, bridge assembly and accessible lunch table.",36,2015-Q3,2015-Q4,Closeout,20220630 75th St. EEC,10004275,75th St. EEC - Shade Shelter,Lunch/Shade Shelter,7,Tanya Ortiz Franklin,South,1955801,16683,242 W. 75th St.,Los Angeles,90003,Three shade structures were added to the site. Includes path of travel improvements to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA).,306,2013-Q4,2014-Q2,Closeout,20220630 San Jose ES,10372368,San Jose ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northwest,1647901,13691,14928 Clymer St.,Mission Hills,91345,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",93,2022-Q4,2022-Q4,Planning,20220630 Avalon Gardens ES,10372372,Avalon Gardens ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1224701,13618,13940 S. San Pedro St.,Los Angeles,90061,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",93,2022-Q3,2022-Q4,Planning,20220630 Bonita ES,10372374,Bonita ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1247301,13796,21929 Bonita St.,Carson,90745,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated ceiling tiles and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",91,2022-Q3,2022-Q4,Planning,20220630 Bridges Span School,10372375,Bridges Span School - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1686701,14543,1235 Broad Ave.,Wilmington,90744,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",82,2022-Q3,2022-Q4,Planning,20220630 Markham MS,10372476,Markham MS - Energy Conservation Pilot (ThermaCote),Energy/Water Efficiency,7,Tanya Ortiz Franklin,South,1823701,13699,1650 E. 104th St.,Los Angeles,90002,"Measurement & Verification of ThermaCote technology: Oversee ThermaCote contractor's coating of one portable unit. Purchase, installation and monthly data gathering of the electric submeters at the BARD AC units of the two (2) portable units, and data gathering (kWh) from the electric submeters once a month over a twelve (12) month performance period.",14,2022-Q3,2023-Q3,Planning,20220630 Vaughn Next Century Learning Center,10369429,Vaughn Next Century Learning Center - SEEDS,SEEDS,6,Kelly Gonez,Northeast,1745201,13756,13330 Vaughn St.,San Fernando,91340,"Construct an outdoor learning space of approximately 1,500 square feet consisting of the removal of asphalt, the installation of new chain link fencing and a gate that complies with the Americans with Disabilities Act (ADA), the installation of decomposed granite and a brush-off concrete pad, a new irrigation system with points of connection for raised beds and planter areas, composite wood headers to create in-ground planting areas, two trees, log benches and stools, raised beds, work tables, and a demonstration table. The project will be outfitted by the school site and partner with native and edible plants.",88,2019-Q2,2020-Q3,Closeout,20220630 Delevan ES,10363916,Delevan ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1339701,13455,4168 W. Ave. 42,Los Angeles,90065,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",243,2014-Q3,2014-Q4,Closeout,20220630 Eastman ES,10363920,Eastman ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1352101,13520,4112 E. Olympic Blvd.,Los Angeles,90023,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",441,2014-Q3,2014-Q4,Closeout,20220630 Fletcher ES,10363929,Fletcher ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",268,2014-Q4,2015-Q1,Closeout,20220630 Del Olmo ES,10363932,Del Olmo ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1238601,13848,100 N. New Hampshire Ave.,Los Angeles,90004,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",329,2014-Q2,2014-Q3,Closeout,20220630 Glenfeliz ES,10363942,Glenfeliz ES - IT Network Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1416401,13526,3955 Glenfeliz Blvd.,Los Angeles,90039,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",238,2014-Q4,2015-Q1,Closeout,20220630 El Sereno EEC,10101596,El Sereno EEC - Modernization,Campus Improvement,2,Monica Garcia,East,1958101,16304,3802 Pueblo Ave.,Los Angeles,90032,Modernization,121,2012-Q3,2015-Q3,Closeout,20220630 Murchison EEC,10101600,Murchison EEC - Modernization,Campus Improvement,2,Monica Garcia,East,1953701,16665,1537 Murchison St.,Los Angeles,90033,Modernization,182,2012-Q3,2014-Q1,Closeout,20220630 Willenberg Special Education Center,10365148,Willenberg Special Education Center - Compliance with State & Federal Access Requirements,Access Compliance,7,Tanya Ortiz Franklin,South,1195701,13545,308 Weymouth Ave.,San Pedro,90732,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with New Accessible Parking & Electronic Vehicular Gate,191,2013-Q3,2014-Q1,Closeout,20220630 Ambler ES,10366876,Ambler ES - 2015-16 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1208901,13833,319 E. Sherman Dr.,Carson,90746,"This project is a charter school renovation for Community Preparatory Academy for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 7 classrooms for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",201,2015-Q2,2015-Q4,Closeout,20220630 Manchester ES,10368307,Manchester ES - Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",South,1509601,13305,661 W. 87th St.,Los Angeles,90044,Provide and install electronic marquee.,41,2017-Q4,2018-Q4,Closeout,20220630 Alta Loma ES,10365184,Alta Loma ES - Security Upgrades,Security System,1,"Dr. George J. McKenna, III",West,1208201,13402,1745 Vineyard Ave.,Los Angeles,90019,"Upgrade physical security of the campus by purchasing and installing an electronic camera door entry system at the main entrance, and new self-closing gates with new hardware in the parking lot.",13,2013-Q4,2016-Q4,Closeout,20220630 Annandale ES,10365185,Annandale ES - Security Upgrades,Security System,5,Jackie Goldberg,Central,1215101,13371,6125 Poppy Peak Dr.,Los Angeles,90042,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance.,20,2014-Q2,2016-Q4,Closeout,20220630 Denker ES,10365650,Denker ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1342501,13638,1620 W. 162nd St.,Gardena,90247,Demolish/Remove 1 Portable Building,33,2015-Q3,2015-Q4,Closeout,20220630 Ranchito ES,10368030,Ranchito ES - School Beautification & Safety Improvement,Painting,6,Kelly Gonez,Northeast,1619201,13721,7940 Ranchito Ave.,Panorama City,91402,"Prepare, prime, paint, and refinish the interior and exterior of the school buildings and appurtenant surfaces.",728,2017-Q3,2018-Q1,Closeout,20220630 24th St. ES,10366874,24th St. ES - 2015-16 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1730101,13335,2055 W. 24th St.,Los Angeles,90018,"This project is a charter school renovation for Crown Preparatory Academy for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 15 classrooms for charter student seats in grades 6-7. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",73,2015-Q4,2015-Q4,Closeout,20220630 Shenandoah ES,10367738,Shenandoah ES - Electronic Marquee,Electrical/Lighting,1,"Dr. George J. McKenna, III",West,1667101,13491,2450 Shenandoah St.,Los Angeles,90034,Provide and install electronic marquee.,41,2016-Q2,2018-Q2,Closeout,20220630 Victory ES,10367935,Victory ES - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1752101,13442,6315 Radford Ave.,North Hollywood,91606,Provide and install electronic marquee.,45,2018-Q1,2018-Q1,Closeout,20220630 White Point ES,10365201,White Point ES - Upgrade Carpet,Flooring,7,Tanya Ortiz Franklin,South,1776701,13617,1410 Silvius Ave.,San Pedro,90731,"Upgrade the school by replacing severely deteriorated carpet in buildings 22, 23, and 24.",16,2014-Q1,2014-Q2,Closeout,20220630 Mack ES,10366815,Mack ES-ADA Repairs,Access Compliance,1,"Dr. George J. McKenna, III",Central,1511301,13851,3020 S. Catalina St.,Los Angeles,90007,ADA Repairs,3,2015-Q2,2015-Q3,Closeout,20220630 Telfair EEC,10368004,Telfair EEC - Campus Upgrades,Campus Improvement,6,Kelly Gonez,Northeast,1958001,15442,10915 Telfair Ave.,Pacoima,91331,"Provide privacy-slatted chain link fence in front of the school for improved safety, replace unsanitary linoleum floor with new quarry tile floor system in the kitchen, replace all polycarbonate (Lexan) windows with glass windows for improved visibility and site safety, and replace cabinetry.",113,2018-Q1,2018-Q4,Closeout,20220630 Arminta ES,10364094,Arminta ES - Roofing,Roofing,6,Kelly Gonez,Northeast,1220501,13710,11530 Strathern St.,North Hollywood,91605,"The project will replace the roofing on the multipurpose room/lunch shelter, 1 classroom building and 9,000 square feet of arcade covered with electrical conduits. The roofing is more than 34 years old and consists of multiple layers and patches, and materials that have blown off in heavy winds.",215,2014-Q1,2014-Q2,Closeout,20220630 Hancock Park ES,10366537,Hancock Park ES - SEEDS,SEEDS,4,Nick Melvoin,West,1439701,13582,408 S. Fairfax Ave.,Los Angeles,90036,"Design and construct an outdoor learning space that is approximately 1,100 square feet and consists of the removal of asphalt and concrete, and the installation of decomposed granite, a hose bib, power outlet, chainlink fence and gate. It will be outfitted by the partner organization (Hancock Park ES Booster Club) with planter boxes and planting materials.",25,2015-Q1,2015-Q2,Closeout,20220630 Graham ES,10367618,Graham ES - Parent & Family Center,Campus Improvement,7,Tanya Ortiz Franklin,South,1421901,13476,8407 S. Fir Ave.,Los Angeles,90001,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",56,2016-Q2,2017-Q1,Closeout,20220630 West Athens ES,10367157,West Athens ES - Technology Upgrades,Communications/Technology Upgrade,1,"Dr. George J. McKenna, III",West,1764401,13317,1110 W. 119th St.,Los Angeles,90044,Increase school's access to technology by providing 7 Lenovo laptops for various classrooms.,7,2015-Q4,2016-Q1,Closeout,20220630 Lockhurst Charter ES,10365716,Lockhurst ES - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1488701,13794,6170 Lockhurst Dr.,Woodland Hills,91367,Replace deteriorated playground matting systems to ensure the health and safety of students.,82,2014-Q4,2015-Q1,Closeout,20220630 Germain Academy for Academic Achievement,10229925,Germain Academy for Academic Achievement - Non Air-Conditioned Classroom & Equipment,HVAC,3,Scott Schmerelson,Northwest,1411701,13872,20730 Germain St.,Chatsworth,91311,Non Air-Conditioned Classroom & Equipment,32,2014-Q1,2014-Q3,Closeout,20220630 Grape ES,10367123,Grape ES - Electronic Marquee & Privacy Fence,Campus Improvement,7,Tanya Ortiz Franklin,South,1427401,13495,1940 E. 111th St.,Los Angeles,90059,Provide upgrades to the campus with a new electronic marquee. Provide safety upgrades with the installation of new privacy screen fencing along Wilmington Ave. to limit the visibility of the portable restroom buildings by pedestrians.,33,2016-Q1,2016-Q4,Closeout,20220630 Telfair ES,10366701,Telfair ES - Multipurpose Room Upgrades,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1706801,13616,10975 Telfair Ave.,Pacoima,91331,"Provide upgrades to the existing multipurpose room by installing an audio/visual system including wiring, pathway and switches. Include a motorized screen and new projector.",39,2015-Q2,2015-Q4,Closeout,20220630 Maclay MS,10369769,Maclay MS - 2018-19 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1822801,13771,12540 Pierce Ave.,Pacoima,91331,"This project is a charter school renovation for YPI Valley Public Charter HS for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",67,2018-Q2,2018-Q3,Closeout,20220630 Chatsworth Charter HS,10369737,Chatsworth Charter HS - 2018-19 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northwest,1858301,13870,10027 Lurline Ave.,Chatsworth,91311,"This project is a charter school renovation for Valley International Preparatory HS for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",310,2018-Q2,2018-Q3,Closeout,20220630 Riverside Charter ES,10369923,Riverside Charter ES - Portable Removal,Portable Removal,3,Scott Schmerelson,Northeast,1631501,13645,13061 Riverside Dr.,Sherman Oaks,91423,"Demolish 1 DOH portable building, provide temporary fencing, remove/relocate furniture and equipment, disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/replace asphalt paving.",86,2018-Q4,2019-Q2,Closeout,20220630 Del Amo ES,10369818,Del Amo ES - Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1338401,13623,21228 Water St.,Carson,90745,Install new electronic free-standing marquee.,50,2019-Q1,2019-Q2,Closeout,20220630 Marshall HS,10366539,Marshall HS- Portable Stage Lift,Access Compliance,2,Monica Garcia,Central,1875001,13571,3939 Tracy St.,Los Angeles,90027,Portable Wheelchair Lift for Stage Accessibility,31,2014-Q4,2014-Q4,Closeout,20220630 156th St. ES,10366440,156th St. ES - Tree Replacement & Concrete Repair,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1580801,13673,2100 W. 156th St.,Gardena,90249,"This project is to remove five trees whose root system is causing significant damage to the asphalt and concrete paving at various locations on the site. Three ficus trees and two liquid amber trees will be removed and replaced with new trees with less aggressive root systems to preserve the 23,000 square feet of new asphalt paving and 3,300 square feet of concrete paving that will be replaced as a result of the damage.",531,2016-Q2,2016-Q4,Closeout,20220630 Mendez HS,10368725,Mendez HS - Wellness Center,Campus Improvement,2,Monica Garcia,East,1861101,14521,1200 Plaza Del Sol,Los Angeles,90033,"The project will provide a new wellness center on a portion of the Mendez HS campus. The project consists of approximately 6,500 square feet of new construction, related site improvements, and reconfiguration of existing basketball courts and handball walls. The new wellness center will be operated by St. John's Well Child & Family Center and will provide medical, mental health and dental services to students and the community.","9,955",2019-Q4,2022-Q3,Construction,20220630 Wilshire Crest ES,10369951,Wilshire Crest ES - Secure Entry System and Fencing,Security System,1,"Dr. George J. McKenna, III",West,1779501,13524,5241 W. Olympic Blvd.,Los Angeles,90036,Install wrought iron fence and a secure entry system at the front of the school to improve security and safety.,42,2019-Q1,2019-Q3,Closeout,20220630 Dacotah EEC,10367446,Dacotah EEC - Roofing,Roofing,2,Monica Garcia,East,1951201,16745,3142 Lydia Dr.,Los Angeles,90023,"This project is to upgrade 18,000 square feet of roofing at the Children's Unit Building with a Polyvinyl Chloride (PVC) material. The roof is over 25 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",157,2016-Q3,2016-Q3,Closeout,20220630 118th St. ES,10366313,118th St. ES - Ceiling System Improvements,Seismic Modernization,7,Tanya Ortiz Franklin,South,1574001,13321,144 E. 118th St.,Los Angeles,90061,"Repair 8,000 square feet of suspended ceiling systems in 009DCR classroom building for seismic corrections and to improve structural integrity. Scope of work includes installation of new seismic compression struts, and hanger wire upgrades per code requirements, as well as abatement of asbestos and removing impacted components beyond their remaining service life.",504,2020-Q2,2020-Q3,Closeout,20220630 Dana MS,10370238,Dana MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1810401,15063,1501 S. Cabrillo Ave.,San Pedro,90731,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2027-Q1,2027-Q2,Planning,20220630 Hoover ES,10370165,Hoover ES - Walk-In Freezer Modernization,Food Services Renovation,5,Jackie Goldberg,Central,1458901,13298,2726 Francis Ave.,Los Angeles,90005,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2028-Q2,2028-Q4,Planning,20220630 Anatola ES,10368172,Anatola ES - ADA Improvements,Access Compliance,3,Scott Schmerelson,Northwest,1211001,13609,7364 Anatola Ave.,Lake Balboa,91406,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 45 doors/hardware, 44 accessible paths of travel, 46 signs, 12 restrooms, 22 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 1 concrete ramp, 7 pieces of accessible furniture, 6 railings, 1 new elevator/stage lift, and 2 passenger/bus loading zones.","3,121",2017-Q4,2021-Q2,Closeout,20220630 Bellingham ES,10366004,Bellingham ES - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1357701,13925,6728 Bellingham Ave.,North Hollywood,91606,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",244,2015-Q1,2015-Q2,Closeout,20220630 Evergreen ES,10366031,Evergreen ES - IT Network Upgrade,IT Network Upgrade,2,Monica Garcia,East,1369901,13569,2730 Ganahl St.,Los Angeles,90033,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",559,2015-Q2,2015-Q4,Closeout,20220630 Madison MS,10369664,Madison MS - Electronic Marquee,Electrical/Lighting,6,Kelly Gonez,Northeast,1823001,13627,13000 Hart St.,North Hollywood,91605,Install new electronic free-standing marquee.,31,2018-Q3,2018-Q4,Closeout,20220630 Pomelo Community Charter ES,10367897,Pomelo Community Charter ES - Accessibility Upgrades,Access Compliance,3,Scott Schmerelson,Northwest,1614001,13764,7633 March Ave.,West Hills,91304,Provide and install concrete passenger loading zone at existing sidewalk.,7,2016-Q3,2016-Q3,Closeout,20220630 Griffith-Joyner ES,10105881,Griffith-Joyner ES - Compliance with State & Federal Access Requirements,Fire Alarm System,7,Tanya Ortiz Franklin,South,1584901,13497,1963 E. 103rd St.,Los Angeles,90002,Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA),337,2015-Q3,2016-Q1,Closeout,20220630 South Gate MS,10370514,South Gate MS - Roofing,Roofing,5,Jackie Goldberg,East,1837701,13261,4100 Firestone Blvd.,South Gate,90280,"This project is to provide approximately 93,000 square feet of new roofing at 19 buildings, including new gutters and downspouts, installation of skylights and painting of affected areas.","2,406",2022-Q3,2023-Q2,Planning,20220630 Van Nuys ES,10366648,Van Nuys ES - Air Phone Entry System,Security System,3,Scott Schmerelson,Northeast,1743801,13403,6464 Sylmar Ave.,Van Nuys,91401,Upgrade physical security of the school by installing and providing a new Air Phone entry system with electrical upgrades and two units for the main office,13,2014-Q3,2014-Q4,Closeout,20220630 Figueroa ES,10366033,Figueroa ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",South,1382201,13502,510 W. 111th St.,Los Angeles,90044,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",270,2015-Q2,2015-Q3,Closeout,20220630 Middleton ES,10370603,Middleton ES - 2019-20 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1530101,13649,6537 Malabar St.,Huntington Park,90255,"KIPP Corazon Academy is vacating this site. This project was approved in Board of Education Report No. 343-18/19. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",26,2019-Q3,2019-Q3,Closeout,20220630 Kindergarten Learning Academy,10005153,Kindergarten Learning Academy - 2013-19 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northeast,1743901,13864,6555 Sylmar Ave.,Van Nuys,91401,"This project was initially approved in BOE Report No. 233-12/13 for 2013-14 Prop. 39 co-locations as a charter school renovation for Ararat Charter School. This project included 1 charter office and 6 instructional spaces for 139.89 charter students in grades K-5. The scope of work included relocation of classrooms, cleaning, miscellaneous repairs, remedial construction, purchase of furniture and equipment, and ITD installation of a separate data and telephone network. The project was amended in BOE Report No. 342-13/14 for 2014-15 Prop. 39 co-locations as a ""no change"" project with 1 charter office and 6 instructional spaces for 134.58 charter students in grades K-5. The project was amended in BOE Report No. 423-14/15 for 2015-16 Prop. 39 co-locations as a ""no change"" project with 1 charter office and 6 instructional spaces for charter students in grades K-5. The project was amended in BOE Report No. 375-15/16 for 2016-17 Prop. 39 co-locations as a ""no change"" project with 1 charter office and 6 instructional spaces for charter students in grades K-5. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no change"" project with 1 charter office and 6 instructional spaces for charter students in grades K-5. The project was again amended in BOE Report No. 429-17/18 for 2018-19 Prop. 39 co-locations as a ""no change"" project with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/19.",2,2014-Q3,2015-Q2,Closeout,20220630 Grant HS,10366736,Grant HS - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1868301,13674,13000 Oxnard St.,Van Nuys,91401,"Convert and renovate two classroom spaces into a new parent & family center by providing interior paint, flooring and lighting repairs, and security upgrades including new doors and hardware as well as security on windows. Remove deteriorated built-in cabinets and patch up walls. Provide new whiteboards/bulletin boards and classroom furniture. Equip with new laptop computers and signage.",82,2015-Q2,2015-Q3,Closeout,20220630 Colfax Charter ES,10366871,Colfax Charter ES - Classroom Addition,Addition,3,Scott Schmerelson,Northeast,1316401,13681,11724 Addison St.,North Hollywood,91607,"This project will provide additional classroom capacity to accommodate a projected increase of students in the attendance area and to ensure the neighborhood students currently being capped out can return to their neighborhood school. The project will construct a new building for 18 classrooms including 8 new classrooms and the replacement of 10 classrooms in 5 portable buildings that will be removed from the campus. Administrative and support spaces, as a reconfiguration of existing space within the administration building and as part of the new classroom building, will be provided. The project will also expand the existing lunch shelter and arcade, provide a new surface parking lot with approximately 75 parking spaces for staff, and provide various site improvements including a student drop-off area, site utilities, landscaping, and programmatic access to meet accessibility requirements of the Americans with Disabilities Act (ADA) including path of travel improvements.","41,799",2018-Q3,2021-Q3,Closeout,20220630 Panorama City ES,10365104,Panorama City ES - Provide New Literacy Garden,Library Renovation,6,Kelly Gonez,Northwest,1560401,13874,8600 Kester Ave.,Panorama City,91402,"Provide a new literacy garden by including concrete work, seating area, new irrigation and landscaping.",33,2015-Q1,2015-Q3,Closeout,20220630 Catskill ES,10369075,Catskill ES - Electronic Marquee,Electrical/Lighting,7,Tanya Ortiz Franklin,South,1289001,13662,23536 Catskill Ave.,Carson,90745,Install new electronic marquee.,51,2018-Q1,2018-Q4,Closeout,20220630 Garden Grove ES,10370707,Garden Grove ES - Technology Upgrades,Communications/Technology Upgrade,4,Nick Melvoin,Northwest,1405501,13715,18141 Valerio St.,Reseda,91335,"Purchase 20 MacBooks, 1 HP laptop, 20 Chromebooks, 1 charging cart, and multimedia technology. This Board District 6 priority project includes a Local District Northwest contribution towards approximately one quarter of the budget.",45,2019-Q3,2019-Q3,Closeout,20220630 Wilson HS,10370313,Wilson HS - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",62,2019-Q3,2020-Q1,Closeout,20220630 Grape ES,10365207,Grape ES - Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1427401,13495,1940 E. 111th St.,Los Angeles,90059,Demolish/Remove 1 Portable Building,126,2014-Q4,2015-Q4,Closeout,20220630 Willenberg Special Education Center,10372173,Willenberg Special Education Center - Playground Matting,Access Compliance,7,Tanya Ortiz Franklin,South,1195701,13545,308 Weymouth Ave.,San Pedro,90732,Replace deteriorated playground matting.,129,2022-Q1,2022-Q2,Closeout,20220630 Marvin ES,10372334,Marvin ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1517801,13573,2411 Marvin Ave.,Los Angeles,90016,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",88,2022-Q3,2022-Q4,Planning,20220630 Wilshire Crest ES,10372336,Wilshire Crest ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1779501,13524,5241 W. Olympic Blvd.,Los Angeles,90036,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",92,2022-Q3,2022-Q4,Planning,20220630 Woodcrest ES,10372337,Woodcrest ES - Parent & Family Center,Campus Improvement,1,"Dr. George J. McKenna, III",West,1786301,13369,1151 W. 109th St.,Los Angeles,90044,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",91,2022-Q3,2022-Q4,Planning,20220630 Glen Alta Span School,10372344,Glen Alta ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1413701,13292,3410 Sierra St.,Los Angeles,90031,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",86,2022-Q3,2022-Q4,Planning,20220630 Hamlin Charter Academy ES,10372349,Hamlin ES - Parent & Family Center,Campus Improvement,3,Scott Schmerelson,Northwest,1434901,13725,22627 Hamlin St.,West Hills,91307,"Modernize Parent & Family Center classroom by installing new white/bulletin boards, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms) and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",94,2022-Q2,2022-Q3,Construction,20220630 Dorris ES,10372354,Dorris ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1347901,13510,2225 Dorris Pl.,Los Angeles,90031,"Modernize Parent & Family Center classroom by: installing new white/bulletin boards, window blinds, a projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated light fixtures and lenses; and providing paint. Provide new classroom furniture. Install signage identifying and leading to room.  Provide (21) laptop computers with storage/charging cart, a projector, a document reader, and a printer.",89,2022-Q3,2022-Q4,Planning,20220630 Coliseum ES,10372442,Coliseum ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1317801,13593,4400 Coliseum St.,Los Angeles,90016,Install new secure entry system at the Main Office.,37,2022-Q2,2022-Q4,Construction,20220630 Nobel Charter MS,10369488,Nobel Charter MS - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1827201,13805,9950 Tampa Ave.,Northridge,91324,"Replace deteriorated interior walk-in cooler and exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in cooler, exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",195,2022-Q3,2023-Q2,Planning,20220630 Woodlake Community Charter ES,10368305,Woodlake Community Charter ES - Paving,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1787701,13686,23231 Hatteras St.,Woodland Hills,91367,"The project installs approximately 196,000 square feet of new asphalt and concrete paving at playground areas, in between buildings, and parking area. The project also includes a new handball court, parking improvements, a new storm water runoff area, a reading garden, and Americans with Disabilities Act (ADA) work.","7,858",2019-Q2,2020-Q3,Closeout,20220630 Miles ES,10369773,Miles ES - 2018-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1531501,13650,6720 Miles Ave.,Huntington Park,90255,"This project was approved in Board of Education Report No. 429-17/18 as a 2018-19 Proposition 39 charter co-location for KIPP Comienza Community Prep for a single-year term with an expiration date of 6/30/19. This reconfiguration project included 1 charter office and 7 instructional spaces for charter student seats in grades 5-7. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. Subsequently to the approval of the project, an alternative agreement was executed. As a result, the scope of work changed from a reconfiguration to a ""no change"" project with no additional work required.",1,2018-Q4,2018-Q4,Closeout,20220630 Loreto ES,10370011,Loreto ES - Restroom Upgrade,Access Compliance,2,Monica Garcia,East,1495901,13301,3408 Arroyo Seco Ave.,Los Angeles,90065,Provide step-n-wash and other adaptive items for kinder student.,7,2018-Q3,2018-Q4,Closeout,20220630 Kittridge ES,10364112,Kittridge ES - HVAC,HVAC,6,Kelly Gonez,Northeast,1476001,13696,13619 Kittridge St.,Van Nuys,91401,"The project will replace deteriorated and aged wall-hung heat pumps in 25 buildings that serve classrooms, administrative and support areas, with rooftop units. The equipment is more than 25 years old, inefficient and requires frequent service. Maintenance & Operations received more than 38 related service calls within the past 12 months prior to approval of this project.","2,407",2016-Q4,2018-Q3,Closeout,20220630 Marianna ES,10367058,Marianna ES - ADA Improvements,Access Compliance,2,Monica Garcia,East,1513701,13479,4215 E. Gleason St.,Los Angeles,90063,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 10 doors/hardware, 6 accessible paths of travel, 5 signs, 8 restrooms, 2 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 5 concrete ramps, 3 pieces of accessible furniture, 1 assembly seat, 1 railing, and 1 passenger/bus loading zone.","1,451",2016-Q4,2022-Q3,Construction,20220630 Porter MS,10367001,Porter MS - Paving & Utilities Upgrades,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1835401,13807,15960 Kingsbury St.,Granada Hills,91344,"The 30-year-old asphalt concrete paving on the campus is severely damaged and in need of replacement. The scope of work includes replacing approximately 17,000 square feet of asphalt concrete pavement; adding approximately 130,000 square feet of solar reflective coating along with approximately 5,000 square feet of interlocking pavers; replacing underground utilities campus-wide which requires extensive excavating, backfilling, and pavement restoration; redesigning the outdoor athletic areas to meet current requirements; and repairing or replacing turf, irrigation, and fencing as needed. In addition, the project includes associated Americans with Disabilities Act (ADA) path of travel and restroom upgrades and drainage systems required by DSA and the District's Storm Water Technical Manual.","10,520",2018-Q3,2019-Q3,Closeout,20220630 96th St. ES,10370186,96th St. ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1557501,13496,1471 E. 96th St.,Los Angeles,90002,"Replace deteriorated interior walk-in freezer and interior walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer, interior walk-in cooler, and refrigeration equipment.",160,2028-Q1,2028-Q2,Planning,20220630 Sylvan Park ES,10369676,Sylvan Park ES - Fencing,Fencing,3,Scott Schmerelson,Northeast,1702701,13477,6238 Noble Ave.,Van Nuys,91411,Install new fence with access gate at front of school.,46,2018-Q2,2018-Q3,Closeout,20220630 Burbank ES,10363892,Burbank ES - IT Network Upgrade,IT Network Upgrade,3,Scott Schmerelson,Northeast,1263001,13678,12215 Albers St.,North Hollywood,91607,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",290,2014-Q2,2014-Q4,Closeout,20220630 Berendo MS,10370571,Berendo MS - 2019-20 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1805701,13274,1157 S. Berendo St.,Los Angeles,90006,"Monsenor Oscar Romero Charter is vacating this site. This project was approved in Board of Education Report No. 343-18/19. The scope of work includes relocation of instructional spaces, remedial construction, and reconnecting of all low voltage systems to the District operated program.",37,2019-Q2,2019-Q3,Closeout,20220630 Accelerated Charter ES,10004672,Accelerated Charter ES Augmentation Grant,Charter Augmentation Grant,5,Jackie Goldberg,Central,1201301,16703,3914 S. Main St.,Los Angeles,90037,"ACES, a charter operated by The Accelerated School Foundation, is proposing to expand their facility by acquiring property located at 115 E. Martin Luther King Jr. Blvd. adjacent to the existing K-12 facility. ACES will construct and operate a facility with 21 classrooms serving approximately 470 students in pre-kindergarten through 6th grades. The proposed 53,190 square foot project consists of a 2-story classroom building, administrative and support space, a library, multipurpose room, lunch shelter, and a service kitchen. The project also includes approximately 23,000 square feet of play yard and a parking structure.","13,703",2015-Q1,2016-Q4,Closeout,20220630 Resolute Charter Academy,10368721,Resolute Charter Academy - CCTV Cameras,Security System,7,Tanya Ortiz Franklin,South,1523201,13838,1265 E. 112th St.,Los Angeles,90059,Install 3-camera video surveillance (CCTV) system to monitor bungalows B1-B4 and eating areas,12,2017-Q2,2017-Q3,Closeout,20220630 Broadacres ES,10368969,Broadacres ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1253001,13837,19424 S. Broadacres Ave.,Carson,90746,Provide and install new secure entry system (Aiphone) at main entrance,26,2017-Q1,2017-Q2,Closeout,20220630 Madison ES,10369557,Madison ES - Electrical Upgrades for Computer Lab,Electrical/Lighting,5,Jackie Goldberg,East,1321001,13907,9820 Madison Ave.,South Gate,90280,Install new electrical components in support of new computer lab.,6,2018-Q3,2018-Q3,Closeout,20220630 4th St. ES,10367102,4th St. ES - Replace Deteriorated Carpet,Flooring,2,Monica Garcia,East,1397301,13482,420 Amalia Ave.,Los Angeles,90022,"Provide upgrades to all classrooms, offices, and hallways of the first and second floors of the Main Building by removing deteriorated carpet and installing new vinyl composition tile throughout.",135,2016-Q1,2016-Q3,Closeout,20220630 Virginia ES,10370809,Virginia ES - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1757501,13504,2925 Virginia Rd.,Los Angeles,90016,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",335,2020-Q4,2021-Q2,Closeout,20220630 Open Magnet Charter ES,10370814,Open Magnet Charter ES - Exterior Painting,Painting,4,Nick Melvoin,West,1588901,13633,5540 W. 77th St.,Los Angeles,90045,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",301,2021-Q1,2021-Q4,Closeout,20220630 Short ES,10367069,Short ES - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1674001,13679,12814 Maxella Ave.,Los Angeles,90066,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 74 doors/hardware, 23 accessible paths of travel, 51 signs, 12 restrooms, 19 drinking fountains/sinks, 14 casework/counters, 1 assistive listening device/intercom/phone, 2 concrete ramps, 4 pieces of accessible furniture, 1 assembly seat, 2 railings, 1 playground component, 1 parking area, 2 door modifications/auto openers, 1 nurse's exam room modification, 1 new elevator, and 1 stage lift.","4,418",2016-Q4,2020-Q3,Closeout,20220630 Fletcher ES,10368055,Fletcher ES - Portable Removal,Portable Removal,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,"Remove/demolish 1 bungalow including abatement of hazardous materials, disconnection of low-volt and high-volt utilities, and repair/replacement of asphalt over the former building footprint.",151,2016-Q4,2018-Q2,Closeout,20220630 Canoga Park ES,10369266,Canoga Park ES - Fencing,Fencing,3,Scott Schmerelson,Northwest,1275301,13416,7438 Topanga Canyon Blvd.,Canoga Park,91303,"Install fence in kindergarten area between rooms 29, 30, 45, and 46 and provide playground striping.",20,2018-Q1,2018-Q1,Closeout,20220630 20th St. ES,10367642,20th St. ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1727401,13333,1353 E. 20th St.,Los Angeles,90011,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide new classroom furniture including tables, chairs, and storage as well as directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",38,2016-Q2,2016-Q4,Closeout,20220630 Wilson HS,10367095,Wilson HS - Slope Remediation,Excavation,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,"The project will address the failing slope on the east end of the campus. In addition to remediating the erosion of the soil, the scope also includes installing a 120-linear-foot reinforced concrete retaining wall with water proofing and drainage systems.","1,856",2017-Q3,2018-Q3,Closeout,20220630 South Shores Visual & Performing Arts Magnet ES,10369347,South Shores Visual & Performing Arts Magnet ES - Classroom Replacement,Addition,7,Tanya Ortiz Franklin,South,1687001,13808,2060 W. 35th St.,San Pedro,90732,"The school has 12 classrooms located in 6 relocatable buildings with 4 of the classrooms in 2 DOH portables that do not comply with State standards for school buildings. This project includes the removal of 12 classrooms located in relocatable buildings and construction of 12 classrooms and support spaces that will be furnished/equipped to current code requirements and Los Angeles Unified design standards. Installation of interim housing to support the school site during construction of the new permanent building. Infrastructure upgrades as required to support the new facilities, including an enhanced Information Technology network convergence system and a new campus-wide fire alarm system. Upgrades to landscape, hardscape, parking, and playground areas as appropriate to support the removal of relocatable buildings and construction of new facilities. Restoration of the eastern portion of the upper playground area that will be utilized for interim housing, including asphalt replacement, striping and installation of playground fixtures. In addition, construction activities include site work and Americans with Disabilities Act (ADA) path of travel upgrades and the installation of a campus-wide fire alarm system.","35,918",2021-Q4,2024-Q3,Construction,20220630 96th St. ES,10365672,96th St. ES - Replace Playground Matting,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1557501,13496,1471 E. 96th St.,Los Angeles,90002,Replace deteriorated playground matting systems to ensure the health and safety of students.,61,2014-Q1,2014-Q1,Closeout,20220630 San Miguel ES,10367635,San Miguel ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,East,1687501,14741,9801 San Miguel Ave.,South Gate,90280,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",21,2016-Q2,2017-Q1,Closeout,20220630 Clay MS,10366886,Clay MS - 2015-16 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1809901,13752,12226 S. Western Ave.,Los Angeles,90047,"This project is a charter school renovation for Animo South LA Charter HS for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 18 classrooms for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",191,2015-Q3,2015-Q3,Closeout,20220630 Van Nuys HS,10101677,Van Nuys HS - Facilities Upgrades (Phase 2),Small Learning Community/Academy,3,Scott Schmerelson,Northeast,1889301,13404,6535 Cedros Ave.,Van Nuys,91411,Facilities Upgrades (Phase 2),"1,417",2013-Q2,2014-Q1,Closeout,20220630 24th St. ES,10368786,24th St. ES - 2017-18 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1730101,13335,2055 W. 24th St.,Los Angeles,90018,"This project is a charter school renovation for Crown Preparatory Academy for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 19 instructional spaces for charter student seats in grades 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",21,2017-Q3,2017-Q3,Closeout,20220630 University Charter HS,10369709,University Charter HS - Roofing & HVAC,Roofing,4,Nick Melvoin,West,1888601,13444,11800 Texas Ave.,Los Angeles,90025,"This project provides approximately 71,000 square feet of new roofing at 20 buildings campus-wide, including new heating, ventilation, and air conditioning (HVAC) units and equipment, gutters and downspouts.","1,448",2019-Q2,2020-Q1,Closeout,20220630 Columbus MS,10371867,Columbus MS - 2021-23 Prop 39,Charter Prop 39,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,"This project was initially approved in BOE Report No. 317-20/21 for the 2021-22 Prop 39 co-locations as a charter school renovation for Ingenium Charter School. This project included 1 charter office, 2 special education rooms, and 16 instructional spaces for charter student seats in grades TK-5. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project latest approval is for a single-year term with an expiration date of 6/30/23 in BOE Report No. 291-21/22 for 2022-23 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 2 special education rooms, and 16 instructional spaces for charter student seats in grades TK-5 and an undefined scope of work.",13,2021-Q4,2021-Q4,Closeout,20220630 Mayall Academy of Arts & Technology Magnet ES,10371422,Mayall ES - Secure Entry System,Security System,3,Scott Schmerelson,Northwest,1519801,13700,16701 Mayall St.,North Hills,91343,Install new secure entry system.,40,2021-Q2,2021-Q4,Closeout,20220630 Laurel EEC,10371813,Laurel EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,4,Nick Melvoin,West,1952901,16286,8023 Willoughby Ave.,Los Angeles,90046,"This project will address critical upgrades needed at the site and will provide a Nature Explore Program outdoor classroom to the campus by dividing the existing playground into distinct activity areas, covering approximately 12,778 ft2. ADA upgrades for this project include (a) resurfacing the parking area - approximately 7,300 ft2 - to provide an ADA compliant path of travel and (b) providing an ADA compliant restroom. Additionally, we will replace deteriorated HVAC units, roofing, approximately 300 ft2 of play matting, and make necessary upgrades to the fire alarm system, as required by current code.","3,692",2023-Q3,2024-Q3,Design,20220630 McBride Special Education Center,10372446,McBride Special Education Center - Secure Entry System,Security System,4,Nick Melvoin,West,1195201,15205,3960 Centinela Ave.,Los Angeles,90066,Install new secure entry system at the Main Office.,40,2022-Q2,2022-Q4,Construction,20220630 Canoga Park HS,10365221,Canoga Park HS - Compliance with State & Federal Access Requirements,Access Compliance,3,Scott Schmerelson,Northwest,1857101,13415,6850 Topanga Canyon Blvd.,Canoga Park,91303,"Meet Accessibility Requirements of the California Building Code and the Americans with Disabilities Act (ADA) with Upgrades to Restroom, Drinking Fountain, Temporary Ramps, and Path of Travel Improvements",115,2013-Q4,2014-Q2,Closeout,20220630 Marlton Special Education School,10366779,Marlton Special Education School - SEEDS,SEEDS,1,"Dr. George J. McKenna, III",West,1194901,13860,4000 Santo Tomas Dr.,Los Angeles,90008,"Improve an existing outdoor learning space that is approximately 3,800 square feet by installing an irrigation system, removing asphalt and installing new concrete pathways. The outdoor learning space will be outfitted by the school site (Marlton School) and the partner organization (Faith Community Fellowship) with raised beds and planting materials.",28,2015-Q2,2015-Q3,Closeout,20220630 Cowan ES,10365695,Cowan ES - Replace Playground Matting,Paving/Greening/Playground Equipment,4,Nick Melvoin,West,1326001,13622,7615 Cowan Ave.,Los Angeles,90045,Replace deteriorated playground matting systems to ensure the health and safety of students.,53,2015-Q2,2015-Q2,Closeout,20220630 Glenwood ES,10367617,Glenwood ES - Parent & Family Center,Campus Improvement,6,Kelly Gonez,Northeast,1419201,13590,8001 Ledge Ave.,Sun Valley,91352,"Modernize parent & family center by providing interior paint and security upgrades (replace door locks and provide metal skins), replacing deteriorated floors, and installing whiteboards/bulletin boards. Provide directional signage leading to the center. Provide 20 new Chromebooks with charging cart and 1 laptop for the Parent Coordinator.",63,2016-Q3,2017-Q1,Closeout,20220630 Ocean Charter School,10367569,Ocean Charter School Augmentation Grant,Charter Augmentation Grant,4,Nick Melvoin,West,1596201,0,12606 Culver Blvd.,Los Angeles,90066,"This augmentation grant is for the acquisition and construction of a new 19-classroom K-8 school to serve approximately 529 students. The new school will be located on approximately 2.1 acres. The new school will have approximately 54,000 square feet of building space consisting of classrooms, administration, gymnasium, and other support spaces. The school will also have drop-off, parking and outdoor play areas.","43,575",2018-Q1,2021-Q1,Closeout,20220630 Avalon Gardens ES,10366514,Avalon Gardens ES - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1224701,13618,13940 S. San Pedro St.,Los Angeles,90061,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 109 doors/hardware, 40 accessible paths of travel, 123 signs, 24 restrooms, 56 drinking fountains/sinks, 5 concrete ramps, 12 metal ramps, 10 pieces of accessible furniture, 1 arcade, 1 railing, 2 playground components, 4 parking areas, 1 nurse's exam room modification, 1 changing room, and 2 passenger/bus loading zones.","8,652",2014-Q4,2022-Q4,Closeout,20220630 Bushnell Way ES,10367733,Bushnell Way ES - Portable Removal,Portable Removal,2,Monica Garcia,Central,1267101,13375,5507 Bushnell Way,Los Angeles,90042,"removal of 2 relocatable classroom bldgs. The disconnection of electrical and plumbing utilities (Gas, water and sewer). Fire Alarm, condensation line as well as bard guard and also the low voltage disconnection.",69,2016-Q3,2017-Q1,Closeout,20220630 Marina EEC,10005048,Marina EEC - Safety Upgrades and Improvements,Campus Improvement,4,Nick Melvoin,West,1953301,16283,4908 Westlawn Ave.,Los Angeles,90066,"Upgrade driveway, entry control system, exterior gates, and playground equipment",27,2014-Q2,2015-Q4,Closeout,20220630 Stonehurst STEAM Magnet ES,10368963,Stonehurst ES - Computers,Communications/Technology Upgrade,6,Kelly Gonez,Northeast,1694501,13653,9851 Stonehurst Ave.,Sun Valley,91352,Furnish computer lab with 17 desktop computers,15,2017-Q3,2017-Q4,Closeout,20220630 Gardena HS,10366896,Gardena HS - 2015-16 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1866401,13735,1301 W. 182nd St.,Gardena,90248,"This project is a charter school renovation for New Millennium Secondary School for a single-year term with an expiration date of 6/30/16. The 2015-16 Prop. 39 co-location approved in Board of Education Report No. 423-14/15 includes 1 charter office and 4 classrooms for charter student seats in grades 9-12. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",10,2015-Q2,2015-Q4,Closeout,20220630 Humphreys ES,10369029,Humphreys ES - Restroom Upgrades,Access Compliance,2,Monica Garcia,East,1461601,13437,500 S. Humphreys Ave.,Los Angeles,90022,"Install 10"" toilet, install folding step stool and relocate hand towel dispenser.",2,2017-Q3,2017-Q3,Closeout,20220630 O'Melveny ES,10369816,O'Melveny ES - Auditorium AV Equipment,Electrical/Lighting,6,Kelly Gonez,Northeast,1572601,13396,728 Woodworth St.,San Fernando,91340,"This project installed a new audio/visual system including a ceiling-mounted projector, audio system, and 60"" TV; replaced stage lighting; and installed wall plates for peripherals to connect to the audio system. This Local District Northeast priority project included a school contribution (project #10369607), however the budget represents only the bond‐funded portion.",31,2018-Q2,2018-Q3,Closeout,20220630 112th St. ES,10369721,112th St. ES - 2018-19 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1588401,13838,1265 E. 112th St.,Los Angeles,90059,"This project is a charter school renovation for Resolute Academy Charter for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 12 instructional spaces for charter student seats in grades 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",7,2018-Q2,2018-Q3,Closeout,20220630 24th St. ES,10369722,24th St. ES - 2018-19 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",Central,1730101,13335,2055 W. 24th St.,Los Angeles,90018,"This project is a charter school renovation for Crown Preparatory Academy for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 19 instructional spaces for charter student seats in grades 5-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",13,2018-Q2,2018-Q3,Closeout,20220630 99th St. ES,10369725,99th St. ES - 2018-19 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1553401,13508,9900 S. Wadsworth Ave.,Los Angeles,90002,"This project is a charter school renovation for KIPP Ignite Academy for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades 2-3. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",247,2018-Q2,2018-Q3,Closeout,20220630 Bethune MS,10369733,Bethune MS - 2018-19 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,South,1806001,13514,155 W. 69th St.,Los Angeles,90003,"This project is a charter school renovation for Animo Florence-Firestone Charter MS for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 18 instructional spaces for charter student seats in grades 6-8. The scope of work includes facilities renovations and reconfigurations, technology, and communication/safety purchases and upgrades.",101,2018-Q2,2018-Q3,Closeout,20220630 Twain MS,10004108,Twain MS - Facelift,Facelift,4,Nick Melvoin,West,1842501,13630,2224 Walgrove Ave.,Los Angeles,90066,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",180,2012-Q1,2016-Q3,Closeout,20220630 Columbus MS,10371600,Columbus MS - Provide Verizon Lab Infrastructure,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,Infrastructure upgrades in support of Verizon Innovative Learning Lab installation.,12,2021-Q1,2021-Q1,Closeout,20220630 Middleton ES,10371233,Middleton ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1530101,13649,6537 Malabar St.,Huntington Park,90255,Install new secure entry system at door to main office with three video receivers in main office.,24,2020-Q3,2020-Q4,Closeout,20220630 Sustainability Initiatives,10371835,emPowered Alliance to Save Energy Education and Awareness Program 20-21,Energy/Water Efficiency,2,Monica Garcia,Central,1145301,13863,"333 S. Beaudry Ave., 22nd Floor",Los Angeles,90017,"This 2020-2021 program is an extension of the 2019-2020 pilot program with 40 LAUSD schools. It features STEM-based curriculum; an interactive online portal integrated with the District's LMS; training, guidance and resources for teachers; and hands-on, student-led activities. It is designed to give students the analytical and leadership skills to drive energy savings campaigns in their schools or - given the COVID-related school closures - in their homes, serving the dual purpose of reducing energy costs while boosting student achievement. The Alliance also seeks to include collaboration with partners from the private sector who share a common interest in efficiency, student achievement and educating an energy-literate workforce.",137,2018-Q4,2021-Q3,Closeout,20220630 Fletcher ES,10372492,Fletcher ES - 2022-23 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,"This project is a charter school renovation for ISANA Octavia Academy for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades TK-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",57,2022-Q3,2022-Q3,Planning,20220630 Victoria ES,10372631,Victoria ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1750701,13493,3320 Missouri Ave.,South Gate,90280,Install new secure entry system at the Main Office.,32,2022-Q3,2022-Q4,Planning,20220630 Banning HS,10370465,Banning HS - Restroom Modifications,Access Compliance,7,Tanya Ortiz Franklin,South,1852901,13368,1527 Lakme Ave.,Wilmington,90744,Remodel existing restroom to accessible restroom with changing table.,113,2019-Q2,2019-Q3,Closeout,20220630 West Hollywood Community Day School,10371740,West Hollywood Community Day School - Exterior Painting,Painting,4,Nick Melvoin,West,1873001,13901,1049 N. Fairfax Ave.,West Hollywood,90046,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",75,2022-Q4,2023-Q2,Planning,20220630 Topanga Charter ES,10369410,Topanga Charter ES - Classroom Replacement & Paving,Campus Improvement,4,Nick Melvoin,West,1719801,13816,22075 Topanga School Rd.,Topanga,90290,"This project replaces 4 classrooms located in 2 DOH portables that do not comply with State standards for school buildings with 2 DSA-certifiable relocatable buildings. The scope of work includes the relocation of 2 portable buildings that will be refurbished and fireproofed; site investigations to determine the location of the replacement classrooms and site adapt work needed for their relocation, such as retaining walls due to the sloped terrain; and connections between the replacement classrooms and the school's existing utilities, communications, technology, and fire alarm systems. The project also includes approximately 84,000 square feet of new paving at the main administration building and playground areas with cool coating added to the upper playground as well as the installation of a new drainage system. In addition, the project provides Americans with Disabilities Act (ADA) path of travel upgrades including ramps, accessible parking, and the purchase of a wheelchair accessible golf cart with its required storage and electrical supply to connect the upper site area where the new replacement classrooms will be placed to the main administration building on the lower site area.","10,842",2023-Q1,2025-Q1,Design,20220630 Hamasaki Medical & Science Magnet ES,10369589,Hamasaki Medical & Science Magnet ES - ADA Improvements,Access Compliance,2,Monica Garcia,East,1627401,13577,4865 E. 1st St.,Los Angeles,90022,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 14 door hardware, 3 thresholds, accessible paths of travel, 30 signs, 5 restrooms, 5 drinking fountains/sinks, 2 assistive listening devices/intercoms/phones, 2 pieces of accessible furniture, 1 assembly seat, 1 railing, 1 playground component, 2 casework/counters, 5 door modifications/auto openers, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","3,863",2019-Q2,2023-Q1,Construction,20220630 36th St. EEC,10372556,36th St. EEC - Outdoor Classroom and Campus Upgrade,Campus Improvement,1,"Dr. George J. McKenna, III",West,1956601,16722,3556 S. St. Andrews Pl.,Los Angeles,90018,"This project will provide an outdoor classroom, with at least 10 learning stations, by dividing the existing playground into distinct activity areas covering 6,075 sq. ft. It will also provide new heating, ventilation, and air-conditioning (HVAC) units, new roofing, new playground matting, and necessary upgrades to the fire alarm system. Americans with Disabilities Act (ADA) upgrades will include an accessible path of travel and restroom and drinking water station upgrades.","2,618",2024-Q2,2025-Q3,Planning,20220630 Willenberg Special Education Center,10371814,Willenberg Special Education Center - Replace Playground Matting,Access Compliance,7,Tanya Ortiz Franklin,South,1195701,13545,308 Weymouth Ave.,San Pedro,90732,Remove and replace deteriorated play mat near room 57.,200,2021-Q3,2021-Q4,Closeout,20220630 Palisades Charter ES,10370816,Palisades Charter ES - Exterior Painting,Painting,4,Nick Melvoin,West,1595901,13443,800 Via De La Paz,Pacific Palisades,90272,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",323,2020-Q3,2021-Q1,Closeout,20220630 Dyer ES,10372305,Dyer ES - Roofing & Arcade Repair,Roofing,6,Kelly Gonez,Northeast,1349301,13712,14500 Dyer St.,Sylmar,91342,"This project is to provide approximately 59,837 square feet of new roofing at 26 buildings and the replacement of damaged arcade structures. The scope of work includes the installation of new gutters and downspouts and painting of affected areas.","3,752",2023-Q4,2025-Q2,Planning,20220630 Fairburn ES,10371445,Fairburn ES - Nurse's Office Remodel,Access Compliance,4,Nick Melvoin,West,1372601,13445,1403 Fairburn Ave.,Los Angeles,90024,Remodel nurse's office in main building to provide accessible restroom and changing area.,277,2020-Q4,2021-Q2,Closeout,20220630 Pacoima MS,10372387,Pacoima MS - Urban Greening,Paving/Greening/Playground Equipment,6,Kelly Gonez,Northeast,1832101,13750,9919 Laurel Canyon Blvd.,Pacoima,91331,"Install an outdoor learning and gathering space with a pollinator garden to replace existing asphalt. This includes the removal of asphalt, installation of a concrete curb and header, interlocking concrete pavers, decomposed granite, new tress, plants, an updated irrigation system, new log stools, metal and log benches, and picnic tables. Path of travel upgrades are also included. 78 new trees will be added around the perimeter of the campus. The total upgraded area covers 12,988 square feet of campus. TreePeople has been awarded a grant of $787,938 by California Natural Resources Agency (CNRA) and they will work in collaboration with LAUSD through a Development Agreement to develop and construct the project.",524,2023-Q3,2024-Q2,Design,20220630 Burbank ES,10371713,Burbank ES - Install Secure Entry System,Security System,3,Scott Schmerelson,Northeast,1263001,13678,12215 Albers St.,North Hollywood,91607,Install new secure entry system at entrance to main office with one video receiver in the main office.,36,2021-Q4,2021-Q4,Closeout,20220630 Normandie ES,10369714,Normandie ES - ADA Improvements,Access Compliance,1,"Dr. George J. McKenna, III",Central,1563001,13300,4505 S. Raymond Ave.,Los Angeles,90037,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 3 doors, 63 door hardware, 25 thresholds, accessible paths of travel, 74 signs, 11 restrooms, 29 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 1 metal ramp, 2 assembly seats, 1 existing elevator modification, 1 locker room modification/locker, 2 playground components, 3 casework/counters, and 2 new elevators/stage lifts.","5,086",2022-Q1,2023-Q1,Construction,20220630 White Point ES,10372644,White Point ES - Restroom Upgrade,Access Compliance,7,Tanya Ortiz Franklin,South,1776701,13617,1410 Silvius Ave.,San Pedro,90731,"Add additional restroom/changing room in room 16, building AA-1381.",159,2022-Q4,2023-Q1,Planning,20220630 Sierra Vista ES,10370340,Sierra Vista ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,East,1676701,13380,4342 Alpha St.,Los Angeles,90032,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",51,2019-Q2,2020-Q1,Closeout,20220630 Reed MS,10371419,Reed MS - Video Surveillance (CCTV) System and Parent Center Furniture,Security System,3,Scott Schmerelson,Northeast,1835501,13647,4525 Irvine Ave.,North Hollywood,91602,Install video surveillance (CCTV) system with one camera. Purchase standard parent center furniture.,62,2021-Q3,2022-Q3,Construction,20220630 Vine ES,10370324,Vine ES - Parent & Family Center,Campus Improvement,4,Nick Melvoin,West,1753401,13342,955 N. Vine St.,Los Angeles,90038,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",73,2019-Q1,2019-Q4,Closeout,20220630 Breed ES,10372487,Breed ES - 2022-23 Prop 39,Charter Prop 39,2,Monica Garcia,East,1249301,13281,2226 E. 3rd St.,Los Angeles,90033,"This project is a charter school renovation for Extera Public School for a single-year term with an expiration date of 6/30/23. The 2022-23 Prop. 39 co-location approved in Board of Education Report No. 291-21/22 includes 1 charter office, 2 special education rooms, and 7 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",39,2022-Q3,2022-Q3,Planning,20220630 Mid-City's Prescott School of Enriched Sciences,10369235,Mid-City's Prescott School of Enriched Sciences - Lunch & Shade Shelters,Lunch/Shade Shelter,1,"Dr. George J. McKenna, III",West,1350001,13911,3150 W. Adams Blvd.,Los Angeles,90018,Extend the existing lunch shelter and add a new shade structure. A temporary fabric will be installed during construction to provide shade.,417,2019-Q3,2020-Q3,Closeout,20220630 36th St. EEC,10369311,36th St. EEC - Restroom Upgrade,Access Compliance,1,"Dr. George J. McKenna, III",West,1956601,16722,3556 S. St. Andrews Pl.,Los Angeles,90018,The project will provide 1 restroom that complies with the Americans with Disabilities Act (ADA).,409,2022-Q4,2023-Q2,Design,20220630 Chatsworth Charter HS,10367938,Chatsworth Charter HS - ADA Improvements,Access Compliance,3,Scott Schmerelson,Northwest,1858301,13870,10027 Lurline Ave.,Chatsworth,91311,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 372 doors/hardware, 30 accessible paths of travel, 81 signs, 21 restrooms, 19 drinking fountains/sinks, 6 assistive listening devices/intercoms/phones, 23 metal ramps, 6 pieces of accessible furniture, 7 assembly seats, 1 existing elevator modification, 2 locker room modifications/lockers, 6 casework/counters, 5 door modifications/auto openers, and 1 passenger/bus loading zone.","7,654",2017-Q3,2023-Q1,Construction,20220630 Ellington Continuation HS,10372167,Ellington Continuation HS - Exterior Painting,Painting,1,"Dr. George J. McKenna, III",West,1893001,16601,1541 W. 110th St.,Los Angeles,90047,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces.",271,2022-Q2,2024-Q2,Construction,20220630 Mulholland MS,10372306,Mulholland MS - HVAC,HVAC,3,Scott Schmerelson,Northwest,1825901,15184,17120 Vanowen St.,Lake Balboa,91406,"This project is to provide new heating, ventilation, and air conditioning (HVAC) systems campus-wide.","29,270",2025-Q1,2028-Q1,Planning,20220630 Liberty ES,10372591,Liberty ES - Install Security Monitor System,Security System,5,Jackie Goldberg,East,1486301,13599,2728 Liberty Blvd.,South Gate,90280,Install video surveillance (CCTV) system with (4) cameras.,66,2022-Q4,2023-Q1,Planning,20220630 Justice Academy Charter ES,10370702,Justice Academy Charter ES - Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1469201,13727,23350 Justice St.,West Hills,91304,"Install a new electronic, free-standing marquee. This Local District Northwest priority project includes a Board District 3 contribution towards approximately half the budget.",57,2019-Q4,2021-Q1,Closeout,20220630 Baca Arts Academy,10371243,Baca Arts Academy - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1688601,193558,1536 E. 89th St.,Los Angeles,90002,Install new secure entry system at door to main office with video receivers in main office.,28,2020-Q4,2020-Q4,Closeout,20220630 Marina Del Rey MS,10372121,Marina Del Rey MS - Energy Conservation Lighting,Electrical/Lighting,4,Nick Melvoin,West,1823501,13782,12500 Braddock Dr.,Los Angeles,90066,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $877,132. Estimated energy savings is 364,373 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $243.198 which is 27.7% of the ECM costs.",243,2022-Q3,2023-Q1,Planning,20220630 Northridge EEC,10372463,Northridge EEC - Purchase Outdoor Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1828401,16622,18050 Chase St.,Northridge,91325,"Purchase outdoor furniture: tables, chairs, and storage (23 items).",18,2022-Q3,2022-Q4,Planning,20220630 Raymond ES,10363989,Raymond ES - IT Network Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1621901,13469,7511 Raymond Ave.,Los Angeles,90044,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",872,2015-Q2,2016-Q2,Closeout,20220630 Kester ES,10369667,Kester ES - Shade Structures,Lunch/Shade Shelter,3,Scott Schmerelson,Northeast,1472601,13683,5353 Kester Ave.,Van Nuys,91411,Install two shade structures: one over the kindergarten play structure and one in the elementary lunch area. This Board District 3 priority project includes a Local District Northeast contribution towards approximately half the budget.,348,2019-Q4,2020-Q1,Closeout,20220630 King-Drew Medicine & Science Magnet HS,10367450,King-Drew Medicine & Science Magnet HS - HVAC in Competition Gym,HVAC,7,Tanya Ortiz Franklin,South,1872701,14561,1656 E. 118th St.,Los Angeles,90059,"The project addresses cooling needs in the gymnasium building with the installation of a new heating, ventilation, and air conditioning (HVAC) system. The new HVAC system includes 7 custom-built units and until the installation of the new units is complete, temporary equipment will continue to provide air conditioning in the gymnasium. The project also includes upgrading the fire alarm system, equipment demolition, asbestos abatement, cleaning and leak test for ducts, structural upgrade, electrical power upgrade, patch and paint if required.","4,816",2018-Q1,2019-Q3,Closeout,20220630 Danube ES,10371215,Danube ES - Technology & Security Upgrades,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1333501,13845,11220 Danube Ave.,Granada Hills,91344,Purchase 35 Chromebooks and 1 storage cart. Secure two doors to the designated room in the library building (Facilities Space ID 85563) with metal skins and panic hardware to provide security for the new technology.,23,2020-Q3,2021-Q1,Closeout,20220630 Bushnell Way ES,10370327,Bushnell Way ES - Parent & Family Center,Campus Improvement,2,Monica Garcia,Central,1267101,13375,5507 Bushnell Way,Los Angeles,90042,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses; and interior painting. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",55,2019-Q2,2019-Q4,Closeout,20220630 Victoria ES,10372244,Victoria ES - Install Privacy Fence,Fencing,5,Jackie Goldberg,East,1750701,13493,3320 Missouri Ave.,South Gate,90280,Install new chain link privacy fence. Replace approx. 150 feet of chain link fence with privacy fencing.,19,2022-Q3,2023-Q1,Planning,20220630 Mayall Academy of Arts & Technology Magnet ES,10371620,Mayall ES - Replace Classroom Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1519801,13700,16701 Mayall St.,North Hills,91343,Replace 90 deteriorated 4th grade classroom chairs.,14,2020-Q4,2021-Q1,Closeout,20220630 Vine EEC,10372092,Vine EEC - Purchase Classroom Furniture and Lunch Table,Furniture/Fixtures/Equipment,4,Nick Melvoin,West,1957401,14281,6312 Eleanor Ave.,Los Angeles,90038,"Purchase new student activity tables, chairs, and cubby storage units and (1) exterior picnic table",6,2021-Q4,2022-Q1,Closeout,20220630 Van Nuys HS,10370668,Van Nuys HS - Install Ramps to Classrooms 519 & 523,Access Compliance,3,Scott Schmerelson,Northeast,1889301,13404,6535 Cedros Ave.,Van Nuys,91411,Purchase and install TMP ramps at classroom 519 and 523. Include adjacent classrooms if practical.,92,2019-Q2,2019-Q3,Closeout,20220630 Capistrano ES,10366565,Capistrano ES - Paving,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1280201,13759,8118 Capistrano Ave.,West Hills,91304,"The 18-year-old asphalt concrete paving on the campus is severely damaged and in need of replacement. The scope of work includes replacing deteriorated asphalt concrete pavement, redesigning the outdoor athletic areas to meet current requirements, and replacing or repairing outdoor apparatus and fencing as needed. In addition, the project includes associated Americans with Disabilities Act (ADA) path of travel upgrades and drainage systems required by DSA and the District's Storm Water Technical Manual.","4,018",2017-Q3,2018-Q2,Closeout,20220630 Avalon Gardens ES,10371241,Avalon Gardens ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1224701,13618,13940 S. San Pedro St.,Los Angeles,90061,Install new secure entry system at door to main office with three video receivers in main office.,31,2020-Q3,2021-Q1,Closeout,20220630 Cohasset ES,10368092,Cohasset ES - Electronic Marquee,Electrical/Lighting,3,Scott Schmerelson,Northwest,1313701,13542,15810 Saticoy St.,Lake Balboa,91406,Provide and install electronic marquee.,31,2017-Q1,2017-Q3,Closeout,20220630 52nd St. ES,10104046,52nd St. ES - Modernization in West Classroom Building,Campus Improvement,1,"Dr. George J. McKenna, III",West,1380801,13307,816 W. 51st St.,Los Angeles,90037,Modernization in West Classroom Building,"2,748",2014-Q2,2015-Q2,Closeout,20220630 San Fernando MS,10369522,San Fernando MS - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1835801,13420,130 N. Brand Blvd.,San Fernando,91340,"Replace deteriorated interior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new interior walk-in freezer/cooler combination unit and refrigeration equipment.",160,2018-Q4,2019-Q1,Closeout,20220630 Reseda Charter HS,10371118,Reseda Charter HS - Water Bottle Filling Stations,Plumbing/Irrigation/Drainage,4,Nick Melvoin,Northwest,1881401,13664,18230 Kittridge St.,Reseda,91335,Provide and install four bottle filling stations,67,2020-Q1,2020-Q3,Closeout,20220630 Emerson Community Charter MS,10370938,Emerson MS - Security Upgrade,Security System,4,Nick Melvoin,West,1812301,13641,1650 Selby Ave.,Los Angeles,90024,Install new secure entry system,32,2019-Q4,2020-Q1,Closeout,20220630 93rd St. ES,10371372,93rd St. ES - Pedestrian Gate,Fencing,7,Tanya Ortiz Franklin,South,1558201,13814,330 E. 93rd St.,Los Angeles,90003,Install wrought iron pedestrian gate on Towne Ave between parking lot and building C,10,2020-Q2,2020-Q2,Closeout,20220630 Carson ES,10372636,Carson ES - Secure Entry System,Security System,7,Tanya Ortiz Franklin,South,1283601,13435,161 E. Carson St.,Carson,90745,Install new secure entry system at the Main Office.,31,2022-Q3,2022-Q4,Planning,20220630 Byrd MS (Relocated to New HS Site in 2008),10366009,Byrd MS - IT Network Upgrade,IT Network Upgrade,6,Kelly Gonez,Northeast,1860801,13895,8501 Arleta Ave.,Sun Valley,91352,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",484,2015-Q1,2015-Q2,Closeout,20220630 Lankershim ES,10371997,Lankershim ES - Install Promethean Activpanels,Electrical/Lighting,6,Kelly Gonez,Northeast,1478101,13358,5250 Bakman Ave.,North Hollywood,91601,Purchase (9) interactive displays with mobile stands. Remove projector screens and patch and paint walls in seven rooms. Add/move electrical outlets in three rooms.,45,2021-Q4,2022-Q1,Closeout,20220630 Edison MS,10368385,Edison MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1811301,13555,6500 Hooper Ave.,Los Angeles,90001,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2024-Q4,2025-Q1,Planning,20220630 Columbus MS,10366525,Columbus MS - Paving,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1810201,13754,22250 Elkwood St.,Canoga Park,91304,"The 30-year-old asphalt concrete paving on the campus is severely damaged and in need of replacement. The scope of work includes replacing deteriorated asphalt concrete pavement, redesigning the outdoor athletic areas to meet current requirements, and replacing or repairing outdoor apparatus and fencing as needed. In addition, the project includes associated Americans with Disabilities Act (ADA) path of travel upgrades and drainage systems required by DSA and the District's Storm Water Technical Manual.","8,577",2020-Q3,2021-Q4,Closeout,20220630 Panorama HS,10371237,Panorama HS - Video Surveillance (CCTV) System,Security System,6,Kelly Gonez,Northeast,1861001,13880,8015 Van Nuys Blvd.,Panorama City,91402,Install video surveillance (CCTV) system with 13 new cameras placed around the campus and integrate existing analog cameras with new system.,121,2020-Q3,2021-Q4,Closeout,20220630 Fullbright ES,10368940,Fullbright ES - Wall Fold Tables in Multipurpose Room,Furniture/Fixtures/Equipment,4,Nick Melvoin,Northwest,1402701,13661,6940 Fullbright Ave.,Canoga Park,91306,Remove deteriorated fold-up tables in auditorium. Provide and install new wall-fold tables. Remove and replace base and trim molding in affected areas.,24,2017-Q3,2017-Q4,Closeout,20220630 Logan EEC,10367336,Logan EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1953201,16290,1712 W. Montana St.,Los Angeles,90026,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",80,2016-Q3,2016-Q4,Closeout,20220630 Coldwater Canyon ES,10369486,Coldwater Canyon ES - Walk-In Freezer Modernization,Food Services Renovation,6,Kelly Gonez,Northeast,1315101,13663,6850 Coldwater Canyon Ave.,North Hollywood,91605,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2022-Q3,2023-Q2,Planning,20220630 Huntington Park HS,10365140,Huntington Park HS - Replace Gym Floor Joists,Seismic Modernization,5,Jackie Goldberg,East,1870001,13597,6020 Miles Ave.,Huntington Park,90255,Replace broken girders and sister & bolt existing floor joist. Replace all missing or removed blocking. The work in the main gym floor will be conducted from underneath and will not involve replacing the floor. The floor in the corrective room will be completed from the top and will have the existing plywood floor replaced.,94,2013-Q4,2014-Q1,Closeout,20220630 Parmelee ES,10363983,Parmelee ES - IT Network Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1602101,13815,1338 E. 76th Pl.,Los Angeles,90001,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades. The budget for this project includes the scope of work for any other school located at this same site.",364,2014-Q4,2015-Q1,Closeout,20220630 Loyola Village Fine & Performing Arts Magnet ES,10370101,Loyola Village ES - Exterior Painting,Painting,4,Nick Melvoin,West,1501401,13602,8821 Villanova Ave.,Los Angeles,90045,"Prepare, paint, and refinish the exterior of all buildings and their appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site, at Loyola Village Elementary School.",294,2019-Q2,2019-Q4,Closeout,20220630 Glenfeliz ES,10307254,Glenfeliz ES - Security Upgrades,Security System,5,Jackie Goldberg,Central,1416401,13526,3955 Glenfeliz Blvd.,Los Angeles,90039,Provide security upgrades by modifying and upgrading the school entrance to the main office.,38,2017-Q4,2018-Q2,Closeout,20220630 Sterry ES,10369210,Sterry ES-Classroom Modifications,Access Compliance,4,Nick Melvoin,West,1693201,13431,1730 Corinth Ave.,Los Angeles,90025,Modify door threshold to accommodate wheelchair. Add outlet in restroom for hi-lo changing table.,5,2017-Q3,2017-Q4,Closeout,20220630 Meridian EEC,10367340,Meridian EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1953401,13705,6124 Ruby Pl.,Los Angeles,90016,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",80,2016-Q2,2016-Q3,Closeout,20220630 Henry MS,10369179,Henry MS - ADA Improvements,Access Compliance,3,Scott Schmerelson,Northwest,1817401,13658,17340 San Jose St.,Granada Hills,91344,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 38 doors, 166 door hardware, 73 thresholds, accessible paths of travel, 156 signs, 17 restrooms, 47 drinking fountains/sinks, 2 assistive listening devices/intercoms/phones, 6 concrete ramps, 1 metal ramp, 3 pieces of accessible furniture, 2 assembly seats, 3 railings, 1 parking area, 2 cafeteria counters, 17 casework/counters, 6 door modifications/auto openers, 3 changing rooms, 1 new elevator, 1 new stage lift and associated upgrades to 2 stages.","9,728",2019-Q4,2023-Q1,Construction,20220630 Friedman Occupational Center,10368203,"Friedman Occupational Center - HVAC, Fire Alarm & Elevator Upgrades",HVAC,2,Monica Garcia,Central,1905801,13462,1646 S. Olive St.,Los Angeles,90015,"This project will replace the deteriorated heating, ventilation, and air conditioning (HVAC) system, which is more than 50 years old and beyond economical repair resulting in frequent system failures, including the central plant and air handling units. In addition, this project will upgrade the existing manual fire alarm system to a fully automatic addressable system and add an emergency voice alarm communication system. There are 6 existing elevators that will be upgraded to connect to the new fire alarm system and to replace motor and car components as well as elevator controllers.","15,741",2024-Q1,2025-Q4,Design,20220630 Frost MS,10365637,Frost MS - Seismic Retrofit of Gym & Physical Education Buildings,Seismic Modernization,3,Scott Schmerelson,Northwest,1813701,13777,12314 Bradford Pl.,Granada Hills,91344,"The main gym and adjacent boys' and girls' physical education buildings are masonry/concrete wood structures built in 1969 and are designated as ""Priority 2A"" structures. These building structures are not expected to perform as well in future earthquakes that require seismic corrections and upgrades. The project will be designed to the current code and will provide additional anchoring and reinforcements to wall and roof structures in order to significantly reduce the seismic vulnerability of the buildings.","4,899",2017-Q2,2019-Q2,Closeout,20220630 Glenwood ES,10370587,Glenwood ES - 2019-22 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1419201,13590,8001 Ledge Ave.,Sun Valley,91352,"This project was initially approved in BOE Report No. 343-18/19 for the 2019-20 Prop 39 co-locations as a charter school renovation for ISANA Palmati Academy. This project included 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades K-8. The scope of work included facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades. The project was then approved for a single-year term with an expiration date of 6/30/21 in BOE Report No. 313-19/20 for 2020-21 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades K-8 and an undefined scope of work. The project was next approved for a single-year term with an expiration date of 6/30/22 in BOE Report No. 317-20/21 for 2021-22 Prop. 39 co-locations as a ""No Change"" project with 1 charter office, 1 special education room, and 5 instructional spaces for charter student seats in grades K-8 and an undefined scope of work.",7,2021-Q3,2021-Q3,Closeout,20220630 Dearborn Charter Academy ES,10370870,Dearborn Charter Academy ES - Purchase Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1337701,13762,9240 Wish Ave.,Northridge,91325,Purchase classroom furniture (tables and chairs),58,2019-Q4,2022-Q3,Construction,20220630 Wilson HS,10371979,Wilson HS - Energy Conservation Lighting,Electrical/Lighting,2,Monica Garcia,East,1861801,13778,4500 Multnomah St.,Los Angeles,90032,"LADWP will be upgrading existing interior and exterior lights with new LED kits or fixtures throughout the campus for increased energy savings. LADWP will also be installing new occupancy sensors and light switches. Per the 2021 MOU, LADWP will perform this work with their own funds for an estimated $1,861,134. Estimated energy savings is 1,027,770 kWh/year. LAUSD will be responsible for all non-Energy Conservation Measures (non-ECMs), as identified in this MOU, for which this project is established. Non-ECMs will be performed by both LADWP and District staff. Non-ECM activities include, but are not limited to, lead and asbestos mitigation, unforeseen conditions, construction administration tasks and LAUSD support staff. LADWP will invoice LAUSD for completing non-ECM work. The non-ECM budget is estimated at $435,004 which is 23.4% of the ECM costs.",435,2022-Q3,2022-Q3,Planning,20220630 Darby ES,10370869,Darby ES - Purchase Furniture,Furniture/Fixtures/Equipment,3,Scott Schmerelson,Northwest,1334001,13797,10818 Darby Ave.,Northridge,91326,Purchase classroom furniture (tables and chairs),50,2019-Q4,2020-Q2,Closeout,20220630 San Miguel ES,10366530,San Miguel ES - HVAC & Roofing,HVAC,5,Jackie Goldberg,East,1687501,14741,9801 San Miguel Ave.,South Gate,90280,"This project upgrades the existing heating, ventilation, and air conditioning (HVAC) systems for 5 classroom buildings, the office/library building, and the multipurpose building. The project also replaces the deteriorated roofing, provides a fire suppression system in the kitchen, and provides temporary HVAC units during construction. The existing equipment and roofing is over 28 years old and in poor condition resulting in frequent system failures and unreliable service.","6,250",2017-Q4,2019-Q2,Closeout,20220630 Liberty ES,10371232,Liberty ES - Secure Entry System,Security System,5,Jackie Goldberg,East,1486301,13599,2728 Liberty Blvd.,South Gate,90280,Install new secure entry system at door to main office with three video receivers in main office.,26,2020-Q3,2020-Q3,Closeout,20220630 Fletcher ES,10371318,Fletcher ES - 2020-21 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,"This project is a charter school renovation for ISANA Octavia Academy for a single-year term with an expiration date of 6/30/21. The 2020-21 Prop. 39 co-location approved in Board of Education Report No. 313-19/20 includes 1 charter office, 1 special education room, and 9 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",34,2020-Q2,2020-Q3,Closeout,20220630 Elizabeth Learning Center,10368156,Elizabeth Learning Center - Comprehensive Modernization,Comprehensive Modernization,5,Jackie Goldberg,East,1354801,13480,4811 Elizabeth St.,Cudahy,90201,"This project includes the construction of new buildings and site improvements with approximately 53 general and specialty classrooms, instructional support spaces, library, outdoor quads, covered walkway connecting the existing lunch shelter and arcades, parking, kindergarten and elementary school playgrounds, and secondary school play areas with tennis, basketball, and volleyball courts. Existing school facilities will be upgraded including the modernization and seismic retrofit of the administration building; and new roofing and HVAC system for the gymnasium. The remaining buildings will receive minor interior classroom improvements and exterior paint. The project also includes the demolition of classroom buildings #7A, #8A & #9 and 22 relocatable buildings. Throughout the school site, infrastructure such as utilities, safety and security systems, and technology networks will be upgraded and programmatic access and landscape/hardscape areas will be improved.","134,407",2022-Q1,2026-Q1,Construction,20220630 Hazeltine ES,10372290,Hazeltine ES - Secure Entry System,Security System,3,Scott Schmerelson,Northeast,1449301,13529,7150 Hazeltine Ave.,Van Nuys,91405,Install new secure entry system at the Main Office.,45,2022-Q3,2022-Q4,Planning,20220630 Foshay Learning Center,10372083,Foshay Learning Center - Roofing,Roofing,1,"Dr. George J. McKenna, III",Central,1813201,13474,3751 S. Harvard Blvd.,Los Angeles,90018,"This project is to provide approximately 92,142 square feet of new roofing sitewide, including the installation of new gutters and downspouts, gravity vents, and painting of affected areas.","2,252",2024-Q3,2025-Q1,Planning,20220630 52nd St. ES,10372530,52nd St. ES - Secure Entry System,Security System,1,"Dr. George J. McKenna, III",West,1380801,13307,816 W. 51st St.,Los Angeles,90037,Install new secure entry system at the Main Office.,35,2022-Q3,2022-Q4,Planning,20220630 Maywood Academy HS,10369073,Maywood Academy HS - Security Upgrades,Security System,5,Jackie Goldberg,East,1888201,13922,6125 Pine Ave.,Maywood,90270,Provide security upgrades by installing exit door alarms for the building housing the cafeteria and classrooms and a 12-camera closed-circuit television (CCTV) system for video surveillance.,79,2019-Q1,2019-Q1,Closeout,20220630 Westminster Math & Technology/Environmental Studies Magnet ES,10370790,Westminster ES - Macbooks,Communications/Technology Upgrade,4,Nick Melvoin,West,1769901,13483,1010 Abbot Kinney Blvd.,Venice,90291,Purchase (21) MacBooks,26,2019-Q3,2019-Q4,Closeout,20220630 Esperanza ES,10371796,Esperanza ES - Roofing,Roofing,2,Monica Garcia,Central,1238301,13824,680 Little St.,Los Angeles,90017,"This project is to provide approximately 50,464 square feet of new roofing sitewide, including the installation of new gutters and downspouts, skylights, gravity vents, and painting of affected areas.","1,128",2022-Q4,2023-Q2,Planning,20220630 Victoria ES,10369044,Victoria ES - Portable Removal,Portable Removal,5,Jackie Goldberg,East,1750701,13493,3320 Missouri Ave.,South Gate,90280,"Removal of 1 bungalow. Abatement of hazardous materials, disconnection of low and high voltage utilities, and repair/replacement of asphalt at building footprint.",400,2018-Q1,2018-Q4,Closeout,20220630 Ford ES,10369883,Ford ES - Portable Removal,Portable Removal,2,Monica Garcia,East,1391801,13503,1112 S. Ford Blvd.,Los Angeles,90022,"Demolish and remove 3 portable buildings. Disconnect all ITD components and utilities and reconnect to existing onsite buildings. Remove all hazardous materials offsite and perform Phase 1, 2, and 3 onsite monitoring. Repair/Replace asphalt paving.",165,2018-Q3,2019-Q1,Closeout,20220630 95th St. ES,10366439,95th St. ES - Roof Replacement,Roofing,1,"Dr. George J. McKenna, III",West,1552101,13349,1109 W. 96th St.,Los Angeles,90044,"This project is to replace the roofing on seven classroom buildings. The roofing is more than 35 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",521,2015-Q1,2015-Q2,Closeout,20220630 Normont ES,10368041,Normont ES - Restroom Upgrades,Access Compliance,7,Tanya Ortiz Franklin,South,1564401,13652,1001 W. 253rd St.,Harbor City,90710,"Modify kindergarten Jack & Jill restroom; enlarge doorway, provide and install folding changing table, and replace standard toilets with kindergarten size.",2,2016-Q4,2017-Q1,Closeout,20220630 Main ES,10369492,Main ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,Central,1506801,13272,129 E. 53rd St.,Los Angeles,90011,"Replace deteriorated side-by-side interior walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new side-by-side interior walk-in freezer and walk-in cooler, and refrigeration equipment.",233,2020-Q3,2021-Q1,Closeout,20220630 Liberty ES,10369762,Liberty ES - 2018-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1486301,13599,2728 Liberty Blvd.,South Gate,90280,"This project is a charter school renovation for KIPP Corazon Academy for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades K-2 and 5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",9,2018-Q2,2018-Q3,Closeout,20220630 Los Angeles Academy MS,10369767,Los Angeles Academy MS - 2018-19 Prop 39,Charter Prop 39,7,Tanya Ortiz Franklin,Central,1820001,13890,644 E. 56th St.,Los Angeles,90011,"This project is a charter school renovation for Summit Preparatory Charter School for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office, 1 special education room, and 11 instructional spaces for charter student seats in grades 4-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",39,2018-Q2,2018-Q3,Closeout,20220630 Middleton ES,10369772,Middleton ES - 2018-19 Prop 39,Charter Prop 39,5,Jackie Goldberg,East,1530101,13649,6537 Malabar St.,Huntington Park,90255,"This project is a charter school renovation for KIPP Corazon Academy for a single-year term with an expiration date of 6/30/19. The 2018-19 Prop. 39 co-location approved in Board of Education Report No. 429-17/18 includes 1 charter office and 11 instructional spaces for charter student seats in grades K-2 and 5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",83,2018-Q2,2018-Q3,Closeout,20220630 Stoner ES,10370046,Stoner ES - Technology Upgrades & Storage,Communications/Technology Upgrade,4,Nick Melvoin,West,1695201,13772,11735 Braddock Dr.,Culver City,90230,"Purchase 30 iPads, 80 Chromebooks, and 3 storage carts.",43,2018-Q4,2019-Q1,Closeout,20220630 Hale Charter Academy MS,10366527,Hale Charter Academy MS - Paving,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1816901,13873,23830 Califa St.,Woodland Hills,91367,"The 25-year-old asphalt concrete paving on the campus is severely damaged and in need of replacement. The scope of work includes replacing deteriorated asphalt concrete pavement, redesigning the outdoor athletic areas to meet current requirements, and replacing or repairing outdoor apparatus, lunch tables and fencing as needed. In addition, the project includes upgrades to drainage systems as required by DSA and the District's Storm Water Technical Manual and meets accessibility requirements of the Americans with Disabilities Act (ADA) with upgrades to restrooms, drinking fountain, and path of travel improvements.","6,384",2017-Q2,2018-Q2,Closeout,20220630 Gratts EEC,10367326,Gratts EEC - Technology Upgrade,IT Network Upgrade,2,Monica Garcia,Central,1944301,13931,1415 W. 5th St.,Los Angeles,90017,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",114,2016-Q2,2016-Q4,Closeout,20220630 Westchester Enriched Sciences Magnets,10366297,Pilot School - Incubator School at Westchester Enriched Sciences Magnets,Reconfiguration,4,Nick Melvoin,West,1894301,13606,7400 W. Manchester Ave.,Los Angeles,90045,"Reconfigure and upgrade 7 classrooms, 2 administrative offices, and 4 workrooms at Westchester Enriched Sciences Magnets to create separate and distinct facilities space that enables the successful operation of the Incubator School.",276,2014-Q2,2014-Q3,Closeout,20220630 Breed ES,10367663,Breed ES - 2016-17 Prop 39,Charter Prop 39,2,Monica Garcia,East,1249301,13281,2226 E. 3rd St.,Los Angeles,90033,"This project is a charter school renovation for Extera Public School - Breed for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office and 12 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",70,2016-Q2,2016-Q3,Closeout,20220630 Limerick ES,10369468,Limerick ES - Walk-In Freezer Modernization,Food Services Renovation,3,Scott Schmerelson,Northwest,1488101,13697,8530 Limerick Ave.,Canoga Park,91306,"Replace deteriorated exterior walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new exterior walk-in freezer/cooler combination unit, refrigeration equipment, and refrigeration lines.",159,2023-Q1,2023-Q4,Planning,20220630 Farmdale ES,10367498,Farmdale ES - Roofing,Roofing,2,Monica Garcia,East,1374001,15166,2660 Ruth Swiggett Dr.,Los Angeles,90032,"This project is to upgrade 60,000 square feet of roofing at seventeen buildings and arcades with a Polyvinyl Chloride (PVC) material. The roofs are over 20 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.","1,046",2016-Q4,2017-Q3,Closeout,20220630 Fair ES,10367679,Fair ES - 2016-17 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1371201,13600,6501 Fair Ave.,North Hollywood,91606,"This project is a charter school renovation for New Horizons Charter Academy for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 11 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",315,2016-Q2,2016-Q3,Closeout,20220630 Dodson MS,10368877,Dodson MS-Portable Removal,Portable Removal,7,Tanya Ortiz Franklin,South,1811001,13846,28014 Montereina Dr.,Rancho Palos Verdes,90275,"Removal of 2 Bungalow Classroom Buildings. We will be disconnecting electrical and plumbing utilities (gas, water and sewer), fire alarms, condensation lines, bard guards and low voltage.",239,2017-Q2,2017-Q3,Closeout,20220630 Nobel Charter MS,10369430,Nobel Charter MS - Roofing,Roofing,3,Scott Schmerelson,Northwest,1827201,13805,9950 Tampa Ave.,Northridge,91324,"The project will replace approximately 230,000 square feet of deteriorated roofing campus-wide with new Polyvinyl Chloride (PVC) material and metal flashing. The scope of work also includes replacing damaged wood, installing new gutters and downspouts, and painting to match existing areas affected in the roof demolition. The existing roof-mounted heating, ventilation, and air conditioning (HVAC) units and ductwork will be protected in place.","3,677",2020-Q1,2020-Q3,Closeout,20220630 Webster MS,10367720,Webster MS - 2016-18 Prop 39 (Magnolia Science Academy #4),Charter Prop 39,4,Nick Melvoin,West,1848101,13741,11330 W. Graham Pl.,Los Angeles,90064,"This project was initially approved in BOE Report No. 373-15/16 for 2016-17 Prop. 39 co-location for Magnolia Science Academy #4. This reconfiguration project included 1 charter office, 1 special education room, and 7 instructional spaces for charter students in grades 6-12, and reduced the spaces previously allocated to Magnolia Science Academy # 4 during the 2015-16 school year. The scope of work included facilities renovations and reconfigurations, recovery of furniture and equipment, and recovery of technology. The project was amended in BOE Report No. 530-16/17 for 2017-18 Prop. 39 co-locations as a ""no growth"" project with 1 charter office and 11 instructional spaces for charter students in grades 6-12 and with a scope of work that is not yet defined and a revised expiration date for the charter school of 6/30/18.",1,2016-Q3,2017-Q1,Closeout,20220630 Bradley Global Awareness Magnet ES,10367662,Bradley Global Awareness Magnet - 2016-17 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1712301,13516,3875 Dublin Ave.,Los Angeles,90008,"This project is a charter school renovation for Libertas College Preparatory for a single-year term with an expiration date of 6/30/17. The 2016-17 Prop. 39 co-location approved in Board of Education Report No. 373-15/16 includes 1 charter office, 1 special education room, and 7 instructional spaces for charter student seats in grades 4-6. The scope of work includes facilities renovations and reconfigurations, technology, and communication/safety purchases and upgrades.",39,2016-Q2,2016-Q3,Closeout,20220630 Carthay Environmental Studies Magnet ES,10102886,Carthay Environmental Studies Magnet ES - Non Air-Conditioned Spaces - Phase 1B,HVAC,1,"Dr. George J. McKenna, III",West,1284901,13461,6351 W. Olympic Blvd.,Los Angeles,90048,Non Air-Conditioned Spaces - Phase 1B,36,2012-Q4,2014-Q1,Closeout,20220630 Central Continuation HS,10368938,Central Continuation HS - Technology & Security Upgrades,Communications/Technology Upgrade,2,Monica Garcia,Central,1858001,14201,"716 E. 14th St., 2nd Floor",Los Angeles,90021,"Provide and install 24 computers for 3 satellite campuses (Central HS Office, Central Academy, and Elysian Valley United) and upgrade security for the computer room at Central Academy.",35,2017-Q3,2017-Q3,Closeout,20220630 McBride Special Education Center,10004596,McBride Special Education Center - Facelift,Facelift,4,Nick Melvoin,West,1195201,15205,3960 Centinela Ave.,Los Angeles,90066,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",29,2016-Q1,2016-Q3,Closeout,20220630 Vine ES,10004606,Vine ES - Facelift,Facelift,4,Nick Melvoin,West,1753401,13342,955 N. Vine St.,Los Angeles,90038,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",139,2012-Q2,2016-Q3,Closeout,20220630 Hoover ES,10004607,Hoover ES - Facelift,Facelift,5,Jackie Goldberg,Central,1458901,13298,2726 Francis Ave.,Los Angeles,90005,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",40,2012-Q3,2016-Q3,Closeout,20220630 Van Ness ES,10366513,Van Ness ES - ADA Improvements,Access Compliance,4,Nick Melvoin,West,1742501,13393,501 N. Van Ness Ave.,Los Angeles,90004,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 76 doors/hardware, 26 accessible paths of travel, 50 signs, 20 restrooms, 12 drinking fountains/sinks, 2 assistive listening devices/intercoms/phones, 4 concrete ramps, 1 metal ramp, 1 piece of accessible furniture, 4 railings, 2 existing elevator modifications, 1 parking area, 5 door modifications/auto openers, 1 changing room, and 1 passenger/bus loading zone.","4,218",2019-Q2,2020-Q3,Closeout,20220630 Calahan ES,10370107,Calahan ES - Parking Gates,Fencing,3,Scott Schmerelson,Northwest,1270601,13747,18722 Knapp St.,Northridge,91324,Install swing gates at both entrances to faculty parking lot,19,2019-Q1,2019-Q2,Closeout,20220630 White MS,10368148,White MS - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1848701,13708,22102 S. Figueroa St.,Carson,90745,"Replace deteriorated walk-in freezer/cooler combination unit by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new walk-in freezer/cooler combination unit and refrigeration equipment.",132,2017-Q1,2017-Q2,Closeout,20220630 Magnolia ES,10369809,Magnolia ES - Secure Entry System,Security System,5,Jackie Goldberg,Central,1505501,13302,1626 S. Orchard Ave.,Los Angeles,90006,Install new secure entry system at main entrance.,14,2018-Q3,2018-Q3,Closeout,20220630 Open Magnet Charter ES,10370045,Open Magnet Charter ES - Electronic Marquee,Electrical/Lighting,4,Nick Melvoin,West,1588901,13633,5540 W. 77th St.,Los Angeles,90045,Install new electronic free-standing marquee,61,2019-Q2,2019-Q2,Closeout,20220630 Dana MS,10367939,Dana MS - ADA Improvements,Access Compliance,7,Tanya Ortiz Franklin,South,1810401,15063,1501 S. Cabrillo Ave.,San Pedro,90731,"This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 87 doors/hardware, 55 accessible paths of travel, 65 signs, 11 restrooms, 5 drinking fountains/sinks, 2 assistive listening devices/intercoms/phones, 1 concrete ramp, 6 metal ramps, 18 pieces of accessible furniture, 2 assembly seats, 7 railings, 1 existing elevator modification, 2 locker room modifications/lockers, 2 cafeteria counters, 1 new elevator/stage lift, and 1 passenger/bus loading zone.","5,965",2018-Q1,2023-Q1,Construction,20220630 Ambler ES,10366441,Ambler ES - Roof Replacement,Roofing,7,Tanya Ortiz Franklin,South,1208901,13833,319 E. Sherman Dr.,Carson,90746,"This project is to replace the roofing on seven classroom buildings. The roofing is more than 15 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",198,2015-Q1,2015-Q2,Closeout,20220630 Alexandria ES,10366478,Alexandria ES - Electronic Camera Main Door Entry,Security System,2,Monica Garcia,Central,1204101,13456,4211 Oakwood Ave.,Los Angeles,90004,Upgrade physical security of the school by purchasing and installing an electronic camera door entry system at the main entrance,21,2015-Q3,2015-Q4,Closeout,20220630 49th St. ES,10004622,49th St. ES - Facelift,Facelift,7,Tanya Ortiz Franklin,Central,1393201,13348,750 E. 49th St.,Los Angeles,90011,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",146,2012-Q3,2016-Q3,Closeout,20220630 Walnut Park ES,10004630,Walnut Park ES - Facelift,Facelift,5,Jackie Goldberg,East,1464001,13825,2642 E. Olive St.,Huntington Park,90255,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",109,2012-Q2,2016-Q3,Closeout,20220630 Audubon MS,10366936,Audubon MS - Replace Roof on 8 Buildings,Roofing,1,"Dr. George J. McKenna, III",West,1802801,13564,4120 11th Ave.,Los Angeles,90008,"This project is to upgrade 87,700 square feet of roofing on 8 buildings with a Polyvinyl Chloride (PVC) material. The roofs are over 40 years old. The proposed project includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition. The scope of work also includes the replacement of approximately 5,500 square feet of clay tile roofing on the south portion of the assembly hall building.","1,274",2016-Q3,2017-Q1,Closeout,20220630 Hawaiian EEC,10106576,Hawaiian EEC - Replace Astroturf Play Area,Paving/Greening/Playground Equipment,7,Tanya Ortiz Franklin,South,1952201,16284,501 Hawaiian Ave.,Wilmington,90744,Replace Astroturf Play Area,4,2014-Q2,2014-Q3,Closeout,20220630 Sunny Brae ES,10365749,Sunny Brae ES - Replace Playground Matting,Paving/Greening/Playground Equipment,3,Scott Schmerelson,Northwest,1698601,13737,20620 Arminta St.,Canoga Park,91306,Replace deteriorated playground matting systems to ensure the health and safety of students.,76,2014-Q4,2015-Q1,Closeout,20220630 Fair ES,10368806,Fair ES - 2017-18 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1371201,13600,6501 Fair Ave.,North Hollywood,91606,"This project is a charter school renovation for New Horizons Charter Academy for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 11 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",42,2017-Q2,2017-Q3,Closeout,20220630 Fulton College Preparatory School,10368809,Fulton College Preparatory School - 2017-18 Prop 39,Charter Prop 39,6,Kelly Gonez,Northeast,1814201,13543,7477 Kester Ave.,Van Nuys,91405,"This project is a charter school renovation for Lashon Academy for a single-year term with an expiration date of 6/30/18. The 2017-18 Prop. 39 co-location approved in Board of Education Report No. 530-16/17 includes 1 charter office, 1 special education room, and 14 instructional spaces for charter student seats in grades K-5. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",56,2017-Q2,2017-Q3,Closeout,20220630 Miles EEC,10004284,Miles EEC - Shade Shelter,Lunch/Shade Shelter,5,Jackie Goldberg,East,1953501,16663,2855 Saturn Ave.,Huntington Park,90255,Two shade structures were added to the site. Includes path of travel improvements to meet accessibility requirements of the California Building Code and the Americans with Disabilities Act (ADA).,158,2013-Q4,2014-Q1,Closeout,20220630 Revere Charter MS,10004099,Revere Charter MS - Facelift,Facelift,4,Nick Melvoin,West,1835601,13665,1450 Allenford Ave.,Los Angeles,90049,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",169,2012-Q2,2016-Q3,Closeout,20220630 186th St. ES,10004652,186th St. ES - Facelift,Facelift,7,Tanya Ortiz Franklin,South,1575301,13303,1581 W. 186th St.,Gardena,90248,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",125,2012-Q4,2017-Q1,Closeout,20220630 Beckford Charter for Enriched Studies,10004572,Beckford Charter for Enriched Studies - Facelift,Facelift,3,Scott Schmerelson,Northwest,1233501,13836,19130 Tulsa St.,Northridge,91326,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",162,2013-Q2,2016-Q3,Closeout,20220630 135th St. ES,10366332,135th St. ES - Deteriorated Roofing Systems,Roofing,7,Tanya Ortiz Franklin,South,1587701,13607,801 W. 135th St.,Gardena,90247,"The roofing system on the lunch shelter, arcades, cafeteria building, and 12 classroom buildings is more than 35 years old and consists of multiple layers and patches. The project will replace the roofing systems on these buildings and includes the installation of new metal flashing, replacement of damaged wood, and painting to match existing areas affected in the roof demolition.",691,2015-Q1,2015-Q3,Closeout,20220630 Berendo MS,10004101,Berendo MS - Facelift,Facelift,5,Jackie Goldberg,Central,1805701,13274,1157 S. Berendo St.,Los Angeles,90006,"Improve the visual conditions of District-owned schools with maintenance improvements such as landscaping, deep cleaning, debris removal, and various repairs",217,2012-Q1,2016-Q3,Closeout,20220630 Los Angeles HS,10366245,Los Angeles HS - 2014-15 Prop 39,Charter Prop 39,1,"Dr. George J. McKenna, III",West,1873601,13361,4650 W. Olympic Blvd.,Los Angeles,90019,"This project is a charter school renovation for Math and Science College Preparatory for a single-year term with an expiration date of 6/30/15. The 2014-15 Prop. 39 co-location approved in Board of Education Report No. 342-13/14 includes 1 charter office and 8 classrooms for 214.7 charter student seats in grades 9-10. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",59,2014-Q2,2014-Q3,Closeout,20220630 Virgil MS,10100186,Virgil MS - Seismic Retrofit Upgrades - Phase II,Portable Upgrade,2,Monica Garcia,Central,1846201,13382,152 N. Vermont Ave.,Los Angeles,90004,Seismic Retrofit Upgrades - Phase II,148,2012-Q2,2015-Q3,Closeout,20220630 112th St. EEC,10367285,112th St. EEC - Technology Upgrade,IT Network Upgrade,7,Tanya Ortiz Franklin,South,1954601,16623,1319 E. 112th St.,Los Angeles,90059,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",90,2016-Q3,2016-Q4,Closeout,20220630 28th St. EEC,10367287,28th St. EEC - Technology Upgrade,IT Network Upgrade,5,Jackie Goldberg,Central,1959501,13325,747 E. 28th St.,Los Angeles,90011,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",76,2016-Q3,2016-Q3,Closeout,20220630 95th St. EEC,10367293,95th St. EEC - Technology Upgrade,IT Network Upgrade,1,"Dr. George J. McKenna, III",West,1953801,16684,1027 W. 96th St.,Los Angeles,90044,"Project scope includes the replacement of obsolete and failing equipment and deteriorating cabling, installation of wireless network infrastructure and fiber to increase bandwidth, and associated IT upgrades.",74,2016-Q3,2016-Q3,Closeout,20220630 Chatsworth Charter HS,10364099,Chatsworth HS - Roofing,Roofing,3,Scott Schmerelson,Northwest,1858301,13870,10027 Lurline Ave.,Chatsworth,91311,"The project will remove and replace all 264,100 square feet of existing roofing on 21 buildings consisting of 116 classrooms and arcades. The roofing has separated and deteriorated in several areas and repairs have been unsuccessful.","2,010",2014-Q3,2015-Q2,Closeout,20220630 Napa ES,10367136,Napa ES - Privacy Fencing,Fencing,3,Scott Schmerelson,Northwest,1544601,13701,19010 Napa St.,Northridge,91324,"Provide upgrades and address safety concerns by installing new privacy fencing around the garden area, and installing a new roll gate and fencing at the east end of the campus. ",37,2016-Q3,2017-Q1,Closeout,20220630 Northridge MS,10367139,Northridge MS - 40 Computers & 2 Color Printers,Communications/Technology Upgrade,3,Scott Schmerelson,Northwest,1828301,13740,17960 Chase St.,Northridge,91325,Increase school's access to technology by providing forty new desktop computers and two color printers for computer lab.,70,2015-Q4,2016-Q1,Closeout,20220630 Delevan ES,10366616,Delevan ES-Alterations for changing tables,Access Compliance,5,Jackie Goldberg,Central,1339701,13455,4168 W. Ave. 42,Los Angeles,90065,Provide & Install Exhaust Fan and Privacy Screen for Changing Table; Relocate Existing Cabinet,21,2014-Q4,2015-Q1,Closeout,20220630 Aldama ES,10365674,Aldama ES - Replace Playground Matting,Paving/Greening/Playground Equipment,2,Monica Garcia,Central,1202701,13401,632 N. Ave. 50,Los Angeles,90042,Replace deteriorated playground matting systems to ensure the health and safety of students.,17,2015-Q2,2015-Q2,Closeout,20220630 Fletcher ES,10370585,Fletcher ES - 2019-20 Prop 39,Charter Prop 39,5,Jackie Goldberg,Central,1387701,13472,3350 Fletcher Dr.,Los Angeles,90065,"This project is a charter school renovation for ISANA Octavia Charter School for a single-year term with an expiration date of 6/30/20. The 2019-20 Prop. 39 co-location approved in Board of Education Report No. 343-18/19 includes 1 charter office, 1 special education room, and 8 instructional spaces for charter student seats in grades K-8. The scope of work includes facilities renovations and reconfigurations, technology, furniture and equipment, and communication/safety purchases and upgrades.",163,2019-Q2,2019-Q3,Closeout,20220630 Moneta Continuation HS,10367580,Moneta Continuation HS - HVAC,HVAC,7,Tanya Ortiz Franklin,South,1866601,16461,17951 Budlong Ave.,Gardena,90248,"This project will upgrade the heating, ventilation, and air conditioning (HVAC) systems in 4 classroom buildings. The HVAC systems are over 15 years old and beyond economical repair.","1,033",2020-Q4,2022-Q1,Closeout,20220630 Santee Education Complex,10366467,Santee LC-Strobe Visual Aid,Access Compliance,5,Jackie Goldberg,Central,1871601,13945,1921 S. Maple Ave.,Los Angeles,90011,Strobe Visual Aid,2,2014-Q3,2014-Q4,Closeout,20220630 Graham ES,10368154,Graham ES - Walk-In Freezer Modernization,Food Services Renovation,7,Tanya Ortiz Franklin,South,1421901,13476,8407 S. Fir Ave.,Los Angeles,90001,"Replace deteriorated walk-in freezer and walk-in cooler by removing all insulation, metals, panels, refrigeration equipment, and existing core/shell space, and installing new walk-in freezer, walk-in cooler, refrigeration equipment, and refrigeration lines.",130,2017-Q1,2017-Q3,Closeout,20220630 Wadsworth ES,10370333,Wadsworth ES - Parent & Family Center,Campus Improvement,5,Jackie Goldberg,Central,1758901,13383,981 E. 41st St.,Los Angeles,90011,"Modernize parent & family center as needed by installing new whiteboards/bulletin boards, window blinds, projector screen, and security upgrades on all doors (metal skins and new locking mechanisms); and replacing deteriorated floor tiles, ceiling tiles, and light fixtures and lenses. Provide new furniture including tables, chairs, and storage. Install signage identifying and leading to the center. Provide 20 new Chromebooks with a storage/charging cart, 1 laptop for the Parent Coordinator, a projector, and a document reader.",58,2019-Q1,2019-Q4,Closeout,20220630 Breed ES,10371637,Breed ES - Exterior Painting,Painting,2,Monica Garcia,East,1249301,13281,2226 E. 3rd St.,Los Angeles,90033,"Prepare, paint, and refinish the exterior of all buildings and all appurtenances including but not limited to, all walls, retaining walls, block walls, enclosures, storage containers, and all previously painted surfaces on the exterior of the site.",434,2021-Q2,2021-Q4,Closeout,20220630 International Studies Learning Center,10367011,International Studies Learning Center Addition,Addition,5,Jackie Goldberg,East,1870101,14621,5225 Tweedy Blvd.,South Gate,90280,"The International Studies Learning Center is a span school serving students in 6th through 12th grades that operates on two separate school sites. This project will construct new school facilities on the Legacy HS Complex campus to enable International Studies Learning Center to operate on one site as well as reduce the District's reliance on relocatable buildings at South Gate MS and align middle school enrollment in the South Gate area. The project will add a classroom building with approximately 33,000 square feet for 16 new classrooms, an administration area, food services and lunch shelter, staff and student restrooms, and support spaces. Additionally, a multipurpose room/gym building with approximately 12,000 square feet will be developed including changing room area with lockers, restrooms, showers, and coaches' office. The project will also provide a parking lot expansion and outdoor basketball/volleyball courts.","38,700",2017-Q3,2019-Q2,Closeout,20220630